mp 311 00 48 70 0 8 5 2 e n ch hl i c...

1
WSC4SDBE001 WSC4SDBE002 W_SD_13147 SJH3SDBE003 W_SD_13147 WJH3SDBE003 W_SD_13147 AS-BUILT ALIGNMENT SHEET 20 OF 20 SHEETS STA. 2471+63 TO STA. 2510+23 1833-03-ML-02-020 3 MATCHLINE 2470+00 MATCHLINE 2508+48 2470+00 ML-SD-CK-0692.0000 2478+56 ML-SD-BD-0693.0000 2508+48 1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG. 2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG. KEYSTONE MAINLINE (NPS 30 2009) FERNEY SECTION SPREAD 3B DISCIPLINE 03 UEI LOYS ALVIN GRAY, III SD CE9004 1833 6 2 30" O.D. X 0.429" W.T., API-5LX-70 W/FBE COATING 30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING 44' 3,343' PIPELINE WARNING SIGNS 2 EA CATHODIC TEST STATION 1 EA AERIAL MARKER 1 EA PIPELINE MARKERS 0 EA STATE HIGHWAY 28 628' FBE 2 246' FBE & ARO BR. 3 2477+91 2480+37 2,715' FBE 2 6 2507+52 2507+96 44' FBE 2510+23 2473+16 P.I. 00°14'10" LT. 2478+13 OVERHEAD 2478+14 FENCE 2479+01 EDGE OF ROAD 2479+17 CL STATE 2479+34 EDGE OF ROAD 2480+20 FENCE 2480+97 P.I. 13°02'29" LT. 2482+92 P.I. 03°11'05" RT. 2493+66 FENCE 2495+51 FENCE 2496+32 FENCE 2501+38 WATER EDGE 2501+93 CL CREEK 2502+54 WATER EDGE 2507+72 P.I. 13°20'17" RT. 2507+93 FENCE POWERLINE, HT. = 35' (BARBED WIRE) (BARBED WIRE) 2493+31 FENCE (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) 2471+53 P.I. 00°14'10" LT. 2476+50 OVERHEAD 2476+51 FENCE 2477+38 EDGE OF ROAD 2477+54 CL STATE 2477+71 EDGE OF ROAD 2478+56 FENCE 2479+34 P.I. 13°02'29" LT. 2481+28 P.I. 03°11'05" RT. 2492+02 FENCE 2493+87 FENCE 2494+68 FENCE 2499+74 WATER EDGE 2500+28 CL CREEK 2500+90 WATER EDGE 2506+06 P.I. 13°20'17" RT. 2506+27 FENCE POWERLINE (BARBED WIRE) (BARBED WIRE) 2491+67 FENCE (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) (BARBED WIRE) 2471+53 P.I. 00°14'10" LT. 2479+34 P.I. 13°02'29" LT. 2481+28 P.I. 03°11'05" RT. 2506+06 P.I. 13°20'17" RT. 2471+63 MATCHLINE 2471+63 NATURAL GROUND TOP OF PIPE 2506+30 ML-SD-BD-0693.0000 ML-SD-CK-0692.0000 HIGHWAY 28 HIGHWAY 28 RD-SD-CK-0692.0000 STATE HIGHWAY 28 2476+51 PUMP STATION ASSEMBLY MATERIAL SEE DWG. 1834-01-ML-03-124 3 30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING & 246' CARPENTER PUMP STATION SEE DWG. 1834-01-ML-03-124 ABRASION RESISTANT OVERCOAT 2508+48 CENTERLINE OF MLV MATCHLINE 2470+00 MP 311 LAT. 44.626513 LONG. -97.923711 2498+64 M.P. 311 2505+40 P.I. 03°17'43" RT. 2506+62 P.I. 06'51'28" RT. 2507+05 P.I. 03°17'43" RT., 2505+40 P.I. 03°17'43" RT. 2508+29 P.I. 06'51'28" RT. 2506+62 P.I. 06'51'28" RT. TEST SECTION 3B-2 ILTO-025-2010 420 CARPENTER PUMP STATION ASSEMBLY (+227') 1 EA PROPERTY LINE 6.4' CVR. 2504+72 6.5' CVR. 2498+80 6.0' CVR. 1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED. 2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83. 3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT. 4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK. 5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS. 8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010. 9) CPS CALCULATION DATE: MAY 2010. 10) ORION STATION SERIES NUMBER: 1182700. 6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888. 11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 13922+16 AND DIVIDE BY 5280. 7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75 AND OCTOBER 10, 2009 FOR M.P. 301.75 TO M.P. 343.98. 2507+96 PUMP STATION 420 420 CARPENTER PUMP STATION 1834-01-ML-03-124 PS-SD-BD-0694.0000 LAT. 44.6235589 LONG. -97.92230514 FOR CONTINUATION SEE DWG. 1833-03-ML-02-019 FOR CONTINUATION SEE DWG. 1834-03-ML-02-001 PS-SD-BD-0694.0000 2510+23 CENTERLINE OF MLV 227' CRPTR-A0-MOV-0102 CRPTR-A0-MOV-0102 M.P. 310.49 TO M.P. 311.22 1834-01-ML-03-125 1834-01-ML-03-126 CARPENTER PUMP STATION CARPENTER PUMP STATION 10/02/08 SEE NOTE #5 2499+60 TEST SECTION 3B-2 ILTO-026-2010 5 0 0 PROPERTY LINE 2506+30 PUMP STATION 310

