AutoCAD SHX Text
1. GENERAL REQUIREMENTS GENERAL REQUIREMENTS A. ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT ALL WORK TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT WORK TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT WORK TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT TO BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT BE CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT CARRIED OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT OUT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT IN ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT ACCORDANCE WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT WITH TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT TOWN OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT OF COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT COLLINGWOOD STANDARDS, OPSD AND OPSS. WHERE CONFLICT STANDARDS, OPSD AND OPSS. WHERE CONFLICT STANDARDS, OPSD AND OPSS. WHERE CONFLICT OPSD AND OPSS. WHERE CONFLICT OPSD AND OPSS. WHERE CONFLICT AND OPSS. WHERE CONFLICT AND OPSS. WHERE CONFLICT OPSS. WHERE CONFLICT OPSS. WHERE CONFLICT WHERE CONFLICT WHERE CONFLICT WHERE CONFLICT CONFLICT CONFLICT OCCURS, TOWN STANDARDS TO GOVERN. B. THE OWNER'S ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. THE OWNER'S ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. OWNER'S ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. OWNER'S ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. ENGINEER SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. SHALL PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. PROVIDE BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. BENCHMARK ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. ELEVATIONS AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. AND HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. HORIZONTAL REFERENCE ALIGNMENT FOR THE CONTRACTOR. REFERENCE ALIGNMENT FOR THE CONTRACTOR. REFERENCE ALIGNMENT FOR THE CONTRACTOR. ALIGNMENT FOR THE CONTRACTOR. ALIGNMENT FOR THE CONTRACTOR. FOR THE CONTRACTOR. FOR THE CONTRACTOR. THE CONTRACTOR. THE CONTRACTOR. CONTRACTOR. CONTRACTOR. THE CONTRACTOR IS RESPONSIBLE FOR THE DETAILED LAYOUT OF THE WORK. C. THE CONTRACTOR SHALL OBTAIN A ROAD OCCUPANCY PERMIT FROM PUBLIC WORKS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. THE CONTRACTOR SHALL OBTAIN A ROAD OCCUPANCY PERMIT FROM PUBLIC WORKS PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. D. ALL SIGNAGE MUST COMPLY WITH APPLICABLE TOWN BYLAWS. ALL SIGNAGE MUST COMPLY WITH APPLICABLE TOWN BYLAWS. E. THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND THE CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND CONTRACTOR IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND IS RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND RESPONSIBLE FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND FOR THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND THE PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND PROTECTION OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND OF, AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND FOR THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND THE COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND COST OF REPLACING, LAYOUT STAKES, BENCHMARKS AND OF REPLACING, LAYOUT STAKES, BENCHMARKS AND OF REPLACING, LAYOUT STAKES, BENCHMARKS AND REPLACING, LAYOUT STAKES, BENCHMARKS AND REPLACING, LAYOUT STAKES, BENCHMARKS AND LAYOUT STAKES, BENCHMARKS AND LAYOUT STAKES, BENCHMARKS AND STAKES, BENCHMARKS AND STAKES, BENCHMARKS AND BENCHMARKS AND BENCHMARKS AND AND AND SURVEY BARS, IF DISTURBED DURING CONSTRUCTION. F. THE CONTRACTOR IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES THE CONTRACTOR IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES CONTRACTOR IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES CONTRACTOR IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES IS RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES RESPONSIBLE FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES FOR PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES PRESERVATION OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES OF ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES ALL EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES EXISTING FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES FACILITIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES AS WELL AS NOTIFYING ALL UTILITY COMPANIES WELL AS NOTIFYING ALL UTILITY COMPANIES WELL AS NOTIFYING ALL UTILITY COMPANIES AS NOTIFYING ALL UTILITY COMPANIES AS NOTIFYING ALL UTILITY COMPANIES NOTIFYING ALL UTILITY COMPANIES NOTIFYING ALL UTILITY COMPANIES ALL UTILITY COMPANIES ALL UTILITY COMPANIES UTILITY COMPANIES UTILITY COMPANIES COMPANIES COMPANIES PRIOR TO COMMENCING WORK AND CO-ORDINATE CONSTRUCTION ACCORDINGLY. G. ENGINEERED FILL COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN ENGINEERED FILL COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN FILL COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN FILL COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN COMPACTED TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN TO 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN 98% SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN SPMDD TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN TO BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN BE USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN USED AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN AS FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN FILL IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN IN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN ALL AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN AREAS WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN WHERE PROPOSED PIPE INVERTS ARE HIGHER THAN PROPOSED PIPE INVERTS ARE HIGHER THAN PROPOSED PIPE INVERTS ARE HIGHER THAN PIPE INVERTS ARE HIGHER THAN PIPE INVERTS ARE HIGHER THAN INVERTS ARE HIGHER THAN INVERTS ARE HIGHER THAN ARE HIGHER THAN ARE HIGHER THAN HIGHER THAN HIGHER THAN THAN THAN EXISTING GRADE OR AS INSTRUCTED BY THE ENGINEER. H. ROCK EXCAVATION TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 ROCK EXCAVATION TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 EXCAVATION TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 EXCAVATION TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 TO BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 BE IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 IN ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 ACCORDANCE WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 WITH OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 OPSS 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 515. EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 EXCAVATION AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 AND GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 GRADING TO BE IN ACCORDANCE WITH OPSS.MUNI 206 TO BE IN ACCORDANCE WITH OPSS.MUNI 206 TO BE IN ACCORDANCE WITH OPSS.MUNI 206 BE IN ACCORDANCE WITH OPSS.MUNI 206 BE IN ACCORDANCE WITH OPSS.MUNI 206 IN ACCORDANCE WITH OPSS.MUNI 206 IN ACCORDANCE WITH OPSS.MUNI 206 ACCORDANCE WITH OPSS.MUNI 206 ACCORDANCE WITH OPSS.MUNI 206 WITH OPSS.MUNI 206 WITH OPSS.MUNI 206 OPSS.MUNI 206 OPSS.MUNI 206 206 206 AND OPSS.MUNI 510. I. THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING THE CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING CONTRACTOR IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING IS RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING RESPONSIBLE FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING FOR NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING NOTIFYING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING ALL UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING UTILITY COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING COMPANIES PRIOR TO COMMENCING WORK AND FOR OBTAINING PRIOR TO COMMENCING WORK AND FOR OBTAINING PRIOR TO COMMENCING WORK AND FOR OBTAINING TO COMMENCING WORK AND FOR OBTAINING TO COMMENCING WORK AND FOR OBTAINING COMMENCING WORK AND FOR OBTAINING COMMENCING WORK AND FOR OBTAINING WORK AND FOR OBTAINING WORK AND FOR OBTAINING AND FOR OBTAINING AND FOR OBTAINING FOR OBTAINING FOR OBTAINING OBTAINING OBTAINING INFORMATION IN REGARD TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF IN REGARD TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF IN REGARD TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF REGARD TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF REGARD TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF TO EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF EXACT LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF LOCATION OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF OF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF BURIED UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF UTILITIES. THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF THIS SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF SHALL INCLUDE EXCAVATION OF INSPECTION HOLES IF INCLUDE EXCAVATION OF INSPECTION HOLES IF INCLUDE EXCAVATION OF INSPECTION HOLES IF EXCAVATION OF INSPECTION HOLES IF EXCAVATION OF INSPECTION HOLES IF OF INSPECTION HOLES IF OF INSPECTION HOLES IF INSPECTION HOLES IF INSPECTION HOLES IF HOLES IF HOLES IF IF IF NECESSARY. THE CONTRACTOR MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND THE CONTRACTOR MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND THE CONTRACTOR MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CONTRACTOR MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CONTRACTOR MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND MUST EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND EXERCISE NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND NECESSARY CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CARE IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND IN CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND CONSTRUCTION OPERATIONS INCLUDING, IF NECESSARY, HAND OPERATIONS INCLUDING, IF NECESSARY, HAND OPERATIONS INCLUDING, IF NECESSARY, HAND INCLUDING, IF NECESSARY, HAND INCLUDING, IF NECESSARY, HAND IF NECESSARY, HAND IF NECESSARY, HAND NECESSARY, HAND NECESSARY, HAND HAND HAND DIGGING TO SAFEGUARD UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS TO SAFEGUARD UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS TO SAFEGUARD UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS SAFEGUARD UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS SAFEGUARD UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS UTILITIES FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS FROM DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS DAMAGE. THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS THE CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS CONTRACTOR SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS SHALL ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS ARRANGE FOR TEMPORARY SUPPORT OF UTILITY POLES AS FOR TEMPORARY SUPPORT OF UTILITY POLES AS FOR TEMPORARY SUPPORT OF UTILITY POLES AS TEMPORARY SUPPORT OF UTILITY POLES AS TEMPORARY SUPPORT OF UTILITY POLES AS SUPPORT OF UTILITY POLES AS SUPPORT OF UTILITY POLES AS OF UTILITY POLES AS OF UTILITY POLES AS UTILITY POLES AS UTILITY POLES AS POLES AS POLES AS AS AS MAY BE REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR BE REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR BE REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR REQUIRED TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR TO COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR COMPLETE THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR THE WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR WORK. THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR THE CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR CONTRACTOR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR IS LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR LIABLE FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR FOR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR ALL DAMAGE TO UTILITIES OCCURRING WITHIN OR DAMAGE TO UTILITIES OCCURRING WITHIN OR DAMAGE TO UTILITIES OCCURRING WITHIN OR TO UTILITIES OCCURRING WITHIN OR TO UTILITIES OCCURRING WITHIN OR UTILITIES OCCURRING WITHIN OR UTILITIES OCCURRING WITHIN OR OCCURRING WITHIN OR OCCURRING WITHIN OR WITHIN OR WITHIN OR OR OR OUTSIDE THE CONTRACT LIMITS CAUSED BY THEIR OPERATIONS. J. THE CONTRACTOR IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY THE CONTRACTOR IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY CONTRACTOR IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY CONTRACTOR IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY IS TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY TO SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY SUBMIT SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY SAMPLES AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY AND A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY A GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY GRADATION ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY ANALYSIS OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY OF THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY THE PROPOSED GRANULAR MATERIALS FOR APPROVAL BY PROPOSED GRANULAR MATERIALS FOR APPROVAL BY PROPOSED GRANULAR MATERIALS FOR APPROVAL BY GRANULAR MATERIALS FOR APPROVAL BY GRANULAR MATERIALS FOR APPROVAL BY MATERIALS FOR APPROVAL BY MATERIALS FOR APPROVAL BY FOR APPROVAL BY FOR APPROVAL BY APPROVAL BY APPROVAL BY BY BY THE ENGINEER PRIOR TO COMMENCING WORK. K. CONTRACTOR TO PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, CONTRACTOR TO PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, TO PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, TO PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, PERFORM ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, ALL WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, WORKS IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, IN ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, ACCORDANCE WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, WITH RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, RECOMMENDATIONS AS SPECIFIED IN THE GEOTECHNICAL REPORT, AS SPECIFIED IN THE GEOTECHNICAL REPORT, AS SPECIFIED IN THE GEOTECHNICAL REPORT, SPECIFIED IN THE GEOTECHNICAL REPORT, SPECIFIED IN THE GEOTECHNICAL REPORT, IN THE GEOTECHNICAL REPORT, IN THE GEOTECHNICAL REPORT, THE GEOTECHNICAL REPORT, THE GEOTECHNICAL REPORT, GEOTECHNICAL REPORT, GEOTECHNICAL REPORT, REPORT, REPORT, UNLESS OTHERWISE APPROVED BY THE ENGINEER. L. COMPACTING TO OPSS 501 (METHOD A). COMPACTING TO OPSS 501 (METHOD A). M. TRAFFIC CONTROL AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT TRAFFIC CONTROL AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONTROL AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONTROL AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT AND SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT SIGNAGE DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT DURING CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONSTRUCTION SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT SHALL CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT CONFORM TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT TO MUNICIPAL REQUIREMENTS AND THE MOST CURRENT MUNICIPAL REQUIREMENTS AND THE MOST CURRENT MUNICIPAL REQUIREMENTS AND THE MOST CURRENT REQUIREMENTS AND THE MOST CURRENT REQUIREMENTS AND THE MOST CURRENT AND THE MOST CURRENT AND THE MOST CURRENT THE MOST CURRENT THE MOST CURRENT MOST CURRENT MOST CURRENT CURRENT CURRENT ONTARIO CONSTRUCTION REGULATIONS INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL CONSTRUCTION REGULATIONS INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL CONSTRUCTION REGULATIONS INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL REGULATIONS INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL REGULATIONS INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL INCLUDING REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL REGULATION NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL NO. 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL 213 UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL UNDER OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL OHSA AND REFERENCE TO ONTARIO TRAFFIC MANUAL AND REFERENCE TO ONTARIO TRAFFIC MANUAL AND REFERENCE TO ONTARIO TRAFFIC MANUAL REFERENCE TO ONTARIO TRAFFIC MANUAL REFERENCE TO ONTARIO TRAFFIC MANUAL TO ONTARIO TRAFFIC MANUAL TO ONTARIO TRAFFIC MANUAL ONTARIO TRAFFIC MANUAL ONTARIO TRAFFIC MANUAL TRAFFIC MANUAL TRAFFIC MANUAL MANUAL MANUAL BOOK NO. 7. N. THE CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST THE CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST SHALL SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST SUPPLY ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST ALL NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST NECESSARY WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST WATER AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST AND/OR CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CALCIUM CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST CHLORIDE AS REQUIRED FOR COMPACTION AND/OR DUST AS REQUIRED FOR COMPACTION AND/OR DUST AS REQUIRED FOR COMPACTION AND/OR DUST REQUIRED FOR COMPACTION AND/OR DUST REQUIRED FOR COMPACTION AND/OR DUST FOR COMPACTION AND/OR DUST FOR COMPACTION AND/OR DUST COMPACTION AND/OR DUST COMPACTION AND/OR DUST AND/OR DUST AND/OR DUST DUST DUST CONTROL. O. CLEAR, GRUB AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO CLEAR, GRUB AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO GRUB AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO GRUB AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO AND DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO DISPOSE ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO ALL SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO SCRUB, BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO BUSHES, AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO AND TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO TREES IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO IN ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO ACCORDANCE WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO WITH OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO OPSS.MUNI 180 AND OPSS 201 AS REQUIRED TO 180 AND OPSS 201 AS REQUIRED TO 180 AND OPSS 201 AS REQUIRED TO AND OPSS 201 AS REQUIRED TO AND OPSS 201 AS REQUIRED TO OPSS 201 AS REQUIRED TO OPSS 201 AS REQUIRED TO 201 AS REQUIRED TO 201 AS REQUIRED TO AS REQUIRED TO AS REQUIRED TO REQUIRED TO REQUIRED TO TO TO INSTALL WORKS. LIMITS TO BE APPROVED BY THE ENGINEER PRIOR TO PROCEEDING. P. STRIP AND DISPOSE ALL TOPSOIL WITHIN ROADWAY CONSTRUCTION IN ACCORDANCE WITH OPSS.MUNI 510. STRIP AND DISPOSE ALL TOPSOIL WITHIN ROADWAY CONSTRUCTION IN ACCORDANCE WITH OPSS.MUNI 510. Q. EXCESS OR UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN EXCESS OR UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN OR UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN OR UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN UNSUITABLE MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN MATERIALS TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN TO BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN BE DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN DISPOSED OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN OF BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN BY THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN THE CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN CONTRACTOR IN ACCORDANCE WITH OPSS.MUNI 180 AT AN IN ACCORDANCE WITH OPSS.MUNI 180 AT AN IN ACCORDANCE WITH OPSS.MUNI 180 AT AN ACCORDANCE WITH OPSS.MUNI 180 AT AN ACCORDANCE WITH OPSS.MUNI 180 AT AN WITH OPSS.MUNI 180 AT AN WITH OPSS.MUNI 180 AT AN OPSS.MUNI 180 AT AN OPSS.MUNI 180 AT AN 180 AT AN 180 AT AN AT AN AT AN AN AN APPROVED LOCATION AS PART OF THE WORK. R. FOR THE DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED FOR THE DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THE DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THE DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED DURATION OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED OF THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THE CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTRACT, MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED MATERIAL THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED THAT BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED BECOMES CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTAMINATED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED DUE TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED TO CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTRACTOR'S ACTIVITY SHALL BE REMOVED CONTRACTOR'S ACTIVITY SHALL BE REMOVED ACTIVITY SHALL BE REMOVED ACTIVITY SHALL BE REMOVED SHALL BE REMOVED SHALL BE REMOVED BE REMOVED BE REMOVED REMOVED REMOVED AND REPLACED AT NO EXTRA COST TO THE CONTRACT. S. DEWATERING TO BE CARRIED OUT IN ACCORDANCE WITH OPSS 517 AND OPSS 518 TO MAINTAIN ALL TRENCHES IN A DRY CONDITION. DEWATERING TO BE CARRIED OUT IN ACCORDANCE WITH OPSS 517 AND OPSS 518 TO MAINTAIN ALL TRENCHES IN A DRY CONDITION. T. ALL ENGINE DRIVEN PUMPS TO BE ADEQUATELY SILENCED, SUITABLE FOR OPERATION IN A RESIDENTIAL AREA. ALL ENGINE DRIVEN PUMPS TO BE ADEQUATELY SILENCED, SUITABLE FOR OPERATION IN A RESIDENTIAL AREA. U. ALL PIPE HANDLING AND INSTALLATION MUST BE IN STRICT COMPLIANCE WITH MANUFACTURERS INSTALLATION GUIDES. ALL PIPE HANDLING AND INSTALLATION MUST BE IN STRICT COMPLIANCE WITH MANUFACTURERS INSTALLATION GUIDES. V. PIPE DEFLECTIONS SHALL NOT EXCEED MANUFACTURER'S SPECIFICATIONS. PIPE DEFLECTIONS SHALL NOT EXCEED MANUFACTURER'S SPECIFICATIONS. W. RIGID PIPE BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND RIGID PIPE BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND PIPE BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND PIPE BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND BEDDING, COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND COVER AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND BACKFILL TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND TO OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OPSD 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND 802.030 OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OR OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND OPSD 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND 802.031 CLASS B WITH GRANULAR 'A' FOR BEDDING AND CLASS B WITH GRANULAR 'A' FOR BEDDING AND CLASS B WITH GRANULAR 'A' FOR BEDDING AND B WITH GRANULAR 'A' FOR BEDDING AND B WITH GRANULAR 'A' FOR BEDDING AND WITH GRANULAR 'A' FOR BEDDING AND WITH GRANULAR 'A' FOR BEDDING AND GRANULAR 'A' FOR BEDDING AND GRANULAR 'A' FOR BEDDING AND 'A' FOR BEDDING AND 'A' FOR BEDDING AND FOR BEDDING AND FOR BEDDING AND BEDDING AND BEDDING AND AND AND COVER MATERIAL. BACKFILL SHALL BE PLACED IN LIFTS, A MAXIMUM OF 200 mm THICK. X. FLEXIBLE PIPE EMBEDMENT AND BACKFILL TO OPSD 802.010 WITH GRANULAR 'A' FOR EMBEDMENT MATERIAL. FLEXIBLE PIPE EMBEDMENT AND BACKFILL TO OPSD 802.010 WITH GRANULAR 'A' FOR EMBEDMENT MATERIAL. Y. RIGID PIPE BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY RIGID PIPE BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY PIPE BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY PIPE BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY BEDDING, COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY COVER AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY BACKFILL AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY FLEXIBLE PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY PIPE EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY EMBEDMENT AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY AND BACKFILL MATERIAL TO BE COMPACTED TO A DRY BACKFILL MATERIAL TO BE COMPACTED TO A DRY BACKFILL MATERIAL TO BE COMPACTED TO A DRY MATERIAL TO BE COMPACTED TO A DRY MATERIAL TO BE COMPACTED TO A DRY TO BE COMPACTED TO A DRY TO BE COMPACTED TO A DRY BE COMPACTED TO A DRY BE COMPACTED TO A DRY COMPACTED TO A DRY COMPACTED TO A DRY TO A DRY TO A DRY A DRY A DRY DRY DRY DENSITY OF AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH OF AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH OF AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH AT LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH LEAST 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH 95% OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH OF THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH THE MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH MATERIAL'S STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH PROCTOR MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH MAXIMUM DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH DRY DENSITY (SPMDD). MINIMUM BEDDING DEPTH DENSITY (SPMDD). MINIMUM BEDDING DEPTH DENSITY (SPMDD). MINIMUM BEDDING DEPTH (SPMDD). MINIMUM BEDDING DEPTH (SPMDD). MINIMUM BEDDING DEPTH MINIMUM BEDDING DEPTH MINIMUM BEDDING DEPTH BEDDING DEPTH BEDDING DEPTH DEPTH DEPTH 150mm, MINIMUM COVER 300 mm. Z. CLEAR STONE WRAPPED IN FILTER FABRIC MAY BE SUBSTITUTED FOR EMBEDMENT MATERIAL IF APPROVED BY THE ENGINEER. CLEAR STONE WRAPPED IN FILTER FABRIC MAY BE SUBSTITUTED FOR EMBEDMENT MATERIAL IF APPROVED BY THE ENGINEER. AA. TRENCH BACKFILL TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, TRENCH BACKFILL TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, BACKFILL TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, BACKFILL TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, TO BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, BE SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, SELECT NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, NATIVE MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, MATERIAL. WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, WHERE NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, NATIVE MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, MATERIAL IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, IS CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, CONSIDERED BY THE ENGINEER TO BE UNSUITABLE, BY THE ENGINEER TO BE UNSUITABLE, BY THE ENGINEER TO BE UNSUITABLE, THE ENGINEER TO BE UNSUITABLE, THE ENGINEER TO BE UNSUITABLE, ENGINEER TO BE UNSUITABLE, ENGINEER TO BE UNSUITABLE, TO BE UNSUITABLE, TO BE UNSUITABLE, BE UNSUITABLE, BE UNSUITABLE, UNSUITABLE, UNSUITABLE, TRENCH BACKFILL SHALL BE IMPORTED SELECT SUBGRADE MATERIAL FROM A LICENSED PIT OR QUARRY. AB. ALL DISTURBED AREAS TO BE REINSTATED TO PREVIOUS CONDITION OR BETTER. ALL DISTURBED AREAS TO BE REINSTATED TO PREVIOUS CONDITION OR BETTER. AC. GENERAL INSTALLATION AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS GENERAL