    1. Safety in the Engine Room

    Safety is paramount to any working environment. Working on ships especially in the engine room where considered a high hazard area, safety procedure must be in placed at all times to prevent any uncontrollable circumstances. Safety procedures and accident prevention measures shall be reviewed periodically and crew motivation and awareness shall be enhanced continuously to adapt the working situation.

    Fig. 1-1 Safety Concerns

    1.1 Principles to be observed in the Conduct of an Engineering Watch

    In the conduct of watch in the engine room the following principles should be observed:

    a. The Chief Engineer is the officer in-charge of the engineering watch and is primary responsible at all times for the safe and efficient operation, maintenance and inspection of machineries affecting the safety of the ship, its personnel and the environment.

    b. The Chief Engineer representative or the engineer officers in charge of the engineering watch when designated must be responsible in lieu of the Chief Engineers primary responsibility in an engineering watch.

    c. Watch arrangement is adequate and arranged suitable to the prevailing circumstances and in accordance to safety management system.

    d. When taking over the watch, the engineer officer in charge of the engineering watch shall not hand-over the watch to the relieving officer if there is reason to

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 2 of 17

    believe that the relieving officer is not capable of carrying out watchkeeping duties effectively and in which case the Chief Engineer shall be informed accordingly.

    e. The relieving duty engineer shall ensure that the members of the relieving duty personnel are fully capable of performing their duties effectively.

    f. Prior taking over of watch, the relieving duty engineer shall satisfy themselves to the engine room conditions relating to safety, operation and maintenance conditions of machineries, standing orders and special instructions, etc.

    g. When performing the engineering watch, the designated duty engineer shall ensure that:

    i. the established watchkeeping arrangements are maintained; ii. any machinery not functioning properly, expected to malfunction or requiring

    special services or attention shall be noted including the action already taken; iii. the duty engineer at all times is readily capable of operating the propulsion

    equipment in response to needs for changes in direction or speed; iv. the duty engineer shall be immediately available and on call to attend the

    machinery spaces during UMS operation; v. all bridge orders are promptly executed; vi. all machinery and equipment which maybe used related to maneuvering is in a

    state of immediate readiness and that available reserve power is available for steering gear and other requirements when the engine room is put on stand-by condition;

    vii. the duty engineer make himself free of any obligatory function other than supervising and assisting the personnel working under his watch, safe and efficient operation and upkeep of machinery and the conduct of adequate rounds in the machinery spaces to prevent any malfunction. He must devote his time during his watch in maintaining the safe and efficient operation of the engine room until he is relieved;

    viii. duty engineer must notify the Chief Engineer in any event such as abnormality of critical machineries, emergency stop of the main engine, electric power supply is lost, unusual increase of bilge water, there is order from bridge to change the engine speed, hazards to navigation, injury to personnel, and danger of polluting the sea.

    1.2 Watchkeeping Arrangement in Engine Room

    Suitable watchkeeping arrangement shall be employed in the engine room in consultation with company SMS procedures, the master of the ship and the prevailing circumstances as deems Chief engineer judgment may not be impaired that all aspects of safe watchkeeping procedures are in placed keeping in foremost the following objectives; Safety of Life at Sea, Safe Operation of Ships, Environmental Protection and Security.

    1.2.1 Unmanned Machinery Spaces (UMS) Watch

    UMS watch or sometimes called as MO watches is being conducted in the engine room capable of maintaining the operation and relevant safety requirements without any personnel involved at certain periods.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 3 of 17

    The UMS watch must be commenced depending on the Chief Engineer judgment that it is technically practicable in accordance with the UMS Check List and that the machinery space has clear of danger and the safe operation is established.

    UMS watch is conducted on daily basis commonly during night time and should not be more than 24 hours in duration. Checking of machinery parameters and condition should be done at least once in 24 hours period using the form UMS Checklists. This is to ensure that the machinery spaces operation and safety procedures are in placed.

    Designated duty engineer (1/E, 2/E and 3/E) of the day to carry out the UMS watch, must make himself available within the nearest areas or in his cabin to ensure that any alarms relating to machinery spaces during the watch should be properly attended to.

    1.2.1 Manned Engine Room Watch

    Manned engine room is a common arrangement in an older designed ships wherein the machinery spaces is kept manned in 24 hours to maintain safe operation and prevents any danger to arise. In the modern ships, manned engine room is also being conducted when the ship is in entering/leaving port situation, during heavy weather condition, etc.