Upload: donhan

Post on 21-Jun-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

WSC4SDBE001

WSC4SDBE002

W_SD_13147

SJH3SDBE003W_SD_13147

WJH3SDBE003

W_SD_13147

AS-BUILT ALIGNMENT

SHEET 20 OF 20 SHEETS

STA. 2471+63 TO STA. 2510+23

1833-03-ML-02-020 3

MAT

CH

LIN

E

2

470+

00

MAT

CH

LIN

E

25

08+4

8

2470

+00

ML-SD-CK-0692.0000

2478

+56

ML-SD-BD-0693.0000

2508

+48

1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.

KEYSTONE MAINLINE (NPS 30 2009) FERNEY SECTION

SPREAD 3B DISCIPLINE 03

UEI

LOYS ALVIN GRAY, III SD CE9004

1833

6

2

30" O.D. X 0.429" W.T., API-5LX-70 W/FBE COATING

30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING

44'

3,343'

PIPELINE WARNING SIGNS 2 EACATHODIC TEST STATION 1 EAAERIAL MARKER 1 EA

PIPELINE MARKERS 0 EA

STA

TE H

IGH

WAY

28

628'FBE

2

246'FBE & ARO BR.

3

2477

+91

2480

+37

2,715' FBE

2 6

2507

+52

2507

+96

44' FBE

2510

+23

2473

+16

P.I.

00°

14'1

0" L

T.

2478

+13

OV

ER

HE

AD

2478

+14

FE

NC

E

2479

+01

ED

GE

OF

RO

AD

2479

+17

CL

STA

TE

2479

+34

ED

GE

OF

RO

AD

2480

+20

FE

NC

E

2480

+97

P.I.

13°

02'2

9" L

T.24

82+9

2 P

.I. 0

3°11

'05"

RT.

2493

+66

FE

NC

E

2495

+51

FE

NC

E

2496

+32

FE

NC

E

2501

+38

WA

TER

ED

GE

2501

+93

CL

CR

EE

K25

02+5

4 W

ATE

R E

DG

E

2507

+72

P.I.

13°

20'1

7" R

T.25

07+9

3 F

EN

CE

P

OW

ER

LIN

E, H

T. =

35'

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

2493

+31

FE

NC

E

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

2471

+53

P.I.

00°

14'1

0" L

T.