INSTALLATION AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS INSTALLATION AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS INSTALLATION AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS AND TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS TESTING OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS OF SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS SEWERS, WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS WATERMAIN AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS AND APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS APPURTENANCES TO BE IN ACCORDANCE WITH OPSS 407, OPSS TO BE IN ACCORDANCE WITH OPSS 407, OPSS TO BE IN ACCORDANCE WITH OPSS 407, OPSS BE IN ACCORDANCE WITH OPSS 407, OPSS BE IN ACCORDANCE WITH OPSS 407, OPSS IN ACCORDANCE WITH OPSS 407, OPSS IN ACCORDANCE WITH OPSS 407, OPSS ACCORDANCE WITH OPSS 407, OPSS ACCORDANCE WITH OPSS 407, OPSS WITH OPSS 407, OPSS WITH OPSS 407, OPSS OPSS 407, OPSS OPSS 407, OPSS 407, OPSS 407, OPSS OPSS OPSS 408, OPSS 409 (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS 409 (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS 409 (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 409 (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 409 (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE (CCTV), OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 410, OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 421, AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE AND OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE OPSS.MUNI 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE 441 AND ALL SPECIFICATIONS REFERENCED WITHIN THESE AND ALL SPECIFICATIONS REFERENCED WITHIN THESE AND ALL SPECIFICATIONS REFERENCED WITHIN THESE ALL SPECIFICATIONS REFERENCED WITHIN THESE ALL SPECIFICATIONS REFERENCED WITHIN THESE SPECIFICATIONS REFERENCED WITHIN THESE SPECIFICATIONS REFERENCED WITHIN THESE REFERENCED WITHIN THESE REFERENCED WITHIN THESE WITHIN THESE WITHIN THESE THESE THESE SECTIONS. AD. ALL STRUCTURES ARE 1200 mm DIA. UNLESS OTHERWISE NOTED. ALL STRUCTURES ARE 1200 mm DIA. UNLESS OTHERWISE NOTED. AE. FROST STRAPS SHALL BE INSTALLED ON ALL MAINTENANCE HOLES AS PER OPSD 701.100. FROST STRAPS SHALL BE INSTALLED ON ALL MAINTENANCE HOLES AS PER OPSD 701.100. AF. STEPS IN ALL STRUCTURES TO OPSD 405.010. STEPS IN ALL STRUCTURES TO OPSD 405.010. AG. PIPE SUPPORT AT ALL STRUCTURES TO OPSD 708.020. PIPE SUPPORT AT ALL STRUCTURES TO OPSD 708.020. AH. THE CONTRACTOR SHALL MAKE THEIR OWN ARRANGEMENTS FOR THE SUPPLY OF TEMPORARY WATER AND POWER. THE CONTRACTOR SHALL MAKE THEIR OWN ARRANGEMENTS FOR THE SUPPLY OF TEMPORARY WATER AND POWER. AI. ALL PVC PIPE TO BE COVERED WHILE STORED ON SITE. ALL PVC PIPE TO BE COVERED WHILE STORED ON SITE. AJ. WATER VALVE BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION WATER VALVE BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION VALVE BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION VALVE BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION BOXES, MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION MAINTENANCE HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION HOLE AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION AND CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION CATCH BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION BASIN FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION FRAME AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION AND GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION GRATES TO BE SET TO BASE COURSE ASPHALT ELEVATION TO BE SET TO BASE COURSE ASPHALT ELEVATION TO BE SET TO BASE COURSE ASPHALT ELEVATION BE SET TO BASE COURSE ASPHALT ELEVATION BE SET TO BASE COURSE ASPHALT ELEVATION SET TO BASE COURSE ASPHALT ELEVATION SET TO BASE COURSE ASPHALT ELEVATION TO BASE COURSE ASPHALT ELEVATION TO BASE COURSE ASPHALT ELEVATION BASE COURSE ASPHALT ELEVATION BASE COURSE ASPHALT ELEVATION COURSE ASPHALT ELEVATION COURSE ASPHALT ELEVATION ASPHALT ELEVATION ASPHALT ELEVATION ELEVATION ELEVATION AND RAISED PRIOR TO THE PLACEMENT OF SURFACE COURSE ASPHALT. AK. REMOVE AND DISPOSE ORGANIC MATERIAL WITHIN THE EXISTING RIGHT OF WAY AND/OR AS REQUIRED TO COMPLETE THE WORK. REMOVE AND DISPOSE ORGANIC MATERIAL WITHIN THE EXISTING RIGHT OF WAY AND/OR AS REQUIRED TO COMPLETE THE WORK. AL. ALL SIGNAGE MUST COMPLY WITH THE TOWN OF COLLINGWOOD'S SIGN BY-LAW AND A SIGN PERMIT IS REQUIRED. ALL SIGNAGE MUST COMPLY WITH THE TOWN OF COLLINGWOOD'S SIGN BY-LAW AND A SIGN PERMIT IS REQUIRED. 2. ROADS ROADS A. JOINTS WITH EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK JOINTS WITH EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK WITH EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK WITH EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK EXISTING ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK ASPHALT TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK TO BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK BE SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK SAW CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK CUT STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK STRAIGHT AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK AS DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK DIRECTED BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK BY ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK ENGINEER PRIOR TO PLACING NEW ASPHALT AND TACK PRIOR TO PLACING NEW ASPHALT AND TACK PRIOR TO PLACING NEW ASPHALT AND TACK TO PLACING NEW ASPHALT AND TACK TO PLACING NEW ASPHALT AND TACK PLACING NEW ASPHALT AND TACK PLACING NEW ASPHALT AND TACK NEW ASPHALT AND TACK NEW ASPHALT AND TACK ASPHALT AND TACK ASPHALT AND TACK AND TACK AND TACK TACK TACK COAT APPLIED TO EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP APPLIED TO EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP APPLIED TO EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP TO EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP TO EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP EXISTING ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP ASPHALT. WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP WHERE EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP EXISTING ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP ASPHALT IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP IS THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP THICKER THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP THAN 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP 75 mm, A 350 mm WIDE BY 40 mm DEEP LAP mm, A 350 mm WIDE BY 40 mm DEEP LAP mm, A 350 mm WIDE BY 40 mm DEEP LAP A 350 mm WIDE BY 40 mm DEEP LAP A 350 mm WIDE BY 40 mm DEEP LAP 350 mm WIDE BY 40 mm DEEP LAP 350 mm WIDE BY 40 mm DEEP LAP mm WIDE BY 40 mm DEEP LAP mm WIDE BY 40 mm DEEP LAP WIDE BY 40 mm DEEP LAP WIDE BY 40 mm DEEP LAP BY 40 mm DEEP LAP BY 40 mm DEEP LAP 40 mm DEEP LAP 40 mm DEEP LAP mm DEEP LAP mm DEEP LAP DEEP LAP DEEP LAP LAP LAP JOINT SHALL BE GROUND INTO EXISTING ASPHALT, OTHERWISE A BUTT JOINT SHALL BE USED. B. TACK COAT TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE TACK COAT TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE COAT TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE COAT TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE TO BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE BE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE APPLIED TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE TO ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE ENTIRE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE SURFACE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE OF BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE BASE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE ASPHALT AT THE TIME OF PLACEMENT OF SURFACE COURSE AT THE TIME OF PLACEMENT OF SURFACE COURSE AT THE TIME OF PLACEMENT OF SURFACE COURSE THE TIME OF PLACEMENT OF SURFACE COURSE THE TIME OF PLACEMENT OF SURFACE COURSE TIME OF PLACEMENT OF SURFACE COURSE TIME OF PLACEMENT OF SURFACE COURSE OF PLACEMENT OF SURFACE COURSE OF PLACEMENT OF SURFACE COURSE PLACEMENT OF SURFACE COURSE PLACEMENT OF SURFACE COURSE OF SURFACE COURSE OF SURFACE COURSE SURFACE COURSE SURFACE COURSE COURSE COURSE ASPHALT. APPLICATION RATE SHALL BE 0.35 kg/m². C. SUBGRADE AND BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD SUBGRADE AND BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD AND BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD AND BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD BOULEVARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD MATERIAL TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD TO BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD BE COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD COMPACTED TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD TO A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD A MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD MINIMUM DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD DRY