INDEX TO EXECUTIVE COMMITTEE MEETING #5/12 Friday, July 6, 2012 MINUTES Minutes of Meeting #4/12, held on June 1, 2012 297 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation Component, Rouge River Watershed Town of Richmond Hill, Regional Municipality of York 956414 Ontario Limited 298 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation Component, Rouge River Watershed Town of Richmond Hill, Regional Municipality of York Yorkwood Homes (RH) Limited 301 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Royal Rouge Trail Erosion Control Project 304 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation Component, Humber River Watershed Greenbrooke Developments Inc. 309 GREENLANDS ACQUISITION PROJECT FOR 2011-2015 Flood Plain and Conservation Component, Humber River Watershed Infinite Homes Ltd. 312 EASEMENT AGREEMENT George Johnson 315 ALBION HILLS CONSERVATION AREA VISITOR SERVICES CENTRE CONSTRUCTION PROJECT 318 ADMITTANCE POLICY 321 BLACK CREEK HISTORIC BREWERY Status Report 326

Upload: tranthu

Post on 28-Jun-2018

213 views

Category:

Documents


0 download

TRANSCRIPT

INDEX TO

EXECUTIVE COMMITTEE MEETING #5/12

Friday, July 6, 2012

MINUTESMinutes of Meeting #4/12, held on June 1, 2012 297

GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of York956414 Ontario Limited 298

GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of YorkYorkwood Homes (RH) Limited 301

GREENLANDS ACQUISITION PROJECT FOR 2011-2015Royal Rouge Trail Erosion Control Project 304

GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedGreenbrooke Developments Inc. 309

GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedInfinite Homes Ltd. 312

EASEMENT AGREEMENTGeorge Johnson 315

ALBION HILLS CONSERVATION AREA VISITOR SERVICES CENTRE CONSTRUCTION PROJECT 318

ADMITTANCE POLICY 321

BLACK CREEK HISTORIC BREWERYStatus Report 326

ONTARIO REGULATION 166/06Brampton (NE) Shopping Centres Limited 329City of Picking and the Town of Ajax 329City of Toronto 3301772014 Ontario Inc. 3309829 Highway 27 330Kleindor Developments Inc.. 331Molise Kleinburg Estates South Inc. 331Vista Parc Limited and Rimax Health Inc. 332Victoria Education Centre (2020207 Ontario Inc.) 3322149629 Ontario Inc./Genview Homes 3332149629 Ontario Inc./Genview Homes 3332073737 Ontario Inc./2073740 Ontario Inc. 334Applemoor Properties Ltd. /Starvilla Homes Corporation 334Mcveanone Developments Inc. 334Opus Homes (River's Edge) Inc. 335Nashville Major Developments Inc./Nashville Developments Inc./Nashville

Developments (South) Inc. 335Nashville Major Developments Inc./Nashville Developments Inc./Nashville

Developments (South) Inc. 336Town of Markham 336Casa East Development Inc. 336Bramalea City Centre Equities Inc. and Morguard Coporation 33711 Aveena Road 337Canada Post Corporation 337Conseil Scholaire Viamonde 338Enbridge Pipelines Inc. 33852 Bonnyview Drive 338Gottardo Galaxy Inc. and UIF Galaxy GP Inc. Partnership 33910 Stewart Crescent 339Markland Wood Golf Club 339100 North Drive 34057 Riverview Heights 34017 Fairglen Crescent 34030 Ridgevalley Crescent 3411 Old Yonge Street 34112 Campbell Crescent 341Donalda Club 34225 Plymbridge Crescent 34235 Wentworth Avenue 34234 George Henry Boulevard 343Toronto District School Board 343V.H.L. Developments Inc. 3438 Manorwood Road 344City of Toronto 3441 Peregrine Way 34480 Hopedale Avenue 34530 Four Oaks Gate 345Phyllo Investments Inc. 345

ONTARIO REGULATION 166/06 Cont'd62 Autumn Grove Court 346132 Deer Run Court 346Regional Municipality of York 346Town of Ajax 34713921 Chickadee Lane 347172 Old King Road 347Richmond Hill Retirement Inc. 34818 Wildwood Avenue 348Sciulli Holdings Inc. 34844 Charles Street 34938 McClure Drive 34978 Treeline Boulevard 3492473 Islington Avenue 3507 Kingsway Crescent 35052 Edenbrook Hill 35034 Senlac Road 3515 Ivor Road 3519 York Valley Crescent 35122 Fulwell Crescent 352195 Burbank Drive 35283 Colonel Danforth Trail 35242 Meadowcliffe Drive 353City of Toronto 353Block 39 (North West) Developer's Group 354Kleindor Developments Inc. 354Nine-Ten West Limited 354Alliance Agri-Turf Inc. 355Regional Municipality of Peel 355Regional Municipality of Peel 356Town of Markham 356Regional Municipality of Peel 357City of Toronto 357Enbridge Gas Distribution Inc. 358Hillside Properties 358Enbridge Gas Distribution Inc. 358Enbridge Gas Distribution Inc. 359Cogeco Data Services 359Enbridge Gas Distribution Inc. 360Enbridge Gas Distribution Inc. 360Enbridge Gas Distribution Inc. 36020 Moldovan Drive 36131 Forestgrove Circle 36166 Midsummer Drive 3612015 Erin Gate Boulevard 362101 Royal Crest Road 3622288 Canterbury Crescent 362

ONTARIO REGULATION 166/06 Cont'd177 Varsity Road 362127 Jeffcoat Drive 363116 Brookbanks Drive 3636 Addington Place 36322 Cedarbank Crescent 36328 Crescentwood Road 36442 Banmoor Boulevard 364University of Toronto - Scarborough 36416 Bennington Heights Drive 365City of Toronto 36558 Nesbitt Drive 36581 Highland Avenue 36572 Hazelridge Court 36633 Brougham Drive 36666 Chaya Sara Gardens 366133 Peak Point Boulevard 36627 Noah Crescent 367141 Albany Drive 36716 Clairewood Court 367195 Twin Hills Crescent 36758 Big Rock Drive 368Al Medad 36817889 Humber Station Road 368100 Castelli Court 368Stonebridge Building Group Inc. 36934 Cedar Allan Place 36941 Sarah Jane Court 36936 Green Ash Crescent 36927 Sandbanks Drive 3703 Raeview Drive 3702179 Stouffville Road 3707 Raeview Drive 370Belmont Properties (Weston) Inc. 371Kleindor Developments Inc. 371Nashville Major Developments Inc./Nashville Developments Inc./Nashville

Developments (South) Inc. 372Nashville Major Developments Inc./Nashville Developments Inc./Nashville

Developments (South) Inc. 3721771107 Ontario Inc. 373Angus Glen Development (2003) Ltd. 373Angus Glen Village Ltd. 373Angus Glen Village Ltd. 374Town of Markham 374Markland Wood Country Club 374223 Riverside Drive 3753 Old George Place 375

ONTARIO REGULATION 166/06 Cont'dRegional Municipality of York 376Angus Glen Developments Ltd. 376148 John Street 37615 Worsley Court 377Town of Richmond Hill 377

297

MEETING OF THE EXECUTIVE COMMITTEE #5/12July 6, 2012

The Executive Committee Meeting #5/12, was held in Weston Room B, Black Creek Pioneer Village, on Friday, July 6, 2012. The Vice Chair Maria Augimeri, called the meeting to order at 9:36 a.m.

PRESENTMaria Augimeri Vice ChairBen Cachola MemberVincent Crisanti MemberMichael Di Biase MemberJack Heath MemberMike Mattos MemberAnthony Perruzza Member

PRESENT VIA TELECONFERENCEColleen Jordan MemberRichard Whitehead Member

ABSENTGlenn De Baeremaeker MemberGerri Lynn O'Connor ChairJim Tovey Member

RES.#B83/12 - MINUTES

Moved by: Michael Di BiaseSeconded by: Ben Cachola

THAT the Minutes of Meeting #4/12, held on June 1, 2012, be approved. CARRIED

_________________________________________

298

SECTION I - ITEMS FOR AUTHORITY ACTION

RES.#B84/12 - GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of York956414 Ontario Limited, CFN 47419. Acquisition of property located on the east of Bathurst Street and south of Gamble Road in the Town of Richmond Hill, Regional Municipality of York, under the 'Greenlands Acquisition Project for 2011-2015', Flood Plain and Conservation Component, Rouge River watershed.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.36 hectares (0.89 acres), more or less, of vacant land, being Part of Lot 57, Concession I, EYS , designated as Block 12 on draft M-Plan prepared by Krcmar OLS under job no.10-246, Town of Richmond Hill, Regional Municipality of York, be purchased from 956414 Ontario Limited;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements;

THAT the firm of Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDResolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for 2011-2015.

As a condition of the subdivision agreement, 956414 Ontario Limited is to transfer the valleylands to TRCA at nominal consideration of $2.00.

Negotiations have been conducted with Mr. Mario Polsinelli, representative of the owner.

Attached is a plan showing the location of the subject lands.

299

RATIONALEThe subject property falls within TRCA’s approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2011-2015. Through the review of subdivision 19T-05003 for a proposed residential development of this site, TRCA staff established the limits of the open space lands (i.e. Block 12 on the draft M-Plan) which is comprised of Oak Ridges Moraine lands. The subject open space land is also adjacent to other TRCA parcels.

TAXES AND MAINTENANCEBased on preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2013 taxation year. The Town of Richmond Hill has agreed to manage the property.

Report prepared by: Edlyn Wong, extension 5711Emails: [email protected] Information contact: Edlyn Wong, extension 5711, Mike Fenning, extension 5223Emails: [email protected], [email protected]: May 15, 2012Attachments: 1

300

Attachment 1

_________________________________________

301

RES.#B85/12 - GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Rouge River WatershedTown of Richmond Hill, Regional Municipality of YorkYorkwood Homes (RH) Limited, CFN 47513. Acquisition of property located on the west of Yonge Street and south of Gamble Road in the Town of Richmond Hill, Regional Municipality of York, under the 'Greenlands Acquisition Project for 2011-2015', Flood Plain and Conservation Component, Rouge River watershed.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 1.05 hectares (2.59 acres), more or less, of vacant land, being Lot 26, 27 and 28, Registered Plan Lot 4667, designated as Block 11 and 12 on draft M-Plan prepared by Salna Surveying OLS under job no.11029, Town of Richmond Hill, Regional Municipality of York, be purchased from Yorkwood Homes (RH) Limited;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the land free from encumbrance, subject to existing service easements;

THAT the firm of Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining of necessary approvals and the signing and execution of documents.

CARRIEDBACKGROUNDResolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for 2011-2015.

As a condition of the subdivision agreement, Yorkwood Homes (RH) Limited is to transfer the valleylands to TRCA at nominal consideration of $2.00.

Negotiations have been conducted with Ms. Maureen Blackmore, Owens, Wright LLP, representative of the owner.

Attached is a plan showing the location of the subject lands.

302

RATIONALEThe subject property falls within TRCA’s approved master plan for acquisition for the Rouge River watershed as outlined in the approved Greenlands Acquisition Project for 2011-2015. Through the review of subdivision 19T-05003 for a proposed residential development of this site, TRCA staff established the limits of the open space lands (i.e. Block 11 and 12 on the draft M-Plan) which is comprised of valleylands. The subject open space land is also adjacent to other TRCA parcels and located in the Oak Ridges Moraine.

TAXES AND MAINTENANCEBased on preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2013 taxation year. The Town of Richmond Hill has agreed to manage the property.

