Financial Year Project Name Project Activity (scope and target area) Completion Date Project Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction of a new classroom Mar-14 600,000 Complete Funds fully utilized and it is in use. 2013/2014 Tian Dispensary Completion of the dispensary and 3 roofed staff Jun-14 400,000 Complete Funds fully utilized and it is in use. 2013/2014 Ngemba Moi Ecd Construction of a classroom Aug-13 500,000 Complete Funds fully utilized and it is in use. 2013/2014 Kamalanget primary school completion of a classroom Apr-14 450,000 Complete Funds fully utilized and it is in use. 2013/2014 Kapcheluguny Primary Completion of a classroom Apr-14 300,000 Complete Funds fully utilized and it is in use. 2013/2014 Oterit Sec school Construction of a classroom Apr-14 700,000 Complete Funds fully utilized and it is in use. 2013/2014 Emining Sec. School Construction of a classroom Mar-14 500,000 Complete Funds fully utilized and it is in use. 2013/2014 Emining Empowerment center Completion of the center- fencing Jun-14 150,000 Complete Funds fully utilized and it is in use. 2013/2014 Kures community Borehole Servicing of the borehole, installation of tank and solar system Nov-14 1,500,000 Complete Funds fully utilized and it is in use. 2013/2014 Emining Chiefs Office Completion of the chiefs office-painting ,window glasses, ceiling board, furniture Aug-14 150,000 Complete Funds fully utilized and it is in use. PROJECT IMPLEMENTATION STATUS AS AT MAY 2016 MOGOTIO NG_CDF

Upload: dolien

Post on 28-Apr-2019

224 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

Financial Year Project Name Project Activity (scope and target area)

Completion Date

Project Cost Status (Indicate whether Complete, Ongoing or Intending to tender

Remarks

2013/2014 Cheberen 

Secondary

Construction of a new 

classroom

Mar-14 600,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Tian Dispensary Completion of the 

dispensary and 3 

roofed staff 

Jun-14 400,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Ngemba Moi Ecd Construction of a 

classroom

Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kamalanget 

primary school

completion of a 

classroom

Apr-14 450,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kapcheluguny 

Primary

Completion of a 

classroom

Apr-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Oterit Sec school Construction of a 

classroom

Apr-14 700,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Emining Sec. 

School

Construction of a 

classroom

Mar-14 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Emining 

Empowerment 

center

Completion of the 

center- fencing

Jun-14 150,000               Complete Funds fully utilized and it 

is in use.

2013/2014 Kures community 

Borehole

Servicing of the 

borehole, installation 

of tank and solar 

system

Nov-14 1,500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Emining Chiefs 

Office

Completion of the 

chiefs office-painting 

,window glasses, 

ceiling board, furniture

Aug-14 150,000 Complete Funds fully utilized and it 

is in use.

PROJECT IMPLEMENTATION STATUS AS AT MAY 2016

MOGOTIO NG_CDF

Page 2: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Asenwe ECD  completion of a 

classroom

Apr-14 400,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sitet Primary Construction of a 

classroom

Aug-14 500,000               Complete Funds fully utilized and it 

is in use.

2013/2014 Kamar Chiefs 

Office

Completion of the 

chiefs office-painting 

,window glasses, 

ceiling board

Jul-14 200,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kibotany Primary Construction of a new 

classroom

Aug-14 600,000               Complete Funds fully utilized and it 

is in use.

2013/2014 Kipkitur Primary Ceiling and wiring of 

adminstration block 

doors

Aug-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Koibarak 

Secondary

Completion of main 

laboratory

Jul-14 600,000               Complete Funds fully utilized and it 

is in use.

2013/2014 Muguyuni Primary Completion of a 

classrooms .

Jul-14 400,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kamasai Pry. 

School

Completion of a 

classroom

Aug-14 250,000               Complete The facility is in use

2013/2014 Kapnosgei Primary Construction of a new 

classroom

Aug-14 700,000 Complete The facility is in use

2013/2014 kapsiloi pry School Completion of a 

classroom

Aug-14 300,000               Complete Funds fully utilized and it 

is in use.

2013/2014 Embogong Primary Completion of a 

classroom

Sep-14 300,000 Complete The facility is in use

2013/2014 Biikwen Gobat 

Primary

Construction of a 

classroom

Nov-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 kimose Dispensary Completion of the 

dispensary-roofing, 

painting and glazing

Jul-14 500,000 Complete The facility is in use

2013/2014 chemereng Dam Cleaning of the dam by 

removing soil

Sep-14 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kimngorom Girls 

High School

Completion of 

dormitory and teacher 

house

Aug-14 1,000,000            Complete The facility is in use

Page 3: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Kapleel Water 

Project

Distribution of water to 

kimngorom,pipe 

connection

Jul-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kapterit Kiptuno 

Water project

Distribution of water to 

kimngorom,pipe 

connection

Sep-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kisanana 

Secondary

Completion of a 

classroom

Sep-14 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 kisanana Health 

Centre

Completion of 

paedriatic ward, 

painting, glazing, 

flooring and ceiling

Sep-14 400,000 Complete Funds fully utilized and it 

is in use.

2013/2014 AIC Majimoto 

Sec. School

Construction of ICT 

laboratory

May-14 1,600,000 Complete The facility is in use

2013/2014 Maji moto youth 

polytechnic

Fencing the school 

compound.

Aug-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Koibos Chiefs 

Office

Completion of the 

chiefs office- painting, 

ceiling board

Sep-14 200,000 Complete The facility is in use

2013/2014 Koibos Chiefs 

Office

 Completion of the 

chiefs office.

Sep-14 100,000 Complete The facility is in use

2013/2014 Letoi primary 

school

Completion of a 

classroom

Aug-14 500,000 Complete The facility is in use

2013/2014 Cheptolil dam 

water project

Construction of the 

dam

Sep-13 645,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kaplelwo 

Secondary

Completion of 

classrooms

Aug-14 500,000 Complete The facility is in use

2013/2014 Radad Water 

Borehole

Purchase of motor and 

wiring

Oct-13 150,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sarakwa Cattle 

Dip

Completion of the dip, 

walling and roofing

Jul-14 436,628 Complete The facility is in use

2013/2014 Aram Primary 

School

Construction of a 

classroom

Aug-14 500,000               Complete The facility is in use

2013/2014 Chepkokon ECD Construction of two 

new classrooms

Aug-14               700,000  Complete Funds fully utilized and it 

is in use.

