michelle duong portfolio 2014

46
MICHELLE DUONG PORTFOLIO

Upload: michelle-duong

Post on 07-Apr-2016

224 views

Category:

Documents


3 download

DESCRIPTION

 

TRANSCRIPT

  • MICHELLE DUONGPORTFOLIO

  • This is how my brain works. Please enjoy.

  • 4 |

    DIALOGVancouver, British Columbia, Canada

    09.2013-12.2013

    Internships

    Telstorm Corp.Vaughan, Ontario, Canada

    01.2012-04.2012 + 05.2013-08.2013

    Italy by InkRome, Italy

    38 - 43

    Basilica di San Clemente StudyRome, Italy

    32 - 33

    Performing Arts Centre and CondominiumToronto, Ontario, Canada22 - 29Massey College StudyToronto, Ontario, Canada30 - 31

    CONTENTS

    Farrow Partnership ArchitectsToronto, Ontario, Canada

    09.2012-12.2012Guelph General Hospital

    Master PlanGuelph, Ontario, Canada

    34 - 35Private Residential Renovation

    Toronto, Ontario, Canada36 - 37

  • |5

    HotelHoteletLund, Sweden

    6 - 11

    Pleasant HillsSan Jose del Monte, Bulacan, Philippines12 - 21

    CONTENTS

  • 6 |

    Proposed Site

    Hotel

    Student Residence

    Residential

    Lunds Tekniska Hogskola

    HOTELHOTELET - SITE CONTEXT

  • |7

    In collaboration with Johan Svartns | Lund University | 2014

    HotelHoteletScandinavian Architecture + Urbanism

    HOTELHOTELET - BLOCK ELEVATION

  • 8 | HOTELHOTELET - SITE PLAN

    0 1 10 20 m5

    site section

    Studiecentrum

    E-husets Bibliotek >

    Matematikhusets annex

    Slve

    gatan

    John Ericssons vg

    SjnSjn

    bloc

    k elev

    atio

    n

    ELEV

    ATED

    PARK

    + FO

    UNTA

    INLA

    KE +

    CAF

    EST

    UDEN

    T RE

    SIDE

    NCE +

    HOT

    EL

  • HotelHotelet LTH FontnenFontnen CafCaft SjnSjn|9HOTELHOTELET - SITE SECTION

    The Faculty of Engineering at Lund University (LTH - Lunds Tekniska Hogskola) is looking to expand and densify. Based on the current CampusPlan, we propose to build HotelHotelet, a student residence and hotel targeted to international students, those needing temporary lodging while looking for permanent accommodations, or visitors to the University attending conferences or other special events.

    Ett av Lunds stora problem r bristen p bostder och speciellt fr studenter. Kring Norra universitetsomrdet finns goda mjligheter till frttningar och etablering av olika bostadstyper. Studentbostadshus kan med frdel byggas p universitetsomrdet och i anslutning till befintliga studentbostder. Mot Smrlyckan kan en relativt stor volym bostder, som kan hyras av studenter eller andra, etableras. - Lunds Universitets CampusPlan, 103

    From the universitys CampusPlan, one of Lunds major problems is the lack of student housing - and especially for students. Around the North campus there are good opportunities for densification and the establishment of different property types. Student residences can very well be built on the campus and adjacent to the existing student housing. We have also considered the universitys goals of beautifying the area of the two lakes central to the Faculty of Engineering, which used to be the quarry for the former local brick factory.

    Sjprojektet. Parkens tv sjar rustas upp och vattentemat utvecklas. Hela sjomrdet frdlas till ett tillgngligt och attraktivt omrde fr vistelse i anslutning till vatten. - Lunds Universitets CampusPlan, 74

    The CampusPlan states that the two lakes in the park will be upgraded and the water theme will be developed. The entire lake area will be refined into an accessible and attractive area to enjoy close to the water. Thus, the third element to our design is to incorporate the Fontnen, designed by Klas Anshelm and Arne Jones. What used to be a set of functioning fountains and the source of miniature boating competition is now defunct and dried up. We want to revitalize the fountains and have them as an integral part of the design. The goals:

    Provide modern accommodations for visitors and students. Encourage city and campus activities during summer months when campus life is least active.

    Revitalize Klas Anshelm and Arne Jones Fontnen.

    0 1 10 20 m5

  • 10 | HOTELHOTELET - FEATURING FOUNTAIN + CAFE

  • The residential units connect to a fountain and garden that seem to float above one of the main circulation paths in the engineering area. This park space is open to residences, Lund University students and members of the public. The existing elevated fountains and bridge have been incorporated into the design and a new restaurant and cafe has been built into the banks with a great view of the lake, a perfect location to watch the annual wakeboard competitions.

  • 12 |

    With a density of 18 087 people per hectare, Metro Manila faces enormous housing challenges. Families relocating from surrounding provinces to the metropolis hope for a better life, but often they find themselves in informal settlements. In fact, more than half of the population in Metro Manila are informal settlers. Although there are several proactive players in the housing sector, adequate and affordable housing is still in great need. Many existing social housing developments lack maintenance and thus deterioration is a problem. A sense of community or methods of livelihood are not taken into consideration in the relocation of informal settlers to these developments. Some neighbourhoods, however, do encourage social interaction, embrace greenery and public spaces and have evolved their community into a place they are proud to call home. This is what we aim to do at Pleasant Hills in San Jose del Monte, Bulacan.

    An integrated community: flexible public spaces that will not become places of fragmentation and social segregation. We pursue the concept of a friendly environment, sustainable and comfortable, where everyone has a place. We have witnessed how public spaces in the Philippines are abandoned, littered in and mistreated. Our goal is to design a public space that the community feels as its own, as its pride, and is thus, not mistreated. Public space should be about interactions, creating communication and livelihood. We will not disregard providing spaces for outdoor activities where the community can interact. This includes facilities such as sports courts, playgrounds for the children and open spaces where community members from every age, gender and income level can socialize.

    A sustainable community: urban agriculture is an existing condition on the proposed site and we aim to implement this into the new development. The communal gardens, located at the bottom of the community spine and within the residential buildings, will assist lower income families with food supply or an income top-up. Workshops will be set up in the multipurpose centre and within some residential buildings where community members can find livelihood either through making crafts and such with recycled materials, or by other creative means.

    PLEASANT HILLS - SITE CONTEXT

    CONTEX

    T

  • |13

    In collaboration with Yuzhe Bao, Olatz Ezquerro and Anna Pekkarinen | Lund University | 2014

    Pleasant Hills in San Jose del Monte, BulacanUrban Shelter Design Studio with the National Housing Authority of the Philippines

    METRO MANILA

    SAN JOSE DEL MONTE, BULACANnha proposed site

    THE PHILIPPINES

    luzon

    visayas

    manila bay

    laguna de bay

    5 km

    metr

    o ma

    nila

    map

    the

    philippine

    s ma

    p

    wor

    ld m

    ap

    mindanaote

    cton

    ic bou

    ndar

    y The Philippines consists of 7 017 islands with a total land area of 300 000 km2.

    A tectonic boundary crosses the islands making it a disaster-prone area.

