    Foreword

    These guidelines are intended to inform the coordinated design

    of both open spaces and building design with the Phase One

    District 4 Site of the Sewoon Development Area.

    As these guidelines are necessarily guided by the aims of the

    competition proposal that they derive from, this booklet is accom-

    panied by the two explanatory volumes (dealing with Urbanism

    and Architecture), that were a part of the original competition sub-

    mission.

  • 8/10/2019 MP Guideline Book1208(1)

    3/98

    1 Introduction

    2 Master Plan SummaryObjectives

    3 Site Development and Landscape GuidelinesPhase One Site PlanStreet Patterns and Street Types

    Primary (Vehicular) Streets

    Secondary (Pedestrian Dominant) Streets

    Through-Block Passages

    Public Open Spaces

    North-South Park Space

    Northeast Corner Plaza

    Cheonggyecheon Canal Park

    Multi-Level Court

    Paving

    Planting

    Lighting

    4 Building GuidelinesObjectives

    Buildings as Extension of Larger Area - Environmental and

    Greening Strategy

    Buildings as Definers and Supporters of Streets/Open Spaces

    Variable and Multi-use Potential of Buildings

    Visual Expression

    Construction

    Environmental Conditions

    Ground Level Conditions

    Upper Building Opportunities

    Building Types

    Wall Buildings

    Towers

    Massing

    Aggregated Buildings as Integrated Profile

    Relationship of Above-Grade and Below-Grade Conditions

    Site-Wide (Phase One) Conditions

    Site Plan

    Site Sections

    Site Elevations

    5 Individual Parcel GuidelinesParcel A-1

    Parcel A-2Parcel A-3

    Parcel A-4

    6 Administrative Framework

    Review & Comment Process

    Applicable Codes

    Schedule

    Table of Contents

  • 8/10/2019 MP Guideline Book1208(1)

    4/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    4

    1. Introduction

  • 8/10/2019 MP Guideline Book1208(1)

    5/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    5

    The proposed redevelopment of the Sewoon District site in the

    historic center of Seoul, along with the citys leadership in the

    reclamation of the Cheonggyecheon Canal and the formation of

    a major north to south park system through the old city togeth-

    er form the basis of extraordinary urban regeneration and public

    realm initiative that can serve as a compelling model for enlight-ened city making at this threshold of the 21st century.

    The Sewoon District site proposal, projecting a provocative vision

    for the future of Seoul while building upon its past, also strives to

    establish a new and ecologically balanced meshing of the natu-

    ral and built environments within the city.

    A close-knit layout of mixed use urban buildings, largely built

    upon existing street patterns, aims to maintain and intensify the

    active, street oriented life and enterprise that characterizes thishistoric district. This intense web of street related building and

    activity will be dramatically enhanced and complimented by the

    presence of the restored canal and new park system.

    These reestablished open spaces, both reflecting Seouls histor-

    ical evolution, bring nature back into the heart of this now vibrant

    contemporary metropolis and help to reestablish the citys tradi-

    tional closeness to the earth.

    This intention is also interpreted as a means of achieving a new

    integration between the historic city and its magnificent green

    setting; reestablishing natural watershed conditions with related

    water management, flood control and microclimatic opportunities

    while weaving extensions of these green park patterns into the

    new building fabric and public open space patterns of the

    Sewoon site.

    Building design further reflects these intentions through an

    emphasis upon natural ventilation, advantageous orientations,

    use flexibility and the enhancement these conditions with a close

    integration of building and landscape-- involving the greening and

    environmental conditioning of upper floor building spaces

    through the related concepts of building as forest and building

    as vertical garden. These concepts can bring landscape into

    direct relationship with the domestic environment of these build-

    ings, establishing an intimate and calm green foreground to com-

    pliment an appreciation of Seouls marvelous green environs

    View of existing site and Shrine to the North

    Plan of Sewoon District 4 Proposal

    1. Introduction

    Proposed development of site

  • 8/10/2019 MP Guideline Book1208(1)

    6/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    6

    while providing a serene counterpoint to the hustle and bustle of

    the surrounding city.

    At the same time, the very nature of this place this meshing of

    the urban and natural environments -- nourished by the scale,

    dimension and inherent amenity of its park and canal open spacesystems also supports even demands a high level of occu-

    pancy and land use. This provides an opportunity for many peo-

    ple to live and work here and to visit this extraordinary new place

    in the city, bringing with it a new level of full time energy and vital-

    ity in the historic center of Seoul.

    This first phase of development occupies the northeast quadrant

    (District 4) of the larger Sewoon Development site addressed by

    the design competition.

    As the larger site-wide plan outlined in the competition indicates

    a pattern of four discreet but interdependent blocks of develop-

    ment, each with its own identity and place of internal focus, this

    first phase will provide both an important building block towards

    the realization of the overall plan as well as a complete urban

    sub-district in its own right.

    Bringing into realization a portion of the proposed north to south

    city-wide park system and occupying significant portions of

    Cheonggyecheon Canal and Jong Ro frontage, this initial phase

    of the Sewoon Development will also serve as a powerful demon-

    stration of this ventures larger vision of establishing a new dia-

    logue between the urban realm and nature.

    Green strategy - city wide

    Central Seoul - macro-scale strategy for urbanredevelopment

    Sewoon District 4 Proposal in context

  • 8/10/2019 MP Guideline Book1208(1)

    7/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    7

    2. Master Plan Summary

  • 8/10/2019 MP Guideline Book1208(1)

    8/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    8

    Objectives

    The Greening of the City

    The restoration of the Cheonggyecheon Canal and the creation

    of the proposed north-south park system offer tremendous envi-ronmental opportunities.

    It is proposed that bio-engineering strategies be employed to

    engage the park and canal systems as components of an urban-

    scale Living Machine, restoring parts of the historic watershed

    and its riparian landscape, introducing related water manage-

    ment/flood control and producing a unique form of urban park

    that includes retention ponds, wetlands, diverse flora/fauna habi-

    tation and a multitude of recreational opportunities.

    Interaction Between Building and Landscape

    Building and site patterns are conceived to be integrated with a

    complex vertical and horizontal distribution of gardens, vegetat-

    ed roofs and permeable surfaces that mimic an uplands forest

    zone. This strategy allows the landscape to become an integral

    part of the domestic environment within the site. This buildings-

    as-forest strategy also recognizes, in plan and detail, the move-

    ment of the sun and the prevailing winds.

    Positive Relationships with the Surrounding City:

    Continuity of Existing Street and Open Space Patterns

    While some of the streets and passages of the new development

    follow the geometry of the districts newer gridded street system,

    others follow the more irregular streambed determined paths ofthe areas historic street patterns. This maintenance of historic

    street patterns preserves important threads of memory and con-

    tinuity with the past while, at the same time, providing another

    dimension to the experiencing of the site.

    These historic and new street and passage patterns are, of

    course, part of a larger whole and literal continuity between this

    North-South Greenway

    Continuity of existing street patterns

    Landscape as part of domestic environment

    2. Master Plan Summary

  • 8/10/2019 MP Guideline Book1208(1)

    9/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    9

    Continuity of Existing Street and Open Space Patterns (cont)

    site and its immediate surroundings. In a similar way, new open

    spaces on the site are planned to recognize and communicate

    with adjacent spaces. The new north-south park, for instance, as

    it moves through the site, is seen as having a high degree of con-tinuity with the gardens of the Jongmyo Royal Shrine and the

    green terrain further up to the north. This strong communication

    not only recognizes the importance of this historic site, but also

    gives a greater presence to the beauty and scale of this larger

    northern extremity of the proposed city-wide north-south park

    system.

    Linkages

    This integration of street and open space patterns of the Sewoon

    development with its surroundings helps offset an inherent sense

    of isolation often associated with contemporary large scale urban

    development. These must not be simply gestures of continuity

    but genuine and legible linkages with the life and physical pat-

    terns of the surrounding city.