Page 4: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Koitebes chiefs 

office

Completion of the 

chiefs office- painting, 

ceiling board

Aug-15 200,000 Complete The facility is in use

2013/2014 Lolbugo pri. 

School

Construction of a 

classroom

Sep-14 600,000               Complete The facility is in use

2013/2014 Kiptoim 

Dispensary

Completion of the 

dispensary-furniture 

and painting

Nov-13 200,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sagasagik Sec. 

School

Completion of 

Administration block

Mar-14 500,000 Complete The facility is in use

2013/2014 Mogotio 

Community 

primary school

Construction of a new 

classrooms

Sep-13 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kaplegich ECD Completion of a 

classroom

Aug-14 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kelelwa hill 

Primary

Completion of land 

payment and 

construction of a 

classroom

Apr-14 1,000,000 Complete The facility is in use

2013/2014 Reuben Cheruiyot 

Sec. School

Completion of 

laboratory.

Aug-14 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kipsogon Sec. 

School

Completion of 

administration block 

block

Sep-14 400,000 Complete The facility is in use

2013/2014 Bulioke ECD Completion of a 

classroom

Sep-13 300,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Molo Sirwe 

Primary

Completion of a 

classroom

Apr-14 400,000 Complete The facility is in use

2013/2014 Molo Sirwe Sec. 

School

Completion of a 

dormitory

Aug-13 800,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kipnyung'Uny 

Primary

Construction of a 

permanent classroom

Jun-14 700,000 Complete The facility is in use

2013/2014 Pombo Pry. School Construction of a 

permanent Classroom

Sep-14 700,000 Complete The facility is in use

2013/2014 Ngubereti pry. 

School

Completion of staff 

house

Aug-14 300,000 Complete The facility is in use

Page 5: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Kaplengnoi Cattle 

Dip

Completion of the 

cattle dip walling and 

roofing

Jul-14 440,000 Complete The facility is in use

2013/2014 Chemalengnet foot 

bridge

Construction of the 

foot bridge

Mar-15 800,000.00 Complete The facility is in use

2013/2014 Chomiek Primary Completion of two 

classrooms

Sep-13 600,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Oldebes Secondary Completion of a 

laboratory

Sep-13 997,400 Complete Funds fully utilized and it 

is in use.

2013/2014 Olkiram Water  

supply 

Water distribution Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kabergei Primary Completion of two 

classrooms

Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Olkokwe borehole Replacement of worn 

out pipes

Sep-13 150,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Olkokwe chiefs 

office

Completion of the 

chiefs office- painting, 

ceiling board, furniture

Sep-13 200,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Olkokwe Sec. 

School

Completion of 

classroom.

Aug-13 700,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Proposed Ebenezer 

primary 

Construction of a new 

classroom

Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Rosoga Chiefs 

Office

Completion of the 

chiefs office- painting, 

ceiling board

Aug-13 180,000 Complete Funds fully utilized and it 

is in use.

2013/2014 St. Maximilian 

Kolbes Primary

Construction of a 

classroom

Aug-13 700,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Mugurin Sec. 

School

Completion of four 

classroom & fencing

Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Waseges Pry. 

School

Construction of a 

permanent classroom

Aug-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Nyalilbuch 

borehole

Purchase of a water 

pump

Sep-13 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sinende chiefs 

office

Completion of the 

chiefs office- painting, 

ceiling board

Oct-13 300,000 Complete The facility is in use

Page 6: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Waseges 

Dispensary

Completion of the 

dispensary, doors 

fixing,ceiling,plasterin

g and laying of floor

Aug-14 150,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sore Secondary Construction of a 

classroom

Aug-14 600,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Kaburgei resource 

center

Leveling of the field, 

construction of hostels 

and Library

Aug-14 974,793 95% of the works has 

been done so 

far.Continuos exercise.

Funds fully utilized

2013/2014 Kapsok Primary Fencing of the school 

compound

Aug-14 300,000 Complete Funds fully utilized

2013/2014 Kipkigei Primary Completion of a 

classroom and 

construction of a 

classroom- painting

Aug-13 350,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Sirwa Secondary Completion of girls 

dormitory

Aug-14 700,000 Complete Funds fully utilized

2013/2014 Sigowo water 

project

Survey, Establishment 

of water intake and 

laying of pipes.

Sep-13 250,000 Complete Funds fully utilized

2013/2014 Kapkole dam Cleaning of the dam by 

removing soil

Feb-14 500,000 Complete Funds fully utilized

2013/2014 Kapnosgei water 

project

Purchase of sub-

mersible pump and 

motor

Mar-14 500,000 Complete Funds fully utilized

2013/2014 Kabuswo - Kiribot 

Foot bridge

Completion of the 

bridge bridge- 1 beam, 

reck support,siderails

Mar-14 1,500,000.00 Complete Funds fully utilized and it 

is in use.

2013/2014 Kabuswo Chiefs 

Office

Construction of the 

chiefs office

Sep-14 500,000 Complete Funds fully utilized and it 

is in use.

2013/2014 Office 

Administration

To meet office 

Administration 

expenses.

May-14 2,726,030.00 Complete Funds fully utilized

2013/2014 Monitoring & 

Evaluation

Monitoring projects in 

the constituency

May-14 863,015.00 Complete Funds fully utilized

Page 7: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2013/2014 Bursary Bursary for needy 

students

Aug-13 4,500,000.00 Complete Funds fully utilized

2013/2014 Bursary Bursary for needy 

students

Aug-13 11,848,335.00 Complete Funds fully utilized

2013/2014 Emergency  To meet contingencies 

arising from 

uncertainties and 

emergencies within the 

constituency

May-14 Nil Complete Funds fully utilized

2013/2014 RECCURRENT Recurrent expenses May-14 1,579,778.00 Complete Funds fully utilized

2013/2014 SPORTS Leveling of the field, 

construction of hostels 

and Library

Sep-14 974,793.31 Complete in levelling Works In Progress 60% of 

works has been done.

2013/2014 SPORTS Kaburgei Resource 

Centre. Planting of 

trees to prevent soil 

erosion.

Sep-14 800,000.00 Complete Funds fully utilized

2013/2014  Kamar Primary completion of a 

classroom

Aug-14 400,000               Complete Funds fully utilized and it 

is in use.