    Metro Manila, in Luzon district, is a conglomeration of 16 cities and 1 694

    barangays and villages. The city is characterized by social segregation; the

    formal city is surrounded and pierced by growing informal settlements.

    The proposed social housing site for the National Housing Authority (NHA)

    of the Philippines is to the north of Metro Manila in San Jose

    del Monte, Bulacan.

    PLEASANT HILLS - WORLD CONTEXT

  • 14 |

    There are a number of things to consider when deciding on building typologies for this development. The average family size is in the Philippines is five people and 34% of the population are children under 14 years of age. There is an unemployment rate of 7%, but 40% of the unemployed are working in the informal sector. There are many sari-sari shops along the streets, and people find creative ways for an income top-up. Within Pleasant Hills we aim to provide housing for mixed income groups: 50% of the units will be designed for informal settler families, 40% for middle income families, like those with government employees and 10% of the units will be designed for the open market. In doing so we aim to decrease the social segregation of Metro Manila.

    By targeting mixed income groups and different family sizes, accordingly, there will be a variety of unit sizes offered. Unit sizes vary from 24 m2 to 50 m2, the most common unit size being 32 m2. The expandibility of units has also been considered for growing families. The typologies have been designed so that the units can be combined horizontally or vertically. Some units also have the ability to expand outwards from the building. On the ground floor, many units offer the possibility of a commercial space.

    Our aim is to design affordable and sustainable, architecturally interesting housing. The Filipino people love to garden, which is why living in a row house is a common dream. The urban sprawl, however, in Metro Manila does not allow for low density housing and higher density neighbourhoods are recommended. One of our goals is to create a feeling of living in a row house while living in a medium rise building by implementing agritecture and climate smart design.

    Aware of the hot humid climate, we have designed the building typologies to incorporate terraces that perforate the buildings, creating wind flow, which can be used for urban gardening and as communal spaces. Many of the units also have balconies that act as private spaces for kitchen gardening, or as an expansion of the living space. The balconies, as well as the access corridors, also offer effective shading for each storey.

    HOUS

    ING +

    BUI

    LDIN

    G T

    YPOLO

    GIE

    S

    COMMUN

    ITY

    SPIN

    E

    low-income householdsmiddle income householdsopen market daycare

    centre

    multipurposecentre

    agricultureoffice

    Terraced housing

    30 m2 to 50 m2 units private terrace gardens wide access corridor for urban gardening

    and social interaction

    Medum-rise housing

    24 m2 to 46 m2 units private balcony gardens - green facades perforations for wind flow and ventilation perforations act also as common spaces rooftop gardens for urban agriculture

    To help our goal of building an open and integrated community, a spine of public and institutional buildings bisect the neighbourhood and are available for use by the entire community. The spine follows the natural topography of the site and culminates at the south end with the communal urban garden.

    Elementary School, High School and Daycare Centre - to service the anticipated increase of children in the new development.

    Basketball Court - an essential addition to any Philippino neighbourhood, to be shared between the two schools and available to the community at any other time.

    Health + Wellness Centre - to educate, promote wellness and provide convenient healthcare to the members of the community.

    Multipurpose Centre - for social events, religious congregations, and to provide space for workshops and resources as a source of livelihood.

    Agriculture Office - to take care of the logistics of the communal gardens and public market; to educate the community on urban agriculture and provide resources for agriculture across the entire community.

    PLEASANT HILLS - HOUSING + BUILDING TYPOLOGIES

  • |15

    market

    major artery

    health + wellnesscentre

    elementaryschool

    daycarecentre

    high school

    multipurposecentre

    basketballcourt

    agricultureoffice

    existing college

    transportationhub

    urban gardenCOMMUNITY SPINE - A SERIES OF PUBLIC BUILDINGS LEADING TO THE COMMUNAL URBAN GARDEN

    PUBLIC MARKET - LOCATED AT NORTH EAST CORNER OF SITE NEXT TO MAJOR TRANSPORTATION HUB

    PLEASANT HILLS - COMMUNITY SPINE

  • 0 10 100 m50

    16 | PLEASANT HILLS - SITE PLAN

    SITE

    PLAN +

    CIR

    CUL

    ATIO

    N A

    NALY

    SIS In Pleasant Hills we are aiming to limit vehicular traffic within the community and promote walking and biking as the main methods of transportation. There is one

    main vehicular artery servicing the neighbourhood that also connects to parking available on site below residential buildings. The circulation networks also connect to the neighbouring communities and services such as colleges to the north and northwest of the site, the major transportation hub, and the river and a church to the south of the site. The east side of the site is buffered from the highway and existing gas station with vegetation while the west side is permeable and inviting to neighbouring communities.

    QUIRINO HIGHWAY

    PLEASANT HILLS GATE 1

    CRUSA

    DER ST

    REET

    COMMUN

    ITY

    SPIN

    E

    URBAN AGRICULTURE

    MARK

    ET

    < TO CHURCH

    < TO COLLEGE

    COLLEGETRANSPORTATION HUB

    GAS STATION

  • |17

    ROAD NETWORK VEHICULAR PEDESTRIAN + BICYCLE

    PEDESTRIAN + BICYCLE NETWORK PRIMARY SECONDARY

    PEDESTRIAN + BICYCLE ACCESS ONLY

    ENTRANCE TO COMMUNITY SPINE

    PARKING AVAILABILITY VEHICULAR NETWORK BELOW GRADE PARKING

    PLEASANT HILLS - SITE ANALYSIS + PERSPECTIVES

  • 0 1 10 20 m5

    18 |

    URBAN AGRICULTURE COMMUNITY SPINE

    AGRI-OFFICE MULTIPURPOSE CENTRE DAY CARE CENTRE

    PLEASANT HILLS - COMMUNITY SPINE SECTION

    COMMUNITY SPINERESIDENTIAL

    COURTYARD / PUBLIC SPACE

    COMMUN

    ITY

    SPIN

    E SE

    CTIO

    NSI

    TE

    SECTIO

    N

  • COM

    MUN

    ITY SP

    INE

    SITE SEC

    TION

    |19

    MARKET

    COMMUNITY SPINE

    DAY CARE CENTRE HEALTH + WELLNESS CENTRE

    PLEASANT HILLS - SITE SECTION

    0 1 10 20 m5

    0 1 10 20 m5

    COMMUNITY SPINE RESIDENTIAL

    COURTYARD / PUBLIC SPACE

  • 20 |

    The existing NHA site in Pleasant Hills is host to many fruit bearing trees that provide food and income to families in the neighbourhood. These trees should be saved in the design of the new development. Fruit bearing tree types include mango, papaya, avocado and many more. In addition, there are also a number of cotton trees on the site of various heights starting from 6 m tall that can provide shading and an aesthetic quality to the neighbourhood.

    Parts of the site have also been cultivated and provide a livelihood to 3 farmers living in the area. The sloping land which faces south takes advantage of the sun and has been sculpted to maximize the number of hours of sun exposure. Some of these areas should also be saved since the earth is readily available for agricultural purposes. Further to the already cultivated land, the housing typologies in the neighbourhood should also incorporate agriculture into the architecture, to reflect a key aspect of our project - agritecture. Many existing vegetation on the site can be cultivated not only in the communal farm, but also within the housing units.

