mice cm at cern alain blondel, march 29 -> april 1 2004 1 mice collaboration meeting at cern...

22
1 MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 MICE collaboration meeting at CERN 1. Neutrino Factory status in the commmunity 2. Some news from the approval front 3. Agenda of this meeting 4. Aims and charges

Upload: coleen-bryant

Post on 30-Dec-2015

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

1MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

MICE collaboration meeting at CERN

1. Neutrino Factory status in the commmunity

2. Some news from the approval front

3. Agenda of this meeting

4. Aims and charges

Page 2: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

2MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Neutrino Factory status in the commmunity(Europe)

There was a meeting on Neutrino Oscillations in Venice (Dec. 2003) This was not prepared by the 'ECFA/BENE' organization but by an independent team missioned by the INFN and IN2P3 managements.

The conclusions were very much in support of -- a very large underground Water Cherenkov detector in the Fréjus Tunnel(there is a franco-italian agreement to study/promote this) -- the CERN SPL (or high intensity proton driver) and beta-beams

-> study of oscillations of electron and muon (anti)neutrinos of O(500 MeV) there was a paper by L. Maiani in support of this scenario

Neutrino Factory is considered as a possible step beyond this:

1. present: CNGS programme2. next: J-PARC neutrino programme (T2K)

nuclear reactor expt. (Double-Chooz)3. Megaton Cherenkov and SPL (beta-beam)4. Neutrino Factory

Page 3: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

3MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Neutrino Factory is seen as -- more precise -- allowing experiments that are decisive in solving ambiguities o energy spectrum

o conjunction of eand eexperiments (and anti-neutrino)

which require high energy e

-- the first step towards muon colliders

Why is it not placed earlier?

my interpretation: -- seen as technologically uncertain -- seen as very expensive

Page 4: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

4MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Where will this get us…

comparison of reach in the oscillationsright to left:present limit from the CHOOZ experiment, expected sensitivity from the MINOS experiment, CNGS (OPERA+ICARUS)0.75 MW JHF to super Kamiokande with an off-axis narrow-band beam, Superbeam: 4 MW CERN-SPL to a 400 kt water Cerenkov@ Fréjus (J-PARC phase II similar)Neutrino Factory with 40 kton large magnetic detector.

0.10 10 2.50 50 130

Mezzetto

X 5

Page 5: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

5MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

NUFACTSuperbeam onlyBeta-beam only

Betabeam + superbeam

Upgrade 400kton-> 1 Mton

J-PARC HK540 kton?

3 sigma sensitivity of various options

Page 6: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

6MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Neutrino Factory studies and R&D

USA, Europe, Japan have each their scheme. Only one has been costed, US study II:

Neutrino Factory CAN be done…..but it is too expensive as is. Aim: ascertain challenges can be met + cut cost in half.

+ detector: MINOS * 10 = about 300 M€ or M$

Page 7: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

7MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Our difficulties in finding the funding are undoubtedly related to the perception of Neutrino Factory as a long term, expensive and uncertain goal.

Yet, the physics case is as strong as ever… and the progress in the R&D is remarkable.

=> we must keep insisting on the physics virtues of muon storage rings, and perform the R&D that will bring the technology closer to reality.

Page 8: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

8MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

some NEWS from the approval front (more will be summarized in the collaboration board meeeting)

-- UK Gateway 1 will be passed with ambre light (red on funding) Not official yet

-- US funding review will be April 12-13. "However, that has now been changed and we are aiming for sometime in May 10-28."

-- CH exceptional funding request was submitted in october 2003… positive review but negative outcome in march 2004 .. will go into regular funding at lower level. (more in september 2004)

-- EU design study proposal (Rob Edgecock et al) will be submitted in february 2005 -- will include MICE request

-- Italian funding request refused in 2003. RAL management will visit INFN management as soon as Gateway 1 is official

main stumbling block as I see it: funding for the spectrometer solenoids

Page 9: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

9MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

- STEP I: spring 2006

STEP II: summer 2006

STEP III: winter 2007

STEP IV: spring 2007

STEP V: fall 2007

STEP VI: 2008

Page 10: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

10MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

MICE collaboration meeting 29 March -- April 2 2004

some aims as defined in RAL oct. 2003

-- internal safety review to be passed (and was passed, congratulations!) answer committees questions and address remaining issues (other absorbers, heat load, etc.)

-- clarify RF power source scenario

-- establish costs and WBS of experiment --> rebaseline beam cryocoolers detector shielding design particle ID system aim is to eliminate double counting of contingency, sharpen the cost estimates and reduce them if possible (while keeping the experiments ambitions) -- progress on the validation of tracker (number of photons, efficiency, dead channels?)