Report prepared by: Edlyn Wong, extension 5711Emails: [email protected] Information contact: Edlyn Wong, extension 5711, or Mike Fenning, extension 5223Emails: [email protected], or [email protected]: June 05, 2012Attachments:1

303

Attachment 1

_________________________________________

304

RES.#B86/12 - GREENLANDS ACQUISITION PROJECT FOR 2011-2015Royal Rouge Trail Erosion Control Project, CFN 45537. Partial Takings or financial contribution from multiple property owners on the north side of Royal Rogue Trail, City of Toronto, to facilitate the construction of the Royal Rouge Trail Erosion Control Project.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) acquire the following partial takings to facilitate the construction of the Royal Rogue Trail Erosion Control Project:

Parcel ‘A’ THAT a parcel of land containing 0.002 hectares (0.004 acres) being part of Lot 23 on Registered Plan 66M-2169, PIN 06209-0087, designated as Part 1 on Registered plan 66R-25966, at the rear of 30 Royal Rouge Trail, City of Toronto, be purchased from Katherine Sparks;

Parcel 'B' THAT a parcel of land containing 0.007 hectares (0.016 acres) being part of Lot 24 on Registered Plan 66M-2169, PIN 06209-0088, designated as Part 2 on Registered Plan 66R-25966, at the rear of 32 Royal Rouge Trail, City of Toronto, be purchased from Debora Gyimah;

Parcel 'C' THAT a parcel of land containing 0.002 hectares (0.006 acres) being part of Lot 25 on Registered Plan 66M-2169, PIN 06209-0089, designated as Part 3 on Registered Plan 66R-25966, at the rear of 34 Royal Rouge Trail, City of Toronto, be purchased from Stephen Joseph Foster and Linda Josephine Foster;

Parcel 'D' THAT a parcel of land containing 0.003 hectares (0.006 acres) being part of Lot 26 on Registered Plan 66M-2169, PIN 06209-0090, designated as Part 4 and Part 5 on Registered Plan 66R-25966, at the rear of 36 Royal Rouge Trail, City of Toronto, be purchased from Abdool Jhuman;

Parcel 'E' THAT a parcel of land containing 0.006 hectares (0.014 acres) being part of Lot 27 on Registered Plan 66M-2169, PIN 06209-0091, designated as Part 6 on Registered Plan 66R-25966, at the rear of 38 Royal Rouge Trail, City of Toronto, be purchased from Carlo Corvese;

Parcel 'F' THAT a parcel of land containing 0.004 hectares (0.011 acres) being part of Lot 29 on Registered Plan 66M-2169, PIN 06209-0093, designated as Part 7 on Registered Plan 66R-25966, at the rear of 42 Royal Rouge Trail, City of Toronto, be purchased from Trevor D’Souza and Winnefred D’Souza;

305

Parcel 'G' THAT a parcel of land containing 0.006 hectares (0.014 acres) being part of Lot 30 on Registered Plan 66M-2169, PIN 06209-0094, designated as Part 8 on Registered Plan 66R-25966, at the rear of 44 Royal Rouge Trail, City of Toronto, be purchased from Jaime Marie and Korah Thomas;

THAT the purchase price for each of the land Parcels ‘A’ to ‘G’ inclusive be $2.00 plus each vendor's reasonable legal costs, if any;

THAT TRCA acquire the necessary temporary easements from the owners for construction access;

THAT TRCA receive conveyance of the lands Parcels ‘A’ to ‘G’ inclusive free from encumbrance, subject to existing service easements;

THAT Gardiner Roberts LLP, be instructed to complete the transactions at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs and disbursements are to be paid;

THAT in the event any of the landowners wish to retain ownership of their property, each of landowners shall have the option to make a financial contribution to TRCA for the Royal Rouge Trail Erosion Control Project in an amount to be determined by TRCA in accordance with the cost-sharing policy and provide an easement and restrictive covenant over the parcel with terms and conditions satisfactory to TRCA;

AND FURTHER THAT the authorized TRCA officials be directed to take the necessary action to finalize the transactions including obtaining needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDResolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for 2011-2015.

In 2004 a signed petition to complete a comprehensive analysis into the on-going erosion at the rear of the properties spanning nos. 30 – 48 Royal Rouge Trail was submitted to TRCA by the residents of the area. In response, TRCA retained the services of Terraprobe Limited to complete the investigation and to provide TRCA with a detailed assessment of the site, including the forecast long-term stable slope crest (LTSSC) and an estimation of the potential risk to the existing properties located within the affected area.

The findings of the initial assessment determined that the primary contributing factor to the erosion is groundwater seepage, and that there was significant risk of loss of valuable tableland. It was recommended at that time that remedial action be undertaken to address the on-going erosion and to provide long-term protection to the existing structures at risk within the study area.

306

In 2009 TRCA initiated a Class Environmental Assessment (Class EA) in accordance with the Conservation Ontario Class Environmental Assessment for Remedial Flood and Erosion Control Projects process, to develop a comprehensive solution to address the problem.

The preferred solution(s) as determined through the Class EA process involves slope trimming, regrading and aggressive planting of the oversteepened slope at the rear of the properties from nos. 30– 40 Royal Rouge Trail, and the construction of a large retaining structure adjacent to, and at the rear of the properties from nos. 42 – 48 Royal Rouge Trail.

The formal Project Plan, generated through the Class EA process was submitted to the Ministry of the Environment in September 2011, and was approved through the 30-day public review period in October 2011. Pending receipt of remaining approvals, and the completion of all landowner agreements, staff anticipate commencing implementation of the proposed works in the summer of 2012.

Through the completion of the proposed erosion control measures, the private properties at 30 - 44 Royal Rouge Trail will be impacted. These properties front onto the north side of Royal Rouge Trail between Sheppard Avenue East and Glen Rouge Park, northwest of Kingston Road. The subject properties to be transferred to TRCA consists of seven parcels described as Parcels ‘A’ to ‘G’ inclusive and are strips of land that run, more or less, northward from the north end of the new top of the slope down into the Glen Rouge ravine. The lands to be retained by the owners include the remaining southerly land with houses and other improvements.

The TRCA funding policy for works carried out on private lands, stipulates that benefiting landowners are required to contribute to the cost of the project, either financially, or through the transfer of lands. Resolution #A159/09 adopted at Authority Meeting #7/09 on September 25, 2009 sets out this funding policy.

If the landowners wish to retain ownership of their lands, the landowners have the option to pay to TRCA a financial contribution and provide a permanent easement and restrictive covenant over the parcel of land. The financial contribution differs for both the easterly and westerly components because the easterly component includes a less costly slope trimming, regrading and aggressive planting of the oversteepened slope while the westerly component includes the construction of a large retaining structure. It is estimated that the financial contribution in the easterly section involving 30 to 40 Royal Rouge Trail will be about $8,500 per property, while the financial contribution in the westerly section involving 42 and 44 Royal Rouge Trail will be about $25,000 per property.

Negotiations are being completed with the seven homeowners. Two of the seven homeowners, being the landowners of Parcel A at 30 Royal Rouge Trail and Parcel B at 32 Royal Rouge Trail have indicated that they wish to consider a financial contribution in lieu of a land transfer.

RATIONALEThe subject properties are required for the construction of the Royal Rogue Trail Erosion Control Project.

307

TAXES AND MAINTENANCEThose Parcels ‘A’ to ‘G’ inclusive which are acquired will be turned over to the City of Toronto under the terms of the existing management agreement.

FINANCIAL DETAILSFunds for the costs related to this purchase are available in the Royal Rouge Trail Erosion Control Project, a project included in the 2012 capital program approved by the City of Toronto.

Report prepared by: Dan O'Donohue, extension; Mike Fenning, extension 5223Emails: do’[email protected]; [email protected] Information contact: Dan O'Donohue, extension 5767;

Mike Fenning, extension 5223Emails: do’[email protected]; [email protected]: June 15, 2012Attachments: 1

308

Attachment 1

_________________________________________

309

RES.#B87/12 - GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedGreenbrooke Developments Inc., CFN 47592. Purchase of property located west of Weston Road, south of Teston Road, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for 2011-2015", Flood Plain and Conservation Component, Humber River watershed.

Moved by: Jack HeathSeconded by: Michael Di Biase

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.14 hectares (0.36 acres), more or less, of vacant land being Part of Lot 23, Concession 6 and designated as Blocks 178 and 179 on a Draft Plan of Subdivision prepared by KRCMAR Surveyors Ltd., under their Job No. 00-183, dated April 3, 2012, City of Vaughan, Regional Municipality of York, located west of Weston Road, south of Teston Road, be purchased from Greenbrooke Developments Inc.;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the lands free from encumbrance, subject to existing service easements;

THAT Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDResolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for 2011-2015.

Negotiations have been conducted with Mr. Ryan Virtanen, Senior Planner, of KLM Planning Partners Inc., who acts as agent on behalf of the owner.

Since TRCA does not presently own any adjoining property and the abutting residential lots to the east (i.e. within subdivision 19T-06V04) will effectively isolate Blocks 178 and 179, the City of Vaughan has agreed to allow TRCA temporary access over the neighbouring City-owned valleyland to the north until alternate access is achieved through the valley buffer Block to the immediate west, which is proposed to be conveyed to TRCA as part of the approval of the adjacent residential subdivision.

Attached is a plan showing the location of the subject lands.

310

RATIONALEThe subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2011-2015. Through the review of residential subdivision 19T-06V04, TRCA staff established the limits of the open space lands (i.e. Blocks 178 and 179 on Draft Plan of Subdivision) which are situated partially within the regulated area and valley corridor of a tributary of the East Humber River at this location.

TAXES AND MAINTENANCEBased on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2013 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.FINANCIAL DETAILSFunds for the costs related to this purchase are available in the TRCA land acquisition capital account.

Report prepared by: George Leja, extension 5342Emails: [email protected] Information contact: George Leja, extension 5342, Mike Fenning, extension 5223Emails: [email protected], [email protected]: June 14, 2012Attachments: 1

311

Attachment 1

_________________________________________

312

RES.#B88/12 - GREENLANDS ACQUISITION PROJECT FOR 2011-2015Flood Plain and Conservation Component, Humber River WatershedInfinite Homes Ltd., CFN 47512. Purchase of property located south of Sicilia Street, east of Martin Grove Road, City of Vaughan, Regional Municipality of York, under the "Greenlands Acquisition Project for 2011-2015", Flood Plain and Conservation Component, Humber River watershed.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT 0.04 hectares (0.10 acres), more or less, of vacant land being Part of Lot 12, Concession 8 and designated as Block 13 on a Draft Plan of Condominium prepared by P. Salna Ltd., Ontario Land Surveyors, under their Job No. 5285, dated June 1, 2009, City of Vaughan, Regional Municipality of York, located south of Sicilia Street, east of Martin Grove Road, be purchased from Infinite Homes Ltd.;

THAT the purchase price be $2.00;

THAT Toronto and Region Conservation Authority (TRCA) receive conveyance of the lands free from encumbrance, subject to existing service easements;

THAT Gardiner Roberts LLP, be instructed to complete the transaction at the earliest possible date. All reasonable expenses incurred incidental to the closing for land transfer tax, legal costs, and disbursements are to be paid;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documents.

CARRIEDBACKGROUNDResolution #A94/10 at Authority Meeting #5/10, held on June 25, 2010, approved the Greenlands Acquisition Project for 2011-2015.

Negotiations have been conducted with Mr. Ali Baniasadi, Associate, of Macdonald Sager Manis LLP, Barristers & Solicitors, who acts as agent on behalf of the owner.

As part of the conveyance, an access easement will be granted to TRCA through the internal road and Common Elements Block at the end of the cul-de-sac for future maintenance of the subject lands.

Attached is a plan showing the location of the subject lands.

313

RATIONALEThe subject property falls within TRCA's approved master plan for acquisition for the Humber River watershed as outlined in the approved Greenlands Acquisition Project for 2011-2015. Through the review of residential condominium 19CDM-09V02, TRCA staff established the limits of the open space land (i.e. Block 13 on Draft Plan of Condominium) which is situated partially within the regulated area of a tributary of the Rainbow Creek at this location.

TAXES AND MAINTENANCEBased on TRCA's preliminary review of the environmental criteria for lands that are eligible to receive a property tax exemption under the provincial Conservation Land Tax Incentive Program, it would appear that all of the subject property would be eligible for exemption for the 2013 taxation year. The addition of the subject parcel of land will not significantly impact TRCA's maintenance costs at this location.

FINANCIAL DETAILSFunds for the costs related to this purchase are available in the TRCA land acquisition capital account.

Report prepared by: George Leja, extension 5342Emails: [email protected] Information contact: George Leja, extension 5342, Mike Fenning, extension 5223Emails: [email protected], [email protected]: June 14, 2012Attachments: 1

314

Attachment 1

_________________________________________

315

RES.#B89/12 - EASEMENT AGREEMENTGeorge Johnson. Entering into an easement agreement for a five year term with automatic extensions until terminated for the purpose of constructing and permitting a public trail system on the Johnson property, located on the south side of Chalk Lake Road, west of Lakeridge Road, Township of Uxbridge, Regional Municipality of Durham.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT Toronto and Region Conservation Authority (TRCA) enter into an easement agreement with George Johnson for the purpose of constructing, and permitting the public use of a trail system, said land being Part of Lot 5, Concession 7, Township of Uxbridge, Regional Municipality of Durham;

THAT the term of the easement agreement be for five (5) years with automatic extensions until terminated and in no event will the initial term and any renewals or extensions thereof, exceed in aggregate twenty-one (21) years, less a day;

THAT TRCA pay an annual fee to George Johnson of $6,000.00, with such fee increasing by 4% annually beginning August 1, 2013;

THAT TRCA erect barriers on both sides of Chalk Lake Road (where the proposed trail is to cross) to help ensure trail users to slow down before crossing at Chalk Lake Road;

THAT TRCA be responsible for signing the trail to ensure trail users understand the trail rules including the need to stay on the trail and not to trespass off the trail;

THAT the agreement be on terms and conditions satisfactory to TRCA staff and solicitors;

AND FURTHER THAT authorized TRCA officials be directed to take the necessary action to finalize the transaction including obtaining needed approvals and signing and execution of documentation.

CARRIEDBACKGROUNDDiscussion began with George Johnson regarding possible trail alignments across Mr. Johnson's property following TRCA's purchase of the neighbouring Skyloft property. Negotiations included Township of Uxbridge staff, Durham Conservation Association, Uxbridge Naturally and Green Durham members (who have agreed to pay 50% of the annual rental fee). The trail easement agreement will facilitate an improved realignment of the Oak Ridges Trail with the intent of reducing on road segments of the trail for user safety and enhanced natural experience. Once it was determined that George Johnson was receptive to the concept of the easement, the Oak Ridges Trail Association was consulted and their organization also participated to determine the preferred easement alignment.

316

The Oak Ridges Trail Association cannot hold easements on land, so TRCA will enter into the easement agreement. The terms of the easement agreement will be for five (5) years with automatic extensions. In no event will the initial term and any renewals or extensions thereof, exceed in aggregate twenty-one (21) years, less a day. George Johnson or TRCA can terminate the easement agreement at anytime by providing six (6) months prior written notice to the other party.