    Designated duty engineer is taking a 4-hourly watch twice in a day and carrying out maintenance works of machinery assigned to him. A rating is also designated to assist the duty engineer in keeping safe operation and maintenance in the engine room.

    The watch schedule is as follows:

    1st Engineer 04~0800/16~2000 hours 2nd Engineer 00~0400/12~1600 hours 3rd Engineer 08~1200/20~2400 hours

    The above schedule is sometimes changed when additional engineer is available onboard and commonly the 1st Engineer is taking charged of the daily jobs or the maintenance works.

    1.2.3 In-Port Watch

    When the ship is approaching her destination or in the port, the engine room under manned or UMS arrangement should be prepared suitable to the operational demand such as entering/leaving port operation, cargo work operation, etc.

    Watchkeeping arrangement in the engine room varies depending on the situation and is arranged in accordance with the operational requirements of the machinery.

    Commonly when the ship is entering/leaving port, the Chief Engineer is taking charge of the watch and reinforces the watch arrangement in the engine room.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 4 of 17

    Additional personnel (electrician, cadets, etc.,) are stationed in the engine room to assist in the machinery space operation.

    1.3 Routine Operation and Maintenance

    When conducting routine operation and maintenance in the engine room, the following activities is the norm procedures that are being conducted to ensure that safe and efficient operation and maintenance is adhered to. Safety aspect is also enhanced when various precautionary measures, safety training and hazard prediction activities are applied.

    1.3.1 The Toolbox Meeting

    Toolbox meeting is a meeting conducted to coordinate job description, schedule of the day and other matters to ensure safety in the workplace at all times. The meeting is being conducted at every start and end of work hours. All the crew that are involved to the specific maintenance jobs in the engine room and other places onboard are briefed accordingly, stating the work schedule, various safety procedures, the relevant outcome required and the hazards involved.

    All crew before carrying out maintenance jobs must make themselves involved in a toolbox meeting at all time.

    Fig. 1.3.1-1 The Toolbox Meeting

    The Toolbox MeetingWhat about you, Cadet? Do you have any suggestions regarding our safety procedure?

    1.3.2 Pointers in Conducting Toolbox Meeting

    a. Choose specific jobs to be done during the day. b. Be prepared to discuss hazards involved, safety procedures, company

    instruction, plans, materials, etc., which are related to the jobs. c. Get the crew actively involve in the meeting as:

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 5 of 17

    i. Talking about real life example (case study) of safety concerns and hazards related to the job.

    ii. Let the crew suggest and ask question related to the topics. iii. Ask feed back from them about the meeting. iv. Involve the crew in preparing for and/or leading future meetings.

    d. Follow up and look back into complaints, suggestions and concerns brought out by the crew, let them informed of the results and keep records of the meeting.

    e. Conduct Hazard Prediction Training (Kiken Yochi Training (KYT) in Japanese).

    1.3.3 Hazards Prediction Training (KYT)

    KYT is a training method developed by Japanese, which is being conducted through pre-work meetings or other procedures, where workers are given advance warning of various unsafe conditions or unsafe behavior related to the job activity, and thereby ensuring their own personal safety and the safety of others around them.

    a. Point and Call

    A method used to prevent accidents by human errors by making every action is clear in which work accuracy is improve.

    Point and call are applied by confirming correct action before performing it and confirming correct action after performing it.

    Fig. 1.3.3-1 Point and Call Method

    OK, This valve is Closed !

    Close the valve, Turn right, OK !

    Confirm correct actionbefore performing it !

    Confirm correct actionbefore performing it !

    "OK, close the valve. Turn right"

    b. Point and Repeat

    Point and repeat is method by which every crew points to an object together and name it in unison. This aims to focus everyones attention on one goal thereby enhance the team sense of identity and solidarity to achieve the goal.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 6 of 17

    Point and repeat generally conducted at the start and end of the workday. This method is also effective in preventing accidents due to error. One person is asking the task to be done and the other person is confirming and mutually agreeing if the task is correct. Both person are pointing to the object to work on and repeating the task and action for confirmation. In this manner, errors or mistakes are avoided.

    Fig. 1.3.3-2 Point and Repeat Method

    Switch on,OK!

    Switch on,OK!

    i. Touch and Call

    It is a type of point and repeat with every crew are in physical contact and chanting a slogan to a certain jobs to be performed. This aims to promote safe actions consciously and unconsciously, prevents careless, absent minded behavior.

