1 Authority Meeting #6/12 Chair: Gerri Lynn O'Connor Vice Chair: Maria Augimeri Members: July 27, 2012 9:30 a.m. WESTON ROOM B, BLACK CREEK PIONEER VILLAGE AGENDA AUTH Material for Consideration at Authority Meetings Only EX Material Considered by the Executive Committee Prior to the Authority BAAB Material Considered by the Budget/Audit Advisory Board Prior to the Authority AUTH1. MINUTES OF MEETING #5/12, HELD ON JUNE 22, 2012 (Minutes Enclosed Herewith on WHITE ) AUTH2. BUSINESS ARISING FROM THE MINUTES AUTH3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF AUTH4. DELEGATIONS AUTH5. PRESENTATIONS (AUTH5.1 - AUTH5.2) AUTH5.1 A presentation by Pamela Veinotte, Superintendent, Rouge National Urban Park, Parks Canada, in regard to the Rouge National Urban Park. AUTH5.2 A presentation Sonya Meek, Manager, Watershed Planning, TRCA, in regard to item AUTH7.1 - Sustainable Neighbourhood Retrofit Action Plan Updates.

Upload: others

Post on 17-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

1

Authority Meeting #6/12

Chair: Gerri Lynn O'ConnorVice Chair: Maria AugimeriMembers:

July 27, 2012

9:30 a.m.WESTON ROOM B, BLACK CREEK PIONEER VILLAGE

AGENDA

AUTH Material for Consideration at Authority Meetings OnlyEX Material Considered by the Executive Committee Prior to the AuthorityBAAB Material Considered by the Budget/Audit Advisory Board Prior to the Authority

AUTH1. MINUTES OF MEETING #5/12, HELD ON JUNE 22, 2012(Minutes Enclosed Herewith on WHITE)

AUTH2. BUSINESS ARISING FROM THE MINUTES

AUTH3. DISCLOSURE OF PECUNIARY INTEREST AND THE GENERAL NATURE THEREOF

AUTH4. DELEGATIONS

AUTH5. PRESENTATIONS(AUTH5.1 - AUTH5.2)

AUTH5.1 A presentation by Pamela Veinotte, Superintendent, Rouge National Urban Park, Parks Canada, in regard to the Rouge National Urban Park.

AUTH5.2 A presentation Sonya Meek, Manager, Watershed Planning, TRCA, in regard to item AUTH7.1 - Sustainable Neighbourhood Retrofit Action Plan Updates.

Page 2: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

2

AUTH7. SECTION I - ITEMS FOR AUTHORITY ACTION(AUTH7.1 - AUTH7.15, Hold AUTH7.1 for Presentation, AUTH7.15 is a New Item)

HOLD FOR PRESENTATIONAUTH7.1 SUSTAINABLE NEIGHBOURHOOD RETROFIT ACTION PLAN

Status Update 37

AUTH7.2 MARIE CURTIS PARK REVITALIZATION PROJECT - PHASE 2 46

AUTH7.3 KORTRIGHT VISITORS CENTRE RETROFIT PHASE 2 PROJECT Contract PMO12-07 48

AUTH7.4 MIMICO WATERFRONT PARK PROJECT (PHASE 2)Contract RSD12-86 53

AUTH7.5 CHERRY BEACHDrainage Improvements 55

AUTH7.6 SUPPLY OF RENTAL RATES FOR OPERATED HEAVY CONSTRUCTION EQUIPMENT AND DUMP TRUCKSContract Extension 58

AUTH7.7 COMMUNITY INFRASTRUCTURE IMPROVEMENT FUND 60

AUTH7.8 TORONTO AND REGION REMEDIAL ACTION PLAN 65

AUTH7.9 HIGHLAND CREEK WATERSHED GREENING PROJECTS UPDATE 68

AUTH7.10 BUILDING RESEARCH ESTABLISHMENTPartnership Memorandum of Understanding 75

AUTH7.11 DRAFT GREAT LAKES STRATEGY AND PROPOSED GREAT LAKES PROTECTION ACT, 2012 78

AUTH7.12 HERITAGE TOURISM TRAIL PLANNING AND A FIRST NATIONS CULTURAL CENTRE IN THE HUMBER RIVER WATERSHED 83

AUTH7.13 NATURAL RESOURCES CANADA - ECOENERGY INNOVATION INITIATIVE (ECO II) - RENE 092Contribution Agreement 89

AUTH7.14 AUDITED FINANCIAL STATEMENTProfessional Access and Integration Enhancement Program 91

AUTH7.15 - NEW ITEMAUTH7.15 MIMICO WATERFRONT LINEAR PARK PROJECT (PHASE 2)

Landscape ImprovementsContract RSD12-91 130

Page 3: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

3

AUTH8. SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD(AUTH8.1 - AUTH8.5)

AUTH8.1 2011 CORPORATE SOCIAL RESPONSIBILITY REPORT 102

AUTH8.2 SUMMARY OF PROCUREMENTSMid-year Review - January 1, 2012 to June 30, 2012 111

AUTH8.3 GOOD NEWS STORIES 124

AUTH8.4 IN THE NEWS 128

AUTH8.5 WATERSHED COMMITTEE MINUTES

AUTH8.5.1 DON WATERSHED REGENERATION COUNCILMinutes of Meeting #5/12, held on May 10, 2012

AUTH8.5.2 HUMBER WATERSHED ALLIANCEMinutes of Meeting #2/12, held on June 12, 2012

AUTH8.5.3 ROUGE PARK ALLIANCEMinutes of Meeting #2/12, held on April 20, 2012

EX. MATERIAL FROM EXECUTIVE COMMITTEE MEETING #5/12, HELD ON JULY 6, 2012

(Refer to Minutes printed on PINK)

BAAB. MATERIAL FROM BUDGET/AUDIT ADVISORY BOARD MEETING

(No meeting held this month )

NEW BUSINESS

NEXT MEETING OF THE AUTHORITY #7/12, TO BE HELD ON SEPTEMBER 28, 2012,

AT 9:30 A.M. IN WESTON ROOM B, BLACK CREEK PIONEER VILLAGE

Brian DenneyChief Administrative Officer

/jr

Page 4: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

4

EX. MATERIAL FROM EXECUTIVE COMMITTEE MEETING #4/12, HELD ON JUNE 1, 2012

(Refer to Minutes printed on PINK)

EX7. SECTION I - ITEMS FOR AUTHORITY ACTION(EX7.1 - EX7.8)

EX7.1 GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of York956414 Ontario LimitedCFN 47419 298

EX7.2 GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of YorkYorkwood Homes (RH) LimitedCFN 47513 301

EX7.3 GREENLANDS ACQUISITION PROJECT FOR 2011-2015Royal Rouge Trail Erosion Control ProjectCFN 45537 304

EX7.4 GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedGreenbrooke Developments Inc.CFN 47592 309

EX7.5 GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedInfinite Homes Ltd.CFN 47512 312

EX7.6 EASEMENT AGREEMENTGeorge Johnson 315

EX7.7 ALBION HILLS CONSERVATION AREA VISITOR SERVICES CENTRE CONSTRUCTION PROJECT 318

EX7.8 ADMITTANCE POLICY 321

EX8. SECTION II - ITEMS FOR EXECUTIVE ACTION

EX9. SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD(EX9.1)

EX9.1 BLACK CREEK HISTORIC BREWERYStatus Report 326

Page 5: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

5

EX10. ONTARIO REGULATION 166/06(EX10.1 - EX10.141, EX10.61, EX10.64-EX10.66 WERE WITHDRAWN)

PERMIT APPLICATIONS EX10.1 - EX10.11 ARE MAJOR APPLICATIONS

CITY OF BRAMPTON

EX10.1 BRAMPTON (NE) SHOPPING CENTRES LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 17, Concession 5, (Southeast Corner of Bramalea Road and Mayfield Road), in the City of Brampton, Humber River Watershed as located on the property owned by Brampton (NE) Shopping Centres Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to construct a temporary stormwater management facility and outfall structure associated with a plan of subdivision to allow a mixed-use development, consisting of 21,151 sq. m. of retail/service and 2,118 sq. m. of office related uses, intended to be the first phase of the District Retail centre within the Countryside Villages Secondary Plan. 329

CITY OF PICKERING

EX10.2 CITY OF PICKERING AND THE TOWN OF AJAXTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 18, Concession 3, Rossland Road near Brock Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering and the Town of Ajax. The purpose is to construct a stormwater management facility and associated wetland flow spreader. 329

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.3 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure on Plan 66R-1794, Assignment 14-04B - Topcliff Park and Derydown Park - 61 Topcliff Avenue near Demaris Avenue, in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to undertake stormwater management system improvements to alleviate surface storm water flooding and to improve the ability of the current system to convey major stormwater volumes from the roadway to the Black Creek discharge location. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 330

Page 6: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

6

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.4 1772014 ONTARIO INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 83, 36 Park Lawn Road, in the City of Toronto (Toronto and East York Community Council Area), Mimico Creek Watershed as located on the property owned by 1772014 Ontario Inc. The purpose is to excavate and install shoring to facilitate the future construction of an underground parking garage and multi-storey mixed use development at 36 Park Lawn Road in the City of Toronto. 330

CITY OF VAUGHAN

EX10.5 9829 HIGHWAY 27To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession 8, 9829 Highway 27, in the City of Vaughan, Humber River Watershed. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate the construction of a temporary sales centre, including three temporary sales buildings and parking area, at 9829 Highway 27 in the City of Vaughan. 330

EX10.6 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on East Half Lot 21, Concession 9, North of Major Mackenzie Drive and West of Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc.. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate grading and servicing in a draft approved plan of subdivision (19T-05V10) within Block 61 East, north of Major Mackenzie Drive and east of the Canadian Pacific Railway, in the City of Vaughan. 331

EX10.7 MOLISE KLEINBURG ESTATES SOUTH INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 22, 23, Concession 9, Highway 27 and Nashville Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Molise Kleinburg Estates South Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management facility (Phase 2 SWM Pond) and associated outfall to service Phase 2 of a draft approved plan of subdivision (19T-06V14) at 115 Putting Green Crescent (former Kleinburg Golf Course) in the City of Vaughan. 331

Page 7: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

7

EX10.8 VISTA PARC LIMITED AND RIMAX HEALTH INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 6, Concession 7, 4700 Highway 7 and 4650 Highway 7, in the City of Vaughan, Humber River Watershed as located on the property owned by Vista Parc Limited and Rimax Health Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a 7-storey residential condominium building with underground and surface parking, servicing, landscaping and amenity structures at 4700 Highway 7 in the City of Vaughan. The works also include a cut and fill balance within the Regional Storm flood plain, driveway upgrades and outfall construction at 4650 Highway 7. 332

TOWN OF RICHMOND HILL

EX10.9 VICTORIA EDUCATION CENTRE (2020207 ONTARIO INC.)To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Of West Half Lot 20, Concession 3, (9901 Leslie Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Victoria Education Centre (2020207 Ontario Inc.). The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the construction of an addition to the existing Victoria Education Centre, additional parking, and stormwater management LID measures (including drainage swales and bio-retention gallery). 332

TOWNSHIP OF KING

EX10.10 2149629 ONTARIO INC./GENVIEW HOMESTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 6, 7, Concession 4, 2890 King Road, in the Township of King, Humber River Watershed as located on the property owned by 2149629 Ontario Inc./Genview Homes. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management facility and associated outfall to service a draft approved plan of subdivision (19T-08K02) at 2890 King Road in the Township of King. 333

Page 8: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

8

EX10.11 2149629 ONTARIO INC./GENVIEW HOMESTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 6, 7, Concession 4, 2890 King Road, in the Township of King, Humber River Watershed as located on the property owned by 2149629 Ontario Inc./Genview Homes. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping, temporary and final rough lot grading, trail construction, landscaping and the installation of sediment and erosion control measures, including temporary sediment control ponds, in a draft approved plan of subdivision (19T-08K02) at 2890 King Road in the Township of King. 333

PERMIT APPLICATIONS EX10.12 - EX10.19 WERE MAJOR APPLICATIONS - ERRATA

CITY OF BRAMPTON

EX10.12 2073737 ONTARIO INC./2073740 ONTARIO INC.To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Lot 9, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by 2073737 Ontario Inc./2073740 Ontario Incorporated. The purpose is to undertake earthworks, servicing, the construction of a stormwater management pond and the construction of a pedestrian bridge within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton. 334

EX10.13 APPLEMOOR PROPERTIES LTD./STARVILLA HOMES CORPORATIONTo site grade on Lot 10, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Applemoor Properties Ltd./Starvilla Homes Corporation. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton. 334

EX10.14 MCVEANONE DEVELOPMENTS INC.To site grade on Lot 9, Concession 9, N.D.S., (East of McVean Drive, South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by McVeanone Developments Incorporated. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton. 334

Page 9: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

9

EX10.15 OPUS HOMES (RIVER'S EDGE) INC.To construct, reconstruct, erect or place a building or structure and site grade on Lot 9, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Opus Homes (River's Edge) Incorporated. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton. 335

CITY OF VAUGHAN

EX10.16 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, North of Major Mackenzie Drive and East of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of two culvert crossings of Tributary ‘A’ at Agar Street East and Agar Street West to service a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. 335

EX10.17 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, North of Major Mackenzie Drive and East of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a culvert crossing and sanitary sewer crossing of Tributary ‘A’ at Mactier Drive to service a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. 336

Page 10: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

10

TOWN OF MARKHAM

EX10.18 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Concession 5, (Warden Avenue and Highway 7), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater management pond, outfall, and outfall channel required as they relate to the broader servicing strategy for Markham Centre. 336

TOWN OF RICHMOND HILL

EX10.19 CASA EAST DEVELOPMENT INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 4, 5, Concession 2, Bayview Avenue and Bethesda Sideroad, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Casa East Development Inc.. The purpose is to place fill and initiate earthworks associated with a new residential plan of subdivision, within a wetland area of interference , and to facilitate temporary stormwater management measures required to support the earthworks. 336

CITY OF BRAMPTON

EX10.20 BRAMALEA CITY CENTRE EQUITIES INC. AND MORGUARD CORPORATIONTo construct, reconstruct, erect or place a building or structure on Part Lot 5, Concession 4, (25 Peel Centre Drive), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Bramalea City Centre Equities Inc. and Morguard Corporation. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the retrofit of an existing Zellers store to a Target store including an addition to the existing building associated with a municipal site plan application. 337

EX10.21 11 AVEENA ROADTo construct, reconstruct, erect or place a building or structure on 11 Aveena Road, in the City of Brampton, Humber River Watershed. The purpose is to undertake works within TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new deck structure at the rear of an existing residential dwelling associated with a municipal building permit. 337

Page 11: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

11

CITY OF PICKERING

EX10.22 CANADA POST CORPORATIONTo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 18, Concession 1, 1740 Kingston Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by Canada Post Corporation. The purpose is to regrade and extend a portion of the existing parking lot to the rear of the operating postal facility at 1740 Kingston Road in the City of Pickering. This application also includes a proposal to remove portion of the entrance to accommodate a new door of the concrete loading bay to the rear of the building. 337

EX10.23 CONSEIL SCHOLAIRE VIAMONDETo construct, reconstruct, erect or place a building or structure, site grade and interfere with a wetland on Part Lot 18, Concession 2, 2265 Brock Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by Conseil Scholaire Viamonde. The purpose is to construct a stormwater sewer outfall, site grading and recreational trail associated with a new public school. 338

EX10.24 ENBRIDGE PIPELINES INC.To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on 2300 Rosebank Road, in the City of Pickering, Petticoat Creek Watershed, as located on the property owned by Ashburton Asset Group Inc. The purpose is to conduct an integrity dig for an internal inspection of the Enbridge gas pipeline system to identify any cracks, corrosion or dents and to undertake necessary repairs at 2300 Rosebank Road, just north of Finch Avenue, in the City of Pickering. 338

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.25 52 BONNYVIEW DRIVETo construct, reconstruct, erect or place a building or structure on Lot 29, Plan 2234, 52 Bonnyview Drive, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to construct a new two-storey single family detached dwelling at 52 Bonnyview Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 338

EX10.26 GOTTARDO GALAXY INC. AND UIF GALAXY GP INC. PARTNERSHIPTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession 3, 165-175 Galaxy Boulevard, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Gottardo Galaxy Inc. and UIF Galaxy GP Inc. Partnership. The purpose is to conduct earth works including soil stripping and site grading. 339

Page 12: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

12

EX10.27 10 STEWART CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 83, Plan 66R-22634, 10 Stewart Avenue, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 10 Stewart Avenue in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 339

EX10.28 MARKLAND WOOD GOLF CLUBTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Plan 2432, 245 Markland Drive, in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on the property owned by Markland wood Golf Club. The purpose is to refurbish hole #4 and hole #6 tee complexes and resurface an existing cart path at Markland Wood Golf Club located at 245 Markland Drive in the City of Toronto (Etobicoke-York Community Council Area). 339

EX10.29 100 NORTH DRIVETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 56, Plan 965, 100 North Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 100 North Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 340

EX10.30 57 RIVERVIEW HEIGHTSTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, 2, Plan 3347, 57 Riverview Heights, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 57 Riverview Heights in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling and shed are to be demolished. 340

Page 13: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

13

EX10.31 17 FAIRGLEN CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 21, Plan 1945, 17 Fairglen Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 14 Fairglen Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 340

EX10.32 30 RIDGEVALLEY CRESCENTTo construct, reconstruct, erect or place a building or structure on Lot 13, Plan 3515, 30 Ridgevalley Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 30 Ridgevalley Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 341

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.33 1 OLD YONGE STREETTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Concession 1 EYS, 1 Old Yonge Street, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two storey replacement dwelling, with new in-ground swimming pool, rear deck and new retaining walls at 1 Old Yonge Street in the City of Toronto (North York Community Council Area). 341

EX10.34 12 CAMPBELL CRESCENTTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Plan 2767, 12 Campbell Crescent, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey addition, second storey balcony, and a new deck to the rear of the single family detached dwelling at 12 Campbell Crescent in the City of Toronto (North York). This proposal also includes a cabana and inground pool in the rear yard. 341

Page 14: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

14

EX10.35 DONALDA CLUBTo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Block F, 9, 10, Plan 5112, 12 Bushbury Drive, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Donalda Club. The purpose is to construct an addition overtop of the existing concrete patio of the Donalda Golf Club clubhouse at 12 Bushbury Drive in the City of Toronto (North York CommunityCouncil Area). 342

EX10.36 25 PLYMBRIDGE CRESCENTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 14, Plan 2478, 25 Plymbridge Crescent, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct an in-ground swimming pool with associated decking at 25 Plymbridge Crescent in the City of Toronto (North York Community Council Area). 342

EX10.37 35 WENTWORTH AVENUETo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Plan 2069, 35 Wentworth Avenue, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a raised deck to the rear of the existing dwelling at 35 Wentworth Avenue in the City of Toronto (North York Community Council Area). 342

EX10.38 34 GEORGE HENRY BOULEVARDTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 79, Plan 6311, 34 George Henry Boulevard, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 34 George Henry Boulevard in the City of Toronto (North York Community Council Area). The existing dwelling is to be demolished. 343

Page 15: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

15

EX10.39 TORONTO DISTRICT SCHOOL BOARDTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, 9, Concession 3, 130 Overlea Boulevard (Valley Park Middle School-TDSB), and 1080 Millwood Road (Hydro Corridor)), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Toronto District School Board (TDSB). The purpose is to construct a new multi-purpose sports field, constructed marsh and bioswale and the addition of landscape and paved pedestrian areas at 130 Overlea Boulevard and 1080 Millwood Road (Hydro Corridor) in the City of Toronto (North York Community Council Area). 343

EX10.40 V.H.L. DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure on Lot 491, Plan M-866, 30 Fifeshire Road, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by V.H.L. Developments Inc.. The purpose is to construct a replacement single family detached dwelling at 30 Fifeshire Road in the City of Toronto (North York). A cabana and an inground pool with associated hardscaping are proposed in the rear yard of the dwelling. 343

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.41 8 MANORWOOD ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 461, Plan, 8 Manorwood Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to construct an in-ground swimming pool with associated decking and new wood landscape retaining wall at 8 Manorwood Road in the City of Toronto (Scarborough Community Council Area). 344

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.42 CITY OF TORONTOTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, Plan 1527, 501 Arlington Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a multi-purpose sport court, new permeable pavers and new access pathway on the City of Toronto Parks, Forestry and Recreation lands directly adjoining Leo Baeck School at 501 Arlington Avenue in the City of Toronto (Toronto and East York Community Council Area). 344

Page 16: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

16

EX10.43 1 PEREGRINE WAYTo construct, reconstruct, erect or place a building or structure on Lot 9891 WEST SECTION, Block D, Plan M-543, 1 Peregrine Way, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to reconstruct the existing patio hardscaping and construct an outdoor kitchen to the rear and side of the existing single family detached dwelling at 1 Peregrine Way in the City of Toronto (Toronto & East York). This application also includes the installation of a bench with flagstone hardscaping in the rear yard. 344

EX10.44 80 HOPEDALE AVENUETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 17, Plan M-444, 80 Hopedale Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 80 Hopedale Avenue in the City of Toronto (Toronto and East York Community Council Area). The existing dwelling and detached garage are to be demolished. 345

EX10.45 30 FOUR OAKS GATETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 2838, 30 Four Oaks Gate, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two storey replacement dwelling with rear deck and balcony and associated landscaping at 30 Four Oaks Gate in the City of Toronto (Toronto and East York Community Council Area). 345

EX10.46 PHYLLO INVESTMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plan 383E, 9 Thornwood Road, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a rear at-grade terrace, infiltration facility and new parking pad in the rear yard of the existing detached residential dwelling at 9 Thornwood Road in the City of Toronto (Toronto and East York Community Council Area). The existing detached garage and parking pad are to be removed. 345

Page 17: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

17

CITY OF VAUGHAN

EX10.47 62 AUTUMN GROVE COURTTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, Plan 65M-3738, 62 Autumn Grove Court, in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 62 Autumn Grove Court in the City of Vaughan. 346

EX10.48 132 DEER RUN COURTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 65M3254, 132 Deer Run Court, in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, patio area and conduct minor landscaping works within a Regulated Area of the Humber River watershed at 132 Deer Run Court in the City of Vaughan. 346

EX10.49 REGIONAL MUNICIPALITY OF YORKTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Nashville Road, east of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to permit a watermain extension along Nashville Road to supply the Town of Kleinburg. 346

TOWN OF AJAX

EX10.50 TOWN OF AJAXTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere under an existing bridge on Carruthers Creek at Kerrison Drive, east of Salem Road North, in the Town of Ajax, Carruthers Creek Watershed, as located on the property owned by Town of Ajax. The purpose is to provide mitigation measures to protect the channel bank against further erosion under a recently built bridge across Carruthers Creek on Kerrison Drive, east of Salem Road North, in the Town of Ajax. The coldwater fisheries timing will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 347

Page 18: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

18

TOWN OF CALEDON

EX10.51 13921 CHICKADEE LANETo construct, reconstruct, erect or place a building or structure and site grade on Lot 10, Concession 6, (13921 Chickadee Lane), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a septic system associated with a municipal building permit.347

EX10.52 172 OLD KING ROADTo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 7, Plan 43R-34399, (172 Old King Road), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a replacement 348 sq. m. (3,746 sq. ft.) single-family dwelling at 172 Old King Road associated with a municipal building permit. 347

TOWN OF RICHMOND HILL

EX10.53 RICHMOND HILL RETIREMENT INC.To construct, reconstruct, erect or place a building or structure and site grade on Part Block 30, Plan 65M-2819, DESIGNATED AS PART 1, 65R-31694, 70 Bernard Avenue, in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Richmond Hill Retirement Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a senior's retirement residence (130 suites) with a total gross floor area (GFA) of 11,548 square metres associated with a municipal site plan application and zoning by-law amendment application. 348

EX10.54 18 WILDWOOD AVENUETo construct, reconstruct, erect or place a building or structure and site grade on Lot 21, Plan 240, 18 Wildwood Avenue, in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 250 square metre (2,685 sq. ft.) single detached dwelling associated with a municipal site plan application. 348

EX10.55 SCIULLI HOLDINGS INC.To construct, reconstruct, erect or place a building or structure on Lot 61, Plan 202, 11 Aubrey Avenue, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Sciulli Holdings Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of a two-storey replacement dwelling. 348

Page 19: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

19

TOWNSHIP OF KING

EX10.56 44 CHARLES STREETTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Plan 395, 44 Charles Street, in the Township of King, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 44 Charles Street in the Township of King. 349

EX10.57 38 MCCLURE DRIVETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part 1 Lot 9, Plan 65R-32788, 38 McClure Drive, in the Township of King, Humber River Watershed. The purpose is to construct a new single-detached dwelling and conduct associated minor grading works on an existing lot within a Regulated Area of the Humber River watershed at 28 McClure Drive in the Township of King. 349

ITEMS EX10.58 - EX10.76 ARE ERRATA ITEMS:

CITY OF BRAMPTON

EX10.58 78 TREELINE BOULEVARDTo construct, reconstruct, erect or place a building or structure on Lot 82, Plan 43M-1361, (78 Treeline Boulevard), in the City of Brampton, Humber River Watershed. The purpose is to resolve an outside violation in order to authorize the recent construction of a below grade entrance and stairway at the rear of an existing residential dwelling located within a TRCA Regulated Area of the Humber River Watershed at 78 Treeline Boulevard, in the City of Brampton associated with a municipal building permit application. 349

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.59 2473 ISLINGTON AVENUETo construct, reconstruct, erect or place a building or structure on Lot 30, Concession B 17, (2473 Islington Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to replace the existing deck and construct an inground pool with associated hardscaping to the rear of the single family detached dwelling at 2473 Islington Avenue in the City of Toronto (Etobicoke York). 350

Page 20: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

20

EX10.60 7 KINGSWAY CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 203, Plan 1686, 7 Kingsway Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling and inground pool at 7 Kingsway Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 350

WITHDRAWNEX10.61 52 EDENBROOK HILL

To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 21, Plan 5773, 52 Edenbrook Hill, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling with integral garage and rear terrace at 52 Edenbrook Hill in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling and gazebo are to be demolished while the existing inground pool, pool equipment house and decking are to be maintained. 350

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.62 34 SENLAC ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Plan 2069, 34 Senlac Road, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey dwelling with rear deck at 34 Senlac Road in the City of Toronto (North York Community Council Area). 351

EX10.63 5 IVOR ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 29, Plan 2343, 5 Ivor Road, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey replacement dwelling with upgraded rear retaining wall at 5 Ivor Road in the City of Toronto (North York Community Council Area). 351

Page 21: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

21

WITHDRAWNEX10.64 9 YORK VALLEY CRESCENT

To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Plan 5982, (9 York Valley Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new in-ground swimming pool with pergola, new decks and soak away pit to hold stormwater at 9 York Valley Crescent in the City of Toronto (North York Community Council Area). 351

WITHDRAWNEX10.65 22 FULWELL CRESCENT

To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 22 Fulwell Crescent, in the City of Toronto (North York Community Council Area), Humber River Watershed. 352