    We aim to provide all the necessary tools and spaces to fully implement a neighbourhood that provides food and livelihood for community members with a full understanding of local produce and agricultural methods that work.

    AGRIC

    ULTUR

    E

    PLEASANT HILLS - AGRICULTURE

    saving treesknowledgefertilizerirrigationsunlight harvestingstoragemarket

    use existing trees to increase agricultural productioncommunity workshops to educate neighbourhood on urban farming composting to yield soilbioswales + rain water managementorientation of buidings and gardens + canopiesproduce for market sales + seeds for replantingopen spaces for drying of vegetablesa place to sell produce to surrounding neighbourhoods

    1

    1

    2

    2

    23

    4

    4

    4

    5

    5

    5

    6

    7

    8

    8

    7

    BIOSWALE NETWORK DETAIL PLANURBAN GARDEN + COMMUNITY SPINE

  • |21

    TREEaratilis (calabur tree)atsuete (achiote tree)kamias (bilimbi tree)santol (cottonfruit)malunggay (moringa)abukado (avocado)saging (banana)mangga (mango)koton (cotton)papaya

    SHRUBpandan (screw pine)tanglad (lemongrass)talong (eggplant)

    sili (chili)pinya (pineapple)kawayan (bamboo)GROUNDampalaya (bitter melon)sitaw (string bean)kamatis (tomato)

    pechay (Chinese cabbage)saluyot (mallow-leaves)mustasa (mustard greens)kang kong (water spinach)

    SUBTERRANEANbalinghoy (cassava)camote (sweet potato)gabi (taro root)

    AB

    C

    DEF

    F

    G

    G

    H

    I L

    L

    M

    M

    N

    N

    O

    P

    P

    Q

    Q

    R S

    S

    T

    T

    R

    O I

    J

    J

    K

    K

    HE

    D CB

    A

    PLEASANT HILLS - GROWING LOCAL PRODUCE

    1

    3

    6

    GROW

    ING L

    OCAL

    PRODU

    CE

  • B A

    B

    A

    residential parking + retail loading entrance

    GROUND FLOOR PLAN0 1 5 10 20

    open green space

    0 m

    0 m

    -2.43 m

    open green space

    colonnade

    grocery store

    retail cafe restaurant

    retail retail retail music store

    colonnade

    residentiallobby

    link above to stair well

    service corridor

    main entrance

    control booth

    feature stairs above

    coat check

    dimmer room

    storageauditorium

    theatre services

    storage

    women's washroom

    bar

    kitchen

    ticket sales

    men's washroom

    stagepiano storage

    canopy

    outdoorperformance space below

    office

    office

    office

    office

    office

    lockers

    loading dock

    mail room

    residential lobby

    BREADALBANE ST

    WELLESLEY ST

    ST NICH

    OLAS ST

    ST LUKE'S LN

    YON

    GE ST

    22 | PERFORMING ARTS CENTRE - GROUND FLOOR PLAN

  • B A

    B

    A

    residential parking + retail loading entrance

    GROUND FLOOR PLAN0 1 5 10 20

    open green space

    0 m

    0 m

    -2.43 m

    open green space

    colonnade

    grocery store

    retail cafe restaurant

    retail retail retail music store

    colonnade

    residentiallobby

    link above to stair well

    service corridor

    main entrance

    control booth

    feature stairs above

    coat check

    dimmer room

    storageauditorium

    theatre services

    storage

    women's washroom

    bar

    kitchen

    ticket sales

    men's washroom

    stagepiano storage

    canopy

    outdoorperformance space below

    office

    office

    office

    office

    office

    lockers

    loading dock

    mail room

    residential lobby

    BREADALBANE ST

    WELLESLEY ST

    ST NICH

    OLAS ST

    ST LUKE'S LN

    YON

    GE ST

    |23

    The housing market in Toronto is currently in high demand and families and individuals alike are looking for quality homes in vibrant and safe communities. There has been a massive condominium boom over the last decade and the increased cost of land and single homes are causing more and more people to turn to the condominium market. The challenge in our third year design studio was to propose not only another condominium, but a multi-use building at the corner of Wellesley St. E. and Yonge St. in downtown Toronto that can offer the community something more than residential units.

    The complex I propose doubles as a Performing Arts Centre equipped with a dance hall, performance theatre, live-work units for artists, an outdoor performance area, impromptu performance spaces and ground floor retail units for the convenience and economy of the community. The residences of the complex are provided with health and wellness amenities on site including a swimming pool, fitness room and multi-purpose exercise room. There is also a sheltered park space open for public use.

    The site is adjacent to both a towering neighbourhood of condominiums as well as the busy area of Yonge St. which is comprised mostly of low-rise commercial buildings with residences above. The design of the Performing Arts Centre is meant to contextualize with these urban conditions, but also be a fresh and welcoming presence.

    Below is a sample of a massing study of the building within the existing conditions of the site, as well as a look at, by colour coding, the placement of programmatic elements within the complex.

    University of Waterloo | 2013

    Performing Arts Centre and Condominium3A Design Studio and Building Science

    PERFORMING ARTS CENTRE - MASSING STUDY

  • B A

    B

    A

    propscarpentry

    storagepaint

    wardrobe

    theatre workshop area

    open to wardrobe above

    residential elevator

    parking

    residential elevator loading area

    service elevator

    PARKING LEVEL FLOOR PLAN

    LOWER LEVEL FLOOR PLAN0 1 5 10 20 B A

    B

    A

    parking ramp

    LOWER LEVEL FLOOR PLAN0 1 5 10 20

    multipurpose room

    weight room

    yoga + fitness

    wardrobe

    change room

    men's w/c

    women's washroom

    change room

    change room

    change room

    production office

    production office

    stagepiano storage

    dooropens

    storage

    auditorium

    mechanical room

    elevator / mechanical room

    kitchen back of house

    outdoorperformance space

    cafe patio restaurant patio

    cafe restaurant

    cafe storage restaurant back of house

    grocery storage

    retail storage

    music storage

    music store

    service corridor

    corridor

    lockers

    lockers

    parking below

    0 m

    -2.43 m

    24 |

    Below Ground Parking Level location of theatre workshops service access to commercial units residential parking below grade to optimize land use

    Lower Level entrance to complex from south lower portion of theatre including

    stage, wardrobe and administration outdoor performance area restaurant and cafe residential lockers