    Continuity

    It is imagined that these strategies of urban environmental reme-

    diation, preservation of historic patterns and the making of posi-

    tive spatial and social linkages within the city might become typ-

    ical to the further regeneration of Seouls historic center that will,

    without doubt, occur in the future.

    Linkages

    Continuity

    Existing street patterns

  • 8/10/2019 MP Guideline Book1208(1)

    10/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    10

    An Active Street-Oriented District

    One of the most positive aspects of the site as it exists today is

    its high levels of street-related activity. It is important that this

    condition of urban energy and enterprise is also present in the

    new development of the site.

    To this end, we propose an arrangement of space-defining build-

    ings that give strong definition, active street frontages and conti-

    nuity to a pattern of streets, passages, and public open spaces

    across the site.

    Public Destinations and Gathering Places

    Each of the four quadrants of the Sewoon Development relates

    to a network of public spaces and destinations. While the

    Cheonggyecheon Canal, the central park space and the course

    of Jong No are primary to this network, each quadrant also con-

    tains, within its site, an important place of public activity and gath-

    ering that are, in turn, connected to one another as well as to the

    surrounding city.

    Pedestrian patterns

    Typical existing street

    Network of public spaces

    Public court

  • 8/10/2019 MP Guideline Book1208(1)

    11/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    11

    The Primary Terms of the Master Plan

    Simply stated, the basic urbanistic and physical terms of the mas-

    ter plan buildings, streets and pedestrian dominant outdoor

    spaces -- can be described as follows:

    Building Parcel Groups

    Within the Phase One Site there are four distinct groups of build-

    ing parcels:

    Site A-1; With its primary orientation westward, along the North-

    South Central Park

    Site A-2; A northern site with long frontages along Jong Ro

    Site A-3; Occupying the center of the site with frontage along

    Bae-O-Gae-Gil

    Site A-4; A southern site overlooking the Cheonggyecheon Canal.

    Streets

    Along with its existing perimeter streets, the site is internally

    served by a primary and a secondary pair of east-west and north-south streets.

    Pedestrian Patterns

    The site is permeated by an intense network of pedestrian waysthat is made up of street and open space related courses as well

    as through-building passages.

    Building parcel groups

    Street patterns

    Pedestrian patterns

    Phase one

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    12/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    12

    Site-Wide Statistics (Phase One)

    Program Business 9.10%

    Commercial 8.16%

    Residential 57.05%

    Officetel 6.49%

    Entertainment 9.93%Reclaimed commercial 9.27%

    Total Site Area 26,063m2

    Maximum Site Coverage 80% (67.25% provided)

    Minimum Public Open Space 10% Total Site Area

    Minimum Landscaped Area 15% Total Site Area

    Maximum Floor Area Ratio 7.56% (7.50% provided)

    Maximum Building Height 114.8m (90m provided)

    Minimum Gross Floor Area 195,911m2 (program space)

    (Above grade)

    Minimum Gross Floor Area 150,032m2

    (Below Grade)

    Total Gross Floor Area 345,943m2

  • 8/10/2019 MP Guideline Book1208(1)

    13/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    13

    3. Site Development & Landscape Guidelines

  • 8/10/2019 MP Guideline Book1208(1)

    14/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    14

    194.72

    162.

    12

    PROPERTY LINE

    20M SETBACK LINE

    PROPERTY LINE

    5M SETBACK LINE

    PROPERTY LINE

    5M SETBACK LINE

    199.18

    173.

    32

    PROPERTY LINE

    20M SETBACKLINE

    JONGNO

    BAE-O-GAEGIL

    DONHWAMUNRO

    EULJIRO

    CHEONGGYERO

    CHEONGGYERO

    Site Limits and Dimensional Constraints

    Illustrated is the property boundary line of the phase One Site

    along with a series of perimeter setback or no-build zones.

    The four Building Parcel Groups and basic patterns of site work

    are also indicated in this diagram.

    Site Limit Plan @ 1:20000 30 60 90

    4 building parcels

    3. Site Development & Landscape Guidelines

  • 8/10/2019 MP Guideline Book1208(1)

    15/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    15

    Site Street Plan @ 1:20000 30 60 90

    On-Site Streets

    The location of on-site streets and their basic dimensions havebeen determined based on traffic analysis. Also indicated are the

    general locations of required through-block passages. These

    streets have no on-street parking.

    5.

    00

    32.

    00

    14.

    20

    30.

    00

    5.

    00

    8.

    00

    6.00

    14.00

    5.00

    40.155.00

    20.00

    134.8014.3129.9119.04

    26.46

    14.10 54.22

    48.586.00

    162.

    12

    194.72

    20MS

    ETBACK

    20M SETBACK

    5M

    SETB

    ACK

    5MSETBACK

    Primary streets

    Secondary streets

  • 8/10/2019 MP Guideline Book1208(1)

    16/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    16

    Primary Streets

    Each quadrant of the site is given two primary vehicular streets

    (running north-south and east-west) that provide through-site

    connections from the outer site perimeters to canal and central

    park frontage streets These streets, along with existing perimeterstreets, can also serve as routes leading to a centralized service

    point in each quadrant. This diagram also indicates the three

    required surface locations to underground service/parking facili-

    ties at the Phase One Site.

    Although primary vehicular routes run through the site, these

    streets will also have continuous retail frontage and intense

    pedestrian use.

    0 30 60 90Streets Plan @ 1:2000

    14.00

    20.00

    134.8014.31

    99.48

    14.10

    B

    BPARKING &SERVICE

    ENTRY

    PARKING &SERVICEENTRY

    PARKING &SERVICEENTRY

    5.

    00

    32.

    00

    14.

    20

    8.

    00

    A

    A

    162.

    12

    194.72

    20MS

    ETBACK

    20M SETBACK

    5M

    SETBA

    CK

    5MSETBACK

  • 8/10/2019 MP Guideline Book1208(1)

    17/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    17

    Section A-A: Primary North- South Street (Four Vehicular Lanes) @ 1:250

    Plan-Primary Road Type 1 @ 1:250

    2.40 14.00 3.60

    20.00

    2.401.60PEDESTRIAN/AMENITY/TREES/LIGHTING ZONE

    SIDEWALK PAVING ZONE

    PARCEL/BUILD-TO LINE

    MULTI-LEVELCOURTYARD

    A-1PARCEL

    3.50 3.50 3.50 3.50

    0.80 1.20

  • 8/10/2019 MP Guideline Book1208(1)

    18/98

    18Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Section B-B: Primary East-west Street (Two Vehicular Lanes) @ 1:250

    Plan-Primary Road Type 2 @ 1:250

    3.10 8.00 3.10

    14.20

    2.30 2.30

    PEDESTRIAN/LIGHTING ZONE

    PARCEL/BUILD-TO LINE

    SIDEWALK PAVING ZONE

    A-2PARCEL

    A-3PARCEL

    4.00 4.00

    0.80 0.80

  • 8/10/2019 MP Guideline Book1208(1)

    19/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    19

    0 30 60 90

    Secondary Streets

    Also traversing each quadrant in both directions are a pair of smaller

    street/ passages that are primarily pedestrian ways and at times are

    provided with light weather cover. While predominantly pedestrian

    routes serving intense retail uses at building frontages, these streets

    are also capable of accommodating vehicles for drop-off, service,

    emergency, etc.

    Secondary Streets Plan @ 1:2000

    A

    A

    B

    B

    6.00 198.07

    40.155.00

    26.46

    116.90

    6.00

    5.

    00

    76.

    20

    5.

    00

    PARKING &SERVICE

    ENTRY

    PARKING &SERVICEENTRY

    PARKING &SERVICEENTRY

    C

    C

    8.50

    5.00

    162.