The Johnson property will provide a strategic trail connection/linkage between TRCA's Skloft property, Oak Ridge Moraine Land Trust's Purvis property and TRCA's Dagmar properties. In May 2011,TRCA approved an Easement Agreement involving another neighbouring landowner within the Township of Uxbridge (Lakeridge Farms Limited) which was also for the purpose of constructing and permitting the public use of the trail system. All partners agree these types of arrangements help to improve the overall trail user experience, community connections and safety.

RATIONALEThe trail easement agreement with George Johnson has been fully supported by the Township of Uxbridge and was developed in consultation with the community and the Oak Ridges Trail Association for non-motorized recreation activities such as walking, hiking, bicycling, snowshoeing, cross country skiing and on leash dog walking. The easement also provides a safer trail route, which takes it off road from the existing alignment. In addition, the new route over the easement will provide the user with a highly valued natural experience.

A plan illustrating the property location and the trail is attached.

FINANCIAL DETAILSIt is anticipated that Mr. Johnson will initially plow and regularly mow/maintain the trail on subject easement, resulting in minimal operating costs to TRCA for this work and management. Green Durham has agreed to pay 50% of the annual rental fee. Funding is available in TRCA's Durham Watershed Trails Capital Account 109-06.

Report prepared by: Tom Campitelli, extension 5335Emails: [email protected] Information contact: Tom Campitelli, extension 5335; Mike Fenning, extension 5223Emails: [email protected] or [email protected]: May 29, 2012Attachments: 1

317

Attachment 1

_________________________________________

318

RES.#B90/12 - ALBION HILLS CONSERVATION AREA VISITOR SERVICES CENTRE CONSTRUCTION PROJECTAward of contract for construction of Albion Hills Conservation Area gatehouse.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT the contract for Albion Hills Conservation Area Visitor Services Centre Construction Project be awarded to Frontier Group of Companies. at a total cost not to exceed $312,500.00, plus HST, it being the lowest bid meeting Toronto and Region Conservation Authority (TRCA) specifications;

THAT award of the contract be subject to terms and conditions satisfactory to TRCA staff and solicitors, including but not limited to determination of the final contract cost not to exceed the approved amount;

THAT should staff be unable to achieve an acceptable contract with the above-mentioned contractor, staff be authorized to enter into and conclude contract negotiations with other contractors that submitted tenders, beginning with the next lowest bidder meeting TRCA specifications;

AND FURTHER THAT authorized staff be directed to take the action necessary to implement the contract including obtaining any approvals and the signing and execution of documents.

CARRIEDBACKGROUNDCurrently, Albion Hills Conservation Area and Campground has two registration intake locations for customers visiting its facilities. Day use clients are processed at the front gate and overnight campers are processed at the campground registration office. This system relies heavily on customer understanding and honesty. For example, when overnight camping customers enter the park, TRCA staff cannot ensure the customer will then proceed to the campground office for registration. The group camping program also experiences significant fee collection challenges for the same reason. As a result, registration, collection of camper/client fees, access to the park and overall customer service are impacted negatively by an inefficient system. In order to improve customer service, capture potential loss of revenue and to exceed customer expectations, it is the intention of TRCA to streamline its services by combining various administrative functions and relocating them to one centralized site at the main entrance of the park.

319

In addition, staff has monitored and evaluated on an annual basis the condition of both the gatehouse and campground office buildings. While the existing gatehouse is structurally sound, it does not meet the needs of a registration administration office in terms of available space, safety, security, storage, administration and staff washroom facilities. In contrast, the campground office requires immediate attention due to its overall disrepair. The campground office is declining at a rapid rate due to age, moisture related issues, pest infiltration and overall weather related damage. In order to meet health and safety standards, exceed customer expectations, safeguard internal equipment and streamline registration services to one location, staff propose the demolition of the existing campground registration office and the construction of a new front entrance gatehouse.

Over the last few months staff worked closely with Paul Didur Architect Inc. to prepare and refine detailed design and construction drawings required to move forward with the tendering and building permit process. The new gatehouse will combine all registration functions currently being performed at separate locations throughout the park. The new front entrance gatehouse will provide the following specific primary functions:

site for primary day use and overnight registration fee collection;

main park administration office;

centralized customer information kiosk;

small retail camp store.

In order to accomplish this goal, TRCA plans to demolish the existing campground office and gatehouse and construct a new four season, approximately 900 square foot, building which will consist of the following features:

staff washroom with holding tank;

staff office;

storage area;

entrance to accommodate walk-in customers;

retail space;

parking lot extension and improvements.

RATIONALEInvitation to Tender documentation was publically advertized on April 3, 2012 and the following 13 firms obtained tender documents and attended a mandatory site meeting:

Alpeza General Contracting;

ARC General Contracting;

B.L.T. Construction Services Inc.;

Integrated Building and Design;

Frontier Group of Companies Inc.;

Greco Construction;

Jeviso Construction Corporation;

KSAL General Contracting Ltd.;

Martinway Contracting Limited;

MRP Builders-Engineers;

Nashid Construction;

Northway Construction Co. Ltd.;

R-CHAD General Contracting Inc.;

Silver Birch Contracting Ltd.;

320

SST Group;

Taylor Wakefield General Contractors Ltd.;

W.E. Marshall Construction 1986 Ltd.

Tenders closed on May 8, 2012 at 4:00 pm and were opened at Tender Opening Committee Meeting #1/12, held on May 16, 2012 with the following results:

Albion Hills Conservation Area Visitor Services Centre Construction Project - Tender Summary

Firm Total Bid(plus HST)

ARC General Contracting $492,975.56Frontier Group of Companies Inc. $312,500.00Greco Construction $664,000.00Jeviso Construction Corporation $530,520.00KSAL General Contracting Ltd. $530,656.00Northway Construction Co. Ltd. $533,000.00R-CHAD General Contracting Inc. $566,000.00Silver Birch Contracting Ltd. $424,280.00SST Group $582,000.00W.E. Marshall Construction 1986 Ltd. $580,000.00Alpeza General Contracting No bidIntegrated Building and Design No bidMartinway Contracting Limited No bidMRP Builders-Engineers No bidNashid Construction No bidTaylor Wakefield General Contractors Ltd. No bidB.L.T. Construction Services Inc. Disqualified

Based on the evaluation criteria and recommendations from Paul Didur Architect Inc., staff concluded that the tender submitted by Frontier Group of Companies Inc. meets all requirements set out in the tender documents and is the lowest bid received. B.L.T. Construction Services Inc. was disqualified due to failure to provide the required mandatory bid bond documentation.

Staff is confident that Frontier Group of Companies Inc. will conduct the required tasks in a timely and cost effective manner. If staff is unable to come to a mutually agreeable contract, then staff is requesting authorization to enter into contact negotiations with the next lowest bidder to complete the project at the budget available.

Staff recommends award of the contract to Frontier Group of Companies Inc. for Albion Hills Conservation Area Visitor Services Centre Construction Project at a total cost not to exceed $312,500.00, plus 10% contingency, plus HST.

321

FINANCIAL DETAILSFunds are available through Region of Peel within the Peel Campground account code 420-63.

Report prepared by: Brad Clubine, 416-771-7081Emails: [email protected] Information contact: Aaron D'Souza, extension 5775Emails: ajd'[email protected]: May 16, 2012

_________________________________________

RES.#B91/12 - ADMITTANCE POLICYApproval of the Admittance Policy and Operational Procedures for Toronto and Region Conservation Authority.

Moved by: Michael Di BiaseSeconded by: Mike Mattos

THE EXECUTIVE COMMITTEE RECOMMENDS THAT the Toronto and Region Conservation Authority (TRCA) Admittance Policy, dated May 23, 2012, as outlined in Attachment 1, be approved;

THAT facility access associated with the TRCA Admittance Policy and Operating Procedures take precedence over the current Fee Schedule for Public Facilities and Programming and that this policy be referred to in future Fee Schedules;

AND FURTHER THAT the Operational Procedures, dated May 23, 2012, as outlined in Attachment 2, be received.

CARRIEDBACKGROUNDIn support of its vision for The Living City, TRCA is committed to providing equal access to its facilities to all community members. TRCA advocates for community health and well-being, as well as promotes and encourages environmental stewardship and guardianship within local communities.

The TRCA Accessibility Standards for Customer Service Policy stems from the Accessibility for Ontario's with Disabilities Act, 2005 (AODA), Regulation 429/07, which was passed in order to implement and enforce mandatory accessibility standards. The Policy outlines TRCA's responsibility to ensure that its services, employment opportunities and current workplace environment are accessible to persons with disabilities.

The Admittance Policy addresses user participation of TRCA programs and services including but not limited to persons with disabilities, financially challenged individuals and groups, children and Active Transportation users (defined by the Public Health Agency of Canada as walking, jogging, running, cycling, in-line skating, skateboarding, wheelchairing and snowshoeing). Additionally, TRCA provides opportunities for free access to public facilities through a wide range of programs, including but not limited to:

322

Doors Open events at Lake St. George Field Centre, Claremont Field Centre, Black

Creek Pioneer Village and the Kortright Centre for Conservation: hosted annually to provide local community access to these facilities.MAP (Museum Access Pass): offered at Black Creek Pioneer Village (BCPV). This

program is available free of charge at all 99 Toronto public libraries. It allows a Museum Access Pass to be taken out on loan using a library card for access to venues like BCPV. Cultural Access Pass: provides free admission to all public use facilities for new Canadian

citizens, and up to four of their children, for one year from date if Citizenship. Research Library Access: access to the BCPV Research Library for the public can be

obtained by making an appointment with BCPV staff. Caledon Canada Day: hosted annually at Albion Hills Conservation Area, this celebration

provides free admission, live entertainment, children’s activities and more to over 10,000 local community members.Kids Free program: provides free general admission for children aged 15 and under at all

conservation areas. BCPV kids free program provides free general admission for children aged 15 and under Monday through Friday during the months of July and August.

RATIONALEDespite the aforementioned TRCA offerings, staff continue to receive numerous inquiries from the public and school/organized groups requesting increased access. In response to these requests, in order to recognize different sectors of the community, and to align TRCA policies with its municipal partners, the TRCA Admittance Policy was developed. The Policy promotes the full participation of users in educational, cultural and recreational programs and services and addresses needs of community members, including but not limited to persons with disabilities, financially challenged individuals and groups, children and Active Transportation users.

DETAILS OF WORK TO BE DONETRCA will undertake an evaluation of the TRCA Admittance Policy within one year after it is

fully implemented to assess its effectiveness and to identify amendments if required. Any proposed substantive amendments will be submitted to the Authority for consideration and approval.Amend the Fee Schedule for Public Facilities and Programming to reflect the changes

outlined in the TRCA Admittance Policy and Operational Procedures.

FINANCIAL DETAILSActive Transportation Users:Financial implications of the elimination of general admission fees for Active Transportation users at TRCA conservation areas will be minimal due to the fact that currently many local residents access TRCA facilities through Active Transportation modes at no charge. The vast majority of visitors arrive by vehicle as the main mode of transportation due to the remote location of TRCA's facilities, minimizing any financial impact.

BCPV Kids Free Program:A marketing analysis determined that free child general admission to BCPV, Monday through Friday, during the months of July and August, is forecasted to increase attendance by 1,600 visits. Revenue generated by the projected increase in attendance, including secondary sales, is forecasted to offset the projected loss in revenue from child general admissions.

323

Affordable Admittance to Persons with Disabilities and Financially Challenged Individuals and Families:As a minimum, staff will ensure that all financial assistance provided to persons and groups with disabilities and financially challenged individuals and groups covers the base operating costs directly associated with the delivery of program/facility. The assistance provided will be based on a needs assessment currently determined by the Ontario school boards, municipalities and community agencies.

Report prepared by: Kate Pankov, extension 6418Emails: [email protected] Information contact: Derek Edwards, extension 5672Emails: [email protected]: May 23, 2012Attachments: 2

324

Attachment 1ADMITTANCE POLICY

1. POLICYToronto and Region Conservation Authority (TRCA) recognizes and promotes the full participation of all residents in educational, cultural and recreational programs and appropriate services including but not limited to, persons with disabilities, financially challenged individuals and groups, children and Active Transportation users.

1.1 Programs and services will be planned, delivered and evaluated to ensure they are affordable, inclusive and responsive to community needs.

1.2 Eliminate general admission fees at Conservation Areas for Active Transportation users.

1.3 Work with local municipalities and stakeholders in order to formalize additional access points, where feasible, for Active Transportation users to TRCA lands.

1.4 Implement free child general admission for specified periods at all day use facilities.

1.5 Offer affordable admittance to persons with disabilities and financially challenged individuals and groups.

2. SCOPE2.1 This policy extends to eligible programs and services directly delivered by TRCA.2.2 This policy excludes contracted program agreements with

individuals/organizations delivering programs in partnership or on behalf of the TRCA unless language related to Admittance is incorporated into the Agreement.

2.3 Individuals/organizations that arrive at our Conservation Areas by means of a motorized vehicle and walk in do not meet the criteria of an Active Transportation user

May 23, 2012

325

Attachment 2

OPERATIONAL PROCEDURES

1. OPERATIONAL PROCEDURES1.1 TRCA will continually seek partnerships and funding for the delivery of affordable

programs and service delivery.1.2 Daily Active Transportation General Admission Fees to TRCA conservation areas

to be as follows:Adult FREE general admission

Senior FREE general admission

Child FREE general admission

1.3 Facility Supervisors are to identify and formalize additional access points for Active Transportation users to TRCA lands in collaboration with the respective municipalities and stakeholders.

1.4 Initiate "Kids Free" program at Black Creek Pioneer Village for free child general admission Monday - Friday, during the months of July and August.

