MEETING THE CHALLENGES OF THE WORLDWIDE NUCLEAR RENAISSANCE
Sunita KUMAR
Director, Nuclear Energy Affairs
![Page 3: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/3.jpg)
Nuclear renaissance, rationale and scale
![Page 4: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/4.jpg)
4 4
Energy supply : a major challenge
Climate Change
Competitiveness
Energy Security
Gas resources (Gm3) around Europe - Source : CEDIGAZ
Oil spot price
![Page 5: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/5.jpg)
5 5
Worldwide, Prominent Environmentalists Support Nuclear Energy
„Nuclear energy is the only non-greenhouse gas emitting power source that can effectively replace fossil fuels and satisfy global demand.“Patrick Moore, founder of Greenpeace, The Miami Herald, January 30, 2005
„Nuclear power has no CO2 emissions. It is Europe’s biggest source of CO2 free energy.“Andris Piebalgs, European Energy Commissioner, quoted in The Telegraph, January, 2007
„Over the past two years, we have seen a perceptible shift in public opinion about nuclear power… people are much more positive. […] There are various factors for it, namely security of supply, the rising price of (fossil-fuel) energy, and concern about climate change from carbon gases. The public mood is changing a lot, and is overtaking fears about nuclear.“Laurent Furedi, spokesman for the industry’s lobby association, Foratom, in Brussels, quoted by AFP, January 2006
![Page 6: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/6.jpg)
6 6
Worldwide, existing and new build markets will be dynamic…
2006
391 GWe
Inst
alle
d N
ucle
ar G
We
279GWe
ExpectedPlants
Shutdowns
469GWe
2030
Inst
alle
d N
ucle
ar G
We
157GWe
Lifetime Extension and Power
Uprate
NEW BUILD MARKET
200GWe
A standardized product line to meet market requirements
Source : WNA 2005, IAEA2006, DOE-EIA 2006 and AREVA internal calculation 2005
… all industrial strategies must be employed to meet the demand and optimize capital outlay
![Page 7: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/7.jpg)
7 7
Import dependency is rising.
Gas reserves are concentrated in a few countries.
Oil and gas prices are rising. High prices for oil and gas are probably here to stay.
There is an urgent need for investment. In Europe alone, to meet expected energy demand and to replace ageing infrastructure, investments of around one trillion euros will be needed over the next 20 years.
European Commission Energy Green Paper,March 2006
![Page 8: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/8.jpg)
AREVA’s activities on existing NPPs in operation
![Page 9: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/9.jpg)
9 9
Nuclear Fleet Management: Recent Trends
Modernization : Safety upgrade, Instrumentation & control, Major component replacement (SGs and RPV heads) Power uprating License extension Availability improvement Reduction of outage durationMaintenance optimization: know-how-pooling, alliancing, packaging, advanced inspection technologiesIntensified Fuel Utilisation (fuel cycle management, higher burn-ups)
![Page 10: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/10.jpg)
10 10
Energy situation:Power intensive, export oriented industryNuclear power has important share, in 2004: 50 %
Energy politics In 1980 decided: Phase-out by 2010However: lift of concrete phase-out dateNo sustainable concept for replacement of nuclear power Power uprate of:
Ringhals 1, 3 (2005-2007)Ringhals 4 (2008-2011)Oskarshamm 3 (2008)Forsmark 1, 2, 3 (2008-2010)
Lifetime extension of:Ringhals 2 (2006)
Power uprates to meet demand increase: Sweden
![Page 11: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/11.jpg)
11 11
Oskarshamm 3 – Project PULS
General goal of the Project PULS:Power uprating and safety upgrading of NPP OKG3
Thermal output shall increase from 3300 MWth to 3900 MWth
Electrical gross output from 1200 MWe to 1450 MWe
Replacement of certain equipment and re-qualification of existing equipment as necessary based on SKIF 2004-2 (new Swedish safety requirements)
Upgrade with a design life of new equipment of 37 years (i.e. until 2045), no replacement of re-qualified equipment due to new operating conditions
Studied since 1998, main installation 2008
