  • Project Delivery Systems

    Project Management Training Module 4

  • Copyright 2012 WorleyParsons Services Pty Ltd This document has been prepared on behalf and for the exclusive use of WorleyParsons. This document may not be reproduced without the express permission of the Business Process Owner

    Level 12, 333 Collins Street Melbourne Vic 3000 Australia Telephone: +061 3 8676 3500 Facsimile: +061 3 8676 3505 wwwworleyparsonscom WorleyParsons Services Pty Ltd ABN 61 001 279 812

    Project Management Training Module 4 Business Management Systems

    Rev Description Orig Review WorleyParsons Approval

    Date

    0 Initial Issue Jane Woodhead

    Joslin Guest

    Suren Thurairajah

    1 Revised and Issued for Use Jane Woodhead

    Suren Thurairajah

    Mike Reilly

    6/12/07

    2 Revised and reissued for Use Denise Orian-Marshall

    Suren Thurairajah

    Mike Reilly

    24-Apr-08

    3 Reissued for Use M. Reilly

    B. Tew

    M. Reilly

    21-May-08

    4 Reissued for Use M. Reilly

    B. Tew M. Reilly 9-Sep-08

    5 Revised and reissued for Use Stella Durdin Suren Thurairajah

    13 Dec 2012

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page i

    TABLE OF CONTENTS

    INTRODUCTION ........................................................................................................... 1 Module Learning Objectives .......................................................................................... 1 WorleyParsons Delivery Systems Strategy ................................................................... 2 Overview of the WorleyParsons Delivery Systems ....................................................... 3

    FINANCE AND ADMINISTRATION TOOLS ................................................................ 5 Rollout of GBS across the WorleyParsons locations ..................................................... 5

    PROJECT MANAGEMENT AND CONTROL TOOLS ................................................. 7 Estimating ...................................................................................................................... 7 Cost Control ................................................................................................................. 10 Planning ....................................................................................................................... 12

    PROCUREMENT AND CONTRACTS TOOLS ........................................................... 14 Procurement ................................................................................................................ 14 Contracts ........................................................................ Error! Bookmark not defined.

    CONSTRUCTION AND COMPLETIONS TOOLS ...................................................... 20

    ENGINEERING AND DESIGN TOOLS ....................................................................... 23 Engineering Design Systems ....................................................................................... 24 WorleyParsons Preferred Engineering Systems ......................................................... 24 Technology Roadmap .................................................................................................. 25 Key Success Factors for successful execution of Engineering Design Systems on a project .......................................................................................................................... 26

    DOCUMENT AND DATA MANAGEMENT TOOLS ................................................... 27 SmartPlant Foundation ................................................................................................ 29

    COMMUNICATION TOOLS ........................................................................................ 33

    IMPROVE PORTFOLIO MANAGEMENT TOOLS ..................................................... 34

    CUSTOMER SYSTEMS .............................................................................................. 36

    SELECTING AND ACCESSING TOOLS .................................................................... 37 What System Should I Use? ........................................................................................ 37 Activity 1 ....................................................................................................................... 45

    COST CONTROL ................................................................. Error! Bookmark not defined. Cost Control Data Flow .................................................. Error! Bookmark not defined.

    REPORTS .................................................................................................................... 47 Finance & Administration Reports WorleyParsons Business Reporting Tool .......... 48 Project Management and Control Reports .................................................................. 51 Procurement Reports (SmartPlant Materials - SPM) ................................................... 68 Procurement Reports ................................................................................................... 72 Construction Reports ................................................................................................... 74 Data Management & Communication Reports ............................................................ 82 Document Management and Communication Reports in SPF .................................... 88 Data Management and Communication Reports ........................................................ 89

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page ii

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 1

    INTRODUCTION

    This Project Delivery Systems module is a critical part of project management training. The module provides an overview of the Project Delivery Systems used at WorleyParsons and how you select and use them for different functions and projects.

    The principles and processes described in this module are valid for all sizes of projects and business process, and to all locations.

    Module Learning Objectives

    Following completion of this module, you will be able to:

    understand the Project Delivery Systems used at WorleyParsons to manage projects

    request and interpret project reports in order to provide status reports and track progress and performance against budget and schedule

    identify the key systems and their interfaces (information flows) to enable effective project management

    identify, assess and select Project Delivery Systems for specific projects and be familiar with the functions of these tools

    explain the functionality of the function specific tools selected by WorleyParsons to improve the efficiency of project execution and communicate this information to the project team

    consult with the location systems support personnel and where required with the Global Project and Improve Systems (PAIS) and Engineering Systems (ES) groups to set-up and configure the project delivery tool(s) for a specific project.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 2

    WorleyParsons Delivery Systems Strategy

    WorleyParsons Executive Committee (Exco) has endorsed the rollout of a consistent set of processes including the following:

    WPMP : WorleyParsons Project Management Process The WorleyParsons

    framework for project execution.

    EMS: Enterprise Management System Repository of standard workflows,

    procedures and templates.

    The WPMP phases are summarized below.