1.5 Programs and services which are delivered directly by TRCA will have financial assistance available to persons with disabilities and the financially challenged. Financial assistance provided will be based on a needs assessment, currently determined by Ontario School Boards, municipalities and community agencies.

1.6 Promote discounted general admission fees provided for persons with disabilities and their attendants as outlined in the TRCA Fee Schedule.

1.7 All staff who deal with the public on behalf of TRCA is to receive training and become familiar with TRCA Admittance Policy.

1.8 Staff are to continue to track all persons receiving subsidized program/service offerings in order to provide statistics for evaluation of the TRCA Admittance Policy.

May 23, 2012

_________________________________________

326

SECTION IV - ITEMS FOR THE INFORMATION OF THE BOARD

RES.#B92/12 - BLACK CREEK HISTORIC BREWERYStatus Report. Summary report for Black Creek Historic Brewery.

Moved by: Anthony PerruzzaSeconded by: Mike Mattos

IT IS RECOMMENDED THAT the report dated June 18, 2012, on the third year of the Black Creek Historic Brewery at Black Creek Pioneer Village (BCPV) be received.

CARRIEDBACKGROUNDAt Executive Committee Meeting #10/08, held on December 12, 2008, Resolution #B168/08 was approved, in part, as follows:

THAT a contract with Trafalgar Ales and Meads to establish and operate a pioneer brewery and museum at Black Creek Pioneer Village be approved, at a cost not to exceed $92,000 annually, plus applicable taxes and reasonable inflationary adjustments;...

AND FURTHER THAT staff report back after one season of operation of the Pioneer Brewery and Beer Museum.

2011 marked the third year of operation for the Black Creek Historic Brewery (BCHB) at BCPV. The brewery continues to impress visitors at BCPV as measured by the consistent excellent feedback on comment cards. A brewery sample tour was a new initiative that was also very well received. Guests were able to sample three different brews while interacting with a brewery interpreter regarding the differences in each.

Some key highlights for the brewery in 2011 included: brewing the 1-mile beer on-site;

a 3/4 page article in the Toronto Star about the brewery ;

successful launch of the Black Creek Stout in November 2011, the brewery's third listing

in the LCBO.

The brewery had a positive effect on both Black Creek Pioneer Village’s paid admission and as an added option for corporate clients. The brewery also received an increased media presence both locally and nationally.

Special Events: On-site and Outreach In 2011, the brewery was integrated as a feature to all special events at Black Creek Pioneer Village. For each event, a specialty brew was created and marketed as part of the event. Some of the specialty brews included:

Canada Day – Maple Beer;

Halloween – Pumpkin Beer;

Christmas – Winter Warmer Beer.

Off site, the brewery participated in three special events including the Toronto Wine and Cheese Show, Paddle the Don and the Charles Sauriol Environmental Dinner.

327

LCBO Sales BCPV launched its first beer in the LCBO in November 2010, the Black Creek Porter Ale. Based on the initial success of the Porter, the LCBO agreed to list two more beers: the Black Creek Pale Ale and the Black Creek Stout. In the first full year of sales, Pioneer Breweries Limited sold 6,517 cases through the LCBO, which represents a 1% share of the microbrewery market. The LCBO has been so impressed with the sales of the beer that they have accepted three new listings for 2012.

The Brewery and Local Food ConnectionThe brewery and restaurant continue to be popular destinations for both visitors and staff. The restaurant continues to promote local, sustainable meals and pairs the Black Creek beers as well as beers from other micro-breweries to menu items. The restaurant will continue to work hand-in-hand with the brewery by creating specials that are either paired with or, in some cases, made with the beer.

Sustainable Practices: The 1-Mile Beer In November 2011, Black Creek Historic Brewery received the distinction of being the only brewery in North America to brew a 1-mile beer. Using barley and hops grown on-site, a 70-litre batch of beer was brewed without electricity. This project helped highlight the sustainability of Black Creek beer as an agricultural product.

The Brewery in 2012/2013 There are a number of very exciting tourism initiatives that have already started or are in the planning stages for 2012 and 2013, including:

launch of a partnership with Ontario Craft Brewery Tours;

a submission, in partnership with Tourism Toronto, Ontario Culinary Tourism

Association and Ontario Craft Brewery Tours, to include Black Creek Historic Brewery (with two other local micro-breweries) in the Canadian Tourism Signatures Experience Collection program, which will market packages to international travelers;acceptance of three new specialty beers into the LCBO, bringing the total listings to six;

procurement of a new refrigerator to meet increased demand for on-site growler sales.

FINANCIAL DETAILS

Brewery Income Statement Year 1 Budget (2009) Year 1 Actuals (2009)Total Revenue $122,000 $74,000Total Expenditure ($132,000) ($147,000)Net ($10,000) ($73,000)

Brewery Income Statement Year 2 Budget (2010) Year 2 Actuals (2010)Total Revenue $128,000 $71,350Total Expenditure ($96,000) ($112,486)Net $32,000 ($41,136)

328

Brewery Income Statement Year 3 Budget (2011) Year 3 Actuals (2011)Total Revenue $134,000 $87,849Total Expenditure ($98,000) ($106,221)Net $36,000 ($18,372)

Income Statement Year 1(2009)

Year 2(2010)

Year 3(2011)

Year 4(2012)

Year 5(2013)

Year 6(2014)

Year 7(2015)

Total Revenue $74,000 $71,350 $87,849 $103,400 $111,672 $118,372 $121,700

Total Expenditure ($147,000) ($112,486) ($106,221) ($106,221) ($101,846) ($104,901) ($106,221)

Net ($73,000) ($41,136) ($18,372) ($2,821) $9,826 $13,471 $15,479

The new tourism initiatives coupled with the LCBO program will continue to help drive the growth of the brewery in 2012. In addition to the aforementioned revenue derived directly from the Brewery program, BCPV realized a 60% increase in general admission revenues from $19,000 in 2010 to $30,585 in 2011 that can be directly attributed to brewery visits. Also, additional revenue of $6,500 was generated through corporate client programming that included the Brewery as part of the package.

Report prepared by: Nick Foglia, extension 5275 Emails: [email protected] Information contact: Nick Foglia, extension 5275 Emails: [email protected]: June 19, 2012

_________________________________________

ONTARIO REGULATION 166/06

RES.#B93/12 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06Development, Interference with Wetlands and Alterations to Shorelines and Watercourses. Pursuant to Ontario Regulation 166/06, written permission from the Authority is required for:

a) straightening, changing, diverting or interfering in any way with the existing channel of a river, creek, stream or watercourse, or for changing or interfering in any way with a wetland;

b) development, if in the opinion of the authority, the control of flooding, erosion, dynamic beaches or pollution or the conservation of land may be affected by the development.

A permit may be refused through a Hearing Process, if in the opinion of the Authority, the control of flooding, erosion, dynamic beaches, pollution or the conservation of land is affected.

Moved by: Richard WhiteheadSeconded by: Jack Heath

329

THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (EX10.1 - EX10.11, EX10.20 - EX10.57 and EX10.125 - EX10.141) which are listed below.

CARRIEDPERMIT APPLICATIONS EX10.1 - EX10.11 ARE MAJOR APPLICATIONS

CITY OF BRAMPTON

EX10.1 BRAMPTON (NE) SHOPPING CENTRES LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 17, Concession 5, (Southeast Corner of Bramalea Road and Mayfield Road), in the City of Brampton, Humber River Watershed as located on the property owned by Brampton (NE) Shopping Centres Limited. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to construct a temporary stormwater management facility and outfall structure associated with a plan of subdivision to allow a mixed-use development, consisting of 21,151 sq. m. of retail/service and 2,118 sq. m. of office related uses, intended to be the first phase of the District Retail centre within the Countryside Villages Secondary Plan.

CFN: 47426 - Application #: 0364/12/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 26, 2012

CITY OF PICKERING

EX10.2 CITY OF PICKERING AND THE TOWN OF AJAXTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 18, Concession 3, Rossland Road near Brock Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by City of Pickering and the Town of Ajax. The purpose is to construct a stormwater management facility and associated wetland flow spreader.

CFN: 46756 - Application #: 0044/12/PICKReport Prepared by: Steve Heuchert, extension 5311For information contact: Steve Heuchert, extension 5311Date: June 18, 2012

330

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.3 CITY OF TORONTOTo construct, reconstruct, erect or place a building or structure on Plan 66R-1794, Assignment 14-04B - Topcliff Park and Derydown Park - 61 Topcliff Avenue near Demaris Avenue, in the City of Toronto (North York Community Council Area), Humber River Watershed as located on the property owned by City of Toronto. The purpose is to undertake stormwater management system improvements to alleviate surface storm water flooding and to improve the ability of the current system to convey major stormwater volumes from the roadway to the Black Creek discharge location. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 46480 - Application #: 0853/11/TORReport Prepared by: Renee Afoom-Boateng, extension 5714For information contact: Renee Afoom-Boateng, extension 5714Date: June 26, 2012

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.4 1772014 ONTARIO INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 83, 36 Park Lawn Road, in the City of Toronto (Toronto and East York Community Council Area), Mimico Creek Watershed as located on the property owned by 1772014 Ontario Inc. The purpose is to excavate and install shoring to facilitate the future construction of an underground parking garage and multi-storey mixed use development at 36 Park Lawn Road in the City of Toronto.

CFN: 47501 - Application #: 0447/12/TORReport Prepared by: Steve Heuchert, extension 5311For information contact: Steve Heuchert, extension 5311Date: June 19, 2012

CITY OF VAUGHAN

EX10.5 9829 HIGHWAY 27To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession 8, 9829 Highway 27, in the City of Vaughan, Humber River Watershed. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate the construction of a temporary sales centre, including three temporary sales buildings and parking area, at 9829 Highway 27 in the City of Vaughan.

331

CFN: 47575 - Application #: 0438/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

EX10.6 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on East Half Lot 21, Concession 9, North of Major Mackenzie Drive and West of Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc.. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate grading and servicing in a draft approved plan of subdivision (19T-05V10) within Block 61 East, north of Major Mackenzie Drive and east of the Canadian Pacific Railway, in the City of Vaughan.

CFN: 47673 - Application #: 0481/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

EX10.7 MOLISE KLEINBURG ESTATES SOUTH INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 22, 23, Concession 9, Highway 27 and Nashville Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Molise Kleinburg Estates South Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management facility (Phase 2 SWM Pond) and associated outfall to service Phase 2 of a draft approved plan of subdivision (19T-06V14) at 115 Putting Green Crescent (former Kleinburg Golf Course) in the City of Vaughan.

CFN: 47255 - Application #: 0230/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 25, 2012

332

EX10.8 VISTA PARC LIMITED AND RIMAX HEALTH INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lot 6, Concession 7, 4700 Highway 7 and 4650 Highway 7, in the City of Vaughan, Humber River Watershed as located on the property owned by Vista Parc Limited and Rimax Health Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a 7-storey residential condominium building with underground and surface parking, servicing, landscaping and amenity structures at 4700 Highway 7 in the City of Vaughan. The works also include a cut and fill balance within the Regional Storm flood plain, driveway upgrades and outfall construction at 4650 Highway 7.

CFN: 47131 - Application #: 0153/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

TOWN OF RICHMOND HILL

EX10.9 VICTORIA EDUCATION CENTRE (2020207 ONTARIO INC.)To construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Of West Half Lot 20, Concession 3, (9901 Leslie Street), in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Victoria Education Centre (2020207 Ontario Inc.). The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to facilitate the construction of an addition to the existing Victoria Education Centre, additional parking, and stormwater management LID measures (including drainage swales and bio-retention gallery).

CFN: 47318 - Application #: 0285/12/RHReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: June 26, 2012

333

TOWNSHIP OF KING

EX10.10 2149629 ONTARIO INC./GENVIEW HOMESTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 6, 7, Concession 4, 2890 King Road, in the Township of King, Humber River Watershed as located on the property owned by 2149629 Ontario Inc./Genview Homes. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a stormwater management facility and associated outfall to service a draft approved plan of subdivision (19T-08K02) at 2890 King Road in the Township of King.

CFN: 45936 - Application #: 0435/11/KINGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 25, 2012

EX10.11 2149629 ONTARIO INC./GENVIEW HOMESTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lots 6, 7, Concession 4, 2890 King Road, in the Township of King, Humber River Watershed as located on the property owned by 2149629 Ontario Inc./Genview Homes. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate topsoil stripping, temporary and final rough lot grading, trail construction, landscaping and the installation of sediment and erosion control measures, including temporary sediment control ponds, in a draft approved plan of subdivision (19T-08K02) at 2890 King Road in the Township of King.

CFN: 47170 - Application #: 0174/12/KINGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 25, 2012

PERMIT APPLICATIONS EX10.12 - EX10.19 ARE MAJOR APPLICATIONS - ERRATA

RES.#B94/12 - APPLICATIONS FOR PERMITS PURSUANT TO ONTARIO REGULATION 166/06 - ERRATA APPLICATIONS

Moved by: Richard WhiteheadSeconded by: Jack Heath

334

THAT permits be granted in accordance with Ontario Regulation 166/06 for the applications (EX11.12 - EX11.19 and EX11.58 - EX10.76, with the exception of EX10.61 and EX10.64 - EX10.66 which were withdrawn), that had been scheduled on the agenda as errata applications, for which all the required information was received and finalized.

