mount victoria village safety upgrade...subject: mount victoria village and hartley valley safety...

23
Katoomba to Lithgow Great Western Highway Upgrade Mount Victoria village safety upgrade Review of Environmental Factors Volume 2 Appendix C - H November 2013 RMS 13.521 ISBN 978-1-922245-98-4

Upload: others

Post on 11-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Katoomba to LithgowGreat Western Highway Upgrade

Mount Victoria village safety upgradeReview of Environmental FactorsVolume 2 Appendix C - H

November 2013

RMS 13.521ISBN 978-1-922245-98-4

Page 2: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Mount Victoria village safety upgrade Appendix C Review of Environmental Factors

Appendix C Stakeholder consultation

Page 3: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 4: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 5: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Information of Drainage Infrastructure on GWH between section Victoria Falls Rd to Mount York Rd.

Drainage Reserve near

120A GWH (Page2)

Drainage Section starts from

63GWH and ends near 7 Fairy

Dell Rd (Page 3)

Drainage Reserve near

155 GWH (Page 4)

Page 6: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Drainage Reserve at 102A GWH. Total pipe length is approximately 195 meter.

Page 7: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Drainage system from 63GWH to 7 Fairy Dell Rd. Total length of the section is approximately 195 meter.

Page 8: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Drainage Reserve beside 155 GWH. That is actually on an unformed road and the total length of the drainage system is approximately 105 meter.

Page 9: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 10: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 11: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

From: Cadungog, Vivira (SKM)To: Cadungog, Vivira (SKM)Subject: Mount Victoria Village and Hartley Valley Safety UpgradesDate: Tuesday, 12 November 2013 9:51:09 PMAttachments: Jemena Construction Guidelines for 3rd party-Rev 06-2012-08-01.pdf

img-731144253-0001.pdf

 

From: George Apostopoulos [mailto:[email protected]] Sent: Wednesday, 31 July 2013 2:47 PMTo: HENDRY Dane ACc: Meng Cheng; Rami Osman; Danny GuerreraSubject: Mount Victoria Village and Hartley Valley Safety Upgrades

Attn: Mr Dane Hendry. Re: Mount Victoria Village and Hartley Valley Safety Upgrades Jemena Asset Management Pty Ltd on behalf of Jemena Gas Networks would like to advise inreference to the proposed safety upgrade works as detailed above and based on the informationprovided by you, Jemena currently have a number of gas mains affected by this proposeddevelopment. This gas infrastructure is located in the road reserve and installed under theprovisions of the Gas Supply Act.

1. The Mount Victoria Village Upgrade proposal. Details of Jemena’s affected assets: - 160mm PE High Risk gas main 75mm Nylon gas main 32mm Nylon gas main (Please see attached maps)

2. The Hartley Valley safety Upgrade proposal. There is no gas infrastructure located in this section of road. Please note, a duty of care exists to ensure these gas mains are not compromised ordamaged during any future development or construction work. All costs associated with therelocation or modification to these gas mains will be borne by the developer and orlandowner. Jemena’s comments to the proposed development are as follows:.

Jemena requires a copy of the Design Package, Drawings and Work Methods Statements toreview and comment prior to the commencement of any construction activity. A Jemena Pipeline Patrol Officer will be required on site during any site works in the vicinityof the 160mm PE gas main.Care is required when operating machinery over the gas mains, it is advised no heavymachinery be used directly over the mains.The existing cover levels shall not be reduced on completion of any work.Any existing Jemena gas pipeline markers and gas valve markers must not be modified orremoved.

Finally attached for your assistance and review please find a copy of Jemena ConstructionGuidelines for works near and over gas infrastructure. If you would like any additional information or would like to discuss further please do not hesitate incontacting me by return email or on the numbers listed below.

Page 12: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction

Regards George ApostopoulosLand Services Department

Jemena100 Bennelong Parkway, Sydney Olympic Park, 2127PO Box 6507, Silverwater, NSW 2128T: (02) 9397 9437 | M: 0402 060 301 | F: (02) 9397 9997E: [email protected] | W: www.jemena.com.au

*************************************************************** This is a confidential message intended for the named recipient(s) only. The contentsherein are privileged to the sender and the use thereof is restricted to the intendedpurpose. If you have received this e-mail in error, please do not use, disclose, distribute,copy, print or relay on this email. If receipt is in error, please advise the sender by replyemail. Thank you. ***************************************************************

Before printing, please consider the environment

IMPORTANT NOTICE: This e-mail and any attachment to it are intended only to be read or used by the named addressee. It isconfidential and may contain legally privileged information. No confidentiality or privilege is waived or lost by any mistakentransmission to you. Roads and Maritime Services (RMS) is not responsible for any unauthorised alterations to this e-mail orattachment to it. Views expressed in this message are those of the individual sender, and are not necessarily the views of RMS.If you receive this e-mail in error, please immediately delete it from your system and notify the sender. You must not disclose,copy or use any part of this e-mail if you are not the intended recipient.

Page 13: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 14: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 15: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 16: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 17: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 18: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 19: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 20: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 21: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 22: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction
Page 23: Mount Victoria village safety upgrade...Subject: Mount Victoria Village and Hartley Valley Safety Upgrades Date: Tuesday, 12 November 2013 9:51:09 PM Attachments: Jemena Construction