    Phase Key Activities / Goals Description

    Identify Project Feasibility

    Business Strategy

    Determine project feasibility and alignment with business strategy

    Identify

    Development

    Options

    Evaluate Conception / Feasibility Engineering

    Evaluate the preferred development option and execution strategy

    Define Front End / Basic Engineering

    Finalize project scope and schedule, and sanction project

    Prepare for Execution phase

    Execution Engineering Procurement and Construction (EPC)

    Produce Asset

    Produce an operating asset consistent with scope, cost and schedule

    Operate Operate Asset Evaluate and operate asset to ensure performance to specifications and maximum return to customers

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 3

    ExCo has also endorsed the rollout of a consistent suite of project delivery systems with the following strategy:

    Reduce the variety of systems, processes and tools through:

    establishment and communication of the standard tool kit establishment of global agreements with suppliers - wider acceptance increased integration of standard tools - reduced duplication.

    Provide access to WorleyParsons knowledge through:

    making available user manuals, guides, templates and standard set-ups providing training, set-up, configuration support and helpdesk facilities.

    Facilitate multiple office work sharing through:

    use of common systems transfer of personnel between offices, locations and projects common databases.

    Overview of the WorleyParsons Delivery Systems

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 4

    Each system has a specific function in WorleyParsons project management process. The systems used depend on the type of project being executedfor example, an Engineering Only project requires a smaller suite of systems than a full Engineering, Procurement and Construction Management (EPCM) project.

    The delivery systems are standalone tools that talk to each other via the interfaces between them. In most cases, the business systems are interdependent and require the interfaces in order to work as a whole. For example, Smart Plant Foundation (SPF) imports data from InControl.

    As a Project Manager you will need to know what tools to use for different types of projects, depending on factors such as type of services, size of project and complexity of transactions and data to be managed.

    You will also need to understand how information flows between the tools, so that you can use them effectively to manage and control each project. It is important that you also know how to work with the systems support personnel to set-up and configure the project delivery tools for each project.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 5

    FINANCE AND ADMINISTRATION TOOLS

    Finance and administration tools are supported by GBS

    The Finance and Administration systems:

    collect EPCM service costs through the Time Management System

    collate actual service costs

    transfer to payroll and project control systems.

    Procurement and construction management cost may be passed through the Finance and Administration Systems in cases where procurement and construction is done on WorleyParsons paper.

    Rollout of GBS across the WorleyParsons locations

    The Global Business System (GBS) is an Oracle e-business suit and is being rolled out to replace all existing Finance and HR management systems. It is a single environment, On Demand service and is globally accessible.

    There are new modules for:

    Projects

    Finance

    HR

    GBS interfaces with the following existing Global Standard WorleyParsons systems:

    InControl (service costs)

    PREDICTION + (contractor costs)

    SmartPlant Materials (committed costs and vendor invoices)

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 6

    What Does GBS Do?

    Initiate projects and proposals

    Classify projects and proposals Register project data

    Time Management System

    Collects EPCM service costs through the Time Management System

    Finance Systems

    Collate actual service costs Transfer to payroll and project control systems

    HR Systems

    Store and manage employee data

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 7

    PROJECT MANAGEMENT AND CONTROL TOOLS

    The Project Control tools are supported by the Project and Improve Systems (PAIS)

    group.

    Estimating

    The Estimating tools include:

    Aspen Capital Cost Estimator (ACCE) is used for the SELECT business line Identify and Evaluate Phase

    Quest Capital Cost Estimator for Class 2 to Class 4 estimates

    @Risk is used for risk modeling and analysis

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 8

    What Does ACCE Do?

    Aspen Capital Cost Estimator (ACCE - formally Kbase) supports the generation of conceptual and detailed cost estimates and schedules over the project lifecycle. With ACCE accurate budgets can be created from conceptual definitions, and it has been configured to optimize utilities and piping as well as project relocation and scaling based on plant size.

    Its ability to define contract structures for multiple contractors and vendors helps project leaders analyze execution strategies, manage change orders and control costs.

    ACCE is used for Class 1 Class 2 estimates only through the Identify and Evaluate phases.

    Benefits of ACCE

    Consistency and common knowledge base

    Speed in calculating and producing estimate with minimal input

    Area-specific estimates (i.e. different specs.) can be combined

    Built-in Expert Systems for equipment foundations and pipe rack design build

    Detailed material and labour indexing - easy adjustment of material costs and labour hours

    Users can manually add any amount of items required that are not offered by default

    Library / manual (user) input info storage

    Ability to flag illegal and out of range" entries

    Manpower Productivity Expert (MPE) module to examine productivity differences due to working conditions, location and environmental factors

    Output is compatible for use with the risk analysis tool

    Many reports to choose from

    What Does Quest Do?

    Quest is an estimating system designed to aid estimators in the preparation of major capital cost estimates. It can help relieve the estimator of much of the number crunching that is inherent in the generation of an estimate.

    Quest enhances the quality of estimates by automating the calculations within a disciplined structure and thereby eliminating a major source of estimate errors.

    Quest is used for Class 2 Class 4 estimates only through the Define, Execute and Operate phases.

    Benefits of Quest

    Automatic retrieval of industry standard information

    Maximised computer calculation reducing possible estimating errors

    Automated budget consolidation

    Ability to create multiple versions of an estimate to address different cases or options

    Can be used to identify estimate trends during project implementation

    Incorporates contracting philosophy and procurement plan for easy roll over to Cost Control

    Aligned to coding (Code of Accounts) in other systems for easy transfer of data and single point data entry

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 9

    What Does @Risk Do

    @RISK is an Excel add-in that allows users to perform simulations and is typically used in the Evaluate, Define and Execute phases of a project for risk analysis.