    Fig. 1.3.3-3 Touch and Call Method

    "Touch and Call" "Let's go for zeroaccidents, OK!"

    c. Lock In/Tag-out

    It is applies to servicing and maintenance of machines and equipment, a method used to ensure that any equipment to be work on is totally isolated, in which the unexpected start up or release of stored energy is not allowed, and lock in that will not cause any harm i.e., putting the switch in off position, removal of fuse in the panel and putting notice tag-out in the source, i.e., control panel, switchboard. The emphasis of this method is to the worker who is doing the jobs and all the control for accident prevention are lie on him

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 7 of 17

    Fig. 1.3.3-4 Lock In/Tag-out Method

    1.3.4 Near-miss Activities and Reporting in the Engine Room

    Near-miss is defined as an incident or event happened that does not cause accident or injury to personnel or damage to machinery but has the potential to do so.

    According to the Heinrich`s Law, there are about 300 near-miss cases and 29 small incidents behind one serious accident. This goes true in daily operation in the engine room and near-miss incidents should be properly identified by reporting activities, compiling and analyzing data to plan for preventative measures.

    Near-Miss 3000 activities which has introduced by NYK line onboard their vessels are intended to identify and neutralize the factors that could cause accidents/or vessel trouble.

    NYK believes that near-miss activities alone do not cover the full scope of accidents warnings and causes. As such, the company places importance on uncovering unsafe conditions and acts, addressing relevant issues on a case to case basis as part of the problem identification activities. Examples of such conditions and behavior include slippery passageways or difficulty in seeing safety warnings. Near-Miss 3000 reflects the companys recognition of 3000 unsafe acts and conditions, which crews are encouraged to be alert in their working environment.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 8 of 17

    Fig.1.3.4-1 Heinrichs Law

    Serious Accident

    Lapses/Mistakes

    Minor Accidents/Troubles

    Unsafe Acts/Unsafe Conditions

    1

    29

    300

    3000

    Heinrich'sLaw

    Fig.1.3.4-2 Near-Miss Factors for the Year 2004 (Source: NYK Line)

    Poor design5%

    Others34%

    Poor maintenance9%

    Communication4%

    Inadequateknowledge14%

    Lack ofplanning7%

    Proceduralviolation26%

    In engine room, there are many dangerous possibilities lurking behind of near miss. Some of them lead to serious injury. Following cases are examples of incidents that that should be taken seriously and the same situation shall be avoided.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 9 of 17

    Fig.1.3.4-3 Examples of Near-Misses

    LOCATION Degree of Serious Primary Cause Description

    Workshop/ Machinery space

    DEVIL (Unsafe Act and Unsafe Condition)

    Neglect, Procedural Violation, or Unsafe Act

    It was found that some steel pipes in engine room near the boiler were not properly secured. It may cause damage to the boiler and other equipments when the vessel rolls in rough sea area.

    Crew Accommodation

    DEVIL (Unsafe Act and Unsafe Condition)

    Mis-operation or Error in Working

    Procedure: due to the

    poor instruction

    Every time the washing machine for dirty clothes is being used, low insulation alarm of 100V occurs. It was due to water overflowing of washing machine. Some water splash over washing machine motor and it was grounded.

    Others (Specify in Description)

    DEVIL (Unsafe Act and Unsafe Condition)

    Inadequate Knowledge/Understanding:

    due to the lack of education

    In steering room fresh water tank level gauge valves were always open. To avoid water leaking when the level gauge glass is broken, these valves must be closed.

    Engine Room

    Near Miss (Slight

    trouble or a minor

    accident was

    avoided)

    DEVIL (Unsafe Act and Unsafe Condition)

    A crewmember was lifting and painting main engine spare exhaust valve. In lunchtime he left engine room without securing the exhaust valve.

    Engine Room DEVIL

    (Unsafe Act and Unsafe Condition)

    DEVIL (Unsafe Act and Unsafe Condition)

    While overhauling of No.2 ballast pump to replace mechanical seal due to leakage, the valve was accidentally opened, causing possible water flooding on E/R.

    Others (Specify in Description)

    DEVIL (Unsafe Act and Unsafe Condition)

    Missing or Disordered

    Equipment or Documents:

    due to the bad arrangement

    After a stormy weather, it was found out that emergency generator room was wet because rain came inside. The cause was leakage water into watertight door.

