Page 1 of 6 02 February 2015 Postwick Hub – Update No. 17 One of the key areas of work early in January has been to progress the construction of the retaining wall to create a space beneath the pier and abutment of the existing A47 bridge which will be the route for the new ‘off slip’. The capping beam to the retaining wall was completed before Christmas and monitoring for settlement continued until work recommenced in the New Year. The go ahead was given by the engineers to commence removal of the material in front of the piles to enable the construction of the new retaining wall to continue.

Upload: doandang

Post on 03-May-2018

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1 of 6

02 February 2015

Postwick Hub – Update No. 17

One of the key areas of work early in January has been to progress the construction of the retaining wall to create a space beneath the pier and abutment of the existing A47 bridge which will be the route for the new ‘off slip’.

The capping beam to the retaining wall was completed before Christmas and monitoring for settlement continued until work recommenced in the New Year. The go ahead was given by the engineers to commence removal of the material in front of the piles to enable the construction of the new retaining wall to continue.

Page 2 of 6

Removal of the sheet piling in front of the new South bridge pier commenced in midJanuary and was completed on time to reveal the first part of the new bridge structure..

Work commences overnight on 2 February to remove the sheet piles to the North pier which will require off peak closure of the Eastbound ‘on slip’.

Page 3 of 6

New stone drains are being installed down the earthworks slope the new ‘on’ slip road.

New North / South link road

Photographs courtesy of Mike Page

Page 4 of 6

Aerial photo of the new roundabout on Oaks Lane and the drainage lagoon which will take the surface water from the A1042 and Park & Ride access road.

Photograph courtesy of Mike Page

Some of the Utilities ductwork that has required moving as part of the Oaks Lane roundabout works.

Page 5 of 6

Traffic Management

A47 Westbound – Weekday Off Peak lane 1 closure (09.30 – 15.30)

A47 Eastbound – 02/02/15 – 06/02/15 & 09/02/15 – 13/02/15 ‘on’ slip lane off peak closure (19.00 – 06.00)lA1042 Yarmouth Road single way working controlled by two way traffic lights.

Temporary roundabout layout will remain in place at the entrance to the park & ride site.

Broadland Way / Peachman Way roundabout localised lane narrowing.

50mph temporary speed limits in force on the East and Westbound carriageways for the duration of the works. 30mph limits in force on A1042 and Broadland Way.

Oaks Lane is closed. Diversion route, A1042 Yarmouth Road, C440 Brundall Low Rd, C440 Church Rd, U59404 Cullings Hill.

Attached at the end of the Newsletter are extracts from the Contractors ‘timeline programme’ for week 30 to week 40.

This and future newsletters, together with timings of the different stages of Traffic Management during the works, can be viewed on the County Councils website, please see below.

For Further Information

Further information on traffic management during the works and updates on progress can be found on Norfolk County Council website. www.norfolk.gov.uk, click he r e .

Live roadworks information can be viewed on the County Council's website he r e , or from'Roadworks' in the A-Z of Services.

Twitter @BB_PostwickHub

Tim Ellis, Deputy Project Manager, on 07885 579597, orNorfolk County Council highways enquiries on 0344 800 8020

Lucy Washington – Randall [email protected] Civils General Enquiries 0800 0329760

S r n1p g

4

Aut mn15u

Hm

m

G

&R

m

L nk R ad c ns r c onEa t kcomp eteSo th k – ro ressMer e tapeNew b dge –No th AbutmentNo th P eSo th Abutment …S ats d ve s on …Dve ge T pe …

P&R Junct on r co gu a onSo th embankm nt …

P&R E tens on – ma n wo ks …

m

o o t u t s nu n n p g

g r r

rr r u

t r sr a r

e n r t u e

x r

@ W

Cu r nt R ad – r man g

Cu r nt R ad – r p ac d

Cu r nt T un Road – A 7

New Ro d –und rco s ru t on

r e o e n

r e o e e

r e r k 4

a e n t c

BB

Pro cO e

S e O ce &Compound

Jan 15

Spr ng14

Hm

Gm

&R

mm

L nk oad O EN

New b dge –No t Abu menNo t rSout Abu men …

S a s d vers ons …

D ve ge ap r …

P&R un t on econ urat onSout mbankmen …

P&R Extens on – M n work…

R P

rr h t t r h P e

h t t

t t

r T e

J c r g h e t

a s

@ W

Cu ren oad – ema n n

Cu ren oad – ep aced

Cu ren runk Road – A4

New Road – undecons r c n

r t R r g

r t R r

r t T 7

r t u t o

B

BPr ectO e

S te O c &C mp und

Page 6 of 6

LLeeggeenndd ::

Current Road – remaini

iing Current Road –

repllaced Current Trunk

Road – A47

New Road – under constructiion

ProjejecttOffficice

Brrooaaddlalanndd

B uussinineessss PPaarrkk

@ Wkk __3300

HeeaatthhFFaarrm

CCoommeennttaarryy ::

Liink Road constructiion East lliink complel te South lliink – iin progress Merge taper --New briidge – North AbutmentNorth Piei rSouth Abutment …..Stats diiversiions …..Diiverge Taper …

P&R Junctiion reconffiiguratiion .... South embankment …

P&R Extensiion – maiin works …..

A1042EB MergeSliproad Grraannggee

FFaarrm

EB DivergeSliproad

PPaarrkk& Rididee

A47Sitite Offfiice & Compound A1042

Spriing14

Jan 15 Autumn15

10 20 30 40 50 60 70

LLeeggeenndd ::

Current Road – remaini

iing Current Road –

repllaced Current Trunk

Road – A47

New Road – under constructiion

ProojjectOffficice

Brrooaaddlalanndd

BuussinineessssPPaarrkk

@ Wkk __4400

HeeaatthhFFaarrm

CCoommeennttaarryy ::

Liink Road --OPEN

New briidge –North AbutmentNorth Piei rSouth Abutment …..

Stats diiversiions

….. Diiverge Taper

P&R Junctiion reconffiiguratiion .... South embankment …

P&R Extensiion – Maiin works…..

A1024EB MergeSliproad Grraannggee

FFaarrm

EB DivergeSliproad

PPaarrkk& Rididee

A47Siite Offfiicee & Coompoound A1024

Spriing14

Jan 15 Autumn

Autumn1

5

Jan 15

Page 7 of 6

1 5

10 20 30 40 50 60 70