    WorleyParsons manages contingency assessments using @RISK with proven templates and reports via a pool of shared licenses able to be shared between specialists in all WorleyParsons locations. An estimator can assess the likelihood of various best and worst case project budget scenarios.

    The system uses Monte Carlo-based simulation to run many possible outcomes.

    Benefits of @Risk

    @Risk adds advanced modelling and risk analysis to Microsoft excel by allowing;

    Development of the risk model WorleyParsons uses its own model, tested and proven on many projects

    Identification of uncertainty risk inputs Model analysis by simulation risk outputs

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 10

    Cost Control

    The Cost Control tools include:

    Services Cost and Progress Control in all phases

    PREDICTION + for TIC Cost and Progress Control.

    What Does InControl Do?

    InControl is a specialist project cost and progress control tool for managing WorleyParsons services. It is built around WorleyParsons processes and procedures to allow projects to manage costs against budget, track progress, control scope and determine forecast in one place.

    It brings together project budget costs, schedule and document data into a single repository. This capability provides weekly, monthly and adhoc reports that are the cornerstone for the project controls group to advise project management on its status at any point in time.

    Benefits of InControl

    WBS and discipline level control

    Detailed deliverable progress and forecast tracking

    Detailed resource budget control

    Variation management

    Productivity, earned value reporting

    Multi-currency reporting

    Interfaces with timekeeping and financial systems

    Interfaces with planning system

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 11

    What Does PREDICTION+ Do?

    PREDICTION+ is a WorleyParsons owned integrated Project Management tool designed to manage TIC cost and progress control for standalone projects or program/portfolio works. It consists of a series of integrated application modules that communicate with each other through a centralised database that controls the flow and management of data.

    The PCS module provides real-time Total Installed Cost (TIC) and progress measurement management for projects and contracts.

    Benefits of PREDICTION +

    Project/program/portfolio details repository

    Activities/transactions/deliverables repository

    Total Install Cost (TIC) budget generation, control, forecasting and reporting

    Project cost/commitments/expenditure reporting, KPIs and dashboards

    Earned value/progress/forecasting

    Cash flow management and invoicing

    Change/variation management

    Interfaces with engineering, materials, time, financial and planning systems

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 12

    Planning

    The planning tools are:

    Oracle Primavera P6 for logic based Planning and Schedule Control for all phases

    Oracle Primavera Risk for Schedule Risk Analysis for all phases

    What does Primavera P6 do?

    The Primavera P6 planning application is used for the development of a schedule/program for all phases of projects. It is a robust, industry standard application suite from Oracle-Primavera that delivers full enterprise project portfolio management throughout the project lifecycle and across a range of project sizes and complexity.

    It has an extensive range of functions including:

    Logic based networking

    Critical path analysis

    Resource scheduling

    Import /export capabilities

    Benefits of Primavera P6

    Enables us to deliver projects on time and within budget

    Provides integration capability with other systems

    Has import / export capabilities

    Has powerful and configurable dashboards

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 13

    What does Primavera Risk do?

    Primavera Risk simulates various scenarios using built-in templates for qualitative and/or quantitative risk assessment, like quick risk feature and risk register configured to align to WorleyParsons risk management practices.

    Primavera Risk Analysis uses advanced Monte Carlo-based cost and schedule analytics to provide full life-cycle risk management through the following types of risk models:

    estimate uncertainty

    task existence

    probabilistic branching

    fixed-cost uncertainty

    variable-cost uncertainty

    resource uncertainty

    conditional branching

    weather modelling

    Benefits of Primavera Risk

    Identifies common scheduling pitfalls that may result in misleading schedule or risk analysis results

    Provide a comprehensive means of reporting project confidence levels

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 14

    PROCUREMENT AND CONTRACTS TOOLS

    The procurement and contracts tools are supported by PAIS.

    Procurement

    The Procurement and Contracts tools are:

    SmartPlant Materials (SPM) for Materials Management.

    CAMS for detailed administration of contracts

    Supplier Portal - Supplier registration portal for supplier registration, invitation, evaluation and selection

    Trade Wizard Live solutions to International trade queries and

    compliance.

    RPS On-Demand screening of customer, suppliers and other trading partners against restricted party lists from government institutions worldwide.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 15

    What does SmartPlant Materials do?

    SmartPlant Materials (SPM) provides control of materials and equipment through the Engineering, Procurement and Construction (EPCM) phases of a project.

    It provides a platform to manage project materials specifications and allows for identification and quantification of materials, showing status throughout the project material lifecycle such as:

    purchased

    under manufacture

    in transit, received

    held in stock

    allocated

    issued.

    It also allows for identification and quantification of required stock, allocated for each item by line or drawing number.

    It has 4 integrated modules as illustrated in the diagram below:

    Smart Plant Reference Data (SPRD)

    SPRD provides material libraries at both corporate and project levels for use for materials revision and change management. It includes a Project Estimating functionality that can be used to generate estimates for new project bids and can access historical SmartPlant Materials project data to develop first estimates based on previous projects.

    It enables corporate (project-independent) material data standardization, especially of bulk material. Data can be organized to suit the required corporate or country standards and can be fed into design systems such as Plant Design System or Plant Design Management System.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 16

    Engineering and Procurement Integration (E&PI)

    E&PI presents the most recent status of material items in the project so that the flow of materials can be controlled, to avoid surpluses and shortages. Based on past experience of material usage and requisition patterns, rule-driven processes enable it to automatically create material requisitions, translating the project engineering view into the project procurement view.