TOTAL 64,515,774

2014/2015 Kapngemui 

Primary

Completion of 3 

classrooms, plastering 

and glazing

Nov-15 450,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Tian Pry. School Construction of a new 

classroom-600,000

Aug-15 600,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Tian Pry. School Completion of a 

classroom-plastering 

and roofing-200,000

Sep-15 200,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Emining Chiefs 

Office

Completion of the 

chief's office-ceiling

Feb-15 222,350 Complete Funds fully utilized and it 

is in use.

2014/2015 Kamalanget 

Primary school

construction of a new 

classroom.

Sep-16 400,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 50% of 

works has been done.

Page 8: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Kabogor Primary Construction of a new 

classroom

Sep-16               500,000  60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 60% of 

works has been done.

2014/2015 Kabuswo Primary Construction of new 

classroom.

Sep-16 400,000 65% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 65% of 

works has been done.

2014/2015 Kiribot Primary Construction of a new 

classroom

Sep-16 800,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 80% of 

works has been done.

2014/2015 Molos Primary Construction of a new 

classroom

Sep-16 600,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 60% of 

works has been done.

2014/2015 Lengnane Dam Completion of the dam Jul-14 500,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Tingtinyon 

Primary

Construction of anew 

classroom

Sep-16 600,000               50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 50% of 

works has been done.

2014/2015 Kibotany Primary Completion of a 

classroom-plastering

Sep-15 700,000               Complete Funds fully utilized and it 

is in use.

2014/2015 Koibarak 

Secondary

Completion of a lab 

roofing, plastering

Oct-14 700,000               Complete Funds fully utilized and it 

is in use.

2014/2015 Muguyuni Primary Construction of a new 

classroom

Sep-16 700,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 80% of 

works has been done.

2014/2015 Koibarak primary 

school

Construction of two 

semi-permanent 

classrooms.

Aug-14 107,565 Complete Funds fully utilized and it 

is in use.

2014/2015 Kipkitur 

Dispensary

Shelves, wiring, 

electricity connection 

and construction of the 

gate.

Sep-16 300,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 80% of 

works has been done.

Page 9: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Kamasai Pry. 

School

Construction of a 

classroom

Sep-16 600,000               65% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 65% of 

works has been done.

2014/2015 Kapnosgei Primary Construction of a 

classroom

Sep-16 600,000 75% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 75% of 

works has been done.

2014/2015 Cheplabot Ecd Transfer of land 

ownership from private 

owner to the school

Apr-14               100,000  Complete Funds fully utilized

2014/2015 Sosion Pry. School Construction of a 

classroom

Sep-16               600,000  60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 60% of 

works has been done.

2014/2015 Chemoinoi 

Primary

Construction of a 

classroom

Sep-16 700,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 60% of 

works has been done.

2014/2015 Chemoinoi 

Dispensary

Completion of health 

centre staff houses-

plastering and glazing

Sep-16 200,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 80% of 

works has been done.

2014/2015 Kimose health 

center

Completion of the 

health center

Jul-14 100,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Kapterit Primary Construction of one 

classroom

Aug-15 800,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Kimngorom Girls 

High School

Purchase of the School 

Bus.

Nov-15 5,000,000            Complete Funds fully utilized and 

the Bus is in use.

2014/2015 Kisanana 

Secondary

Construction of 

administration block

Sep-16 500,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 50% of 

works has been done.

2014/2015 Koisaram Water 

Borehole

Drilling of a bore hole N/A 1,000,000            Ongoing Works In Progress 80% of 

works has been done.

Page 10: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Koisaram Primary Completion of a 

classroom

Aug-14 400,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Emsos Primary Completion of the 

classroom-plastering

Jul-15               600,000  Complete Funds fully utilized and it 

is in use.

2014/2015 Emsos Primary Completion of the 

classroom-plastering

Jul-15               140,000  Complete Funds fully utilized and it 

is in use.

2014/2015 Majimoto Health 

Center

Fencing the facility 

with wooden poles and 

wire mesh

Sep-14 90,000                 Complete Funds well utilized

2014/2015 Siewa Dam Fencing the dam Aug-14 110,000 Complete Funds well utilized

2014/2015 AIC Majimoto 

Sec. School

Purchase of School 

Bus.

Nov-15 5,000,000 Complete Funds fully utilized and 

the Bus is in use.

2014/2015 Chemutung health 

center

Construction of health 

center

N/A               600,000  70% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 70% of 

works has been done.

2014/2015 Majimoto primary 

school

Renovation of two 

school dormitories

Aug-14               400,000  Complete Funds well utilized

2014/2015 Majimoto primary 

school

Power connection Aug-15               150,000  Complete Funds fully utilized

2014/2015 Emsos dispensary Construction of shelves 

and internal fixings

Oct-14               120,000  Complete Funds fully utilized and 

Facility is in use.

2014/2015 Mutaran primary 

school

Completion of a 

classroom-plastering

Apr-15               600,000  Complete Funds fully utilized and it 

is in use.

2014/2015 Radad Primary 

School

Completion of 2 

classroom windows, 

glazing and plastering

Aug-14 300,000 Complete Funds fully utilized and 

Facility is in use.

2014/2015 Radat primary 

school

Completion of three 

door toilets

Aug-14 325,000 Complete Funds fully utilized and 

Facility is in use.

2014/2015 Kwirindoche 

primary school

Construction of a 

classroom. 

Sep-16 600,000 65% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 65% of 

works has been done.

Page 11: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Kiskis primary 

school

Construction of a 

classroom. 

Sep-16 600,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 60% of 

works has been done.

2014/2015 Radad Secondary 

School

Construction of three 

door toilet.

Sep-16 300,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 80% of 

works has been done.

2014/2015 Kaplelwo 

Secondary

Completion of a new 

classroom

Aug-15 300,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Koitebes chiefs 

office

Plastering,glazing,wind

ows,ceilling

Jul-15 300,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Matebei Primary Completion of a 

classroom.

Augt 2015 300,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 50% of 

works has been done.

2014/2015 Koitebes Sec. 

School

Plastering,glazing,wind

ows

Aug-14 400,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Equator Suswo Soi 

Water Project

Drilling of the borehole Sep-15 900,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Sagasagik Pry. 

School

Construction of a 

classroom

Augt 2014 600,000 70% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 70% of 

works has been done.

2014/2015 Sagasagik Pry. 