CARRIEDCITY OF BRAMPTON

EX10.12 2073737 ONTARIO INC./2073740 ONTARIO INC.To construct, reconstruct, erect or place a building or structure, site grade and alter a watercourse on Lot 9, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by 2073737 Ontario Inc./2073740 Ontario Incorporated. The purpose is to undertake earthworks, servicing, the construction of a stormwater management pond and the construction of a pedestrian bridge within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton.

CFN: 47163 - Application #: 0170/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

EX10.13 APPLEMOOR PROPERTIES LTD./STARVILLA HOMES CORPORATIONTo site grade on Lot 10, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Applemoor Properties Ltd./Starvilla Homes Corporation. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton.

CFN: 47161 - Application #: 0166/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

EX10.14 MCVEANONE DEVELOPMENTS INC.To site grade on Lot 9, Concession 9, N.D.S., (East of McVean Drive, South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by McVeanone Developments Incorporated. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton.

335

CFN: 47164 - Application #: 0171/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

EX10.15 OPUS HOMES (RIVER'S EDGE) INC.To construct, reconstruct, erect or place a building or structure and site grade on Lot 9, Concession 9, N.D.S., (East of McVean Drive/South of Castlemore Road), in the City of Brampton, Humber River Watershed as located on the property owned by Opus Homes (River's Edge) Incorporated. The purpose is to undertake earthworks and servicing within a TRCA Regulated Area of the Humber River Watershed associated with a proposed residential plan of subdivision located east of McVean Drive and south of Castlemore Road, in the City of Brampton.

CFN: 47162 - Application #: 0168/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

CITY OF VAUGHAN

EX10.16 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, North of Major Mackenzie Drive and East of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of two culvert crossings of Tributary ‘A’ at Agar Street East and Agar Street West to service a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

CFN: 47385 - Application #: 0338/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

336

EX10.17 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, North of Major Mackenzie Drive and East of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the construction of a culvert crossing and sanitary sewer crossing of Tributary ‘A’ at Mactier Drive to service a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

CFN: 47386 - Application #: 0339/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

TOWN OF MARKHAM

EX10.18 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Concession 5, (Warden Avenue and Highway 7), in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater management pond, outfall, and outfall channel required as they relate to the broader servicing strategy for Markham Centre.

CFN: 46426 - Application #: 0815/11/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: June 26, 2012

TOWN OF RICHMOND HILL

EX10.19 CASA EAST DEVELOPMENT INC.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 4, 5, Concession 2, Bayview Avenue and Bethesda Sideroad, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Casa East Development Inc.. The purpose is to place fill and initiate earthworks associated with a new residential plan of subdivision, within a wetland area of interference , and to facilitate temporary stormwater management measures required to support the earthworks.

337

CFN: 47671 - Application #: 0474/12/RHReport Prepared by: Quentin Hanchard, extension 5324For information contact: Quentin Hanchard, extension 5324Date: June 26, 2012

CITY OF BRAMPTON

EX10.20 BRAMALEA CITY CENTRE EQUITIES INC. AND MORGUARD CORPORATIONTo construct, reconstruct, erect or place a building or structure on Part Lot 5, Concession 4, (25 Peel Centre Drive), in the City of Brampton, Etobicoke Creek Watershed as located on the property owned by Bramalea City Centre Equities Inc. and Morguard Corporation. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the retrofit of an existing Zellers store to a Target store including an addition to the existing building associated with a municipal site plan application.

CFN: 47466 - Application #: 0403/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

EX10.21 11 AVEENA ROADTo construct, reconstruct, erect or place a building or structure on 11 Aveena Road, in the City of Brampton, Humber River Watershed. The purpose is to undertake works within TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new deck structure at the rear of an existing residential dwelling associated with a municipal building permit.

CFN: 47508 - Application #: 0470/12/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 26, 2012

CITY OF PICKERING

EX10.22 CANADA POST CORPORATIONTo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Lot 18, Concession 1, 1740 Kingston Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by Canada Post Corporation. The purpose is to regrade and extend a portion of the existing parking lot to the rear of the operating postal facility at 1740 Kingston Road in the City of Pickering. This application also includes a proposal to remove portion of the entrance to accommodate a new door of the concrete loading bay to the rear of the building.

338

CFN: 47383 - Application #: 0340/12/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: June 25, 2012

EX10.23 CONSEIL SCHOLAIRE VIAMONDETo construct, reconstruct, erect or place a building or structure, site grade and interfere with a wetland on Part Lot 18, Concession 2, 2265 Brock Road, in the City of Pickering, Duffins Creek Watershed as located on the property owned by Conseil Scholaire Viamonde. The purpose is to construct a stormwater sewer outfall, site grading and recreational trail associated with a new public school.

CFN: 46742 - Application #: 1023/11/PICKReport Prepared by: Chris Jones, extension 5718For information contact: Chris Jones, extension 5718Date: June 25, 2012

EX10.24 ENBRIDGE PIPELINES INC.To temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and interfere with a wetland on 2300 Rosebank Road, in the City of Pickering, Petticoat Creek Watershed, as located on the property owned by Ashburton Asset Group Inc. The purpose is to conduct an integrity dig for an internal inspection of the Enbridge gas pipeline system to identify any cracks, corrosion or dents and to undertake necessary repairs at 2300 Rosebank Road, just north of Finch Avenue, in the City of Pickering.

CFN: 47397 - Application #: 0365/12/PICKReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: June 25, 2012

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.25 52 BONNYVIEW DRIVETo construct, reconstruct, erect or place a building or structure on Lot 29, Plan 2234, 52 Bonnyview Drive, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed. The purpose is to construct a new two-storey single family detached dwelling at 52 Bonnyview Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 47509 - Application #: 0472/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

339

EX10.26 GOTTARDO GALAXY INC. AND UIF GALAXY GP INC. PARTNERSHIPTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, Concession 3, 165-175 Galaxy Boulevard, in the City of Toronto (Etobicoke York Community Council Area), Mimico Creek Watershed as located on the property owned by Gottardo Galaxy Inc. and UIF Galaxy GP Inc. Partnership. The purpose is to conduct earth works including soil stripping and site grading.

CFN: 47421 - Application #: 0349/12/TORReport Prepared by: Mark Rapus, extension 5259For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.27 10 STEWART CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 83, Plan 66R-22634, 10 Stewart Avenue, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 10 Stewart Avenue in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 47358 - Application #: 0317/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.28 MARKLAND WOOD GOLF CLUBTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 9, Plan 2432, 245 Markland Drive, in the City of Toronto (Etobicoke York Community Council Area), Etobicoke Creek Watershed as located on the property owned by Markland wood Golf Club. The purpose is to refurbish hole #4 and hole #6 tee complexes and resurface an existing cart path at Markland Wood Golf Club located at 245 Markland Drive in the City of Toronto (Etobicoke-York Community Council Area).

CFN: 47487 - Application #: 0414/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 22, 2012

340

EX10.29 100 NORTH DRIVETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 56, Plan 965, 100 North Drive, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 100 North Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 47081 - Application #: 0116/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.30 57 RIVERVIEW HEIGHTSTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 1, 2, Plan 3347, 57 Riverview Heights, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 57 Riverview Heights in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling and shed are to be demolished.

CFN: 43391 - Application #: 1032/09/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.31 17 FAIRGLEN CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 21, Plan 1945, 17 Fairglen Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 14 Fairglen Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 46205 - Application #: 0643/11/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

341

EX10.32 30 RIDGEVALLEY CRESCENTTo construct, reconstruct, erect or place a building or structure on Lot 13, Plan 3515, 30 Ridgevalley Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 30 Ridgevalley Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 47510 - Application #: 0473/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.33 1 OLD YONGE STREETTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 10, Concession 1 EYS, 1 Old Yonge Street, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two storey replacement dwelling, with new in-ground swimming pool, rear deck and new retaining walls at 1 Old Yonge Street in the City of Toronto (North York Community Council Area).

CFN: 47505 - Application #: 0464/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.34 12 CAMPBELL CRESCENTTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 5, Plan 2767, 12 Campbell Crescent, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey addition, second storey balcony, and a new deck to the rear of the single family detached dwelling at 12 Campbell Crescent in the City of Toronto (North York). This proposal also includes a cabana and inground pool in the rear yard.

CFN: 47494 - Application #: 0428/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 25, 2012

342

EX10.35 DONALDA CLUBTo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units on Part Block F, 9, 10, Plan 5112, 12 Bushbury Drive, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Donalda Club. The purpose is to construct an addition overtop of the existing concrete patio of the Donalda Golf Club clubhouse at 12 Bushbury Drive in the City of Toronto (North York Community Council Area).

CFN: 47378 - Application #: 0346/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 22, 2012

EX10.36 25 PLYMBRIDGE CRESCENTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 14, Plan 2478, 25 Plymbridge Crescent, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct an in-ground swimming pool with associated decking at 25 Plymbridge Crescent in the City of Toronto (North York Community Council Area).

CFN: 47521 - Application #: 0434/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 22, 2012

EX10.37 35 WENTWORTH AVENUETo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 10, Plan 2069, 35 Wentworth Avenue, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a raised deck to the rear of the existing dwelling at 35 Wentworth Avenue in the City of Toronto (North York Community Council Area).

CFN: 47490 - Application #: 0417/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 22, 2012

343

EX10.38 34 GEORGE HENRY BOULEVARDTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 79, Plan 6311, 34 George Henry Boulevard, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 34 George Henry Boulevard in the City of Toronto (North York Community Council Area). The existing dwelling is to be demolished.

CFN: 46866 - Application #: 0041/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 26, 2012

EX10.39 TORONTO DISTRICT SCHOOL BOARDTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, 9, Concession 3, 130 Overlea Boulevard (Valley Park Middle School-TDSB), and 1080 Millwood Road (Hydro Corridor)), in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Toronto District School Board (TDSB). The purpose is to construct a new multi-purpose sports field, constructed marsh and bioswale and the addition of landscape and paved pedestrian areas at 130 Overlea Boulevard and 1080 Millwood Road (Hydro Corridor) in the City of Toronto (North York Community Council Area).

CFN: 47425 - Application #: 0363/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 26, 2012

EX10.40 V.H.L. DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure on Lot 491, Plan M-866, 30 Fifeshire Road, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by V.H.L. Developments Inc.. The purpose is to construct a replacement single family detached dwelling at 30 Fifeshire Road in the City of Toronto (North York). A cabana and an inground pool with associated hardscaping are proposed in the rear yard of the dwelling.

CFN: 47460 - Application #: 0396/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 25, 2012

344

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.41 8 MANORWOOD ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 461, Plan, 8 Manorwood Road, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to construct an in-ground swimming pool with associated decking and new wood landscape retaining wall at 8 Manorwood Road in the City of Toronto (Scarborough Community Council Area).

CFN: 47434 - Application #: 0386/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 21, 2012

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.42 CITY OF TORONTOTo site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 86, 87, 88, 89, 90, 91, 92, 93, 94, 95, Plan 1527, 501 Arlington Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to construct a multi-purpose sport court, new permeable pavers and new access pathway on the City of Toronto Parks, Forestry and Recreation lands directly adjoining Leo Baeck School at 501 Arlington Avenue in the City of Toronto (Toronto and East York Community Council Area).

CFN: 47452 - Application #: 0388/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 21, 2012

EX10.43 1 PEREGRINE WAYTo construct, reconstruct, erect or place a building or structure on Lot 9891 WEST SECTION, Block D, Plan M-543, 1 Peregrine Way, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to reconstruct the existing patio hardscaping and construct an outdoor kitchen to the rear and side of the existing single family detached dwelling at 1 Peregrine Way in the City of Toronto (Toronto & East York). This application also includes the installation of a bench with flagstone hardscaping in the rear yard.

345

CFN: 47188 - Application #: 0198/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 25, 2012

EX10.44 80 HOPEDALE AVENUETo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 17, Plan M-444, 80 Hopedale Avenue, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey single family detached dwelling at 80 Hopedale Avenue in the City of Toronto (Toronto and East York Community Council Area). The existing dwelling and detached garage are to be demolished.

CFN: 47338 - Application #: 0305/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.45 30 FOUR OAKS GATETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 15, Plan 2838, 30 Four Oaks Gate, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a new two storey replacement dwelling with rear deck and balcony and associated landscaping at 30 Four Oaks Gate in the City of Toronto (Toronto and East York Community Council Area).

CFN: 46490 - Application #: 0857/11/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 21, 2012

EX10.46 PHYLLO INVESTMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 4, Plan 383E, 9 Thornwood Road, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to construct a rear at-grade terrace, infiltration facility and new parking pad in the rear yard of the existing detached residential dwelling at 9 Thornwood Road in the City of Toronto (Toronto and East York Community Council Area). The existing detached garage and parking pad are to be removed.

346

CFN: 47600 - Application #: 0482/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

CITY OF VAUGHAN

EX10.47 62 AUTUMN GROVE COURTTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 9, Plan 65M-3738, 62 Autumn Grove Court, in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 62 Autumn Grove Court in the City of Vaughan.

CFN: 47435 - Application #: 0393/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 5, 2012

EX10.48 132 DEER RUN COURTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 7, Plan 65M3254, 132 Deer Run Court, in the City of Vaughan, Humber River Watershed. The purpose is to construct an inground pool, patio area and conduct minor landscaping works within a Regulated Area of the Humber River watershed at 132 Deer Run Court in the City of Vaughan.