    Materials Supply Chain Management (MSCM)

    MSCM integrates interchanges between commodity suppliers, manufacturers, fabricators and freight forwarders, so that all procurement and relevant supply chain information is in the same database.

    It allows paperless integration of supplier performance and history measurement, supplier management, inquiry cycle, bid tabulation, purchase order/award, scheduling, progress/milestone control and tracking/tracing.

    MSCM data can be integrated with financial systems such as SAP or Oracle to control payment and invoicing.

    Site Control

    Site Control balances onsite personnel with material availability, assigning material to site inventories in the shortest possible time. It allows automated material receiving, forecasting, reservation and allocation routines to control and manage materials in various site warehouses. It is used when reviewing the project schedule.

    Benefits of SmartPlant Materials

    All specialist items, long lead items and large items (including equipment) can be fully managed and can include links to specifications, drawing and data sheets.

    Consistent equipment and item numbering, including corporate catalogues for bulk materials.

    Project-specific vendor lists.

    Totalling of items by part, description and vendor.

    Separate or multiple fabrication shops for materials supporting projects with multiple fabricators by geographic areas.

    Continuous material reconciliation.

    Global project work sharing and execution, using correct, complete and consistent data.

    By using a web-based and centralised environment, SPM allows a central synchronisation of a decentralised project organisation

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 17

    What Does CAMS Do?

    Contract Administration Management System (CAMS) is facilitated by the use of task and event management, performance metrics, compliance monitoring, budget analysis, amendments, change orders, and contract correspondence administration. The task and event alerts allow the contract manager to monitor the ongoing performance of the contract.

    CAMS provides visibility into contracts, providing opportunities to identify cost savings, mitigate risk and improve compliance. It allows projects to centralise all contract packages and information, enabling collaboration across locations, supporting projects to share work across locations using the same core systems.

    Benefits of CAMS

    Full-scope contract management solution - from request for information through the stages of contract creation, administration management, revenue/expense processing and renewal cycles

    Central control and distributed management with standard terms and conditions defined centrally and localised, including the ability to translate the contract into other languages

    Management reporting - via the Internet with security access

    Compliance monitoring - items identified as requiring some form of compliance can be followed

    Generation of payment certificates within the application, tracking items such as:

    total cost approved remaining balance recovery of advance payments accounting for retention withheld

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 18

    What Does Supplier Portal Do?

    Suppliers are a crucial part of our project execution so WorleyParsons has a Global Suppliers Portal; a secure online registration process that captures the relevant information to support Supplier registration, invitation, evaluation and selection through to performance rating.

    By Suppliers registering with us, their details will be accessible to every procurement location in our worldwide organisation and potentially provide them with new business opportunities with WorleyParsons.

    Benefits of Supplier Portal

    Supplier self-registration via external web portal

    One global database

    Web-based application enables easy access remotely

    Performance rating tracked against a Supplier on a project

    Knowledge is at hand if a Supplier is engaged in another project

    Follows a step process, from Invited to Committed, on each Supplier

    Instant accessibility for all the project team

    Quick online training is available immediately

    System security granular levels of access

    Provides a secure and accessible location for approved Supplier records

    Supplier information is available across locations/countries for Workshare

    What Does Trade Wizard Do?

    To become trade compliant, WorleyParsons utilises Trade Wizard, a tool that is powered by the industry's most comprehensive and robust database of global trade content for over 120 countries. This content is sourced and analysed by the global content team at Management Dynamics Inc.

    The Trade Wizard tool is a single function, browser-based interactive query tool that can provide quick answers to specific international trade related queries.

    Benefits of Trade Wizard

    Ability to determine:

    a party's eligibility to conduct a global trade transaction whether a certain product can be imported into a certain country whether a country requires an import or export license, certificates,

    inspections and/or permits required for trade with certain products documentation required for commercial and government for a given country

    of export and country of import

    Can calculate the landed cost for a transaction including duties, taxes, custom fees, port charges and all other import taxes

    Assists us to pay correct duties, often reducing total customs charges

    Allows us to take advantage of preferential trade programs

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 19

    What does RPS On-Demand do?

    Many companies face significant challenges in finding whether the party to a shipment has been placed on any official denied persons or illegal trans-shipper list that is blocked from import or export transactions, or not sanctioned by the government for illegal acts such as terrorism, narcotics trafficking, etc. Restricted Party Screening (RPS) provides a secure and comprehensive method to quickly screen customers, suppliers and other trading partners against all restricted party lists from government institutions worldwide. The use of the system will prevent any illegal transactions with restricted entities or trade parties and avoid penalties. Additionally this will significantly reduce our corporate risk, liability and exposure to prohibited transactions.

    Benefits of RPS On-Demand

    Complies with international trade regulations

    Accurately identifies restricted parties before goods are shipped

    Prevents illegal transactions with band trading partners

    Preserves a complete audit trail

    Reduces corporate risk

    Avoids fines, penalties & sanctions

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 20

    CONSTRUCTION AND COMPLETIONS TOOLS

    The construction and completions tools are supported by PAIS.

