challenges in making the bullet train

16
Challenges in making the Bullet Train Submitted by Appalla Aditya Shiva 12881A0306

Upload: aditya-appalla

Post on 20-Jan-2017

274 views

Category:

Engineering


2 download

TRANSCRIPT

Page 1: CHALLENGES IN MAKING THE BULLET TRAIN

Challenges in making the Bullet Train

Submitted byAppalla Aditya Shiva

12881A0306

Page 2: CHALLENGES IN MAKING THE BULLET TRAIN

CONTENTS: • Bullet Train systems currently used.• Challenges in making the Bullet Train.• Hunting Oscillation.• Power Transmission.• Power to Speed conversion.• Cornering.• Earthquake management.• Conclusion.• References.

Page 3: CHALLENGES IN MAKING THE BULLET TRAIN

Bullet Train systems currently used:

Japanese: ShinkansenFrench: Train á Grande Vitesse Maglev

Page 4: CHALLENGES IN MAKING THE BULLET TRAIN

Challenges in making the Bullet Train: Hunting Oscillation. Power Transmission. Power – to – Speed conversion. Cornering. Earthquake management.

Page 5: CHALLENGES IN MAKING THE BULLET TRAIN

Hunting Oscillation:Self oscillation about an equilibrium. Causes:High speed resulting in higher interactions between adhesion & inertial forces.Effects:1. Violent movement in yawing manner.2. Derailment.3. Severe rail damage.

Page 6: CHALLENGES IN MAKING THE BULLET TRAIN

Solution:1. Wheel design. Speed (N)

Make the train wheel nearly flat.

2. Use heavy springs to dampen yawing.

Page 7: CHALLENGES IN MAKING THE BULLET TRAIN

Power Transmission:High voltage of 25kV – 30kV created by stepping up the voltage instead of current.Pantograph is used for transmission. Problem:Improper contact between line and pantograph – causing a plasma arc of 10000C.Effect:Power loss/power overload.

Page 8: CHALLENGES IN MAKING THE BULLET TRAIN

Solution: Lever principle of a CROWBAR.

Spring attached to the pantograph to make a compensatory mechanism.

Page 9: CHALLENGES IN MAKING THE BULLET TRAIN

Power – to – Speed Conversion: Key point is to increase the traction to run at high speeds. Problem:Weight constraint and engine pull.Effects:• More power required to run the train.• Slip of bogie wheels.• Pulling force at high speeds rather than pushing force, thereby creating less traction.

Solution:All – axle drive except for the engines – creating more traction and more control. Also called ELECTRIC MULTIPLE DRIVE UNIT. Provides for REGENERATIVE BRAKING.

Page 10: CHALLENGES IN MAKING THE BULLET TRAIN
Page 11: CHALLENGES IN MAKING THE BULLET TRAIN

Cornering:Centrifugal force is experienced, which can derail the train – causing accidents.

Solution:Banking the track to create a centripetal force that will balance the centrifugal force.Limitations:• Train cannot be run at high speeds.• Passengers and other luggage in the compartment will oscillate.

This limitation can be overcome with the Airbag Tilting System.

Page 12: CHALLENGES IN MAKING THE BULLET TRAIN

Airbag Tilting System (Courtesy: Eastern Japan Railway Corporation)

Page 13: CHALLENGES IN MAKING THE BULLET TRAIN

Earthquake Management: Japan – plagued by 900 earthquakes a year of magnitude 5 and above. Bullet Trains are equipped with Urgent Earthquake Detection & Alarm System (UrEDAS).

Comprehensive system to detect the

p – waves using electromagnetic

seismometer, relay the information to

the alarms which brake the train in 2

seconds.

Support rails are used to hold the train

if it is too close to the epicenter.

Page 14: CHALLENGES IN MAKING THE BULLET TRAIN

Conclusion:• Extreme engineering depends on simple physical principles.• Bullet Trains in India to become a reality in 2025 and these challenges are

the first step to build on the project.• Transport system can be improved and the necessity of domestic flight

travel can be highly reduced with bullet trains.• With the bullet train use, there is less pollution due to CFC and CO than by

regular diesel locos and flights.

Page 15: CHALLENGES IN MAKING THE BULLET TRAIN

References: • https://en.wikipedia.org/wiki/Hunting_oscillation• https://www.youtube.com/watch?v=ulDhklLJxZc (Nat Geo

Engineering)• https://en.wikipedia.org/wiki/Pantograph_(transport)• https://www.quora.com/How-can-a-pantograph-in-electric-

trains-move-up-and-down-according-to-the-height-of-an-overhead-electric-line

• http://www.irfca.org/faq/faq-elec2.html • http://www.geo.mtu.edu/UPSeis/waves.html• http://web-japan.org/trends/09_sci-tech/sci101209.html

Page 16: CHALLENGES IN MAKING THE BULLET TRAIN

Thank You!