Page 1: Micro-Generation Installations Your Way

Micro-GenerationInstallations

YOUR Way

Rocky View County

Joe Peters, Manager Service Development

Allison Thomas, Stakeholder Relations Manager

November 30, 2011

1/13/2012 1

Page 2: Micro-Generation Installations Your Way

1/13/2012Footer Text 2

Electrical System Overview

Page 3: Micro-Generation Installations Your Way

Wires Service Provider

• Deliver safe and reliable

electricity

• Manage outages

• Connect new customers

• Manage metering data

• Rates regulated by the

Alberta Utilities Commission

(AUC)

• Micro-generation

coordination

1/13/2012 3

Page 4: Micro-Generation Installations Your Way

Micro-Generation Regulation

• Issued by the Alberta

Government in 2008

• The AUC oversaw

implementation and

developed processes to

simplify approvals

1/13/2012 4

Page 5: Micro-Generation Installations Your Way

Connecting YOUR Project

• 128 generators have

signed interconnection

agreements with

FortisAlberta since

2009.

1/13/2012Micro-generation 5

Page 6: Micro-Generation Installations Your Way

Micro-Generation

To qualify as a micro-generator

the generating unit must…

• Use renewable or alternative

energy technologies or

higher efficiency fossil fuels

• Have a generating capacity

smaller than one megawatt

• Produce electricity primarily

for the customer’s own use

1/13/2012 6

2-4 kW

600 kWh per month

Page 7: Micro-Generation Installations Your Way

Installations

• Mini MG Inverter-based

o 10 kW and smaller

• Small MG

o 0 kW to 150 kW (excludes

Mini MG)

• Large MG

o Greater than 150 kW and less than 1 MW

1/13/2012Footer Text 7

Page 8: Micro-Generation Installations Your Way

Mini Micro-Generator

1/13/2012 8

• Capacity < 10 kW

• Equipped with a grid-tie

invertero Changes DC to AC

o AC compatible with

distribution system

o Provides safety features

Page 9: Micro-Generation Installations Your Way

Steps to get your project started!

1/13/2012 9

Step 1 (optional) - Inform FortisAlberta of your plan to install a micro-

generator

Step 2 - Consult with an electrical contractor

Step 3 - Get municipal permits

Step 4 - Prepare a site plan and electric

single-line diagram

Step 5 – Submit application to

FortisAlberta

Page 10: Micro-Generation Installations Your Way

Application & Guidelines

1/13/2012Footer Text 10

Page 11: Micro-Generation Installations Your Way

Supporting Documents

• Electrical single-line

diagram

• Site plan - where the

MG will be located

• Electrical permit

1/13/2012 11

Page 12: Micro-Generation Installations Your Way

FortisAlberta’s Role

• Process and approve

application

• Interconnection

agreement

• Install bi-directional

meter

• Meter info to Retailer

1/13/2012 12

Page 13: Micro-Generation Installations Your Way

Only YOU have the power

to monitor and control the

energy you use.

FortisAlberta wants to help

Page 14: Micro-Generation Installations Your Way

• Public library power

monitor program

• Community education

programs

• Energy efficiency

resources

• Alberta OnFarm program http://www.onfarmenergy.ca/

Save Energy! Save Money!

Page 15: Micro-Generation Installations Your Way

Visit us online at

www.fortisalberta.com

Phone us 403-310-WIRE or email

[email protected]

Phone us 403-310-WIRE or email

[email protected]

1/13/2012 15