    The Construction and Completions tools include:

    PREDICTION+ JCS - JobCard Management System

    CMT Completions Management Tool

    RFI Electronic Management of Site Queries

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 21

    What Does PREDICTION +JCS Do?

    PREDICTION+ is a WorleyParsons owned integrated Project Controls tool designed to manage all aspects of Project Controls for standalone projects or program/portfolio works. It consists of a series of integrated application modules that communicate with each other through a centralised database that controls the flow and management of data.

    The Job Card System (JCS) module is a structured low level tool which provides real-time management of the fabrication, construction and commissioning phases of the projects or program/portfolio works.

    JCS is also suitable for planning and controlling turnaround / shutdown scopes of work.

    Benefits of PREDICTION +JCS

    Acts as a Job Card/Work Pack repository

    It can manage:

    estimating norms (hours/unit rates) and CTR Generation materials and drawings references/details and attachments HSE/Risk/QA/QC references/details and attachments Plant/equipment and resource allocation/assignment man-hours expenditure and quantities installed

    It can also manage and report on progress, performance and productivity

    What Does CMT Do?

    The Completions Management Tool (CMT) is an enterprise application system specifically developed to provide preparation and execution management for field commissioning activities and to support the WorleyParsons Completions Framework.

    The combination of the Framework and CMT provides the methodology and functionality for a seamless start up on typical projects.

    Benefits of CMT

    It is an enterprise software tool customized for WorleyParsons

    Compliments and supports the WorleyParsons Completions Framework

    Built around a SQL database giving access remotely via internet

    Has layered security network, SQL, application group and user level

    Can store and produce completions handover and turnover requirements

    Can manage test results ( A&B check sheets etc.)

    Enables intelligent commissioning procedure status reporting

    Provides a facility for punch list management and tracking

    Can facilitate the management of equipment preservation

    Provides facility to manage as-builts

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 22

    What Does RFI Do?

    RFI electronically manages all technical questions/ queries. It is the vehicle that will circulate the query from initiation to resolution via the email system. It is the basis for reporting of quality performance via quality codes and for change management and claim avoidance.

    Benefits of RFI

    Web-based access

    Standard and/or customized reports and forms

    Reduces technical query turnaround cycle time

    Captures query details (dates, time, deliveries, categories)

    Manages all the data connected to all queries

    Expedites questions and answers to reduce impacts in the field

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 23

    ENGINEERING AND DESIGN TOOLS

    The engineering and design tools are supported by Engineering Services (ES).

    The Engineering Design Systems diagram below shows the full suite of engineering systems and how they interface with other tools WorleyParsons uses.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 24

    Engineering Design Systems

    Used for engineering analysis and design. Examples are:

    SACS for Offshore structural design

    CAEPIPE / CAESAR II for Pipe Stress Analysis

    Aspen Basic Engineering - Used for process and mechanical data

    management

    Used to produce 2D engineering design

    Microstation 2D design system supported by WorleyParsons

    AutoCAD 2D design system supported by WorleyParsons

    Used to produce 3D engineering design

    PDMS Primarily used for 3D Offshore Plant Design

    AutoPlant Alternate 3D design system supported by WorleyParsons

    WorleyParsons Preferred Engineering Systems

    Used for Piping and Instrument Design to develop intelligent P&IDs

    Used to complete instrument and control engineering and design activities

    Used to complete electrical engineering and design activities

    Used to produce specifications

    Used to produce 3D engineering design

    Used to conduct design reviews

    Used as an intelligent Document and Data Management System

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 25

    Technology Roadmap

    The diagram below illustrates the advances that have taken place in engineering design

    systems in the past 50 years; from being very manual and document-centric, through the

    use of basic CAD systems, to the current data-centric integrated systems providing far

    greater efficiency and reduced risk.

    The diagram below details the various engineering design systems we use and the way they are integrated with other systems.

    Source: ReVisionz Inc

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 26

    Key Success Factors for successful execution of Engineering Design Systems on a project

    1. Get on to systems set-up early and with some priority. It will pay off!

    2. Engage support groups do not wait until there is an issue

    3. Review the status and application of checking and verification processes regularly

    4. Make sure actions from Model Reviews are addressed and closed out

    5. If team members suggest system improvements (including project specific reporting), arrange to review the suggestions with your group and the EDS team

    6. Ensure MTO development is controlled on larger projects you may need someone in your team to coordinate this activity

    7. Review model progress regularly with your team dont wait for the formal reviews

    8. Induct your team members on the specific project set-ups and requirements for the EDS tools

    9. Encourage interested team members to participate in the Communities of Practice (COPs)

    10. If Workshare is involved, verify that the Supporting Office has the set-up information it needs and communication protocols are in place

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 27

    DOCUMENT AND DATA MANAGEMENT TOOLS

    The document and data management tools are supported by Engineering Data

    Management (EDM).

    Data Management systems collect all project documents in a single repository. This enables the data collected during the course of project execution to be entered into a single repository, thereby easing the process of data for handover to the customer at the end of a project.

    ENCOMPASS for document management

    SPF for Document and Data Management especially when Data Integration is required

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 28

    What does Encompass do?

    Encompass is an automated project information and document management system designed to support our workflow processes. It is an in-house developed platform using all commercially available software and is designed to facilitate easy participation by external project stakeholders

    It is a rule-based system which is totally customizable and is built for managing the full project life cycle. Data delivered to customers can be structured for upload into their document management system.