2476

+50

OV

ER

HE

AD

2476

+51

FE

NC

E

2477

+38

ED

GE

OF

RO

AD

2477

+54

CL

STA

TE

2477

+71

ED

GE

OF

RO

AD

2478

+56

FE

NC

E

2479

+34

P.I.

13°

02'2

9" L

T.24

81+2

8 P

.I. 0

3°11

'05"

RT.

2492

+02

FE

NC

E

2493

+87

FE

NC

E

2494

+68

FE

NC

E

2499

+74

WA

TER

ED

GE

2500

+28

CL

CR

EE

K25

00+9

0 W

ATE

R E

DG

E

2506

+06

P.I.

13°

20'1

7" R

T.25

06+2

7 F

EN

CE

PO

WE

RLI

NE

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

2491

+67

FE

NC

E

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

(BA

RB

ED

WIR

E)

2471

+53

P.I.

00°

14'1

0" L

T.

2479

+34

P.I.

13°

02'2

9" L

T.

2481

+28

P.I.

03°

11'0

5" R

T.

2506

+06

P.I.

13°

20'1

7" R

T.

2471

+63

MA

TCH

LIN

E

247

1+63

NATURAL GROUND

TOP OF PIPE

2506

+30

ML-SD-BD-0693.0000

ML-

SD

-CK

-069

2.00

00

HIG

HW

AY

28

HIG

HW

AY

28

RD

-SD

-CK-

0692

.000

0ST

ATE

HIG

HW

AY 2

8

2476

+51

PUMPSTATION

ASSEMBLYMATERIALSEE DWG.

1834-01-ML-03-124

3 30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING & 246'

CARPENTER PUMP STATIONSEE DWG. 1834-01-ML-03-124

ABRASION RESISTANT OVERCOAT

2508

+48

CE

NTE

RLI

NE

OF

MLV

MA

TCH

LIN

E

247

0+00

MP311

LAT. 44.626513LONG. -97.923711

2498

+64

M.P

. 311

2505

+40

P.I.

03°

17'4

3" R

T.

2506

+62

P.I.

06'

51'2

8" R

T.

2507

+05

P.I.

03°

17'4

3" R

T.,

2505

+40

P.I.

03°

17'4

3" R

T.

2508

+29

P.I.

06'

51'2

8" R

T.25

06+6

2 P

.I. 0

6'51

'28"

RT.

TEST SECTION 3B-2ILTO-025-2010

420 CARPENTER PUMP STATION ASSEMBLY (+227') 1 EA

PR

OP

ER

TY L

INE

6.4'

CV

R.

2504

+72

6.5

' CV

R.

2498

+80

6.0

' CV

R.

1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.

2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.

3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.

4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.

5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.

8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.

9) CPS CALCULATION DATE: MAY 2010.

10) ORION STATION SERIES NUMBER: 1182700.

6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.

11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 13922+16 AND DIVIDE BY 5280.

7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75 AND OCTOBER 10, 2009 FOR M.P. 301.75 TO M.P. 343.98.

2507

+96

PU

MP

STA

TIO

N

420

420 CARPENTER PUMP STATION 1834-01-ML-03-124

PS-SD-BD-0694.0000

LAT. 44.6235589LONG. -97.92230514

FOR

CO

NTI

NU

ATIO

N S

EED

WG

. 183

3-03

-ML-

02-0

19

FOR

CO

NTI

NU

ATIO

N S

EE

DW

G. 1

834-

03-M

L-02

-001

PS-SD-BD-0694.0000

2510

+23

CE

NTE

RLI

NE

OF

MLV

227'

CR

PTR

-A0-

MO

V-0

102

CR

PTR

-A0-

MO

V-0

102

M.P. 310.49 TO M.P. 311.22

1834-01-ML-03-1251834-01-ML-03-126

CARPENTER PUMP STATION CARPENTER PUMP STATION

10/02/08

SEE NOTE #5

2499+60TEST SECTION 3B-2

ILTO-026-2010

500

PR

OP

ER

TY L

INE

2506

+30

PU

MP

STA

TIO

N

310