Introduction BELECTRIC MIDDLE EAST LTD is part of BELECTRIC HOLDING an international PV System Integrator and PV Component Manufacturer with its Headquarters in Kolitzheim, Germany, that encompasses more than 25 companies concentrated on the development and EPC turnkey implementation of photovoltaic (PV) solar systems in 24 different countries worldwide.
BELECTRIC's vision is to achieve grid parity state with conventional power generation, through climate-friendly photovoltaic solutions, under all climate conditions and for many different installation types. For this sustainable and economic target, its in house R&D professionals develop and design innovative and price-competitive photovoltaic concepts with state-of-the-art technologies, highly durable and reliable.
BELECTRIC owns several BoS component manufacturing facilities and produces BoS components for the local markets with local skilled workers according to the local quality, health and security standards (Germany, USA, Italy, India and UAE in the future). BELECTRICs BoS components are used for own PV Plants and also sold to other PV project companies.
BELECTRIC has a successfully implemented over 800 MW PV projects worldwide and approximately 15MW in the Middle East. The very first PV project in UAE was implemented in 2006 on the Pacific Control building in Dubai.
BELECTRIC hast completed 97% of all projects in the history of the company on time and in budget. The annual performance reports show that the calculated project yields has been met at 98%.
All BELECTRIC s projects are performing to the full satisfaction of the project companies and the customers. BELECTRIC never had any major claim or legal case in the history of the company.
BELECTRIC has long term experience in Project Finance of Solar PV plants in Germany and International projects. BELECTRIC is also handling the import and export financing together with different international finance institutes.
“Reduce the levelized costs of energy (LCOE) by
simplification, standardization and increase in technical efficiency “ (Bernhard Beck – Chairman Belectric Group)
Vision & Mission
Optimizing all processes, power plant technologies and the whole systems design
Simplification Standardization Increase in efficiency
Maximize the solar power generation and minimize the construction and maintenance costs at the same time = Reduction of the LCOE
Belectric Group All operations are organized as part of the BELECTRIC Holding and are divided into the
following companies:
• BELECTRIC Solarkraftwerke GmbH (Solar PV plants) - targeting free field solar power plants
• BELECTRIC PV-Dachsysteme GmbH (Solar PV roof systems) - targeting Roof based solar power plants
• BELECTRIC Trading GmbH - Wholesale & Distribution of PV related equipment
• BELECTRIC International GmbH – International Project Development, with subsidiaries in 15 countries (Europe/America/Asia/Middle East), serving 24 countries in total.
BELECTRIC Group's track record includes, among other, the following achievements:
• World Leading PV-System Integrator 2010 with 313 MW of utility generation
• World Leading PV-System Integrator 2011 with 404 MW of utility generation
• More than 2,600 roof-mounted Photovoltaic Systems realized in Europe & Asia
• 70 patents awarded to Belectric and further 40 patents submitted
BELECTRIC Group has more than 2,000 employees worldwide focused on developing projects, developing key technologies and producing PV components.
Group Structure
Private Investor
Private Investor
Private Investor
Private Investor
Other Investor
More than 30 other investments
Jurchen Techn. GmbH HQ: Helmstadt (Germany)
Manufacturer BoS components
Padcon GmbH HQ: Helmstadt (Germany) Manufacturer electronics
BELECTRIC Middle East Ltd. HQ: Masdar City (UAE)
EPC-contractor local
Belectric International GmbH HQ: Kolitzheim (Germany)
Holding company BELECTRIC Holding GmbH HQ: Kolitzheim (Germany)
Holding company
BELECTRIC Trading
Distributor
BELECTRIC PV-Dach-systeme
EPC-contractor
roof
BELECTRIC Solarkraft-
werke EPC-
contractor free field
100% 100% 100%
100%
100%
100%
94%
100%
6%
65%
Market Leader - 2010 & 2011 According to current studies by renowned market research institutes (iSuppli and IMS Research)
Local Policy Statement All steps to realize a solar power plant will be executed by BELECTRIC MIDDLE EAST LTD project planning team, by own construction teams, using the own machinery. All local workforces will be trained on all aspects of design, planning, implementation, operation & maintenance and service of the PV plants. However, the local team will always be backed by the experience of the experts in the headquarters of Belectric in Germany. Thus an important center of competence will be created in UAE.