    Benefits of Encompass

    Easy setup and maintenance

    Flexible document numbering

    Automated transmittal generation

    Repository for all project documents, including but not limited to:

    Worleyparsons design documents Vendor documents Customer documents Contractor documents Correspondence, including emails

    Ability to use custom templates for any document type

    Ability to associate documents to equipment tags

    Turnover to customer, electronic files and metadata

    Action item list

    Drawings hold list

    Project personnel list

    Archiving capability

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 29

    SmartPlant Foundation

    What does SPF do?

    SPF is the electronic repository and tracking system for all documentation produced by the project. It maintains all document references, document cross-references and revision histories and can hold all approved versions of documentation in either their native or scanned format. It makes documents available across locations and time zones within a secure document repository.

    SPF is WorleyParsons preferred tool for Document and Data Management on EP and EPCM projects of a size that justify this tool, ie with a large amount of document and data to be managed. It interfaces directly with MS Office tools and a wide range of other third-party add-ons.

    Benefits of SPF

    SPF allows WorleyParsons to develop a Data Management Plan in conjunction with the owner/customer that enables data to be transferred to the customers systems as soon as the data is authorized.

    This ongoing transfer of information eases the burden and cost of collating data for a single transfer at the end of the project

    It is a secure, managed environment which is fully configurable and auditable with full revision history. User access can be controlled by:

    document type document attributes user groups

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 30

    Key Functionality

    Data Management - Global, controlled access to project data

    Document Management - Global, controlled access to documentation

    Workflow - Multi-application workflow

    Change Management - Multi-discipline change management

    Application Integration - Vendor neutral application integration

    Engineering Framework - Rules based application integration

    Other functionality

    File Management Check in and checkout

    Revision and signoff

    Revision status tracked

    Full reference file support

    Search and retrieval based on: Document number

    Discipline type

    Revision

    Transmittals Formalised document release mechanism with external organizations and within

    local departments

    Document review dates and tracking

    Responses formally recorded

    Email notification of activities

    Transmittal matrix (external and internal)

    Revision Control Stores all revision

    Comparison including graphic

    Configured revision scheme

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 31

    Change Notification

    Push : e-Mail Subscription

    Pull : To-Do List

    Stores all the data forever

    You can turn the clock back to look at what revisions were current at an earlier point in time

    Easy Navigation of Intelligent Links Automated creation of graphical hotspots from drawings

    Consistency Reporting

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 32

    Document Viewing and Markup SmartPlant Markup Plus 160+ formats

    No native application required

    Pan, zoom, magnify

    Print to scale, watermarks, stamps

    Mark-ups are separate layers with own security controls

    Multiple redline layers per file

    SPF Workflow

    The SPF workflow includes:

    Graphical process definition

    Electronic routing(e-mail) and approval

    Progress tracking

    Check List

    Full audit history is retained can show who changed what, why and when

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 33

    Data Handover

    The diagram below illustrates how data is transferred between SPF and other systems used at Worley Parsons.

    COMMUNICATION TOOLS

    The communication tools at WorleyParsons are supported by the iM group.

    Safety statistics and incident reporting

    Repository of all WorleyParsons procedures, workflows, templates, guidelines, forms, checklists and prompt lists

    Project web-based Intranet environment

    Repository for non-project, uncontrolled data

    Communication tool for user communities

    Key internal and external mail communication system

    Data Handover

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 34

    IMPROVE PORTFOLIO MANAGEMENT TOOLS

    The improve portfolio management tools are supported by PAIS.

    What Does IOP Do?

    The Improve Operating Platform (IOP) comprises a generic set of methodologies and systems within a defined framework, for the delivery of a portfolio of projects within an Improve Contract. These methodologies and systems are based on the WorleyParsons Corporate Standards of the EMS and WPMP, which have been tailored specifically for Improve Contracts. Put another way, the IOP is essentially a user front end for EMS, WPMP and other systems.

    The IOP in its entirety represents what has previously been known as a Contract Execution Plan or Contract Operating Manual. The IOP however takes a different approach where the same information is presented in the form of a network of web pages with linked documents. The advantage of this format is that it makes information more accessible to users and makes any customisation required a simple and logical process.

    The generic IOP has all the required content for use in a typical Improve Contract and in this context is ready to be used out of the box. However a key feature of the IOP is that it has been designed to be readily customised for individual Improve Contracts and as such can provide dual access to both WorleyParsons and a Customers processes, documents etc.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 35

    Benefits of IOP

    The IOP has been developed to support the execution of a portfolio of smaller projects (< than US$10 million TIC or < than $1 million WorleyParsons contract value), and will also support nano projects (< $100K TIC or less than $10K WorleyParsons contract value).

    The IOP addresses both content and structure since there is a lot of the difficulty in establishing new contracts due to the structure for the systems and the Customer systems interface requirements.

    The generic IOP will be accessible to WorleyParsons personnel with task sheets stored in EMS. This will ensure that WorleyParsons process improvements will be passed on to Improve customers on an ongoing basis.

    The IOP will incorporate best practice solutions from existing Improve contracts thus enhancing standard WorleyParsons systems and procedures.

    The IOP can be functional at an effective level on:

    WorleyParsons neutral (non-WP, non-Customer) Customer systems environments.

    The IOP sharepoint site has the capability to store / link live contract / project data but keeps this displayed separately from reference / procedural data.

