Page 1: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

MEPRS Early Warning and Control System

(MEWACS) Online 2010 and the

Consolidated Cost Report (CCR)

MEPRS 2010TMA MEPRS Program Office

Management Control and Financial Studies Division

Page 2: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

MEWACS Online2010

Overview

Page 3: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Highlights of the MEWACS upgrade include:

* FTE and salary snapshots by Skill Type* Visibility of step-down expenses before allocation* Addition of Dental Weighted Procedures and OBD to MTF Data Profiles* Identification of data inconsistencies where workload is reported without expenses* Flexibility to see FTEs and salaries before or after cost pool purification* Expanded help features

Page 4: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Two New metrics:Personnel Profiles

Workload-Expense Check

Page 5: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Though the format is fresh, the basic concept of condition selection has not changed.

Page 6: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Check for notes detailing issues

that affect all MTFs.

Page 7: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

For best results, Save first and

then Open.

Page 8: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Two new data elements:Occupied Bed Days

Dental Weighted Procedures

Page 9: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control
Page 10: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Data are visible by Skill Type and by Pre- or Post-

purification.

Graphs can be copied for use in

documents.

Page 11: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

All of these instances are from the same

clinic BGAB.

For more help, consult the

Users Guide.

Page 12: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

MEWACS Online2010

Scenario

Page 13: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Using your own MTF, check for data anomalies in:

* Data Load Status* Summary Outliers* MTF Data Profiles – Use multiple select on FY to see if data behavior is seasonal* WWR/EAS IV Outliers* Allocation Test/Detail* Personnel Profiles* Workload-Expense Check

Page 14: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

FY10 CCR

Overview

Page 15: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

FY10 Consol i dated Cost Report (CCR)

Executive Summary

External Resources

Data SourcesNotes and

Documentation

Prepared by:TMA/ MEPRS Program Offi cePOC: Mr. Patr i ck Wesl ey Patr i ck. Wesl ey@tma. osd. mi l

An i nteract i ve Servi ce- speci fi c monthl y MEPRS data snapshot by Mi l i tary Treatment Faci l ty, Fi scal Month, and 4th- Level Funct i onal Cost Code i ncorporat i ng automated vari ance detect i on to f aci l i tate data qual i ty

eval uat i on, expense and workl oad val i dat i on, and monthl y l ocal MEPRS data management.

Versi on:Prototype V7May 2010

Ai r Force

Cl i ck Here to Access CCR

Page 16: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

CCR Highlights include:

* Executive Summary * Detailed direct and Indirect expenses by Parent MTF, FM, and FCC4* Multi-stage outlier flagging methodology: - Negative Expenses - Expenses with no workload - Indirect expenses remaining after step-down - Application of Pareto principle (80 – 20 rule) to indicate which values to

evaluate for outliers.

Page 17: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control
Page 18: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Direct Expenses have been split into

two categories

Costpools are included in the Direct expense

Page 19: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

All FCCs are

available for review

Page 20: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

FY09 Data as baseline for FY10

FY09 data that drives FY10 flags

are highlighted

Page 21: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Scenario

FY10 CCR

Page 22: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Using your own MTF:

* Look for Total Expense anomalies in MEWACS. If your site has no anomalies, use 0043 Tyndall (AF) or 0056 Great Lakes (Navy)* Go to CCR in the appropriate month and 1st Level FCC* Evaluate instances of negative expenses* Evaluate instances of expenses with no workload* Evaluate instances of workload with no expenses* Evaluate other outliers

Page 23: MEPRS Early Warning and Control System (MEWACS) Online 2010 and the Consolidated Cost Report (CCR) MEPRS 2010 TMA MEPRS Program Office Management Control

Questions?Deirdre Baker

[email protected]

MEPRS Early Warning and Control System

(MEWACS) Online 2010 and the

Consolidated Cost Report (CCR)