mp 311 00 48 70 0 8 5 2 e n ch hl i c...
TRANSCRIPT
WSC4SDBE001
WSC4SDBE002
W_SD_13147
SJH3SDBE003W_SD_13147
WJH3SDBE003
W_SD_13147
AS-BUILT ALIGNMENT
SHEET 20 OF 20 SHEETS
STA. 2471+63 TO STA. 2510+23
1833-03-ML-02-020 3
MAT
CH
LIN
E
2
470+
00
MAT
CH
LIN
E
25
08+4
8
2470
+00
ML-SD-CK-0692.0000
2478
+56
ML-SD-BD-0693.0000
2508
+48
1. THE MAXIMUM OPERATING PRESSURE (MOP) IS 1440 PSIG.2. THE MINIMUM TEST PRESSURE WAS 1801 PSIG.
KEYSTONE MAINLINE (NPS 30 2009) FERNEY SECTION
SPREAD 3B DISCIPLINE 03
UEI
LOYS ALVIN GRAY, III SD CE9004
1833
6
2
30" O.D. X 0.429" W.T., API-5LX-70 W/FBE COATING
30" O.D. X 0.386" W.T., API-5LX-70 W/FBE COATING
44'
3,343'
PIPELINE WARNING SIGNS 2 EACATHODIC TEST STATION 1 EAAERIAL MARKER 1 EA
PIPELINE MARKERS 0 EA
STA
TE H
IGH
WAY
28
628'FBE
2
246'FBE & ARO BR.
3
2477
+91
2480
+37
2,715' FBE
2 6
2507
+52
2507
+96
44' FBE
2510
+23
2473
+16
P.I.
00°
14'1
0" L
T.
2478
+13
OV
ER
HE
AD
2478
+14
FE
NC
E
2479
+01
ED
GE
OF
RO
AD
2479
+17
CL
STA
TE
2479
+34
ED
GE
OF
RO
AD
2480
+20
FE
NC
E
2480
+97
P.I.
13°
02'2
9" L
T.24
82+9
2 P
.I. 0
3°11
'05"
RT.
2493
+66
FE
NC
E
2495
+51
FE
NC
E
2496
+32
FE
NC
E
2501
+38
WA
TER
ED
GE
2501
+93
CL
CR
EE
K25
02+5
4 W
ATE
R E
DG
E
2507
+72
P.I.
13°
20'1
7" R
T.25
07+9
3 F
EN
CE
P
OW
ER
LIN
E, H
T. =
35'
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
2493
+31
FE
NC
E
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
2471
+53
P.I.
00°
14'1
0" L
T.
2476
+50
OV
ER
HE
AD
2476
+51
FE
NC
E
2477
+38
ED
GE
OF
RO
AD
2477
+54
CL
STA
TE
2477
+71
ED
GE
OF
RO
AD
2478
+56
FE
NC
E
2479
+34
P.I.
13°
02'2
9" L
T.24
81+2
8 P
.I. 0
3°11
'05"
RT.
2492
+02
FE
NC
E
2493
+87
FE
NC
E
2494
+68
FE
NC
E
2499
+74
WA
TER
ED
GE
2500
+28
CL
CR
EE
K25
00+9
0 W
ATE
R E
DG
E
2506
+06
P.I.
13°
20'1
7" R
T.25
06+2
7 F
EN
CE
PO
WE
RLI
NE
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
2491
+67
FE
NC
E
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
(BA
RB
ED
WIR
E)
2471
+53
P.I.
00°
14'1
0" L
T.
2479
+34
P.I.
13°
02'2
9" L
T.
2481
+28
P.I.
03°
11'0
5" R
T.
2506
+06
P.I.
13°
20'1
7" R
T.
2471
+63
MA
TCH
LIN
E
247
1+63
NATURAL GROUND
TOP OF PIPE
2506
+30
ML-SD-BD-0693.0000
ML-
SD
-CK
-069
2.00
00
HIG
HW
AY
28
HIG
HW
AY
28
RD
-SD
-CK-
0692
.000
0ST
ATE
HIG
HW
AY 2
8
2476
+51
PUMPSTATION
ASSEMBLYMATERIALSEE DWG.