    12

    194.72

    20MS

    ETBACK

    20M SETBACK

    5M

    SETBAC

    K

    5MSETBACK

  • 8/10/2019 MP Guideline Book1208(1)

    20/98

    20Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Section AA-Secondary Road Type 1 @ 1:250

    Plan-Secondary Road Type 1 @ 1:250

    3.00

    9.00

    MIN. 20M SETBACK ZONE

    2.405.00

    PARCEL/BUILD-TO LINE

    SIDEWALK PAVING ZONE

    PEDESTRIAN/AMENITY/PARK/TREES/LIGHTING ZONE1.60

    EXISTING SITE LINENOT IN PHASE 1 WORK

    3 STORY PORCH ZONE

    1.60

    7.60

    GRAVEL

    DRIVE LANE/PEDESTRIAN DROP-OFF LANE/PEDESTRIAN

    3.00

  • 8/10/2019 MP Guideline Book1208(1)

    21/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    21

    Section BB-Secondary Road Type 2 @ 1:250

    Plan-Secondary Road Type 2 @ 1:250

    15.40

    MIN. 20M SETBACK ZONE

    3.405.00

    PARCEL/BUILD-TO LINE

    SIDEWALK PAVING ZONE

    SUNKEN COURTYARD

    W/ VERTICAL CIRCULATION

    EXISTING SITE LINENOT IN PHASE 1 WORK

    PEDESTRIAN/AMENITY/TREES/LIGHTING ZONE

    PEDESTRIAN PASSAGE ZONE

    GRAVEL

    BOLLARDS

    PEDESTRIAN/VEHICULAR ZONE

    SUNKEN COURTYARDW/ VERTICAL CIRCULATION

    10.00

    GLASS BRIDGE

    REMOVEABLE BOLLARDS

    7.00

    2.00 2.003.00

  • 8/10/2019 MP Guideline Book1208(1)

    22/98

    22Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Section CC-Secondary Road Type 3 @ 1:250

    Plan-Secondary Road Type 3 @ 1:250

    8.00

    3.005.00

    PARCEL/BUILD-TO LINE

    PEDESTRIAN/VEHICULAR ZONE

    MULTI-LEVEL COURTYARD

    PORCH ZONE

    BUILDING OVERHANG

    BOLLARDS

    A-3PARCEL

    3.00 2.00

  • 8/10/2019 MP Guideline Book1208(1)

    23/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    23

    A

    A

    LIGN

    ALIGN

    CL

    CL

    ALIGN

    E Q

    .

    EQ.

    E Q

    .

    E

    Q.

    5.00 5.00

    5.005.00

    5.00 5.00

    5 . 0

    0

    5 . 0

    0

    A

    10.5

    0

    Through-Block Passages

    This is a site-wide network of even smaller passages through and

    between buildings that, like many such passages at this site today,can accommodate incidental and ad hoc small-scale retail and mar-

    ket uses as well as fixed frontages. These ground level passages

    can also give access, via stair and escalators, to above and below

    grade retail activities along their routes -- running from the perimeter

    inward and converging at the sites multi-level central court.

    0 30 60 90Thru-Block Passage Plan @ 1:2000

    Approximate Locations

  • 8/10/2019 MP Guideline Book1208(1)

    24/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework 24

    This section, running from the sites Jong Ro to its central multi-level court, indicates

    how a number of retail and public use activities and destinations, located on multiple

    levels and in different building, can relate to and be served by these through-block pas-

    sages.

    This is a more detailed view of how multi-level movement might be accommodated in

    these passages.

    Site Section AA @ 1:750

  • 8/10/2019 MP Guideline Book1208(1)

    25/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    25

    The Central North-South Park Space

    The larger scale planning objectives for this district of the city

    include the incremental provision of a new public open park

    space running north to south from the Jongmyo Royal Shrine and

    its gardens across the entire center city to the Nam San southernhills. This extremely decisive and powerful projection, giving new

    large-scale structure, clarity and amenity to the historic center

    city, will find its initial increment of realization as a companion to

    this first phase of building development. Even in its initial abbre-

    viated form, this park space can bring a sustainable natural land-

    scape back into the center and, with this, can bring renewed

    attention and importance to the central area of the city. The antic-

    ipated presence of this space has informed this proposal in sev-

    eral ways.

    Following a site-wide strategy of giving this space strong defini-

    tion and form by a series of major space defining buildings along

    its eastern and western frontages, this Phase One program

    establishes the first of these buildings.

    The Central North-South Park Space

    Again reflecting this general strategy, the form of this space (and

    the position of its defining Phase One building) is then further

    inflected to bring the space and pathway alignments of the

    Jongmyo Royal Shrine Gardens into the site, recognizing the his-

    torical and symbolic importance of this great building and its set-

    ting within the city and, in this way, including this historic quarter

    as an integral part of the new park system.

    Above:

    This inflection, this enlargement of the park

    space into the Phase One site, also serves

    another, extremely important role within the city.

    By widening the eastern area of the park, along

    the site line towards the Jongmyo Royal Shrineand its Gardens, the view southwards from the

    Shrine towards the site is a vista dominated

    by open space the Shrine Gardens seam-

    lessly followed by the Central Park space the

    Sewoon 4 site framed and defined by buildings

    rather that occupied by buildings. This south-

    ern vista from the Shrine is in sharp contrast to

    that from the precinct of the Royal Palace, fur-

    ther to the west, towards the city.

    Public Open Spaces

  • 8/10/2019 MP Guideline Book1208(1)

    26/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    26

    The Central North-South Park Space (cont.)

    The portion of the Central Park developed within the Phase One

    site is provided with a long allee of trees giving strong visual and

    pedestrian connection to the Royal Shrine Gardens while also

    forming a green park extension to the great porch/gallery of thePhase One park- defining building. This direct relationship

    between building porch and park gives tremendous definition,

    identity and summer shade to this very active building frontage.

    .A large open park structure is also planned at the southern end

    of this frontage.

    Yet this great new park space, while providing the beginnings of

    a new major open space system within the city, also tends to

    fracture and disconnect what is now a continuous and intense

    pattern of street-related activities at this site and its surroundingdistrict. Simply stated, an important new continuity, the park

    space, has disrupted another important continuity, that of contin-

    uous active street patterns.

    Above:

    View of the lower (B-1) level of the Central Park

    with active frontage, gathering spaces and over-

    looks from green park spaces above. A water level

    connection to the Cheonggyecheon Canal is seen

    in the distance.

    Public Open Spaces

  • 8/10/2019 MP Guideline Book1208(1)

    27/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    27

    PORTION OF NORTH-SOUTH PARK NOT INCLUDED IN PHASE 1

    PORTION OF NORTH-SOUTH PARK INCLUDED IN PHASE 1

    20MSETBACK

    A-1

    A-2

    A-3

    A-4

    North-South Park Plan @ 1:20000 30 60 90

    The Central North-South Park Space (cont)

    It is proposed here that this dilemma can be offset by taking advantage

    of the fact that this site can have more than one ground level. That is,

    while the space of the park can be largely at ground level, a second

    ground plane can be established below the existing one. This second

    lower ground level, (identified as level B-1) is highly visible and acces-sible as proposed and can facilitate complete east-west continuity of

    active frontages below the space of the park. While we understand the

    stated restriction that the setback perimeter of the park cannot contain

    retail uses at ground level, we assume that this limitation need not

    apply to below ground level conditions.

    Thus this park is conceived of as providing a balanced interplay

    between these two desired realities the renewed reality of a major

    environmentally attuned green space amenity in the city and the main-

    tained and enhanced reality of an active and energetic commercial dis-

    trict.

    Public Open Spaces

    Detail view of North-South Park with lower level

    gardens in foreground

  • 8/10/2019 MP Guideline Book1208(1)

    28/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    28

    Northeast Corner Plaza

    This triangular site, a part of building parcel A-2, is also one corner of

    a large diagonal street intersection, a condition that is likely to be in

    existence for quite some time. Design strategies for this site should

    preserve and enhance present ground level pedestrian paths andfunctions (gathering place, subway ventilation, below street retail),

    etc. and maintain some sense of the diagonal configuration while not

    compromising the development potential of this corner.

    Public Open Spaces

  • 8/10/2019 MP Guideline Book1208(1)

    29/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    29

    37.19

    5.

    00

    32.