DENSITY OF 95% OF THE MATERIAL'S STANDARD DENSITY OF 95% OF THE MATERIAL'S STANDARD DENSITY OF 95% OF THE MATERIAL'S STANDARD OF 95% OF THE MATERIAL'S STANDARD OF 95% OF THE MATERIAL'S STANDARD 95% OF THE MATERIAL'S STANDARD 95% OF THE MATERIAL'S STANDARD OF THE MATERIAL'S STANDARD OF THE MATERIAL'S STANDARD THE MATERIAL'S STANDARD THE MATERIAL'S STANDARD MATERIAL'S STANDARD MATERIAL'S STANDARD STANDARD STANDARD PROCTOR MAXIMUM DRY DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL MAXIMUM DRY DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL MAXIMUM DRY DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL DRY DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL DRY DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL DENSITY (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL (SPMDD). SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL SUBGRADE TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL TO BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL BE PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL PROOF ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL ROLLED, INSPECTED AND CERTIFIED BY A GEOTECHNICAL INSPECTED AND CERTIFIED BY A GEOTECHNICAL INSPECTED AND CERTIFIED BY A GEOTECHNICAL AND CERTIFIED BY A GEOTECHNICAL AND CERTIFIED BY A GEOTECHNICAL CERTIFIED BY A GEOTECHNICAL CERTIFIED BY A GEOTECHNICAL BY A GEOTECHNICAL BY A GEOTECHNICAL A GEOTECHNICAL A GEOTECHNICAL GEOTECHNICAL GEOTECHNICAL ENGINEER PRIOR TO PLACING GRANULAR 'B'. D. ALL GRANULAR AND ASPHALT MATERIAL TO BE PLACED IN ACCORDANCE WITH OPSS.MUNI 314 AND OPSS 310. ALL GRANULAR AND ASPHALT MATERIAL TO BE PLACED IN ACCORDANCE WITH OPSS.MUNI 314 AND OPSS 310. E. 100 mm DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND 100 mm DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND mm DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND mm DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND DIA. PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND PIPE SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SUBDRAIN SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SHALL BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND BE PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND PROVIDED WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND WHERE SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND SHOWN ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND ON DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND DRAWINGS, CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND CONSTRUCTED IN ACCORDANCE WITH OPSS 405 AND IN ACCORDANCE WITH OPSS 405 AND IN ACCORDANCE WITH OPSS 405 AND ACCORDANCE WITH OPSS 405 AND ACCORDANCE WITH OPSS 405 AND WITH OPSS 405 AND WITH OPSS 405 AND OPSS 405 AND OPSS 405 AND 405 AND 405 AND AND AND OPSD 216.021, UN-WRAPPED GRANULAR 'A' EMBEDMENT. F. SUBDRAIN TO BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE SUBDRAIN TO BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE TO BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE TO BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE PERFORATED OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE OTHER THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE THAN THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE THE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE 2.0 m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE m SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE SECTION IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE IMMEDIATELY UPSTREAM OF ALL STRUCTURES WHICH SHALL BE UPSTREAM OF ALL STRUCTURES WHICH SHALL BE UPSTREAM OF ALL STRUCTURES WHICH SHALL BE OF ALL STRUCTURES WHICH SHALL BE OF ALL STRUCTURES WHICH SHALL BE ALL STRUCTURES WHICH SHALL BE ALL STRUCTURES WHICH SHALL BE STRUCTURES WHICH SHALL BE STRUCTURES WHICH SHALL BE WHICH SHALL BE WHICH SHALL BE SHALL BE SHALL BE BE BE NON-PERFORATED. G. GRANULAR 'A' AND 'B' TO BE COMPACTED TO 100% OF EACH MATERIAL'S SPMDD. GRANULAR 'A' AND 'B' TO BE COMPACTED TO 100% OF EACH MATERIAL'S SPMDD. H. ASPHALT TO BE COMPACTED TO A MINIMUM OF 92% OF THE MATERIAL'S MAXIMUM RELATIVE DENSITY. ASPHALT TO BE COMPACTED TO A MINIMUM OF 92% OF THE MATERIAL'S MAXIMUM RELATIVE DENSITY. I. CONCRETE BARRIER CURB TO OPSD 600.110 AND OPSS.MUNI 353. CONCRETE BARRIER CURB TO OPSD 600.110 AND OPSS.MUNI 353. J. CURB DEPRESSIONS AT DRIVEWAY IN ACCORDANCE WITH OPSD 350.010. CURB DEPRESSIONS AT DRIVEWAY IN ACCORDANCE WITH OPSD 350.010. K. CURB TERMINATIONS IN ACCORDANCE WITH OPSD 608.010. CURB TERMINATIONS IN ACCORDANCE WITH OPSD 608.010. L. SIDEWALKS TO OPSD 310.010, OPSD 310.030 AND OPSS 351. SUBBASE TO CONSIST OF 150 mm GRANULAR 'A'. SIDEWALKS TO OPSD 310.010, OPSD 310.030 AND OPSS 351. SUBBASE TO CONSIST OF 150 mm GRANULAR 'A'. M. REINSTATEMENT OF DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 REINSTATEMENT OF DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 OF DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 OF DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 DISTURBED AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 AREAS WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 WITHIN BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 BOULEVARDS TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 TO INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 INCLUDE A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 A MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 MINIMUM OF 150 mm OF SCREENED TOPSOIL AND NO. 1 OF 150 mm OF SCREENED TOPSOIL AND NO. 1 OF 150 mm OF SCREENED TOPSOIL AND NO. 1 150 mm OF SCREENED TOPSOIL AND NO. 1 150 mm OF SCREENED TOPSOIL AND NO. 1 mm OF SCREENED TOPSOIL AND NO. 1 mm OF SCREENED TOPSOIL AND NO. 1 OF SCREENED TOPSOIL AND NO. 1 OF SCREENED TOPSOIL AND NO. 1 SCREENED TOPSOIL AND NO. 1 SCREENED TOPSOIL AND NO. 1 TOPSOIL AND NO. 1 TOPSOIL AND NO. 1 AND NO. 1 AND NO. 1 NO. 1 NO. 1 1 1 NURSERY SOD IN ACCORDANCE WITH OPSS 802 AND OPSS 803. N. REINSTATEMENT OF RAGLAN STREET TO MATCH EXISTING TYPE AND DEPTH OF ASPHALT AND GRANULAR BASE REINSTATEMENT OF RAGLAN STREET TO MATCH EXISTING TYPE AND DEPTH OF ASPHALT AND GRANULAR BASE 3. PAVEMENT MARKINGS PAVEMENT MARKINGS A. PAVEMENT MARKINGS REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED PAVEMENT MARKINGS REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED MARKINGS REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED MARKINGS REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED REQUIRE 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED 2 APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED APPLICATIONS OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED OF PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED PAINT FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED FOR NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED NEW ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED ASPHALT. THE SECOND APPLICATION SHALL NOT BE APPLIED THE SECOND APPLICATION SHALL NOT BE APPLIED THE SECOND APPLICATION SHALL NOT BE APPLIED THE SECOND APPLICATION SHALL NOT BE APPLIED SECOND APPLICATION SHALL NOT BE APPLIED SECOND APPLICATION SHALL NOT BE APPLIED APPLICATION SHALL NOT BE APPLIED APPLICATION SHALL NOT BE APPLIED SHALL NOT BE APPLIED SHALL NOT BE APPLIED NOT BE APPLIED NOT BE APPLIED BE APPLIED BE APPLIED APPLIED APPLIED UNTIL THE FIRST IS TACK FREE. B. PAVEMENT MARKINGS SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY PAVEMENT MARKINGS SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY MARKINGS SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY MARKINGS SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY SHALL ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY ONLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY BE APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY APPLIED WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY WHEN TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY TEMPERATURE IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY IS ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY ABOVE 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY 10 DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY DEGREES CELSIUS, THE PAVEMENT IS PERFECTLY CELSIUS, THE PAVEMENT IS PERFECTLY CELSIUS, THE PAVEMENT IS PERFECTLY THE PAVEMENT IS PERFECTLY THE PAVEMENT IS PERFECTLY PAVEMENT IS PERFECTLY PAVEMENT IS PERFECTLY IS PERFECTLY IS PERFECTLY PERFECTLY PERFECTLY DRY AND UPON THE AUTHORIZATION OF THE ENGINEER. C. WORK TO BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, WORK TO BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, TO BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, TO BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, BE IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, IN ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, ACCORDANCE WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, WITH OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 532, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1712, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1713 AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, AND OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, OPSS 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, 1714 AND THE ONTARIO TRAFFIC MANUAL BOOK 11, AND THE ONTARIO TRAFFIC MANUAL BOOK 11, AND THE ONTARIO TRAFFIC MANUAL BOOK 11, THE ONTARIO TRAFFIC MANUAL BOOK 11, THE ONTARIO TRAFFIC MANUAL BOOK 11, ONTARIO TRAFFIC MANUAL BOOK 11, ONTARIO TRAFFIC MANUAL BOOK 11, TRAFFIC MANUAL BOOK 11, TRAFFIC MANUAL BOOK 11, MANUAL BOOK 11, MANUAL BOOK 11, BOOK 11, BOOK 11, 11, 11, MINISTRY OF TRANSPORTATION OF ONTARIO. 