Background
To release new INVETER board for type A
We released a substitute Type A Zestia Inverter board using the latest Type B ZestiaINV board with modification kit and additional setting. Please follow the instruction of INV Board Replacement Manual for the model LX10F10A.
Descriptions
Current
Parts # #2170208 #2531557
*New Inverter board includes modification kit
The current type B Inverter board #2222628 is NOT compatible for type A.
Appearance
NEW
-
Descriptions
【Config Set】
Turn OFF the circuit breaker after changing the setting.
Press the key after select “OFF”
Select “Type 2”
Select“INV Board Setting”
Added the setting for the inverter board in Config set only if Controller Model had been selected as “DECOSV” in order to the controller recognizes which inverter board type is installed on LX10F**A model.
If “Controller Mode” had been selected as “DECOSVa”(Type B) , INV Board Setting is not appeared in Config set.(DECOSVa should have B type inverter board. not accept to install A type).
When new Inverter board replacement, software and initial settings must be changed.
Problems occur in operation of container unit if setting is incorrect.
Controller type : DECOS V (Type A)Software version : 3045 or laterInitial settings_INV Board Setting : Type2
Type 1 : for Old type inverter board Type 2 : for new type inverter board
-
3
Container Refrigeration UnitINV Board Replacement Manual
Daikin Industries, Ltd., Refrigeration Div.
Transport Refrigeration Development Group
September 11, 2020
Model: LX10F15A*
CB20T009A
Warn ing
After board replacement, software and initial settings must be changed.
Software version : 3045 or later
Initial settings_INV Board Setting : Type2
Problems occur in operation of container unit if setting is incorrect.
-
[Contents]
Precautions
Supplementary Kit
Required Tools
Removal of the Heatsink Assembly (INV Board Assembly)
Installation of the Ferrite Cores
Fixate the wire harnesses inside INVBOX
Storage of Components
Installation of New Heatsink Assembly (INV Board Assembly)
Wiring work
Attaching Name Plates
Software update and configuration setting Rewrite/Trial Run
Finishing
4CB20T009A
-
Precautions
5
Danger
Caution• Cut extra length of cable ties so that the cut end does not form a dangerous edge.
• Since the removed bolts will be reused, keep them in such a manner that they are not
confused with each other.
• Prepare 400 V power supply that will be needed for check after completion of the work.
• Before starting the work, turn off the circuit breaker, unplug the power cable, and wait for
more than ten minutes until the electric charge stored in the capacitors on the INV board
is discharged.
• Start the replacement work after confirming by a tester that the voltage between the
terminals P2 and N on the INV board on the right side inside the INVBOX is DC 50 V or
lower.
Terminal P2
Tester Terminal N
CB20T009A
-
No Name Qty
1 INV board assembly 1
2 Ferrite core mounting plate 1
3 Wire harness (57) 1
4 Wire harness (58) 1
5 Wire harness (-) 1
6 Seal washer (M5) 21
7 Seal washer (M8) 2
8 Toothed washer (M5) 1
9 Cable tie (large) 1
10 Cable tie (small) 18
11 M4 machine screw 1
12 Bag 1
13 Instruction card 1
14Caution plate (electrical
component box lid)1
15 Caution plate (INV lid) 1
16 Caution plate (CA front lid) 1
• Ratchet wrench (M5, M8)
• Diagonal pliers
• Screwdriver (slotted, Phillips)
• Tester
[Required tools]
[Contents of supplementary kit]
Supplementary Kit/ Required Tools
6CB20T009A
-
Removal of the Heatsink Assembly (INV Board Assembly)
7
[2] Remove cable ties inside the INVBOX (4 places).
* Be careful not to damage wires.
* Please keep the removed screws for reuse.
[1] Remove the INVBOX lid (10 x M5).
CB20T009A
-
Removal of the Heatsink Assembly (INV Board Assembly)
[3] Remove cable ties outside the INVBOX (5 places).
* Be careful not to damage wires.
* Please keep the removed screws for reuse.
8
No Connected to_1 Connected to_2
1
INV board
X202A MC A1,A2
2 X602A N/F board X91A
3 L1B MC 2
4 L3B MC 6
5 L1I N/F L1B-2
6 P1,P2 DCL -
7N/F board
L1B MC 1
8 L3B MC 5
[4] Remove wires inside the INVBOX.
INV board N/F board
[5] Remove the ground wire.
* Put the following wires in the bag included in the kit.