CFN: 47431 - Application #: 0383/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Coreena Smith, extension 5269Date: June 5, 2012

EX10.49 REGIONAL MUNICIPALITY OF YORKTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Nashville Road, east of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to permit a watermain extension along Nashville Road to supply the Town of Kleinburg.

CFN: 47401 - Application #: 0368/12/VAUGReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: June 26, 2012

347

TOWN OF AJAX

EX10.50 TOWN OF AJAXTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere under an existing bridge on Carruthers Creek at Kerrison Drive, east of Salem Road North, in the Town of Ajax, Carruthers Creek Watershed, as located on the property owned by Town of Ajax. The purpose is to provide mitigation measures to protect the channel bank against further erosion under a recently built bridge across Carruthers Creek on Kerrison Drive, east of Salem Road North, in the Town of Ajax. The coldwater fisheries timing will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 46868 - Application #: 0037/12/AJAXReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: June 21, 2012

TOWN OF CALEDON

EX10.51 13921 CHICKADEE LANETo construct, reconstruct, erect or place a building or structure and site grade on Lot 10, Concession 6, (13921 Chickadee Lane), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a septic system associated with a municipal building permit.

CFN: 47436 - Application #: 0398/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 26, 2012

EX10.52 172 OLD KING ROADTo construct, reconstruct, erect or place a building or structure and site grade on Part Lot 7, Plan 43R-34399, (172 Old King Road), in the Town of Caledon, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a replacement 348 sq. m. (3,746 sq. ft.) single-family dwelling at 172 Old King Road associated with a municipal building permit.

CFN: 47682 - Application #: 0485/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 26, 2012

348

TOWN OF RICHMOND HILL

EX10.53 RICHMOND HILL RETIREMENT INC.To construct, reconstruct, erect or place a building or structure and site grade on Part Block 30, Plan 65M-2819, DESIGNATED AS PART 1, 65R-31694, 70 Bernard Avenue, in the Town of Richmond Hill, Rouge River Watershed as located on the property owned by Richmond Hill Retirement Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a senior's retirement residence (130 suites) with a total gross floor area (GFA) of 11,548 square metres associated with a municipal site plan application and zoning by-law amendment application.

CFN: 47342 - Application #: 0308/12/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 26, 2012

EX10.54 18 WILDWOOD AVENUETo construct, reconstruct, erect or place a building or structure and site grade on Lot 21, Plan 240, 18 Wildwood Avenue, in the Town of Richmond Hill, Humber River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a new, 250 square metre (2,685 sq. ft.) single detached dwelling associated with a municipal site plan application.

CFN: 47177 - Application #: 0189/12/RHReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 26, 2012

EX10.55 SCIULLI HOLDINGS INC.To construct, reconstruct, erect or place a building or structure on Lot 61, Plan 202, 11 Aubrey Avenue, in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Sciulli Holdings Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of a two-storey replacement dwelling.

CFN: 47577 - Application #: 0443/12/RHReport Prepared by: Uton Samuels, extension 5386For information contact: Uton Samuels, extension 5386Date: June 26, 2012

349

TOWNSHIP OF KING

EX10.56 44 CHARLES STREETTo construct, reconstruct, erect or place a building or structure and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Plan 395, 44 Charles Street, in the Township of King, Humber River Watershed. The purpose is to construct an inground pool within a Regulated Area of the Humber River watershed at 44 Charles Street in the Township of King.

CFN: 47515 - Application #: 0425/12/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 11, 2012

EX10.57 38 MCCLURE DRIVETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part 1 Lot 9, Plan 65R-32788, 38 McClure Drive, in the Township of King, Humber River Watershed. The purpose is to construct a new single-detached dwelling and conduct associated minor grading works on an existing lot within a Regulated Area of the Humber River watershed at 28 McClure Drive in the Township of King.

CFN: 47409 - Application #: 0352/12/KINGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 5, 2012

PERMIT APPLICATIONS EX10.58 - EX10.76 WERE ERRATA ITEMS:

CITY OF BRAMPTON

EX10.58 78 TREELINE BOULEVARDTo construct, reconstruct, erect or place a building or structure on Lot 82, Plan 43M-1361, (78 Treeline Boulevard), in the City of Brampton, Humber River Watershed. The purpose is to resolve an outside violation in order to authorize the recent construction of a below grade entrance and stairway at the rear of an existing residential dwelling located within a TRCA Regulated Area of the Humber River Watershed at 78 Treeline Boulevard, in the City of Brampton associated with a municipal building permit application.

CFN: 47427 - Application #: 0376/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 26, 2012

350

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.59 2473 ISLINGTON AVENUETo construct, reconstruct, erect or place a building or structure on Lot 30, Concession B 17, (2473 Islington Avenue), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to replace the existing deck and construct an inground pool with associated hardscaping to the rear of the single family detached dwelling at 2473 Islington Avenue in the City of Toronto (Etobicoke York).

CFN: 47485 - Application #: 0411/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 26, 2012

EX10.60 7 KINGSWAY CRESCENTTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 203, Plan 1686, 7 Kingsway Crescent, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling and inground pool at 7 Kingsway Crescent in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 46325 - Application #: 0730/11/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.61 52 EDENBROOK HILLTo construct, reconstruct, erect or place a building or structure, change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 21, Plan 5773, 52 Edenbrook Hill, in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new two-storey single family detached dwelling with integral garage and rear terrace at 52 Edenbrook Hill in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling and gazebo are to be demolished while the existing inground pool, pool equipment house and decking are to be maintained.

Withdrawn

351

CFN: 44980 - Application #: 1041/10/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.62 34 SENLAC ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Plan 2069, 34 Senlac Road, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new two-storey dwelling with rear deck at 34 Senlac Road in the City of Toronto (North York Community Council Area).

CFN: 46681 - Application #: 0973/11/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 26, 2012

EX10.63 5 IVOR ROADTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 29, Plan 2343, 5 Ivor Road, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a two-storey replacement dwelling with upgraded rear retaining wall at 5 Ivor Road in the City of Toronto (North York Community Council Area).

CFN: 45973 - Application #: 0462/11/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.64 9 YORK VALLEY CRESCENTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 8, Plan 5982, (9 York Valley Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct a new in-ground swimming pool with pergola, new decks and soak away pit to hold stormwater at 9 York Valley Crescent in the City of Toronto (North York Community Council Area).

Withdrawn

352

CFN: 47672 - Application #: 0475/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 27, 2012

EX10.65 22 FULWELL CRESCENTTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on 22 Fulwell Crescent, in the City of Toronto (North York Community Council Area), Humber River Watershed.

Withdrawn

CFN: 47459 - Application #: 0395/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.66 195 BURBANK DRIVETo change a building or structure so that it alters its use or potential use, increases its size or increases the number of dwelling units, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 130, Plan 5099, 195 Burbank Drive, in the City of Toronto (North York Community Council Area), Don River Watershed. The purpose is to construct two new rear raised decks, as well as replacement pool house and new hardscaping around the perimeter of the existing pool at 195 Burbank Drive in the City of Toronto (North York Community Council Area).

Withdrawn

CFN: 47346 - Application #: 0324/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.67 83 COLONEL DANFORTH TRAILTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 24, 25, Plan 2546, 83 Colonel Danforth Trail, in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed. The purpose is to construct a one-storey addition with cedar steps on the north side of the existing dwelling, a two-storey addition on the southwest side of the existing dwelling, a new rear deck to replace an existing concrete patio and a new garden shed at 83 Colonel Danforth Trail in the City of Toronto (Scarborough Community Council Area).

353

CFN: 47669 - Application #: 0468/12/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 25, 2012

EX10.68 42 MEADOWCLIFFE DRIVETo construct, reconstruct, erect or place a building or structure on Lot 167, Plan M-440, 42 Meadowcliffe Drive, in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed. The purpose is to construct a two-storey replacement dwelling with new septic system at 42 Meadowcliffe Drive in the City of Toronto (Scarborough Community Council Area).

CFN: 44676 - Application #: 0866/10/TORReport Prepared by: Jessica Bester, extension 5250For information contact: Steve Heuchert, extension 5311Date: June 22, 2012

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.69 CITY OF TORONTOTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere - between 25 Old Eglinton Avenue and 188 Bermondsey Road, in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed as located on the property owned by City of Toronto. The purpose is to reconstruct sections of the damaged Bermondsey Trunk Sanitary Sewer which runs along the Charles Sauriol Conservation Reserve located near the Bermondsey Transfer Station in the City of Toronto. There will be no in water works associated with the proposed sewer repairs.

CFN: 47450 - Application #: 0410/12/TORReport Prepared by: Renee Afoom-Boateng, extension 5714For information contact: Renee Afoom-Boateng, extension 5714Date: June 26, 2012

354

CITY OF VAUGHAN

EX10.70 BLOCK 39 (NORTH WEST) DEVELOPER'S GROUPTo construct, reconstruct, erect or place a building or structure, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse, Major Mackenzie Drive and Pine Valley Drive, in the City of Vaughan, Humber River Watershed as located on the property owned by Block 39 (North West) Developer's Group. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate repairs to the outfall of Stormwater Management (SWM) Pond M3 on the west side of Pine Valley Drive, south of Major Mackenzie Drive, in the City of Vaughan.  SWM Pond M3 services new residential development within the northwest corner of Block 39.

CFN: 47576 - Application #: 0441/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: June 26, 2012

EX10.71 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 20, 21, Concession 9, Major Mackenzie Drive east of Huntington Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc.. The purpose is to conduct site grading in order to install a sanitary/watermain along Major Mackenzie Drive which will facilitate the servicing of Block 61, in the City of Vaughan.

CFN: 46726 - Application #: 1007/11/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: June 26, 2012

EX10.72 NINE-TEN WEST LIMITEDTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 16, 17, Concession 2 WYS, northwest of Dufferin Street and Rutherford Road, in the City of Vaughan, Don River Watershed as located on the property owned by Nine-Ten West Limited. The purpose is to conduct site grading in order to facilitate the completion of a residential subdivision on lands owned by Nine-Ten West Limited, in Planning Block 11, in the City of Vaughan.

355

CFN: 47617 - Application #: 0466/12/VAUGReport Prepared by: Kevin Huang, extension 5307For information contact: Kevin Huang, extension 5307Date: June 26, 2012

TOWN OF CALEDON

EX10.73 ALLIANCE AGRI-TURF INC.To construct, reconstruct, erect or place a building or structure and site grade on Lot 11, Concession 5, 8112 King Street West, in the Town of Caledon, Humber River Watershed as located on the property owned by Alliance Agri-Turf Incorporated. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed in order to facilitate the construction of a seed grain storage building as part of an expansion to an existing commercial agricultural business associated with a municipal site plan application.

CFN: 47599 - Application #: 0480/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 26, 2012

EX10.74 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Highway 50 at the Humber River, in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to construct a concrete encased watermain on the west side of Hwy 50 over the Humber River. This structure will also be used as a pedestrian bridge separating pedestrians from Hwy 50 traffic. These construction activities are part of the larger Bolton watermain project. The coldwater fisheries timing window will apply to the project unless otherwise specified by MNR and a letter of advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 47279 - Application #: 0281/12/CALReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: June 26, 2012

356

EX10.75 REGIONAL MUNICIPALITY OF PEELTo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Hwy 50 and Columbia Way, in the Town of Caledon, Humber River Watershed as located on the property owned by Regional Municipality of Peel. The purpose is to construct 350 metres of 200 mm diameter watermain on Highway 50 from Hickman Street to Columbia Way, in the town of Caledon. These works will form part of the larger Bolton Feedermain project which is currently being review under a separate application. In addition, sidewalks, curbs and gutters have also been proposed along Hwy 50 and Columbia Way.

CFN: 47280 - Application #: 0282/12/CALReport Prepared by: Ben Krul, extension 5769For information contact: Ben Krul, extension 5769Date: June 26, 2012

TOWN OF MARKHAM

EX10.76 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure and alter a watercourse on Robinson Street over a tributary of the Rouge River, near Main Street North, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to permit the rehabilitation of the Robinson Street bridge spanning a tributary of the Rouge River and repairs to the bank protection.

CFN: 43914 - Application #: 0283/10/MARKReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: June 26, 2012

PERMIT APPLICATIONS EX10.77 - EX10.86 ARE PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS:

RES.#B95/12 - PERMISSION FOR ROUTINE INFRASTRUCTURE WORKS PURSUANT TO ONTARIO REGULATION 166/06

Moved by: Richard WhiteheadSeconded by: Jack Heath

THAT permission for routine infrastructure granted by Toronto and Region ConservationAuthority staff in accordance with applications (EX10.77 - EX10.86, inclusive), which arelisted below, be received.

CARRIED

357

CITY OF MISSISSAUGA

EX10.77 REGIONAL MUNICIPALITY OF PEELTo undertake the installation of a test well, two monitoring wells and three piezometers on the north and south sides of Eastgate Parkway, just east of Tomken Road and near Little Etobicoke Creek, in the City of Mississauga, Etobicoke Creek Watershed, as located on the property owned by Infrastructure Ontario and the City of Mississauga. The purpose is to install a test well, two monitoring wells and three piezometers to determine the hydrogeological characteristics at Little Etobicoke Creek along Eastgate Parkway. The warmwater fisheries timing window will be applied to the near water works (installation of piezometers), unless otherwise specified in writing by the Ministry of Natural Resources. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 46993 - Application #: 0083/12/MISSReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: May 18, 2012

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.78 CITY OF TORONTOTo undertake road/pathway resurfacing or reconstruction, structure maintenance and drainage structure general maintenance at 10 Cliffwood Road, Duncan Creek Park, in the City of Toronto (North York Community Council Area), Don River Watershed as located on property owned by the City of Toronto. The purpose is to undertake rehabilitation works to the existing playground within Duncan Creek Park. Works will include the removal and replacement of the existing playground structure, replacement of the existing asphalt trail and the installation of a drainage system. No in-water works are associated with this project.