    PERFORMING ARTS CENTRE - FLOOR PLANS

  • B A

    B

    A

    THIRD FLOOR PLAN

    0 1 205

    shoes change area

    10

    residential unit

    residential unit

    viewingplatform

    dance hall / rehearsal space

    impromptu performance area

    connection to livework studios

    live work unit

    live workunit

    open corridor

    corridor

    living wall

    lobby below theatre lobby below

    possible bar service area

    B A

    B

    A

    SIXTH FLOOR PLAN

    0 1 205 10

    corridor

    corridor

    residentialunit

    residentialunit

    residential unit

    residential unit

    green roomboard room

    IT room

    cloister

    canopy

    railing to view below

    offices

    living wall

    offices

    cloister

    lobby below

    men's washroom

    women's washroom

    outdoor terrace

    0 1 205 10

    THIRTEENTH FLOOR PLAN

    0 1 205 10

    residential units below

    outdoor terrace

    change rooms

    mechanical room

    outdoor terrace

    pool

    B A

    B

    A

    0 1 205 10

    0 1 205 10

    SECTION A

    parking parking

    crawl space

    mechanical roomkitchen + bar storage beyond

    washrooms

    coat checkkitchen beyond

    bar auditoriumstage

    ramp beyond to kitchen storage

    dance hall / rehearsal space

    officeoffices beyond

    exterior courtyard

    elevator shaft

    green room

    UNDERGROUND FLOOR PLAN

    LOWER LEVEL FLOOR PLAN

    GROUND FLOOR PLAN

    THIRD FLOOR PLAN

    SIXTH FLOOR PLAN

    open workshop area

    open workshop area

    change room change room change room

    loading dock

    residential residential

    residential

    residential

    residential

    lobbyvestibule

    mail room

    mail area

    production offices

    -2

    -1

    0

    3

    6

    |25

    Third Floor live work units in north tower impromptu performance space

    in live work corridor atrium with feature stairs,

    lobby below and living wall dance hall / rehearsal space residential units in south tower

    Section A

    Sixth Floor theatre administration area and

    green room outdoor terrace for employees atrium to lobby below residential units in both north

    and south towers

    Thirteenth Floor indoor - outdoor pool for

    residential use outdoor terraces facing

    Wellesley St to the north and park space to the south

    residential units above and below in north tower only

    PERFORMING ARTS CENTRE - PLANS AND SECTION

  • 0 1 205 10

    SECTION B

    UNDERGROUND FLOOR PLAN

    LOWER LEVEL FLOOR PLAN

    GROUND FLOOR PLAN

    THIRD FLOOR PLAN

    SIXTH FLOOR PLAN

    THIRTEENTH FLOOR PLAN

    -2

    -1

    0

    3

    6

    13

    residentialunit

    residentlockers

    residentialelevatorbeyond

    serviceelevator

    loading area parking stairs beyond parking beyond

    dancehall

    yoga + dancestudio

    weight room

    office office

    multipurpose room beyond

    green room

    connectionto offices

    connectionto dance hall

    feature stairs

    lobby beyond theatre behind

    theatre workshopsbehind

    impromptu performancespace with access topiano on stage beyondramp/stairs to

    exterior

    viewing platform

    connection tolive workdance studios

    livingwallbeyond

    livingwallbeyond

    paintworkshopbehind

    residentialelevatorsbehind

    carpentryworkshopbehind

    grocerystorage

    cafe servicearea behind

    restaurant servicearea behind

    residentialunit

    residentialunit

    residentialunit

    residentialunit

    balcony

    mechanicalroom

    live work

    indoor / outdoor pool change rooms

    stair wellbehind

    elevator shaftelevator beyond

    open to atrium

    live work

    live work

    grocery grocery retail cafe restaurant

    live work

    26 |

    Section BPERFORMING ARTS CENTRE - SECTION

  • 0 1 205 10

    SECTION B

    UNDERGROUND FLOOR PLAN

    LOWER LEVEL FLOOR PLAN

    GROUND FLOOR PLAN

    THIRD FLOOR PLAN

    SIXTH FLOOR PLAN

    THIRTEENTH FLOOR PLAN

    -2

    -1

    0

    3

    6

    13

    residentialunit

    residentlockers

    residentialelevatorbeyond

    serviceelevator

    loading area parking stairs beyond parking beyond

    dancehall

    yoga + dancestudio

    weight room

    office office

    multipurpose room beyond

    green room

    connectionto offices

    connectionto dance hall

    feature stairs

    lobby beyond theatre behind

    theatre workshopsbehind

    impromptu performancespace with access topiano on stage beyondramp/stairs to

    exterior

    viewing platform

    connection tolive workdance studios

    livingwallbeyond

    livingwallbeyond

    paintworkshopbehind

    residentialelevatorsbehind

    carpentryworkshopbehind

    grocerystorage

    cafe servicearea behind

    restaurant servicearea behind

    residentialunit

    residentialunit

    residentialunit

    residentialunit

    balcony

    mechanicalroom

    live work

    indoor / outdoor pool change rooms

    stair wellbehind

    elevator shaftelevator beyond

    open to atrium

    live work

    live work

    grocery grocery retail cafe restaurant

    live work

    B A

    A

    B

    |27

    Massing Study - View from Bay StreetPERFORMING ARTS CENTRE - MASSING STUDY

  • 28 |

    The temperate climate of Toronto offers cold winters and hot summers. The enclosure must be designed to handle many climatic elements. First and most important, the rainscreen system of the facade must deal with water from rain and melting snow. The cladding will deflect the rain and the glazing will act as a perfect barrier. The cladding is also angular to guide the water and encourage drainage. The airspace between the cladding and insulation provides space for evaporation. The vapour permeable membrane will act as another drainage plane. Flashing will deflect water, and weep holes around windows will also allow for drainage.

    Second, the exterior finish and insulating thermal control layer will protect the subsequent control layers and the structure from UV rays, as well as provide insulation to reduce heating and cooling needs. Vapour permeable, rigid mineral fibre insulation will be used. The control layers need to allow permeation to prevent the trapping of moisture since the main structure, cross laminated timber (CLT), will release moisture over time.

    To deal with sound insulation from the vehicular and pedestrian traffic of downtown Toronto, a few measures are taken. The structure of the exterior walls is also CLT and the acoustical windows will also help keep out the noise. The live work units have a 31-49% glazing to solid wall ratio to minimize sound disturbance. As an extra layer of noise protection for residential units, each unit is set back from the faade with a small balcony framed with CLT.

    DETAIL Awall to roof connection

    PERFORMING ARTS CENTRE - EXPLORING DETAILS AND MATERIALS

  • |29

    Sound insulation is crucial in a building focused on the performing arts. Walls, floors and ceilings must work to keep music and the sound of dance steps out of the residential units and within the theatre or the dance hall. The walls, floors and ceilings must also function as sound barriers between any live work units that are being used as dance or music studios and between residential units. To control sound, two methods are proposed. First, the structure of the building is primarily CLT. Inherent in the solid, layered properties of the material, CLT inhibits sound movement through the structure because there are no air spaces. Second, select interior walls (dance studios, theatre) and ceilings will be finished with acoustic panels while other walls (residential units) will be the natural wood finish of the CLT. Sandwiched between the CLT floor structure and the finish, acoustic flooring will be installed. This flooring material can be considered a control layer. The double glazed windows with acoustic cores also act as a control layer.

    DETAIL A

    DETAIL Cwindow to wall connection through sill

    DETAIL Bfloor junction with wall

    DETAIL BDETAIL C

    PERFORMING ARTS CENTRE - EXPLORING DETAILS AND MATERIALS

  • The urban conditions of Massey College are examined here by rendering a section through the front gates and inner courtyard. The institution stands firm as a solid fortress, introverted and sheltered from the public realm. The buildings presence on the street side is defined by massive brick walls, slender windows, and pavers that run continuously from the adjacent sidewalk along Devonshire Place, through the gated entrance, and into the courtyard. The entrance physically compresses the space with a tower overhead before releasing the visitor into a well lit and airy courtyard.