School

Renovation of 

classrooms

Nov-15 400,000 85% of the works has 

been done so 

far.Continuos exercise.

Works In Progress 85% of 

works has been done.

2014/2015 Lombogishu Sec. 

School

Completion of two 

classrooms

Sep-15 600,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Lombogishu 

Primary School

Renovation of 

classrooms-plastering, 

painting and dooring.

Aug-14 337,932 Complete Funds fully utilized and it 

is in use.

2014/2015 Kelelwa Primary Construction of a toilet Jul-15 300,000 Complete Funds fully utilized and it 

is in use.

Page 12: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Logiri Primary Construction of a new 

classroom

Aug-15 500,000 65% of the works has 

been done so 

far.Continuos exercise.

Works In Progress needs 

more funds to complete

2014/2015 Lomanira Primary Completion of a 

classroom

May-15 300,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Ngusero Primary Construction of a new 

classroom and semi-

permanent 

Administration block.

Aug-15 300,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress needs 

more funds to complete

2014/2015 Mogotio Girls 

High

Construction of a new 

dormitory

Sep-15 800,000 20% of the works has 

been done so 

far.Continuos exercise.

Works In Progress needs 

more funds to complete

2014/2015 Noiwet Day And 

Boarding Primary

Renovation of 6 

classrooms-plastering

Aug-15 650,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Reuben Cheruiyot 

Sec. School

Construction of 

staffroom/administratio

n block.

Sep-15 500,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Mogotio Youth 

Polytechnic

Completion of 

dormitory

Nov-15 500,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Olduka Cattle dip Construction of a new 

Cattle Dip

Sep-14 700,000 65% of the works has 

been done so 

far.Continuos exercise.

Works In Progress needs 

more funds

2014/2015 Molo Sirwe 

Primary

Construction of new 

toilet

Apr-15 100,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Molo Sirwe Sec. 

School

Construction of new 

girls dormitory

Aug-15 2,000,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Chebarer cattle dip Construction of a new 

cattle dip

Jun-15 760,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Chebarer primary 

school

Purchase of land and 

construction of 

classroom

May-15 700,000 Complete Funds fully utilized and it 

is in use.

Page 13: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Kipnyung'Uny 

Primary

Completion of a 

classroom-plastering

Aug-15 400,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Kitecho primary Construction of a new 

classroom

Nov-15 600,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Ng'endalel 

borehole

Water distribution Sep-15 600,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Ng'endalel 

borehole

Installation of solar 

panel system to assist 

in pumping water

Oct-15 2,000,000 75% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Ngubereti Day 

Secondary

Completion of a 

laboratory

Aug-15 300,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Ngubereti Water 

Project

Purchase of land 1/4 

acre

Jun-15 150,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Ngubereti Water 

Project

Construction of a water 

tank.

Jun-15 850,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Oldebes Water 

Project

Purchase of pipes for 

water

Sep-15 400,000 85% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Chomiek Water 

project

Construction of 50m3 

water tank.

Sep-15 500,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Oldebes Primary Completion of seven 

classrooms-plastering

Aug-15 600,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Kabergei Primary Completion of 

classroom-plastering

Aug-15 250,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Olkokwe Sec. 

School

Construction of a 

classroom

Oct-15 700,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Olkokwe Sec. 

School

Wiring & Electricity 

connection

Aug-15 150,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Rosoga Chiefs 

Office

Completion of the 

chiefs office- Window 

glazing.

May-15 300,000 Complete Funds fully utilized and it 

is in use.

Page 14: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Kures Primary Construction of new 

classroom.

Oct-15 500,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Rosoga secondary Construction of dining 

hall

Nov-15 500,000 40% of the works has 

been done so 

far.Continuos exercise.

Works In Progress needs 

more funds to complete

2014/2015 Kapkundul 

Primary

Construction of a new 

classroom

Jul-15 800,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Kibulwe primary 

school

Purchase of land. Feb-15 500,000 Complete Funds fully utilized.

2014/2015 Kibulwe primary 

school

Construction of a 

permanent classroom

Oct-15 500,000 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Nyalilbuch 

Primary

Construction of a 

permanent classroom

Oct-15 700,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Sinende Secondary Construction of a new 

classroom

Oct-15 700,000 70% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Sore Secondary Completion of three 

classrooms plastering

Oct-15 900,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Kapkein Primary Completion of a 

classroom-plastering, 

glazing.

Oct-15 300,000 75% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 sigowo water 

project

Purchase and laying 

down pipes along the 

water lines

Sep-15 250,000 Complete Funds fully utilized and it 

is in use.

2014/2015 Beche bono water 

project

Establishment and 

extension of weir

Mar-15 150,000 Complete Funds fully utilized and it 

is in use.

Page 15: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Sirwa Secondary Construction of two 

classrooms & 

staffroom

May-16 2,000,000 60% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Sirwa Health 

Center

Construction of 

medical laboratory

Sep-15 500,000 80% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 Molos Dispensary Completion 

plastering,windows,ceil

ling,doors

Jun-15 500,000               Complete Funds fully utilized and it 

is in use.

2014/2015 CDF Office Completion of CDF 

office-79000 fencing

Sep-14 229,000 Complete Funds fully utilized and it 

is in use.

2014/2015 CDF Motor 

Vehicle-Land 

cruiser/Land Rover

Purchase of CDF 

motor Vehicle

Sep-15 6,000,000.00 Complete Funds fully utilized and 

Vehicle is in use.

2014/2015 Office 

Administration

Payment of staff 

salaries(shs.1,000,000)

Jun-15 1,236,000.00 Complete Funds fully utilized.

2014/2015 Office 

Administration

Purchase of 

photocopiers, staplers

Continuos 

exercise

200,000.00 Ongoing Works In Progress

2014/2015 Office 

Administration

Purchase of CDF 2 

computers

Continuos 

exercise

300,000.00 Ongoing Works In Progress

2014/2015 Office 

Administration

Purchase of fuel, 

repairs and 

maintenance,printing,st

ationery,telephone,trav

el and subsistence

Jun-15 1,500,000.00 Complete Funds fully utilized.

2014/2015 Office 

Administration

Payment of NSSF 

Deductions

Jun-15 50,000.00 Complete Funds fully utilized.

2014/2015 Office 

Administration

Payment of committee 

sitting 

allowances,transport,co

nferences

Jun-15 1,907,493.78 Complete Funds fully utilized.

