meeting handouts from june 7, 2006 public meeting with ... · meeting handouts from june 7, 2006...
TRANSCRIPT
![Page 1: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/1.jpg)
CD
-
![Page 2: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/2.jpg)
• Background
• Schedule
• Current Status
• Licensing
• Replacement Steam Generators
• Transportation
• Implementation
• Disposal of Original Steam Generators
• Q&A
=:2
![Page 3: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/3.jpg)
• Started SONGS 2 & 3 Construction: 1974
• Commercial Operation: August 1983 - Unit 2 April 1984 - Unit 3
• Licensed to Operate: Until 2022 ~.o:l""'._:=:ca
• Nuclear Steam System Supplier: Combustion Engineering
• Architect/Engineer: Bechtel
• Turbine Supplier: English Electric
• Unit Output: 1,150 Megawatts each
• ABB-CE Steam Generator, Model 3410, two S/G per unit
• 1-600 MA Tubing
3 =: TEAM
![Page 4: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/4.jpg)
- Current Plugging Values
-Unit 2: 13.5% Effective Plugging (Includes Sleeves)
-Unit 3: 7.6% Plugging (No Sleeves)
- SG Inspections Before Cycle 16 Steam Generator Replacement Outage (SGRO)
-Unit 2: Cycle 15
-Unit 3: Cycle 14 & 15
- Plugging Limit is 21.4%
- Do Not Expect to Reach Plugging Limit
C! 4
![Page 5: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/5.jpg)
RSG Fabl"ication
Unit 2A RSG Tubing Production
Unit 2B RSG Tubing Production
Unit 2 RSG Testing
Unit 2 RSG Shipping
Unit 2 RSG @ Long Beach
Unit 2 RSG's Long Beach to SONGS
Unit 3 RSG @ Long Beach
Unit 3 RSG's Long Beach to SONGS
Engineel"ing
SGRP Plan Production
Unit 2 N-1 Design Engineering
Unit 2 SGRO Design Engineering
Unit 3 N-1 Design Engineering
Unit 3 SGRO Design Engineering
Installation
N-1 , Unit 2
SGRO Unit 2
2~ Tube PI"~duction t 4 : ~B Tube P,l"oduction!
til;; iiiisl! !Testing
i ShipPin~
j Aniue @ Long Be~ch,U-2 :
. Unit 2 Beach Tl"ansport 'Wind : :
I Aniue @ L~ng Beach,U-3
, Unit 3 Beach Tnns
Plan Pl"oduction
!Unit 2 N-1' Eng
i _~II Unit 2 ~GRO Eng..·4 1m Unit 3 N-1 Eng.
Will@~.N*hl~mt¥l Unit SGRO Eng.
mN-1,Unit 2
moo SGRO Unit 2
!If N-1,Unit 3
lIDI SGRO,Unit 3
5 :!
![Page 6: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/6.jpg)
Plans
» Recently Completed SGRO
• Palo Verde 1 & 2 • Beaver Valley 1 • ANO
• Plant Benchmarking • Fabricator
Benchmarking • Loan Employees • Future Benchmarkin
• Callaway
~
Palo Verde RSG Transport
~Future SGRO
• Ft. Calhoun • Watts Bar • Comanche Peak • Palo Verde 3
6
![Page 7: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/7.jpg)
• CPUC Application for Steam Generator Replacement Project (SGRP) Submitted February 2004
• Estimated Cost at $680m (2004 $)
• CPUC Decision December 2005
• EIX Board Accepted CPUC Decision March 2006
~ 7
![Page 8: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/8.jpg)
• Will Be Implemented Under 10CFR 50.59
• No Power Uprate
• Associated Technical Specification Changes
~ Identification 2007
8 ~
TEAM
![Page 9: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/9.jpg)
Mitsubishi Heavy Industries Kobe, Japan • Contract Award September 28, 2004
RSG 2ATube Sheet _A Prirnal")
9 ~
![Page 10: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/10.jpg)
![Page 11: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/11.jpg)
• Design Reviews
• Technical Meetings (SONGS, Kobe)
• SeE Resident Personnel @ Kobe
• Special Engineering Visits
• Readiness Reviews
• Independent Inspections
• Audits
!
11
SONGS 28 Channel Head
:!
![Page 12: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/12.jpg)
~
• Larger Surface Area
• Alloy 690 Thermally
Treated Tubing
• Improved AVB Design
• Integral Steam Nozzle
• Improved Material for
Tube Supports SIG 3A Lower and Middle Shell SIG 2A Balance Ring, Extension
• Forged Shell Ring, & Tubesheet
12
![Page 13: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/13.jpg)
Original RSG
Weight 620 tons 643.6 Tons
Height 65'6" 65'6"
Upper Section 22 feet 22 feet Diameter
Tubes 9,350 per SG 9,727 per SG
% inch diameter
:!13
![Page 14: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/14.jpg)
• Heavy Lift Cargo Ship from Japan to Port of Long Beach
• Ocean Barge from Long Beach to Camp Pendleton
• Heavy Transport Vehicle from Camp Pendleton to SONGS
14
~ ===
![Page 15: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/15.jpg)
![Page 16: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/16.jpg)
16
• 28' X 28' Opening
• 33.5' Above Ground Level
• Over Equipment Hatch
• 4 ft Thick, Reinforced Wall
• 100 Cubic Yards Concrete
• Approximately 50
Tendons Will Be Removed
=: TEAM
![Page 17: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/17.jpg)
~--i--i _. CD en ;C CDo.::SCD
Dl cnOlo.",,::S1"'+ 1"'+ " , ,...,_. 0 0 ",
O::s ::s:::J 0
![Page 18: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/18.jpg)
o»()o ~ Ol
2?~CDCCDOlOQ) _. ro+ CD ("") ::l CD -i ~3a.....,
CD C'" Q)::J'<'< ro+ en
![Page 19: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/19.jpg)
![Page 20: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/20.jpg)
Awarded Installation Contract December 2005
Original SONGS AE
Current Maintenance Contractor for SONGS
Significant SGR Experience
quipment hatch during a normal refueling outage Early Project Involvement
=:I~~ 20
![Page 21: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/21.jpg)
• Disposal of OSG's Offsite Is Required Due to SONGS Compact Site
• OSG's Large Size Requires Segmentation to Facilitate Shipping
• Disposal at Energy Solutions, LLC, (formerly Envirocare of Utah, LLC ) Planned
~ 21
![Page 22: Meeting Handouts from June 7, 2006 Public Meeting with ... · Meeting Handouts from June 7, 2006 Public Meeting with Southern California Edison to Discuss Steam Generator Replacement](https://reader034.vdocuments.net/reader034/viewer/2022042108/5e889b52fa25fd1d4743fdcf/html5/thumbnails/22.jpg)
N oN
~
»