24 th June 2015 Metropolitan Update on Gas Drainage Operations Peter Jandzio Gas Drainage Superintendent

Upload: others

Post on 09-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

24th June 2015

Metropolitan Update on Gas

Drainage Operations

Peter Jandzio

Gas Drainage Superintendent

Page 2: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Agenda

● Overview of Mine

● Mine plan and Seam overview

● Drilling Equipment Used

● Gas Drainage Process

● Challenges

● Further Work and Projects

2

Page 3: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

SydneyLiverpool

Camden

NRoyal Nat.

Park

Cambelltown

Macarthur

AppinTower

Picton

Tahmoor

DendrobiumMittagong

Elouera

Cordeaux

Bellpac

West Cliff

NepeanRes.

Wollongong

Port KemblaCoal Loader &Steelworks

S o u t h

P a c i f i c O c e a n

Metropolitan

Helensburgh

Avon

WoronoraRes.

0 20 km10

Washery

Proposedopen cut mine

Proposedunderground mine

Open cut mine

Railway

Main Road

Urban areas

Other collieries

Underground mine

w

Water reservoir

SOUTHERN COALFIELD

Location of

Metropolitan Colliery

Page 4: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Since being sold by BHP in 1988 the mine has passed through 5 small

mining operators. With limited capital available the mine has been in

‘survival’ mode, unable to address a number of key limitations this has

contributed to some of the restraints we have today.

Peabody acquired Metropolitan in 2006 when it recognised the

potential of the operation and have owned the mine since.

In 2015 Metropolitan Mine turned 126 years old. It has a long and

proud mining history.

This history unfortunately incudes outburst incidents both fatal and

non fatal. It is this history which has shaped the way Metropolitan has

evolved to safely mine coal in an outburst prone seam – ’The Bulli

Seam’.

Metropolitan History

Page 5: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Mine Plan

Currently Mining

• LW 24 (Longwall)

• MG25 (Dev 1)

• 300 Mains (Dev 2 and 3)

Page 6: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Gas Drainage Equipment

– 3 x Boart Longyear drill rigs

– DGS survey system

– 3 x Supavac units – Fines dewatering

– Fish tanks

– Fines pods

– Spa baths

– Gas / water separators

– Composite standpipes

– Pumps

– Pro Ram

– Various hoses and fittings

Page 7: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Gas reticulation

● Metropolitan does not operate a gas drainage vacuum plant, this can be both beneficial and challenging – Benefit of a less complicated system

– Challenge of maintaining and balancing gas flow around the mine – Force / Suction System with a moving operating point depending on drainage sites

● Gas drainage ranges used – 18” steel range in mains – Main arteries

– 12” steel ranges in gate roads – Capillaries

– 4” hosing and jewellery used on holes

● 2 x driving forces for drainage – Vented to bottom of upcast shaft – Suction

– Seam gas pressure – Forcing

7

Page 8: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Metropolitan Bulli Seam Characteristics

● Change in composition from Methane to Carbon Dioxide

– Longer drainage lead times

– Drainage effectiveness sensitive to cleat direction

● Predominant geological structure – strike slip faulting

● Current area content and composition ranges:

– 12 m3/t - 25 m3/t

– Typically around 15 m3/t

– Some passes have also been obtained in some virgin areas

– Generally 95+% CO2

8

Page 9: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Metropolitans Gas Drainage Process

9

• Preliminary Gas Drainage Design Based on Mine plan requirements Design

• Take an initial core for a representative sample of area to be drained Gather Data

• Review preliminary drainage pattern against time restraints from mine schedule and develop revised drainage plan if required Review

• Drill holes for drainage Implement

• Monitor flows from holes, calculate gas reservoir, extrapolate required drainage time

• Maintenance of gas ranges to maximise efficiency Monitor / Maintain

• Implement a coring regime which aligns with the outburst control plan

• Closing the grid to identify missed structures Verify Effectiveness

• Review data and authorise a permit to mine

• ORC to review all data against compliance with the mines Control Plan Review / Authorise

• Gathering data and Monitoring mining conditions as mining advances – Check and Act Mine Coal

Outb

urs

t C

ontr

ol P

lan

Page 10: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Design

● Initial design covers requirements of developing roadways and LW block drainage.

● Any Known geological features

● Design includes location to be drilled from and services available etc

● Favourable drainage hole direction

● Generally aim for 20m hole spacing initially

● Where possible drill across 2 blocks due to short LW face width

● Saves setup time and can increase drainage time for adjacent panels

● Each site is also used as an in situ permeability test and previous success drives future patterns

10

Page 11: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Gather Data

● First hole and core location is

determined by Gas Drainage

Superintendent and Mine

Manager to determine best

location for a representative

sample or area to be drained.

● Core is taken and analysed.

● Gas reservoir is calculated.

