    Demand estimation in

    Adelaide and

    development of yield

    criteria

    Unreasonable demand

    estimation

    Reasonable demand

    estimates and design

    criteria, no justification

    Some justification of methods,

    reasonable estimates of

    demand and yield criteria

    Good justification of methods,

    assumptions fully described,

    reasonable estimates of demand

    and yield criteria

    Excellent justification of

    methods, assumptions fully

    described, reasonable estimates

    of demand and yield criteria

    /10

    Environmental waterNo consideration of

    environmental demands

    Basic environmental

    demands considered

    Environmental water

    requirements articulated, and a

    set of quantitative

    environmental flow rules

    provided

    Environmental water

    requirements articulated and

    well justified, a set of

    quantitative environmental flow

    rules provided

    Excellent justification of

    environmental water

    requirements with references, a

    set of quantitative

    environmental flow rules

    provided

    /10

    Reservoir inflows under

    historical and future

    climate scenarios, and

    stochastic generation of

    data

    No consideration of future

    climate

    Reasonable reservoir inflows

    for all scenarios

    Reasonable reservoir inflows

    for all scenarios, future climate

    projections supported by

    appropriate references

    Reasonable reservoir inflows for

    all scenarios, future climate

    projections supported by

    appropriate references,

    stochastic generation tools used

    to enhance the amount of data

    available

    Reasonable reservoir inflows for

    all scenarios, future climate

    projections supported by

    appropriate references,

    stochastic generation tools used

    to enhance the amount of data

    available, budyko analysis of

    climate elasticity

    /15

    Flood storage capacityIncorrect consideration of

    flood storage

    Reasonable estimates of the

    10% AEP flood and flood

    storage design

    10% AEP flood correctly

    calculated, some consideration

    of assumptions when sizing the

    flood storage

    10% AEP flood correctly

    calculated, good consideration of

    assumptions when sizing the

    flood storage

    10% AEP flood correctly

    calculated, excellent

    consideration of assumptions

    when sizing the flood storage

    /15

    Reservoir dimensions and

    operation rules

    Incomplete calibration, no

    validation with no discussion

    Sizing of the reservoir

    (including specification of

    dead storage, active storage

    and flood storage levels, the

    outlet configuration and the

    spillway level) appropriate

    with little justification

    Sizing of the reservoir

    (including specification of dead

    storage, active storage and

    flood storage levels, the outlet

    configuration and the spillway

    level) appropriate and

    supported by the analysis

    Sizing of the reservoir (including

    specification of dead storage,

    active storage and flood storage

    levels, the outlet configuration

    and the spillway level)

    appropriate and supported by

    the analysis, operation rules

    summarised

    Sizing of the reservoir (including

    specification of dead storage,

    active storage and flood storage

    levels, the outlet configuration

    and the spillway level)

    appropriate and supported by the

    analysis, operation rules clearly

    articulated and justified

    /15

    Summary of final

    reservoir design

    performance

    Incorrect calculation of

    reservoir yield

    Reasonable yield from

    reservoir design

    Discussion of reservoir yield

    under both current and future

    climate conditions

    Good discussion of reservoir

    yield under both current and

    future climate conditions, yield

    articulated in terms of a

    percentage of adelaide's overall

    water demands currently and in

    the future, summary of

    necessary desalination

    production

    Excellent discussion of reservoir

    yield under both current and

    future climate conditions, yield

    articulated in terms of a

    percentage of adelaide's overall

    water demands currently and in

    the future, summary of necessary

    desalination production

    /10

    Comparison with natural

    catchment flows

    No comparison of natural

    flowsLimited comparison of flows

    Comparison of flows

    downstream of Mt Bold

    reservoir, including a number of

    flow metrics (10,50,95,99%

    quantiles of the daily flow

    duration curve, seasonal flow

    metrics and annual flow

    metrics)

    Good comparison of flows

    downstream of Mt Bold reservoir

    at multiple locations, including a

    number of flow metrics

    (10,50,95,99% quantiles of the

    daily flow duration curve,

    seasonal flow metrics and annual

    flow metrics)

    Comprehensive comparison of

    flows downstream of Mt Bold

    reservoir at multiple locations,

    including a number of flow

    metrics (10,50,95,99% quantiles

    of the daily flow duration curve,

    seasonal flow metrics and annual

    flow metrics)

    /10

    Executive Summary

    Poor clarity of expression,

    no summary of key points

    findings

    Satisfactory clarity of

    expression, some summary

    of key points

    Good clarity of expression,

    relevant and complete

    summary of key points

    Good clarity of expression,

    relevant and complete summary

    of key points, contains

    conclusions and

    recommendations

    Excellent clarity of expression,

    relevant and complete summary

    of key points, concise, contains

    conclusions and

    recommendations

    /5

    Report professionalismReport difficult to follow

    with significant errors

    Report lacks

    professionalism, difficult to

    identify sections, incorrect

    use of figures

    Report well structured,

    selection of relevent figures

    Report well structured and

    professionally written, figures

    used throughout the report with

    purpose to illustrate the main

    concepts and findings

    Report well structured and

    professionally written, figures

    used throughout the report to

    illustrate the main concepts and

    findings, reads like a real

    engineering report

    /10

    Demand Preparation (35%)

    Reservoir Design (50%)