This concept of building capacities and local expertise in combination with experience and know-how of the headquarters has been successfully applied in all international subsidiaries of BELECTRIC so far.
BELECTRIC MIDDLE EAST LTD aims to:
• Setup manufacturing and production facilities for BELECTRIC BoS components, creating local jobs, building local capacities and skills and educate employees.
• Transfer of BELECTRICs know-how about manufacturing, system integration, value chain management, operation, maintenance.
• In the long term establishing a competence center with local professionals in the UAE to supply know- how and material to the MENA region.
All BELECTRIC companies are interested to bring their knowledge and know-how to the local markets and create support centers with local experts.
Local Structure - UAE BOD
Bernhard Beck, Thomas Neussner, Martin Zembsch, Dr. Mehdi Ali
Chief Executive Officer Martin Mock
ADMIN Jbemay Bastillada
IT Finance Human
Resources Procurement
Technical Manager Mechanical
Arch. Toufik Jabbour
Technical Manager Electrical
Engg. Ayman Khalifa
Bid and Estimation
Design Sales &
Marketing
Retail Business
Unit Installation Maintenance
QA, Health & Safety
KSA Unit Engg. John Davitt
KSA Unit Project Manager
John Davitt
QA/QC Manager Amr El Samkary
Administrative Furqan Riaz
Procurement Manager
Jayan Josev
Constr. Manager Samir Amin
Engineering Managers
Hanno Sattler / Stephan Jerichow
QC Supervisor Mechanical
QC Supervisor Electrical
Doc. Control Abdallah Al
Ghamdi
QC Supervisor
PV
Building Services
Supervisor
Surveyor
PV Panel Installation Supervisor
Civil Engineer
Mechanical Engineer
Electrical Engineer
HR
Project Accountant
Cost Controller J. Sumague
Suppliers & Partners BELECTRIC MIDDLE EAST LTD has a solid partnership with key components suppliers such as:
• SMA,
• First Solar,
• Sharp,
• Solar Frontier,
• Masdar PV,
• Nanosolar
with world leading investors in PV:
• EDF-EN,
• Commerz Real Bank,
as well with leading R&D entities:
• Fraunhofer Institute.
Product Portfolio BELECTRIC MIDDLE EAST LTD product portfolio comprises EPC turnkey installations of:
• Utility PV power plants, • Rooftop installations, • Solar carports, • Solar greenhouses, • Energy storage solutions • PV integrated smart grid solutions
IEC Compliant All turnkey power plants implemented by BELECTRIC are IEC compliant. All materials, components, tools and machinery of Belectric is certified by TUV and/or Fraunhofer in Germany. If local regulations require to comply with local standards, BELECTRIC will either procure or purchase materials from local suppliers and qualify it to assure quality, health and security according international standards.
All the materials, components and machinery will be tested and certified against BELECTRIC standards and local regulations and standards. BELECTRIC executes all work and services according the relevant standards of the respective country of destination.
Reference Emirate of Dubai
2006 Turnkey construction 1st ever grid connected solar system in UAE (Roof Pacific Control building Dubai).
Emirate of Abu Dhabi
2010 Turnkey construction of Solar PV roof system of Abu Dhabi Aircraft Technologies (ADAT) – 296kWp.
2010 Turnkey construction of Solar PV roof system of the Abu Dhabi Crown Prince Court (CPC- as subcontractor of Gulf International Group) – 300kWp.
2011 Turnkey construction of Diesel Generator integrated Hybrid Solar Ground based System of Marawah Island – 500kWp.
2011 Turnkey construction of Solar PV roof system of Private VIP villa in Abu Dhabi – 60kWp.
Kingdom of Saudi Arabia
2011 Turnkey construction of Solar Car park Canopy at Saudi Aramco North Park Complex – 10MWp
2011 Turnkey construction of PV-module test and evaluation facility for Saudi Aramco – 60kWp
2012 Electrical connection DC/AC of building integrated PV System (BIPV) at KAPSARC Research & Office Complex – 300kWp.