  • |31

    University of Waterloo | 2013

    Massey College StudyDesign Studio

    MASSEY COLLEGE - RENDER

  • 32 | BASILICA DI SAN CLEMENTE - MODEL DETAILS

  • |33

    As a learning tool for Cultural History, a number of places of worship, including the Basilica di San Clemente, were reconstructed as part of a City of Temples. This basilica is a palimpsest of religion and culture. Excavations are ongoing in the 1st century layer of Roman housing and warehouses, which surrounds a Mithraeum. Above this layer are fragments of a 4th century basilica which was lopped off to later carry a 12th century basilica.

    By building at 1:100 scale, this encouraged us to study the art and architectural history in detail. A section was strategically cut through the model to reveal important structural elements.

    The model was hand crafted and laser cut of plywood, mill board, corrugated paper, matte board, task board, basswood, wood dowels, and acrylic paint.

    Model published in Archnet-IJAR - International Journal for Architecture Research, article by Tammy Gaber, 2012. Group members: Michelle Duong, Cynthia Eng, Trimira Garach, Carly Kandrack, Emily Li, Paniz Maoyeri.

    Group collaboration | University of Waterloo | 2011

    Basilica di San Clemente StudyCultural History

    BASILICA DI SAN CLEMENTE - SECTIONAL MODEL

  • PHASE 0: Existing Site

    PHASE 1: Construct Ambulatory Care Wing and LobbyPHASE 1A: Expand existing Emergency Department

    PHASE 2: Construct New Medical IPU Facility and ConcoursePHASE 3: Internal Decanting and RenovationsVARIENT: Demolition of #73 and #125 Delhi StreetZONING COMPLIANCE

    CIRCULATION

    34 | GUELPH GENERAL HOSPITAL - PHASING AND DIAGRAMS

  • |35

    The purpose of this project was to develop a Master Program and Master Plan for hospital-based health services at the Guelph General Hospital, located in Guelph, Ontario. Redevelopment was required due to pressures that included, but were not limited to, significant infrastructure challenges, inadequate and non-functional spaces, increasing bed demands, projected growth in clinical area and public access concerns, as well as anticipated changes in practice and changing demographics. A long-term phasing strategy was suggested that can be divided into four primary phases and a variable phase.

    My responsibilities included the landscaping design of the green space adjacent to the main road as well as the logistics and circulation of the emergency entrance. I created graphic materials for the assembly of the Master Plan report including site plans and 3D renders, edited content and then continued with the layout of the entire report.

    With Sean Stanwick of FPA | 2012

    Guelph General Hospital Master PlanWork Term at Farrow Partnership Architects Inc.

    GUELPH GENERAL HOSPITAL - SITE PLAN

  • -7'-6 1/4"EXISTING BASEMENT FIN. FLOOR

    -0'-11 1/2"EXISTING BASEMENT FIN. CEILING

    10'-4"EXISTING SECOND FIN. FLOOR

    9'-4 1/2"EXISTING GROUND FIN. CEILING

    19'-7 1/2"EXISTING THIRD FIN. FLOOR

    18'-9 1/4"EXISTING SECOND FIN. CEILING-02

    18'-7"EXISTING SECOND FIN. CEILING-01

    27'-11"EXISTING THIRD FIN. CEILING

    0'-0"EXISTING GROUND FIN. FLOOR - LEVEL 120.53

    -3'-4 1/2"AVERAGE GRADE - LEVEL 119.50

    31'-3"EXISTING ROOF HEIGHT - LEVEL 130.05

    29'-5 1/8"MAX. ROOF HEIGHT - LEVEL 129.50

    1 4 52

    PROPOSEDSLOPEDSKYLIGHT

    PROPOSEDSTAIRS AND RAILING

    EXISTING ASPHALTSHINGLE ROOF

    EXISTINGCHIMNEY

    EXISTING BRICK

    EXISTING ASPHALTSHINGLE ROOF

    EXISTING BRICK

    21'-3

    1/2

    "

    35'-2

    3/4

    "

    34'-7

    1/2

    "

    3'-6

    "

    6"

    6"

    6'-5

    1/2

    "

    3

    3'-6

    "

    EXISTING STONETERRACE STRUCTURE

    GUTTER ANDDOWNSPOUT

    26'-8"MEAN PROPOSED ROOF HEIGHT

    PROPOSEDSTANDINGSEAM ZINCFINISH

    DEMOLITIONELEVATION

    PROPOSED 42" H.GLASS GUARDRAIL

    PROPOSEDCLERESTORY

    EW

    PROPOSEDPRODEMAFINISH

    EW

    EXISTING OPENING TO BEREMOVED AND INFILLEDWITH BRICK TO MATCH

    EXISTING OPENINGTO BE REMOVED ANDINFILLED WITH BRICKTO MATCH

    PROPOSEDSLOPEDSKYLIGHT

    EXISTING ASPHALTSHINGLE ROOF

    1'-8

    "

    2'-1 1/4"

    4'-9

    "

    W12

    W15

    W16

    10'-2 1/2"

    PROPOSEDWINDOW

    PROPOSEDSKYLIGHT

    PROPOSED WEST ELEVATION

    1/4" = 1'-0"

    A304

    MD

    20 DEC 2012

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    -7'-6 1/4"EXISTING BASEMENT FIN. FLOOR

    -0'-11 1/2"EXISTING BASEMENT FIN. CEILING

    10'-4"EXISTING SECOND FIN. FLOOR

    9'-4 1/2"EXISTING GROUND FIN. CEILING

    19'-7 1/2"EXISTING THIRD FIN. FLOOR

    18'-9 1/4"EXISTING SECOND FIN. CEILING-02

    18'-7"EXISTING SECOND FIN. CEILING-01

    27'-11"EXISTING THIRD FIN. CEILING

    0'-0"EXISTING GROUND FIN. FLOOR - LEVEL 120.53

    -3'-4 1/2"AVERAGE GRADE - LEVEL 119.50

    31'-3"EXISTING ROOF HEIGHT - LEVEL 130.05

    29'-5 1/8"MAX. ROOF HEIGHT - LEVEL 129.50

    PROPOSED STANDING SEAMZINC FINISH

    PROPOSED SKYLIGHT

    5'-0 1/4"

    A B DC

    PROPOSEDSIDE DOOR

    EXISTING ASPHALTSHINGLE ROOF

    EXISTINGBRICK

    PROPOSED STAIRS

    PR

    OP

    ER

    TY L

    INE

    14'-4

    "

    1'-7

    "

    24'-1

    1 1/

    2"

    30'-5

    1/2

    "

    35'-2

    3/4

    "

    33'-9

    "

    34'-7

    1/2

    "

    3'-6

    "

    6"

    1'-0 1/4"