WITHDRAWNEX10.66 195 BURBANK DRIVE

To change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 130, Plan 5099, 195 Burbank Drive, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct two new rear raised decks, as well as replacement pool house and new hardscaping around the perimeter of the existing pool at 195 Burbank Drive in the City of Toronto (North York Community Council Area). 352

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.67 83 COLONEL DANFORTH TRAILTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 24, 25, Plan 2546, 83 Colonel Danforth Trail, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to construct a one-storey addition with cedar steps on the north side of the existing dwelling, a two-storey addition on the southwest side of the existing dwelling, a new rear deck to replace an existing concrete patio and a new garden shed at 83 Colonel Danforth Trail in the City of Toronto (Scarborough Community Council Area).352

Page 22: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

22

EX10.68 42 MEADOWCLIFFE DRIVETo construct, reconstruct, erect or place a building or structure on Lot 167, Plan M-440, 42 Meadowcliffe Drive, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a two-storey replacement dwelling with new septic system at 42 Meadowcliffe Drive in the City of Toronto (Scarborough Community Council Area). 353

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.69 CITY OF TORONTOTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere - between 25 Old Eglinton Avenue and 188 Bermondsey Road, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to reconstruct sections of the damaged Bermondsey Trunk Sanitary Sewer which runs along the Charles Sauriol Conservation Reserve located near the Bermondsey Transfer Station in the City of Toronto. There will be no in water works associated with the proposed sewer repairs. 353

CITY OF VAUGHAN

EX10.70 BLOCK 39 (NORTH WEST) DEVELOPER'S GROUPTo construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse, Major Mackenzie Drive and Pine Valley Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by Block 39 (North West) Developer's Group. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate repairs to the outfall of Stormwater Management (SWM) Pond M3 on the west side of Pine Valley Drive, south of Major Mackenzie Drive, in the City of Vaughan. SWM Pond M3 services new residential development within the northwest corner of Block 39. 354

EX10.71 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 20, 21, Concession 9, Major Mackenzie Drive east of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc.. The purpose is to conduct site grading in order to install a sanitary/watermain along Major Mackenzie Drive which will facilitate the servicing of Block 61, in the City of Vaughan. 354

Page 23: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

23

EX10.72 NINE-TEN WEST LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, 17, Concession 2 WYS, northwest of Dufferin Street and Rutherford Road, in the City of Vaughan, Don River Watershed as located on the property owned by Nine-Ten West Limited. The purpose is to conduct site grading in order to facilitate the completion of a residential subdivision on lands owned by Nine-Ten West Limited, in Planning Block 11, in the City of Vaughan. 354

TOWN OF CALEDON

EX10.73 ALLIANCE AGRI-TURF INC.To construct, reconstruct, erect or place a building or structure and site grade on Lot 11, Concession 5, 8112 King Street West, in the Town of Caledon, Humber River Watershed as located on the property owned by Alliance Agri-Turf Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a seed grain storage building as part of an expansion to an existing commercial agricultural business associated with a municipal site plan application. 355

EX10.74 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Highway 50 at the Humber River, in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to construct a concrete encased watermain on the west side of Hwy 50 over the Humber River. This structure will also be used as a pedestrian bridge separating pedestrians from Hwy 50 traffic. These construction activities are part of the larger Bolton watermain project. The coldwater fisheries timing window will apply to the project unless otherwise specified by MNR and a letter of advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 355

EX10.75 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Hwy 50 and Columbia Way, in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to construct 350 metres of 200 mm diameter watermain on Highway 50 from Hickman Street to Columbia Way, in the town of Caledon. These works will form part of the larger Bolton Feedermain project which is currently being review under a separate application. In addition, sidewalks, curbs and gutters have also been proposed along Hwy 50 and Columbia Way. 356

Page 24: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

24

TOWN OF MARKHAM

EX10.76 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure and alter a watercourse on Robinson Street over a tributary of the Rouge River, near Main Street North, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to permit the rehabilitation of the Robinson Street bridge spanning a tributary of the Rouge River and repairs to the bank protection. 356

PERMIT APPLICATIONS EX10.77 - EX10.86 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS:

CITY OF MISSISSAUGA

EX10.77 REGIONAL MUNICIPALITY OF PEELTo undertake the installation of a test well, two monitoring wells and three piezometers on the north and south sides of Eastgate Parkway, just east of Tomken Road and near Little Etobicoke Creek, in the City of Mississauga, Etobicoke Creek Watershed, as located on the property owned by Infrastructure Ontario and the City of Mississauga. The purpose is to install a test well, two monitoring wells and three piezometers to determine the hydrogeological characteristics at Little Etobicoke Creek along Eastgate Parkway. The warmwater fisheries timing window will be applied to the near water works (installation of piezometers), unless otherwise specified in writing by the Ministry of Natural Resources. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 357

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.78 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction, structure maintenance and drainage structure general maintenance at 10 Cliffwood Road, Duncan Creek Park, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to undertake rehabilitation works to the existing playground within Duncan Creek Park. Works will include the removal and replacement of the existing playground structure, replacement of the existing asphalt trail and the installation of a drainage system. No in-water works are associated with this project. 357

Page 25: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

25

EX10.79 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on May Tree Road, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by the City of Toronto with permission granted through a Franchise Agreement to Enbridge Gas Distribution Inc.. The purpose is to relocate two existing 6" gas mains under May Tree Road. Relocation will be limited to the existing roadway and will be completed by open cut excavation. Works are to take place within the City of Toronto's previously established work zone, with permission granted by the City for Enbridge to complete the relocation. No in-water works are associated with the proposed. 358

EX10.80 HILLSIDE PROPERTIESTo undertake borehole investigations on Part Lot 12, Concession 3 EYS, South-east Corner of Don Mills Road and Graydon Hall Drive, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Hillside Properties. The purpose is to undertake a geotechnical investigation to facilitate the detail design of a sanitary sewer. Works will include the drilling of three boreholes. No in-water works are associated with this project. 358

TOWN OF CALEDON

EX10.81 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing driveway at 15924 Innis Lake Road, approximately 210 m south of Old Church Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Ontario Provincial Police under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline crossing above a culvert that conveys a tributary of Centreville Creek along a driveway at 15924 Innis Lake Road, approximately 210 m south of Old Church Road. The coldwater fisheries timing window will be applied to the project unless otherwise specified in writing by the Ministry of Natural Resources (MNR) and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 358

EX10.82 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within a new subdivision on Street A , located just east of Kennedy Road and south of King Street, in the Town of Caledon, Humber River Watershed, as located on the property owned by the Town of Caledon under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline on Street A, within a new subdivision, located just east of Kennedy Road and south of King Street, in the Town of Caledon. The coldwater fisheries timing window will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 359

Page 26: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

26

TOWN OF MARKHAM

EX10.83 COGECO DATA SERVICESTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Allstate Parkway and The Seneca Way, north of Highway 7, in the Town of Markham, Rouge River watershed as located on the property owned by Town of Markham. The purpose is to install a 100 mm HDPE conduit with fiber optic cable using Horizontal Directional Drilling (HDD) and open cut methods over a culvert along the west side of Allstate Parkway, in the Rouge River watershed, in the Town of Markham. Open cut method will be used to install the HDPE conduit over the culvert. No in-water works are associated with the proposed works. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. 359

EX10.84 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on 14th Avenue - just east of Vettese Court, and on Vettese Court, just south of 14th Avenue, in the Town of Markham, Rouge River Watershed as located on the property owned by York Region and the Town of Markham. The purpose is to install 2 inch and 1 1/4 inch gas mains at 14th Avenue and Vettese Court. The Ministry of Natural Resources (MNR) warm water timing window will apply to this project unless otherwise specified in writing by MNR. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project. 360

EX10.85 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Highway 7, approximately. 235m west of Rodick Road, in the Town of Markham, Rouge River Watershed as located on the property owned by The Regional Municipality of York. The purpose is to permit the installation of a gas line on the north side of Highway 7 via horizontal directional drill (HDD) under Apple Creek. 360

TOWNSHHIP OF UXBRIDGE

EX10.86 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation under a watercourse by trenchless technology on Durham Road 30, north of Bethesda Road, in the Township of Uxbridge, Duffins Creek Watershed, as located on the property owned by the Regional Municipality of Durham under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline to service Metrolinx on Durham Road 30, north of Bethesda Road. The coldwater fisheries timing window will be applied to this project, as specified in writing by the Ministry of Natural Resources (MNR). Enbridge Gas Distribution Inc. will be using the Fisheries and Oceans Canada (DFO) Operational Statement for High Pressure Directional Drilling. 360

Page 27: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

27

PERMIT APPLICATIONS EX10.87 - EX10.124 ARE MINOR WORKS LETTER OF APPROVAL:

CITY OF BRAMPTON

EX10.87 20 MOLDOVAN DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 443, Plan M-1691, (20 Moldovan Drive), in the City of Brampton, Humber River Watershed. 361

EX10.88 31 FORESTGROVE CIRCLETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on, (31 Forestgrove Circle), in the City of Brampton, Etobicoke Creek Watershed. 361

EX10.89 66 MIDSUMMER DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 69, Plan 43M-1798, (66 Midsumer Drive), in the City of Brampton, Humber River Watershed. 361

CITY OF PICKERING

EX10.90 2015 ERIN GATE BOULEVARDTo install a swimming pool on Lot 37, Plan 40M-1969, (2015 Erin Gate Boulevard), in the City of Pickering, Waterfront Watershed. 362

EX10.91 2288 CANTERBURY CRESCENTTo install a swimming pool on Lot 16, Plan 40M-2344, (2288 Canterbury Crescent), in the City of Pickering, Duffins Creek Watershed. 362

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.92 101 ROYAL CREST ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 84, Plan M-1084, (101 Royal Crest Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 362

EX10.93 177 VARSITY ROADTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Block N, Plan 1260, (177 Varsity Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 362

Page 28: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

28

EX10.94 127 JEFFCOAT DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 403, Plan 4969, (127 Jeffcoat Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. 363

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.95 116 BROOKBANKS DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 99, Plan 5544, (116 Brookbanks Drive), in the City of Toronto (North York Community Council Area), Don River Watershed. 363

EX10.96 6 ADDINGTON PLACETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 3, Plan 4023, (6 Addington Place), in the City of Toronto (North York Community Council Area), Don River Watershed. 363

EX10.97 22 CEDARBANK CRESCENTTo install a swimming pool on , (22 Cedarbank Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. 363

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.98 28 CRESCENTWOOD ROADTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 152, Plan 1902, (28 Crescentwood Road), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. 364

EX10.99 42 BANMOOR BOULEVARDTo construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 145, Plan M-801, (42 Banmoor Boulevard), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. 364

EX10.100 UNIVERSITY OF TORONTO - SCARBOROUGHTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 9, 10, Concession 1, (130 Old Kingston Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by University of Toronto - Scarborough.364

Page 29: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

29

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.101 16 BENNINGTON HEIGHTS DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 7, Plan M363, (16 Bennington Heights Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 365

EX10.102 CITY OF TORONTOTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and undertake a municipal or utility project on Part Lot 19, 20, 21, 22, 23, 24, 25, , Part Of Water Lot In Front Of Lot 33, BFC Plan 782, (1391 Lakeshore Boulevard West), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by City of Toronto. 365

EX10.103 58 NESBITT DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 20, Plan 2398, (58 Nesbitt Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 365

EX10.104 81 HIGHLAND AVENUETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 52, Plan 528, (81 Highland Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. 365

CITY OF VAUGHAN

EX10.105 72 HAZELRIDGE COURTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 63, Plan 65M-3895, (72 Hazelridge Court), in the City of Vaughan, Humber River Watershed. 366

EX10.106 33 BROUGHAM DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (33 Brougham Drive), in the City of Vaughan, Humber River Watershed. 366

EX10.107 66 CHAYA SARA GARDENSTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 69, Plan 65M-3985, (66 Chaya Sara Gardens), in the City of Vaughan, Don River Watershed. 366

Page 30: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

30

EX10.108 133 PEAK POINT BOULEVARDTo install a swimming pool on Lot 270, Plan 65M-3878, (133 Peak Point Boulvard), in the City of Vaughan, Don River Watershed. 366

EX10.109 27 NOAH CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 26, Plan 65M3470, (27 Noah Crescent), in the City of Vaughan, Humber River Watershed. 367

EX10.110 141 ALBANY DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 45, Plan M1875, (141 Albany Drive), in the City of Vaughan, Humber River Watershed. 367

EX10.111 16 CLAIREWOOD COURTTo install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 2, Plan 65M-4177, (16 Clairewood Court), in the City of Vaughan, Humber River Watershed. 367

EX10.112 195 TWIN HILLS CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan 65M-4212, (195 Twin Hills Crescent), in the City of Vaughan, Humber River Watershed. 367

EX10.113 58 BIG ROCK DRIVETo install a swimming pool on Lot 7, Plan 65M-4191, (58 Big Rock Drive), in the City of Vaughan, Don River Watershed. 368

TOWN OF CALEDON

EX10.114 AL MEDADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 5, Concession 6 EHS Plan R0G86035, (16331 Mountainview Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Al Medad. 368

EX10.115 17889 HUMBER STATION ROADTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 30, Concession 5 Plan R0SS6240, (17889 Humber Station Road), in the Town of Caledon, Humber River Watershed. 368

EX10.116 100 CASTELLI COURTTo install a swimming pool on , (100 Castelli Court), in the Town of Caledon, Humber River Watershed. 368

Page 31: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

31

EX10.117 STONEBRIDGE BUILDING GROUP INC.To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 9, Plan 43M1787, (44 Diamondwood Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Stonebridge Building Group Inc.. 369

EX10.118 34 CEDAR ALLAN PLACETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 43M-1837, (34 Cedar Allan Place), in the Town of Caledon, Humber River Watershed. 369

TOWN OF MARKHAM

EX10.119 41 SARAH JANE COURTTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 29, Plan M-1870, (41 Sarah Jane Court), in the Town of Markham, Rouge River Watershed. 369

TOWN OF RICHMOND HILL

EX10.120 36 GREEN ASH CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (36 Green Ash Crescent), in the Town of Richmond Hill, Don River Watershed. 369

EX10.121 27 SANDBANKS DRIVETo install a swimming pool on Lot 34, Plan 65M-3588, (27 Sandbanks Drive), in the Town of Richmond Hill, Humber River Watershed. 370

TOWN OF WHITCHURCH-STOUFFVILLE

EX10.122 3 RAEVIEW DRIVETo construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 4, Plan 65R-29936, (3 Raeview Drive), in the Town of Whitchurch-Stouffville, Duffins Creek Watershed. 370

EX10.123 2179 STOUFFVILLE ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (2179 Stouffville Road), in the Town of Whitchurch-Stouffville, Rouge River Watershed. 370

EX10.124 7 RAEVIEW DRIVETo construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 5, Plan 65R-29956, (7 Raeview Drive), in the Town of Whitchurch-Stouffville, Duffins Creek Watershed. 370

Page 32: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

32

PERMIT APPLICATIONS EX10.125 - EX10.133 ARE MAJOR APPLICATIONS

CITY OF VAUGHAN

EX10.125 BELMONT PROPERTIES (WESTON) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Lot 22, Concession 6, Northwest of Major Mackenzie Drive and Weston Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Belmont Properties (Weston) Inc. The purpose is to conduct site grading in order to construct a stormwater management pond (SWM Pond No. 3), to facilitate the servicing of a draft approved subdivision on lands owned by Belmont Properties, in Block 40 South, in the City of Vaughan. 371

EX10.126 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on East Half Lot 21, Concession 9, (North of Major Mackenzie Drive and West of Highway 27), in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the realignment of approximately 550 metres of a headwater tributary on the western half of draft approved plan of subdivision 19T-05V10 within Block 61 East, north of Major Mackenzie Drive and west of Highway 27, in the City of Vaughan. 371

EX10.127 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, (north of Major Mackenzie Drive and east of Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the realignment of approximately 1100 metres of Tributary 'A' from a temporary diversion channel to the final Tributary 'A' corridor in draft approved plan of subdivision 19T-10V004 within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. The purpose is also to facilitate the construction of an outfall to the final Tributary 'A' corridor from a roof drain collector system. 372

Page 33: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

33

EX10.128 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lots 21-23, Concession 9, (Major Mackenzie Drive and Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate grading and servicing in a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. 372

TOWN OF MARKHAM

EX10.129 1771107 ONTARIO INC.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 10, Concession 5, (southeast corner of Warden Avenue and Highway 7), in the Town of Markham, Rouge River Watershed as located on the property owned by 1771107 Ontario Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall, headwall and implementation of sediment erosion control measures for the construction of Outfall #2 as they relate to the broader servicing strategy for Markham Centre. 373

EX10.130 ANGUS GLEN DEVELOPMENT (2003) LTD.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Development (2003) Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to construct stormwater management pond C, inlets to the storm sewers, pond control structures and associated erosion sediment control and access road, located at Lot 19 Concession 5 in the Town of Markham. 373

EX10.131 ANGUS GLEN VILLAGE LTD.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Village Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to repair a sanitary sewer siphon crossing of Bruce Creek at Lot 19 Concession 5 in the Town of Markham. 373

Page 34: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

34

EX10.132 ANGUS GLEN VILLAGE LTD.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Village Ltd.. The purpose is to establish final grades for the draft approved plan of subdivision and to construct the required infrastructure in the buffer located at the rear of the proposed lots. 374

EX10.133 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse over the Rouge River at Birchmount Road, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to construct a bridge over the Rouge River in order to connect existing segments of Birchmount Road. The redside dace fisheries timing window will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO). 374

CITY OF TORONTO

EX10.134 MARKLAND WOOD COUNTRY CLUBTo construct, reconstruct, erect or place a building or structure on Part Lot 1, Concession 1, (245 Markland Drive), in the City of Toronto, Etobicoke Creek Watershed as located on the property owned by Markland Wood Country Club. The existing golf course is located on lands within both the City of Toronto and the City of Mississauga, separated by the Etobicoke Creek. These particular works are located on lands within the City of Mississauga. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 185.78 sq. m. (1999.72 sq. ft.) addition to an existing 373.72 sq. m. (4,022.69 sq. ft.) maintenance facility building located at the Markland Wood Country Club associated with a municipal building permit application. 374

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.135 223 RIVERSIDE DRIVETo construct, reconstruct, erect or place a building or structure on Lot 186, Plan M356, (223 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new three-storey single family detached dwelling with integral garage, rear terrace (permeable pavers) and deck at 223 Riverside Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished. 375

Page 35: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

35

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.136 3 OLD GEORGE PLACETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 2 Lot 3, Plan 797-E, (3 Old George Place), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to refurbish the existing inground pool, construct a stone terrace, wood deck, pizza oven, french drain and hot tub to the rear of the existing single family detached dwelling at 3 Old George Place in the City of Toronto (Toronto and East York Community Council Area). Included in this proposal is a ravine stewardship program. 375

CITY OF VAUGHAN

EX10.137 REGIONAL MUNICIPALITY OF YORKTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at 10299 Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to permit the reconstruction of the slope above the existing outfall at the Kleinburg Water Pollution Control Plant. A Letter of Advice will be written on behalf of Fisheries and Oceans Canada and the redside dace timing window will be applied, unless otherwise directed by the Ministry of Natural Resources in writing. 376

TOWN OF MARKHAM

EX10.138 ANGUS GLEN DEVELOPMENTS LTD.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, 20, Concession 5 Lot 24, PART OF 25, Plan 6037, (Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Developments Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to construct a vehicular and pedestrian bridge, traversing Bruce Creek at Lot 19 Concession 5 in the Town of Markham. 376

EX10.139 148 JOHN STREETTo construct, reconstruct, erect or place a building or structure on Part Lot 30, Plan 64R-8191, (148 John Street), in the Town of Markham, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a first storey kitchen addition and a second storey addition at the rear of an existing detached dwelling associated with a municipal site plan application. 376

Page 36: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

36

EX10.140 15 WORSLEY COURTTo construct, reconstruct, erect or place a building or structure on Lot 175, Plan 7566, (15 Worsley Court), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a swimming pool in the rear yard of the property. 376

TOWN OF RICHMOND HILL

EX10.141 TOWN OF RICHMOND HILLTo construct, reconstruct, erect or place a building or structure, site grade and interfere with a wetland on Part Lot 70, Concession 1 WYS, (Red Cardinal Trail & Bloomington Road), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of a pedestrian trail and pedestrian footbridge. 377

Page 37: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

37

Item AUTH7.1TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Deborah Martin-Downs, Director, Ecology

RE: SUSTAINABLE NEIGHBOURHOOD RETROFIT ACTION PLANStatus Update

____________________________________________________________________________KEY ISSUEApproval of three pilot sustainable neighbourhood retrofit action plans (SNAPs), progress toward their implementation and launch of two additional SNAPs.

RECOMMENDATION

THAT the County Court, Lake Wilcox and Black Creek Sustainable Neighbourhood Retrofit Action Plans be approved;

THAT Toronto and Region Conservation Authority (TRCA) staff be directed to continue to work with municipalities and other neighbourhood partners toward the successful implementation of the plans and the further development of new retrofit plans;

THAT the Region of Peel, City of Brampton, Region of York, Town of Richmond Hill and the City of Toronto be asked to endorse the respective Sustainable Neighbourhood Retrofit Action Plan and consider ways to implement the plan, as appropriate, through corporate business planning, annual budget planning and other innovative arrangements in partnership with TRCA and others;

AND FURTHER THAT Paul Gay and Marisa Mancuso of 71 Turtlecreek Boulevard, Brampton be thanked for offering their home as the subject of the Green Home Makeover and for being ambassadors of this model in support of the neighbourhood-wide residential retrofit program.

BACKGROUNDThe SNAP projects represent an innovative model for sustainable urban renewal. SNAPs are plans for measurable environmental improvement and community transformation. They address environmental objectives by identifying solutions that are well aligned with local community interests and implementation challenges. The plans address multiple objectives of municipalities, TRCA and other partners as drawn from higher level strategic plans. Many municipal departments and a wide range of community partners are involved in the planning process through a variety of forums.

Page 38: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

38

Three pilot SNAPs were initiated in 2009 in Brampton, Richmond Hill and Toronto, and two new SNAPs were launched last year in Markham and Mississauga. Over the past year, work on the three pilot SNAPs has focused on finalizing the action plans, developing implementation programs for the initial priority action areas, and completing strategic demonstration projects - all in cooperation with local partners. Work on two new SNAPs has involved formation of project management teams with appropriate representation from key partners and workplan development.

The pilot SNAPs have been breaking new ground for addressing urban retrofit implementation challenges. Innovative approaches have emerged through the SNAP’s planning approach, which is cross-cutting and collaborative. It is open to solutions that cross property lines at a neighbourhood scale, tailors solutions to local community interests, addresses a range of environmental objectives in an integrated way and fosters involvement by many partners. Key features from TRCA's pilot SNAPs that may prove transferable to other urban retrofit settings include:

Green Home Makeover demonstration project, in partnership with private homeowners and

others, is serving as a catalyst for a neighbourhood-wide residential program by showcasing examples and creating local champions (County Court SNAP). The project fostered relationships among relevant private and public sector suppliers of innovative products and services, which led to crowd-sourced deals and partnerships in delivery of a neighbourhood-wide program of indoor and outdoor retrofits (i.e. Green Home Discount Package).Creative retrofit solutions that require cooperation by adjacent property owners, including

private landowners and public sector authorities, but solved problems that would have been difficult individually – e.g. collection of neighbourhood stormwater run-off and re-use for golf course irrigation water supply (County Court SNAP).County Court SNAP has identified multiple design objectives for public realm projects that

may provide the business case for cost-sharing opportunities among partner beneficiaries in implementation – e.g. park renewal, stormwater pond retrofit.Front Yard Makeover designs and associated promotions set a landscaping trend that

marries ecologically sound design objectives with local homeowner tastes, in a neighbourhood where “being green and stylish” are important (Lake Wilcox SNAP).Black Creek SNAP has recommended a locally tailored marketing strategy that is geared to

boost homeowner participation in municipal basement flood prevention subsidy programs and other available retrofit programs, which to date have had low uptake in this neighbourhood. This marketing strategy appeals to local cultural values and interests (e.g. residential rain harvest supported vegetable gardening incentives are expected to be a door opener to promote other strategic retrofits).A neighbourhood-wide urban agriculture expansion program, promoting rain harvest

supported gardens to achieve objectives for stormwater management, food security and community building, as part of the Black Creek SNAP.

Summary documents containing a full description of each of the three pilot Action Plans can be found at www.sustainableneighbourhoods.ca.

The following sections summarize the unique action plan, demonstration projects and implementation program directions for each of the three pilot SNAPs, the main areas of focus for the two new SNAPs and next steps for the SNAP program overall.

Page 39: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

39

County Court SNAP, BramptonLocated in the Etobicoke and Mimico creeks watershed, this SNAP aims to improve the water management functions of the Upper Nine stormwater management pond and its catchment, a facility identified as a top retrofit priority by the City of Brampton. The project is engaging businesses, residents and institutions in identifying integrated retrofit solutions to achieve water management and biodiversity targets, while achieving other sustainable community objectives and creating a stronger sense of place and identity in the neighbourhood. Representatives of the Region of Peel, City of Brampton, Peel Village Golf Course and Brampton Golf Club form the Project Management Team, along with TRCA.

Action PlanThe County Court SNAP promotes place making and suburban renewal. Action Plan recommendations and lead roles include:

retrofit of the aging Upper Nine stormwater pond to address water quality and volume

objectives and also serve as a community amenity and natural area destination – City of Brampton lead;renewal of County Court Park to better suit recreational needs and integrate environmental

education features and community gathering space – City of Brampton lead;enhancement of the urban forest and bioretention along the boulevards to provide

stormwater filtration and other benefits – City of Brampton and TRCA;a system of neighbourhood rainwater harvesting and storage as an irrigation option for

nearby golf clubs – Brampton Golf Club, Peel Village Golf Club and City of Brampton with TRCA support;habitat restoration along the creek valley and in the golf courses – golf courses with TRCA

support;green parking lot design at the Court House as a model for other paved spaces –

Infrastructure Ontario; andactive promotion of green home renovation and landscape to address energy and water

conservation – TRCA lead.

Green Home Makeover The Green Home Makeover is a key demonstration project of the County Court SNAP. Given the predominance of low density residential land use and the opportunity to achieve greater water and energy reductions, this demonstration is part of a targeted effort to promote residential participation in indoor and outdoor green home renovation. In collaboration with SNAP partners, associations and private sector suppliers, one older home was selected to showcase a total green home transformation of water and energy systems and outdoor landscapes. Located at 71 Turtlecreek Boulevard, the Makeover is meant to showcase green home improvements, educate residents and the renovation industry and monitor energy and water savings. A series of videos featuring aspects of the Green Home Makeover are posted on the TRCA’s SNAP website. Following renovations and a ribbon cutting celebration on May 23, 2012 to officially kick-off the program, homeowners Paul Gay and Marisa Mancuso are acting as local champions to share their experience and learning with others interested in undertaking similar projects. Monitoring of hydro, natural gas and water as well as a series of tours will be ongoing from spring of 2012 to the fall of 2013.