    00

    A-1

    A-2

    A-3

    A-4

    5M

    SETBA

    CK

    5MSETBACK

    Northeast Corner Plaza Plan @ 1:20000 30 60 90

    Public Open Spaces

    Existing site conditions

    Northeast Corner Plaza (cont)

  • 8/10/2019 MP Guideline Book1208(1)

    30/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    30

    The Cheonggyecheon Canal Park

    This linear park space, occupying the 20 meter setback zone

    along the sites southern Canal frontage, is conceived of as a

    shady canal-side terrace and a spatial extension of the Building

    A-4 retail frontage along its northern edge. Provided with denseregular tree planting, many metal chairs and tables, this space

    should be partially surfaced in French gravel. A series of sunken

    courts running parallel to the park should be faced in stone as an

    extension of the pedestrian surface down to the lower retail lev-

    els. These courts will provide opportunities for quiet dinning and

    admit natural light and air to the below grade retail. Glass

    handrails and glass bridges should be provided for these courts.

    Also in this location is a secondary pedestrian dominated street

    to provide drop-off and service access to Building Parcel A-4.

    Public Open Spaces

  • 8/10/2019 MP Guideline Book1208(1)

    31/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    31

    The Cheonggyecheon Canal Park (cont)

    153.01

    A-1

    A-2

    A-3

    A-4

    20.00

    0 30 60 90Canal Park Plan @ 1:2000

    Public Open Spaces

  • 8/10/2019 MP Guideline Book1208(1)

    32/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    32

    Public Open Spaces

    The Multi-Level Court

    In addition to these site-wide spaces, there are also important

    public open space destinations defined in each of the sites four

    quadrants.

    Network of public spaces

    Multi-Level Court

  • 8/10/2019 MP Guideline Book1208(1)

    33/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    33

    103.538.20

    103.91

    34.14

    5.

    00

    76.

    20

    5.

    00

    4.

    88

    56.67

    A-1

    A-2

    A-4

    A-3

    0 30 60 90Multi-Level Courtyard Plan @ 1:2000

    Public Open Spaces

    Larger mid-block spatial setting

    Activity collector

    The Multi-Level Court (cont)

    In the Phase One (north-eastern) quadrant, this space is identi-

    fied here as the Central Multi-Level Court. This space, defined by

    the surrounding buildings of sites A 1, 2 and 3, serves severalinterests;

    As a large defined open space removed from the major through

    streets of the city, this space serve as an urban square, providing

    both active and tranquil amenities, as well as long vistas for its

    surrounding residents.

  • 8/10/2019 MP Guideline Book1208(1)

    34/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    34

    Public Open Spaces

    North-South section

    East-West section

    A-4 A-3 A-2

    A-1

    A-3

    The Multi-Level Court (cont)

    As a multi-level space, partially glazed and partially open, this

    location can be an all-weather destination providing strong visu-

    al connections and gracious pedestrian movement between the

    ground level and the two lower public use and retail levels below.

    While not as yet specifically programmed, this place can accom-

    modate a varied combination of uses- retail, entertainment, cul-

    tural installations, recreational facilities, etc.

  • 8/10/2019 MP Guideline Book1208(1)

    35/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    35

    The Cheonggyecheon Canal

    The re-establishment of the Cheonggyecheon, like the making

    of the proposed north-south Park space, will have dramatic and

    transforming effects upon this district as well as the overall his-

    toric city center. The place where these two great urban pas-sages cross at the center of the competition site -- is obvious-

    ly a location of immense significance.

    The great potential of this canal within the city is discussed fur-

    ther in the urbanism competition booklet of our proposal. We

    would only indicate here that, under normal conditions, the

    water level of the canal is far below the ground level and very

    difficult to see from street level pedestrian ways. The canal is

    thus considerably removed from the everyday life of the city.

    In this case we would recommend;

    That an easily accessible lower ground level at the water

    level of the canal be established in various places to bring the

    canal in closer proximity to people, or:

    That the normal water level of the canal be raised to have a

    closer relationship to the ground. This could be achieved in a

    variety of ways.

    Present conditions

    Proposed conditions

  • 8/10/2019 MP Guideline Book1208(1)

    36/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    36

    Paving

    Required widths are established in these Design Guidelines rel-

    ative to the type of street and consequent amount of pedestrian

    traffic anticipated. Permitted paving materials are established in

    these guidelines to provide a sense of continuity within the antic-ipated fabric of the new city center, to reflect building modules

    and indicate building entries, through building passages, street

    crossings and other significant events. All pedestrian paving will

    be separated from primary streets with granite curbing. All sec-

    ondary pedestrian dominated streets will have curb cuts at inter-

    sections with primary streets and form a continuous hardscape

    surface with granite bollards to define the drop-off service lane.

    Type 1

    Located on Jong-Ro and Bar-O-Gae-Gill, this paving

    is generally 10 to 11 meters in width, inclusive of curb

    and planting areas. The pattern of precast pavers

    should be articulated in response to building wall

    modules and entrances. The cobblestone zone

    accepts tree plantings and provides a location for the

    majority of street furniture. Tree grates (not less than

    1.2m square) may be provided as an alternative

    within the cobbled zones. The areas of cobbles (and

    tree grates, if provided) will be as continuous so far

    as practical so as to provide water infiltration and

    root space for the accommodation of tree planting.

    Location Plan

    Typical Section

    Typical Plan

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    37/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    37

    Paving

    Type 3

    This paving is located within the public

    passages/easements of the buildings and the multi

    level court. It may be thought of as an extension ofthe street paving inside the building envelops and

    sunken court and be primarily exterior in character.

    The paving pattern should reflect the frequency of

    the adjacent building wall modules. Where bridge

    crossings are indicated glass should be substituted

    to provide visual continuity and a sense of lightness.

    Type 2

    This paving type is generally 2.5 to 3.5 meters in

    width, inclusive of curb and planting areas. This

    paving has granite curb and a walking surface of pre-

    cast pavers. Tree grates, where indicated, are pro-vided and designed to fit within the paving module.

    Location Plan

    Typical Section

    Typical Plan

    Location Plan

    Typical Section at public passage

    Typical Plan at public passage

    A-1 A-2

    A-3

    A-4

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    38/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    38

    Type 4

    This zone makes up the eastern edge of the park

    frontage and contains extensive areas for pedestrian

    traffic. The axis connecting the Jongmyo Roy Shine

    to the north will be completed with a French gravel

    walkway and an allee of trees that matches the path

    to the shrine. Also in this location is a secondary

    pedestrian dominated street to provide service

    access to Building Parcel A-1

    Location Plan

    Typical Section

    Typical Plan

    A-1 A-2

    A-3

    A-4

    Face of A-1 Parcel

  • 8/10/2019 MP Guideline Book1208(1)

    39/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    39

    Type 5

    This linear park space, occupying the 20 meter set-

    back zone along the sites southern Canal frontage,

    is conceived of as a type of shady waterfront park.

    Provided with dense regular tree planting, many

    metal chairs and tables, this space should be partial-

    ly surfaced in French gravel. A series of sunken

    courts running parallel to the park should be faced in

    stone as an extension of the pedestrian surface

    down to the lower retail levels. Glass handrails and

    glass bridges should be provided for these courts.

    Also in this location is a secondary pedestrian domi-

    nated street to provide service access to Building

    Parcel A-4.

    Location Plan

    Typical Section

    Typical Plan

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    40/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    40

    Type 1

    A broad allee of trees is intended to connect axially with the

    Jongmyo Roy Shine to the north. These trees should form a con-

    tinuously overhead canopy and frame the view of the shrine.

    Planting

    The three dimensional scale and impact of tree lined streets and

    leafy open spaces work together to connect the Sewoon District

    to the adjacent North South Park, Cheonggyecheon Canal and to

    the broader city-wide system of greenery. Planting will bedesigned to enhance the urban regeneration of the public realm

    and will establish a new and ecologically balanced meshing of

    the natural and built environments within the city.

    Type 2

    Major street trees of similar scale and character to existing city

    standards. These trees should be planted on approximately 5

    meters on center to provide a dense overlapping growth. Specific

    clipping is permitted to ensure views into ground level retail

    spaces.