4. WATERMAIN WATERMAIN A. ALL WATERMAIN AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF ALL WATERMAIN AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF WATERMAIN AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF WATERMAIN AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF AND SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF SERVICES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF BE CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF CONSTRUCTED IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF IN ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF ACCORDANCE WITH THE TOWN OF COLLINGWOOD AND TOWN OF WITH THE TOWN OF COLLINGWOOD AND TOWN OF WITH THE TOWN OF COLLINGWOOD AND TOWN OF THE TOWN OF COLLINGWOOD AND TOWN OF THE TOWN OF COLLINGWOOD AND TOWN OF TOWN OF COLLINGWOOD AND TOWN OF TOWN OF COLLINGWOOD AND TOWN OF OF COLLINGWOOD AND TOWN OF OF COLLINGWOOD AND TOWN OF COLLINGWOOD AND TOWN OF COLLINGWOOD AND TOWN OF AND TOWN OF AND TOWN OF TOWN OF TOWN OF OF OF COLLINGWOOD WATER DEPARTMENT STANDARDS. B. THRUST PROTECTION TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE THRUST PROTECTION TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE PROTECTION TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE PROTECTION TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE TO BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE BE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE PROVIDED BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE BY THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE THE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE USE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE OF RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE RESTRAINING GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE GLANDS RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE RESTRAINT SYSTEM TO BE INSTALLED IN ACCORDANCE SYSTEM TO BE INSTALLED IN ACCORDANCE SYSTEM TO BE INSTALLED IN ACCORDANCE TO BE INSTALLED IN ACCORDANCE TO BE INSTALLED IN ACCORDANCE BE INSTALLED IN ACCORDANCE BE INSTALLED IN ACCORDANCE INSTALLED IN ACCORDANCE INSTALLED IN ACCORDANCE IN ACCORDANCE IN ACCORDANCE ACCORDANCE ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. C. CLEARANCE BETWEEN WATERMAINS AND SEWERS TO BE A MINIMUM OF 0.50 m VERTICAL OR 2.5 m HORIZONTAL. CLEARANCE BETWEEN WATERMAINS AND SEWERS TO BE A MINIMUM OF 0.50 m VERTICAL OR 2.5 m HORIZONTAL. D. CONTRACTOR SHALL PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, CONTRACTOR SHALL PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, SHALL PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, SHALL PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, PROVIDE CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, CATHODIC PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, PROTECTION ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, ON THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, THE WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, WATER DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, DISTRIBUTION SYSTEM. IN DETERMINING THE MODE OF PROTECTION, SYSTEM. IN DETERMINING THE MODE OF PROTECTION, SYSTEM. IN DETERMINING THE MODE OF PROTECTION, IN DETERMINING THE MODE OF PROTECTION, IN DETERMINING THE MODE OF PROTECTION, DETERMINING THE MODE OF PROTECTION, DETERMINING THE MODE OF PROTECTION, THE MODE OF PROTECTION, THE MODE OF PROTECTION, MODE OF PROTECTION, MODE OF PROTECTION, OF PROTECTION, OF PROTECTION, PROTECTION, PROTECTION, AN ELECTRICAL RESISTIVITY OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND ELECTRICAL RESISTIVITY OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND ELECTRICAL RESISTIVITY OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND RESISTIVITY OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND RESISTIVITY OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND OF 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND 4000-4500 OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND OHM-CM SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND SHOULD BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND BE USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND USED. THE CONTRACTOR SHALL PROPOSE THE METHODS AND THE CONTRACTOR SHALL PROPOSE THE METHODS AND THE CONTRACTOR SHALL PROPOSE THE METHODS AND CONTRACTOR SHALL PROPOSE THE METHODS AND CONTRACTOR SHALL PROPOSE THE METHODS AND SHALL PROPOSE THE METHODS AND SHALL PROPOSE THE METHODS AND PROPOSE THE METHODS AND PROPOSE THE METHODS AND THE METHODS AND THE METHODS AND METHODS AND METHODS AND AND AND MATERIALS TO BE USED FOR APPROVAL BY THE ENGINEER AND TOWN OF COLLINGWOOD WATER DEPARTMENT. E. TERMINATE 1.0 m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" TERMINATE 1.0 m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" 1.0 m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" 1.0 m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" m FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" FROM BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" BUILDING C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" C/W CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" CAP, 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" 25 mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" mm DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" DIA. TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" TESTING BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" BLOWOFF WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" WHICH EXTENDS 500 mm ABOVE GRADE AND A 2"x4" EXTENDS 500 mm ABOVE GRADE AND A 2"x4" EXTENDS 500 mm ABOVE GRADE AND A 2"x4" 500 mm ABOVE GRADE AND A 2"x4" 500 mm ABOVE GRADE AND A 2"x4" mm ABOVE GRADE AND A 2"x4" mm ABOVE GRADE AND A 2"x4" ABOVE GRADE AND A 2"x4" ABOVE GRADE AND A 2"x4" GRADE AND A 2"x4" GRADE AND A 2"x4" AND A 2"x4" AND A 2"x4" A 2"x4" A 2"x4" 2"x4" 2"x4" MARKER POST PAINTED BLUE. F. MINIMUM COVER ON WATERMAIN AND SERVICES TO BE 1.7 m. MINIMUM COVER ON WATERMAIN AND SERVICES TO BE 1.7 m. G. ALL GATE VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS ALL GATE VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS GATE VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS GATE VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS VALVES, BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS BENDS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS AND FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS FITTINGS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS TO BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS BE CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS CONNECTED WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS WITH RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS RESTRAINING GLANDS (REGARDLESS IF THRUST PROTECTION IS GLANDS (REGARDLESS IF THRUST PROTECTION IS GLANDS (REGARDLESS IF THRUST PROTECTION IS (REGARDLESS IF THRUST PROTECTION IS (REGARDLESS IF THRUST PROTECTION IS IF THRUST PROTECTION IS IF THRUST PROTECTION IS THRUST PROTECTION IS THRUST PROTECTION IS PROTECTION IS PROTECTION IS IS IS REQUIRED). H. FOLLOWING TESTING, CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE FOLLOWING TESTING, CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE TESTING, CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE TESTING, CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE CONTRACTOR SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE SHALL OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE OPERATE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE WATER SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE SERVICE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE TO VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE VERIFY FULL FLOW AND PRESSURE AT THE CURB STOP TO THE FULL FLOW AND PRESSURE AT THE CURB STOP TO THE FULL FLOW AND PRESSURE AT THE CURB STOP TO THE FLOW AND PRESSURE AT THE CURB STOP TO THE FLOW AND PRESSURE AT THE CURB STOP TO THE AND PRESSURE AT THE CURB STOP TO THE AND PRESSURE AT THE CURB STOP TO THE PRESSURE AT THE CURB STOP TO THE PRESSURE AT THE CURB STOP TO THE AT THE CURB STOP TO THE AT THE CURB STOP TO THE THE CURB STOP TO THE THE CURB STOP TO THE CURB STOP TO THE CURB STOP TO THE STOP TO THE STOP TO THE TO THE TO THE THE THE SATISFACTION OF THE ENGINEER. I. GENERAL INSTALLATION AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN GENERAL INSTALLATION AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN INSTALLATION AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN INSTALLATION AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN AND TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN TESTING OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN OF WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN WATERMAIN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN TO BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN BE IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN IN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN ACCORDANCE WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN WITH OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN OPSS.MUNI 421, OPSS.MUNI 701 AND TOWN 421, OPSS.MUNI 701 AND TOWN 421, OPSS.MUNI 701 AND TOWN OPSS.MUNI 701 AND TOWN OPSS.MUNI 701 AND TOWN 701 AND TOWN 701 AND TOWN AND TOWN AND TOWN TOWN TOWN SPECIFICATIONS. ALL WATERMAINS ARE TO BE SWABBED BY THE CONTRACTOR. ALL WATERMAINS ARE TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO WATERMAINS ARE TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO WATERMAINS ARE TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO ARE TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO ARE TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO BE PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO PRESSURE TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO TESTED BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO BY THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO THE CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO CONTRACTOR, WITH A COPY OF THE PRESSURE TEST REPORT SENT TO WITH A COPY OF THE PRESSURE TEST REPORT SENT TO WITH A COPY OF THE PRESSURE TEST REPORT SENT TO A COPY OF THE PRESSURE TEST REPORT SENT TO A COPY OF THE PRESSURE TEST REPORT SENT TO COPY OF THE PRESSURE TEST REPORT SENT TO COPY OF THE PRESSURE TEST REPORT SENT TO OF THE PRESSURE TEST REPORT SENT TO OF THE PRESSURE TEST REPORT SENT TO THE PRESSURE TEST REPORT SENT TO THE PRESSURE TEST REPORT SENT TO PRESSURE TEST REPORT SENT TO PRESSURE TEST REPORT SENT TO TEST REPORT SENT TO TEST REPORT SENT TO REPORT SENT TO REPORT SENT TO SENT TO SENT TO TO TO THE THE TOWN OF COLLINGWOOD WATER DEPARTMENT. TOWN OF COLLINGWOOD WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE OF COLLINGWOOD WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE OF COLLINGWOOD WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE COLLINGWOOD WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE COLLINGWOOD WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WATER DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE DEPARTMENT WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WILL PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE PERFORM WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE WATERMAIN DISINFECTION AND MICROBIOLOGICAL TESTING AT THE DISINFECTION AND MICROBIOLOGICAL TESTING AT THE DISINFECTION AND MICROBIOLOGICAL TESTING AT THE AND MICROBIOLOGICAL TESTING AT THE AND MICROBIOLOGICAL TESTING AT THE MICROBIOLOGICAL TESTING AT THE MICROBIOLOGICAL TESTING AT THE TESTING AT THE TESTING AT THE AT THE AT THE THE THE DEVELOPER'S EXPENSE. WATERMAINS ARE NOT TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY ARE NOT TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY ARE NOT TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY NOT TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY NOT TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY TO BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY BE CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY CONNECTED TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY TO THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY THE EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY EXISTING WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY WATERMAIN UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY UNTIL BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY BACTERIOLOGICAL TESTING HAS BEEN SUCCESSFULLY TESTING HAS BEEN SUCCESSFULLY TESTING HAS BEEN SUCCESSFULLY HAS BEEN SUCCESSFULLY HAS BEEN SUCCESSFULLY BEEN SUCCESSFULLY BEEN SUCCESSFULLY SUCCESSFULLY SUCCESSFULLY PASSED. ALL CONNECTIONS TO THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY CONNECTIONS TO THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY CONNECTIONS TO THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TO THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TO THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY THE TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TOWN WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY WATER SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY SYSTEM ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY ARE TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TO BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY BE INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY INSTALLED BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY THE TOWN OF COLLINGWOOD WATER DEPARTMENT BY TOWN OF COLLINGWOOD WATER DEPARTMENT BY TOWN OF COLLINGWOOD WATER DEPARTMENT BY OF COLLINGWOOD WATER DEPARTMENT BY OF COLLINGWOOD WATER DEPARTMENT BY COLLINGWOOD WATER DEPARTMENT BY COLLINGWOOD WATER DEPARTMENT BY WATER DEPARTMENT BY WATER DEPARTMENT BY DEPARTMENT BY DEPARTMENT BY BY BY LIVE TAP, AT THE DEVELOPER'S EXPENSE. TOWN OF COLLINGWOOD WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. OF COLLINGWOOD WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. OF COLLINGWOOD WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. COLLINGWOOD WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. COLLINGWOOD WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. WATER DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. DEPARTMENT TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. TO RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. RECEIVE AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. AT LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. LEAST 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. 48 HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. HOURS NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. NOTICE OF TESTING, FLUSHING, CHLORINATION, ETC. OF TESTING, FLUSHING, CHLORINATION, ETC. OF TESTING, FLUSHING, CHLORINATION, ETC. TESTING, FLUSHING, CHLORINATION, ETC. TESTING, FLUSHING, CHLORINATION, ETC. FLUSHING, CHLORINATION, ETC. FLUSHING, CHLORINATION, ETC. CHLORINATION, ETC. CHLORINATION, ETC. ETC. ETC. OF THE WATERMAINS. THE WATER AND LABOUR USED IN THE TESTING OF THE WATERMAINS WILL BE RECORDED AND BILLED TO THE CONTRACTOR. J. EACH PROPERTY SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED EACH PROPERTY SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED PROPERTY SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED PROPERTY SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SHALL HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED HAVE ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED ONE SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SERVICE AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED AND ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED ONE METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED METER (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED (FIRE SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED SERVICE IS NOT METERED). ADDITIONAL METERS CAN BE ADDED IS NOT METERED). ADDITIONAL METERS CAN BE ADDED IS NOT METERED). ADDITIONAL METERS CAN BE ADDED NOT METERED). ADDITIONAL METERS CAN BE ADDED NOT METERED). ADDITIONAL METERS CAN BE ADDED METERED). ADDITIONAL METERS CAN BE ADDED METERED). ADDITIONAL METERS CAN BE ADDED ADDITIONAL METERS CAN BE ADDED ADDITIONAL METERS CAN BE ADDED METERS CAN BE ADDED METERS CAN BE ADDED CAN BE ADDED CAN BE ADDED BE ADDED BE ADDED ADDED ADDED INTERNALLY TO MEASURE THE WATER USE FOR EACH UNIT. K. BACKFLOW PREVENTION DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A BACKFLOW PREVENTION DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A PREVENTION DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A PREVENTION DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A DEVICES PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A PER OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A OBC AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A AND THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A THE TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A TOWN'S WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A WATER BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A BYLAW TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A TO BE PROVIDED INTERNAL TO THE BUILDING. IT IS A BE PROVIDED INTERNAL TO THE BUILDING. IT IS A BE PROVIDED INTERNAL TO THE BUILDING. IT IS A PROVIDED INTERNAL TO THE BUILDING. IT IS A PROVIDED INTERNAL TO THE BUILDING. IT IS A INTERNAL TO THE BUILDING. IT IS A INTERNAL TO THE BUILDING. IT IS A TO THE BUILDING. IT IS A TO THE BUILDING. IT IS A THE BUILDING. IT IS A THE BUILDING. IT IS A BUILDING. IT IS A BUILDING. IT IS A IT IS A IT IS A IS