Page 40: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

40

Implementation DirectionsImplementation plan directions and immediate actions for County Court include the following:

launch of the Green Home Discount Package, a package of discounts on strategic indoor

and outdoor renovations exclusive to the neighbourhood (in July 2012) – led by TRCA in partnership with many private and public sector partners;Project Management Team shift to SNAP Implementation Team to provide coordination

among projects – initially led by TRCA; City of Brampton is exploring how to operationalize SNAP in the longer term;ongoing community outreach to build capacity for neighbourhood leadership, and to

continue to inform future SNAP direction - TRCA continuing outreach in the short term, with City of Brampton considering its longer term role;development of Performance Monitoring Plan and ongoing monitoring - TRCA to lead in

partnership with Brampton, Peel, and community.

Expected Outcomes The SNAP was designed to meet or exceed established municipal and watershed management targets. Highlights include:

expand urban forest (from 8 to 18% of area);

Green Home Makeover and residential retrofit program to reduce water (31%) and energy

use (39%);rainwater harvesting for irrigation (provide 100% of water needs; offset municipal water use

and water taking from creek);reduce greenhouse gas (GHG) emissions (18%);

provide increased ecoservices (540 tonne carbon storage, 214 tonne carbon sequestration,

11 tonne pollution removal).

Lake Wilcox SNAP, Richmond HillLocated in the headwaters of the Humber River, this SNAP complements the Town of Richmond Hill’s lake-based remediation initiatives by focusing on private land measures to reduce nutrient loading (especially phosphorus) to Lake Wilcox, the largest kettle lake on the Oak Ridges Moraine. Other objectives are to foster stewardship of local wetlands and forests, reduce outdoor treated water use and cultivate a shared sense of identity among the long term and newer residents. TRCA is leading this SNAP in partnership with representatives of the Region of York and Town of Richmond Hill.

Action PlanThe Lake Wilcox SNAP promotes embracing nature in the community through three primary action areas:

Residential Eco-landscaping – Homeowners are encouraged to adopt ecologically sound

landscaping to help achieve stormwater run-off reduction and pollution prevention (nutrient load reduction), reduced treated water use, expanded urban forest and enhanced native plant biodiversity. Priority implementation zones have been identified, capitalizing on local soil and groundwater conditions conducive to stormwater infiltration, and opportunities to buffer existing natural areas. Visitor Stewardship – Visitors and residents are encouraged to become stewards of the

natural areas they visit through adoption of simple practices that help minimize the spread of invasive species and reduce encroachment on sensitive areas.

Page 41: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

41

Green Renovations and Energy – Widespread infill construction, home renovations and

re-builds offer opportunities to advance renewable energy options and green building techniques, resulting in improved energy and water conservation.

Front Yard MakeoversFront Yard Makeover demonstration projects are profiling eco-landscaping on two private residential lots in Oak Ridges. Champion homeowners were selected by jury to receive free Makeovers and a landscape designer was engaged to create customized front yard designs. The gardens are being installed in summer 2012 and feature rainwater soak aways, a rain garden, native and water-efficient plants, canopy trees, permeable paving and high-capacity rain barrels. Funded by York Region’s Long Term Water Conservation Strategy, and supported by private sector sponsors, these Makeovers represent a shift from demonstrations on public lands to engaging private homeowners to showcase desirable practices. Monitoring will confirm anticipated reductions in use of treated tap water for irrigation (on both lots) and the performance of the soak aways (on one lot).

The Makeovers are the first step in prompting a trend towards adoption of eco-landscaping. The experiences of those participating in the Makeovers will be captured in a series of short , engaging videos that will profile the Makeovers and SNAP, and promote eco-landscaping. The videos will be available on TRCA’s SNAP website.

Implementation DirectionsThe Makeovers are forerunners of an upcoming neighbourhood-wide program promoting residential eco-landscaping. The program is being led by TRCA in partnership with York Region’s Water for Tomorrow, Richmond Hill’s Healthy Yards, LEAF (Local Enhancements & Appreciation of Forests) and local environmental groups. The program will endorse landscaping that marries contemporary design with the latest in ecologically sound technologies and practices. This innovative program will explore third-party delivery by engaging landscaping sector businesses and motivating them to advocate for ecologically sound landscaping with their clients. An incentive package for homeowners is expected to include design templates and supply lists, and time-limited financial offers from local businesses. The program model builds on residents’ appreciation for local natural areas and their desire to be environmentally friendly. It responds to their wish for convenient and sound environmental solutions with clear business cases. With many new and renovating homes in the neighbourhood, the potential to influence residential landscaping is high at this time.

Next steps are to fully develop the program model with SNAP partners and engage local landscaping businesses. Ontario’s Showcasing Water Innovation fund is supporting implementation of the neighbourhood-wide program in 2013, creating a provincial platform to showcase SNAP and lessons learned from implementation.

Expected OutcomesThe Lake Wilcox SNAP is targeting strategic retrofits for pollution prevention and expanded urban forest. Preliminary analysis shows that water quality targets for reduced nutrient loading to the lake can be achieved with 46% uptake of eco-landscaping in priority areas, while tree cover in residential areas can be doubled with 55% uptake of eco-landscaping. With 100% uptake, the urban forest can be expanded from 27 to 35%, and at maturity, could remove 25,000 kg of air pollution and sequester 1,212,000 kg of carbon annually at a combined economic value of $246,000 per year.

Page 42: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

42

Black Creek SNAP, TorontoLocated in the Black Creek subwatershed of the Humber River, this SNAP has focused on seeking ways to reduce the risk of basement flooding through lot level measures, improve health of Black Creek and expand urban forest, within the context of community interests. This SNAP area is centred around the Jane-Finch area, extending from Steeles Avenue in the north to just south of Finch Avenue and from roughly Hwy 400 in the west to the Black Creek valley in the east. Within this neighbourhood, there is a strong interest in having more opportunities to grow food, improved access to fresh food and job opportunities. TRCA is leading this project in partnership with the City of Toronto, Jane Finch Family and Community Centre, Black Creek Conservation Project and many other community stakeholders.

Action PlanThe Black Creek SNAP promotes growing food and green opportunities through four primary action areas:

Vegetable gardens supported with rain harvesting for homes and open spaces;

Stormwater management and basement flood prevention - focus on lot level measures for

homes, paved areas and roads, aimed at reducing run-off volume before entering sewers, and also promotion of backwater valves, sump pumps and other key basement flood prevention measures;Energy conservation and renewables - focus on greenhouse gas reduction for single family

residential homes through weatherization, furnace and appliance replacement and electricity use reduction within the commercial, institutional and multi-unit residential sector; and solar power installations associated with large commercial or multi-unit residential roof spaces; andUrban forest enhancement - expand natural cover along creek corridors and promote

additional plantings within the built up area to reduce the heat island and provide for improved ecosystem services.

Specific targets and strategic locations for actions have been outlined in the plan. Building on the strengths of existing programs, local green job creation and skills development are principles that will be built into the delivery of these action areas.

Demonstration Projects Several projects have been underway over the past year:

Rainwater harvesting for community vegetable garden at Edgeley Apartments, 35 Shoreham

Drive – TRCA installed two 500 litre rain barrels in summer 2011 to provide a low cost water supply and improve stormwater management at this Toronto Community Housing Corporation seniors residence.Rainwater harvesting design and vegetable garden creation at University Presbyterian

Church for their Reaching Up Homework Club – TRCA, with help from the Black Creek Conservation Project, constructed a vegetable garden in May 2012 and we are in the process of retrofitting an existing shed on the property and installing two 500 litre rain barrels as a rainwater collection system to support a low cost water supply. Children learn gardening skills and share harvest with their families.Green parking lot design for the Jane-Finch Mall – TRCA is coordinating this design in

partnership with the University of Toronto’s Landscape Design Faculty (underway July 2012).

Page 43: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

43

TRCA is preparing to launch in August 2012 a series of demonstration projects involving single family residential homeowners. These projects would recognize up to five great vegetable gardens by providing downspout disconnection services and providing rain barrels and other strategic water and energy retrofits. These demonstration homes will be the forerunners of a neighbourhood-wide residential retrofit program, delivered in partnership with the City of Toronto, local community groups and local private retailers, and targeted for initial launch in fall 2012.

Implementation DirectionsImplementation plan areas, immediate actions and lead roles for the Black Creek SNAP include the following:

Neighbourhood-wide agriculture supported by rain harvesting – TRCA is leading in

cooperation with local agriculture groups, and will explore the role of the Toronto Urban Farm as a central component of this program.Single-family residential eco-edible landscaping and other strategic retrofits – TRCA is

leading the design and launch of this program in partnership with the City of Toronto and other groups.Urban forest enhancement – Black Creek Conservation Project is leading this component of

SNAP in close coordination with TRCA and other groupsGreening of paved areas and building on institutional, commercial and multi-unit residential

properties – green parking lot design project with the Jane Finch Mall is an initial focus; TRCA will explore this area more fully with partners after the residential implementation program is underway.Project Management Team shift to SNAP Implementation Team to provide coordination

among projects – led by TRCA Ongoing community outreach to build capacity for neighbourhood leadership, and to

continue to inform future SNAP direction - TRCA is leading in close collaboration with a wide range of local SNAP partners and community leaders.

Expected Outcomes The SNAP was designed to meet or exceed established municipal and watershed management targets. Highlights include:

produce 20% of the community’s vegetable needs locally;

reduce the risk of basement flooding;

reduce stormwater run-off by 30%;

expand urban forest from 26 to 34% of the area;

increase ecoservices provided (5,700 kg pollutant removal; 128,000 kg carbon storage);

reduce electricity use (10%) and natural gas use (17%) below 2007 levels.

Page 44: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

44

Bayview Glen SNAP, MarkhamThe Bayview Glen SNAP is located in an established neighbourhood of 750 homes in the Upper East Don River subwatershed in Markham’s Thornhill community. The area is located north of Steeles Avenue, east of Bayview Avenue, south of the CN Rail line and bounded on the east by the Bayview Golf and Country Club. The area is the subject of a City of Markham flood remediation study and has been identified by York Region as a priority for resolving high inflow and infiltration to sanitary sewers. SNAP will focus on integrated strategies to address multi-faceted water challenges (surface and basement flooding, storm and sanitary sewer capacity, water conservation, Don River impacts) and opportunities to address additional objectives, such as urban canopy succession planning, promotion of green infill development and community interests. The SNAP will demonstrate implementation of the City of Markham’s Greenprint Sustainability Plan at the neighbourhood scale.

A scoped characterization phase was launched in April 2012, consisting of a suite of cross-agency technical workshops to establish baseline conditions and identify potential retrofits. Workshops focusing on water management and urban forest have been held. Next steps over the spring and summer of 2012 include the remaining technical workshops, integration with Markham’s West Thornhill Flood Control Implementation Alternative Refinement study, and community engagement in cooperation with the local councillor.

Mississauga SNAPIn partnership with the City of Mississauga and the Region of Peel, TRCA is working to develop a SNAP in the community located north of Bloor Street, south of Eastgate Parkway, east of Dixie Road, and west of the west branch of the main Etobicoke Creek. This SNAP will specifically demonstrate implementation of Mississauga’s Living Green Master Plan at the neighbourhood scale, along with advancing objectives of the Etobicoke-Mimico Watershed Plan and other municipal management plans and strategies. This community of 21,000 residents is highly diverse in terms of demographics, and as such the project team is taking a multifaceted approach to engagement and working closely with the local councillor and staff working in the area to understand community interests and help shape the scope of the project. A Community Leaders Focus Group was held in April, and the SNAP team has been present at local Town Hall meetings and in the Mississauga Ward 3 newsletter. The team is currently undertaking technical scoping meetings with staff groups and utility partners Enbridge Gas and EnerSource to explore baseline conditions, identify working goals and targets based on existing strategies, and identify retrofit opportunities, challenges and synergies.

SNAP Program DirectionsSNAP Program EvaluationTRCA has partnered with a York University researcher to conduct an evaluation of the SNAP program with input from a variety of partners. The goal of the study is to learn from the three pilot SNAPs and relevant initiatives around the world, to improve the design and delivery of the program in the future, and explore its transferability to other jurisdictions. The SNAP program evaluation is supported, in part, by MITACS Accelerate, a national research internship program. A final report is anticipated in fall 2012.

Page 45: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

45

Implementation Business CasesAs the pilot SNAPs move into the implementation phase, TRCA is pursuing new partnerships with financial institutions, insurance industry and real estate boards to develop the business cases for undertaking retrofits as a way to maintain market value of one’s property and also as ways to finance strategic retrofits.

Neighbourhood Retrofit “State of the Art”TRCA continues to pursue opportunities to share our SNAP models and learn from other groups in this emerging area of practice.

FINANCIAL DETAILSFunding for the SNAPs is in part from the Region of Peel, Region of York and City of Toronto capital budgets. SNAPs have continued to be successful at leveraging the municipal funding to secure additional grants and awards. Over the past year, these awards have included:

Ministry of the Environment Showcasing Water Innovation grant ($175,000);

Toronto Community Foundation Vital Ideas grant ($30,000);

Green Home Makeover – private and public sector sponsorships of products and services

(valued at over $100,000);Front Yard Makeovers – private and public sector sponsorships of products and services

(valued at over $30,000);Shell Canada Environment Fund ($10,000);

Toronto and Region Remedial Action Plan ($15,000);

MITACS Accelerate Ontario ($11,250).

Report prepared by: Sonya Meek, extension 5253Email: [email protected] Information contact: Sonya Meek, extension 5253; Shannon Logan, extension 5708 Emails: [email protected]; [email protected]: July 11, 2012

Page 46: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

46

Item AUTH7.2TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Nick Saccone, Director, Restoration Services

RE: MARIE CURTIS PARK REVITALIZATION PROJECT - PHASE 2____________________________________________________________________________KEY ISSUEApproval to enter into an Agreement with the City of Toronto to implement specific elements of the Marie Curtis Park Revitalization Project - Phase 2 on their behalf.

RECOMMENDATION

THAT approval be granted to enter into an agreement with the City of Toronto to implement specific elements of the Marie Curtis Park Revitalization Project - Phase 2 on their behalf;

THAT the agreement be subject to availability of funding from the City of Toronto;

AND FURTHER THAT authorized Toronto and Region Conservation Authority (TRCA) officials be directed to take any action necessary to implement the agreement including obtaining any required approvals and the signing and execution of documents.

BACKGROUNDSince 2010, Toronto and Region Conservation Authority (TRCA)'s Watershed Management Division and the City of Toronto’s Parks Forestry and Recreation (PF&R) Division have partnered on the revitalization of Marie Curtis Park East and West on the waterfront, which is being carried out in tandem with the City of Mississauga’s and TRCA’s development of a new park on the former Arsenal Lands which is located immediately adjacent to Marie Curtis Park West.

The intent is that Marie Curtis Park West and the Arsenal Lands site be developed as a regional destination park, while Marie Curtis Park East will continue to serve as a local park. The lands comprising Marie Curtis Park are owned by TRCA and will continue to be managed and operated by PF&R in accordance with the existing 1972 Waterfront Agreement between the two agencies.

The revitalization efforts generally consists of creating new park uses such as a Dog Off Leash Area, upgraded facilities, restored and new pathway connections, decommissioning of old lighting and parking areas and the creation of a new bioswale within an existing parking area to provide improved stormwater controls at the site.

RATIONALE PF&R staff has requested the assistance of TRCA's Restoration Services Division to assist with the implementation of select components of the Phase 2 revitalization efforts in light of the environmental sensitivities at the site which include:

surrounding aquatic and riparian habitat of Etobicoke Creek;

Page 47: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

47

impacted soils from historic land uses; and

the proposed bioswale, which requires specialized knowledge of soil and plant care for

proper installation.

To ensure that the above-noted sensitivities are managed with due care during construction, PF&R has requested assistance with the following specific elements of the Phase 2 works:

restoration and creation of pathway connections, including the removal of surplus soils 1.to appropriate disposal facilities as required by Ministry of Environment Guidelines;construction of the bioswale and associated features.2.

The scope of work to be undertaken by TRCA consists of the following general tasks: Prepare a detailed cost estimate and Memorandum of Understanding (MOU) for the 1.implementation of restored and new pathway connections, bioswale and associated features.Prepare, issue, award and manage all subcontracts for equipment, materials and services 2.related to the construction of the aformentioned works.Implement the works as per the approved design.3.Provide financial and other documentation as specified in the MOU.4.

Recognizing that the City of Toronto is funding the implementation of the Phase 2 works, TRCA will adopt the City of Toronto's purchasing policy regarding the use of union and skilled trade workers for any subcontracted work associated with the above. This includes, but is not necessarily limited to, works such as the final surfacing (e.g. paving) of restored and new pathway connections.

FINANCIAL DETAILS The preliminary budget is estimated at approximately $950,000.00, plus HST, plus a 10% contingency to be expended by TRCA with permission from the City of Toronto. The cost of the project is 100% recoverable from the City of Toronto within account #214-01.

Report prepared by: Moranne McDonnell, 416-392-9725Emails: [email protected] Information contact: Moranne McDonnell, 416-392-9725Emails: [email protected]: July 06, 2012

Page 48: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

48

Item AUTH7.3TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: KORTRIGHT VISITORS CENTRE RETROFIT PHASE 2 PROJECT Contract PMO12-07

____________________________________________________________________________KEY ISSUEAward of Contract PMO12-07 for roof replacement, exterior recladding and new glazing at the Kortright Visitors Centre, City of Vaughan.

RECOMMENDATION

WHEREAS the Kortright Centre, constructed in 1979, a 30,000 square foot, three level post and beam structure has major deficiencies including severely deteriorated roof and walls;

AND WHEREAS Toronto and Region Conservation Authority's (TRCA) preliminary capital budgets have made requests for approximately $700,000.00 of ongoing capital funding over the next five years to address the state of good repair of the Kortright building, and additional funding is being sought through the Federal Community Infrastructure Improvement Fund for essential renewal of the Kortright building and The Living City Campus at Kortright;

AND WHEREAS the retrofit of the building has been planned to ensure minimal disruption of the operations, including access and rental for corporate and social functions, including the growing "green" wedding business and use by over 65,000 program participants and 40,000 visitors during the maple syrup season;

THEREFORE LET IT BE RESOLVED THAT Contract PMO12-07 for the Kortright Visitor Centre Retrofit Phase 2 Project be awarded to Compass Construction Resources Ltd., at a cost not to exceed $1,271,440.00, plus 10% contingency, plus HST, subject to receipt of all necessary approvals and funding, it being the lowest bid meeting Toronto and Region Conservation Authority (TRCA) specifications;

THAT award of tender be subject to terms and conditions satisfactory to TRCA staff and legal advisers (if necessary), including but not limited to determination of the final contract cost not to exceed the approved amount;

THAT should staff be unable to negotiate a mutually acceptable tender agreement with the above-mentioned contractor, staff be authorized to enter into contract negotiations with other contractors, beginning with the next lowest bidder meeting TRCA specifications;

Page 49: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

49

THAT staff be authorized to spend in excess of available funding in any one year in order to carry out the most effective phasing of the work, as long as the total project does not exceed available funding over the life of the project;

THAT staff continue to implement the project in phases which have the highest regard for the needs and safety of the students and other visitors to Kortright;

THAT authorized officials be directed to take the necessary action to implement the contract including the signing and execution of documents;

AND FURTHER THAT staff report back to the Authority on funding status prior to initiating future phases of the retrofit.

BACKGROUNDSituated just north of Toronto, on 325 hectares of pristine woodlands, Kortright Centre for Conservation (KCC) combines a natural oasis with some of the most leading edge sustainable education programs and events in Canada. KCC hosts 135,000 visitors annually and offers over 50 environmental education programs for schools and 30 sustainable technology workshops for the public, trade and professionals. It is also a popular location for green weddings and corporate functions.

Constructed in 1979, the Kortright Visitor Centre is a 30,000 square foot, three level post and beam structure, with a 140 seat theatre, eight classrooms, a cafe and gift shop. The Visitor Centre is the hub of all educational and recreational programs and activities that provide avenues to nature-based adventures such as hiking, skiing, orienteering, geocaching, birding, dogsledding and a natural classroom.

TRCA staff has identified significant deficiencies in the overall energy efficiency of the building which coincide with the failing structure. The mechanical system has deteriorated beyond its life expectancy and the windows and doors of the building are in need of replacement. The balcony overlooking the surrounding valley environment has been condemned for several years. In more recent years, the roof has been leaking excessively resulting in water damage to the interior of the building. These factors have all contributed to the increased ongoing maintenance cost, excessive energy bills and constant equipment failures which significantly impact daily programming. In order to continue as Ontario's premier environmental and renewable energy education and demonstration centre, TRCA plans to retrofit the Kortright Visitor Centre focusing on reducing the buildings overall energy/carbon footprint.

Beginning in 2010, TRCA staff worked closely with Levitt Goodman Architects Ltd. to prepare and refine detailed design and construction drawings required to move forward with a phased approach to retrofit the aging building. The Kortright Visitor Centre Retrofit Phase 1 project was subsequently completed in March 2012 and concentrated on the operations aspect of the building in order to improve its energy efficiency. The scope of work completed for Phase 1 included:

replacement of the existing HVAC system with a geothermal ground source heat pump 1.system;structural repairs to the balcony;2.replacement of clerestory windows on the mezzanine and balcony level;3.

Page 50: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

50

new doors at every level of the building;4.installation of an Energy Recovery Ventilation unit; and5.all abatement work related to the Designated Substance Survey report completed 6.December, 2010.

Having addressed the internal energy deficiencies, the focus has now shifted towards the building envelope for Phase 2 of the retrofit. The scope of work includes completing the detailed design for the rehabilitation of the exterior walls and roof of the existing building. Additional insulation will be added to several areas of the building to increase the thermal resistance (R-Value) to improve the interior temperature conditions. Additional glazing has also been proposed along the south and east walls and skylights in the north and west sloped roofing sections to bring more natural light into the three levels of the Visitor Centre. The Phase 2 works will ensure that the building exterior issues are addressed in conjunction with improving the building aesthetics to support the Kortright Centre programming.

RATIONALERequest for Pre-Qualification (RFPQ) for general contractors to perform the Phase 2 retrofit was advertised on-line with Biddingo.com on May 25, 2012 and closed on May 30, 2012. The work includes, but is not necessarily limited to, the supply of labour, material, supervision and equipment required to complete the scope of work for the project. The general contractor will coordinate all construction activities which comprise of a new roof, new siding and additional windows on the lower level of the building.

Interested general contractors in pre-qualifying were advised that the criteria for evaluation will include the following in order to receive a tender package:

CCDC 11 (Canadian Construction Documents Committee) requirements and completion;

past experience in the construction of buildings of similar size;

past experience with similar buildings;

experience of suggested personnel for this project;

project record over the past five years;

ability to meet construction schedule milestones;

ability to coordinate work by others;

experience dealing with designated hazardous substances;

experience dealing with projects with construction budgets of $750,000.00 to $1,500,000.00;

references focusing on firms history of project control and experience.

All interested general contractors will need to be bondable and will require a bid bond of 10% of the contract price at the time of the tender submission. Pre-qualification information was submitted by the following 14 firms:

BECC Construction Group;

Chart Construction Management;

Compass Construction Resources Ltd.;

Elite Construction;

Everlast Restoration;

J.D. Strachan Construction;

JJM McGuire Contractors;

Limen Group;

Martinway Contracting;

Page 51: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

51

Morosons Construction;

R-Chad Contracting;

RTM;

Rutherford Contracting; and

Struct-Con Construction.

The pre-qualifying documents were reviewed by the selection committee made up of TRCA staff whose evaluation was based on the previously defined criteria and reference checks for past completed projects.

Based on the evaluation process, Tender documents were made available to the following nine general contractors:

BECC Construction Group;

Compass Construction Resources Ltd.;

Elite Construction;

J.D. Strachan Construction;

JJM McGuire Contractors;

Limen Group;

Martinway Contracting;

Rutherford contracting; and

Struct-Con Construction.

All pre-qualified companies attended a mandatory site meeting on June 12, 2012.

Tenders closed on July 5, 2012 at 12:00pm and were opened by the Tender Opening Committee on July 6, 2012 with the following results:

BIDDERS TOTAL(Plus HST)

Compass Construction Resources Ltd. $1,271,440.00BECC Construction Group $1,293,694.69Struct-Con Construction $1,353,000.00

Martinway Contracting $1,398,000.00 Rutherford contracting $1,436,508.00 J.D. Strachan Construction $1,550,300.00

Having previously pre-qualified the bidders qualifications, TRCA staff evaluated the tenders on the bid prices and the ability to complete the project as specified in the tender documents. TRCA reviewed the bids against its own cost estimates and has determined that the bids are of reasonable value. Based on evaluation of the bids received, staff recommends that Contract PMO12-07 be awarded to Compass Construction Resources Ltd. for the total cost not to exceed $1,271,440.00, plus a 10% contingency plus HST, as they are the lowest bidder that meets TRCA specifications.

Page 52: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

52

FINANCIAL DETAILSThe costs associated with Kortright Centre Retrofits will be offset by funding requested for 2012-2017. The table below outlines the projected budgets for each applicable year.

Funder 2012($)

2013($)

2014($)

2015($)

2016($)

2017($)

York Region (418-22) 242,000 255,000 255,000 260,000 260,000 270,000Peel Region (425-01) 175,000 200,000 200,000 200,000 200,000 300,000York Region (425-01) 242,000 250,000 250,000 250,000 250,000 250,000 Funding Subtotal 659,000 705,000 705,000 710,000 710,000 820,000

The Phase 2 Retrofit will require additional funding from the 2013 budget to subsidize the costs over and beyond the 2012 budget. The reasoning behind this financing strategy is to prevent any disruptions to the Kortright Centre programming such as green weddings and school groups. The phases of the retrofit will be dependant on each other to ensure that the building will be able to continue with its revenue generating operations by providing a suitable venue to its clients. With the anticipated completion of the Phase 2 retrofit, the aesthetic improvements will allow for the scheduling of Phase 3 of the retrofit without having to turn away future business.

Additionally, the federal government has recently announced the Community Infrastructure Improvement Funding. Funding will be sought through this program to accelerate the retrofit of the building and to restore the Campus trails to a state of good repair.

2012 funds required are available in from the regions of York and Peel. Additional funds required to complete this project are identified in preliminary 2012-2017 Kortright Retrofit Capital Budget requests to York and Peel regions in accounts 418-22 and 425-01.

Report prepared by: Aaron D'Souza, extension 5775 Emails: [email protected] Information contact: Derek Edwards, extension 5672Emails: [email protected]: July 10, 2012

Page 53: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

53

Item AUTH7.4TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Nick Saccone, Director, Restoration Services

RE: MIMICO WATERFRONT PARK PROJECT (PHASE 2)Contract RSD12-86

____________________________________________________________________________KEY ISSUEAward of Contract RSD12-86 for the supply and installation of Decorative Pathway Lighting.