    Location PlanTypical Section

    Location PlanTypical Section

    A-1 A-2

    A-3

    A-4

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    41/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    41

    Planting

    Type 3

    This dense bosque of flowering trees will provide seasonal color

    at the canal and shade in the summer months.

    Type 4

    These are court yard trees with a lighter foliage character that will

    not conflict with available dimensions or views.

    Location PlanTypical Section

    Location Plan

    Typical Section

    A-1 A-2

    A-3

    A-4

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    42/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    42

    Lighting

    Street lighting within the Sewoon District is intended to reflect the

    scale and usage of the public spaces and carriage-ways. The

    typical light pattern may be interrupted at loading docks, service

    entries etc., and replaced in these instances with building mount-ed lights. Additional building mounted and integrated up-lighting

    may be used to highlight exterior terraces, penthouses and below

    grade courts.

    Type 1

    The widest carriageways of 14 meters and up require the great-

    est density of lighting. Type 1 fixtures will be high pressure sodi-

    um mounted directly opposite one another across the carriage-

    way width on a 15 meter grid.

    Type 2

    Carriage-ways of lesser width (typically 8 meters) require a less-

    er density of light. Consequently these high pressure sodium fix-

    tures will be mounted on a 10 meter grid on a staggered pattern

    of alternate sides.

    Location Plan

    Typical Section

    Typical Plan

    Location Plan

    Typical Section

    Typical Plan

    A-1 A-2

    A-3

    A-4

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    43/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrativ e Framework

    Sewoon District 4 Design Guidelines

    43

    Type 3

    The lighting of Jong-Ro and Bar-O-Gae-Gill should reflect the

    character of Seouls major street system lighting standards while

    reflecting the unique character of the Sewoon District as a new

    city center.

    Lighting

    Type 4

    In the areas of continuous tree planting a system of up lights will

    be integrated into the paving in order to highlight the pattern of

    the trees and provide a unique shimmering night time character.

    At the multi level court, integral architectural lighting will be

    designed to provide a site-wide radiance to draw pedestrians

    toward the retail and cultural heart of the district. Glass bridges at

    the court should be up-lighted.

    Location Plan

    Typical Section

    Typical Plan

    Location Plan

    A-1 A-2

    A-3

    A-4

    A-1 A-2

    A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    44/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    44

    4. Building Guidelines

  • 8/10/2019 MP Guideline Book1208(1)

    45/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    45

    Objectives

    Buildings as Extensions of Larger Area Environmental &

    Greening Strategy

    As noted in Section 3 above, the larger environmental goals of

    this development include the concept of Building as Forest

    wherein building and site patterns are conceived to be inte-

    grated with a complex vertical and horizontal distribution of gar-

    dens, vegetated roofs and permeable surfaces that mimic an

    upland forest zone. Within this strategy, a close meshing of

    building, environmental conditions and landscape brings plant-

    ing into buildings as both environmental conditioners and gener-

    al amenities.

    Integral to this process is also designing for natural ventilation,

    favorable orientation, natural day-lighting and solar control, sun

    shading and passive solar heat gain.

    Buildings as Definers & Supporters of Streets/Open Spaces

    The making of a an Active Street Oriented Urban District is

    directly dependent upon the use of buildings that can give

    strong and legible definition to the streets and open spaces of

    the city. These buildings must also have a strong, robust and

    highly accessible relationship to their street frontage or ground

    plane.

    Variable & Multi-Use Potential of Buildings

    The contemporary world is increasingly a place of changing use

    patterns and unpredictable space requirements. One index of a

    buildings value today is its ability to accommodate changes of

    use and avoid obsolescence. In this way an important aspect of

    a buildings sustainability is its ability to respond to change.

    In building design, this leads to robust simple format structures

    with inherent use flexibility, easily accessible/changeable envi-

    ronmental systems, a distinction between short-lived and long-

    lived building systems/components and access/circulation pat-

    terns that work together to reinforce this flexibility. Incorporated

    into the master plan is a flexible use zone where building usage

    may change in response to market demand. This zone fronts

    onto the major roads, Jong-Ro and Bar-O-Gae-Gill.Multi-Use Zones

    Extension of larger ecological system

    Active street frontage

    4. Building Guidelines

  • 8/10/2019 MP Guideline Book1208(1)

    46/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    46

    Visual Expression

    Construction

    Building facades to be primarily clear vision glass curtain wall (no

    colored glass) with a continuous surface expression (no bal-conies hung from wall surface). The scale of any openings/bays

    should be dependent on orientation (street vs. garden, north vs.

    south) and height above grade. The facades should visually

    express their construction methods and techniques. The faade

    expression should be primarily one of frame plus an infill of

    cladding with a pallet of non-load bearing materials expressed as

    such. Clear glass, wood, metal, terracotta all may be used in their

    natural forms.

  • 8/10/2019 MP Guideline Book1208(1)

    47/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    47

    Environmental Conditions

    Of prime importance to the visual expression of all buildings in

    Phase One is the through ventilation of all residential units and

    incorporation of natural daylight into all interior spaces. This

    requirement leads to the project-wide employment of a thermal

    buffer zone to be incorporated into vertical surfaces. It will allow

    the visual extension of private living spaces to nature. This zone

    is intended to serve as a transition between inside and outside

    and to be seasonally adaptable. Much like the traditional Korean

    house typology, this layering of private domestic space provides

    numerous amenities.

    Buffer Zones of Traditional Korean House

    Framed view with solar control

  • 8/10/2019 MP Guideline Book1208(1)

    48/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    48

    Environmental Conditions (cont)

    The orientation of each faade should affect the architectural

    expression by optimizing passive solar collection in the winter

    and reducing heat gain in the summer ideally the end result is

    a tunable faade where the inhabitant can customize his or herliving environment. This zone may have exterior sunshades or an

    interior system of operable shading. To improve air quality, oper-

    able glazing should be included into both layers of this buffer

    zone. Semi-climatized green spaces incorporated into this zone

    can act as a mediator/foreground to outdoors and promote a

    closer relationship between urban life and nature. The final result

    will be to bring green spaces back into the historic city.

  • 8/10/2019 MP Guideline Book1208(1)

    49/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    49

    Ground Level Conditions

    The bases of the buildings must be visually permeable to pro-

    mote a pedestrian friendly active street life. Continuity of surface

    from the facades into the pedestrian passages is encouraged

    with multiple retail opportunities and possibilities of vertical circu-

    lation to below and above grade retail inside these spaces. The

    facades should meet the ground in a robust fashion with clear

    visual distinction between the residential expression above and

    the lower floors of retail. Operable full height doors should be

    included in the arcade frontages to allow seasonal connections

    between interior and exterior. Exterior neon signage is prohibited

    on park and canal frontages.

  • 8/10/2019 MP Guideline Book1208(1)

    50/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    50

    Upper Building Opportunities

    Within the penthouse zones of the wall type buildings opportuni-

    ties exist for larger scale duplex units and extensive exterior gar-

    dens. The towers offer further possibilities for exterior spaces

    captured between the faade extension and the recessed pent-

    house. These spaces will function as exterior protected living

    zones and be planted with greenery. A system of green roof-

    scapes above will filter and slow runoff water for park below while

    providing a thermal barrier in the hotter times of the year.

  • 8/10/2019 MP Guideline Book1208(1)

    51/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    51

    Building Types

    Above grade buildings developed for the site are of two basic

    types with several variations.

    An Incremental Wall TypeA Small Floor Plate Tower Type

    Together, these two building types as defined are capable of

    accommodating a wide variety of uses and meeting the stated

    urban and environmental objectives of this proposal. That is, in

    general terms, the wall type is essential to the spatial definition

    of streets and open spaces, while the tower can mark important

    destinations, places of transition, etc. while providing increased

    intensity of use.

    Both of these building types utilize point loaded vertical circula-

    tion systems to avoid corridors and increase the prospects of

    natural cross and through ventilation.