A IS A A A REQUIREMENT THESE DEVICES BE TESTED AND CERTIFIED ANNUALLY. E. STORM SEWER STORM SEWER A. MAINTENANCE HOLES TO OPSD 701.010 MAINTENANCE HOLES TO OPSD 701.010 B. CATCHBASIN MANHOLES FRAMES AND COVERS PER OPSD 400.020. CATCHBASIN MANHOLES FRAMES AND COVERS PER OPSD 400.020. C. STORM SEWER SHALL BE CCTV INSPECTED. STORM SEWER SHALL BE CCTV INSPECTED. D. UNDERGROUND STORAGE SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, UNDERGROUND STORAGE SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, STORAGE SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, STORAGE SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, SYSTEM - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, - CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, CULTEC RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, RECHARGER HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, HEAVY DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, DUTY 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, 150XLHD CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, CHAMBERS, CULTEC HVLV FC-24 FEED CONNECTORS, CULTEC HVLV FC-24 FEED CONNECTORS, CULTEC HVLV FC-24 FEED CONNECTORS, HVLV FC-24 FEED CONNECTORS, HVLV FC-24 FEED CONNECTORS, FC-24 FEED CONNECTORS, FC-24 FEED CONNECTORS, FEED CONNECTORS, FEED CONNECTORS, CONNECTORS, CONNECTORS, CULTEC NO. 20L POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NO. 20L POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NO. 20L POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH 20L POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH 20L POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH POLYETHYLENE LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH LINER, CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH CULTEC NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NO. 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH 410 NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH NON-WOVEN GEOTEXTILE - INSTALLED IN ACCORDANCE WITH GEOTEXTILE - INSTALLED IN ACCORDANCE WITH GEOTEXTILE - INSTALLED IN ACCORDANCE WITH - INSTALLED IN ACCORDANCE WITH - INSTALLED IN ACCORDANCE WITH INSTALLED IN ACCORDANCE WITH INSTALLED IN ACCORDANCE WITH IN ACCORDANCE WITH IN ACCORDANCE WITH ACCORDANCE WITH ACCORDANCE WITH WITH WITH MANUFACTURER'S INSTRUCTIONS AND SPECIFICATIONS. 6. SANITARY SEWERS SANITARY SEWERS A. PRECAST MAINTENANCE HOLES SHALL BE IN ACCORDANCE WITH OPSD 701.010 C/W BENCHING TO OPSD 701.021. PRECAST MAINTENANCE HOLES SHALL BE IN ACCORDANCE WITH OPSD 701.010 C/W BENCHING TO OPSD 701.021. B. FRAMES AND GRATES TO OPSD 401.010 (TYPE 'A'), CLOSED COVER. FRAMES AND GRATES TO OPSD 401.010 (TYPE 'A'), CLOSED COVER. C. SANITARY SERVICE TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED SANITARY SERVICE TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED SERVICE TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED SERVICE TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED TO TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED TERMINATE 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED 1.0 m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED m FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED FROM THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED THE BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED BUILDING WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED WITH WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED WATERTIGHT CAP AND 38 mm x 89 mm MARKER POST PAINTED CAP AND 38 mm x 89 mm MARKER POST PAINTED CAP AND 38 mm x 89 mm MARKER POST PAINTED AND 38 mm x 89 mm MARKER POST PAINTED AND 38 mm x 89 mm MARKER POST PAINTED 38 mm x 89 mm MARKER POST PAINTED 38 mm x 89 mm MARKER POST PAINTED mm x 89 mm MARKER POST PAINTED mm x 89 mm MARKER POST PAINTED x 89 mm MARKER POST PAINTED x 89 mm MARKER POST PAINTED 89 mm MARKER POST PAINTED 89 mm MARKER POST PAINTED mm MARKER POST PAINTED mm MARKER POST PAINTED MARKER POST PAINTED MARKER POST PAINTED POST PAINTED POST PAINTED PAINTED PAINTED GREEN. D. RADIUS BENDS TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER RADIUS BENDS TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER BENDS TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER BENDS TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER TO BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER BE USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER USED ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ON ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ALL SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER CONNECTIONS WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER WHERE THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER THE ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER ANGLE OF CONNECTION BETWEEN THE SERVICE AND SEWER OF CONNECTION BETWEEN THE SERVICE AND SEWER OF CONNECTION BETWEEN THE SERVICE AND SEWER CONNECTION BETWEEN THE SERVICE AND SEWER CONNECTION BETWEEN THE SERVICE AND SEWER BETWEEN THE SERVICE AND SEWER BETWEEN THE SERVICE AND SEWER THE SERVICE AND SEWER THE SERVICE AND SEWER SERVICE AND SEWER SERVICE AND SEWER AND SEWER AND SEWER SEWER SEWER EXCEEDS 90°.E. KOR-N-SEAL GASKETS TO BE USED AT ALL MAINTENANCE HOLE CONNECTIONS. KOR-N-SEAL GASKETS TO BE USED AT ALL MAINTENANCE HOLE CONNECTIONS. 7. MATERIALS MATERIALS A. SANITARY SERVICES - SDR 35 PVC, COLOUR GREEN. SANITARY SERVICES - SDR 35 PVC, COLOUR GREEN. B. WATERMAIN - DUCTILE IRON CLASS 52, CONDUCTIVITY CONNECTORS TO BE USED ON ALL JOINTS. WATERMAIN - DUCTILE IRON CLASS 52, CONDUCTIVITY CONNECTORS TO BE USED ON ALL JOINTS. C. VALVES - RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE VALVES - RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE - RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE - RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE RESILIENT SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE SEATED, RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE RSGV, MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE MECHANICAL JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE JOINT, OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE OPEN LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE LEFT CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE CLOW OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE OR MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE MUELLER WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE WITH 5 SL-48 SLIDING VALVE BOX. PROVIDE 5 SL-48 SLIDING VALVE BOX. PROVIDE 5 SL-48 SLIDING VALVE BOX. PROVIDE SL-48 SLIDING VALVE BOX. PROVIDE SL-48 SLIDING VALVE BOX. PROVIDE SLIDING VALVE BOX. PROVIDE SLIDING VALVE BOX. PROVIDE VALVE BOX. PROVIDE VALVE BOX. PROVIDE BOX. PROVIDE BOX. PROVIDE PROVIDE PROVIDE PROVIDE VALVE STEM EXTENSIONS WHERE WATERMAIN EXCEEDS 1.7m DEPTH. D. MECHANICAL JOINT DUCTILE FITTINGS - AWWA/ANSI C153/A21.53. MECHANICAL JOINT DUCTILE FITTINGS - AWWA/ANSI C153/A21.53. E. RESTRAINT SYSTEM - ROMAC GRIPPING FOR JOINT RESTRAINTS, ROMAC 600 SERIES FOR BELL RESTRAINTS. RESTRAINT SYSTEM - ROMAC GRIPPING FOR JOINT RESTRAINTS, ROMAC 600 SERIES FOR BELL RESTRAINTS. F. LIVE TAP SADDLES - EPOXY COATED WITH STAINLESS STEEL BOLTS. LIVE TAP SADDLES - EPOXY COATED WITH STAINLESS STEEL BOLTS. G. LIVE TAP VALVE - RESILIENT SEATED RSGV, LIVE TAP VALVE, OPEN LEFT MUELLER. LIVE TAP VALVE - RESILIENT SEATED RSGV, LIVE TAP VALVE, OPEN LEFT MUELLER. H. FILTER FABRIC - TERRAFIX 270R OR APPROVED EQUAL. FILTER FABRIC - TERRAFIX 270R OR APPROVED EQUAL. I. SUBDRAINS - PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SUBDRAINS - PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR - PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR - PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR PERFORATED BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR BIG 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR 'O' SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SUBDRAIN OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SOLID BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR BIG 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR 'O' SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SUBDRAIN (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR (AS SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR SPECIFIED) WITH GEOTEXTILE FILTER SOCK OR WITH GEOTEXTILE FILTER SOCK OR WITH GEOTEXTILE FILTER SOCK OR GEOTEXTILE FILTER SOCK OR GEOTEXTILE FILTER SOCK OR FILTER SOCK OR FILTER SOCK OR SOCK OR SOCK OR OR OR APPROVED EQUAL. J. STORM SEWER - HDPE OPEN PROFILE BELL & SPIGOT (BOSS 2000 AND MIN. PIPE STIFFNESS = 320 kPa). STORM SEWER - HDPE OPEN PROFILE BELL & SPIGOT (BOSS 2000 AND MIN. PIPE STIFFNESS = 320 kPa). K. OIL GRIT SEPARATOR - HYDRO FIRST DEFENSE FD-4HC OIL GRIT SEPARATOR - HYDRO FIRST DEFENSE FD-4HC L. ALL SPECIFIED AGGREGATES TO OPSS.MUNI. 1010. ALL SPECIFIED AGGREGATES TO OPSS.MUNI. 1010. M. INSULATION - STYROFOAM HIGHLOAD 40 EXTRUDED POLYSTYRENE FOAM INSULATION, 50mm THICK SHEETS.INSULATION - STYROFOAM HIGHLOAD 40 EXTRUDED POLYSTYRENE FOAM INSULATION, 50mm THICK SHEETS.