RECOMMENDATION

THAT Contract RSD12-86 for the supply and installation of Decorative Pathway Lighting, to the Mimico Waterfront Park Project (Phase 2) and the Humber Bay West Park, in the City of Toronto, be awarded to Stacey Electric Company for a total cost not to exceed $248,387.40, plus a contingency amount of $25,000.00 to be expended as authorized by Toronto and Region Conservation Authority (TRCA) staff, plus HST, it being the lowest bid meeting TRCA staff cost estimates and specifications;

AND FURTHER THAT authorized officials be directed to take the necessary action to implement the contract including the signing and execution of documents.

BACKGROUNDThe Mimico Waterfront Park Project (Phase 2) is located between Superior Avenue and Humber Bay West Park along the north shore of Lake Ontario, in the City of Toronto. The proposed pathway lighting will be an important element that ties Mimico Linear Waterfront Park (Phase 2) together with the surrounding city. Toronto Waterfront Revitalization Corporation (TWRC) authorized TRCA to assume a leadership role in the planning, design and implementation for the construction of the Mimico Waterfront Park Project (Phase 2).

The decorative pathway lighting will be used along Mimico Linear Waterfront Park’s pathway to provide the necessary light and aesthetics to the area. It will continue along to the connecting Humber Bay West Park to replace the existing lighting fixtures to create a more uniform lighting scheme.

RATIONALERequest for Quotation (RFQ) packages were sent to a total of nine potential bidders as follows:

Sturdy Power Lines Ltd.;

Dilisado Enterprises;

Langley Utilities Contracting Ltd;

TBG Landscape Inc.;

Stacey Electric Company;

Black and McDonald;

Beacon Utilities Contractors;

Guild Electric; and

Platinum Electric.

Page 54: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

54

Tender RSD12-86 was publicly advertised on the electronic procurement website Biddingo (http://www.biddingo.com/) on June 19, 2012. Tenders were opened at Tender Opening Committee Meeting #3/12, held on July 6, 2012, with the following results:

Contract RSD12-86, Supply and installation of Decorative Pathway Lighting

BIDDERSTOTAL VALUE OF CONTRACT

(Plus HST)Stacey Electric Company $248, 387.40Platinum Electric $253,895.00Guild Electric $257,530.00Dilisado Enterprises $315,750.00TBG Landscape Inc. $342,220.80Beacon Utilities Contractors $479,693.70

The Project Design Engineer (Stevenson Engineering) reviewed the Tender submitted by Stacey Electric Company and agrees with staff's review of the same that the contract is of good value. Based on the bids received, staff recommend that Stacey Electric Company be awarded Contract RSD12-86 for the supply and installation of Decorative Pathway Lighting for a total amount not to exceed $248,387.40, plus a contingency amount of $25,000.00 to be expended as authorized by TRCA staff, plus HST, it being the lowest bid that meets TRCA staff cost estimates and specifications.

FINANCIAL DETAILSFunds are available within account #205-90 from TWRC.

Report prepared by: Rudra Bissoon, 416-393-6336 Emails: [email protected] Information contact: James Dickie, 416-392-9702 Email: [email protected]: July 06, 2012

Page 55: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

55

Item AUTH7.5TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Nick Saccone, Director, Restoration Services

RE: CHERRY BEACHDrainage Improvements

____________________________________________________________________________KEY ISSUEApproval to enter into an agreement with the City of Toronto to complete the planning and design of drainage improvements for Cherry Beach, City of Toronto.

RECOMMENDATION

THAT approval be granted to enter into an agreement with the City of Toronto for the planning and design of drainage improvements for the roadway, turning circle and east parking lot at Cherry Beach, in the City of Toronto;

THAT implementation be subject to funding from the City of Toronto and terms and conditions satisfactory to Toronto and Region Conservation Authority (TRCA) staff;

THAT authorized TRCA officials be directed to take such action as is necessary to implement the approved projects, including obtaining needed approvals, tendering work, signing of contracts and execution of documents; and

AND FURTHER THAT the City of Toronto be so advised.

BACKGROUNDTRCA has partnered with the City of Toronto for many years to provide project design, coordination of approvals and implementation services in support of City-led natural environment projects throughout the City and across the Toronto waterfront.

In 2006, the City formalized the process and requested TRCA to enter into an agreement which stipulated terms and conditions for the supply and delivery of projects and services in accordance with an approved list of projects. The agreement also provided a mechanism by which TRCA could invoice the City to recover costs for the services and material supplied.

In November 2011, TRCA was approached by the City of Toronto Parks, Recreation and Forestry Department to provide the lead role in the planning to re-design the existing roadway, turning circle and east parking lot to address deficiencies and improve stormwater drainage at Cherry Beach.

TRCA staff submitted a proposal to the City outlining the approach to the agreement, which was approved by the City of Toronto’s Parks, Recreation and Forestry Department in July 2012.

Page 56: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

56

SCOPE OF WORKTRCA will be responsible for the overall project management including the following items:

Retain the services of a professional geotechnical engineering firm and registered

Ontario land surveyor to assist with the planning and design of the project.Contract management of the successful consultants.

Manage the project schedule and budget.

Ensure the completion of all project deliverables.

Actively participate in meetings (including organization, attendance and

preparation/distribution of meeting materials and minutes).Provide details on project approvals as project progresses through the planning process

(including application(s) and notices).If required, complete the restoration/landscape plan for the project area.

The proposed consulting team will be responsible to complete the following items: Investigate and advise on drainage properties of existing soils, and provide

recommendations for drainage improvements with respect to the development of design options.Investigate and advise on the geotechnical properties of existing soils and granular

parking lots, and advise on design recommendations for the repair of parking lot surfaces (and prevention of future potholes), and roadway design.Provide technical input into the construction/tender documentation to implement

accepted design recommendations.Recommend and execute a materials and compaction testing quality control program

during construction of park and drainage improvements.

RATIONALETRCA involvement in the planning and implementation of this project was requested based on the history of cooperative project management between the City of Toronto and TRCA, and TRCA's specialized expertise in works of this type.

TRCA is recognized by the City of Toronto as being able to provide cost-effective management of watershed related projects due to highly specialized expertise, the ability to expedite required approvals and permits, facilitate community involvement and meet tight timelines. As such, the City has requested that TRCA enter into an agreement to implement the project.

FINANCIAL DETAILSWorks will proceed by TRCA staff once approval is given by City of Toronto staff. Procurement of services will be conducted in accordance with TRCA's Purchasing Policy.

The total estimate value of work based on preliminary information is $90,000. Account code 197-01 has been setup for this project. The full costs of the project are 100% recoverable from the City of Toronto.

Report prepared by: Lindsay Prihoda, extension 5787Emails: [email protected] Information contact: Lindsay Prihoda, extension 5787Emails: [email protected]: July 05, 2012Attachments: 1

Page 57: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

57

Attachment 1

Page 58: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

58

Item AUTH7.6TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Nick Saccone, Director, Restoration Services

RE: SUPPLY OF RENTAL RATES FOR OPERATED HEAVY CONSTRUCTION EQUIPMENT AND DUMP TRUCKSContract Extension

____________________________________________________________________________KEY ISSUEExtension of Contract RSD11-25 for the Supply of Rental Rates for Operated Heavy Construction Equipment and Dump Trucks, for the period August 1, 2012 to March 31, 2013.

RECOMMENDATION

THAT Contract RSD11-25 for Supply of Rental Rates for Operated Heavy Construction Equipment and Dump Trucks, awarded in 2011 to Sartor & Susin Ltd., be extended from August 1, 2012 to March 31, 2013 subject to terms, conditions and performance satisfactory to Toronto and Region Conservation Authority (TRCA) staff, at an estimated total cost of $3,200,000 plus HST, for a total estimated contract cost not to exceed $6,000,000 plus HST.

BACKGROUNDAt Authority Meeting #7/11, held on July 29, 2011, Resolution #A168/11 was approved, in part, as follows:

THAT the Restoration Services Division utilize, as required, the services of Sartor and Susin for the supply of operated heavy construction equipment and dump trucks for the period August 1, 2011 to July 31, 2012, be awarded to Sartor and Susin Limited, it being the tender that bests meets Toronto and Region Conservation Authority's (TRCA's) requirements at a competitive cost;...

The current contract expiration date of July 31st is less than ideal as the summer months are extremely busy for construction, and the potential disruption in the provision of equipment by changing suppliers adds unnecessary risk to meeting project delivery dates. To mitigate this risk, staff recommend that the current contract be extended to March 31, 2012 to allow for the annual heavy equipment contract to commence April 1st annually thereafter, which is traditionally less demanding of heavy equipment at TRCA given the in-water construction restrictions between April 1st and July 31st. A contract commencement date of April 1st also aligns better with annual capital budget approvals, giving staff a better understanding of heavy equipment needs when preparing the new tender documents.

Sartor & Susin Ltd. have agreed to a contract extension and have submitted, in writing, a request for an increase of three percent (3%) to all unit rates to cover increases in their operating costs should the contract be extended on August 1st.

Page 59: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

59

RATIONALETRCA and Sartor & Susin Ltd. have worked together on numerous successful projects for more than 25 years, and through the tendering process, Sartor & Susin Ltd. has consistently provided the lowest unit rates with a broad spectrum of equipment and experienced operators. During this long-standing relationship Sartor & Susin Ltd. has always strived to accommodate TRCA's changes in scheduling, scope and equipment needs to help TRCA keep its projects on time and on budget.

Staff has reviewed the proposed new rate structure, in conjunction with a review of performance over the past year, and are satisfied that the requested three percent increase is reasonable.

FINANCIAL DETAILSUnder the existing contract, Sartor & Susin Ltd. will have supplied approximately $2.8 million in heavy equipment services to TRCA between August 1, 2011 and July 31st, 2012. Based on a review of Restoration Services' tentative construction schedule between August 1, 2012 and March 31, 2013, the estimated value of this contract extension is $3.2 million, which was determined based on an average annual monthly expenditure in heavy equipment of $234,000 x eight months, plus the addition of a special project approved under Resolution #A2/12 at Authority Meeting #1/12, held on February 24, 2012 (Armouring of the Flood Protection Landform at the West Don Lands) which is estimated to require up to $1,000,000 in heavy equipment alone between August 1st and October 31, 2012, plus a 10% contingency for additional work that may be identified during the extension period. It is noted that an increase or decrease in workload will have an impact on the value of this contract extension. The operated equipment is rented on an "as required" basis with no minimum or maximum rental hours guaranteed.

Report prepared by: Rudra Bissoon, 416-393-6336 Emails: [email protected] Information contact: James Dickie, 416-392-9702 Emails: [email protected]: June 29, 2012

Page 60: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

60

Item AUTH7.7TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Derek Edwards, Director, Parks and Culture

RE: COMMUNITY INFRASTRUCTURE IMPROVEMENT FUND____________________________________________________________________________KEY ISSUEProject endorsement to meet Community Infrastructure Improvement Fund application requirements.

RECOMMENDATION

WHEREAS the federal government has announced the Community Infrastructure Improvement Fund (CIIF), a funding program for the renovation and rehabilitation of community infrastructure between April 1, 2012 and March 31, 2014;

AND WHEREAS project applications must be duly authorized or endorsed by a resolution of the Authority and submitted as a component of the application;

THEREFORE LET IT BE RESOLVED THAT Toronto and Region Conservation Authority (TRCA) submit funding applications to the CIIF program for the following projects:

Kortright Centre For Conservation Retrofit, Municipal Water Connection and Trail

Plan;Black Creek Pioneer Village Emergency Preparedness Infrastructure;

Communication IT Services and Upgrades across all TRCA Facilities;

Petticoat Creek Aquatic Facility Enhancements;

Accessibility Upgrades at all TRCA Facilities;

Claremont Field Centre Accessibility and Energy Efficiency Retrofit;

Albion Hills Conservation Area Road Upgrades;

Bolton Camp Recreation Centre Revitalization;

Arsenal Building Renovation;

AND FURTHER THAT TRCA staff report to the Authority for additional approvals as required.

BACKGROUNDFirst announced in Economic Action Plan 2012, the Community Infrastructure Improvement Fund provides $150 million for the repair and improvement of community infrastructure facilities across Canada. Eligible projects include expansion of existing community infrastructure facilities such as community centres, recreational buildings, local arenas, cultural facilities and other community facilities. This will improve the quality of community facilities and provide economic benefits, including support for job creation, in communities across Canada.

FedDev Ontario is delivering the CIIF in Ontario with an allocation of $49.6 million over two years. Applications are being accepted for projects in Ontario until August 24, 2012.

Page 61: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

61

Under CIIF, eligible recipients may receive a non-repayable contribution of up to 50 percent of eligible costs of an infrastructure project, with recipients providing the remaining balance. However, priority may be given to those projects that require a CIIF contribution of only 33.3 percent. Eligible recipients may receive contributions of up to a maximum of $1,000,000. The total funding from all federal sources will not exceed 50 percent of total eligible project cost. Eligible projects must be substantially completed by March 31, 2014.

Project applications must be duly authorized or endorsed by a board resolution. The resolution must be submitted at the time of the application.

TRCA staff would like to submit applications for the following projects. The application requires projects be ranked in terms of priority for a submitting agency, and ranking will be determined as full project applications are developed. Project names, details, costs grant percentages provided below are preliminary and may be updated as staff work through the application process.

Kortright Centre For Conservation Retrofit, Municipal Water Connection and Trail PlanUpgrade and enhance existing facilities as follows with the aim of revitalizing the programs and facilities of the Kortright Centre:

retrofit of the Kortright Visitor Centre;

installation of municipal water servicing; and

upgrade and reconfiguration of existing trail systems and learning spaces to enhance

learning activities related to renewable energy, biodiversity and cultural heritage, including The Shared Path/Le Sentier Partagé: Discovery Walk

The budget for this project is approximately $3,000,000. TRCA is seeking a 33.3% contribution of $1,000,000 from the CIIF for this project. Planning for this project is underway with $2,000,000 funding secured from Peel and York regions.

Black Creek Pioneer Village Emergency Preparedness InfrastructureImprove emergency preparedness at Black Creek Pioneer Village to protect its property, infrastructure, staff and visitors as well as reduce the potential for economic losses by undertaking the following:

installation of a generator at the Visitors Centre to reduce impacts of power outages on:

public safety of the more than 135,000 visitors annually; and historic artifacts and perishable products that must be maintained in a climate controlled setting; andstaff training in, emergency procedures and protocols, and purchase of emergency

equipment.

The budget for this project is $250,000. TRCA is seeking 50% contribution of $125,000 from the CIIF. Remainder of the funding is available through Black Creek Pioneer Village 2013 Capital Budget through the City of Toronto.

Communication IT Services and Upgrades across all TRCA FacilitiesThis project involves upgrades to the computing power and network call carrying capacity across all TRCA facilities in order to drive: employee productivity and learning; quality customer service to clients; and cost effectiveness; through improved computer hardware, connectivity, consolidated databases, e-government website services and process automation.

Page 62: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

62

The budget for this project is $1,170,000. TRCA is seeking 50% contribution of $585,000 from the CIIF. The remainder of the funds are available through TRCA's IT and Website Development budgets.

Petticoat Creek Aquatic Facility EnhancementsConstruction of Petticoat Creek Aquatic Facility was completed in 2012 through funding from the Recreational Infrastructure Canada (RInC) and Ontario Recreation programs as well as TRCA reserve funds. Several design components of the facility were omitted from the original project due to budget constraints. The TRCA submission for Petticoat Creek Aquatic Facility Enhancements will include:

retrofit of existing snack bar building;

replacement of existing playground facility;

installation of a central shade structure and two smaller structures; and

installation of additional water play features in the splash pool.

The budget for this project is $600,000. TRCA is seeking a 50% contribution of $300,000 from the CIIF and will work jointly with our municipal partners and others to provide the remainder of the required funds.

Accessibility Upgrades at all TRCA FacilitiesTRCA is committed to improving opportunities for persons with disabilities and to provide for their involvement in the identification, removal and prevention of barriers that may otherwise preclude them from visiting TRCA facilities. One in six Canadians has some form of disability, comprising a significant portion of the consumer market. Furthermore, due to the aging Baby Boomer generation, the percentage of the population requiring barrier free access to recreation facilities is likely to increase in the next decade. Therefore, accessibility improvements and the removal of barriers at TRCA facilities provides opportunities for engagement in recreation and learning activities by a larger segment of the population, and a resultant potential increase in revenue generation.

All proposed upgrades and retrofits will follow the City of Toronto Accessibility Design Guidelines and be in compliance with the Ontario Human Rights Code, Ontarians with Disabilities Act and the Ontario Building Code. Accessibility retrofits will meet the following objectives:

make approaching, entering and using buildings and structures easier. In this respect,

accessible design must address a wide variety of internal and external building elements; provide an equivalent level of life safety for everyone, including methods of leaving a

building and communicating in an emergency; and emphasize dignity and independence, providing those features that will allow people to

function in their day to day activities.

Scope of work will include: establish barrier-free access trails and paths to existing washrooms/public use facilities

across all TRCA locations; create accessible camping areas and adjacent facilities; and

retrofit existing washroom facilities to meet accessibility standards.

Page 63: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

63

The budget for this project is $500,000. TRCA is seeking a 50% contribution of $250,000 from the CIIF. TRCA is currently pursuing other grant applications as well as capital asks from its municipal partners for the remainder of the funds.

Claremont Field Centre Accessibility and Energy Efficiency RetrofitRenovation and retrofit of Claremont Field Centre to provide barrier free access for students of various levels of ability (physical, visual and auditory) to outdoor education programs through:

redevelopment of outdoor education assets, including wetlands, pioneer cabin, group

dynamics course and associated trails; and retrofit and renovation of Claremont Field Centre building.

In addition, improvements will be made to the building envelope to achieve a high level of environmental performance, thereby reducing the climate change impact of Claremont Field Centre and improve visitor comfort, while providing a learning opportunity for visiting students on climate change.

The budget for this project is $380,000. TRCA is seeking a 50% contribution of $190,000 from the CIIF. Planning for this project is underway with funding available in the Claremont Field Centre Operating Major Maintenance Account, Public Use Capital and The Living City Foundation (proceeds from Sunny Days for Conservation).

Albion Hills Conservation Area Road UpgradesAlbion Hills Conservation Area requires significant road upgrades to the internal road network as many are in a state of disrepair and pose a health and safety issue for staff and visitors. Works include paving or repaving auxiliary roads at the conservation area.

The budget for this project is $450,000. TRCA is seeking a 50% contribution of $225,000 from the CIIF. Remainder of the funding is available through the Region of Peel capital budget.

Bolton Camp Recreation Centre RevitalizationUpgrade and enhance existing recreation facilities as follows at the historic Bolton Camp in the Town of Caledon in order to kick start the efforts of TRCA and its municipal partners in re-establishing a recreation use at this significant community asset:

upgrade the ‘Dining Hall’ and gymnasium to allow for barrier-free access and to return the

buildings to a usable state; andrecreation infrastructure upgrades including pool retrofit, replacing and upgrading

changerooms to meet Ontario Disability Act Standards, turf sports field restoration and nature trail enhancements.

The budget for this project is $1,200,000. TRCA is seeking a 33.3% contribution of $400,000 from the CIIF. Remainder of the funding of $800,000 is identified in the TRCA budget from the Region of Peel and City of Toronto.

Arsenal Building RenovationThe Arsenal Building has been designated by City of Mississauga under the Ontario Heritage Act . The Lakeview Legacy Foundation, created by a group of local residents, is looking at adaptive reuse opportunities for the building. Future uses proposed by the Lakeview Legacy Foundation include:

Arts: with artists in residence and others sharing studio/display/performance space;

Page 64: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

64

Culture: with programming to celebrate culture in Mississauga;

Heritage: to commemorate the role of the site and building history;

Science: to examine brownfield sites in relation to culture and community development.

In order to accommodate these uses, this heritage structure needs to be preserved and prevented from further deterioration, therefore requiring the following upgrades:

replacement or improvement of the heating, plumbing, electrical supply and distributions

systems; replacement of the roof on the rear portion of the building and other minor structural work;

andabatement of existing asbestos.

The budget for this project is $3,000,000. TRCA is seeking 33.3% contribution of $1,000,000 from the CIIF. $2,000,000 has been requested from the Region of Peel.

DETAILS OF WORK TO BE DONETRCA staff will submit CIIF funding applications for the aforementioned projects by August 24, 2012. Approved projects will be presented to the Authority for further approvals as required.

Report prepared by: Kate Pankov, extension 6418Emails: [email protected] Information contact: Kate Pankov, extension 6418Emails: [email protected]: July 13, 2012

Page 65: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

65

Item AUTH7.8TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: TORONTO AND REGION REMEDIAL ACTION PLAN____________________________________________________________________________KEY ISSUERenewal of Toronto and Region Remedial Action Plan agreements between Toronto and Region Conservation Authority, Environment Canada and the Ontario Ministry of the Environment, respectively.

RECOMMENDATION

THAT Toronto and Region Conservation Authority (TRCA) staff continue to work with federal and provincial representatives to finalize the 2012-2013 Remedial Action Plan (RAP) agreements between TRCA and Environment Canada and the Ontario Ministry of the Environment, respectively;

AND FURTHER THAT staff continue to work with the Toronto and Region Remedial Action Plan (RAP) team, federal, provincial and municipal staff, the academic community, environmental non-governmental organizations and others to implement the 2012-2013 RAP workplan and advance RAP objectives.

BACKGROUNDThe Toronto and Region Remedial Action Plan was instituted in response to the 1987 designation of Toronto and Region as a Great Lakes Area of Concern (AOC). The AOC designation was one of 42 (later 43) made by the International Joint Commission. The Toronto and Region AOC consists of six watersheds stretching from the Rouge River in the east to Etobicoke Creek in the west.

Under the Great Lakes Water Quality Agreement (GLWQA) and Canada-Ontario Agreement (COA), Environment Canada (EC) and the Ontario Ministry of the Environment (MOE) share responsibility for ensuring progress on the Great Lakes AOCs. Since 2002, TRCA has led the administration of the Toronto and Region RAP under agreements with EC and the MOE. Management of the Toronto and Region RAP is undertaken by representatives from EC, MOE, the Ontario Ministry of Natural Resources (MNR) and TRCA.

On June 13, 2009, U.S. Secretary of State Hillary Clinton and Canadian Foreign Affairs Minister Lawrence Cannon announced their intention to renegotiate the GLWQA. The GLWQA came into effect in 1978, and was last amended in 1987 - the time at which areas of concern and remedial action plans were introduced through GLWQA Annex 2. The renegotiation of the GLWQA is currently ongoing, and Conservation Ontario has been involved as a respondent in the associated GLWQA public consultation processes.

Page 66: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

66

On March 31, 2010, the 2007-2010 COA expired, as did the respective 2007-2010 RAP agreements between TRCA and EC and MOE, respectively. As the GLWQA is the agreement on which COA negotiations are predicated, the federal and provincial governments have to date deferred the renegotiation of a subsequent COA. Instead, the governments extended the 2007-2010 COA over the 2010-2011 and 2011-2012 federal/provincial fiscal years and maintained program scope and funding at existing levels. Remedial Action Plan program delivery in the 2012-2013 fiscal year is anticipated to be supported through the second year of a four-year, $1,000,000 agreement with EC, as well as a single year, $250,000 agreement with the MOE.

DETAILS OF WORK TO BE DONEThe activities of the Remedial Action Plan 2012-2013 fiscal year will build on the milestones of 2011-2012. The first of these milestones was the re-designation of two categories of environmental degradation, or Beneficial Use Impairments (BUIs), from “Requires Further Assessment” to “Not Impaired”. At the completion of the RAP Stage 1 report in 1989, Toronto and Region was deemed to be “Impaired” for eight BUIs, as well as to require additional research on three Beneficial Use Impairements. Three additional BUIs were deemed to be “Not Impaired”. Additional assessment, research, analysis and public review were completed 2011-2012 for two of the three Beneficial Use Impairments that required further assessment: Fish Tumours or Other Deformities; and Bird or Animal Deformities or Reproductive Problems. The research results indicated that these Beneficial Uses were Not "Impaired" within the Toronto and Region AOC; their respective changes in status to “Not Impaired” marked the first such re-designations for the Toronto and Region Remedial Action Plan.

A second milestone attained in 2011-2012 was the launch of a review and update of the criteria against which the remaining Beneficial Use Impairments will be considered “Impaired” or “Not Impaired”. The existing criteria were set forth in the 1994 RAP Stage 2 document Clean Waters, Clear Choices . The review of these criteria involves a public consultation process underpinned by dialogue with academic and agency technical experts. The anticipated outcome of these proceedings will be updated targets based on indicators of both environmental quality and program implementation - these targets will outline an ambitious but achievable path forward toward delisting Toronto and Region as an Area of Concern by 2020.

Current Remedial Action Plan InitiativesThe TRCA RAP workplan for 2012-2013 was approved at the RAP Team meeting of July 12, 2012. The 2012-2013 workplan is similar to those of previous years, with the majority of resources being directed toward the Sustainable Technologies Evaluation Program (STEP), the Regional Watershed Monitoring Program (RWMP), habitat initiatives, watershed strategies, and education and outreach programs. Collectively these programs reflect the RAP’s priorities in supporting Low Impact Development (LID), stormwater management, effective stewardship and environmental monitoring of the AOC.

The City of Toronto Don River and Central Waterfront Project (Wet Weather Flow Management Master Plan Implementation) continues to constitute an important element of a revitalized Toronto and Region AOC.

Page 67: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

67

In collaboration with TRCA and Conservation Ontario, in 2012-2013 the Remedial Action Plan has contributed, and will continue to contribute, feedback as requested in response to the June 6, 2012, MOE draft Bill 100: An Act to protect and restore the Great Lakes – St. Lawrence River Basin and draft Great Lakes Strategy . If passed, this Act could represent significant opportunity for the protection and restoration of the Great Lakes, and Great Lakes Areas of Concern thereof.

The Remedial Action Plan will also continue to fund a public outreach program – the Lake Ontario Evenings (LOE) – throughout 2012-2013. The LOE program was initiated in 2009 with the mandate to provide casual public venues in which attendees can listen to, and ask questions of experts on issues currently faced by Lake Ontario. There have been nine LOE events to date, and the audience and media response have been sufficiently positive to maintain this initiative through 2012-2013.

Challenges for the FutureAs noted above, federal and provincial support of the RAP in 2012-2013 is similar in scope and resources to that provided in recent years. While the review and update of AOC targets will provide realistic and achievable endpoints for the Toronto and Region RAP, these targets will only be met and the Toronto and Region be delisted as an Area of Concern with significant financial commitments by all levels of government.

FINANCIAL DETAILSTRCA funding for RAP initiatives in 2012-2013 will be provided by funding agreements between TRCA and EC ($250,000), and TRCA and MOE ($250,000). Project proponents from within TRCA apply to the Toronto and Region RAP team for funds, and the TRCA RAP workplan is developed on the basis of these proposals. It is anticipated that the agreement between TRCA and MOE will be for one year and will expire on March 31, 2013; a four-year agreement with Environment Canada was implemented in July 2011 and will expire on March 31, 2015.