    PR

    OP

    ER

    TY L

    INE

    EW

    GUTTER AND DOWNSPOUT

    PROPOSED 42" H.GLASS GUARDRAIL

    26'-8"MEAN PROPOSED ROOF HEIGHT

    PROPOSEDWINDOWS& DOORS

    SPANDRELS

    PROPOSEDCLERESTORY WINDOW

    PROPOSEDJULIETTEBALCONY

    PROPOSED STANDING SEAMZINC FINISH

    PROPOSED SKYLIGHT

    PROPOSED SIDE WINDOW

    PROPOSEDPRODEMA FINISH

    B1A1

    9'

    9'-0"EXISTING GROUND FIN. CEILING-01

    1'-4

    "6'

    -11"

    6 3/4"

    6'-11"

    10 3/4"

    2'-5"

    11 1/4"

    4'-6" 3'-7" 3'-7" 5'-2 1/2"

    W1

    W3

    D1

    D2

    W2

    W4

    W5

    W9

    W10

    W8

    W7

    W6

    D1a

    D2a

    D3

    D4

    10 3/4" 6" 11 1/2" 6" 10 3/4"

    PROPOSEDSKYLIGHT

    PROPOSED NORTH ELEVATION

    1/4" = 1'-0"

    A301

    20 DEC 2012

    MD

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    -7'-6 1/4"EXISTING BASEMENT FIN. FLOOR

    -0'-11 1/2"EXISTING BASEMENT FIN. CEILING

    10'-4"EXISTING SECOND FIN. FLOOR

    9'-4 1/2"

    EXISTING GROUND FIN. CEILING-02

    19'-7 1/2"EXISTING THIRD FIN. FLOOR

    18'-9 1/4"EXISTING SECOND FIN. CEILING-02

    18'-7"EXISTING SECOND FIN. CEILING-01

    27'-11"EXISTING THIRD FIN. CEILING

    0'-0"EXISTING GROUND FIN. FLOOR - LEVEL 120.53

    -3'-4 1/2"AVERAGE GRADE - LEVEL 119.50

    31'-3"EXISTING ROOF HEIGHT - LEVEL 130.05

    29'-5 1/8"MAX. ROOF HEIGHT - LEVEL 129.50

    26'-8"MEAN PROPOSED ROOF HEIGHT

    CLOSET W/CEXISTING ENTRANCEBEYONDLIVING ROOM

    EXISTINGRECREATION

    EXISTINGMECHANICAL STORAGE

    CLOSETBEYOND

    CLOSETBEYOND BATHROOM

    FAMILY ROOM /STUDY

    BEDROOM

    BATHROOMBEYOND

    PROPOSED SKYLIGHT

    PROPOSED STAIRS

    5'-4" 3'-6 1/2" 5'-10 1/2" 3'-6"

    13'-10 1/2"

    13'-4 1/4" 5'-2 3/4" 3'-9"

    1 3 4 5

    24'-6 1/4" 13'-5 3/4" 16'-3"

    10'-8

    1/2

    "

    8'-3

    1/2

    "8'

    -5 1

    /4"

    7"

    2

    3'-6

    "

    PROPOSED STAIRSWITH DRYWALL GUARDRAIL

    PROPOSEDFULL HEIGHTFROSTED GLASS

    5'

    9'-0"EXISTING GROUND FIN. CEILING-01

    MURPHY BEDBEYOND

    BEDROOM

    3'-6

    "

    9'-11"4'-10 3/4"6'-5 3/4"2'-5"14'-4 3/4"

    23'-9 1/4" 3'-4 1/4"

    1'-4 1/2"

    3' 5'-5" 6'-4 1/2" 11"5'-8 1/2" 3'-9"

    13'-1 3/4"10'-11 1/4"8'-10"3'1'-8" 2'

    13'-5 1/4" 2'-8 3/4"

    9'-4

    1/2

    "6'

    -6 3

    /4"

    8'-3

    "9'

    6'-6

    3/4

    "

    PROPOSED SPANDREL

    PROPOSED JULIETTE BALCONY

    PROPOSED WINDOW

    EXISTING WINDOW

    EXISTING COVERED PORCH

    BATHROOMBEYOND

    SHELVING

    PROPOSEDGLASSGUARDRAIL

    10 1

    /4"

    GWB BULKHEADFURRING CHANNELSSTEEL BEAM

    BULKHEAD TO ALIGNWITH WALL BEYOND

    W SECTION REFER TO STRUCTURAL

    WALL BEYOND

    11 1

    /2"

    1'-4

    "

    EXISTING BEAM

    POSTREFER TO STRUCTURAL

    POSTREFER TOSTRUCTURAL

    PROPOSED SECTION B

    1/4" = 1'-0"

    A402

    MD

    20 DEC 2012

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    21'

    6'-1

    1/2

    "

    -7'-6 1/4"EXISTING BASEMENT FIN. FLOOR

    -0'-11 1/2"EXISTING BASEMENT FIN. CEILING

    10'-4"EXISTING SECOND FIN. FLOOR

    9'-4 1/2"

    EXISTING GROUND FIN. CEILING

    19'-7 1/2"EXISTING THIRD FIN. FLOOR

    18'-9 1/4"EXISTING SECOND FIN. CEILING-02

    18'-7"EXISTING SECOND FIN. CEILING-01

    27'-11"EXISTING THIRD FIN. CEILING

    0'-0"EXISTING GROUND FIN. FLOOR - LEVEL 120.53

    -3'-4 1/2"AVERAGE GRADE - LEVEL 119.50

    31'-3"EXISTING ROOF HEIGHT - LEVEL 130.05

    29'-5 1/8"MAX. ROOF HEIGHT - LEVEL 129.50

    26'-8"MEAN PROPOSED ROOF HEIGHT

    12'-7 1/4"

    SITTING ROOM

    EXISTINGMECHANICAL ROOM

    GUEST BEDROOMBEYOND

    6'-6

    3/4

    "

    4'-9

    1/2

    "

    3'-4

    1/2

    "

    5'-0 1/4"

    SHELVING

    BEDROOMBEYOND

    4'-1 3/4"

    FAMILY ROOM /STUDY

    NEW ADDITION

    4'-8 1/2" 4'-4 1/2"

    10'-8

    1/2

    "

    12'-7

    "

    12'

    1'-11 1/2"

    7'-3"

    EXISTING ENTRANCEBEYOND

    INTERIOR FINISH12 MIL GYPSUM WALLBOARD2 X 6 STUDS 16" O.C. W/ BATT INSULATIONOSB SHEATHING6 MIL POLY AIR/VAPOUR BARRIER2 X 2 VERTICAL BATTEN WITH AIR SPACESTANDING SEAM ZINC CLADDINGPROPOSED WINDOW

    EXISTING EXTERIOR

    PROPOSED SKYLIGHT

    PROPOSED STAIRSWITH DRYWALLGUARDRAIL

    9'-4

    1/2

    "8'

    -3"

    22'-6

    3/4

    "

    4'-9

    "

    PROPOSED STANDING SEAMZINC FINISH

    3'-6

    "

    5'-2 1/4"13'-3 3/4" 14'-0 1/4"

    A B C D

    PR

    OP

    ER

    TY L

    INE

    PR

    OP

    ER

    TY L

    INE

    3'-6

    "

    3'-6

    "

    3'-6

    "

    PROPOSED BRIDGE

    9'-0"EXISTING GROUND FIN. CEILING-01

    PROPOSED GLASS GUARDRAIL

    6'-2" 4'-3 1/2" 1'-0 1/2"7"

    13'-3 1/4" 1'-3" 4'-0 1/4"

    7 1/2"

    5'-7 1/2" 6' 4'-4"

    PROPOSEDGLASS GUARDRAIL

    4'-4 1/2"

    A1

    4'-4 1/2"

    EDGE OF STRUC.WOOD STUDS

    CENTER OF HSS

    3'-11" CLEAR

    STEEL BEAM TO ALIGNWITH EDGE OF HSS

    B1

    4'-4 1/2"

    HSS BEYOND

    STEEL POST &SLOPE STEEL BEAMREFER TO STRUC. DWGS.