No Connected to_1 Connected to_2
9
INV board
L2B N/F L2B
10 X3A DFM
11 X4A Communication
12 X6A HPS
13 U / V / W Compressor
* Please keep the following wires to use for the work
later (no need to detach from ground).
CB20T009A
-
Removal of the Heatsink Assembly (INV Board Assembly)
[6] Remove the fixing bolts of the INVBOX (12 x M8).
* Please keep the removed bolts for reuse.
9
[8] Remove the fixing bolts of the heatsink (12 x M5).
* When the bolts cannot be easily loosened, remove
silicone by using a utility knife or diagonal pliers.
* When the heatsink cannot be easily removed, use a
slotted screwdriver and so on.
* Please keep the removed bolts for reuse.
[7] Shift the right side of the INVBOX in front so that
the heatsink can be easily removed.
* Please be careful so that the INVBOX does not fall
off.
* Please be careful not to apply a tension of the wire.
CB20T009A
-
Removal of the Heatsink Assembly (INV Board Assembly)
[9] Remove the cable tie on the side of the MC.
* Be careful not to damage wires.
[10] Remove the fixing bolts of the MC (4 x M4) to
dismantle it.
* Put the removed bolts in the bag included in the kit.
[11] Remove the cable ties fixing the compressor
wires and the resin clamp material fixing the
ferrite cores to remove the ferrite cores A and B.
* Put the removed resin clamp material and fixing
screws in the bag included in the kit.
10
Resin clamp
material
Ferrite core B
Ferrite core A
MC
CB20T009A
-
Installation of the Ferrite Cores
[1] Loosen the bolts of the fixture, then tighten them
to fix at the direction shown on the right (2 places).
11
[2] Thread a cable tie through the ferrite core
mounting plate included in the kit and tie the ferrite
core removed earlier.
[3] Install it where the MC has been installed (2 x
M4).
* Use the screws included in the kit as fixing screws.
Thread a cable tie
M4 screws
[4] Wrap the compressor lead wire once around the
ferrite core A.
* Adjust the wire length so that tension of the wire is
not applied to the wire when INV board is installed.
Fixing method
CB20T009A
-
Installation of the Ferrite Cores
12
[5] Fix 2 ferrite cores A and wires together by the
cable tie (small).
* The head of cable tie must not be in front of the
ferrite core A.
Head of cable tie_OK
[6] Thread wires through the removed ferrite core B
and fix it to the resin clamp material by a cable tie
(small).
[7] Thread a cable tie (small) through the wire
penetrating part of the ferrite core B and fix it so
the wires cannot move.
Fix to the resin clamp material
Thread a cable tie
through the ferrite core
Head of cable tie_NG
Wires must be
fixed inside
CB20T009A
-
13
Fixate the wire harnesses inside INVBOX
[1] Fix the ground wires by a cable tie (small).
DC reactor
[2] Fix the DFM wires and the ground wires by a
cable tie (small).
* Clamp extra DFM wires by a cable tie so that
they do not go out of control.
CB20T009A
-
Storage of Components
[1] Place the accessory bag with
components inside the INVBOX.
* Confirm that the followings are in the bag.
14
[2] Fix it by a cable tie (large) so it cannot
move.
Cable tie (large)
No Classification Connected to_1 Connected to_2
1 Wire
INV board
X202A MC A1,A2
2 Wire X602A N/F board X91A
3 Wire L1B MC 2
4 Wire L3B MC 6
5 Wire L1I N/F L1B-2
6 Wire P1,P2 DCL -
7 WireN/F board
L1B MC 1
8 Wire L3B MC 5
9M4 machine screw
(4 x MC fixing screw)
10 Resin clamp material
11Fixing screw for resin
clamp material
Installation location
of the accessory bag
CB20T009A
-
Installation of New Heatsink Assembly (INV Board Assembly)
Wire numberWire to be
used
Connected to
(INV board)
57Included in the
kitL1B
58 Reuse L2B
59Included in the
kitL3B
N/AIncluded in the
kitP1-P2
[1] Install wires to the INV board assembly as shown
in the following table.
L1B
L2B
L3B
P1-P2
15
[2] To prevent water intrusion, apply silicone sealant
to the packing of the INV board assembly.
* Apply silicone sealant on the packing all around the
circumference.
Position to apply silicone
(on the frame)
Connecting points on INV board
Wire number
CB20T009A
-
[3] Install the INV board assembly on the INVBOX (12 x
M5).
* Remove sealant and dirt adhering to the right side of
the INVBOX completely by using a scraper or waste
cloth.
* Use seal washers included in the supplementary kit (or
new washers).