    An incremental wall type building

    A small floor plate tower type

    Tower Type BuildingsWall Type Buildings

  • 8/10/2019 MP Guideline Book1208(1)

    52/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    52

    Wall Type Building

    As developed for the requirements of this site, the Wall Type is

    a multi-use vertically organized building providing a high level of

    use flexibility in its lower floors and capable of being built in

    small (free standing or contiguous) increments and at variableheights.

    Lower Base Floors

    As illustrated, a six floor, 20 meter high base accommodates,

    from the ground up, two floors of retail (32-36 meters in depth)

    below four floors of variable use loft spaces (27-30 meters in

    depth) and above this base a variable number of residential

    floors.

    Typically, floor to floor heights are set at an average of 4 meters

    at floors 1-2 and a maximum of 3.25 meters at the upper resi-

    dential floors. This height allows the use of either concrete or

    steel construction. Tower Type buildings utilize these same ver-

    tical dimensions.

    Floors one through five are conceived to be highly flexible loft

    space floors with, typically, retail uses on floors one and two,

    with loft apartments, live-work spaces or officetel accommoda-

    tion on floors three through six.

    Unique environmental enhancements of these floors, including

    supplemental strategies of natural ventilation and lighting, will

    be discussed later in this section.

    Section at Wall type

    Buildings interact with Urban Squares

    Example of wall type building

    Example of wall type building

  • 8/10/2019 MP Guideline Book1208(1)

    53/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    53

    Wall Type Plan

    Natural Ventilation Solar ChimneyNatural Cross Ventilation

    Garden in the sky

    Upper Residential Floors

    The upper residential floors of Wall Buildings are organized in

    longitudinal plan increments of 22.5, 27, and 31.5 meters, a

    range that adapts easily of varying site dimensions and relates

    well to the desired spatial expression.

    Typically, three dwelling units cluster around a vertical access

    core. Two such increments together form a common multi-story

    garden space that, as shown, can be environmentally treated.

    All units are through ventilated with two aspects, thus providing

    a great range of orientation and view opportunities.

    At the top floors of the Wall Buildings a recessed multi-story

    penthouse provides outdoor landscaped terraces and spectacu-

    lar views for the occupants. The green roofscape will provide a

    thermal barrier and a changeable year round extension of the

    north south park system below.

  • 8/10/2019 MP Guideline Book1208(1)

    54/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    54

    The Tower Type

    The Tower Buildings have floor plates in the range of 850

    1,000 m2 with typical dimensions of 30m x 30m. Also, typically,

    four dwelling units are arranged around a center core providing

    cross ventilation at the corners and two aspects at all units. Thetower should meet the ground in a vigorous fashion typical of

    the retail intense character of the district. The top expression is

    intended to be a continuation of the simple tower shaft with a

    recessed penthouse behind a free standing multistory curtain

    wall extension. This protected terrace space can be used by the

    occupants year round and may be planted with vegetation.

    Tower Types

    Gateway markers

    Visual Markers

    Urban Square Markers

  • 8/10/2019 MP Guideline Book1208(1)

    55/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    55

    Tower Type

    Garden in the sky at tower corner

    Section at Tower Type

  • 8/10/2019 MP Guideline Book1208(1)

    56/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    56

    Massing

    Aggregated Buildings as Integrated Profile

    Typical of intentions for the larger four quadrant development

    area, the combination of Wall and Tower Type buildings at thePhase One site are arranged to provide a variety of building wall

    heights defining the streets and open spaces of the site. These

    various heights relate to scale relationships, adjacencies and the

    recognition of favorable view and solar orientation opportunities.

    Visually, this process results in an integrated profile of aggregat-

    ed buildings with a level of horizontal continuitypunctuated by

    the tops of tower elementsthat directly reflects these buildings

    collective street and space defining attributes. This resultant pro-

    file displays a multi-scaled continuum of building rather than a

    collection of free-standing tower elements rising above typicallow podiums. This is an expression of aggregation and continuity

    rather than one of singularity and isolation.

    Free-standing towers on podium

    Continuity of building expression - an integrated profile of arrgregated buildings: the goal

  • 8/10/2019 MP Guideline Book1208(1)

    57/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    57

    Relationship of Above-Grade and Below-Grade Conditions

    Below existing street level, proposed accommodation includes

    two levels of retail, entertainment and pubic use spaces above

    four levels of parking. As noted in Section 3, (Multi-Level

    Central Court) the two retail/public use levels are punctuatedand focused by a large multi-level court space carved out of the

    street level ground plane. The upper of these two below grade

    levels (B-1) is interpreted as a second street level -- active,

    highly visible and easily accessible at numerous other court

    locations with east to west continuity across the entire site.

    These two lower levels, with large areas open to the sky at the

    central court and integrated in this way with the upper ground

    plane, not only give continuity to active frontages but, in their

    loft-like robustness, offer a tremendous level of use range and

    flexibility, expanding, for instance, location options for the re-

    accommodation of existing retail activities on the site The cen-

    tral court, with its floor at the lower level B-2, also brings the

    active ground plane down closer to parking levels below.

    These lower levels are structured with a nominal 9-meter grid.

    Access to visitor parking and service areas (located at level B

    2), is provided by centralized ramp systems at locations as indi-

    cated in Section 3.

    District Wide Below-Grade Connections

    Continuity of below-grade retail

    Perspective into Courtyard

  • 8/10/2019 MP Guideline Book1208(1)

    58/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    58

    Upper building massing

    Street related lower building floors and

    frontages

    Mid-block urban squares and major

    city open space systems

    (canal and east-west park)

    Below-grade passages and destinations

    Relationship of Above-Grade and Below-Grade Conditions (cont)

  • 8/10/2019 MP Guideline Book1208(1)

    59/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    59

    Site-Wide Conditions

  • 8/10/2019 MP Guideline Book1208(1)

    60/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    60

    Site Wide Plan (Phase One)

    A-1

    A-2

    A-3

    A-4

    12.66

    12.66

    A

    A

    B B

    149.5

    54

    6.13

    20.5027.79

    4 9

    . 9 9

    36.37 20.17

    103.91

    125.48

    94.10

    32.80

    15.68

    30.75

    3

    2.34

    36.12

    5 0

    . 7 3

    9 . 8

    8

    3 0

    . 0 0

    14.20

    110.06

    118.29 3 2

    . 0 0

    5.00

    5.

    00

    103.53

    20.00

    101.2

    0

    0 30 60 90Site-wide dimension plan & above-grade parcel plan @ 1:2000

    A-2

    A-3

    6,445 sm

    40,947 sm

    5,505 sm

    36,747 sm

    A-47,978 sm

    41,524 sm

    A-16,205 sm76,054 sm

    Below-grade parcel division and areas

  • 8/10/2019 MP Guideline Book1208(1)

    61/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    61

    59.90m(67.60m)

    45.65m

    45.65m(50.60m)

    54.20m(60.80m)

    54.20m

    90.00m

    39.95m

    (43.80m)

    39.95m

    77.80m20.00m

    20.00m

    0 30 60 90Maximum Building Heights Plan @ 1:2000

    * Building heights with alternate program shown in parenthesis

    A-2

    A-1 A-3

    A-4

  • 8/10/2019 MP Guideline Book1208(1)

    62/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    62

    0 20 40 60Site Section AA @ 1:1500

    0 20 40 60Site Section BB @ 1:1500

  • 8/10/2019 MP Guideline Book1208(1)

    63/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    63

    Relationships of Above-Grade to Below-Grade Conditions

    West facing porch / collector

    Below-grade connections Retail matrix

  • 8/10/2019 MP Guideline Book1208(1)

    64/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    64

    5. Individual Parcel Guidelines

  • 8/10/2019 MP Guideline Book1208(1)

    65/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    65

    Parcel A-1

  • 8/10/2019 MP Guideline Book1208(1)

    66/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    66

    Parcel A-1

    The Situation

    Site A-1 is Phase Ones Central North-South Park frontage. This

    frontage is defined by a combination of three building elements -

    two wall buildings (at 54.2 meters maximum height) at the north-

    ern portion of the frontage and, at its southern extremity, a 90

    meter high tower. Above ten floors the wall buildings are limited

    to a frontage width of 55 meters (see local zoning) to provide

    porosity, light and views.