    It is available for all existing and new Improve contracts in order to ensure consistency in use of systems and processes while catering for customer specific needs.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 36

    CUSTOMER SYSTEMS

    Customer Systems are important because very often WorleyParsons will be requested to interface with these systems. The interfaces may be required on an ongoing basis, on agreed frequencies or at the end of the project.

    Examples of these interfaces are as follows:

    Ongoing downloads of Purchase Order commitments into customer ERP System, as and when Purchase Orders are placed in the WorleyParsons Procurement system

    Weekly timesheet downloads into customer ERP system

    Weekly cost commitment data into customer ERP system

    Handover of completed documents and intelligent data into the customer ERP system or Document Management system

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 37

    SELECTING AND ACCESSING TOOLS

    It is important for you to be able to select and access appropriate tools for your project. The tool(s) will vary according to:

    Project size (Major, Minor, Miscellaneous)

    Project phase (Identify, Evaluate, Define, Execute, Operate)

    Scope of service (Engineering, E&P, PMC, EPCM, EPC, Improve)

    Customer requirements etc.

    You should work closely with the Project and Improve Systems (PAIS), Engineering Systems (ES) and Engineering Data Management Systems (EDM) Groups to select and configure the systems for your project.

    What PAIS System Should I Use?

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 38

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 39

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 40

    Selecting The Appropriate Project Delivery Tools

    Scope of Work E E/P EPCM PMC/TIC Improve

    Function/System Phases All Define/Execute Execute Define/Execute Operate

    ESTIMATING Description

    Aspen Capital Cost Estimator (ACCE) Used in the development of large grass-root projects to generate Class 1 (Order of Magnitude) and Class 2 (Screening) estimates. * Identify & Evaluate phases only

    Quest Used to estimate Class 2 (Screening), Class 3 (Control) & Class 4 (Definitive) Capital Cost estimates.

    @RISK Used for performing quantitative cost risk analysis using the Monte Carlo Simulation model which gives an information rich and accurate representation of potential risk exposures.

    PROJECT CONTROLS Description

    InControl Used for the management and control of scope, budget, progress, forecasting and cash flow. Predominantly deployed for engineering/services contracts on standalone projects and portfolio scopes of work.

    PREDICTION+ PCS Used for the management and control of scope, budget, progress, forecasting and cash flow for standalone EPC/EPCM projects and portfolio scopes and where the customer requires Total Installed Cost (TIC) management.

    PLANNING Description

    Primavera P6 Used for the development and management of all project schedules through the project lifecycle. Has an extensive range of functionality, some of which are, logic based networking, critical path analysis, resource scheduling and import/export capabilities.

    Primavera Risk Used to provide quantitative evaluation of full project life-cycle risks associated with uncertainty in schedule.

    PROCUREMENT Description

    SmartPlant Materials (SPM) Used for material management work flow from preliminary design through to detailed engineering and purchasing to construction by providing a common collaboration platform and workbench for all stakeholders involved in the supply chain management.

    CONTRACTS Description

    Contract Administration Management System (CAMS) Used to manage contract formation via standard or imported terms and conditions and the administration cycle including; amendments, progress, claims, back charges, reporting and compliance.

    CONSTRUCTION Description

    PREDICTION+ JCS

    Used to provide real-time management of the fabrication, construction and commissioning phases of the projects or programme/portfolio works via Work Packs & Job Cards.

    COMPLETIONS Description

    Completions Management Tool (CMT)

    Used to generate scope and control the data, information and documentation necessary to successfully manage the field commissioning activities in turn supporting the seamless start up on projects.

    IMPROVE Description

    Improve Operating Platform (IOP) Used to provide projects with a flexible and customisable operating framework that highlights and allows easy access to WorleyParsons and Customer processes, systems and people. Utilises the Microsoft SharePoint platform for successful delivery of a portfolio of projects.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 41

    Further information regards each of the PAIS Systems and how to select the appropriate tools is available via the PAIS SharePoint site as per the

    link below;

    http://bsg.worleyparsons.com/Pages/Pursuit.aspx

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 42

    Selecting Appropriate Project Management Tools - Examples Example 1

    Project type: Engineering Services

    Project phase: Evaluate

    Project fee value: US$200,000

    Project scope: Conduct feasibility study to extend a gas plant

    Project Management tools:

    Finance and time management system time and cost data management

    InControl EPCM services cost control

    Primavera planning

    WPMP project management process

    EMS functional procedures.

    Example 2

    Project type: EPCM contract

    Project phase: Execute

    Project fee value: US$40,000,000

    Project scope: Conduct engineering, procurement and construction management services for the development of an ammonium nitrate plant.

    Project Management tools:

    GBS Finance and time management system time and cost data management

    InControl EPCM services cost management and control

    Primavera planning

    Primavera Risk Schedule Risk

    CAMS Contracts Management

    SmartPlant Materials (SPM) materials management

    SmartPlant Foundation (SPF) document and data management

    WPMP project management process

    EMS functional procedures

    Completion Management Tool (CMT) Completions management.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 43

    Interfaces

    The successful delivery of these systems is very much dependent upon the interfaces

    between systems and ensuring consistent coding and processes are followed throughout.

    Module 2 Project Controls & Commercial Management focuses on the importance of the WBS and global CoA structures. It is important that suitable WBS structures have been

    clearly defined before any systems are implemented and the global code of accounts is

    utilized consistently.