Apply bolt tightening torque of 229 ±34cNm until seal of the seal washer protrudes from the washer.
* Be careful not to clamp a wire.
Installation of New Heatsink Assembly (INV Board Assembly)
After
tightening
Before
tightening
16
[4] After installation, fill the heads of screws with silicone
(12 places).
Installation direction
Capacitors are on
the lower side
Position to apply silicone
Replace with
new seal washers.Dispose of
old seal washers.
Reuse bolts.
CB20T009A
-
Wiring work
[1] Connect wires to the INV board assembly as
shown in the following table.
Compressor
Communication line
17
Connected to
(INV board)
Compressor
(Red) U
(White) V
(Black) W
HPS (VH4 pin) X6A
Communication line
(VH4 pin)X4A
[2] Attach the ground wire to the heatsink.
* Use the screws removed earlier.
[3] Connect wires connected to the INV board to the
N/F board as shown in the following table.
N/F board Wire number
L1B 57
L2B 58
L3B 59
L1B_2 -
• Does not connect any wire to [L1B_2] on the N/F
board.
HPS
CB20T009A
-
Wiring work
[4] Fix the connection wiring between the INV
board and the N/F board to the wiring fixed to
the ferrite cores by a cable tie (small).
18
[5] Fix the compressor wiring to the fixture by a
cable tie (small).
[6] Fix the HPS and communication wiring to the
spacer on the INV board by a cable tie (small).
* Bundle extra wires in the upper part.
CB20T009A
-
[7] Fix the wiring outside the INVBOX by a cable tie
(small) (five places).
19
Wiring work
[8] Tighten the bolts (12 x M8).
* Be careful as the specifications of bolts are different
for each fixed location.
: M8 bolt
: M8 bolt + spacer
: M8 bolt + seal washer
* Use seal washers included in the supplementary kit
(or new washers).
Replace with
new seal washers.Dispose of
old seal washers.
Reuse bolts.
CB20T009A
-
Attaching Name Plates
20
Attach the name plates included in the kit to the following locations.
[2] Attach the initial settings caution plate on the C/BOX lid.
Operation
nameplat
e
[1] Service caution plate
[2] Initial settings caution plate
[3] Instruction card (in C/BOX)
[4] Caution plate (caution for cover
installation) (in INVBOX)
[1] Attach the service caution plate to the right side of the plate.
CB20T009A
-
Attaching Name Plates
[4] Attach the caution plate (caution for cover installation) to the back of the front lid of the INVBOX.
21
INV lid
[3] Install the instruction card in the C/BOX.
Put through the ring and fix in place.
CB20T009A
-
Software update and configuration setting Rewrite/Trial Run
[1] Please change software version and execute initial settings as follows.
・Software version: 3045 or later
・Initial settings
22
Warn ing
After board replacement, software must be updated and
initial settings must be changed.
If software version and setting are incorrect, the unit is
abnormal operation.
Item Set value
INV Board Setting Type2
* When you have changed the setting, turn off the CB to confirm the change.
CB20T009A
-
Software update and configuration setting Rewrite/Trial Run
23
[2] Please confirm the following items after setting up. .
Tick Check item
□ Is electrical wiring correct? Confirm electrical wiring diagrams.
□ Is silicone applied around the heatsink of the INV board for sure?
□ No dangerous edge of a cable tie left?
□ Are initial settings correct?
□ Are fixing bolts fastened for sure?
□Is water intrusion in the INVBOX?
➔ If an evidence of water intrusion is found, please contact RM.
[3] After confirming that there is no problem with the check items, please execute SPTI.
* For safety, please execute operation after fixing the lid of the INVBOX temporarily.
CB20T009A
-
[1] Install the INVBOX lid.
Use a toothed washer included in the kit at .
* Use seal washers included in the supplementary kit (or
new washers).
Apply bolt tightening torque of 229 ±34cNm until seal of the seal washer protrudes from the washer.
* Remove dust and scraps of cable ties in the INVBOX.
* Remove dirt adhering to the mounting part of the
INVBOX lid completely by using waste cloth and so on.
Finishing
24
[2] Apply silicone to the position of the toothed washer.
* Apply for sure as there is a risk of water intrusion.
[3] According to the color of the packing on the lid, please
perform the following work.
• Black: Work required
• White: Work not required
Apply silicone around the lid (all around the
circumference).
* Apply for sure as there is a risk of water intrusion.
Position to apply silicone: All around
the circumference of the edge of the
lid
Position to apply silicone:
Cover the bolt head
★
Replace with
new seal washers.Dispose of
old seal washers.
Reuse bolts.