-- begin study of needs in controls and monitoring with help from simulations and design team

Page 11: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

11MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Monday 9:30 Plenary (AB auditorium) 13:30 AFCWG (AB auditorium) 13:30 Tracker (17-1-007) technical board meeting (17-1-007)

Tuesday 9:00-12:00 beamline (AB auditorium) 10:45 Alignment and tolerances (17-1-007) 13:30 PID (AB auditorium) 13:30 RF (304-1-001A) (with phone connection) Wednesday 9:00 simulations (32-1-A 24) 9:00 magnets and integration (AB auditorium) 13:30 Plenary: reports from wroking groups 17:30 Collaboration board meeting (room 304-1-001A) 19:30 buses will wait in front of building 33 collaboration dinner Thursday 9:00 PLENARY (AB auditorium) in particular discussion on controls and monitoring

52 have registered (a record! )

Page 12: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

12MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

MICE Collaboration Board Agenda  CERN March 31 17:30 AB auditorium unless phone connection requested.  1. Approval of the Minutes of the last meeting 2. Spokesman’s Remarks

Executive Board Report 3. Funding Situation by country

Belgium (G Gregoire)France (J-M Rey)Italy (V PalladinoJapan (Y Kuno)Russia (A Skrinsky)Switzerland (A Blondel)UK (K Long, P Drumm)USA (D Kaplan)

 4. Technical Coordinator’s Report 5. Any Issues from the Plenary Meeting requiring decisions 6. Procedure for election of Collaboration Board Chairperson 7. Election of First MICE Spokesperson 8. AOB

Page 13: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

13MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Controlling MICE

A preliminary set of control measurements and experimentsPhysics point of view

-- to begin discussion --

Page 14: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

14MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Experimental Systematics

Mice fiction in 2007 or so. Mice fiction in 2007 or so.

. MICE measures e.g. (. MICE measures e.g. (outout inin))exp exp = 0.904 = 0.904 ± 0.001 (statistical)± 0.001 (statistical)

and compares with (and compares with (outout inin))theory. theory. = 0.895 = 0.895

and tries to understand the difference.

SIMULATIONSIMULATION

REALITYREALITY

MEASUREMENTMEASUREMENT

theory systematics: modeling of cooling cell is not as reality

experimental systematics:modeling of spectrometers is not as reality

Page 15: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

15MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Principle of experimenter's point of view.

We will measure the emittance ratio with a statistical precision of

ut/in of

leave aside issues on definition of emittance and such. 6D emittance IS well defined)

we have to investigate the sources of systematic errors at a level that is about 3 times smaller, so that 10 independent sources will accumulate to the same level --> aim at keeping each source of error at 3 10-4 level if we can.

Page 16: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

16MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

Example of such: Coil tilt tolerance.

Take U. Bravar's MICE note 62:

this looks like a quadratic dependence.

it takes 40 =0.068 rad to get a change by 0.065

==> it will take (tilt) = 0.068rad x sqrt(0.001/0.065) to get a change by 0.001

this is 8mrad or 0.5 degrees.

this sensitivity is (3x) smaller than the tolerance calculated by U. Bravar, because MICE will be sensitive to effects that are somewhat smaller than what is assumed to be needed for the cooling channel.

similarly for the transverse position I find ~6mm tolerance instead of 20mm

Page 17: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

17MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

In fact we will probably be able to position the magnets to a better precision than that. BUT:The magnet system will be operated in a variety of currents and even polarities and it is difficult to assume that the field maps will simply be the linear superposition of those measured on each single magnet independently: forces are likely to squeeze the supports and move the coils in the cryostats. (or maybe not?)

==> we will measure the magnetic field with probes (NIKHEF) (contacts Frank Linde and Frank Filthaut [email protected] and [email protected] )

Page 18: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

18MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

SC Coils

Magnetic

sensors

3 hall probes

Positioning holes

The magnetic measurement devices as from the proposalsee pages 52, 53.

NB, we need to know *where* the probes are for this to work

Page 19: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

19MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

quantity design tol. monitoring with beam

beam optics

transfer matrix: par ex.(pt, pL, phi, x0 , y0)in <-> (pt, pL, phi, x0, y0)out

measure with no RF and empty absorbers each time one changes the mag set-up.

positions of coils

some mm alignment

currents some 10-4 amp-meter

mag field some 10-4 mag probes

amount of absorber (in g/cm2)

310-3 = 1mm/35 cm

density through T & Pthickness how???

measure energy loss of muons for 0 absorber, 1 absorber, two absorberswith RF off.

RF field 3 10-3 measure E to E/E= 3.10-3

measure energy of muons vs RF phase before and after cooling channel

What needs to be controlled from the point of view of the physics?How can we control it by design tolerances / by monitoring / with the beam itself

Page 20: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

20MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

example of such an experiment Eout -Ein (GeV)

simulated by Janot in 2001this measures ERF(t) (nb: this was at 88 MHz)

Page 21: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

21MICE CM at CERN Alain Blondel, March 29 -> April 1 2004

summary

at first look the required monitoring consists of

-- Ampermeter for each coil-- Magnetic field measurement -- monitor position of probes and coil assemblies-- ERF(t) (gradient and phase of each cavity)-- absorber density (i.e. T & P) and thickness.

Some of these are not so obvious but this is what one should be able to do in a neutrino factory

The muons themselves will provide very powerful cross-checks(energy loss and energy gain, transfer matrix) (this one cannot do easily at all in a neutrino factory)

Is this the right approach? Did I forgot something? How does one do that? Who does it?

Page 22: MICE CM at CERN Alain Blondel, March 29 -> April 1 2004 1 MICE collaboration meeting at CERN 1.Neutrino Factory status in the commmunity 2.Some news from

22MICE CM at CERN Alain Blondel, March 29 -> April 1 2004