Page 16: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Monitoring & 

Evaluation

Purchase of fuel, 

repairs and 

maintenance,printing,st

ationery,Airtime,

Jun-15 500,000.00 Complete Funds fully utilized.

2014/2015 Monitoring & 

Evaluation

Payment of committee 

sitting 

allowance,transport,co

nferences

Jun-15 1,735,788.28 Complete Funds fully utilized.

2014/2015 Monitoring & 

Evaluation

Undertake Training of 

the PMCs/CDFCs on 

CDF Related issues

Jun-15 607,958.61 Complete Funds fully utilized.

2014/2015 Constituency Audit Constituency Audit Continuos 

exercise

500,000.00 awaiting CDF Board 

guideline

undisbursed funds

2014/2015 Bursary Tertiary 

Schools

Payment of Bursary to 

needy students

Jan-15 8,284,817.53 Complete Funds fully utilized.

2014/2015 Bursary Tertiary 

Schools

Payment of Bursary to 

needy students

Jan-15 4,000,000.00 Complete Funds fully utilized.

2014/2015 Mocks/CATs Printing and 

distributions

Jan-15 1,000,000.00 Complete Funds fully utilized.

2014/2015 Emergency  To cater for any 

unforeseen occurrences 

in the constituency

Continuos 

exercise

2,529,819.00 Ongoing undisbursed funds

2014/2015 EMERGENCY  Kimngorom girls 

secondary construction 

of girls dormitory

May-16 1,000,000.00 Ongoing Funded by emergency funds

2014/2015 EMERGENCY  Rosoga secondary 

school construction of 

dining hall

Apr-16 500,000.00 Ongoing Funded by emergency funds

2014/2015 EMERGENCY  Rosoga primary school 

renovation of 

classroom

Jun-15 350,000.00 Complete Funds fully utilized and it 

is in use.

2014/2015 EMERGENCY  Kabarbaya dam 

embankment/gabions

Sep-15 200,000.00 Complete Funds fully utilized and it 

is in use.

2014/2015 EMERGENCY  Tian primary school 

construction of toilets

Sep-15 167,000.00 Complete Funds fully utilized and it 

is in use.

Page 17: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 EMERGENCY  Kabergei primary 

school roofing of 

classroom blown by 

wind.

Jul-15 125,000.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Aram primary school 

construction of toilets

Aug-15 200,000.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Chemorgong primary 

school construction of 

toilets

Aug-15 200,000.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Sirwa secondary school 

construction of girls 

toilets and bathrooms

Aug-15 400,000.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Tung tung-chepnes 

foot bridge 

construction

Jun-16 800,000.00 50% of the works has 

been done so 

far.Continuos exercise.

Works In Progress

2014/2015 EMERGENCY  Sagasagik pry. 

School(Roofing of 

classrooms blown-off 

by wind.)

Aug-15 141,200.00 Complete Funds fully utilized and it 

is in use.

2014/2015 EMERGENCY  Kimose pry. 

School(Roofing of 

classrooms blown-off 

by wind.)

Jul-15 120,020.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Kaplelwo pry. 

School(One 

classroom.)

Jul-15 423,600.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Kapyemit pry. 

School(Roofing of 

classrooms blown -off 

by wind.)

Jul-15 123,550.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Kenet ECD(Land 

buying-to be funded by 

emergency).

May-15 200,000.00 Complete Funds fully utilized.

Page 18: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 EMERGENCY  Kaburgei pry. 

School(Construction of 

teachers latrines.)

Aug-14 63,540.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Kisanana girls 

Sec.School(Buying of 

land.)

Sep-14 70,600.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Mogotio constituency 

Boda Boda Sheds-

Mogotio 

Centre(Construction of 

Boda Boda Shed.)

Oct-15 35,300.00 Complete Funded by emergency funds 

and it is in use

2014/2015 SPORTS Mogotio constituency 

Boda Boda Sheds-

Mogotio Centre and 

Noiwet 

Centre(Construction of 

Boda Boda Shed.)

Nov-15 100,000.00 Ongoing Works In Progress

2014/2015 EMERGENCY  Mogotio Health 

Centre(Ambulance 

Servicing.)

Jun-14 21,180.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Mogotio Constituency 

Boda Boda Sheds-

Noiwet 

Centre(Construction of 

Boda Boda Shed.)

Jun-16 21,180.00 Ongoing Works In Progress-requires 

additional  funding

2014/2015 EMERGENCY  Chebarer Pry. 

School(Fencing of the 

compound.)

Sep-15 127,080.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Ngubereti 

Borehole(Renovation 

and Rehabilitation of 

the Borehole.)

Oct-14 70,600.00 Complete Funded by emergency funds 

and it is in use

2014/2015 EMERGENCY  Koisaram Pry. 

School(Renovation and 

Completion

Augt 2014 10,590.00 Complete Funded by emergency funds 

and it is in use

Page 19: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2014/2015 Constituency 

Sports 

Tournament.

Carry out Constituency 

Sports tournament and 

the winning 

teams/schools to be 

awarded with trophies, 

balls and games kits-

Kaburgei resource 

centre-

shs.300,000:sports 

development.

Continuos 

exercise

1,138,690.60 Ongoing Works In Progress

2014/2015 SPORTS To support activities in 

the 

constituency(tourname

nts and music).

Continuos 

exercise

200,000.00 Ongoing Works In Progress

2014/2015 MOGOTIO 

CONSTITUENCY

.

Planting of trees to 

prevent soil erosion in 

the constituency.

Mar-14 338,698.00 Complete Funds fully utilized.

