meeting the communication challenges for positive train control

Upload: fernando-reyes

Post on 03-Jun-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    1/20

    AREMA 2009 Annual Conference & Exposition

    Meeting t e Communication

    Control

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    2/20

    AREMA 2009 Annual Conference & Exposition

    Railroad Safet Advisor Committee- 3 core

    objectives1. Prevent train to train collisions.

    2. Enforce all forms of speed limits (permanent,temporary speed restrictions, and switchs eeds .

    3. Protect roadway workers working within theirauthorized limits.

    PLUS 1: Protect against switches not lined properly.

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    3/20

    AREMA 2009 Annual Conference & Exposition

    -

    Safet

    Warnings and AlertsEnforcement of safe practices

    Efficiency

    Instructive display

    Visibility in Non-Signal Territory

    VitalitDesigned with same integrity of existing signaling

    systems

    Chicago, IL | September 20-23, 2009

    a s o nown sa e s a e

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    4/20

    AREMA 2009 Annual Conference & Exposition

    Interoperable Train Control (ITC) Agreement

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    5/20

    AREMA 2009 Annual Conference & Exposition

    ITC Agreement BNSF/CSX/NS/UPRR si n a reement to

    establish positive train controlinteroperability standards

    eve op s an ar s Uniform interface standards

    Messaging format re ess pro oco

    Braking Algorithm

    Interoperable hardware platforms

    Waysi es Base stations

    Locomotives

    Chicago, IL | September 20-23, 2009

    n ras ruc ure s ar n

    Utilization of 220MHz frequency spectrum

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    6/20

    AREMA 2009 Annual Conference & Exposition

    Must have a reement at man levels to intero erate

    Application- System Functional BehaviorMessaging- Format, Content, Track Database

    Crew Display (HMI)- Same form, function, feel

    Wireless (RF) protocols- Minimized wireless

    Transport protocols- Support multiple wireless/wired

    aths

    FRA approval of Type Approval for joint operation

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    7/20

    AREMA 2009 Annual Conference & Exposition

    Norfolk Southern Pilot Territory Columbia to Charlotte

    Signal Territory- ABS & CTC

    108 Route Miles

    Charleston to Columbia

    Non-signaled

    114 Route Miles

    Charlotte

    Columbia

    Charleston

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    8/20

    AREMA 2009 Annual Conference & Exposition

    -The Track Database, Train Clearance, Bulletins andTrack Authorities, are sent electronically for displayto the crew. This data is used b OTC to enerateWarnings and Enforcement.

    GPS

    UTCSOTC OFFICE

    TRAIN

    DATA TRAINDATASYSTEM

    WORK

    PASSING SIDING

    NT

    Chicago, IL | September 20-23, 2009

    INDUSTRY SIDING

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    9/20

    AREMA 2009 Annual Conference & Exposition

    - System monitors safe operating conditionsincluding switch positions, speedrestrictions and authorities and provideswarnings of changing conditions.

    OTC OFFICE

    TRACK

    DATABASE SYSTEM

    WORK

    PASSING SIDING

    BRAKING

    DISTANCE

    Chicago, IL | September 20-23, 2009

    INDUSTRY SIDING

    SWITCH

    POSITION

    MONITORING

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    10/20

    AREMA 2009 Annual Conference & Exposition

    -If action is not taken to bring the train intosafe operating conditions, the system willa l brakes to brin the train to a safestop.

    WORK

    PASSING SIDING

    ACCURATE

    POSITION

    BRAKING

    DISTANCE

    MAINTAIN

    AUTHORIZED

    SPEEDS

    Chicago, IL | September 20-23, 2009

    INDUSTRY SIDING

    SWITCH

    POSITION

    MONITORINGELECTRONICOPERATING

    INSTRUCTIONS

    PROTECT

    AUTHORITY

    LIMITS

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    11/20

    AREMA 2009 Annual Conference & Exposition

    WaysideSegment

    Control

    PointsOTC BackOfficeServer

    M03

    Dispatch

    ice egment

    AssetTracking System

    MessageRouter Monitored

    Switches

    CommunicationsSegment Other

    Monitored

    LocomotiveSegment

    Chicago, IL | September 20-23, 200911

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    12/20

    AREMA 2009 Annual Conference & Exposition

    OTC with ITPBackground

    S/A BOS

    ATCS

    TCP/IPXML

    SOAP/HTTPS

    XMLSOAP/HTTPS

    EMPUDP

    XML

    JMS/MQ

    XMLSOAP/HTTP(S)

    Routing Transformation Management

    IP

    XML

    JMS/MQ

    IP

    MonitoringBusiness

    Process

    Messaging(Local Queues)

    ClassD

    Auditing Logging Alerting

    C/I BOSG/D BOS (1) G/D BOS (2)

    Chicago, IL | September 20-23, 2009

    VisioDocument

    0 of 8 November 19, 2008

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    13/20

    AREMA 2009 Annual Conference & Exposition

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    14/20

    AREMA 2009 Annual Conference & Expositionays e o ocomo ve

    LocomotiveWayside

    Wayside Communications Module (WCM)Locomotive Communications Module (LCM)

    Class C

    a o (Pilot: 220 MHZ RCLRadio (Pilot: 220 MHZ RCL)

    Class C

    WIUTMC

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    15/20

    AREMA 2009 Annual Conference & Exposition

    On-Board Network (OBN) Enclosure

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    16/20

    AREMA 2009 Annual Conference & Exposition

    Back-Office Network Components

    -

    Firewall Services

    Routing Services

    o e ome en erv ces

    etwor ost ng

    Chicago, IL | September 20-23, 2009

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    17/20

    AREMA 2009 Annual Conference & Exposition

    PTC-220 LLC

    200 KHz nationwide

    8 x 25 KHz channels OR 4 paired channels

    Chicago, IL | September 20-23, 2009

    80 KHz regional/nationwide

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    18/20

    AREMA 2009 Annual Conference & Exposition

    w z u

    nationwide

    services for train control

    existing VHF voice radio systems

    - -

    support train control

    Chicago, IL | September 20-23, 200918

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    19/20

    AREMA 2009 Annual Conference & Exposition

    Key H g Leve tec n ca eta s:1. Radios will operate on 220 MHz channels

    Radios will support office to locomotive comms.

    Radios will support locomotive to wayside comms.

    Base

    Locomotive

    3. Channel access is TDMA

    Base assigns channel slot

    4. All radios will use GPS-based timing

    Chicago, IL | September 20-23, 200919

    AREMA 2009

  • 8/12/2019 Meeting the Communication Challenges for Positive Train Control

    20/20

    AREMA 2009 Annual Conference & Exposition

    Crucial to successful PTC deployment

    , ,

    Satellite, 802.11

    WiMax

    Chicago, IL | September 20-23, 2009

    AREMA 2009