CFN: 47394 - Application #: 0344/12/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: May 30, 2012

358

EX10.79 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on May Tree Road, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by the City of Toronto with permission granted through a Franchise Agreement to Enbridge Gas Distribution Inc.. The purpose is to relocate two existing 6" gas mains under May Tree Road. Relocation will be limited to the existing roadway and will be completed by open cut excavation. Works are to take place within the City of Toronto's previously established work zone, with permission granted by the City for Enbridge to complete the relocation. No in-water works are associated with the proposed.

CFN: 47447 - Application #: 0387/12/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: May 29, 2012

EX10.80 HILLSIDE PROPERTIESTo undertake borehole investigations on Part Lot 12, Concession 3 EYS, South-east Corner of Don Mills Road and Graydon Hall Drive, in the City of Toronto (North York Community Council Area), Don River Watershed as located on the property owned by Hillside Properties. The purpose is to undertake a geotechnical investigation to facilitate the detail design of a sanitary sewer. Works will include the drilling of three boreholes. No in-water works are associated with this project.

CFN: 46708 - Application #: 0993/11/TORReport Prepared by: Jonathan Pounder, extension 5304For information contact: Jonathan Pounder, extension 5304Date: May 25, 2012

TOWN OF CALEDON

EX10.81 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing driveway at 15924 Innis Lake Road, approximately 210 m south of Old Church Road, in the Town of Caledon, Humber River Watershed, as located on the property owned by Ontario Provincial Police under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline crossing above a culvert that conveys a tributary of Centreville Creek along a driveway at 15924 Innis Lake Road, approximately 210 m south of Old Church Road. The coldwater fisheries timing window will be applied to the project unless otherwise specified in writing by the Ministry of Natural Resources (MNR) and a Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

359

CFN: 47152 - Application #: 0181/12/CALReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: June 5, 2012

EX10.82 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within a new subdivision on Street A , located just east of Kennedy Road and south of King Street, in the Town of Caledon, Humber River Watershed, as located on the property owned by the Town of Caledon under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline on Street A, within a new subdivision, located just east of Kennedy Road and south of King Street, in the Town of Caledon. The coldwater fisheries timing window will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 47330 - Application #: 0296/12/CALReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: June 14, 2012

TOWN OF MARKHAM

EX10.83 COGECO DATA SERVICESTo undertake sewer and watermain or utility installation or maintenance within an existing roadway on Allstate Parkway and The Seneca Way, north of Highway 7, in the Town of Markham, Rouge River watershed as located on the property owned by Town of Markham. The purpose is to install a 100 mm HDPE conduit with fiber optic cable using Horizontal Directional Drilling (HDD) and open cut methods over a culvert along the west side of Allstate Parkway, in the Rouge River watershed, in the Town of Markham. Open cut method will be used to install the HDPE conduit over the culvert. No in-water works are associated with the proposed works. A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project.

CFN: 46747 - Application #: 1028/11/MARKReport Prepared by: Harsha Gammanpila, extension 5629For information contact: Harsha Gammanpila, extension 5629Date: June 1, 2012

360

EX10.84 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on 14th Avenue - just east of Vettese Court, and on Vettese Court, just south of 14th Avenue, in the Town of Markham, Rouge River Watershed as located on the property owned by York Region and the Town of Markham. The purpose is to install 2 inch and 1 1/4 inch gas mains at 14th Avenue and Vettese Court. The Ministry of Natural Resources (MNR) warm water timing window will apply to this project unless otherwise specified in writing by MNR. A Letter of Advice (LOA) will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO) for this project.

CFN: 47403 - Application #: 0371/12/MARKReport Prepared by: Scott Smith, extension 5758For information contact: Harsha Gammanpila, extension 5629Date: June 5, 2012

EX10.85 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation or maintenance within an existing roadway on Highway 7, approximately. 235m west of Rodick Road, in the Town of Markham, Rouge River Watershed as located on the property owned by The Regional Municipality of York. The purpose is to permit the installation of a gas line on the north side of Highway 7 via horizontal directional drill (HDD) under Apple Creek.

CFN: 47440 - Application #: 0374/12/MARKReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: June 20, 2012

TOWNSHHIP OF UXBRIDGE

EX10.86 ENBRIDGE GAS DISTRIBUTION INC.To undertake sewer and watermain or utility installation under a watercourse by trenchless technology on Durham Road 30, north of Bethesda Road, in the Township of Uxbridge, Duffins Creek Watershed, as located on the property owned by the Regional Municipality of Durham under franchise agreement with Enbridge Gas Distribution Inc. The purpose is to install a gas pipeline to service Metrolinx on Durham Road 30, north of Bethesda Road. The coldwater fisheries timing window will be applied to this project, as specified in writing by the Ministry of Natural Resources (MNR). Enbridge Gas Distribution Inc. will be using the Fisheries and Oceans Canada (DFO) Operational Statement for High Pressure Directional Drilling.

CFN: 47400 - Application #: 0367/12/UXBReport Prepared by: Shirin Varzgani, extension 5785For information contact: Shirin Varzgani, extension 5785Date: June 25, 2012

361

PERMIT APPLICATIONS EX10.87 - EX10.124 ARE MINOR WORKS LETTER OF APPROVAL:

RES.#B96/12 - PERMISSION FOR MINOR WORKS LETTER OF APPROVAL PURSUANT TO ONTARIO REGULATION 166/06

Moved by: Richard WhiteheadSeconded by: Jack Heath

THAT minor works letter of approval granted by Toronto and Region ConservationAuthority staff in accordance with applications (EX10.87 - EX10.124, inclusive), which arelisted below, be received.

CARRIEDCITY OF BRAMPTON

EX10.87 20 MOLDOVAN DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 443, Plan M-1691, (20 Moldovan Drive), in the City of Brampton, Humber River Watershed.

CFN: 47293 - Application #: 0260/12/BRAMReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: June 14, 2012

EX10.88 31 FORESTGROVE CIRCLETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on, (31 Forestgrove Circle), in the City of Brampton, Etobicoke Creek Watershed.

CFN: 47458 - Application #: 0394/12/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: May 28, 2012

EX10.89 66 MIDSUMMER DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 69, Plan 43M-1798, (66 Midsumer Drive), in the City of Brampton, Humber River Watershed.

CFN: 47498 - Application #: 0440/12/BRAMReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 19, 2012

362

CITY OF PICKERING

EX10.90 2015 ERIN GATE BOULEVARDTo install a swimming pool on Lot 37, Plan 40M-1969, (2015 Erin Gate Boulevard), in the City of Pickering, Waterfront Watershed.

CFN: 47468 - Application #: 0406/12/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: May 31, 2012

EX10.91 2288 CANTERBURY CRESCENTTo install a swimming pool on Lot 16, Plan 40M-2344, (2288 Canterbury Crescent), in the City of Pickering, Duffins Creek Watershed.

CFN: 47467 - Application #: 0405/12/PICKReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: May 29, 2012

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.92 101 ROYAL CREST ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 84, Plan M-1084, (101 Royal Crest Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 47413 - Application #: 0359/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 8, 2012

EX10.93 177 VARSITY ROADTo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Block N, Plan 1260, (177 Varsity Road), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 47414 - Application #: 0362/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 5, 2012

363

EX10.94 127 JEFFCOAT DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 403, Plan 4969, (127 Jeffcoat Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed.

CFN: 47493 - Application #: 0421/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 6, 2012

CITY OF TORONTO [NORTH YORK COMMUNITY COUNCIL AREA]

EX10.95 116 BROOKBANKS DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 99, Plan 5544, (116 Brookbanks Drive), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 47415 - Application #: 0369/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 5, 2012

EX10.96 6 ADDINGTON PLACETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 3, Plan 4023, (6 Addington Place), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 47502 - Application #: 0448/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 18, 2012

EX10.97 22 CEDARBANK CRESCENTTo install a swimming pool on , (22 Cedarbank Crescent), in the City of Toronto (North York Community Council Area), Don River Watershed.

CFN: 47453 - Application #: 0389/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 20, 2012

364

CITY OF TORONTO [SCARBOROUGH COMMUNITY COUNCIL AREA]

EX10.98 28 CRESCENTWOOD ROADTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 152, Plan 1902, (28 Crescentwood Road), in the City of Toronto (Scarborough Community Council Area), Waterfront Watershed.

CFN: 47461 - Application #: 0407/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 5, 2012

EX10.99 42 BANMOOR BOULEVARDTo construct a ground floor addition up to 50 sq. m (538 sq. ft) and change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 145, Plan M-801, (42 Banmoor Boulevard), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed.

CFN: 47471 - Application #: 0413/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 7, 2012

EX10.100 UNIVERSITY OF TORONTO - SCARBOROUGHTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Part Lot 9, 10, Concession 1, (130 Old Kingston Road), in the City of Toronto (Scarborough Community Council Area), Highland Creek Watershed as located on the property owned by University of Toronto - Scarborough.

CFN: 47516 - Application #: 0426/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 18, 2012

365

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.101 16 BENNINGTON HEIGHTS DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 7, Plan M363, (16 Bennington Heights Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 47583 - Application #: 0453/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Mark Rapus, extension 5259Date: June 21, 2012

EX10.102 CITY OF TORONTOTo undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) and undertake a municipal or utility project on Part Lot 19, 20, 21, 22, 23, 24, 25, , Part Of Water Lot In Front Of Lot 33, BFC Plan 782, (1391 Lakeshore Boulevard West), in the City of Toronto (Toronto and East York Community Council Area), Waterfront Watershed as located on the property owned by City of Toronto.

CFN: 47495 - Application #: 0430/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: June 18, 2012

EX10.103 58 NESBITT DRIVETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Lot 20, Plan 2398, (58 Nesbitt Drive), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

CFN: 47488 - Application #: 0415/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 7, 2012

EX10.104 81 HIGHLAND AVENUETo change the use, size, or number of dwelling units of a structure, or undertake work that does not change the footprint of the existing structure on Part Lot 52, Plan 528, (81 Highland Avenue), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed.

366

CFN: 47496 - Application #: 0427/12/TORReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Steve Heuchert, extension 5311Date: June 18, 2012

CITY OF VAUGHAN

EX10.105 72 HAZELRIDGE COURTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 63, Plan 65M-3895, (72 Hazelridge Court), in the City of Vaughan, Humber River Watershed.

CFN: 47469 - Application #: 0409/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: May 31, 2012

EX10.106 33 BROUGHAM DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (33 Brougham Drive), in the City of Vaughan, Humber River Watershed.

CFN: 47523 - Application #: 0436/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 15, 2012

EX10.107 66 CHAYA SARA GARDENSTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 69, Plan 65M-3985, (66 Chaya Sara Gardens), in the City of Vaughan, Don River Watershed.

CFN: 47416 - Application #: 0372/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: Anthony Sun, extension 5724Date: May 25, 2012

ES10.108 133 PEAK POINT BOULEVARDTo install a swimming pool on Lot 270, Plan 65M-3878, (133 Peak Point Boulvard), in the City of Vaughan, Don River Watershed.

CFN: 47464 - Application #: 0401/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 18, 2012

367

EX10.109 27 NOAH CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 26, Plan 65M3470, (27 Noah Crescent), in the City of Vaughan, Humber River Watershed.

CFN: 47432 - Application #: 0384/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: May 25, 2012

EX10.110 141 ALBANY DRIVETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 45, Plan M1875, (141 Albany Drive), in the City of Vaughan, Humber River Watershed.

CFN: 47465 - Application #: 0402/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: May 29, 2012

EX10.111 16 CLAIREWOOD COURTTo install a swimming pool and undertake minor landscaping involving the placement, removal or regrading of material of less than 30 cubic metres (equivalent to 3 truckloads) on Lot 2, Plan 65M-4177, (16 Clairewood Court), in the City of Vaughan, Humber River Watershed.

CFN: 47574 - Application #: 0437/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 14, 2012

EX10.112 195 TWIN HILLS CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 13, Plan 65M-4212, (195 Twin Hills Crescent), in the City of Vaughan, Humber River Watershed.

CFN: 47581 - Application #: 0451/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 14, 2012

368

EX10.113 58 BIG ROCK DRIVETo install a swimming pool on Lot 7, Plan 65M-4191, (58 Big Rock Drive), in the City of Vaughan, Don River Watershed.

CFN: 47473 - Application #: 0423/12/VAUGReport Prepared by: Anthony Sun, extension 5724For information contact: June Little, extension 5756Date: June 8, 2012

TOWN OF CALEDON

EX10.114 AL MEDADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Part Lot 5, Concession 6 EHS Plan R0G86035, (16331 Mountainview Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Al Medad.

CFN: 47456 - Application #: 0392/12/CALReport Prepared by: Adam Miller, extension 5244For information contact: Adam Miller, extension 5244Date: May 30, 2012

EX10.115 17889 HUMBER STATION ROADTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Part Lot 30, Concession 5 Plan R0SS6240, (17889 Humber Station Road), in the Town of Caledon, Humber River Watershed.

CFN: 47608 - Application #: 0455/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 20, 2012

EX10.116 100 CASTELLI COURTTo install a swimming pool on , (100 Castelli Court), in the Town of Caledon, Humber River Watershed.