TOTAL 94,891,553.00

2015/2016 EMERGENCY 

(5%)

To Cater for emergencies 

that may occur within the 

constituency during the 

year

Continuos 

exercise

         2,407,647.00  Ongoing undisbursed emergency 

funds

2015/2016 Motomisie water pan dam excavation Mar-16             500,000.00  Ongoing Funded by emergency funds

2015/2016 Emining sec school construction of one 

classroomMar-16             300,000.00  Ongoing Funded by emergency funds

2015/2016 Kiptoim sec school 2 classrooms Mar-16             300,000.00  Ongoing Funded by emergency funds

2015/2016 Kaplelwo sec school one classroom Mar-16             300,000.00  Ongoing Funded by emergency funds

2015/2016 Kiptulwe water pan purchase 3 acre land Mar-16             300,000.00  Ongoing Funded by emergency funds

2015/2016 Maranbei water pan purchase 5 acre land Mar-16          1,500,000.00  Ongoing Funded by emergency funds

2015/2016 Mogotio sub-county 

water and expansion 

project

water piping  Mar-16               60,000.00  Ongoing Funded by emergency funds

Page 20: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Mogotio constituecy 

bodaboda sheds-

noiwett

construction of bodaboda 

shedMar-16             100,000.00  Ongoing Funded by emergency funds

2015/2016 Employees 

Salaries

Payment of staff 

salaries and gratuity 

Continuos 

exercise

       1,632,300.00  Ongoing Works In Progress

2015/2016 Goods and Services Purchase of fuel, repairs 

and maintenance, 

printing, stationery, 

telephone, travel and 

subsistence, office tea, 

etc.  

Continuos 

exercise

         1,232,000.00  Ongoing Works In Progress

2015/2016 Purchase of 

Computers

Purchase of CDF  

computers,Printers and 

shredders

Continuos 

exercise

            673,004.00  Ongoing Works In Progress

2015/2016 Purchase of 

Furniture/equipment

s

Purchase of 

photocopiers, staplers 

,office tables,chairs

Continuos 

exercise

            704,630.00  Ongoing Works In Progress

2015/2016 NSSF Payment of NSSF 

DeductionsContinuos 

exercise

              50,000.00  Ongoing Works In Progress

2015/2016 NHIF Payment of NHIF 

DeductionsContinuos 

exercise

              67,200.00  Ongoing Works In Progress

2015/2016 Committee Expenses Payment of Committee 

sitting allowances, 

transport, conferences

Continuos 

exercise

         1,668,000.00  Ongoing Works In Progress

2015/2016 SPORTS 

ACTIVITIES (2%)

Carryout constituency 

sports tournaments Continuos 

exercise

1,500,000.00 Ongoing Works In Progress

2015/2016 Goods and Services Purchase of fuel, repairs 

and maintenance, 

printing, stationery, 

Airtime, travel and 

subsistence, e.t.c

Continuos 

exercise

300,000.00 Ongoing Works In Progress

2015/2016 Committee Expenses Payment of Committee 

sitting allowances, 

transport, conferences

Continuos 

exercise

1,213,017.00 Ongoing Works In Progress

Page 21: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 CDFC/PMC 

Capacity Building

Undertake Training of 

the PMCs/CDFCs on 

CDF Related issues

Continuos 

exercise

1,500,550.00 Ongoing Works In Progress

2015/2016 ENVIRONMENTA

L ACTIVITIES 

(2%)

Planting of trees to 

prevent soil erosionContinuos 

exercise

500,000 Ongoing Works In Progress

2015/2016 Bursary Secondary 

Schools

Payment of bursary to 

needy student

Continuos 

exercise

     10,543,887.00  Ongoing Works In Progress

2015/2016 Bursary Tertiary 

Schools

Payment of bursary to 

needy student

Continuos 

exercise

       5,000,000.00  Ongoing Works In Progress

2015/2016 Mocks/CATs Printing and 

distribution of Mocks 

and CATs

Continuos 

exercise

       1,000,000.00  Ongoing Works In Progress

2015/2016 Kures primary 

school

completion of two 

classrooms-Plastering 

and finishings

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Ebenezar primary 

school

completion of classroom 

& toilet constructionApr-16             400,000.00  Ongoing Works In Progress

2015/2016 Lombala primary 

school

 Construction of new  4-

door latrine blockSep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Rosoga primary 

school

construction of girls 

latrinesSep-16             150,000.00  NEW Yet to receive the funds

2015/2016 Kipsogon primary 

school

construction of one new 

classroomApr-16             500,000.00  Ongoing Works In Progress

2015/2016 kelelwa hill primary 

school

completion of 

2classrooms-plastering 

and flooring

Apr-16             500,000.00  Ongoing Works In Progress

2015/2016 Ngusero primary 

school

completion of 

3classrooms-

plastering,flooring and 

paintworks

Apr-16             500,000.00  Ongoing Works In Progress

2015/2016 Kiskis Primary 

School

construction of  a new 

latrine blockSep-16             200,000.00  NEW Yet to receive the funds

Page 22: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Kaplelwo Primary 

School

completion of 4 

classrooms-

plastering,flooring and 

roofing

Apr-16             600,000.00  Ongoing Works In Progress

2015/2016 Molok Primary 

School

Completion  of girls 

dormitory-

plastering,paintworks 

and partitioning

Sep-16             400,000.00  NEW Yet to receive the funds

2015/2016 Letoi Primary 

School

completion of 4 

classrooms-

plastering,painting and 

flooring

Apr-16             400,000.00  Ongoing Works In Progress

2015/2016 Radad Primary 

School

construction of two new  

latrine blocks for both 

boys & girls 

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Matebei Primary 

School

construction of one new 

classroom(kshs.400,000/ 

and renovation of 

classrooms-

kshs.100,000/

Sep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Chepkokon Primary 

School

completion of two 

classrooms-

plastering,roofing,floorin

g and fencing

Apr-16             700,000.00  Ongoing Works In Progress

2015/2016 Aram Primary 

School

completion of 

2classrooms-

plastering,flooring and 

roofing

Sep-16             400,000.00  NEW Yet to receive the funds

2015/2016 Koitebes Primary 

School

completion of the 

administration block-

plastering and finishings

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Kapterit Primary 

School

 Construction of a new 

classroom Sep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Kimngorom  day & 

boarding Primary 

School

 Construction of a new 

classroom Sep-16             500,000.00  NEW Yet to receive the funds

Page 23: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Sore Primary School  Completion of 

2classrooms-plastering 

and paintworks 

May-16             400,000.00  Ongoing Works In Progress

2015/2016 Kipkigei Primary 

School

completion of two 

classrooms-

plastering,flooring,paint

works and finishing

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Kaplaimoi Primary 

School

 Construction of 1 

classroom  (ICT)Sep-16             700,000.00  NEW Yet to receive the funds

2015/2016 Kapsok Primary 

School

 Construction of one new 

classroom Sep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Chemorgong 

Primary School

 Completion of 

2classrooms-plastering 

and finishings

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Kaburgei Primary 

School

 Construction of 

staffroom (prefabricated 

)