In addition to dedicated RAP funds, certain TRCA projects (e.g. STEP and Rural Clean Water Program) also receive funding through municipal capital funding, MOE, MNR and federal Great Lakes Sustainability Fund which also advances RAP objectives.

Report prepared by: Stephanie Hawkins, extension 5576 Emails: [email protected] Information contact: Meg St John, extension 5576Emails: [email protected]: May 03, 2012

Page 68: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

68

Item AUTH7.9TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: HIGHLAND CREEK WATERSHED GREENING PROJECTS UPDATE____________________________________________________________________________KEY ISSUETo report on current Highland Creek watershed greening projects and recent accomplishments.

RECOMMENDATION

THAT Toronto and Region Conservation Authority (TRCA) staff be directed to continue to work with the Highland Creek watershed communities and City of Toronto staff to plan and implement Neighbourhood Greening Plan projects;

THAT staff continue to apply for external funding to support the implementation of Neighbourhood Greening projects;

THAT staff apply the Neighbourhood Greening Project planning and community engagement approach to other areas of the Highland Watershed as opportunities arise;

THAT the final Neighbourhood Greening Plans be circulated to the project’s community partner organizations and made available to the public on TRCA’s website;

THAT the Ontario Trillium Foundation be thanked for their generous contribution to make the Highland Creek Watershed Neighbourhood Greening Project possible;

AND FURTHER THAT staff be directed to report back to the Authority on this project and the Greening Strategy as appropriate.

BACKGROUNDThe Highland is an “urban creek” with more than 85 kilometres of watercourses draining an area of 102 square kilometres. It is located primarily within the City of Toronto (Scarborough) with its northern-most limits within the City of Markham. Whereas the watershed was once nearly 100 percent forested, it is now 85 percent developed and home to over 360,000 people. Due to intense pressures from urbanization, the watercourses and natural ecosystems in the Highland Creek watershed are affected by compromised water quality, erosion caused by high storm flows, and degradation of terrestrial natural heritage. Only 0.5 percent of its original wetlands remain.

Page 69: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

69

While the Highland Creek watershed has been extensively developed, remnant forests, wetlands and meadows provide habitat for a range of wildlife, particularly through the ravine system south of Highway 401 which includes Morningside Park, Cedarbrook Park, Colonel Danforth Park and Stephenson’s Swamp at the mouth of the creek. Many of the Highland’s watercourses have been buried or channelized as land was developed, particularly north of Highway 401.

The Highland Creek watershed is the only remaining watershed within the City of Toronto's jurisdiction that has not undergone a comprehensive process to develop an integrated watershed strategy to address the multiple issues and opportunities for regeneration of urban watersheds.

A State of the Watershed Report was completed by TRCA and City of Toronto for the Highland watershed in 1999, that provided a comprehensive document on the natural and cultural heritage conditions of the Highland Creek watershed and an assessment of then-current environmental and related social conditions. The report also provided suggestions for future management of the Highland watershed.

The City of Toronto's Wet Weather Flow Master Plan (WWFMP), adopted in 2003, has provided an excellent basis to address a number of serious water quality and quantity issues found across the City of Toronto, including the Highland watershed. Subsequent to completion of the WWFMP, the City proceeded with a geomorphology study of the Highland watershed to protect infrastructure and improve fish habitat. The objectives of this Highland Creek Geomorphic Systems Master Implementation Plan are to:

gain a detailed understanding of the Highland Creek system;

reduction in risk to public health and safety;

enhancement of channel stability;

preservation/enhancement of fisheries habitat; and

prioritization of works and management of capital and operational costs.

The August 19, 2005 storm had a significant impact on Highland Creek, including extensive erosion, damage to Toronto Water infrastructure and private property. Down-cutting of the creek bed from ongoing stormwater erosion led to exposure and damage to a sanitary sewer crossing in Morningside Park requiring Toronto Water to undertake emergency works while simultaneously working on the comprehensive Geomorphic Systems Master Implementation Plan for 40 valley segments across the watershed.

At Authority Meeting #7/07 TRCA staff provided an update on the City's Geomorphic Systems Master Plan studies and design process to implement channel restoration works. Authority direction to develop a Highland Creek Watershed Greening Strategy was approved via Resolution #A207/07, in part, as follows:

...THAT the City of Toronto be requested to explore opportunities to enhance the Highland Creek valley system by restoring natural habitat, reconnecting the channel to the floodplain and improving the trails and other recreational amenities through the development of a comprehensive Greening Strategy for the Highland Creek watershed;...

Page 70: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

70

In 2009 a TRCA capital budget request, supported by the City of Toronto, was approved to develop a Greening Strategy to integrate various TRCA and City of Toronto objectives and plans. The Greening Strategy was to serve as a restoration strategy to, in part, accompany the Geomorphic Systems Master Implementation Plan. TRCA and City staff decided to defer undertaking the development of the Greening Strategy, and associated plans such as the Habitat Implementation Plan and Aquatic Habitat Management Plan, until the City’s Geomorphic Systems Master Implementation Plan was complete.

In early 2011, the City of Toronto completed the Highland Creek Geomorphic Systems Master Implementation Plan under the Municipal Class EA Master Planning process. The Plan identified geomorphic and aquatic habitat-based solutions to manage the impacts of historical channelization and excessive stormwater run-off in the stream channels of the Highland Creek watershed. TRCA staff provided technical input to the plan including archaeological screening of the study area, York-Peel-Durham-Toronto Groundwater model and TRCA’s base flow measurements comparisons, and an assessment of potential terrestrial heritage impacts as a result of the proposed valley segment works. Key recommendations of the study include:

The study confirms the Wet Weather Flow Master Plan study finding that in-stream

intervention is the necessary solution to resolve stream restoration issues. A variety of solutions that vary in scale are needed to address priority infrastructure

protection and aquatic habitat issues, ranging from stream realignment projects to complete channel reconstruction to site scale repairs and channel maintenance solutions.A limited number of opportunities for end-of-pipe facilities exist.

These solutions would be implemented over the next two to three decades.

With the City of Toronto’s Highland Creek Geomorphic Systems Master Plan study completed, TRCA staff moved forward with development of a work plan for the Greening Strategy, establishing goals and objectives, and compiling updated existing conditions mapping. Community engagement and education efforts also commenced through the Ontario Trillium Foundation funded Highland Watershed Neighbourhood Greening Project (see below).

Greening StrategyAn internal steering committee of TRCA and City of Toronto staff from Parks, Forestry and Recreation, and Toronto Water worked to develop and refine the following goal and objectives of the Greening Strategy:

Goal :The goal of the Highland Watershed Greening Strategy is to provide a strategic restoration action plan to enhance the Highland Creek valley system and overall watershed functions. The strategy will complement the City of Toronto’s Highland Creek Geomorphic Systems Master Implementation Plan and focus on urban stormwater management and terrestrial natural heritage system improvements. The target audience is landowners, land managers and planners, community groups and residents. It will address City of Toronto and TRCA plans including:

Wet Weather Flow Management Master Plan;

Remedial Action Plan for the Toronto Area of Concern;

Terrestrial Natural Heritage System Strategy and Urban Tree Canopy targets;

Aquatic Habitat Management Plan;

Climate Change Clean Air and Sustainable Energy Action Plan;

Page 71: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

71

The Living City Objectives.

Additional elements such as opportunities for green energy and the socioeconomic structure of the watershed will also be considered.

Objectives:provide input to restoration requirements associated with the City of Toronto’s Geomorphic

Systems Master Plan Implementation Project;identify opportunities to:

protect and restore natural aquatic and terrestrial habitat and species;

reconnect the channel to the floodplain;

manage stormwater to protect people and health of streams and rivers;

address flooding and erosion through greening actions;

protect and improve surface and groundwater quality;

improve trail connections and recreational amenities;

apply climate change mitigation and adaptation measures;

provide recommendations to retrofit infill and redevelopment projects; and

apply innovative approaches and sustainable technologies;

concentrate and integrate efforts in strategic areas where multiple objectives of various

plans, policies and practices can be met;support and build the capacity of landowners, land managers, community groups and

residents to understand and implement greening initiatives, through education, awareness, stewardship, partnerships, social marketing and demonstration projects; recognize the diverse population in the watershed and work to engage a wide range of

communities in the Highland; andgauge success and evaluate the effectiveness of implemented projects.

A workplan was developed identifying three key phases of work: Phase 1 - Scoping and Characterization, Phase 2 - Analysis and Evaluation of Options, and Phase 3 - Development of the Greening Strategy. A Public, Partner and Stakeholder Involvement Strategy was also developed with ongoing consultation with City of Toronto departments and other agencies such as Ministry of Natural Resources and Hydro One. Currently, Phase 1 - Scoping and Characterization is near completion and includes an update of existing conditions mapping using best available data, a Restoration Opportunities Plan, an Aquatic Habitat Management Plan, identification of urban tree canopy enhancement opportunities and recommendations for lot level stormwater management.

Phase 2 - Analysis and Evaluation of Options, is commencing in summer 2012 to identify priority restoration and strategic implementation actions through review and integration of findings of the various Phase 1 study components.

Page 72: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

72

Key next steps include reconvening the internal steering committee to review and select priority restoration opportunities and recommendations, develop a draft implementation plan, circulate a draft Greening Strategy for review by partners and stakeholders, hold public information sessions to present the strategy to the larger watershed community, and finalize and make available the Highland Creek Watershed Greening Strategy. The Greening Strategy is anticipated to be completed in 2013.

It should be noted that in addition to the technical study component of the Greening Strategy, community interests, constraints and opportunities are being explored and are to be addressed in the Greening Strategy through the two-year Highland Creek Watershed Neighbourhood Greening Project and the development of Neighbourhood Greening Plans for three pilot project areas of the watershed.

Neighbourhood Greening Project

In 2010 TRCA received $131,000 over two years from the Ontario Trillium Foundation for the Highland Creek Watershed Neighbourhood Greening Project. The objective of the project is to build the capacity of communities in three neighbourhoods to address the key issues facing the Highland Creek watershed – urban stormwater run-off and degradation of terrestrial natural heritage systems. Further, the project aids in building our understanding of the watershed communities, and identifying opportunities for stewardship projects associated with Greening Strategy initiatives.

Residents’ interests have also included greening initiatives such as green energy options, water conservation and waste reduction/management and are being incorporated into the project through the Greening Plans and connecting residents with existing programs offered by the municipality and others.

The project:uses education and engagement activities to build capacity of communities to develop a

vision for neighbourhood greening activities in the Highland Creek watershed;has developed Neighbourhood Greening Concept Plans for three focus areas within the

watershed; andis establishing ‘Green Teams’ and resources for each of the three focus areas to move

concept plans forward to the planning and implementation stage.

The three pilot project areas in the Highland Creek are the neighbourhoods around Milliken Park, Cedarbrook Park and Morningside Park.

A strength of the project is its collaborative nature, including the following partners: ACORN Canada;

Centennial College;

Centennial College Student Association – Environmental Student Society;

Curran Hall Community Association;

City of Toronto - Parks, Forestry and Recreation and Toronto Water;

Live Green Toronto; and

Toronto Chinese for Ecological Living.

Page 73: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

73

Key deliverables of the project include:development of community-supported Neighbourhood Greening Plans for three pilot project

areas of the watershed, through a series of community based workshops;establishment of Green Teams to help drive identified projects forward through the planning

to implementation stages;a Neighbourhood Greening Resources guide as a companion piece to the Greening Plans,

compiling local resources for residents to aid them in taking action to start projects ;survey of residents of the three pilot project areas to better understand community interests,

concerns, opportunities, constraints and outreach mechanisms;a Community Characterization Report, based on surveys, interviews with community

leaders, Toronto Neighbourhood and Priority Neighbourhood data, and census information;development of a self-guided interpretive walk for Milliken Park;

communications materials including an informational brochure on the watershed and its

programs, a biannual Highland Highlights e-newsletter, and website updates; and over 30 community stewardship events, such as tree plantings, workshops and clean ups,

with original and new community partners.

The Neighbourhood Greening Plans developed for the three pilot project areas are similar to other TRCA community action site plans such as the Don watershed regeneration plan’s concept site plans and Humber River watershed plan’s community action sites. The Sustainable Neighbourhood Retrofit Action Plans (SNAPs) represent a more intensive and technically detailed planning process. The Neighbourhood Greening Plans may serve as initial high level plans for future, more comprehensive SNAP-type projects depending on funding and interest levels.

In addition to the deliverables noted above, significant added value benefits have been realized as a result of the project to date. TRCA’s presence, working in collaboration with community partners has increased communities’ ecological literacy and understanding of specific watershed issues and related solutions, identified watershed champions to work with TRCA and City of Toronto to advocate for implementation of greening projects into the future, developed an effective door-to-door and personalized outreach method to engage residents in surveys and workshops, increased our understanding of Scarborough communities, and led to new initiatives beyond the scope of the Neighbourhood Greening Projects, including the Scarborough Butterfly Trail and a Friends of Birkdale Ravine group.

Key next steps include sourcing additional funding for the implementation phase of identified priority projects of the Neighbourhood Greening Plans, continued community capacity building through working with Green Team members, work with City of Toronto departments to support community based projects, and the application of the Neighbourhood Greening Plan model to other watershed communities. Funding applications for these future phases of work are planned for fall 2012.

Page 74: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

74

Copies of the Neighbourhood Greening Plans will be available at the July 27, 2012 Authority meeting.

Related ProjectsScarborough Centre Butterfly TrailThe Habitat Implementation Plan developed for the Greening Strategy included a review of hydro corridors in the Highland to identify potential habitat restoration projects. The review led to the more detailed plans for the Scarborough Centre Butterfly Trail in Ward 38. This habitat restoration project is designed to improve the environmental integrity of the Gatineau Hydro Corridor, particularly meadow habitat, with a pilot project phase that began in spring 2012 between McCowan and Brimley roads. The site will be restored, from non-native fescue grass, to meadow habitat including native wildflowers, grasses, shrub nodes and habitat structures. Future phases of work are planned pending availability of funding. The project is in partnership with City of Toronto, Hydro One and the Rural Lambton Stewardship Network.

Friends of Birkdale RavineThrough community engagement initiatives as part of the Neighbourhood Greening Project, interest from the Midland Park Community Association in establishing a Friends of Birkdale Ravine group was raised. Interests include habitat enhancement projects, education and awareness initiatives, and garnering support for implementation of Greening Strategy projects. TRCA, along with City of Toronto staff, attended the initial Friends of Birkdale Ravine group meeting to provide input and identify areas of potential support. Further, discussions with the local councillor about habitat restoration project opportunities in Birkdale Ravine are underway.

FINANCIAL DETAILSFunds for finalizing the Greening Strategy and undertaking implementation of priority projects are available in the Highland Creek Valley and Stream Greening Program account 113-94 in the 2012-2022 Toronto capital budget. In addition, the Greening Strategy will serve as a guide for directing restoration actions that will be required as Toronto Water implements the Wet Weather Flow Management Master Plan and the Geomorphic Systems Master Implementation Plan through the Environmental Assessment and Ontario Regulation 166/06 permitting process. Staff will also seek additional funding opportunities to continue community engagement and implementation of Neighbourhood Greening Plan projects through the existing budget processes, in collaboration with City of Toronto departments and through other external funding sources, including partnerships and in kind resources.

Report prepared by: Keri McMahon, extension 5243Emails: [email protected] Information contact: Keri McMahon, extension 5243,

Adele Freeman, extension 5238Emails: [email protected], [email protected]: July 6, 2012

Page 75: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

75

Item AUTH7.10TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: BUILDING RESEARCH ESTABLISHMENTPartnership Memorandum of Understanding

____________________________________________________________________________KEY ISSUEAuthorization to enter into a Memorandum of Understanding with Building Research Establishment and to develop a business plan for a Canadian innovation park.

RECOMMENDATION

THAT Toronto and Region Conservation Authority (TRCA) enter into a Memorandum of Understanding (MOU) with the Building Research Establishment (BRE) to collaborate on research, education and training initiatives;

THAT authorized TRCA officials be directed to take the necessary action to implement the agreement;

AND FURTHER THAT TRCA be authorized to spend up to $50,000.00 to fund the development of a business plan for a Canadian innovation park to be located at The Living City Campus at Kortright, subject to funding being available.

BACKGROUNDWith over 90 years of building research to its credit, BRE is a world-leading research, consultancy, training, testing and certification organization delivering sustainability and innovation across the built environment and beyond. Headquartered in the United Kingdom, BRE is owned by BRE Trust, a registered charity. Profits earned by BRE go to BRE Trust and are used to conduct key research projects that benefit the construction sector and the greater society.

The following is a list of services offered by BRE:Consultancy – help to create safe and healthy, high quality, cost effective buildings,

communities and businesses, while meeting legislative, client, social and environmental requirements at every stage of the project.Research – an ability to generate new knowledge to tackle today's challenges head on.

Provision of information needed to underpin national building regulations, and to help develop and use new and improved processes and products. Testing - with an extraordinary range of cutting-edge facilities, BRE can test the

performance of everything from individual products to whole buildings. Innovation – BRE’s specialized knowledge of the built environment, combined with their

research and development capabilities, can help bring new ideas to life.Sustainability – BRE can help clients reduce environmental impacts of buildings,

communities and businesses at all stages, from planning and design, through use and refurbishment, to end of life disposal.

Page 76: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

76

Training and Events – a very wide range of training courses, seminars and

conferences are offered by BRE experts.

In October, 2011 BRE Canada was launched with an aim to:improve the quality of the economic, environmental and social legacy for future

generations;help Canada be more competitive internationally;

partner with Canadian industry, government and education to advance research and

innovation for the built environment;innovate, test and showcase best practices, new methods and construction materials

through the development of a BRE Canada Innovation Park;bring world-class expertise to Canada;

influence consumer behavior through improved awareness.

The development of innovation parks is at the core of BRE’s business services. In 2005, BRE established the first Innovation Park in Watford, England. Its aim was to provide a mini-community test bed for architects, designers, planners, manufacturers, materials producers and technology suppliers where they could try out their innovations before applying them in the real world. Encouraged by the success in Watford, BRE has developed two additional innovation parks in the UK (Scotland and Wales) and are developing a network of innovation parks across the world in places such as China, Mexico and Brazil in order to provide inspiration, demonstration and innovation for the local construction industries within each country. The innovation parks have helped shape national sustainability policy, supported manufacturers to develop new products, taught designers and contractors how to build more sustainable buildings, supported companies to sell their products and services, and helped over 50,000 people live in a more environmentally conscious manner.

RATIONALETRCA staff has met with BRE representatives on a number of occasions to discuss the potential for partnership opportunities recognizing there is a mutual interest in advancing the Canadian sustainable building industry. TRCA and BRE have drafted a Memorandum of Understanding to formalize this partnership between the two organizations based on the following shared vision:

To support sustainable economic development and to influence environmental change in Canada through high quality and sustainable built form, innovative construction methods and materials and the adoption of clear and challenging standards that improve the quality of life for all who live and work in the region.

This partnership, the first of its kind between BRE and a Canadian organization, will mark a significant milestone in the future of the built environment in Canada. As outlined in the Memorandum of Understanding, both parties will work to address the wider issues related to the built environment covering issues such as sustainable development, innovation, business enterprise and wealth creation, green jobs, skills and training.

Page 77: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

77

Both parties will collaborate on the following key areas of business:development of an Innovation Park to demonstrate the latest innovative technologies for

new and existing buildings and further demonstration opportunities for design, construction process, renewable energy and quality of place;collaborate on the role out of BREEAM (Building Research Establishment Evaluation

Assessment Methodology) within Ontario;collaborate on education and training;

collaborate on research activities.

Both parties will collaborate on the following key areas of research:low carbon construction technologies;

sustainable building materials;

sustainable construction standards such as BREEAM;

green building science;

low impact development/sustainable urban drainage system;

low water and energy housing;

sustainable communities;

healthy indoor environments;

renewable energy.

At this time, BRE Canada is in the beginning stages of planning a BRE Canada Innovation Park. It will become part of the BRE Innovation Park Network which aims to facilitate collaboration, partnerships and unlock export opportunities between countries and organizations. A BRE Canada Innovation Park will bridge trial concepts to large scale implementation/development, showcase construction innovation and emerging technologies and demonstrate how practical and affordable sustainability can be. Through this process, BRE Canada will partner with Canadian organizations to innovate, test and showcase best practices, new methods and materials suited to the Canadian built environment.

FINANCIAL DETAILSA total of $60,000 is required to fund the business planning exercise, including development of a business model and market testing. BRE has committed $10,000 in-kind to assist with this process and TRCA is currently seeking partners to contribute to the additional $50,000. At this time the Earth Rangers Foundation has committed $10,000 and Roxul Inc. has committed $5,000. An additional $10,000 has been committed from TRCA's Community Transformation Program budget. TRCA staff is currently seeking additional funding partners to support the project, including the Region of York, the City of Vaughan and other industry organizations. This project is consistent with the objectives of The Living City Campus at Kortright Development Program and the balance of business planning cost will be charged to that account.

Report prepared by: Patricia Lewis, 289-268-3903Emails: [email protected] Information contact: Glenn MacMillan, 289-268-3901Emails: [email protected]: July 05, 2012

Page 78: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

78

Item AUTH7.11TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: DRAFT GREAT LAKES STRATEGY AND PROPOSED GREAT LAKES PROTECTION ACT, 2012

____________________________________________________________________________KEY ISSUEToronto and Region Conservation Authority comments on the Draft Great Lakes Strategy and the proposed Great Lakes Protection Act, 2012.

RECOMMENDATION

WHEREAS the Province of Ontario is seeking comments on the Draft Great Lakes Strategy and Draft Bill 100: An Act to protect and restore the Great Lakes - St. Lawrence River Basin (short title, Great Lakes Protection Act, 2012);

AND WHEREAS Toronto and Region Conservation Authority (TRCA) has provided comments regarding the Draft Great Lakes Strategy and the proposed Great Lakes Protection Act, 2012 to Conservation Ontario;

THEREFORE LET IT BE RESOLVED THAT the comments on the Draft Great Lakes Strategy and the proposed Great Lakes Protection Act, 2012 be forwarded to the Ministry of the Environment and Toronto and Region Conservation Authority's member municipalities.

BACKGROUNDThe Province of Ontario is seeking feedback from Ontarians on the Draft Great Lakes Strategy (EBR011-6418) and the proposed Great Lakes Protection Act, 2012 (EBR 0116461). The two proposals are currently posted for a 62-day public review and comment period from June 6, 2012 to August 7, 2012. All comments received in this review period will be considered as part of the decision-making process. Comments are not intended to replace public consultation that will be undertaken on any potential legislative, regulatory or other policy changes.

Draft Great Lakes StrategyThe Minister of the Environment, following consultation with other Great Lakes Ministers, has developed the Draft Great Lakes Strategy. The scope of the Draft Strategy includes water quality, water quantity, aquatic ecosystem health, climate change adaptation and environmentally sustainable economic development opportunities. The Draft Strategy:

explains why action is needed on the Great Lakes by identifying important ecosystem issues

and socio-economic opportunities; provides an overview of Ontario’s Great Lakes accomplishments and explains the current

Great Lakes protection framework; outlines key elements of the proposed Great Lakes Protection Act, 2012; and

organizes future actions around six Great Lakes Goals to protect and restore the Great

Lakes and St. Lawrence River.

Page 79: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

79

The Draft Strategy is proposed as an adaptive, evolving document with a nine-year review cycle.

Great Lakes Protection ActThe Minister of the Environment met with and heard from municipalities, First Nations and Métis communities, environmental experts and stakeholders including industry, agriculture and the tourism sector, to obtain their views about the issues facing the Great Lakes-St. Lawrence River Basin. In response to the comments received, the government introduced the Great Lakes Protection Act, 2012 . The proposed Act would empower the province to take targeted action to improve water quality, and protect coastlines, beaches and wetlands, with the overall intent of helping to attain Great Lakes that are drinkable, swimmable, and fishable.

The purposes of the proposed Act are to protect and restore the ecological health of the Great Lakes-St. Lawrence River Basin, and to create opportunities for individuals and communities to become involved in its protection and restoration.

Purposes of the Act also include:to protect human health and well being through the protection and restoration of the

ecological health of the Great Lakes-St. Lawrence River Basin;to protect and restore wetlands and beaches and other coastal areas of the Great Lakes-St.

Lawrence River Basin; to protect and restore the natural habitats and biodiversity of the Great Lakes-St. Lawrence

River Basin;to advance science relating to existing and emerging stressors, such as climate change, that

improves understanding and management of the Great Lakes-St. Lawrence River Basin; andto enrich the quality of life in communities in the Great Lakes-St. Lawrence River Basin

through support of environmentally sustainable economic opportunities and innovation through environmentally sustainable use of natural resources.

The proposed Act was introduced in the Legislature on June 6, 2012.

RATIONALETRCA staff reviewed the Draft Great Lakes Strategy and the proposed Great Lakes Protection Act, 2012 and is generally supportive and encouraged by the potential they represent for Great Lakes protection and restoration.

TRCA staff has prepared the following comments and recommendations on the Draft Great Lakes Strategy and the proposed Great Lakes Protection Act, 2012 :

Although the Draft Strategy and Act make reference to the scientific community and to 1.collaborative and science-based decision-making, neither of these documents define clear processes through which science-based decision making, and/or linkages with local, regional or watershed plans and associated expertise, are ensured. TRCA recommends that the Draft Strategy and Act more clearly articulate the decision-making process through which priorities, metrics and response timescales for protective and restorative actions will be established.

Page 80: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

80

Neither the Draft Strategy nor Act articulates the mechanism by which agreed upon 2.desirable end-points (“restored”) conditions of the Great Lakes (i.e. the defined endpoints of ‘drinkable, swimmable, fishable) might be identified, and/or the timeframes under which these conditions might be reasonably achieved. In the absence of such contexts, it will be difficult if not impossible to provide objective or subjective rankings to ‘greatest need’ areas or issues, and/or the requisite physical, cultural or economic initiatives required to achieve the desired yet undefined end states.

TRCA strongly advocates that both the Draft Strategy and the Act be supported by a 3.science-based understanding of specific and particular physical, chemical and biological processes at play within each of the Great Lakes. Successful achievement of the Strategy’s and Act’s stated objectives requires a science-based determination of each Lake’s limits of carrying capacity, resilience, productivity and other similar metrics. Such an understanding includes the recognition and reconciliation not only of how land side abatement efforts may or may not result in meaningful lake responses, but also of the inability of the Great Lakes to accommodate all current humans wants and still maintain ecosystem health. It is from science-based understandings that the Strategy and Act might best be used to curtail activities that push the Great Lakes near or beyond their ecosystemic limits, and to use any observed proximity to such limits as a reasonable and appropriate mechanism for identifying areas of greatest need and/or concern.

TRCA supports the reference made in the Act and Draft Strategy to both Green 4.Infrastructure and Low Impact Development. TRCA recommends that this direction be continued and expanded.

