Page 1: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Measurements on pre-production wafers

at Udine

Presented by M. Cobalon behalf of the Udine groupPixel Week December 2001

Page 2: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Measured Wafers

• CiS • Tesla

- 4456-21- 4456-23- 4457-23- 4458-21

- A31-02- A31-07- A31-08- A31-12

Page 3: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Outline

• Tiles and diodes with guard ring– IV measurements– CV measurements– tile conformity

• SC’s and MC’s yield• Visual inspection

– ID marking correctness– visual inspection– mask alignment

Page 4: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

IV measurements

• This time, taken with 2-side chuck

• Temperature corrections applied

Page 5: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Diode position

n side

#17

#16

Page 6: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

IV meas. on diode #17 (CiS)

Page 7: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

IV meas. on diode #17 (Tesla)

Page 8: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Quality Control Parameters

• Tile conformity criteria:

– Vbd(tile)> Vop(diode)

– Slope=I(tile @ Vop)/I(tile @ Vop-50)<2

• Vop=max(Vdep+50,150)

• Need to measure Vdep

Page 9: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Capacitance offset

Page 10: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

CV results

Page 11: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

CV results

Page 12: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

- Measurements lie within 65 V < Vdep< 100 V

- Procedure specs demanded: 30 V < Vdep < 120 V

- For all wafers: Vdep <100 V

Vop= max(Vdep+50,150) = 150 V

Determination of Vdep and Vop

Page 13: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

• Cdep is between 1.7-4.2 (4.5-5.6) pF for CIS (Tesla)

• Determined as: Cdep=C(Vdep)-Coffset

Coffset of order of 0.2-0.7 pF (for positive polarity)

• lies within 2.1-3.3 kcm• conformity range is 2-5 kcm

Determination of Cdep and

Page 14: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Tile results (CiS)

• Results in agreement with CIS• 2 wafers with 2 good tiles• 2 wafers with 3 good tiles wafer 4456-21 with Slope (Tile 1) = 3.58

Page 15: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

SC and MC yield (CiS)

• SC’s: 6 x 4= 24

• 5 are bad (Vbd<150)

• 79% are good

• MC’s: 4 x 4 = 16

• 1 is bad (Vbd<150)

• 94% are good

Page 16: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

• Disagreement for 1 Wafer out of 4: Wafer A31-12 Slope(Tile 2): Our measure Tesla 2.08 1.85

Tile results (Tesla)

Page 17: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

• SC’s: 6 x 4=24

• 1 is bad (Vbd<150)

• 96% are good

• MC’s: 4 x 4=16

• 4 are bad (Vbd<150)

• 75% are good

SC and MC yield (Tesla)

Page 18: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

2- and 3-good-tile wafers:

– TILES: all 4 pads marked.– SC’s: only 1 of the 2 pads marked

(lower one).

– All markings are correct.

Scratch pad marking (CIS)

Page 19: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

2 and 3 good tiles wafers

– TILES: only 2 out of 4 pads marked.– SC’s: only 1 of the 2 pads marked

(lower one).

– All markings are correct.

Scratch pad marking (Tesla)

Page 20: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Visual Inspection (CiS)

• 4456-21n-side: Tile 2, small scratch (6 pixels)

#16, extended scratch (superficial)

• 4456-23n-side: Tile 1, one pixel defective Tile 2, “ “ Tile 3, three pixels defective #22, extended scratch (superficial) MC13, one pixel “larger”

Page 21: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Visual Inspection (Tesla)

• A31-02p-side: #17, small scratch

#12, small scratch

• A31-08n-side: #19, extended scratchp-side: bad end of the three top structures

Page 22: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Scratch

Page 23: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Mask alignment

vernier

Goal: Measure 2 mm misalignmentUse: “Nikon Optiphot 150” @ 200-500 X

Page 24: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Mask alignment (CiS)

•Good contrast•For vertical vernier, 4 vs 5 bars

Page 25: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Mask alignment (CiS)

• Out of specifications:

Wafer 4457-23: n-side, left pad, 4th hor. right pad, 4th hor.

p-side, right pad, 4th hor.

Wafer 4456-23: n-side, right pad, 4th hor. p-side, right pad, 4th hor.

Wafer 4458-21: n-side, left pad, 4th hor. right pad, 4th hor. p-side, right pad, 4th hor.

Page 26: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

• Quite bad contrast for all the vernier• All 3rd vernier are missing• All the 4th vernier are badly printed

Mask alignment (Tesla)

Page 27: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Mask alignment (Tesla)

• Out of specifications:

Wafer A31-02: p-side, right pad, 1st vert.

Wafer A31-07: p-side, right pad, 1st vert.

Wafer A31-12: p-side, left pad, 4th vert.

Page 28: Measurements on pre-production wafers at Udine Presented by M. Cobal on behalf of the Udine group Pixel Week December 2001

Database

•The new wafers (both CiS and Tesla) have been already inserted in the database

• IV measurements will be added very soon

•For CV measurements, needs to understand better