    10 1/2"

    8 1/2"3 1/2"

    11 3/4"

    7 1/

    4"

    EXISTING BEAMBEYONDEXISTING COLUMNBEYOND

    PROPOSED SECTION A

    1/4" = 1'-0"

    A401

    MD

    20 DEC 2012

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    36 |

    West ElevationNorth Elevation

    Section BSection A

    RESIDENTIAL RENOVATION - DRAWINGS

  • 15'-6 1/4" [4731]

    16'-3"15'-11 3/4" 8'-6 1/2" 13'-5 3/4"

    EXISTING PORCH

    DN 6R

    DN 6R

    W/C

    KITCHEN

    LIVING ROOM

    DN 12R

    OPEN TO ABOVE

    UP 18R

    OPEN TO BELOW

    D/WD/W

    OPEN TO BELOW

    SHELVES

    SHELVES

    SITTING ROOM

    CLOSET

    55'-2" [16815]

    28'-3

    " [86

    11]

    55'-2" [16815]

    26'-5

    " [80

    52]

    6'-4 1/2" [1943]5'-5" [1651]13'-5 3/4" [4109]

    24'-0 3/4" [7334] 13'-5 3/4" [4109]

    15'-9 1/2" [4813]

    12'-6

    3/4

    " [38

    29]

    7" [

    178]

    11'-2

    1/4

    " [34

    10]

    9'-8

    " [29

    47]

    4'-5

    " [13

    46]

    3'-6

    " [10

    67]

    EXISTING ENTRANCE

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EXISTING FLOOR JOISTS

    7'-5

    3/4

    " [22

    77]

    2' [

    610]

    6' [

    1829

    ]4'

    -4" [

    1321

    ]

    8'-3" [2515]

    1'-3 1/2" [394]

    3' [915]

    5'-0

    1/4

    " [15

    30]

    14'-3 1/4" [4350]7'-7 1/4" [2318]

    NEW 3 STOREY ADDITIONSEE SECTION A FOR DETAILS

    NEW 1 STOREY ADDITIONSEE SECTION A FOR DETAILS

    1 3 4 5

    A

    B

    C

    2

    PROPERTY LINE

    PROPOSED WINDOWS1' [305]

    5'-2

    1/4

    " [15

    78]

    D

    8'-1

    1 1/

    2" [

    2728

    ]9'

    -7 3

    /4" [

    2940

    ]

    A1

    4'-4

    1/2

    " [13

    30]

    B1

    4'-4

    1/2

    " [13

    33]

    HSS ABOVE, REFER TO STRUCTURAL

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    7 1/

    4" [

    184]

    HSS

    HSS

    HSS

    HSS

    HSS HSS

    HSS

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    HSS HSS

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    HSS ABOVEREFER TO STRUCTURALS

    TEE

    L B

    EA

    M A

    BO

    VE

    RE

    FER

    TO

    STR

    UC

    TUR

    AL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    1' [305]

    5'-2

    1/4

    " [15

    78]

    4'-3

    3/4

    " [13

    15]

    PROPOSEDSKYLIGHTABOVE

    LEGEND

    EXISTING WALL

    PROPOSED WALL

    SMOKE / CO DETECTOR

    MECHANICAL AIR VENT

    12" GYPSUM WALLBOARD

    2" X 6" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    12" GYPSUM WALLBOARD

    2" X 4" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    INTERIOR FINISH1

    2" GYPSUM WALLBOARD2" X 6" WOOD STUDS 16" O.C.W/ BATT INSULATIONOSB SHEATHING6 MIL POLY AIR/VAPOUR BARRIERVERTICAL BATTEN WITH AIR SPACESTANDING SEAM ZINC CLADDING

    W2A: W2 WALL TYPE WITHOUT INSULATION

    W3A: W3 WALL TYPE WITHOUT INSULATION

    12" GYPSUM WALLBOARD

    2" X 4" WOOD STUDS 16" O.C.

    W1A: W1 WALL TYPE WITH PRODEMA FINISH INSTEAD OF ZINC

    12" GYPSUM WALLBOARD

    4" X 2" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    SCALE:

    PROPOSED FIRST FLOOR PLAN

    1/4" = 1'-0"

    A202

    MD

    20 DEC 2012

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    16'-3"15'-11 3/4" 8'-6 1/2" 13'-5 3/4"

    16'-3 1/2" [4963]

    18'-8

    1/2

    " [57

    02]

    13'-3

    1/4

    " [40

    45]

    PROPOSEDFROSTED GLASSREFER TO SECTIONS

    FAMILY ROOM /STUDY

    BRIDGE

    MASTER BEDROOM

    DN 18RUP 16R OPEN TO BELOW

    LAUNDRYROOM

    6'-3 3/4" x 7'-4"

    BATHROOM

    CLOSET

    DRYER

    WASHER

    SINK

    RAILING

    OPEN TO ABOVE

    CLOSET

    55'-2" [16815]

    55'-2" [16815]

    28'-3

    " [86

    11]

    13'-1 1/2" [4001]

    12'-4

    " [37

    59]

    11'-2

    " [34

    04]

    3'-4 3/4" [1035] 13'-1 3/4" [4007] 2'-5" [737] 13'-4" [4059]

    7'-8

    1/2

    " [23

    50]

    5'-5

    1/4

    " [16

    57]

    14'-9

    3/4

    " [45

    12]

    13'-1

    1/4

    " [39

    94]

    11'-3 3/4" [3448]

    12'-8 3/4" [3880]

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    EXISTING DECK JOISTS(VERIFY ON SITE)

    EXIST.RAFTERSOVER

    EX

    IST.

    RA

    FTE

    RS

    OV

    ER

    EX

    IST.