CFN: 47492 - Application #: 0420/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: June 21, 2012

369

EX10.117 STONEBRIDGE BUILDING GROUP INC.To construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 9, Plan 43M1787, (44 Diamondwood Drive), in the Town of Caledon, Humber River Watershed as located on the property owned by Stonebridge Building Group Inc..

CFN: 47470 - Application #: 0412/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 5, 2012

EX10.118 34 CEDAR ALLAN PLACETo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on Lot 9, Plan 43M-1837, (34 Cedar Allan Place), in the Town of Caledon, Humber River Watershed.

CFN: 47609 - Application #: 0456/12/CALReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 20, 2012

TOWN OF MARKHAM

EX10.119 41 SARAH JANE COURTTo construct a ground floor addition up to 50 sq. m (538 sq. ft) on Lot 29, Plan M-1870, (41 Sarah Jane Court), in the Town of Markham, Rouge River Watershed.

CFN: 47579 - Application #: 0452/12/MARKReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: June 18, 2012

TOWN OF RICHMOND HILL

EX10.120 36 GREEN ASH CRESCENTTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (36 Green Ash Crescent), in the Town of Richmond Hill, Don River Watershed.

CFN: 47517 - Application #: 0429/12/RHReport Prepared by: Uton Samuels, extension 5386For information contact: Uton Samuels, extension 5386Date: June 13, 2012

370

EX10.121 27 SANDBANKS DRIVETo install a swimming pool on Lot 34, Plan 65M-3588, (27 Sandbanks Drive), in the Town of Richmond Hill, Humber River Watershed.

CFN: 47429 - Application #: 0377/12/RHReport Prepared by: Uton Samuels, extension 5386For information contact: Uton Samuels, extension 5386Date: June 8, 2012

TOWN OF WHITCHURCH-STOUFFVILLE

EX10.122 3 RAEVIEW DRIVETo construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 4, Plan 65R-29936, (3 Raeview Drive), in the Town of Whitchurch-Stouffville, Duffins Creek Watershed.

CFN: 47519 - Application #: 0432/12/WSReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: June 14, 2012

EX10.123 2179 STOUFFVILLE ROADTo construct a non-habitable accessory structure up to 50 sq. m (538 sq. ft) on , (2179 Stouffville Road), in the Town of Whitchurch-Stouffville, Rouge River Watershed.

CFN: 47430 - Application #: 0378/12/WSReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: May 29, 2012

EX10.124 7 RAEVIEW DRIVETo construct a ground floor addition or structure greater than 50 sq. m (538 sq. ft) but less than 150 sq. m (1614 sq. ft) on Lot 5, Plan 65R-29956, (7 Raeview Drive), in the Town of Whitchurch-Stouffville, Duffins Creek Watershed.

CFN: 47520 - Application #: 0433/12/WSReport Prepared by: Vanessa Aubrey, extension 5662For information contact: Chris Jones, extension 5718Date: June 14, 2012

371

CITY OF VAUGHAN

EX10.125 BELMONT PROPERTIES (WESTON) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere, interfere with a wetland and alter a watercourse on Lot 22, Concession 6, Northwest of Major Mackenzie Drive and Weston Road, in the City of Vaughan, Humber River Watershed as located on the property owned by Belmont Properties (Weston) Inc. The purpose is to conduct site grading in order to construct a stormwater management pond (SWM Pond No. 3), to facilitate the servicing of a draft approved subdivision on lands owned by Belmont Properties, in Block 40 South, in the City of Vaughan.

CFN: 46644 - Application #: 0952/11/VAUGReport Prepared by: June Little, extension 5756For information contact: June Little, extension 5756Date: July 4, 2012

EX10.126 KLEINDOR DEVELOPMENTS INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on East Half Lot 21, Concession 9, (North of Major Mackenzie Drive and West of Highway 27), in the City of Vaughan, Humber River Watershed as located on the property owned by Kleindor Developments Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the realignment of approximately 550 metres of a headwater tributary on the western half of draft approved plan of subdivision 19T-05V10 within Block 61 East, north of Major Mackenzie Drive and west of Highway 27, in the City of Vaughan.

CFN: 47712 - Application #: 0502/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: July 3, 2012

372

EX10.127 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Part Lots 21-23, Concession 9, (north of Major Mackenzie Drive and east of Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development and the alteration of a watercourse within a Regulated Area of the Humber River Watershed to facilitate the realignment of approximately 1100 metres of Tributary 'A' from a temporary diversion channel to the final Tributary 'A' corridor in draft approved plan of subdivision 19T-10V004 within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan. The purpose is also to facilitate the construction of an outfall to the final Tributary 'A' corridor from a roof drain collector system.

CFN: 47271 - Application #: 0252/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: July 3, 2012

EX10.128 NASHVILLE MAJOR DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS INC./NASHVILLE DEVELOPMENTS (SOUTH) INC.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lots 21-23, Concession 9, (Major Mackenzie Drive and Huntington Road), in the City of Vaughan, Humber River Watershed as located on the property owned by Nashville Major Developments Inc./Nashville Developments Inc./Nashville Developments (South) Inc. The purpose is to allow development within a Regulated Area of the Humber River Watershed to facilitate grading and servicing in a draft approved plan of subdivision (19T-10V004) within Block 61 West, northeast of Major Mackenzie Drive and Huntington Road, in the City of Vaughan.

CFN: 47343 - Application #: 0314/12/VAUGReport Prepared by: Coreena Smith, extension 5269For information contact: Coreena Smith, extension 5269Date: July 3, 2012

373

TOWN OF MARKHAM

EX10.129 1771107 ONTARIO INC.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 10, Concession 5, (southeast corner of Warden Avenue and Highway 7), in the Town of Markham, Rouge River Watershed as located on the property owned by 1771107 Ontario Inc.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a stormwater outfall, headwall and implementation of sediment erosion control measures for the construction of Outfall #2 as they relate to the broader servicing strategy for Markham Centre.

CFN: 47514 - Application #: 0424/12/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

EX10.130 ANGUS GLEN DEVELOPMENT (2003) LTD.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Development (2003) Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to construct stormwater management pond C, inlets to the storm sewers, pond control structures and associated erosion sediment control and access road, located at Lot 19 Concession 5 in the Town of Markham.

CFN: 45211 - Application #: 0020/11/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

EX10.131 ANGUS GLEN VILLAGE LTD.To site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Village Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to repair a sanitary sewer siphon crossing of Bruce Creek at Lot 19 Concession 5 in the Town of Markham.

CFN: 44242 - Application #: 0526/10/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

374

EX10.132 ANGUS GLEN VILLAGE LTD.To site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Lot 19, 20, Concession 5, (Major MacKenzie Drive and Angus Glen Boulevard), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Village Ltd.. The purpose is to establish final grades for the draft approved plan of subdivision and to construct the required infrastructure in the buffer located at the rear of the proposed lots.

CFN: 47518 - Application #: 0431/12/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

EX10.133 TOWN OF MARKHAMTo construct, reconstruct, erect or place a building or structure, site grade, temporarily or permanently place, dump or remove any material, originating on the site or elsewhere and alter a watercourse over the Rouge River at Birchmount Road, in the Town of Markham, Rouge River Watershed as located on the property owned by Town of Markham. The purpose is to construct a bridge over the Rouge River in order to connect existing segments of Birchmount Road. The redside dace fisheries timing window will be applied to the project, unless otherwise specified in writing by the Ministry of Natural Resources (MNR). A Letter of Advice will be written by TRCA staff on behalf of Fisheries and Oceans Canada (DFO).

CFN: 47364 - Application #: 0329/12/MARKReport Prepared by: Suzanne Bevan, extension 5759For information contact: Suzanne Bevan, extension 5759Date: July 3, 2012

CITY OF TORONTO

EX10.134 MARKLAND WOOD COUNTRY CLUBTo construct, reconstruct, erect or place a building or structure on Part Lot 1, Concession 1, (245 Markland Drive), in the City of Toronto, Etobicoke Creek Watershed as located on the property owned by Markland Wood Country Club. The existing golf course is located on lands within both the City of Toronto and the City of Mississauga, separated by the Etobicoke Creek. These particular works are located on lands within the City of Mississauga. The purpose is to undertake works within a TRCA Regulated Area of the Etobicoke Creek Watershed in order to facilitate the construction of a 185.78 sq. m. (1999.72 sq. ft.) addition to an existing 373.72 sq. m. (4,022.69 sq. ft.) maintenance facility building located at the Markland Wood Country Club associated with a municipal building permit application.

375

CFN: 47694 - Application #: 0514/12/MISSReport Prepared by: Jason Wagler, extension 5743For information contact: Quentin Hanchard, extension 5324Date: July 3, 2012

CITY OF TORONTO [ETOBICOKE YORK COMMUNITY COUNCIL AREA]

EX10.135 223 RIVERSIDE DRIVETo construct, reconstruct, erect or place a building or structure on Lot 186, Plan M356, (223 Riverside Drive), in the City of Toronto (Etobicoke York Community Council Area), Humber River Watershed. The purpose is to construct a new three-storey single family detached dwelling with integral garage, rear terrace (permeable pavers) and deck at 223 Riverside Drive in the City of Toronto (Etobicoke York Community Council Area). The existing dwelling is to be demolished.

CFN: 47240 - Application #: 0223/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: July 3, 2012

CITY OF TORONTO [TORONTO AND EAST YORK COMMUNITY COUNCIL AREA]

EX10.136 3 OLD GEORGE PLACETo construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 2 Lot 3, Plan 797-E, (3 Old George Place), in the City of Toronto (Toronto and East York Community Council Area), Don River Watershed. The purpose is to refurbish the existing inground pool, construct a stone terrace, wood deck, pizza oven, french drain and hot tub to the rear of the existing single family detached dwelling at 3 Old George Place in the City of Toronto (Toronto and East York Community Council Area). Included in this proposal is a ravine stewardship program.

CFN: 47693 - Application #: 0507/12/TORReport Prepared by: Nicole Moxley, extension 5284For information contact: Steve Heuchert, extension 5311Date: July 3, 2012

376

CITY OF VAUGHAN

EX10.137 REGIONAL MUNICIPALITY OF YORKTo temporarily or permanently place, dump or remove any material, originating on the site or elsewhere at 10299 Highway 27, in the City of Vaughan, Humber River Watershed as located on the property owned by Regional Municipality of York. The purpose is to permit the reconstruction of the slope above the existing outfall at the Kleinburg Water Pollution Control Plant. A Letter of Advice will be written on behalf of Fisheries and Oceans Canada and the redside dace timing window will be applied, unless otherwise directed by the Ministry of Natural Resources in writing.

CFN: 47443 - Application #: 0382/12/VAUGReport Prepared by: Brian Storozinski, extension 5744For information contact: Brian Storozinski, extension 5744Date: July 3, 2012

TOWN OF MARKHAM

EX10.138 ANGUS GLEN DEVELOPMENTS LTD.To construct, reconstruct, erect or place a building or structure, site grade and temporarily or permanently place, dump or remove any material, originating on the site or elsewhere on Part Lot 19, 20, Concession 5 Lot 24, PART OF 25, Plan 6037, (Major Mackenzie Drive), in the Town of Markham, Rouge River Watershed as located on the property owned by Angus Glen Developments Ltd.. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed to construct a vehicular and pedestrian bridge, traversing Bruce Creek at Lot 19 Concession 5 in the Town of Markham.

CFN: 39164 - Application #: 227/07/MARKReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

EX10.139 148 JOHN STREETTo construct, reconstruct, erect or place a building or structure on Part Lot 30, Plan 64R-8191, (148 John Street), in the Town of Markham, Don River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Don River Watershed in order to facilitate the construction of a first storey kitchen addition and a second storey addition at the rear of an existing detached dwelling associated with a municipal site plan application.

CFN: 47713 - Application #: 0508/12/MARKReport Prepared by: Jason Wagler, extension 5743For information contact: Jason Wagler, extension 5743Date: July 4, 2012

377

EX10.140 15 WORSLEY COURTTo construct, reconstruct, erect or place a building or structure on Lot 175, Plan 7566, (15 Worsley Court), in the Town of Markham, Rouge River Watershed. The purpose is to undertake works within a TRCA Regulated Area of the Rouge River Watershed in order to facilitate the construction of a swimming pool in the rear yard of the property.

CFN: 47710 - Application #: 0495/12/MARKReport Prepared by: Uton Samuels, extension 5386For information contact: Uton Samuels, extension 5386Date: July 3, 2012

TOWN OF RICHMOND HILL

EX10.141 TOWN OF RICHMOND HILLTo construct, reconstruct, erect or place a building or structure, site grade and interfere with a wetland on Part Lot 70, Concession 1 WYS, (Red Cardinal Trail & Bloomington Road), in the Town of Richmond Hill, Humber River Watershed as located on the property owned by Town of Richmond Hill. The purpose is to undertake works within a TRCA Regulated Area of the Humber River Watershed to facilitate the construction of a pedestrian trail and pedestrian footbridge.

CFN: 47382 - Application #: 0335/12/RHReport Prepared by: Doris Cheng, extension 5306For information contact: Doris Cheng, extension 5306Date: July 4, 2012

_________________________________________

TERMINATION

ON MOTION, the meeting terminated at 9:55 a.m., on Friday, July 6, 2012.

Maria AugimeriVice Chair

Brian DenneySecretary-Treasurer