Page 1: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Michele RONCHIParis, 23rd October 2003

Experience with liberalisation

Page 2: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Agenda

• Tariffs & Capacity

• Network Code

• National Balancing Point

• LNG

2

Page 3: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

The key Success Factor:Convergence of Interests between TSOs and Regulator

Autorità per l’energia elettrica e il gas

Competition: market opening and tariffs reduction

VALUE GENERATION: growth and efficiency

Incentives on Throughput

Gas FlowsOptimisation

Incentives/Productivity Targets

Management Optimisation

Criteria for Market Development

IT PlatformsNetwork Utilisation

Incentives onDevelopment CAPEX

Investments in Network Expansion

Capacity UtilisationMaximisation

Increasing EfficiencyIncreasing Market

DynamicsNetwork Development

3

Page 4: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Utente 50 Mm3/ anno - distanza 200 Km MTS + RTS -

0

20

40

60

80

100

120

0,30 0,60 0,90 c.u.

Lire/ m3

MAX

SRG

MIN

Thermoelectric Pulps

SM Industry Thermoelectric

Household Handcrafting

Current SRG tariffs lower more than 15% vs. the 1st Thermal Year

Tariffs Lowered

Consumer 50 Mcm/y

Distance 200 Km MTS + RTS

4

Page 5: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

PASSO GRIESPASSO GRIES

TARVISIOTARVISIO

GNL PANIGAGLIAGNL PANIGAGLIA

MAZARA DEL VALLOMAZARA DEL VALLO

GORIZIAGORIZIA

Continuous 57,700

Interruptible 5,000

Total 62,700

Continuous 11,500

Interruptible 0,000

Total 11,500

Continuous 01/10-31/12/0376,400

Interruptible 7,300

Total 83,700

Continuous 01/1-31/03/03 82,000

Interruptible 5,200

Total 87,200

Continuous 01/04-30/09/03 82,000

Interruptible 2,100

Total 84,100

Continuous 86,000

Interruptible 0,000

Total 86,000

2003/042003/04

Continuous 0,700

Interruptible 0,300

Total 1,000

Interruptible Capacity Offered

(Total Capacity in MScm/d) 5

Third Thermal Year 2003/2004

Page 6: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Total Shippers’ Demand Fulfilled(Scm/d - 15° C; 1,01325 bar)

PASSO GRIESPASSO GRIES

TARVISIOTARVISIO

GNL PANIGAGLIAGNL PANIGAGLIA

MAZARA DEL VALLOMAZARA DEL VALLO

GORIZIAGORIZIA

Continua Int.Ann. I nt.Stag. TOT

Tecnica 57,700 5,000 - 62,700

Conferita 57,700 1,178 - 58,878

Disponibile - 3,822 - 3,822

Continua Int.Ann. I nt.Stag. TOT

Tecnica 11,500 - - 11,500

Conferita 11,400 - - 11,400

Disponibile 0,100 - - 0,100

Continua Int.Ann. I nt.Stag. TOT

Tecnica 0,700 0,300 - 1,000

Conferita 0,700 0,177 - 0,877

Disponibile - 0,123 - 0,123

Continua Int.Ann. I nt.Stag. TOT

Tecnica 01/10-31/12/02 76,400 2,500 4,800 83,700

Conferita 76,400 2,500 1,394 80,294

Disponibile - - 3,406 3,406

Tecnica 01/01-31/03/03 82,000 2,100 3,100 87,200

Conferita 81,333 - 0,240 81,573

Disponibile 0,667 2,100 2,860 5,627

Tecnica 01/04-30/09/03 82,000 2,100 - 84,100

Conferita 80,884 - - 80,884

Disponibile 1,116 2,100 - 3,216

Continua I nt.Ann. I nt.Stag. TOT

Tecnica 86,000 - - 86,000

Conferita 77,405 - - 77,405

Disponibile 8,595 - - 8,595

Assignments August 2003Assignments August 2003

6

Page 7: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

12 Pressures at exit points

5 Transportation Capacity AssignmentTransportatio

nService:ACCESS

7 Capacity transactions

2 Description of the network and its management

GeneralInformation

Transportation

Service:DELIVERY

8 Capacity booking, assignment and re-assignment

9 Balancing

10 Gas Measures

11 Gas Quality

3 Description of the services

4 Procedures of informative coordination

6 Implementation and management of exit points

1 Normative Context

ChapterSection

Network Code Approved and in Force

Planning

Emergency

Network CodeUpdating

Quality of the Service

Admini-stration

Section

16 Information needs for transportation capacity planning

14 Planning and management of maintenance

21 Emergencies management

22 Rules for shifting from normal operations to crisis management

23 Network Code updating

13 Quality of the service

15 Operational coordination

17 Fiscal and Duane rules18 Invoicing and payment19 Responsibilities of the parties20 General rules

Chapter

7

Page 8: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

The Delibera 137/02 has considered the cession/exchange of the gas in the network and has removed the constrain on the capacities.

In the Network Code context, Snam Rete Gas has considered a new function accessible to our users: the exchange of the gas running in the network, at a VIRTUAL EXCHANGE POINT (National Balancing Point).

The “Entry/Exit” System is obviously consistent with the NBP.

National Balancing Point in Operation

Entry 1

Entry 2

Entry N

Exit 1

Exit 2

Exit M

NATIONAL NETWORK REGIONAL NETWORK

NBP

Shipper A Shipper B

8

Page 9: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Characteristics of the Portal:

• It helps the users to Balance• It may be Equivalent to daily capacity booking;• It is of great utility in the case of

interruption/reduction of capacity;• SRG will not have knowledge of the economic

terms of the transactions which will be se by the Users externally to the System;

• SRG will have only the role of Portal Administrator.

9

National Balancing Point in Operation

Page 10: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

“STOCK EXCHANGE”

The current trends

CAPACITYEXCHANGES

NATIONAL BALANCINGPOINT

DISTINCTIVE KNOW-HOW:

• Business Information• Processes Integration• Problem-solving for the shipper

• Increasing Market liquidity• Spot market for capacity and commodity• Gas-to-gas competition

10

Today

Page 11: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Market Development in Italy

TARVISIO

Mazara

Power - New CCGT:

20 GW expected by 2006/07

of which:

11 GW under construction

• 3,43 GW start up this year

•La Casella (Enel) 1,52 GW•Porto Corsini (Enel) 0,76 GW•Pietrafitta (Enel) 0,37 GW•Priolo (Enel) 0,78 GW

• 2,71 GW start up in 2004•Sermide (Edipower) 0,76 GW•Ostiglia (Endesa) 0,38 GW•3 CCGT Enipower 1,56 GW

In 2003

In 2004

By 2006/7

Rovigo

Brindisi

Taranto

Gioia Tauro

Livorno

Algeria-Sardinia

Gela

P. Gries

11

Page 12: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

1st Priority

GTE’s LNG Working Group Action Plan

Business Rules Quality specifications Capacity Calculation

2ndPriority IN PROGRESS

Published on the GTEWebsite

Ship Approval Procedure (S.A.P.) Technical characteristics/ Map

GTE Working Group on LNG created in early 2002

12

Page 13: Michele RONCHI Paris, 23rd October 2003 Experience with liberalisation

Michele RONCHIParis, 23rd October 2003

Experience with liberalisation