TRCA recommends that more direct emphasis be placed on urban watershed 5.regeneration actions within the Focus areas for action, particularly in the GTA. Significant proportions of GTA watersheds have already been urbanized, so “retrofit” is a required focus. Retrofit areas provide an ideal site for testing innovative technologies and approaches as, in contrast to Greenfield settings, there is little risk (but considerable advantage) to the application of innovative technologies and approaches. TRCA recommends that the Strategy consider a specific action area for urban retrofit, and advocates for integrated, multi-objective approach to projects (e.g. initiatives such as TRCA’s Sustainable Neighborhood Retrofit Action Plan or Partners in Project Green initiative).

TRCA recommends that the watershed, and watershed based activities, be more clearly 6.recognized and articulated throughout the Draft Strategy and Act.

Page 81: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

81

TRCA applauds the apparent shift in responsibility for Great Lakes from provincial 7.control to a shared model with multiple partners. The Act and Draft Strategy are sufficiently flexible to enable geographically-based priority setting and to empower local groups to lead the development of strategic actions, thereby increasing local support. The Act and Draft Strategy further provide mechanisms to establish practical, locally relevant, yet legally enforceable policies or shoreline regulations, builds capacity by funding local group-led projects, and should help coordinate provincial ministerial priorities and directions (e.g. Growth Plan vs. Watershed Protection). TRCA notes that while the Act and Draft Strategy make reference for the need to consider current initiatives (eg. Lake Ontario Management Plans (LaMPS), the Great Lakes Water Quality Agreement, and the Canada-Ontario Agreement), the province will need the further cooperation of federal government, U.S. agencies, universities, municipalities and stakeholders, as well as the support of the International Joint Commission lead activities such as State of the Lakes Ecosystem Conference.

TRCA recognizes the significant role that collaborations and partnerships play in 8.advancing Great Lakes objectives. Accordingly, TRCA recommends that, wherever appropriate, the role of partnerships with non-public body institutions such as the International Joint Commission, universities and all levels of U.S. Government be acknowledged. Further, TRCA recommends that a description of partnerships be added to the required components of an initiative proposal.

TRCA strongly recommends that conservation authorities, or Conservation Ontario, be 9.represented on the Great Lakes Guardian’s Council.

TRCA notes that certain elements of the Act could require conservation authorities to 10.become involved in target setting, policy implementation and/or new enforcement roles. Such additional roles and responsibilities, while potentially welcomed, could cause significant financial and human resource implications to conservation authorities should they fail to be accompanied by adequate scope and scale of additional resources. TRCA therefore very strongly advocates that the Act articulate how accompanying resources will be provided in concert with any such imposed obligations. TRCA notes that there could be significant financial and human resource implications for conservation authorities as public bodies, defined under the Act

TRCA suggests that, once the geographic boundaries and therefore specific public 11.bodies with jurisdiction(s) relevant to the proposed direction are known, that the Act require the Minister of the Environment to consult directly with the public bodies with jurisdiction. TRCA therefore recommends the removal of the term “of the interests ” from Part V, Section 1(ii) of the proposed Act.

TRCA further recommends that the Draft Strategy and Act commit to working with the 12.Government of Canada to collectively secure and commit the necessary resources to achieve delisting of all Canadian Areas of Concern within the next ten years.

Page 82: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

82

TRCA will continue to monitor and participate in opportunities for input throughout the completion of the Draft Strategy and throughout the legislative process.

Report prepared by: Connie Pinto, extension 5387Emails: [email protected] Information contact: Nancy Gaffney, extension 5313 Emails: [email protected]: July 11, 2012

Page 83: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

83

Item AUTH7.12TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: HERITAGE TOURISM TRAIL PLANNING AND A FIRST NATIONS CULTURAL CENTRE IN THE HUMBER RIVER WATERSHED

____________________________________________________________________________KEY ISSUETo endorse the concept of a heritage tourism trail within Claireville Conservation Area in the City of Brampton and along the William Granger Greenway in the City of Vaughan, as well as the potential creation of a First Nations/Aboriginal cultural centre within the City of Vaughan.

RECOMMENDATION

WHEREAS the story of Aboriginal habitation of southern Ontario within the Toronto and Region Conservation Authority (TRCA) jurisdiction including both the cities of Vaughan and Brampton in both pre- and post-Contact periods is extraordinary, complex and little understood by the over 5-million inhabitants of the Toronto region;

AND WHEREAS the traditional territories of many Aboriginal nations (Huron-Wendat Nation, Anishnaabe nations, Haudenosaunee nations and the Métis Nation of Ontario) overlap to provide a rich and varied cultural history in the Humber River watershed;

AND WHEREAS the Councillors and staff of the City of Vaughan have over the past 10 years expressed an interest in working with Aboriginal nations, including the Huron- Wendat Nation whose ancestral villages and ancestral burials date from the 15th to the 17th centuries, to recognize and celebrate the heritage of these nations;

AND WHEREAS the sacred Skandatut First Nations archaeological site, located within the City of Vaughan, is now permanently protected through a generous private donation of land and is now in process of being incorporated in public ownership;

AND WHEREAS the City of Vaughan is interested in exploring the potential for a First Nations/Aboriginal cultural centre in partnership with Aboriginal nations as a means of celebrating their ancestral heritage;

AND WHEREAS The Shared Path/Le Sentier Partagé: Discovery Walk© program offers a successful model for inclusive interpretation reflecting the rich and varied cultural history;

AND WHEREAS both the cities of Vaughan and Brampton have continually over many years invested in trail infrastructure and conservation areas within their municipalities with the goal of promoting major recreation gateways for outdoor recreation and tourism;

Page 84: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

84

AND WHEREAS TRCA has a policy to conduct archaeological assessments on TRCA lands and to curate the artifacts resulting from investigations of archaeological sites, and is able to incorporate the artifacts and teachings about the past peoples at those sites into education programs for students, such as the Boyd Archaeological Field School (35 years running);

AND WHEREAS TRCA led, in partnership with The City of Toronto, Heritage Toronto, the Huron-Wendat Nation, Mississaugas of the New Credit First Nation, Six Nations of the Grand River Territory, and La Société d’histoire de Toronto the nationally award winning The Shared Path/Le Sentier Partagé: Discovery Walk© program in Toronto in 2011, consisting of 13 story circles with interpretative signage along the pedestrian trails of the lower Humber River;

AND WHEREAS the Ministry of Tourism, Culture and Sport may provide financial support to municipalities interested in initiating tourism development plans through a tourism feasibility study grant;

THEREFORE LET IT BE RESOLVED THAT TRCA staff be directed to participate in the preparation and planning for the creation of heritage tourism trails in the cities of Vaughan and Brampton in partnership with municipal staff, regional staff, representatives of Aboriginal nations and other vested stakeholders;

THAT staff be directed to participate in the discussions and preparation of grant application submissions to the Ministry of Tourism, Culture and Sport for a tourism feasibility study that would assess the tourism economic development potential for the creation of a heritage tourism trail, as well as identify product packages and outline the preliminary economic opportunities for a First Nations/Aboriginal cultural centre in the City of Vaughan;

THAT staff be directed to participate in discussions and subsequent study being led by the City of Vaughan in conjunction with the Region of York to explore the potential for the location of a First Nations/Aboriginal cultural centre within the City of Vaughan;

THAT a potential location for a First Nations/Aboriginal cultural centre be investigated within the lands known as the Boyd Tract, which includes Kortright Centre for Conservation, and Boyd North and Glassco Park;

THAT TRCA staff be directed to review current opportunities as part of the Kortright Centre building retrofit to house, initially on a temporary basis, displays or other installation developed in collaboration with representatives of Aboriginal nations that would celebrate the unique and vibrant cultural heritage of the area;

THAT the regions of York and Peel, the cities of Vaughan and Brampton, Friends of Boyd Park and the Humber Watershed Alliance be so advised.

Page 85: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

85

BACKGROUNDThe proposal to create First Nations/Aboriginal cultural centre within the City of Vaughan has been in discussion with Vaughan Councillors and staff over a period of ten years, as a means of celebrating the rich and varied history of Aboriginal nations ancestral to the area. Proposed to be situated within the Humber River watershed, the inclusive First Nations/Aboriginal cultural centre will highlight Aboriginal history unique to the area, including the Toronto Carrying Place Trail, which was a trade and transportation route for all Indigenous peoples throughout the ages, as well as the many archaeological sites in this part of Vaughan which speak to the varied cultural history of the area.

A successful model for highlighting Aboriginal nations and their heritage is The Shared Path/Le Sentier Partagé: Discovery Walk© launched in the Humber River valley in Toronto in 2011, in partnership with TRCA, the City of Toronto, Heritage Toronto, the Huron-Wendat Nation, Mississaugas of the New Credit First Nation, the Six Nations of the Grand River Territory and La Société d’histoire de Toronto. As a nationally award winning project by the Heritage Canada Foundation, The Shared Path/Le Sentier Partagé tells the early history of Toronto and Canada from the perspectives of its founding nations (Aboriginal nations, and early European settlers, the French and British) through a series of story circles containing interpretative signage. These story circles are installed along existing pedestrian trails and follow the banks of the Humber River, the Greater Toronto Area’s only Canadian Heritage River.

The Shared Path/Le Sentier Partagé contains thirteen story circles that are installed at contextually relevant locations, where events significant to the development of Canada took place. Tracking across centuries, the trail connects an ancient Aboriginal portage route to modern roads and railways, Aboriginal settlements to 18th-century, French trading posts, and the ruins of water-powered mills to the birth of industrial Toronto. The trail highlights how the Humber River is an ancient corridor of Aboriginal settlement and trade, a route for the fur trade with Europeans, and a reason for the founding of the modern City of Toronto. Building upon the success of The Shared Path/Le Sentier Partagé, both the cities of Vaughan and Brampton have expressed an interest in extending the concept of a heritage tourism trail up from the City of Toronto, along the inter-regional trail network, into both respective municipalities along existing and proposed trail networks, and within Claireville and Boyd conservation areas, Kortright Centre, Nashville Resource Management Tract and two designated Heritage Conservation Districts (Woodbridge and Kleinburg).

The opportunities for extending the The Shared Path/Le Sentier Partagé model into both Vaughan and Brampton are extraordinary. Some of these opportunities are summarized as follows:

In the City of VaughanThe proposed heritage tourism trail:

promotes the inter-regional trail in the Humber valley from the top of Vaughan to the

bottom;crosses over three heritage bowstring bridges;

connects Vaughan to Toronto and Bolton along a continuous trail network;

links Nashville Resource Management Tract, Kortright Centre and Boyd Conservation

Area;

Page 86: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

86

links two designated Heritage Conservation Districts: Kleinburg to Woodbridge;

promotes the recently protected Skandatut First Nations archaeological site in Vaughan;

ties in major anchors such as McMichael Art Gallery, The Living City Campus at

Kortright, conference facilities, businesses in Kleinburg and Woodbridge, the Board of Trade Country Club, etc.;complements newly proposed major initiatives such as the First Nations/Aboriginal

cultural centre, and the proposed Pierre Berton Discovery Centre;provides opportunities for promoting natural and cultural heritage as well as active living

in the valleys;

The majority of the trail is developed, in development or under review for future development.

The following partners are interested in participating in The Shared Path/Le Sentier Partagé: Discovery Walk© model in Vaughan: Kleinburg Area Ratepayers Association, Humber Valley Heritage Trail Association, Kleinburg BIA, Woodbridge Heritage groups, Woodbridge Farmers Market, Humber Watershed Alliance and Central Counties Tourism/RTO6. The project also provides opportunities for near urban agriculture and culinary tourism development.

In the City of BramptonThe proposed heritage tourism trail:

links the inter-regional trail from Toronto into Brampton through Claireville;

promotes Brampton, the Humber and Claireville as a primary trail tourism destination;

crosses over one heritage bowstring bridge, the Wiley Bridge, which is in process to

become heritage designated;ties in major anchors such as Wild Water Kingdom, Humber Arboretum, surrounding golf

courses, etc.;has potential to highlight unique cultural heritage area of the designated McVean Farm

site;provides opportunities for near urban agriculture and culinary tourism development;

The majority of trail is developed, or is under development in 2012/13. Many dozens of archaeological sites are already identified within Claireville which tell the story of 10,000 years of pre-Contact Aboriginal habitations as well as post-Contact pioneer settler habitations.

The following partners are interested in participating in The Shared Path/Le Sentier Partagé: Discovery Walk© model in Brampton: City of Brampton, Humber Watershed Alliance, Claireville Subcommittee, local BIAs, arts councils, trail groups and RTO6. Claireville subcommittee members are already assisting with identification of areas of interest and scenic secondary trail options as part of the trail planning process for the Claireville Trail Plan.

Furthermore, The Shared Path/Le Sentier Partagé: Discovery Walk© model may serve as a successful example for promoting the unique Aboriginal culture history of the area that not only enhances existing municipal investment in the form of trails, Heritage Conservation Districts and conservation areas, but may lead to new potential investment, in the form of a First Nations/Aboriginal cultural centre in Vaughan.

Page 87: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

87

Project Benefits and Components:The benefits of this project include:

Civic pride - celebrates Vaughan and Brampton’s rich and diversified heritage as well as

the City of Vaughan’s Vision 2020 “to preserve our heritage and support diversity, arts and culture”.Increased public awareness - educates and informs the general public by revealing

shared Aboriginal and Euro-Canadian experiences.Tourism industry - offers residents and visitors a broader horizon of the history of

Vaughan and Brampton.Public education - offers pedagogical resources for public school curricula.

Environment – promotion of the existing designation under the Canadian Heritage Rivers

System as well as both the cities of Vaughan and Brampton’s Official Plans will help further promote, enhance and protect the Humber River.Cultural and historical festivals - provide a setting for festivals highlighting the cultural

and historical contributions of the Humber River to the development of Canada .Health and recreational activities - incorporates existing hiking trails and specific areas

of fitness and suggests improvements to the trail network through specific projects.

The Ministry of Tourism, Culture and Sport’s Tourism Development FundTourism Development Fund supports projects that encourage tourism investment, tourism product development and industry capacity building.

Supports the creation or revitalization of tourism attractions, sites and experiences.1.Supports innovative product development for emerging sectors that have demonstrated 2.market potential.Enhances the quality of tourism services, businesses and practices through training.3.Assists with tourism planning and capacity support to ensure that the tourism industry is 4.well positioned to make future strategic decisions, address issues and opportunities.Assists communities with investment readiness, investor relations, investment attraction 5.and communications.

Tourism associations, economic development corporations, municipalities, tourism businesses and organizations interested in undertaking tourism-related initiatives which support industry development and increased visitation are all eligible to apply.

DETAILS OF WORK TO BE DONESeek council endorsement of the concept by the City of Vaughan and the City of 1.Brampton to pursue The Shared Path/Le Sentier Partagé model with a First Nations/Aboriginal cultural centre in the City of Vaughan.Identify project champions, Aboriginal community representatives and form stakeholder 2.committees in each respective municipality.Apply for Ministry of Tourism, Culture and Sport Tourism Development funds in 3.partnership with local municipalities. Confirm funding.Retain a tourism planning consultant to prepare a Tourism Feasibility Study for both 4.proposed trails that identifies project potential, opportunities, product packages and short, medium and long range goals for implementation with estimated costs outlined.Circulate completed feasibility study to stakeholder committees for review as well as the 5.Authority and both municipal councils;Implement project goals based on funding availability and current priorities. 6.

FINANCIAL DETAILS

Page 88: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

88

Through the completion of a tourism feasibility study, staff will have a clearer idea of the financial implications for the short, medium and long-term project goals.

Prepared by: Susan Robertson, extension 5325Email: [email protected] Information contact: Adele Freeman, extension 5238Email: [email protected]: July 18, 2012

Page 89: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

89

Item AUTH7.13TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: NATURAL RESOURCES CANADA - ECOENERGY INNOVATION INITIATIVE (ECO II) - RENE 092Contribution Agreement

____________________________________________________________________________KEY ISSUEAuthorization to enter into a Contribution Agreement with Natural Resources Canada for research in the field of photovoltaics

RECOMMENDATION

THAT Toronto and Region Conservation Authority (TRCA) enter into a Contribution Agreement with Natural Resources Canada (NRCAN) to receive funding in the amount of $1,065,609.00 and perform research in the field of photovoltaics;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to implement the agreement.

BACKGROUNDNatural Resources Canada’s EcoEnergy Innovation Initiative (Eco II) provides funding for activities that will help reduce barriers to the deployment of sustainable technologies. TRCA has a proven track record managing photovoltaic energy yield studies with multiple stakeholders including Canadian manufacturers, universities and accredited test laboratories. This project builds on significant contributions in photovoltaic (PV) systems and performance analysis by TRCA, including the analysis of PV projects on numerous City of Toronto properties as part of the Solar City Partnership, a performance and energy yield study of PV arrays at varying tilts, and energy yield testing for Ontario PV manufacturers as part of the Kortright Photovoltaic Performance Verification Program. This work has great value for the Canadian photovoltaic industry and helps establish TRCA as a non-biased test facility of photovoltaic modules.

RATIONALETRCA has developed the Kortright Energy Yield Test Standard project (RENE 092) and received conditional approval for funding in the amount of $1,065,609.00, subject to the successful execution of a written contribution agreement, building on 30 years of experience in renewable energy at the Kortright Centre and 75 years of combined staff experience in photovoltaics. This project is consistent with the goals of the Sustainable Technologies Evaluation Program (STEP) to conduct third party evaluation of clean water, air and energy technologies; assess barriers and opportunities for implementing technologies, develop supporting tools, guidelines and policies, and promote broader uptake of effective technologies through research, education and advocacy.

Page 90: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

90

The Kortight Energy Yield Test Standard is intended to provide more realistic energy yields for PV modules through the validation of an international standard developed by the International Electrotechnical Commission (IEC) Technical Committee 82 Working group 2, an international team of experts in the field of photovoltaics. This standard for PV Module Performance assesses performance under a variety of light levels and temperature conditions and provides realistic expectations of photovoltaic performance at sites with different environmental parameters. Testing and validation of this standard is required to assess its value and applicability to Canada’s diverse climate. The IEC creates technical documents and international standards for the testing of products and systems, that can then be adopted by national agencies.

This research will inform Canadian standard development organizations such as the Canadian Standards Association (CSA) on the importance of adopting this standard. The validation of this standard will help provide stability for investment in the solar sector, increase consumer confidence and improve the economic competitiveness of Canada. The ability to more accurately and efficiently optimize system performance leads to reduced risk on solar investment across Canada and for Canadian exports. This research, intended to increase the level of quality assurance on Canadian products, will lead to increased reliability of PV performance in Canada and greater investment opportunities in the Canadian Solar sector. This project will allow for recommendations in collaboration with key project partners as to the adoption of this standard and contribute to its successful implementation in Canada. Should this standard be adopted in Canada, these functions of improved reliability and performance will become standard for the Canadian photovoltaic industry. Early adopters will have the opportunity to incorporate the findings of this research to build successful energy models contributing to reliable performance standards and enhanced business opportunities for Canadian investment in clean technologies.

FINANCIAL DETAILSThis is a four year agreement with a total project cost of $1,442,609. To be eligible for funding TRCA and partner contributions meet the 25% stacking requirement for the ECO II funding with overall contributions of $377,000 made up of $85,000 from TRCA in the STEP and Community Transformation Program budgets, $65,000 cash contributions from manufacturers and George Brown College, and $227,000 of in-kind contributions.

Project Partners include: Exova Canada Inc., Science Applications International Corporation (SAIC), Toronto Hydro, Solar City Partnership, Eclipsall Energy Corp., Heliene Inc., Ontario Solar Manufacturing Corp. York University and George Brown College. These partners have all confirmed their commitments with letters of support submitted with the project proposal.

Additional letters of support were submitted by PowerStream Inc. and the Canadian Solar Industries Association (CANSIA).

Report prepared by: Paul Luukkonen, 416-277-3849Emails: [email protected] Information contact: Paul Luukkonen, 416-277-3849Emails: [email protected]: July 18, 2012

Page 91: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

91

Item AUTH7.14TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Catherine MacEwen, Director, Human Resources, Marketing and Communications

RE: AUDITED FINANCIAL STATEMENTProfessional Access and Integration Enhancement Program

____________________________________________________________________________KEY ISSUEThe Professional Access and Integration Enhancement audited financial statement and management letter for the period April 1, 2011 to March 31, 2012 are presented for Authority approval.

RECOMMENDATION

THAT the Professional Access and Integration Enhancement (PAIE) audited financial statement and management letter, as presented, be approved, signed by the Chair and Secretary-Treasurer of Toronto and Region Conservation Authority (TRCA), in accordance with the Ministry of Citizenship and Immigration Bridging Projects - Project Audit Guidelines.

BACKGROUNDFunded by the Ministry of Citizenship and Immigration (MCI), since 2006 TRCA has been delivering the PAIE Ontario bridge training program to assist internationally trained professionals to access training, licensing and employment opportunities in their field within the environmental sector. As part of its project audit guidelines, MCI requires Authority approval of PAIE financial statements and management letters, as attached, as verification that the financial information in the audit report is complete and accurate.

The accounting firm of Grant Thornton LLP, has completed its audit. The audited financial statements are presented as Attachments 1 and 2.

RATIONALEThe approval of the Statement of Revenue and Expenditures attests to the following:

project funding has been solely applied to costs directly related to the project;

deferred revenue refers to receipt of cash in advance of rendering a good or service and

while initially recorded as cash coming in, is also a liability because the organization has an obligation;funding and/or expenditures from other sources, not directly related to this project, have not

been included in the report;reported expenditure is net of HST rebates;

shared costs have been properly apportioned to the project;

the project bears full responsibility for absorbing any project deficits;

project funds that were provided to the project prior to their immediate need were

maintained in an interest-bearing account; andinterest earned on project funding has been credited to the project.

Page 92: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

92

The Authority is responsible for ensuring that management fulfills its responsibilities for financial reporting and is ultimately responsible for reviewing and approving the financial statements. The management letter confirms that management and the Authority have fulfilled their responsibilities, as determined in the transfer payment agreement dated June 2, 2010. The management letter is presented as Attachment 3.

Report prepared by: Marisa Iorfido-Sdao, extension 5582Emails: [email protected] Information contact: Rocco Sgambelluri, extension 5232Emails: [email protected]: July 09, 2012Attachments: 3

Page 93: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

93

Attachment 1

Professional Access and Integration Enhancement (PAIE) Program (A Project of Toronto and Region Conservation Authority)Statement of Revenue and ExpendituresFor year ended March 31, 2012

Organization Name: Toronto and Region Conservation AuthorityOrganization contact: Rocco Sgambelluri, Chief Financial OfficerName: Marisa Iorfida-Sdao Telephone #: 416-661-6600 ext. 5582Project Name: PAIE – Professional Access and Integration Enhancement Program

PROJECT REVENUE

Approved Carryover Funding from Previous Reporting Period(s) $ 63,296

Ministry Funding for audit period as per Schedule B (2011 / 2012) $ 548,787

Interest Earned on Ministry Funding $ 396Total Revenue for the audit period as per Schedule B (2011 / 2012) (A) $ 309,534

Deferred Revenue

Deferred Revenue for audit period as per Schedule B (2011 / 2012) (if appropriate) $ 302,945

PROJECT EXPENDITURE

Total Expenditure (B) $ 309,534Unspent funding (C) $ -I verify that the above financial information is correct and that:

Project funding has been solely applied to costs directly related to the Project;

Funding and/or expenditures from other sources, not directed related to this project, have

not been included in the Report;Reported expenditure is net of HST rebates;

Shared costs have been properly apportioned to the Project;

The Project bears full responsibility for absorbing any project deficits;

Project funds that were provided to the Project prior to their immediate need were

maintained in an interest-bearing account; andInterest earned on Project funding has been credited to the Project.

I certify that the information is true and correct to the best of my knowledge and claimed in accordance the Bridge Training Agreement.

___________________________________Signature of Agency Signing AuthorityName: Gerri Lynn O'ConnorTitle: ChairI have authority to bind the Recipient

____________________Date

Page 94: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

94

Attachment 2

Statement of Revenue and Expenditures

Professional Access and Integration Enhancement

(A Program of Toronto and Region Conservation

Authority)

Year ended March 31, 2012

Page 95: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

95

Contents

Page

Independent Auditor’s Report 1

Statement of Revenue and Expenditures 2

Note to the Statement of Revenue and Expenditures 3 - 4

Page 96: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

96

Grant Thornton LLPSuite 20015 Allstate ParkwayMarkham, ONL3R 5B4T (416) 366-0100F (905) 475-8906www.GrantThornton.ca

Independent auditor’s report on compliance with agreement

To the Ministry of Citizenship and Immigration

We have audited the statement of revenue and expenditures of the Professional Access and Integration Enhancement Program of the Toronto and Region Conservation Authority for the period from April 1, 2011 to March 31, 2012, with the criteria established by the terms and conditions described in sections 4.6, 5.1, 5.3, 6.2, 6.3 and 7.1 of the Funding Agreement dated April 1, 2010 issued by the Ministry of Citizenship and Immigration. Compliance with the criteria established by the provisions of the agreement is the responsibility of the management of the Toronto and Region Conservation Authority. Our responsibility is to express an opinion on this compliance based on our audit.

We conducted our audit in accordance with Canadian generally accepted auditing standards. Those standards require that we plan and perform an audit to obtain reasonable assurance whether the Professional Access and Integration Enhancement Program of the Toronto and Region Conservation Authority complied with the criteria established by the provisions of the agreement referred to above. Such an audit includes examining, on a test basis, evidence supporting compliance, evaluating the overall compliance with the agreement, and where practicable assessing the accounting principles used and significant estimates made by management.

In our opinion, the statement of revenue and expenditures of the Professional Access and Integration Enhancement Program for the period from April 1, 2011 to March 31, 2012 is in compliance, in all material respects, with the criteria established by provisions described in sections 4.6, 5.1, 5.3, 6.2, 6.3 and 7.1 of this agreement.

Markham, Ontario Chartered AccountantsJune 27, 2012 Licensed Public Accountants

Audit • Tax • Advisory

Grant Thornton LLP. A Canadian Member of Grant Thornton International Ltd

Page 97: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

97

See accompanying notes to the statement of revenue and expenditures.2

Page 98: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

98

3

Page 99: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

99

4

Page 100: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

100

Attachment 3

July 27, 2012

Ms. Julia PembertonSenior Program AdvisorMinistry of Citizenship and ImmigrationLabour Market Integration Unit400 University Ave., 3rd FloorToronto, ON M7A 2R9

Dear Ms. Pemberton:

This management representation letter is provided in connection with the audited financial statements of Toronto and Region Conservation Authority’s (TRCA) Professional Access and Integration Enhancement (PAIE) Program for the year ended March 31, 2012. The financial statements of TRCA’s PAIE Program are the responsibility of management and have been approved by the Authority, the board of TRCA.

The financial statements have been prepared by management in accordance with Canadian Generally Accepted Accounting Policies. Management has determined that its choice of accounting policies supporting the amounts presented on the financial statements, are presented fairly, in all material respects.

