8/12/2019 Meeting the Communication Challenges for Positive Train Control
1/20
AREMA 2009 Annual Conference & Exposition
Meeting t e Communication
Control
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
2/20
AREMA 2009 Annual Conference & Exposition
Railroad Safet Advisor Committee- 3 core
objectives1. Prevent train to train collisions.
2. Enforce all forms of speed limits (permanent,temporary speed restrictions, and switchs eeds .
3. Protect roadway workers working within theirauthorized limits.
PLUS 1: Protect against switches not lined properly.
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
3/20
AREMA 2009 Annual Conference & Exposition
-
Safet
Warnings and AlertsEnforcement of safe practices
Efficiency
Instructive display
Visibility in Non-Signal Territory
VitalitDesigned with same integrity of existing signaling
systems
Chicago, IL | September 20-23, 2009
a s o nown sa e s a e
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
4/20
AREMA 2009 Annual Conference & Exposition
Interoperable Train Control (ITC) Agreement
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
5/20
AREMA 2009 Annual Conference & Exposition
ITC Agreement BNSF/CSX/NS/UPRR si n a reement to
establish positive train controlinteroperability standards
eve op s an ar s Uniform interface standards
Messaging format re ess pro oco
Braking Algorithm
Interoperable hardware platforms
Waysi es Base stations
Locomotives
Chicago, IL | September 20-23, 2009
n ras ruc ure s ar n
Utilization of 220MHz frequency spectrum
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
6/20
AREMA 2009 Annual Conference & Exposition
Must have a reement at man levels to intero erate
Application- System Functional BehaviorMessaging- Format, Content, Track Database
Crew Display (HMI)- Same form, function, feel
Wireless (RF) protocols- Minimized wireless
Transport protocols- Support multiple wireless/wired
aths
FRA approval of Type Approval for joint operation
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
7/20
AREMA 2009 Annual Conference & Exposition
Norfolk Southern Pilot Territory Columbia to Charlotte
Signal Territory- ABS & CTC
108 Route Miles
Charleston to Columbia
Non-signaled
114 Route Miles
Charlotte
Columbia
Charleston
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
8/20
AREMA 2009 Annual Conference & Exposition
-The Track Database, Train Clearance, Bulletins andTrack Authorities, are sent electronically for displayto the crew. This data is used b OTC to enerateWarnings and Enforcement.
GPS
UTCSOTC OFFICE
TRAIN
DATA TRAINDATASYSTEM
WORK
PASSING SIDING
NT
Chicago, IL | September 20-23, 2009
INDUSTRY SIDING
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
9/20
AREMA 2009 Annual Conference & Exposition
- System monitors safe operating conditionsincluding switch positions, speedrestrictions and authorities and provideswarnings of changing conditions.
OTC OFFICE
TRACK
DATABASE SYSTEM
WORK
PASSING SIDING
BRAKING
DISTANCE
Chicago, IL | September 20-23, 2009
INDUSTRY SIDING
SWITCH
POSITION
MONITORING
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
10/20
AREMA 2009 Annual Conference & Exposition
-If action is not taken to bring the train intosafe operating conditions, the system willa l brakes to brin the train to a safestop.
WORK
PASSING SIDING
ACCURATE
POSITION
BRAKING
DISTANCE
MAINTAIN
AUTHORIZED
SPEEDS
Chicago, IL | September 20-23, 2009
INDUSTRY SIDING
SWITCH
POSITION
MONITORINGELECTRONICOPERATING
INSTRUCTIONS
PROTECT
AUTHORITY
LIMITS
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
11/20
AREMA 2009 Annual Conference & Exposition
WaysideSegment
Control
PointsOTC BackOfficeServer
M03
Dispatch
ice egment
AssetTracking System
MessageRouter Monitored
Switches
CommunicationsSegment Other
Monitored
LocomotiveSegment
Chicago, IL | September 20-23, 200911
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
12/20
AREMA 2009 Annual Conference & Exposition
OTC with ITPBackground
S/A BOS
ATCS
TCP/IPXML
SOAP/HTTPS
XMLSOAP/HTTPS
EMPUDP
XML
JMS/MQ
XMLSOAP/HTTP(S)
Routing Transformation Management
IP
XML
JMS/MQ
IP
MonitoringBusiness
Process
Messaging(Local Queues)
ClassD
Auditing Logging Alerting
C/I BOSG/D BOS (1) G/D BOS (2)
Chicago, IL | September 20-23, 2009
VisioDocument
0 of 8 November 19, 2008
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
13/20
AREMA 2009 Annual Conference & Exposition
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
14/20
AREMA 2009 Annual Conference & Expositionays e o ocomo ve
LocomotiveWayside
Wayside Communications Module (WCM)Locomotive Communications Module (LCM)
Class C
a o (Pilot: 220 MHZ RCLRadio (Pilot: 220 MHZ RCL)
Class C
WIUTMC
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
15/20
AREMA 2009 Annual Conference & Exposition
On-Board Network (OBN) Enclosure
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
16/20
AREMA 2009 Annual Conference & Exposition
Back-Office Network Components
-
Firewall Services
Routing Services
o e ome en erv ces
etwor ost ng
Chicago, IL | September 20-23, 2009
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
17/20
AREMA 2009 Annual Conference & Exposition
PTC-220 LLC
200 KHz nationwide
8 x 25 KHz channels OR 4 paired channels
Chicago, IL | September 20-23, 2009
80 KHz regional/nationwide
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
18/20
AREMA 2009 Annual Conference & Exposition
w z u
nationwide
services for train control
existing VHF voice radio systems
- -
support train control
Chicago, IL | September 20-23, 200918
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
19/20
AREMA 2009 Annual Conference & Exposition
Key H g Leve tec n ca eta s:1. Radios will operate on 220 MHz channels
Radios will support office to locomotive comms.
Radios will support locomotive to wayside comms.
Base
Locomotive
3. Channel access is TDMA
Base assigns channel slot
4. All radios will use GPS-based timing
Chicago, IL | September 20-23, 200919
AREMA 2009
-
8/12/2019 Meeting the Communication Challenges for Positive Train Control
20/20
AREMA 2009 Annual Conference & Exposition
Crucial to successful PTC deployment
, ,
Satellite, 802.11
WiMax
Chicago, IL | September 20-23, 2009
AREMA 2009