![Page 1: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/1.jpg)
MARTA ART/BRT DESIGN STANDARDSPROJECT PROGRESSFEBRUARY 2019
![Page 2: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/2.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 2
PROJECT OVERVIEW
As MARTA expands its suite of bus and rapid transit services, there is a need to develop design standards for roll-out and development of new modes:
» Arterial Rapid Transit (ART) - HNTB
» Bus Rapid Transit (BRT) - HNTB
» Freeway BRT (FBRT) - WSP
Project Scope:
- High-level Service Standards for ART & BRT operations
- Runningway Standards
- Station Standards
- Bus Depot Impacts
![Page 3: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/3.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 3
PROJECT SCHEDULE
• Major Milestones
» Stakeholder Engagement Workshops: March
» Internal MARTA Workshop: April
» Stakeholder Review: May
» Final Deliverable: June
2019Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul2018
Kick-OffStakeholder Engagement
60% Draft
Final DeliverableInternal MARTA Workshop #1
ART/BRT
Freeway BRT
Major Milestones
HNTBKHA
WSP
Internal MARTA Workshop #2
![Page 4: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/4.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 4
BACKGROUND• MARTA ART Definition*
» “... fast and frequent enhanced transit routes on existing high density, mixed-use arterial corridors... short headway, transit signal priority, queue jumps and enhanced stops.”
• MARTA BRT Definition*
» “... fixed-route bus mode operating in a dedicated right-of-way during peak periods, emulates rail through defined stations, traffic signal priority, short headways, bidirectional services, pre-board ticketing, platform level boarding, and separate branding...”
* More MARTA Service Types Matrix
![Page 5: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/5.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 5
ART BRT• Frequent Service• Station Spacing• Open System• Off-board fare payment, mobile ticketing
• Frequent Service• Station Spacing• Open & Closed system• Off-board fare payment, mobile ticketing
• Queue Jump Lanes• BAT Lanes• TSP at most congested intersections
• Net-positive environmental impact• Achieve new cost savings
• Net-positive environmental impact• Achieve new cost savings• Green Infrastructure
• Build off existing MARTA brand • Customized station/mode brand• Limited advertising
• Separate system brand• Customized station branding• No or limited advertising
• Far-side, curb-aligning stations• Curb-level/near-level platform height• Enhanced stations
• Corridor-dependent: Far-side, curb & median-aligning• Larger, raised platforms• Enhanced stations
• Corridor-Specific decision: median-running or curb-running• Dedicated lanes (at least 50%)• TSP throughout alignment
• Listed below is preliminary guidance from the first Internal MARTA Workshop which will inform the development of characteristics for each service.
INTERNAL MARTA WORKSHOP #1
WORKSHOP RECAP
![Page 6: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/6.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 6
STAKEHOLDER INPUT
• Opportunities for Stakeholder Engagement:
» Interactive Workshop
» Input on Design
» Follow-up meetings as requested
» Review of DRAFT Document before it is finalized
![Page 7: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/7.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 7
STAKEHOLDER WORKSHOPS
• Meeting Details:
» Mid-March
» By County Jurisdicitons
• Stakeholders will:
» Receive overarching guidance for MARTA ART/BRT Service & Design Standards
» Learn how elements of ART/BRT will effect their local jurisdictions
» Have the opportunity to provide feedback to improve the quality of the standards overall.
Operations
Runningways
Stations
Sustainability
![Page 8: MARTA ART/BRT DESIGN STANDARDS» Final Deliverable: June 2018 Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul 2019 Kick-Off Stakeholder Engagement 60% Draft Internal MARTA Final Deliverable](https://reader033.vdocuments.net/reader033/viewer/2022060903/609f2bacd75b383d6e31e5c0/html5/thumbnails/8.jpg)
MARTA ART/BRT Design Standards - Project Overview Slide 8
QUESTIONS?