    The screenshots below give a snapshot of the information available on interfaces between

    the PAIS systems. The information has been organised into the following categories and is

    available via the Implementations page of the PAIS SharePoint site;

    Interface Diagram

    Interface Reference Table

    Interface Guidelines

    Interface How-to Guides

    Interface Specification Details

    Import Templates

    Sample Source Files

    http://bsg.worleyparsons.com/Pages/Implementations.aspx

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 44

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 45

    Activity 1

    Select appropriate project delivery systems

    Working in groups, you will be allocated one of the project examples below.

    Select the appropriate project delivery systems for project management (excludes engineering systems) for your project example and prepare to explain your reasons for this selection to the wider group.

    Develop project-specific system diagram

    Develop a project-specific system diagram for your project example

    Draw arrows indicating the direction of information flow

    Use solid lines for electronic information flow Use dotted lines for manual information transfer

    Project 1

    Engineering Only project in the Evaluate phase.

    Project fee value: US$0.5 million.

    WorleyParsons scope is to complete Engineering activities and develop concept study adequate documentation to enable the customer to make a decision to move forwards to the next phase of work. The next phase may or may not be completed by WorleyParsons.

    Project 2

    Engineering and Procurement Services project in the Define phase with some potential for early procurement on long-lead items.

    Project fee value: US$ 5 million, excluding the early purchase cost of the procurement items.

    All procurement services for the agreed long lead items will have to be supplied by WorleyParsons while the purchase orders will be placed by the customer directly on the vendors.

    The contracting strategy on the project will be for WorleyParsons to complete the FEED in the Define phase and develop a comprehensive tender document for the customer to go out for an EPC bid.

    Project 3

    Execute phase EPCM Project for the development of a Gas Plant.

    Project Total Installed Cost: US$ 200 Million.

    WorleyParsons has full responsibility for the management of the TIC costs.

    All procurement services will have to be supplied by WorleyParsons while the purchase orders will be placed by the customer directly on the vendors. Though WorleyParsons will not be placing purchase orders directly, we will have the responsibility for the verification of invoices prior to the payment by the customer. WorleyParsons will have full responsibility for materials control from design all the way through to fabrication and installation. WorleyParsons will have full responsibility for the management of the construction contractors and for monitoring their performance and the authorization of progress payments.

    The scope of work for WorleyParsons will conclude at plant start-up.

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 46

    Notes page ..

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 47

    REPORTS

    Reports are the most important output from the various tools used by WorleyParsons. Project managers rely on reports to:

    Verify integrity of data

    Analyze status of project

    Manage change

    Make measured decisions

    Report on progress to clients

    On the following pages you will find examples of:

    Finance and Administration reports

    Project Management and Control reports

    Procurement reports

    Construction reports

    Data Management and Communication reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 48

    Finance & Administration Reports WorleyParsons Business Reporting Tool

    Project Hours and Revenue Validation Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 49

    Aged Debtors Summary Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 50

    Financial Analysis Reports:

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 51

    Project Management and Control Reports

    Aspen Capital Cost Estimator Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 52

    Quest Capital Cost Estimator Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 53

    @Risk Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 54

    InControl - Proposal Report (CTR/Activity Sheet)

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 55

    InControl Activity Register

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 56

    InControl - PGM Graphical Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 57

    InControl - Project Summary Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 58

    InControl - Resources DetailsManhour/Quantity Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 59

    Resource Productivity Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 60

    InControl - Resource Progress Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 61

    InControl - Cost Commitment Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 62

    PREDICTION + - Estimate Summary Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 63

    PREDICTION + - Detailed Cost Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 64

    PREDICTION + - Cost S Curve

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 65

    PREDICTION+ - Variation Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 66

    Primavera P6 Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 67

    Primavera Risk Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 68

    Procurement Reports (SmartPlant Materials - SPM)

    Procurement Status Report (Part 1 of 2)

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 69

    Procurement Status Report (Part 2 of 2)

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 70

    Expediting Summary Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 71

    CAMS Subcontract Monthly Status Report

    CAMS Contract Commitment Report

    CAMS Total Forecast Contract Value Summary

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 72

    Procurement Reports

    Supplier Portal

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 73

    Trade Wizard

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 74

    Construction Reports

    PREDICTION+ Jobcard

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 75

    PREDICTION+ Jobcard Hours Progress Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 76

    PREDICTION+ - Jobcard Quantity Histogram Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 77

    PREDICTION+ Jobcard Quantity Progress Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 78

    Completions Management Tool Sub System Status Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 79

    Completions Management Tool Object Status Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 80

    Completions Management Tool Progress Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 81

    RFI Tool - Reports

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 82

    Data Management & Communication Reports

    Xxxx

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 83

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 84

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 85

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 86

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 87

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 88

    Document Management and Communication Reports in SPF

    Document Control Reports

    Master Document Register Transmittal Reports Document Expediting

    Supplier Data Reports

    Supplier Document Register Supplier Transmittal Details PO Status Reports Expediting Reports

    Custom Reports as required

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 89

    Data Management and Communication Reports

    Document Revision Register

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 90

    Internal Transmittal Overdue Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 91

    Supplier Expediting - External

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 92

    Custom Project Status Report

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 93

  • Rev 5 13-Dec-12 Module 4 Project Delivery Systems Page 94