TRCA maintains systems of internal accounting and administrative controls of high quality. Such systems are designed to provide reasonable assurance that the financial information is relevant, reliable and accurate and that TRCA’s operations are appropriately accounted for and assets are adequately safeguarded.

All transactions have been recorded in the accounting records and are reflected in the financial statements. All liabilities have been reviewed by management in consultation with its external auditor, Grant Thornton LLP. There are no material liabilities or contingencies as of the date of this report.

Significant assumptions used by management in making accounting estimates, including those measured at fair value, are reasonable and approved by the Authority. The effects of uncorrected misstatements are immaterial, both individually and in the aggregate, to the financial statements as a whole.

This letter confirms that management and the Authority have provided; access to all information to the external auditors of which they were aware of that is relevant to the preparation of the financial statements, such as records, documentation and other matters; additional information that was requested by the external auditors for the purpose of the audit, and provided unrestricted access to persons within the entity who would be determined necessary to provide audit evidence.

Member of Conservation Ontario5 Shoreham Drive, Downsview, Ontario M3N 1S4 (416) 661-6600 FAX 661-6898 www.trca.on.ca

Page 101: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

101

The Authority is responsible for ensuring that management fulfills its responsibilities for financial reporting and is ultimately responsible for reviewing and approving the financial statements. This letter confirms that management and the Authority have fulfilled their responsibilities, as determined in the transfer payment agreement dated June 2, 2010.

___________________________________________________Signed: Gerri Lynn O’Connor

Chair

___________________________________________________Signed: Brian Denney

Chief Administrative Officer/Secretary-Treasurer

Page 102: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

102

Item AUTH8.1TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Adele Freeman, Director, Watershed Management

RE: 2011 CORPORATE SOCIAL RESPONSIBILITY REPORT______________________________________________________________________________KEY ISSUEReceipt of report on progress towards operational sustainability in 2011

RECOMMENDATION

IT IS RECOMMENDED THAT the Toronto and Region Conservation Authority's (TRCA) 2011 Corporate Social Responsibility Report be received.

BACKGROUNDIn 1999, TRCA approved a corporate Environmental Policy statement and a framework to implement an environmental management system. In 2000, staff researched suitable environmental metrics and engaged in extensive consultations both internally and with various outside institutions to determine and test environmental management targets, objectives and tools. The program was expanded in 2004 to allow for inclusion of social and economic targets and renamed Sustainability Management System in order to better manage TRCA's organizational commitment to sustainability. In 2009, the program was renamed the Corporate Social Responsibility Program to more appropriately align with accepted international terminology for sustainability reporting. In 2011, quantifiable social metrics have been included in the report.

The Corporate Social Responsibility (CSR) Program and associated report is the primary vehicle for communicating TRCA's sustainability performance to internal and external stakeholders. The report encompasses four key areas of sustainability:

1. Our PeopleThe impact TRCA has on its employees:

Equity, Diversity, and Staff Retention;

Employee Engagement;

2. Our EnvironmentThe environmental impact of our operations:

Carbon Footprint;

Energy Use;

Water Use

Vehicles, Fuel and Travel;

Land Management;

Waste Management.

Page 103: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

103

3. Our BusinessThe overall impact of our business practices:

Sustainable Business Practice;

Green Purchasing.

4. Our CommunityThe impact TRCA's social programs have on the community.

Outlined in Attachment 1 is Sustainability Scorecard. Hard copies of the complete 2011 Corporate Social Responsibility Report will be available at the meeting and subsequently posted on line.

Highlights of 2011 Sustainability Performance

Our People

Equity, Diversity, and Staff RetentionThe national average rate of employee turnover is approximately 22% across all industries in Canada, while at TRCA, employee resignations were only 3.6% in 2008, 4.1% in 2009, 4.5% in 2010, and 2.85% in 2011. TRCA is exceeding its objectives on this metric.

Employee EngagementIn 2011, TRCA staff participated in Pollution Probe’s annual Clean Air Commute and the City of Toronto's 20 Minute Makeover. TRCA continued its membership (since inception) in Smart Commute, North Toronto and Vaughan running car pool and trip reduction events, and providing staff with access to a car pooling database and a guaranteed ride home for “green” commute. As well, EcoCentres and TRCA EcoOffices “green teams” were operational at five educational facilities and four offices. With the support of The Living City Foundation (formerly Conservation Foundation), TRCA's employee sustainability outreach program - CarbonCats, continued engaging staff with sustainability tips, highlights of TRCA initiatives and contests.

In 2012, TRCA will continue with CarbonCats and staff participation in external, sustainability related initiatives. As well, TRCA will hold staff-led rehabilitation projects at conservation areas (CAs), achieve Audubon certification for CAs and Kortright Centre.

Our Environment

Carbon FootprintTRCA’s carbon footprint, 2,839 tonnes in 2011, has decreased 623 tonnes from 2009. This is a decrease of 18%. From 2010 to 2011, the carbon footprint decreased 280 tonnes. This decrease in carbon footprint has been primarily driven by three factors. The first and most impactful was a dramatic reduction in the amount of waste sent to landfill between 2009 and 2010, and sustained at the lower level in 2011. The second most important factor was a reduction in facility energy consumption in 2011 over 2010. This may be partially weather related, but is more likely related to a meter failure at one of our facilities. Staff is investigating and more detailed analysis will be conducted to assess trends. Finally, purchasing Bullfrog green natural gas for Head Office has reduced TRCA's carbon footprint.

Page 104: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

104

In 2012, TRCA will continue with the sustainability-focused redevelopment of the Kortight Centre, as well as develop a corporate energy plan, which will enable further footprint reductions by developing options for further facility conservation improvements, and opportunities for converting to renewable energy sources.

EnergyTotal TRCA energy use in 2011 was down 6% from the 2005 base year. Over the same period, TRCA staff levels has increased, attesting to the conservation measures TRCA has taken. In 2011 total facility energy consumption decreased 11% from 2010. Most of the decrease was in electricity consumption, particularly at one TRCA facility. Staff is investigating, but early indications are that an electricity meter may have partially failed. However, more analysis of individual facilities will be done in 2012 in order to assess the reasons for these trends.

In 2011, TRCA completed energy audits for four facilities, converted to green natural gas at Head Office, upgraded to efficient HVAC systems at Albion Hills CA and Indian Line Campground, made efficient lighting upgrades at Heart Lake CA, and installed solar tube natural lighting and biowalls at Claremont Field Centre.

In 2012, TRCA will conduct lighting retrofits at Black Creek Pioneer Village and Lake St. George Field Centre, develop a corporate energy management plan and continue with the Kortright Centre energy retrofits.

WaterSince 2007, when a number of TRCA facilities switched from well to municipal water, TRCA’s water use varied between 43,000 m

3 and 61,000 m

3 annually. This range would

have been narrower were it not for a large water leak at Albion Hills CA in 2009. Petticoat Creek pool, traditionally, a consumer of 30 to 40% of TRCA’s municipal water use, was not operational in 2010 or 2011, but at the same time the pool at Albion Hills CA became active, effectively offsetting any potential reduction in water use at Petticoat Creek. With both pools expected to be operational in 2012, TRCA is likely to see an overall increase in water use.

In 2012 TRCA will determine metrics for measuring and reporting on TRCA stormwater practices at its facilities, and address short and long term planning for water conservation as part of the corporate energy management plan.

Vehicles, Fuel and TravelAlthough we moved from no hybrids or alternative fuel vehicles in 2006 to a total of nine in 2011 (12.5% of TRCA's fleet), the overall fuel efficiency of the fleet did not change. Since 2003, fleet fuel efficiency has fluctuated between 16.1 litres/100km and 17.7 litres/100km (17.1 in 2011). In order to make further improvements in fuel efficiency we will need to dramatically increase the percentage of alternative fuel vehicles in the fleet, and especially electric vehicles where appropriate.

In 2011, TRCA established designated car pool slots at Boyd Office, Restoration Services Centre and Head Office, completed a study of five TRCA vehicles to determine feasibility of replacing them with electric cars, and initiated use of non-corn-based biodiesel at Claremont Field Centre.

Page 105: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

105

In 2012, TRCA will continue to research options for acquiring electric vehicles, implement a video conferencing room at Downsview Office, and prepare a report on best practices in Green Fleet and Green Commuting in Canada.

WasteTRCA diverted 40% in 2007, 41% in 2008, 22% in 2009, and 21% in 2010, and 21% in 2011. TRCA continues to struggle with unreliable data from haulers, and, consequently will include an internal auditing process in 2012 in order to check the hauler data.

In 2011, TRCA continued revamping conservation area recycling centres, providing new bins, better signage and more public education, installed new Head Office lunchroom waste and recycling centre for greater diversion potential, moved to electronic purchase and employee expenses reporting systems. As well, Black Creek Pioneer Village reduced waste by 80% from parking lots by removing waste bins, and Albion Hills Field Centre changed to monthly waste and recyclables pickup in order to reduce their footprint.

In 2012 TRCA will also prepare a corporate waste management plan and consider new targets and objectives for waste reduction and diversion from landfill. Parks staff will continue revamping conservation area recycling centres, providing new bins, better signage and more public education.

Our Business

Sustainable Business PracticeIn 2012, TRCA will develop and refine goals, objectives and metrics for measuring the sustainability of TRCA business practices, complete first draft of the TRCA strategic plan – including greater levels of input from all staff, and develop a TRCA partnership map, identifying all TRCA partnership relationships across all TRCA offerings.

Green PurchasingIn 2011, staff completed new green cleaning request for proposals to be used at TRCA facilities. Kortright Centre converted to green office supplies, and the education centres adopted standard operating procedures for purchase and lifecycle use of carpeting.

In 2012, TRCA will carry out green procurement training for staff, transition cleaning practices to meet new green cleaning standard operating procedures, and investigate additional goals, objectives and performance metrics for green procurement.

Our Community

TRCA continued its three innovative social development programs: PAIE (Professional Access and Integration Enhancement), M2P (Mentoring to Placement) and EVN (Environmental Volunteer Network). These programs achieve many positive outcomes simultaneously. They help new Canadians gain access to meaningful experience and networking opportunities, increasing the pool of planners, ecologists, geoenvironmental professionals and engineers in the GTA, as well as allowing TRCA staff and program participants to network, collaborate and share ideas and best practices pertaining to sustainability.

Page 106: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

106

In 2012, TRCA will launch the next round of PAIE and M2P with new clients.

DETAILS OF WORK TO BE DONEKey activities of the Corporate Social Sustainability Program in 2012 will be:

complete corporate energy management plan;

develop corporate waste management plan;

conduct facility waste audits;

assess implication/opportunity for Global Reporting Initiative (GRI) for 2012 report;

complete TRCA online facility sustainability reporting tool and EcoCentre registration tool ;

assess effectiveness of employee engagement.

FINANCIAL DETAILSThe CSR program is funded by TRCA's municipal funding partners in the TRCA operating budget.

Report prepared by: Brian Dundas, extension 5262Emails: [email protected] Information contact: Bernie McIntyre, extension 5326Emails: [email protected]: March 22, 2012Attachments: 1

Page 107: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

107

Attachment 1TRCA Sustainability Scorecard

New for the 2011 CSR report, staff has prepared a Sustainability Scorecard. The purpose of the Scorecard is to provide a concise summary of TRCA progress towards its CSR targets as of the end of 2011, including whether the measure is improving (up arrow), getting worse (down arrow), or remains unchanged (horizontal arrows). These measures, our CSR key performance indicators, are presented under four categories: Our People; Our Environment; Our Business; Our Community. TRCA is proud to highlight that TRCA continues to be an employer of choice with staff retention well above the national average. TRCA continues to leverage its core municipal funding allocation through revenue from a wide range of other sources, and the sale of products and services. The corporate carbon footprint has continued to decline in 2011 and is expected to fall further as retrofits of facilities such as the Kortright Centre are completed in 2012. The award winning PAIE and M2P programs continue to be oversubscribed and provide new Canadians with valuable mentoring and training.

*Bold and italics indicates targets met or exceeded.

Our PeopleMeasure 2011

Performance/Status

Trend Target

Equity, Diversity, and Staff RetentionMy work gives me a sense of accomplishment

92.8% Achieve 90% on staff survey

I would recommend TRCA as a good place to work

91.8% Achieve 90% on staff survey

Overall I am satisfied with my job 88.0% Achieve 90% on staff survey

TRCA is socially responsible 83.6% Achieve 90% on staff survey

TRCA is environmentally responsible 87.5% Achieve 90% on staff survey

Morale at TRCA is high 73.9% Achieve by 2025, 80% on staff survey

TRCA is well managed 71.1% Achieve by 2025, 80% on staff survey

I am sufficiently informed about where TRCA is going in the future

61.2% Achieve by 2025, 80% on staff survey

TRCA is economically responsible 74.5% Achieve by 2025, 80% on staff survey

Staff Retention 87% Not reported last year

Achieve, annually, at least 2% below national average in employee turnover.

Page 108: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

108

Our PeopleMeasure 2011

Performance/StatusTrend Target

Employee EngagementStaff participation in Clean Air Commute

62

Have 80 staff members participate in Pollution Probe’s Clean Air Commute by 2012

Staff participation in 20 minute makeover

68

Have at least 200 staff members participate in the 20-Minute Makeover by 2012

Work location green programs Green teams or Audubon in place at 10 TRCA work locations

Have EcoSchool/EcoOffice type “ecoteam” programs at all work locations (18 total) by 2012

Our EnvironmentGoal or Objective 2011 Performance/Status Trend TargetCarbon FootprintCarbon neutrality 2,760 tonnes 2011

TRCA will be carbon neutral by 2025

EnergyEnergy reduction 6%

Reduce total energy consumption by 30% from 2005 levels by 2015; and by 50% by 2025.

Renewable energy 31.4%

50% of TRCA facility space is heated and cooled from renewable sources by 2015.

Green electricity 24% Source 80% of electrical energy from green sources by 2015.

WaterWater use 19% Reduce total potable water

consumption from 2009 levels by 35% by 2025

Vehicles, Fuel, and TravelFleet fuel efficiency 17.1 litres per 100 km

(average, all vehicles)TRCA’s average fleet fuel efficiency is 12 litres per 100 kilometres by 2018

Fleet GHG emissions 3.4% decrease in fleet contribution to carbon footprint

since 2009.

This descriptor needs to stay in – 3.4% means nothing

Reduce TRCA greenhouse gas emissions from fleet and travel by 50% from 2009 levels by 2018

Alternative fuel vehicles 12.1 % of fleet TRCA’s fleet will be 50% alternative fuel vehicles by 2020

Page 109: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

109

Our EnvironmentGoal or Objective 2011 Performance/Status Trend TargetLand ManagementLand Management Plans 8 of 14 land management

plans completed

Complete baseline land management plans for 14 major TRCA properties.

Waste ManagementWaste diversion 21% diversion rate from landfill Diverting 80% of total waste at all

TRCA facilities by 2018

Our BusinessGoal or Objective 2011 Performance/Status Trend TargetSustainable BusinessFunding diversity – leveraging partnerships

55% of funding from non-municipal sources

At least 50% of funding from non-municipal sources

Green PurchasingLocal Food 29% of food is sourced locally Not

measured last year

40% of food purchased by TRCA is sourced locally by 2012

Our Community – SocialGoal or Objective 2011

Performance/Status

Trend Target

Employment programs for internationally trained professionals (PAIE and M2P)Number applicants 647 435 applications received by end of

2014

Number participants accessing programs

97 170 participants accessing programs by end of 2014

Number participants completing program

35 150 participants complete program by end of 2014

Number participants obtaining employment in professional field

64 133 participants gain employment by end of 2014

Number participants obtaining licensure/Certification/Credential for Employment

29 55 participants receive credential for licensure by end of 2014

Number M2P Participants (mentees) matched to a Mentor in their field

100% 100 % M2P participants matched to mentor in field by end of 2014

Percent M2P Mentors from TRCA 50% 50% mentors recruited from community at large for M2P program by end of 2014

Page 110: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

110

Our Community – SocialGoal or Objective 2011

Performance/Status

Trend Target

Environmental Volunteer Network (EVN)Number new volunteers registered with EVN

570 900 new registrants by end of 2014

Number volunteer passes issued to individuals who have volunteered 30 or more hours at TRCA

280 625 volunteer passes issued by end of 2014

Number external (non TRCA) volunteer opportunities posted on EVN

530 900 external volunteer opportunities posted on EVN by end of 2014

Page 111: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

111

Item AUTH8.2TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Brian Denney, Chief Administrative Officer

RE: SUMMARY OF PROCUREMENTSMid-year Review - January 1, 2012 to June 30, 2012

______________________________________________________________________________KEY ISSUEReceipt of the 2012 mid-year summary of procurements approved by the Chief Administrative Officer or his designate.

RECOMMENDATION

IT IS RECOMMENDED THAT the summary of Toronto and Region Conservation Authority (TRCA) procurements approved by the Chief Administrative Officer or his designate for the period January 1, 2012 to June 30, 2012, be received.

BACKGROUNDAt Authority Meeting #5/05, held on June 24, 2005, Resolution #A124/05 approved the Purchasing Policy, and resolved, in part, as follows:

...staff report to the Business Excellence Advisory Board semi-annually with a list of all Requests for Quotations and Requests for Proposals approved by the Chief Administrative Officer pursuant to Schedule 'A'...;

Pursuant to the resolution quoted above, the summaries of Requests for Quotations and Requests for Proposals from January 1, 2012 to June 30, 2012, are found in Attachments 2 and 3, respectively. The report includes approvals of $10,000 or greater, to the maximum allowable limit under the policy, falling within the purview of the Chief Administrative Officer or his designate.

Attachment 1 includes the criteria as to why non-competitive procurement was appropriate for the particular goods or services procured, as per Section 1.14 of TRCA's Purchasing Policy.

As permitted under the approved policy, the Chief Administrative Officer has designated senior staff, generally including director and manager level positions, approval authority for purchases up to $10,000 (including HST not recoverable by TRCA).The total purchases (including contingencies) approved by the Chief Administrative Officer/designate from January 1 to June 30, 2012 was as follows:

Page 112: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

112

Procurements(Plus HST)

$Sole Source 333,591.49Lowest Bid/Competitive 3,165,898,66Not Lowest Bid 11,040.00TOTAL 3,510,530.15

Report prepared by: Kathy Stranks, extension 5264Email: [email protected] Information contact: Kathy Stranks, extension 5264Email: [email protected]: July 4, 2012Attachments: 3

Page 113: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

113

Attachment 1

TORONTO AND REGION CONSERVATION AUTHORITYPURCHASING POLICY

Section 1.14 Non - Competitive Procurement Process

A non-competitive procurement process shall only be used if one or more of the following conditions apply and a process of negotiation is undertaken to obtain the best value in the circumstances for the TRCA. Authorized Buyers are authorized to enter into negotiations without formal competitive bids, under the following circumstances:

1. The goods and services are only available from one source or one supplier by reason of:

A statutory or market based monopoly

A fluctuating market prevents the TRCA from obtaining price protection or owing to

market conditions, required goods or services are in short supplyExistence of exclusive rights (patent, copyright or licence)

Need for compatibility with goods and services previously acquired and there are no

reasonable alternatives, substitutes or accommodationsNeed to avoid violating warranties and guarantees where service is required

2. An attempt to purchase the required goods and services has been made in good faith using a competitive method and has failed to identify a successful supplier.

3. When the extension or reinstatement of an existing contract would prove most cost-effective or beneficial. The extension shall not exceed one year.

4. The goods and services are required as a result of an emergency, which would not reasonably permit the use of the other methods permitted.

5. The required goods and services are to be supplied by a particular vendor or supplier having special knowledge, skills, expertise or experience that cannot be provided by any other supplier.

6. Any other sole or single source purchase permitted under the provisions of this policy including those noted in Schedule ‘B’.

Page 114: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

114

Attachment 2REQUESTS FOR QUOTATIONLowest Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

Standard First Aid Training & Recertification Hespro EMP Canada Services Ltd.

12,711.00+10% contingency

3/3

Detailed Design Drawings & Construction Cost Estimates for Two Pedestrian Bridges - Claireville Conservation Area Inter-Regional Trail

GD Jewell Engineering Inc. 69,067.00+10% contingency

5/2

BLACK CREEK PIONEER VILLAGECable Replacement to Shoreham Drive Transformer

Ainsworth 37,647.00 4/2

Snider Drive Shed and Cider Mill Restoration and Building Stabilization

Byte Construction Limited 43,920.00+ 10% contingency

4/1

Repair & Construction Worl for Slaughter House Byte Construction Limited 17,850.00+10% contingency

4/2

Repair, Painting & Animal Proofing of Harness Shop

G.V. Miller Custom Contracting

12,310.00+10% contingency

3/2

Restoration & Repair Work to Tinsmith Shop D & L Laurin Construction 31,634.94+10% contingency

3/2

Replacement of a Faulty Fire Hydrant & Installation of Water Line to the Grain Barn

Nor-Line Plumbing & Mechanical Ltd.

19,055.00+10% contingency

3/3

MIMICO WATERFRONT LINEAR PARKSupply & Delivery of 700 Tonnes of 100mm-200mm Gabion Stone by Triaxle Truck

Glenn Windrem Trucking 16,100.00+2,000.00 contingency

4/3

Supply & Delivery of Approximately 2,000 Tonnes of 100mm-200mm Cobble Stone by Triaxle Truck

Nelson Aggregates Co. 55,000.00+6,000.00 contingency

10/4

Supply & Delivery of Approximately 875 Tonnes of 2-4 Tonne Stackable Armourstone

CDR Young Aggregates Inc. 47,197.50+5,000.00 contingency

6/4

Supply & Delivery of Approximately 1,750 Tonnes of Concrete Sand

Strada Aggregates 34,037.50+4,000.00 contingency

6/3

Supply & Delivery of Approximately 500 Tonnes of 100mm-200mm Gabion Stone by Tri-axle Truck

Strada Aggregates 14,250.00+1,000.00 contingency

10/4

Supply & Delivery of Approximately 1,700 Tonnes of 19mm Crusher Run by Tri-axle Truck

Lafarge Aggregates 28,050.00+3,000.00 contingency

10/5

Relocation of Grand Harbour Gazebo McPherson-Andrews Contracting Limited

81,680.00+8,000.00 contingency

4/4

KORTRIGHT CENTRE FOR CONSERVATIONKortright Water Well & Hand Pump Installation Ontario Well Drilling Ltd. 8,000.00 Contract

ExtensionPurchase & Installation of Ultrafiltration System for the Greenworks Building

Aquasoft Water Centre 12,500.00 3/2

Page 115: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

115

REQUESTS FOR QUOTATIONLowest Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

YONGE - YORK MILLS CHANNEL PROJECTConcrete Panel Restoration (Reach 1) McPherson-Andrews

Contracting Limited9,992.00

+3,000.00 contingency3/3

Supply & Delivery of Approximately 1,000 Tonnes of Recycled Concrete 19mm Crusher Run (Reach 3)

D. Crupi & Sons Limited 10,200.00+2,500.00 contingency

8/5

Supply & Delivery of Approximately 660 Tonnes of 150mm-300mm Gabion Stone (Reach 3)

Strada Aggregates Inc. 15,180.00+2,000.00 contingency

8/3

Off Site Disposal of Woody Debris Via Disposal Service Co. Ltd. 12,025.00+3,000.00 contingency

7/2

Supply of One Three-person Crew of Certified Traffic Control Operators

Barricade Traffic Services 14,400.00+2,000.00 contingency

2/2

Erosion and Sediment Control Products Terrafix Geosynthecs 3,710.64 Contract Extension

Supply of One Extra Certified Traffic Control Person

Barricade Traffic Services 6,600.00 Contract Extension

Digital Topographic Base Mapping for Lake Wilcox Area

First Base Solutions 8,350.00 2/2

1083 BEACHPOINT PROMENANDEAsbestos Abatement & Removal Priestly Demolition

Incorporated28,127.00

+3,000.00 contingency7/4

Rental of One Operated Hydraulic Excavator Priestly Demolitions Inc. 10,445.00+1,135.00 contingency

4/3

Rental & Disposal of Ten 40-yard Garbage Bins Via Disposal Service Co. Ltd. 12,945.00+1,300.00 contingency

3/3

ROUGE PARK PROPERTIESBathroom Renovations at 9 Reesor Road Benedetto Plumbing Inc. 11,800.00

+10% contingency6/3

Roof & Eaves Replacement at 7401 Reesor Road

B.W. Doucette Roofing 9,508.25+10% contingency

6/2

Roof Replacement at 2273 Meadowvale Road Tony K. Aluminum/Roofing 11,022.50+10% contingency

4/3

MUD CREEK EROSION CONTROL PROJECTDesign & Delivery of Supplies for Creek Bypass System for Mud Creek Erosion Control Project

Xylem Water Solutions 35,356.00+3,600.00 contingency

3/3

Rental of One Operated Hydraulc Excavator & One Rubber Tire Loader

Galcon Marine Limited 67,980.00+7,000.00 contingency

7/3

Supply and Delivery of 100mm - 200mm Gabion Stone by Triaxle Truck

Nelson Aggregate Company 27,580.00+2,800.00 contingency

9/4

Page 116: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

116

REQUESTS FOR QUOTATIONLowest Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

Update Floodplain Maps for Section of East Humber River from Lake Wilcox to Bathurst Street

R.J. Burnside & Associates Limited

13,487.00+1,350.00 contingency

3/2

149 Chesterton Shores Demolition Project - Asbestos Abatement & Removal

Envirosafe Incorporated 10,500.00+2,000.00 contingency

6/6

Supply & Delivery of 150mm-300mm Roundstone

Fowler Construction Company Limited

12,080.00 Contract Extension

EAST DON RIVER SOUTH OF FINCH AVENUE EAST BANK RESTORATIONSupply and Delivery of Approximately 400 Tonnes of 2-4 Tonne Stackable Armour Stone

J.C. Rock Limited 19,200.00+ 2,000.00 contingency

8/2

Supply and Delivery of Approximately 400 Tonnes of Stackable 100mm-200mm Gabion Stone

Miller Paving Limited 11,180.00+ 1,200.00 contingency

8/3

Rental of One Operated Hydraulic Excavator and One Rubber Tire Loader

Dynex Construction Limited $51,100.00+18,400.00 contingency

7/4

Asphalt Paving Works Bryron Contracting Limited 21,310.00+2,500.00 contingency

6/6

MEADOWCLIFFE DRIVE EROSION CONTROL PROJECTSupply & Delivery of approximately 1,800 Tonnes of 4-6 Tonne Stackable Armourstone

Glenn Windrem Trucking 84,600.00+8,500.00 contingency

9/3

Supply & Delivery of approximately 1,500 Tonnes of 225mm-450mm Rip Rap Stone

Dufferin Aggregates 39,525.00+4,000.00 contingency

9/6

Horse Drawn Wagon Rides for the Sugarbush Maple Syrup Festival at Kortright Centre for Conservation and Bruce's Mill Conservation Area

Tiger Paw Exotics 22,600.00+10% contingency

10/4

PARTNERS IN PROJECT GREENCase Study Filming Powerline Films 20,400.00 4/3Venue Facilities & Refreshments for Training & Networking Events

Centre for Health and Safety Innovation

10,000.00 30/4

Venue Facilities & Refreshments for Training & Networking Events

International Centre 10,000.00 30/4

Caledon Canada Day Pyrotechnics Display North Star Fireworks Entertainment Inc.