    In NYK ships, Near-Miss 3000 Activity is being enforced and one of the objectives is to raise the awareness of safety among crewmembers and motivate them to make improvements on the scene. Every crew members are encouraged to participate, identify any near-miss observed and do correction directly as much as possible, report data to the company and to have the company effectively prepare countermeasures against troubles.

    You, as cadet have the potential to cause an accident, and the potential to prevent an accident, improve the state of your ship and nip trouble in the bud and raise your situational awareness. This means that in every activity or working procedure in the engine room shall be incorporated with near-miss identification and correction to prevent an accident.

    Thus, DEVIL Hunting is introduced and continuously follows up by all crew. It is very essential in keeping the engine room a safe place to work and free of machinery troubles.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 10 of 17

    DEVIL: (Unsafe Act/Condition) or simply Dangerous Events and Irregular Looks.

    Fig.1.3.4-4 Devil Hunting

    Fig.1.3.4-5 Procedures for Near-Miss and Devil Hunting

    Step AAll crewmembers search for near misses and DEVIL's in the ship, and submit report if found.

    Step BThe contents of the submitted reports should be confirmed and discussed to determine the necessary measures.

    Step CMeasures are conducted on the basis of the discussions. And permanent corrective actions are taken, if necessary.

    Step DIntroduce submitted reports and corrective actions to all crewmembers.

    Submit reports to the company.

    The above procedure should kept in a continuous cycle and to take improvements whenever is necessary.

    Fig.1.3.4-6 Near-Miss Report Form, below figure is used to write down datas of any event related to near-miss/DEVIL acts in the engine room by the crew. It should be filed to a near-miss box located at the ships office or at the designated areas.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 11 of 17

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 12 of 17

    Fig.1.3.4-7 Cutting of Empty Drum

    Please

    make a

    water

    tank

    with this

    drum.

    Lets cut

    the

    lid by gas

    cutting.

    Some oil

    was still

    left.

    In the figure above, a serious injury occurred to the personnel due to wrong procedure for the work that was carried out. If the near-miss activity was conducted, the possible hazards can be identified and necessary preventative measure can be drawn up and implemented accordingly.

    1.4 What To Do in Case of an Emergency

    It is very essential that every personnel must know how to deal and cope with an emergency or in case of machinery trouble specifically in the engine room.

    Familiarity of the machinery spaces is a must for all the personnel working in these areas in order for them to act in any prevailing situation. Various situations must be grasps in order for them to act according to what is required in an event of;

    1.4.1 Fire

    Fire is one of the catastrophic scenarios when occurred in the engine room. Combustion mostly occurs when the three elements of fire (heat, fuel and air) are present.

    These three elements of fire are always presents in the engine room, especially in machinery spaces and working areas. The best method of fighting a fire is prevention. Any flammable materials will not emit fire when properly handled and kept in proper location.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 13 of 17

    Fig. 1.4.1-1 Fire in the Engine Room

    When occurrence of fire in the engine room is observed, the following measures should be done:

    a. Keep calm and fight the fire with available fire extinguishing agent at hand when fire has just only started. When two persons detect the fire, another person shall do the raising of the alarm.

    b. Raise the alarm and inform the bridge of the location, kind of combustible materials, etc.,

    c. Continue to fight the fire if applicable and if impossible, look for a safe place near the location of fire, coordinate with the on-scene leader of the firefighting team and give information such as the cause of fire, any crew in the vicinity of fire, initial firefighting applied, scope of the spread of fire and the estimated time outbreak of the fire.

    d. When the on-scene leader grasps all the information, ask permission to proceed in your muster station and follow the instruction of your team leader.

    Notes:

    i. Best fire fighting agent is prevention. ii. Initial action when fire is detected is foremost important to successfully contain

    the fire.

    1.4.2 Black-out

    Black-out or electrical power outages is an occurrence when the electrical power generator or other ancillarys related equipment fails the supply of electricity onboard.

    This scenario is very rare to occur but proper knowledge in prevention and countermeasures is a must for engineer officers to take charge of an engineering watch.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 14 of 17

    When Black-out occurrence prevails, do the following:

    a. Initially, the duty engineer must check and try to recover the electrical power supply and report the situation to the bridge and to the Chief Engineer.

    b. Identify the direct cause and judge the possibility of restarting the main electric power supply, or of starting the auxiliary or stand-by generator and closing ACB, etc.

    c. Restart the auxiliary or stand-by generator automatically or manually and close the ACB.

    d. Stop, slow-down and restart the operation of the main engine as occasion demands.

    e. Sequentially restart the vital auxiliary machinery or manually restart them in succession as occasion demands while watching the electrical loads.

    f. Restart the other auxiliary machinery such as purifier, air cond. system, etc. g. Recover and maintain the operating parameters of the main engine. h. Investigate the cause and take countermeasures.