    These three elements provide strong eastern definition to the

    park space, while the southern tower element dramatically marks

    the parcels narrow Cheonggyecheon Canal frontage. The base

    of the park frontage contains a three story porch/arcade that acts

    as a gathering place/collector for the district. This porch provides

    visual continuity and access both up and down to the various lev-

    els of retail, while offering dramatic views of the park and acting

    to define a direct spatial extension of the gardens of the Jongmyo

    Royal Shrine across Jong Ro. Three pedestrian easements

    which pass through this parcel connect to the porch and provide

    a permeable base -- allowing preservation of historic movement

    patterns while linking the park to the retail intense multi level

    court at the heart of the quadrant. The eastern wall of the parcel

    forms the edge to the primary north-south internal vehicular

    street. One parking/service ramp, with access to the A-1 parcel,

    is located off of the north-south primary road.

    Parcel Area: 5,203m2

    Buildable Parcel Area: 4,825m2

    Maximum Height: 90.00m

    Required Easement: Yes. See plan.

    Program

    Above Grade

    Retail 0-8m 11,154m2

    Variable Use 8-20m 9,060m2

    Residential* above 20m 50,758m2Below Grade

    Retail 6,601m2

    Parking/Service/Mechanical 23,439m2

    TOTAL GSM 101,438m2

    note: all area tabulations are gross numbers

    * Unit mix is 25% of each of the following: 134m2, 146m2, 164m2, 198m2

  • 8/10/2019 MP Guideline Book1208(1)

    67/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    67

    Opportunities

    Located along the new North-South Park, the western frontage

    of this site is the primary public faade of the entire Phase 1

    Development. The proposed tall public porch at this location

    accommodating a varied range of retail and public uses-- canrespond dramatically to this prominence and act as a memorable

    introduction to the overall retail and public use offerings of the

    Phase 1 Site. Moreover, the high visibility of this faade and its

    permanent park views further reinforce the importance and desir-

    ability of this frontage. At the same time, this is a west facing

    frontage subject to unpleasant solar heat gain and glare. Here,

    the development of an integrated solar control strategy is of

    utmost importance to the marketability and livability of the indi-

    vidual residential units. This western frontage also offers lateral

    views to the Jongmyo Royal Shrine to the north and the faadeshould be designed to take advantage of this. The southern tower

    will visually mark the intersection of the canal and park on the

    skyline and should reflect the importance of this intersection of

    earth, water and sky.

    Parcel A-1

  • 8/10/2019 MP Guideline Book1208(1)

    68/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    68

    3 .

    8 7

    27.79

    5 0

    . 0 4

    149.55

    36.37

    36.00

    20.00

    PROPERTY LINE

    5M

    SE

    TBA

    CK

    PROPERTY LINE 20MS

    ETBACK

    20MSETBACK

    101.1

    6

    A-1

    Parcel A-1 Dimension Plan @ 1:15000 20 40 60

    Parcel A-1

  • 8/10/2019 MP Guideline Book1208(1)

    69/98

    69Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    A-1

    A-4

    A-3

    A-2

    4.00

    32.00

    SETBACK LINEABOVE BASE

    PROPERTY LINE

    BUILD-TOLINE

    BUILD-TOLINE

    BUILD-TOLINE

    PROPERTY LINE

    PARKING &SERVICE

    ENTRY

    PEDESTRIAN

    PASSAGE/

    EASEMENT

    5 . 0

    0

    5 . 0

    0

    CLEQ

    .

    EQ

    .

    CL

    EQ

    .

    EQ

    .

    ALIGN

    PEDESTRIAN

    PASSAGE/

    EASEMENT

    POTENTIAL BRIDGECONNECTION ABOVE

    POTENTIAL BRIDGECONNECTION ABOVE

    BUILDINGSEPARATION

    ZONE

    3STORY

    PORCH ZONE

    3STORY

    PORCH

    ZONE

    ELEV.

    ELEV.

    5M

    SETB

    ACK

    20MS

    ETBACK

    20MSETBACK

    Profile Elevation-West @ 1:1500

    54.20m MAX 54.20m MAX

    90.00m MAX

    3 STORYPORCH

    2 OR 3 STORYPENTHOUSE ZONE

    LIMIT OF CONT.WALL SURFACE

    @ 10 STORY

    REQUIRED THRU-BUILDINGARTICULATION ZONE

    (MAX. INTERVAL OF 55m)

    HORIZONTAL EXPRESSIONLINE @ 20m

    2 OR 3 STORYPENTHOUSE ZONE

    3 STORY PORCH

    LOCATIONS OF REQUIREDTHRU-BUILDING ARTICULATION@ MAX. OF 55m

    APPROXIMATEPEDESTRIANPASSAGELOCATIONS

    60.80m MAX

    ALTERNATE PROFILE FOROFFICE USE ABOVE BASE

    POSSIBLE BRIDGE

    55m MAX.

    CL

    ALIGN

    CL

    ALIGN

    Parcel A-1 Plan @ 1:15000 20 40 60

    Parcel A-1

    0 20 40 60

  • 8/10/2019 MP Guideline Book1208(1)

    70/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    70

    36.00

    A-1

    PARCEL A-1

    2 OR 3 STORYPENTHOUSE

    ZONE

    3 STORYPORCH

    90.00m

    11.00m

    79.00

    11.00

    3 STORYPORCH

    36.00

    PARCEL A-1

    2 OR 3 STORYPENTHOUSE ZONE

    A-1

    43.20

    11.00

    54.20m

    11.00m

    REQUIREDTHRU-BUILDINGARTICULATION ZONE

    (MAX. INTERVAL OF 55m)

    HORIZONTALEXPRESSION

    LINE @ 20m

    LIMIT OF CONT.WALL SURFACE

    @ 10 STORY

    PROBABLEWALL LINE

    MAX

    Section AA @ 1:1000 Section BB @ 1:1000

    Parcel A-1

    A

    A

    B

    B

  • 8/10/2019 MP Guideline Book1208(1)

    71/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    71

    Section Thru 3 Story Porch @ 1:500

    Parcel A-1

    Retail connection at porch

  • 8/10/2019 MP Guideline Book1208(1)

    72/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    72

    Parcel A-2

  • 8/10/2019 MP Guideline Book1208(1)

    73/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    73

    Parcel A-2

    The Situation

    Site A-2 forms an urban wall on Jong Ro, one of Seouls most his-

    toric and important east-west thoroughfares. At the eastern end

    of the A-2 site, this street has a large road intersection with

    inscribed 45-degree street frontages. The A-2 Site occupies one

    of these diagonal frontages. The parcel development must

    respect the current geometry of this corner and its significance as

    part of a larger pattern of streets and squares. The Corner Plaza

    indicated for this location can reinforce this corners role as a

    gathering place and site of passage.

    The sites overall massing is limited to a height of 45.65 meters.

    Above ten floors the wall buildings are limited to a width of 55

    meters (see local zoning) to provide porosity, light and views.

    Three pedestrian easements pass through this parcel and link to

    the site wide system of passages and streets. The continuity of

    an active street level retail system is encouraged. One

    parking/service ramp is located off of the east-west primary road.

    A below grade an existing subway tunnel, an existing subway

    ventilator located on the corner of Jong Ro and Bar-O-Gae-Gill

    and access to below grade retail running underneath Bar-O-Gae-

    Gill must be incorporated into the design.