May-16             200,000.00  Ongoing Works In Progress

2015/2016 Sirwa Primary 

School

construction of ICT 

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Sagasagik Primary 

School

Construction of one new  

latrine blockSep-16             150,000.00  NEW Yet to receive the funds

2015/2016 Lolbugo primary 

school

construction of one new 

classroomApr-16             500,000.00  Ongoing Works In Progress

2015/2016 Esageri school for 

the deaf

construction of one new 

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kiptoim primary 

school

Completion and 

Renovation of 

classrooms-

plastering,flooring and 

roofing

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 A.I.C Esageri day 

boarding primary 

school

Construction of   dining 

hallSep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Ainopsos Primary 

School

completion of one  

classroom-plastering and 

paintworks

Sep-16             200,000.00  NEW Yet to receive the funds

Page 24: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Kaplogos Primary 

School

completion of two 

classrooms-

plastering,flooriong and 

paintworks

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Ngentui Primary 

School

construction of 

administration blockSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kapngemui Primary 

School

construction of one new 

classroomSep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Oterit Primary 

School

 Completion of of 

administration block and 

3 classrooms-plastering 

and paintworks 

Awaiting for 

funds

            300,000.00  NEW Yet to receive the funds

2015/2016 Nato Primary School completion of two 

classrooms-

plastering,flooring and 

painting

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Kamalanget Primary 

School

completion of two 

classrooms-

plastering,flooring and 

painting

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Kapcheluguny 

Primary School

completion of two 

classrooms-

flooring,painting,fixing 

doors and windows

Sep-16             400,000.00  NEW Yet to receive the funds

2015/2016 Emining Primary 

School

completion of two 

classrooms-

plastering,flooring and 

painting

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Sorti Primary School Construction of one new 

classroomsSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Emining Divisional 

Education Office

 Renovation of office 

verandah and roofingSep-16             100,000.00  NEW Yet to receive the funds

2015/2016 Kimose Primary 

School

construction of one new 

classroomSep-16             500,000.00  NEW Yet to receive the funds

Page 25: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Sosion Primary 

School

completion of the 2 

classrooms-

plastering,flooring and 

painting 

Apr-16             300,000.00  Ongoing Works In Progress

2015/2016 Maji Motto Primary 

School

fencing the school 

compoundSep-16             100,000.00  NEW Yet to receive the funds

2015/2016 Kapyemit Primary 

School

 Construction of one new 

classroom Sep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kaplegich Primary 

School

 Construction of one new 

classroom Sep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Sitet Primary School  Completion of one  

classroom -flooring and 

plastering

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Chebarer Primary 

School

 Construction of one new 

classroom Sep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Chepyuan Primary 

School

construction of one new 

classroomsSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Magoi Primary 

School

construction of one new 

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Molo-Sirwe Primary 

School

construction of 2 new 

classroomsSep-16             850,000.00  NEW Yet to receive the funds

2015/2016 Kapkundul Primary 

School

construction of one new 

a classroom Sep-16             700,000.00  NEW Yet to receive the funds

2015/2016 Ngendalel Primary 

School

completion of one  

classroom-flooring and 

plastering

Sep-16             200,000.00  NEW Yet to receive the funds

2015/2016 Kabergei Primary 

School

completion of 2 

classrooms-flooring and 

plastering

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Kabuswo primary 

school

construction of boys 

dormitorySep-16             800,000.00  NEW Yet to receive the funds

2015/2016 Kamasai primary 

school

construction of one new 

classroomSep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Kamasai primary 

school

construction of teachers 

house-prefabricatedSep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Chebirebei primary 

school

construction of one new 

classroomSep-16             500,000.00  NEW Yet to receive the funds

Page 26: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Waseges  primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kamar primary 

school

 construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Molos primary 

school

Completion of  one new 

classroomsSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kisanana primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Koisaram primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Chomiek Primary 

School

purchase of 6 acres land 

for expansionApr-16             650,000.00  Ongoing Works In Progress

2015/2016 Oldebes Primary 

School

construction of boys 

toiletsSep-16             100,000.00  NEW Yet to receive the funds

2015/2016 Pombo primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Kipnyuguny primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 kipkitur primary 

school

construction of one new 

classroomSep-16             600,000.00  NEW Yet to receive the funds

2015/2016 Koibarak primary 

school

construction of one new  

classroomSep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Chomiek primary 

school

Construction of teachers 

latrine block-

kshs.100,000/ and 

completion of 

2classrooms-plastering 

and flooring-

kshs.200,000/

Sep-16             300,000.00  NEW Yet to receive the funds

2015/2016 Rosoga Secondary 

School

construction of 

laboratory-plastering and 

flooring

Apr-16             800,000.00  Ongoing Works In Progress

2015/2016 Kipsogon Secondary 

School

completion of 

4classrooms-

plastering,flooring and 

oaintworks

Sep-16             200,000.00  NEW Yet to receive the funds

Page 27: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Mogotio Girls 

Secondary School

 Completion of girls 

dormitory-walling and 

roofing

Sep-16             500,000.00  NEW Yet to receive the funds

2015/2016 Proposed Mogotio 

Day Secondary 

School

 Proposed 4 classroom Sep-16          1,200,000.00   New (NOT 

APPROVED)