    RA

    FTE

    RS

    OV

    ER

    EX

    ISTI

    NG

    FLO

    OR

    JO

    ISTS

    2'-1

    1" [

    889]

    5'-1

    3/4

    " [15

    69]

    14'-3 1/4" [4350]

    5'-0

    1/4

    " [15

    30]

    NEW 3 STOREY ADDITIONSEE SECTION A FOR DETAILS

    1 3 4 5

    A

    B

    C

    2

    NEW 1 STOREY ADDITIONBELOW

    1'-9

    1/2

    " [54

    3]

    3'-3 1/2" [1004]

    OPENTO BELOW

    PROPERTY LINE

    MURPHY BED

    PROPOSEDJULIETTEBALCONY

    3' [915]

    7'-5

    " [22

    59]

    3'-9

    1/4

    " [11

    49]

    5'-1

    1 1/

    4" [

    1810

    ]

    5'-2

    1/4

    " [15

    78]

    D

    8'-1

    1 1/

    2" [

    2728

    ]9'

    -7 3

    /4" [

    2940

    ]

    A1

    4'-4

    1/2

    " [13

    30]

    B1

    4'-4

    1/2

    " [13

    33]

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    HSS ABOVE, REFER TO STRUCTURAL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    EXISTING BEAM ABOVEREFER TO STRUCTURAL

    HSS ABOVEREFER TO STRUCTURAL

    STEEL BEAM ABOVEREFER TO STRUCTURAL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    HSS

    HSS

    HSS ABOVEREFER TO STRUCTURAL

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    STE

    EL

    BE

    AM

    AB

    OV

    ER

    EFE

    R T

    O S

    TRU

    CTU

    RA

    L

    HSSHSS

    HSS HSS

    HSS

    HSS

    HSS

    1' [305] 1' [305]PROPOSED WINDOWS

    GLASS PARTITION

    4'-5 1/2" [1359]

    9'-10 1/2" [3010]

    3'-0

    1/2

    " [92

    7]

    5'-4 3/4" [1641]

    4'-0

    3/4

    " [12

    36]

    4'-3

    3/4

    " [13

    15]

    4'-3

    3/4

    " [13

    15]

    5'-2

    3/4

    " [15

    94]

    3'-9

    1/4

    " [11

    49]

    2' [610]6' [1829]5'-1 1/2" [1562]

    PROPOSEDSKYLIGHT ABOVE

    PROPOSEDSKYLIGHT

    LEGEND

    EXISTING WALL

    PROPOSED WALL

    SMOKE / CO DETECTOR

    MECHANICAL AIR VENT

    12" GYPSUM WALLBOARD

    2" X 6" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    12" GYPSUM WALLBOARD

    2" X 4" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    INTERIOR FINISH1

    2" GYPSUM WALLBOARD2" X 6" WOOD STUDS 16" O.C.W/ BATT INSULATIONOSB SHEATHING6 MIL POLY AIR/VAPOUR BARRIERVERTICAL BATTEN WITH AIR SPACESTANDING SEAM ZINC CLADDING

    W2A: W2 WALL TYPE WITHOUT INSULATION

    W3A: W3 WALL TYPE WITHOUT INSULATION

    12" GYPSUM WALLBOARD

    2" X 4" WOOD STUDS 16" O.C.

    W1A: W1 WALL TYPE WITH PRODEMA FINISH INSTEAD OF ZINC

    12" GYPSUM WALLBOARD

    4" X 2" WOOD STUDS 16" O.C.W/ BATT INSULATION1

    2" GYPSUM WALLBOARD

    SCALE:

    PROPOSED SECOND FLOOR PLAN

    1/4" = 1'-0"

    A203

    MD

    20 DEC 2012

    PROJECT TITLE:

    CLIENT:

    DRAWING TITLE:

    PROJECT NUMBER:

    DRAWN:

    DATE:

    DRAWING NUMBER:

    12008

    SCALE:

    KEY PLAN

    REVISION - RECORD

    100 ROXBOROUGH STREET WEST

    RESIDENTIAL RENOVATION

    100 ROXBOROUGH STREET WEST

    TORONTO, ONTARIO M5R 2J3

    ROXBOROUGH STREET WEST

    MO

    LSO

    N S

    TRE

    ET

    MACPHERSON AVE

    |37

    Second Floor

    Ground Floor

    The renovation of this private residence includes a complete redesign of the layout of the interior space with the inclusion of a 3-storey central atrium connected to the addition of a new side entrance. Substantial glazing units are incorporated into the design to allow more daylight into the core of the house. The back facade was also redesigned to compliment the new interior layout.

    Working closely with Tye Farrow as the lead designer, my responsibilities included assisting in design development, ensuring proposed changes are in compliance with OBC standards, preparing drawing sets for client reviews, structural coordination, researching product specifications, and conducting site visits.

    With Tye Farrow of FPA | 2012

    Private Residential RenovationWork Term at Farrow Partnership Architects Inc.

    RESIDENTIAL RENOVATION

  • Sper

    long

    a - T

    orre

    Tru

    glia

    Tiv

    oli -

    Vill

    a A

    dria

    na

    Sper

    long

    a - V

    ia I

    Ort

    icel

    lo

    Urb

    ino

    - Via

    Pos

    ta V

    ecch

    ia

    Tiv

    oli -

    Vill

    a A

    dria

    na

  • ROME TIVOLI

    SIENA PIENZA

    URBINO

    VENICEPOSSAGNO

    PARMASABBIONETA MANTOVA

    VERONAVICENZA

    PAESTUM

    SPERLONGA

    |39

    University of Waterloo | 2014

    Italy by InkRome Studio and Italian Urbanism

    ITALY BY INK - MAP

    A architects sketchbook is a place to serve many purposes. It is a place to learn, express, make memories and to create a vault of references.

    In our final school year, we studied in Rome. During the term we visited over twenty cities across Italy. Here is a sample of sketches and

    drawings from some of them that helped me to understand Italian Architecture and Urbanism through the act of drawing.

    Sien

    a - U

    rban

    Arm

    atur

    e

  • Vene

    zia

    - Pon

    te R

    ialt

    oU

    rbin

    o - U

    rban

    Arm

    atur

    e

    Pie

    nza

    - Urb

    an A

    rmat

    ure

    Man

    tova

    - U

    rban

    Arm

    atur

    e

  • Pae

    stum

    - Te

    mpi

    o di

    Ate

    na

    Sabb

    ione

    ta -

    Teat

    ro a

    llan

    tica

    Par

    ma

    - Bap

    tist

    ry

    Urb

    ino

    - Pal

    azzo

    Duc

    ale

    Pos

    sagn

    o - M

    useo

    Can

    ova

    Vero

    na -

    Vill

    a R

    oton

    daR

    oma

    - S G

    iova

    nni i

    n L

    ater

    no

  • Rom

    a - M

    ura

    Aur

    elia

    ne n

    ear

    Por

    ta M

    etro

    nia

    Rom

    a - P

    iazz

    a de

    i Mer

    cant

    i

    Rom

    a - V

    ia S

    anta

    Cec

    ilia

    Rom

    a - C

    aste

    l San

    tA

    ngel

    o

    Rom

    a - P

    iazz

    a di

    San

    ta C

    ecili

    a

  • Rom

    a - V

    ia d

    el G

    iani

    colo

    Rom

    a - P

    iazz

    a di

    San

    ta M

    aria

    in T

    rast

    ever

    eR

    oma

    - Ter

    me

    di C

    arac

    alla

    Rom

    a - P

    orta

    Met

    roni

    aR

    oma

    - Tea

    tro

    di M

    arce

    llo

    Rom

    a - M

    ACR

    O -

    Mus

    eo d

    Art

    e Co

    ntem

    pora

    nea

  • 613.400.7463 | [email protected]

  • MICHELLE DUONGPORTFOLIO