![Page 12: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/12.jpg)
12 12
Ringhals 4 – Project FREJ
Power uprate rationales:
SG replacement and Turbine refurbishment decided anyway
Power uprate significantly improves ROI
Licensing effort not that much higher in case of power uprate Studies &Engineering work rather equivalent
Impact of new regulations anyway
The market is favourable for additional capacityGrowing demand
Stable prices guaranteed in the Nordic Market (Nordpool)
Project dates Dec 2006 - Fall 2011
![Page 13: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/13.jpg)
13 13
Oskarshamm NPP Project PULS – Power Uprateand Lifetime Extension
Basic License
Power Uprate 109 %
Power Uprate 129 % - PULS
Lifetime Extension
Power
Year
2010 2025 20451985
100 %
![Page 14: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/14.jpg)
14 14
Modernization to meet strengthened safety requirements: Bulgaria
Kozloduy 5 & 6 (VVER1000) – Modernization Project
Long term core cooling improvementEmergency power supply and electrical systems improvementContainment integrityInstrumentation and controlRadiation monitoring system Diagnostic and computerised information systems Replacement and modernisation of information systemsInternal and external hazardsSafety analyses and operation documentsMechanical analyses
![Page 15: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/15.jpg)
15 15
Extension of the operating license
with strengthened safety requirements of:
Loviisa
LoviisaHelsinki
Olkiluoto
Design lifespan, license extension: Finland
![Page 16: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/16.jpg)
AREVA’s construction projects of new NPPs
![Page 17: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/17.jpg)
17 17
EPR, AREVA’s GEN3+ reactor to meet new requirements for a systematic defence-in-depth concept
Melt corecooling area
Containment heat dispersion system
Four redundant safety systems
Double containment with ventilation and filtration
Water reserves inside the containment
Melt corecooling area
Containment heat dispersion system
Four redundant safety systems
Double containment with ventilation and filtration
Water reserves inside the containment
Spreading AreaProtection of the Basemat
A logic with four levels of safety systemsMain Safeguard Systems of the EPR
![Page 18: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/18.jpg)
18 18
A COMPETITIVE kWhNuclear Island availability requirements
Unscheduled unavailability rate lower than 5 days/year (3 days/year for NI) : < 1,4% / r.y
Refueling Only Outage (ROO): < 11 days
Normal maintenance and refueling Outage (NRO): < 16 days
Ten-year inspection outage (TIO): < 40 days
EPR Nuclear Island is designed to fulfill above requirements
>>>> Availability better than 92% over lifetime
![Page 19: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/19.jpg)
19 19
A COMPETITIVE kWhReactor building accessible during power operation
: Inaccessible area(during power operation)
![Page 20: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/20.jpg)
20 20
EPR the only Generation III+ under construction:
Worldwide operating experience by 2015
Olkiluoto 3, Finland Flamanville 3, France
AmerenUE, U.S.Calvert Cliffs 3, U.S.
Under Construction
Project Preparation
C A 4-1
![Page 21: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/21.jpg)
21 21
Flamanville 3, France
Preparation of the area scheduled for reactor building
location
General worksite view
Installation of circulating water system pipes in progress (intake)
Courtesy of EDF, August 2007
![Page 22: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/22.jpg)
22 22
Olkiluoto 3, Finland
Courtesy of TVO, September 07
![Page 23: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/23.jpg)
23 23
Emerging projects
C A 5 -1
Contract signed
Short-listed
Selected
Pre-licensing process
South Africa
USA
UK
China
Baltic ProjectUnder preparation
The fleet is well on its way…
![Page 24: MEETING THE CHALLENGES OF THE - indiacore.com](https://reader031.vdocuments.net/reader031/viewer/2022012422/617702709872c536c71127ca/html5/thumbnails/24.jpg)
EPR, the path of greatest certainty
AREVA is ready to meet the challenges of the Indian ambitious new build program