    1.4.3 Flooding

    Flooding is an occurrence when there is breakage of sea water piping or tearing of the ships hull that will cause flowing of sea water in the engine room.

    When flooding is detected in the engine room, you should:

    a. Raise alarm to crew around, notify the bridge and give information regarding the situation and inform the Chief Engineer.

    b. Conduct initial damage control bearing in mind the following concerns:

    i. Isolation of the affected area. ii. Protects all machinery especially those used for damage and flooding control

    such as the electrical equipments, pumps, etc.

    c. When the on-scene leader has arrived, brief him regarding the situation such as the location of source of water, the possible cause, etc.

    d. When all relevant information has given to the on-scene leader, ask permission to proceed to your muster station and follow the order of your team leader.

    1.5 Hazards Related to Job Activities in the Engine Room

    Various hazards are involved while working in the engine room. Some cases are discussed here are to be used for guidance and may not be complete. It is recommended that hazards related to job activities are to be identified and discussed among the crew to improve the safety procedures and to prevent accidents.

    a. Drilling hole on metal using bench drill machine.

    Point of Hazards: i. Not wearing of safety goggles or glass. Metal chip/ powder may likely enter the

    eyes.

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 15 of 17

    ii. Wearing of gloves. The hands maybe caught by the

    rotating elements of the machine.

    iii. Work piece is unsecured and is using the hand. Work piece must be fastened by securing tool to avoid swinging and thrown due to rotating force that may cause injury to a person (Fig. 1.6-1 Drilling Hole).

    b. Grinding work on bench grinder.

    Point of Hazards: i. Work supporting block clearance (d) is

    too big. Block clearance must be adjusted to minimum distance to support the work piece and to avoid flying off.

    ii. Work piece is secured by pliers. Pliers cannot support the work piece securely and may cause the work piece to fly-off (Fig. 1.6-2 Grinding).

    c. De-burring work.

    Point of Hazards: i. The work is not secured completely, it

    maybe sent off flying. ii. The air sander may jump-off from the

    hand that can hurt the user (Fig. 1.6-3 De-burring work).

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 16 of 17

    d. Cleaning of filter elements in the workshop.

    Point of Hazards: i. Cleaning of filter while welding jobs is

    being carried out on the other side. This can cause fire in the area, if the chemical is combustibles and used as cleaning materials.

    ii. Do not work at welding area as this may injured your eyes.

    iii. Water shall not be used near the welding area otherwise electric shock may occur (Fig. 1.6-4 Filter Cleaning).

    e. Lifting/Carrying of objects while in the Engine Room

    Point of Hazards: i. Lifting position.

    Even though the lifting position is correct and the weight is enough, never attempt to lift object above you. This will cause tip-off especially when the ship experience rolling or pitching.

    ii. Non-secure objects. Avoid manual lifting of heavy object and as much as possible ensure that it is fully secure. Use lifting devices as necessary or ask assistance when carrying heavy objects. Be careful with stairs. When lifting object in stairs, always free up one hand to hold on rail (Fig. 1.6-5 Lifting Object).

    f. Working with ladder.

    Point of Hazards: i. Falls from height above the ground.

    Select the right ladder for the job. Never splice two ladders at a time.

    ii. Falling tool and equipment. Secure all tools that are being used on top.

    iii. Slips. Be sure to position the ladder and properly secured (Fig. 1.6-6 Work with Ladder).

  • Original Date: 01 Mar. 2008

    Version No.1 Page:

    Chapter 1 - Safety in the Engine Room Revision Date:

    Revision No:0 17 of 17

    g. When entering a tank for inspection or maintenance.

    Point of Hazards: i. Asphyxiation from oxygen deficiency.

    Oxygen content of the tank must be continuously monitored as most of accidents inside the tanks are caused by oxygen deficiency.

    ii. Falls As the tank was not cleaned, be precautious in stepping at the steps and flooring.

    iii. Communication Failure. Common problems when entering tanks is communication. Use buddy system and always confirm that proper communication is established at all times (Fig. 1.6-7 Entering a Tank).