1834-01-ML-03-124
3 30" O.D. X 0.516" W.T., API-5LX-70 W/FBE COATING & 246'
CARPENTER PUMP STATIONSEE DWG. 1834-01-ML-03-124
ABRASION RESISTANT OVERCOAT
2508
+48
CE
NTE
RLI
NE
OF
MLV
MA
TCH
LIN
E
247
0+00
MP311
LAT. 44.626513LONG. -97.923711
2498
+64
M.P
. 311
2505
+40
P.I.
03°
17'4
3" R
T.
2506
+62
P.I.
06'
51'2
8" R
T.
2507
+05
P.I.
03°
17'4
3" R
T.,
2505
+40
P.I.
03°
17'4
3" R
T.
2508
+29
P.I.
06'
51'2
8" R
T.25
06+6
2 P
.I. 0
6'51
'28"
RT.
TEST SECTION 3B-2ILTO-025-2010
420 CARPENTER PUMP STATION ASSEMBLY (+227') 1 EA
PR
OP
ER
TY L
INE
6.4'
CV
R.
2504
+72
6.5
' CV
R.
2498
+80
6.0
' CV
R.
1) ALL CHAINAGES ARE IN FEET UNLESS OTHERWISE SPECIFIED.
2) DATUM ELEVATION AND PROJECTION ARE BASED ON MEAN SEA LEVEL AND NAD 83.
3) FIELD PIPE LOCATING REQUIRED TO DETERMINE PLACEMENT OF PIPELINE WITHIN PERMANENT EASEMENT.
4) UNLESS OTHERWISE NOTED, 48 INCHES MINIMUM COVER EXCEPT 36 INCHES IN AREAS OF CONSOLIDATED ROCK.
5) NO ACTUAL AS-BUILT GROUND SHOTS WERE TAKEN AT THIS LOCATION. THE PROFILE REPRESENTS A PROJECTION FROM SHOTS TAKEN AT 150' TO 250' INTERVALS.
8) ORIGINAL IN-SERVICE DATE OF THE KEYSTONE PIPELINE (PHASE 1): JUNE 30, 2010.
9) CPS CALCULATION DATE: MAY 2010.
10) ORION STATION SERIES NUMBER: 1182700.
6) THE TYPE OF COATING APPLIED TO THE FIELD WELDS DURING THE ORIGINAL CONSTRUCTION WAS TWO COMPONENT LIQUID EPOXY. THE COATING PRODUCTS USED WERE DENSO 7200 OR SPC SP-2888.
11) TO DETERMINE THE MILE POST AT A GIVEN LOCATION, ADD THE 3D STATION NUMBER FROM THIS SEGMENT TO STATION NUMBER 13922+16 AND DIVIDE BY 5280.
7) THE SUBSTANTIAL CONSTRUCTION COMPLETION DATE, BASED ON CALIPER PIG RUN, WAS OCTOBER 08, 2009 FOR M.P. 259.21 TO M.P. 301.75 AND OCTOBER 10, 2009 FOR M.P. 301.75 TO M.P. 343.98.
2507
+96
PU
MP
STA
TIO
N
420
420 CARPENTER PUMP STATION 1834-01-ML-03-124
PS-SD-BD-0694.0000
LAT. 44.6235589LONG. -97.92230514
FOR
CO
NTI
NU
ATIO
N S
EED
WG
. 183
3-03
-ML-
02-0
19
FOR
CO
NTI
NU
ATIO
N S
EE
DW
G. 1
834-
03-M
L-02
-001
PS-SD-BD-0694.0000
2510
+23
CE
NTE
RLI
NE
OF
MLV
227'
CR
PTR
-A0-
MO
V-0
102
CR
PTR
-A0-
MO
V-0
102
M.P. 310.49 TO M.P. 311.22
1834-01-ML-03-1251834-01-ML-03-126
CARPENTER PUMP STATION CARPENTER PUMP STATION
10/02/08
SEE NOTE #5
2499+60TEST SECTION 3B-2
ILTO-026-2010
500
PR
OP
ER
TY L
INE
2506
+30
PU
MP
STA
TIO
N
310