conditional approval

2015/2016 Kaplelwo Secondary 

School

replacement of roofs 

blown by windSep-16               50,000.00   New  Yet to receive the funds

2015/2016 Radad Secondary 

School

construction of 

laboratory Sep-16             600,000.00   New  Yet to receive the funds

2015/2016 Ngubereti Day 

Secondary School

construction of one new 

classroomSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Kimngorom Girls 

Secondary School

completion of dormitory-

walling and roofingApr-16             800,000.00  ongoing Works In Progress

2015/2016 Kimngorom Girls 

Secondary School

Construction  of 

laboratory-Sep-16          1,500,000.00  New Yet to receive the funds

2015/2016 Sirwa Secondary 

School

construction of 

laboratory-kshs.750,000/ 

& staff house-

kshs.800,000 

May-16          1,550,000.00  ongoing Works In Progress

2015/2016 Sore Secondary 

School

construction of science 

laboratorySep-16             800,000.00   New  Yet to receive the funds

2015/2016 Kiptoim Secondary 

School

purchase of school bus May-16          5,000,000.00  ongoing Works In Progress

2015/2016 Sagasagik 

Secondary  School

 completion of 

classrooms-flooring and 

plastering-kshs.350,000/ 

and construction of a 

laboratory.-kshs.500,000/

May-16             850,000.00   Ongoing  Works In Progress

Page 28: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Lombogishu 

Secondary School

construction of new 

laboratory-kshs.800,000/  

and completion of 

classrooms-plastering 

and flooring-

kshs.200,000/

Apr-16          1,000,000.00   Ongoing  Works In Progress

2015/2016 Cheberen Secondary 

School

completion of one  

classroomSep-16             200,000.00   New  Yet to receive the funds

2015/2016 Cheberen Secondary 

School

construction of  one new 

classroomSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Oterit Secondary 

School

construction of 3 new 

classroomsMay-16          2,000,000.00   Ongoing Works In Progress

2015/2016 Kimose Secondary 

School

Equipping  girls 

dormitory with bedsMay-16             500,000.00   Ongoing Works In Progress

2015/2016 A.I.C Maji-Motto 

Secondary School

construction of one new  

classroom May-16             500,000.00  ongoing  Works In Progress

2015/2016 A.I.C Maji-Motto 

Secondary School

completion of 3 

classrooms-

plastering,flooring and 

paintworks

May-16             600,000.00   Ongoing Works In Progress

2015/2016 Molo-Sirwe 

Secondary School

Completion  of dormitory-

plastering,flooring and 

finishings

May-16             500,000.00   ongoing Works In Progress

2015/2016 Molo-Sirwe 

Secondary School

construction of one new  

classroomSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Mugurin Secondary 

School

construction of 

laboratorySep-16             800,000.00   New  Yet to receive the funds

2015/2016 Olkokwe Secondary 

School

construction of one new  

classroomSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Sinende Secondary 

School

construction of one new 

classroomsSep-16             600,000.00   New  Yet to receive the funds

2015/2016 kisanana secondary 

school

purchase of school bus May-16          5,000,000.00   ongoing Works In Progress

2015/2016 A.I.C kisanana 

Totona girls 

secondary school  

purchase of land May-16             800,000.00  ongoing Works In Progress

Page 29: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Oldebes Secondary 

School

completion of laboratory-

flooring and plasteringSep-16             800,000.00   New  Yet to receive the funds

2015/2016 Koibarak Secondary 

School

Construction of girls 

dormitorySep-16             700,000.00   New  Yet to receive the funds

2015/2016 Rosoga Chiefs 

Office

construction of latrines Sep-16             200,000.00   New  Yet to receive the funds

2015/2016 Mogotio Chiefs 

Office (ACC)

Renovation of the office-

flooring,plastering and 

paintworks

Sep-16             200,000.00   New  Yet to receive the funds

2015/2016 Koibos Soi Chiefs 

Office

construction of chiefs 

officeSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Ngubereti  Chiefs 

Office

construction of the office Sep-16             500,000.00   New  Yet to receive the funds

2015/2016 Koitebes Chiefs 

Office

completion of the office-

plastering and 

paintworks and fencing

Sep-16             200,000.00   New  Yet to receive the funds

2015/2016 Kimngorom Chiefs 

Office

completion of the office-

plastering, flooring and 

painting

Sep-16             200,000.00   New  Yet to receive the funds

2015/2016 Cheberen Chiefs 

Office

construction of chiefs 

office-Sep-16             500,000.00   New  Yet to receive the funds

2015/2016 Emining Chiefs 

Office

fencing and wiring the 

officeSep-16             200,000.00   New  Yet to receive the funds

2015/2016 Koibos Chiefs 

Office

 Completion of the office 

block flooring and 

plastering  

Sep-16             250,000.00   New  Yet to receive the funds

2015/2016 Molo-Sirwe Chiefs 

Office

construction of chiefs 

officeSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Simotwe Chiefs 

Office

construction of chiefs 

officeSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Olkokwe  Police 

Post

construction of police 

post officeSep-16             500,000.00   New  Yet to receive the funds

2015/2016 Kabuswo Chiefs 

Office

completion of chiefs 

office -flooring and 

plastering

Sep-16             200,000.00   New  Yet to receive the funds

Page 30: MOGOTIO NG CDF PROJECT IMPLEMENTATION STATUS AS … fileProject Cost Status (Indicate whether Complete, Ongoing or Intending to tender Remarks 2013/2014 Cheberen Secondary Construction

2015/2016 Kapnosgei Chiefs 

Office

construction of  a latrine 

blockSep-16             100,000.00   New  Yet to receive the funds

2015/2016 Sinende Chiefs 

Office

completion of the office- 

flooring and plasteringSep-16             400,000.00   New  Yet to receive the funds

2015/2016 Chebirebei Assistant 

Chiefs Office

construction of the 

Ass.chiefs office-

prefabricated

Sep-16             200,000.00   New  Yet to receive the funds

2015/2016 Molos  Assistant 

Chiefs Office

construction of the office-

prefabricatedSep-16             200,000.00   New  Yet to receive the funds

2015/2016 Ngendalel Chiefs 

Office

completion of the office -

flooring and plasteringSep-16             200,000.00   New  Yet to receive the funds

2015/2016 Mugurin Dispensary  electrification Sep-16             300,000.00   New  Yet to receive the funds

2015/2016 Olkokwe Health 

Centre

installation of electricity Sep-16             100,000.00   New  Yet to receive the funds

2015/2016 Proposed Oterit 

Dispensary

Purchase of  land-4 acres Sep-16             400,000.00   New  Yet to receive the funds

2015/2016 Chepngerechi Water 

dam

 Purchase of 2acres land Sep-16             300,000.00   New  Yet to receive the funds

2015/2016 Kapnosgei Borehole purchase of submersible 

pump for pumping waterSep-16             350,000.00   New  Yet to receive the funds

2015/2016 Ainopkor Bridge   Completion of the 

bridge -Slab laying

Sep-16           400,000.00   New  Yet to receive the funds

2015/2016 Kaplengnoi Cattle 

Dip 

Fencing , construction 

of toilets & store

Sep-16           100,000.00   New  Yet to receive the funds

2015/2016 Legetetwe Cattle 

Dip

Renovation , 

construction of store & 

latrines

Sep-16           200,000.00   New  Yet to receive the funds

2015/2016 Kabuswo cattle dip purchase of land-2 

acres

Sep-16           150,000.00   New  Yet to receive the funds

TOTAL 100,452,235.00