11

Page 12: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Review

● Simple review process (reviewed against historical

performance)

– High gas / Low Lead Time

Increase hole density

– Low gas / Long Lead Time

Decrease hole density

● Other factors around the design review are:

– Known geological features

– Any Outburst prone structures

– Reservoir volume (content)

– Lead time available to meet mine scheduling restraints

12

Page 13: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Implement

● Drilling of the revised pattern

● During the drilling process more monitoring is conducted

by the drill rig operators:

– Return water colour

– Hardness of drilling

– Size and shape of fines through returns

– Increase / Decrease of gas make

● Findings noted on drillers report and logs are review by

Gas Drainage superintendent

● Samples of cuttings are taken if required to be analysed

13

Page 14: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Monitor/Maintenance

Monitoring

● Following the completion of a hole it is connected to the gas drainage reticulation system.

● Each hole is then measured for gas flow on a regular basis – Aim is twice per week.

● Gas range gas composition is constantly monitored by tube bundle system and flow measurements are taken

● Regular gas bags taken for gas ranges to verify tube readings

● Pressure monitoring of gas range – Suction location and strength

Maintaining

● Inspections of gas drainage sites, gas drainage ranges for any damages

● Empty water along gas ranges regularly

14

Page 15: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Individual Hole Monitoring

15

Individual Standpipes

Gas Flow Reading (l/s) Estimated Trends of QT (m3/t) the first point represents the virgin core, the second point represents the first reading

A

0.0

2.0

4.0

6.0

8.0

10.0

12.0

14.0

16.0

18.0

24/10/11 13/11/11 3/12/11 23/12/11 12/1/12 1/2/12 21/2/12 12/3/12 1/4/12 21/4/12

Gas

Flo

w (

l/s)

Date of reading

0

2

4

6

8

10

12

14

16

18

14/9/11 3/11/11 23/12/11 11/2/12 1/4/12 21/5/12 10/7/12 29/8/12

QT

(m3

/s)

Date of Reading

Estimated QT

Expon. (Estimated QT)

QT limit

● Hole flow monitoring is analysed and is used as a predictive tool and is then fed back into the mine scheduling

Page 16: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Verify Effectiveness

● Once we believe the coal has been drained below threshold

levels and the area of coal needs to be mined we need to

verify that the controls implemented has been effective.

We do this by:

– Compliance coring at a maximum spacing of 60m in normal

unstructured coal

– Compliance coring within 10m of any structure identified as outburst

prone by the mines Outburst review committee, this determines the

pressure gradient across the structure and potential risk of outburst.

● A hole is also drilled which ‘closes the grid’ to prove that there

are no structures which are entering the proposed workings

parallel to previous drainage holes and have gone

undetected. 16

Page 17: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Review / Authorise

● Surveyors plot holes, core results and any other relevant information onto mine plan

● These plans are then used to authorise a block of coal to be mined safely under the PTM system

● All gathered data relating to the area is now reviewed in a PTM meeting before issuing a PTM

● The major items reviewed are:

– Location and Core results

– Location and number of boreholes

– Gas flows from the drainage sites

– Geological features within permit area

● Once satisfied that we can safely mine an area a PTM can be issued and signed off by the ORC

17

Page 18: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Mine Coal

● During the mining process the deputies and operators are constantly monitoring their work environment for change. In particular outburst indicators

● The PTM is constantly being reviewed shiftly and mining conditions monitored

● The mine operates a Outburst TARP which is based around outburst indicators

● Operators annually undergo refresher training in outburst awareness

● Geologist regularly inspects roadways mined

● Return gas monitoring system

● The PTM is the most important document in a panel and without it no mining can take place

18

Page 19: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Throughout all processes

DO

CHECK ACT

PLAN

19

Page 20: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Other checks and balances

● Monthly ORC meeting

– Review of current permit and permit limits against production

– Review of flow and gas data for all areas of the mine which are

being monitored

– Review of drilling and coring for previous month

– Identify future areas for drilling as per mine schedule

– Includes local check inspector

– Review any actions from PTM process

20

Page 21: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Current challenges

● Change in mining direction – New set of mains

– VLI engaged to drill long holes to drain the first 2 gate roads

aiming for 1800m holes

– Needs to be completed in seam as there are number of surface

constraints which eliminate surface to seam options

● Short lead times for drainage

– As little as 4 months drainage time in some areas

● Gas drainage range efficiency

– Maintaining suction at drill sites without a vacuum plant

● Limited reserve gas content definition

21

Page 22: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Challenges

● Generally use cross

block drainage, this is

not possible for the first

gate road in 300 series

– VLI engaged to drill

long holes to drain the

first 2 gate roads aiming

for 1800m holes

– Needs to be completed

in seam as there are

number of surface

constraints which limit

surface to seam options

Page 23: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

Future Projects

● Vacuum Gas Plant to improve gas reticulation efficiency

● Nitrogen Injection trial with ACARP and UOW to ‘Speed

up’ drainage time

23

Page 24: Metropolitan Update on Gas Drainage Operations...Drilling Equipment Used Gas Drainage Process Challenges Further Work and Projects 2 . ... Washery Proposed open cut mine Proposed underground

PeabodyEnergy.com AdvancedEnergyForLife.com