11,504.43 3/1

Page 117: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

117

REQUESTS FOR QUOTATIONLowest Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

ACQUISITION OF VEHICLES/EQUIPMENTOne 2012 Extend Cab Truck Bolton Motor Products 28,456.00 14/6One Service Van Humberview NCV 29,711.20 8/8One Compact SUV Parkway Honda 30,121.95 15/5One 4x4 Chassis Cab Truck with Hydraulic Dump Box

City Buick Chevrolet Cadillac GMC Ltd.

36,192.20 14/6

Two New Kubota RTV900 Worksite Utility Vehicles

Kooy Brothers Lawn Equipment Limited

31,325.00 5/2

One New Kubota F3680 4WD Front Mower Kooy Brothers Lawn Equipment Limited

33,393.00 5/2

Three New John Deer 1445 Front Mowers Hutchinson Farm Supply 57,876.00 6/2One John Deer 5065E Tractor/Loader Hutchinson Farm Supply 35,609.00 7/2One New 2012 Midsize 4x4 Pick-up Truck Brimell Toyota 28,397.35 15/5One New 2012 Compact Hatchback Automobile Yorkdale Toyota 18,741.20 15/5One New 2012 Full Size Pick-up Truck East-Court Ford Lincoln Sales 25,756.00 15/5Glen Haffy Conservation Area - Fish Food Supply

Martin Mills Inc. 35,000.00+10% contingency

2/2

Head Office South Office Building Insulation Air Seal Insulators Inc. 14,450.00 5/4Bathurst Glen Golf Course / Bruce's Mill Conservation Area - Supply and Delivery of Fuel

Armstrong Petroleum LTD. 18,000.00 3/3

2012 Cleaning & Washroom Supplies for all Parks and Culture Facilities

Rally Distribution 75,000.00+10% contingency

6/4

Lake St. George Field Centre - Supply & Installation of Ductless Split Air Conditioners in Davies Hall

Summers and Smith Heating and Cooling Limited

38,899.00 7/2

2012 Bathroom Products for Head Office, Downsview Office, Boyd Office & Restoration Services Centre

Mr. Janitorial Supplies 21,000.00+10% contingency

3/3

Supplier of Safety Footwear Imagewear by Mark's Work Wearhouse

25,000.00 2/2

KLEINBURG NEW FOREST NORTH TRAILSSupply and Delivery of Approximately 2500 Tonnes of 19mm Crushed Limestone Aggregate

Strada Aggregates 46,000.00 3/3

Supply and Delivery of Approximately 400 Tonnes of Limestone Screenings

Strada Aggregates 6,360.00 3/3

Removal and Replacment of Porch Roof and Deck Components at Former Maciver Property

Meridian Construction Inc. 47,820.00+3,000.00 contingency

7/4

Page 118: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

118

REQUESTS FOR QUOTATIONLowest Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

BATHURST GLEN GOLF COURSEGolf Carts Rental Bennett Golf Carts 15,000.00

+10% contingency3/2

Course Hardware, Pest Control Products & Grass Seed

AllTurf Ltd. 15,000.00+10% contingency

4/3

WILKET CREEK EMERGENCY WORKSSupply & Installation of 19mm Limestone Crusher Run & Asphalt Paving at Sites 6 & 7

Bryron Contracting Limited 17,295.00+2,000.00 contingency

6/6

Albion Hills & Heart Lake Aquatic Facilities - Supply of Commercial Pool Heaters

Water and Ice North America Inc.

16,132.00+10% contingency

4/4

Asphalt Paving Works at Taylor Creek Park Mopal Construction Ltd. 22,012.50+2,500.00 contingency

6/6

PETTICOAT CREEK CONSERVATION AREA AQUATIC FACILITYSupply & Installation of Slides & Rubber Surfacing

ABC Recreation LTD. 58,031.00+ 10% contingency

5/1

Entrance Unit Paving LandVision Contracting Limited

28,050.00+10% contingency

biddingo/10

PORTICO DRIVE MAJOR MAINTENANCE PROJECTSupply and Delivery of 300mm - 600mm Boulders

Fowler Construction Company Limited

32,500.00 contract extension

Supply and Delivery of 150mm - 300mm Boulders

Fowler Construction Company Limited

15,250.00 contract extension

Water Line Installation at Bruce's Mill Conservation Area

Somerville Co. Limited 15,000.00+10% contingency

3/3

PORT UNION WATERFRONT PARK (PHASE 2)Supply and Delivery of Approximately 500 Tonnes of Granular A (19mm Crusher Run)

Strada Aggregates 9,125.00+1,000.00 contingency

8/7

Supply and Delivery of Approximately 600 Tonnes of Granular B (Crushed Limestone)

Strada Aggregates 10,950.00+1,000.00 contingency

8/7

Purchase of 12 New Water Level Sensors for Stream Flow Monitoring Network

Rice Engineering and Operating Ltd.

22,044.92+2,500.00 contingency

2/2

Claireville Dam Asbestor and Mould Removal JMX Environmental Incorporated

26,500.00+5,000.00 contingency

7/7

Supply & Delivery of Approximately 1,500 Tonnes of Granular A (19mm Crusher Run)

Canadian Building Materials (CBM) Aggregates

24,675.00+2,000.00 contingency

8/7

Supply & Delivery of Approximately 2,000 Tonnes of 75-200mm Cobble Stone

Glenn Windrem Trucking 61,800.00+6,000.00 contingency

8/2

Supply & Delivery of Sediment Erosion Control Measures for Alfred Kuehne Boulevard Stream Realignment & Restoration Project

Terrafix Geosynthetics Inc. 14,663.74+10% contingency

3/3

TOTAL 2,441,575.36

Page 119: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

119

REQUESTS FOR PROPOSALCompetitive Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

3030-3068 Weston Road Erosion Risk Analysis Stantec Consulting Ltd. 18,483.00+1,200.00 allowance for

additional borehole+4,000.00 contingency

5/4

PARTNERS IN PROJECT GREENEnergy Leaders Consortium Facilitation 360 Energy Inc. 58,800.00 26/6Energy Leaders Consortium Energy Monitoring Innovative Solultions Inc. 30,920.00 36/11Conduct Construction Risk Mitigation & Impact assessment for Properties Along 30-48 Rouge Rouge Trail, Toronto

Stephenson Engineering Limited

50,066.00+5,000.00 contingency

8/1

Detailed Design & Specifications for Construction of Steel Pedestrian Bridge - Contract Extension at Port Union Waterfront Improvement Project (Phase 2)

AECOM Canada Limited 5,200.00 Contract Extension

Website & Application Support & Development Services for TRCA Managed Websites

Three Wise Men Inc. 46,000.00 Biddingo/2

Climate Change and Water Resources: National Water Adaptation Guidance Best Practices Compendium

ESSA Technologies Ltd. 129,775.90 8/8

Mimico Waterfront Park Project (Phase 2) - Complete Detailed Design for Power Service, Distribution & Pathway Lighting, & option for Geotechnical Testing, if Required

Stephenson Engineering Ltd. 21,751.00 7/4

Phase 3 Stormwater Modelling Services for County Court SNAP

Aquafor Beech Limited 24,345.00 3/3

Seaton Improvement Project - Geotechnical Investigation Services for Construction of Steel Staircase

DBA Engineering Ltd. 12,150.00 4/2

Detailed Design & Specifications for Water, Sanitary & Hydro Servicing at Tommy Thompson Park Infrastructure Project

Stephenson Engineering Ltd. 33,153.00+6,000.00 additional

testing+3,500.00 contingency

6/3

LAKEVIEW WATERFRONT CONNECTION COORDINATED PROJECT ENVIRONMENTAL ASSESSMENTUndertake Third Party Facilitator Services Hardy Stevenson and

Associates50,747.00

+20% contingencybiddingo.com/4

Marine Archaeology Services Scarlett Janusas Archaeological and Heritage Consulting and Education

63,265.00+20% contingency

4/1

Page 120: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

120

REQUESTS FOR PROPOSALCompetitive Bid (up to $100,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

Erosion Risk Assessment at the Rear of 4 to 14 Hardwood Gate, Toronto

Terraprobe Inc. 25,530.00 5/4

Slope Stability Assessment & Erosion Risk Analysis of Scarborough Bluffs along 26 to 30 Livingston Road, Toronto

Sarafinchin Associates Limited 12,315.00+1,250.00 contingency

5/4

Frenchman's Bay Harbour Entrance - Marine Archaeology Services

Scarlett Janusas Archaeological and Heritage Consulting and Education

16,450.00+20% contingency

4/1

Detailed Design for Bank Stabilization Works, Highland Creek

Aquafor Beech Ltd. 20,230.00+2,500.00 contingency

7/6

Filming & Video Production for Lake Wilcox SNAP Front Yard Makeovers & Neighbourhood-wide Residential Eco-landscaping Program

Powerline Films 25,000.00 8/6

Economic Costs of Not Adapting to Climate Change Phase 1 (ORCCC)

Econometric Research Limited 30,600.00 8/1

TOTAL 724,323.30

Page 121: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

121

REQUESTS FOR QUOTATIONLowest Bid Not Accepted (up to $25,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Number of Quotations Requested/

Complete Bids Received

PARTNERS IN PROJECT GREENFilming & Editing Services for Event & Training Filming

Images Made Real 11,040.00 4/3

TOTAL 11,040.00

Page 122: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

122

REQUESTS FOR QUOTATIONSole Source (up to $50,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Sole Source Criteria

(Section 1.14 of TRCA's

Purchasing Policy)

Heart Lake Conservation Area - Outdoor Pool Deck Forensic Engineering Services

Griffin Koerth 20,000.00+10% contingency

5

Two Month Rental of Crawler Carrier (Reach 3) at York - York Mills Channel Project

Hub Equipment Inc. 11,000.00+2,250.00 contingency

1

Processing Fish Tissue Samples for 2012 Sport Fish Contaminant Project

Chuck Cox 20,000.00 5

Senior Climate Scientist & Advisor to Ontario Regional Climate Change Consortium

Neil Comer 9,734.51 5

Partners in Project Green Website Maintenance WirelessLinx Inc. 10,000.00 3 & 5New Canadian Environmental Work Experience Program

Career Edge 18,340.00 5

Job Search Workshops to M2P for Environmental Professionals Program Clients

ACCES Employment 10,512.00 5

Telemetry Fish Tags VEMCO 13,925.00 5Native Grassland Enhancements at Bob Hunter Memorial Park, Claireville CA & Gatineau Corridor

Rural Lambton Stewardship Network

40,000.00 5

Workplace Communciation Training for M2P Clients

JVS Toronto 16,011.00 5

Hotel to Host Mainstream: The National Water Adaptation to Climate Change Forum

Marriott Toronto Bloor-Yorkville

19,380.00 4

Purchase of Mike Flood Hydraulic Modelling Package

DHI Water & Environment 19,085.00 5

630 Square Metres of Vast Permeable Intrelocking Recycled Rubber Composite Pavers for Kortright Green Parking Retrofity

IOWAT 35,398.23 1

630 Square Metres of Permeable Interlocing Recycled Rubber Composity Pavers for Kortright Green Parking Retrofity

Eco-flex 34,955.75 1

Printing Draft Proposed Source Protection Plan & Approved Credit Valley Source Protection Area Assessment Report

Swiss Print International 11,000.00 5

TOTAL 293,591.49

Page 123: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

123

REQUESTS FOR PROPOSALSole Source (up to $50,000)

Project/Product Awarded Bidder Cost Not to Exceed($)

Plus HST

Sole Source Criteria

PARTNERS IN PROJECT GREENDelivery of Eco-Efficieny Program for Food Processors

Guelph Food Technology Centre

15,000.00 5

Management & Delivery of Sustainability Consortiums

High Power Solutions Inc. 25,000.00 5

TOTAL 40,000.00

Page 124: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

124

Item AUTH8.3TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Brian Denney, Chief Administrative Officer

RE: GOOD NEWS STORIES______________________________________________________________________________KEY ISSUEOverview of Toronto and Region Conservation Authority activities from April - June, 2012.

RECOMMENDATION

IT IS RECOMMENDED THAT the summary of Good News Stories from April - June, 2012 be received.

BACKGROUNDAs per Authority direction during 2006, a report covering highlights of Toronto and Region Conservation Authority's (TRCA) activities is provided to the Authority every few months. The stories for April - June, 2012 are as follows:

April

Sunny Days fundraising event raised approximately $30,000 for Claremont Field Centre and

will be used to improve accessibility to TRCA lands in the Duffins Creek watershed.Completed two major maintenance projects with more than $400,000 in Ministry of Natural

Resources (MNR) funding.Black Creek SNAP (Sustainable Neighbourhood Retrofit Action Plan) received a $30,000

Vital Ideas grant from Toronto Community Foundation.Goose tracking system by cellphone is up and running, and data is available online. Twenty

collars are being used in Toronto, as part of a larger Canadian Wildlife Service study.500 people involved in Port Lands Acceleration Initiative consultation.

Undertaking major project for Infrastructure Ontario this year on West Don Lands. The work

will cost approximately $11 million dollars and include soil remediation, armouring of the landform and landscaping.At the first annual meeting of The Living City Foundation, the 51st annual meeting of the

foundation, four new board members were elected. The foundation board is more diverse than ever before and better reflects the community.Authority approves 2012 budget totalling $103.1 million to implement Living City programs

and projects.Over 650 employees from Pearson Eco-Business Zone companies attended the Earth Day

planting in Etobicoke Creek watershed.TRCA to present our watershed management model in the Philippines.

Enbridge Gas and Trout Unlimited announced one year investment of approximately

$200,000 in Duffins watershed for habitat improvements and community engagement.The Sugarbush Maple Syrup Festival at Bruce's Mill and Kortright wrapped up another

successful season attracting 43,000 visitors.

Page 125: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

125

Staff has done approximately 40 interviews with landowners in the flood vulnerable areas

(FVA) in the vicinity of Pickering Beach, on how to deal with residing in FVAs. Residents are pleased with this hands-on approach.McMichael Canadian Art Collection and 300 guests participated in Humber Earth Day Event.

May

Town of Ajax Council endorsed the Lower Carruthers Municipal Class EA for flood

protection and the planning approach to provide for the future remediation of a flood spillway and flexible approach to the regulation of floodplain lands.Two major projects with a combined value of $3 million were completed on behalf of the City

of Toronto; Wilket Creek Park Phase 2 Emergency Works and Glen Stewart Ravine Management Plan Implementation Project. At Wilket Creek 300 m of channel reconstruction, including infrastructure protection, the replacement of two bridges and the construction of a 40 m boardwalk to protect an ephemeral wetland were implemented. At Glen Stewart Ravine trail improvements for the protection of the ecologically significant habitat, and to improve user accessibility, were completed through the installation of a 100 m boardwalk with a lookout platform, the replacement of a 27 m high staircase, and upgrades to the fencing and granular trail.Launched Black Creek's 4th beer in the LCBO which is selling very well. Black Creek Pale

Ale received 91/100 rating from the Globe and Mail. Black Creek Pale Ale received Ontario Brewers Award as best North American style pale ale.A juvenile Atlantic salmon was caught by Restoration Services staff during routine fisheries

monitoring of the lower Don River. Native Atlantic salmon have not been seen in the Don River for over a century and is a potentially significant find for the GTA Atlantic salmon re-introduction program.Hosted 150 Durham Catholic School gifted elementary students and secondary students for

their dig days at Lost Brant site (Lake Wilcox) as part of their archaeology program.Boyd Archaeological Field School will run for its 35th year, through Claremont Field Centre.

Approved to be on Huron-Wendat site in Duffins watershed with Boyd Archaeological Field School students in August.Green Home Makeover ribbon cutting and street party were both well attended. TRCA will

host additional tours for those that could not be accommodated at the street party.Bathurst Glen Golf Course's annual Audubon audit was held and reduced Class 9 pesticide

use by 20%.Partners in Project Green Annual Report was released and over 3,500 companies were

engaged in energy conservation measures in 2011, saving 46,479 MWh of electricity and 3.5 m

3 of natural gas.

The Tommy Thompson Park (TTP) Bird festival was a huge success hosting over 1,500

participants engaged in bird walks, workshops and activities.TTP Banding Lab banded a very rare townsend’s warbler – a black-throated gray warbler

hybrid. Only five have ever been reported in Canada.In partnership with Region of Peel and Credit Valley Conservation, the draft Terms of

Reference for the Lakeview Waterfront Project EA was submitted for review and comment.TRCA hockey team won the conservation authorities hockey tournament for the eighth year

in a row.

Page 126: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

126

Phase I of retrofit at Kortright is complete, with the forced air system changed to ground

source heat pump. The deck has been completed so visitors can walk out there for the first time in years.Rouge National Urban Park approved for $143 million over 10 years as a new national park

run by Parks Canada. Rouge Park Alliance will be retired at the end of June. TRCA will be the transitional manager. Parks Canada will appoint a transitional advisory committee.Metcalf Foundation provides $30,000 for the Toronto Urban Farm.

TRCA has been selected to be a member of the Toronto Food Policy Council.

300 students, teachers and the Richmond Hill Rotary Club pitch in to plant more trees at

Oak Ridges Corridor Park.A new TRCA corporate logo and watermark was approved. The new logo, to be put into

use later this year, has evolved from the existing logo with a new visual symbol and updated lettering that represent today's TRCA while recognizing our rich past. 19th Paddle the Don raised over $70,000 with approximately 900 people paddling or

volunteering.

June

Black Creek Pioneer Village welcomed over 22,000 school students to the Village in May

and June alone. BCPV will have many more attending our new summer programs.Major repair work has been carried out on buildings at Black Creek Pioneer Village. The

Snider Drive Shed and Edgeley Slaughter House have both had a "face lift" and are looking forward to the next forty years.At Black Creek Pioneer Village, a new patio has been constructed outside the Half Way

House. Visitors will now be able to enjoy a meal from the restaurant, or a refreshing pint of ale from the Black Creek Historic Brewery, outside under the shade trees.The Province of Ontario recently announced renewed funding for PAIE and M2P programs.

With funding from the Province and Government of Canada, these programs have assisted skilled newcomers since 2006 to get licensed and find employment in their field of expertise. For the period December 1, 2011 to May 31, 2014 these projects will assist over 90 new clients with a background in engineering, planning, ecology and green building to develop the technical, cultural and/or language skills required to be successful in finding and retaining employment in their field.The Living City Foundation and TRCA were pleased to host over 200 RBC Royal Bank

employees in three community days events across the region. Canoers paddled in the Humber River and learned about this great heritage river and 1.vital link to Canada's fresh water source on World Environment Day. Over 100 employees were engaged at Kortright Centre for Conservation in water 2.testing experiments that explored a number of factors making up our water systems, along with planting and learning about sustainable agriculture at Kortright 's urban farm. Another 50 employees painted 245 yellow fish symbols next to the storm drains on 3.the streets in Scarborough and distributed 1,500 flyers to their households - three times the work of past community groups.

The W. Garfield Weston Foundation donated close to one million dollars supporting TRCA's

various education programs, including: The Weston Family Environmental Leaders of Tomorrow Program at three TRCA facilities; the expansion of this program to five additional field centres across Ontario; and the Monarch Teachers Network Canada expansion program.

Page 127: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

127

TRCA received $100,000 from the Federation of Canadian Municipalities to assist the Town

of Caledon in creating the Coleraine West Eco-Business Park in Bolton.160 people attended the second annual Erosion and Sediment Control Field Training

Workshop.Through the Peel EcoSchools Project, 167 schools in the Region of Peel have been

successfully certified in the Ontario EcoSchools program this year. The Peel EcoSchools Project is managed and supported by TRCA, with funding from the Peel Climate Change Strategy.TRCA produced the Peel EcoSchools Celebration Video, which was distributed to all

certified Ontario EcoSchools in the Region of Peel. The video features a message from the Minister of Education, The Honourable Laurel Broten, as well as the Directors of Education from both school boards. A provincial version was also created and made available to schools participating in the program across Ontario.In a decision released June 2012, the Mining and Lands Commissioner upheld TRCA

policies for valleyland protection and dismissed an appeal of a TRCA permit application to build a structure located on the valley slopes at a Banbury Road residence, in Toronto. Planning and Development staff concluded review of a new French language K-12 school

proposed by the Conseil Scholaire Viamonde. The site design and LEED certified building will provide for extensive renaturalization of the adjacent Ganatsekaigon Creek valleylands and a clean storm water infiltration system that will help conserve adjacent wetland communities.TRCA agreed to assist the City of Toronto on an Impact Assessment for Scarborough

Waterfront Trail Connection, and Environmental Assessments for:Humber Bay Landform;

Amberlea Creek Erosion Control Project;

Ashbridge's Bay;

Eastern Beaches;

East Don Trail.

Tiger muskie (pike/muskellunge cross) found for first time in Toronto Harbour.

For the fifth year, TRCA staff took part in the 24hrs of Summer Solstice mountain bike relay

race at Albion Hills. The TRCA Tree Fairies managed a respectable 19th out of 99 teams in the club category. Team members issued a challenge within the development and environmental community to participate in the race and some sustainable trails initiatives. In addition to TRCA, seven teams from consulting firms participated with approximately 75 individuals.TRCA Racers tied for first place in the 2012 Oak Ridges Moraine Relay Race. TRCA

Underdogs finished in 26th place.

Report prepared by: Kathy Stranks, extension 5264Emails: [email protected] Information contact: Kathy Stranks, extension 5264Emails: [email protected], [email protected]: July 12, 2012

Page 128: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

128

Item AUTH8.4TO: Chair and Members of the Authority

Meeting #6/12, July 27, 2012

FROM: Catherine MacEwen, Director, Human Resources, Marketing and Communications

RE: IN THE NEWS______________________________________________________________________________KEY ISSUEOverview of Toronto and Region Conservation Authority activities April - June, 2012.

RECOMMENDATION

IT IS RECOMMENDED THAT the summary of media coverage from April - June, 2012 be received.

BACKGROUNDAs per Authority direction during 2006, a report covering highlights of Toronto and Region Conservation Authority's (TRCA) news coverage for the preceding few months is provided to the Authority every few months. The stories for April - June, 2012 are as follows:

Media Coverage HighlightsA search on a news archives database (FPInfomart) for the period from April 1 to June 30 that mentioned Toronto and Region Conservation or Black Creek Pioneer Village produced 176 media hits. These results only reflect a portion of media coverage, since the database does not monitor some online media, some broadcast, smaller community papers and trade publications. The highlights are examples of noteworthy media coverage secured.

To raise awareness about Paddle the Don, media were invited once again to experience

the event first had. Media participants included: 680 News, Newstalk1010, CBC Here and Now, Discovery Channel, Don Valley Girls Bloggers, Outdoor Canada, Toronto Star and Globe and Mail. Media coverage from the Globe and Mail appeared in a half page print story with accompanying photo title “Upstream fight, but there’s hope for the fish in the Don“ on May 7 and Toronto Star column “Thrills and spills on the normally placid Don” on May 12; raised awareness about the Don River and the Paddle the Don event. Interviews on 680 News, Newstalk1010 and Rogers TV Daytime Toronto aired in the days leading up to the event. TRCA was mentioned in many print and broadcast news stories in the months of May

and June, regarding a request for the sale of a parcel of park land owned by TRCA. TRCA Media Management assisted in providing information and coordinating interviews. From the stories, TRCA’s role as on of Toronto’s largest public landowners and protector of greenspace was brought to the forefront. Media were working on very tight deadlines and were very appreciative of TRCA’s cooperation in providing information on a timely basis.Rogers Daytime Toronto filmed two segments at Black Creek Pioneer Village for its

Summer in the City episodes. The segments air on July 6, July 20, August 4, August 17 and August 31 on Rogers TV Channel 10.

Page 129: Meeting - Authoritytrca.on.ca/dotAsset/140597.pdf · 2017-10-25 · auth8.1 2011 corporate social responsibility report 102 auth8.2 summary of procurements mid-year review - january

129

A tour of “birds in the city” with a TRCA expert was arranged for a Toronto Star writer

during the week leading up to the Tommy Thompson Park Spring Bird Festival. The result was a half page story “Song bird 'superhighway' runs through Toronto“on May 11.Local community media relations were the focus for the Green Home Makeover Ribbon

Cutting event held on May 16. The event drew media coverage from Rogers Daytime Peel Region, Brampton Guardian, Municipal Information Network news and eieihomes.com. Brampton Guardian also did several interviews for a full length feature story that will analyze why more homeowners are not embracing green alternatives, the reasons, the policies and the overall climate for green innovation. A story is also being submitted to Green Building and Sustainable Strategies Magazine for their Fall issue.Green Buildings and Sustainable Solutions Magazine published TRCA bylined article

“The Living City Campus hosts Canada’s Outdoor Photovoltaic Test Facility” on May 31.The launch of the Grow Me Instead Nursery Outreach Campaign media event was a

success. Media coverage was secured from: Omni News, Yonge Street Media, CBC Radio Metro Morning, CBC Radio Ontario Morning, CBC Radio International The Link. A tour of native/invasive plants in the GTA was also organized for a Toronto Star writer for the half page feature story “Invasive Plants Taking over Landscape“ June 18. The media coverage helped to raise awareness about choosing native plants over invasive plants.Several TRCA experts and spokesperson from Toronto Waterfront Revitalization

Corporation participated in a CBC French TV two hour special feature documentary on the "health" of the St. Lawrence River from Lake Ontario to the Gulf. Interviews and tours were coordinated over two days to showcase good examples of watershed restoration projects. Spokespeople took the crew to: waterfront habitats, Spadina wavedeck/wetland, Toronto Island wetlands and Tommy Thompson Park. The documentary is tentatively set to air in mid-November.On June 29th, a tour of Black Creek Pioneer Village was given to the TV crew from

Amaury Jr. Television Show out of Brazil. The crew made stops at tourist destinations in Toronto, Calgary and Vancouver. The show is targeted to the upper social class audience in Brazil, airing a variety of entertainment options to an audience of millions.Black Creek Historic Brewery continues to make news with two announcements this

period. A new series of historic beers available at LCBOs was announced as well as a new series of limited edition ales available only onsite. Positive reviews/stories of Black Creek Historic Beer were received from the Globe and Mail, May 1st; and The Newspaper (University of Toronto student paper), May 1st. Black Creek Historic Brewery's Pale Ale won People's Choice in the North American Pale Ale Category at the Canadian Brewing Awards 2012. Several beer bloggers including: Canadian Beer News and Great Canadian Beer Blog, also give positive reviews about the new beer.

Report prepared by: Rowena Calpito, extension 5632Email: [email protected] Information contact: Rowena Calpito, extension 5632Email: [email protected]: April 24, 2012