    Parcel Area: 3,900m2

    Buildable Parcel Area: 3,900m2

    Maximum Height: 45.65m

    Required Easement: Yes. See plan.Program

    Above Grade

    Retail 0-8m 7,310m2

    Variable Use 8-20m 15,524m2

    Residential* above 20m 24,682m2Below Grade

    Retail 8,378m2

    Parking/Service/Mechanical 30,291m2

    TOTAL GSM 86,185m2

    note: all area tabulations are gross numbers

    * Unit mix is 25% of each of the following: 134m2, 146m2, 164m2, 198m2

  • 8/10/2019 MP Guideline Book1208(1)

    74/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    74

    Opportunities

    The Sites north facing frontage offers unparallel views to the

    Royal Shrine, its gardens and the distant northern hills. The

    design should also take advantage of the environmental potential

    of this northern exposure and its relationship, within thedwellings, to accompanying southern exposures and related nat-

    ural cross ventilation. This southern orientation also provides

    opportunities for day-long natural lighting, passive solar warming,

    and various kinds of in-building gardens.

  • 8/10/2019 MP Guideline Book1208(1)

    75/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    75

    125.48

    118.29

    32.80

    32.00

    A-2

    5.00

    5.00

    PROPERTY LINE

    5M

    SE

    TBA

    CK

    PROPERTY LINE

    5M SETBACK

    0 10 20 30Parcel A-2 Dimension Plan @ 1:1000

    Parcel A-2

  • 8/10/2019 MP Guideline Book1208(1)

    76/98

    2 STORYBASE

    EXPRESSION

    45.65m MAX

    ALTERNATE PROFILE FOROFFICE USE ABOVE BASE

    50.60m MAX

    2 OR 3 STORYPENTHOUSE ZONE

    LIMIT OF CONT.

    WALL SURFACE@ 10 STORY

    REQUIRED THRU-BUILDINGARTICULATION ZONE

    (MAX. INTERVAL OF 55m)

    HORIZONTALEXPRESSION

    LINE @ 20m

    APPROXIMATEPEDESTRIANPASSAGELOCATIONS

    LOCATIONS OF REQUIREDTHRU-BUILDING ARTICULATION

    @ MAX. OF 55m 55m MAX.CL

    ALIGN

    CL

    ALIGN

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    76

    A-4

    A-2

    A-3 A-3

    PARKING& SERVICEENTRY

    5M SETBACK LINE

    PROPERTY LINE

    EXTENT OFSUBWAY LINE

    BELOW

    EXISTING VENTILATION SHAFT

    EXISTING ENTRY TO BELOW-GRADE RETAIL ARCADE

    POTENTIAL BRIDGECONNECTION ABOVE

    PEDESTRIANPASSAGE/EASEMENT

    5.00

    5.00

    5.00

    POTENTIAL BRIDGECONNECTION ABOVE-ALIGN WITH SETBACK

    ON PARCEL A-3

    THRU-BUILDINGARTICULATION ZONE

    PEDESTRIANPASSAGE/EASEMENT

    THRU-BUILDINGARTICULATION ZONE

    ELEV. ELEV.CL

    5M

    SE

    TBA

    CK

    5MSETBACK

    A

    A

    Parcel A-2

    0 10 20 30Parcel A-2 Plan @ 1:1000

    Profile Elevation - South @ 1:10000 10 20 30

  • 8/10/2019 MP Guideline Book1208(1)

    77/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    77

    32.00

    PARCEL A-2

    2 OR 3 STORYPENTHOUSE ZONE

    45.65m

    8.00m

    37.65

    8.00

    A-2A-3

    HORIZONTALEXPRESSIONLINE @ 20m

    REQUIRED THRU-BUILDINGARTICULATION ZONE

    (MAX. INTERVAL OF 55m)

    LIMIT OF CONT.WALL SURFACE

    @ 10 STORY

    2 STORYBASEEXPRESSION

    PROBABLEWALL LINE

    PROBABLEWALL LINE

    A-2A-3A-4

    MULTI-LEVEL COURT

    VIEWS

    DEC 21NOON

    JUNE 21NOON

    Parcel Section @ 1:1000

    Parcel A-2

    Section AA @ 1:1000

    Views and Solar ExposureThe low (5 floor) middle building element

    of the Adjacent A-3 Site to the south,

    allows positive solar exposure to the south

    face of the A-2 Parcel, opening almost the

    entirety of this wall to direct sunlight over

    the course of the day for most of the year.This low element also provides a great

    range of frontal and lateral views from the

    upper floors of the A-1 Site buildings.

    VIEWS TO

    PARK &

    SHRINE

  • 8/10/2019 MP Guideline Book1208(1)

    78/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    78

    Parcel A-2

    A more detailed view of a possible street frontage configuration at the Parcel A-2

    southern wall. Indicated is a double high treatment of ground level retail/public

    use space and possible third floor uses (restaurants, etc.) taking advantage of

    probable third floor setbacks at this faade.

  • 8/10/2019 MP Guideline Book1208(1)

    79/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    79

    Parcel A-3

  • 8/10/2019 MP Guideline Book1208(1)

    80/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    80

    Parcel A-3

    The Situation

    Site A-3 forms the heart of the Phase One development and as

    such forms inter-dependant relationships with the other three

    parcels in defining the spatial center of the site. Highly accessi-

    ble, The A-3 site is flanked on its northern and western edge by

    new primary vehicular roads, on its east by the existing Bar-O-

    Gae-Gill and, to the south by the multilevel court. A secondary

    service road runs between the court and the parcels southern

    edge to provide service and drop off.

    A tall sunny porch at the Sites southern frontage will allow the

    buildings to open up toward the multi- level court and promote the

    retail/entertainment intensive atmosphere of this district-wide

    destination. The parcel contains two pedestrian easements run-

    ning north to south that mark the lines of transition in its massing.

    The parcel must work in tandem with Parcel A-4 to provide spa-

    tial definition to the multi level court. A below-grade existing sub-

    way tunnel and access to below grade retail running underneath

    Bar-O-Gae-Gill must be incorporated into the design.

    Its massing is composed of three elements. On the west a free-

    standing tower that may be thought of as a type of object tower

    (maximum height of 77.8 meters) and a marker within the larger

    urban square formed by the A-1, 2, 3 parcels. This tower has

    omni-directional views and a direct visual link south to the canal

    (and the city beyond) over the lower portions of parcel A-4. The

    sites middle building element is formed by a low wall building (20

    Parcel Area: 2,582m2

    Buildable Parcel Area: 2,582m2

    Maximum Height: 77.80m

    Required Easement: Yes. See plan.

    Program

    Above Grade

    Retail 0-8m 5,160m2

    Variable Use 8-20m 2,760m2

    Office/Hotel 0-77.8m 15,504m2

    Office 8-45.65m 10,813m2

    Below Grade

    Retail 7,156m2

    Parking/Service/Mechanical 25,873m2

    TOTAL GSM 67,266m2

    note: all area tabulations are gross numbers

  • 8/10/2019 MP Guideline Book1208(1)

    81/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    81

    meters in height) overlooking an on grade garden square of the

    Multi-Level Court. This building is kept low to allow light, air and

    views into the mid block spaces and streets from surrounding

    buildings. Acting in continuity with the adjacent garden square,

    this low building can accommodate vertical gardens topped by a

    densely planted and highly visible green roofscape. To the east,a third mid-height building element (45.65 meters in height) faces

    Bar-O-Gae-Gill and aligns with adjacent cross streets to promote

    citywide continuity of movement patterns into the site.

    Opportunities

    By its location, this parcel offers the most opportunity to spatially

    bind the quadrant together into a coherent whole. Conversely if

    improperly considered, the buildings of this site parcel could com-

    promise the overall balance of this sensitive inner-block situation.

    The parcel should thus be designed in close relationship with

    parcel A-4 to define the built setting of the Multi- Level Court. The

    tower element should visually mark the districts center on the

    skyline and, at ground level, seem to grow directly from the multi

    level retail court. The low middle element has the potential to be

    visually and spatially permeable to promote cross- site pedestri-

    an movement and reveal the cultural activities inside and below.

    The eastern portion forms, along with Parcels A-2 and A-4, an

    eastern gateway into the district from existing street patterns.

    Parcel A-3

  • 8/10/2019 MP Guideline Book1208(1)

    82/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    82

    Parcel A-3

    103.53

    3 0

    . 0 0

    110.06

    A-3

    6.17

    5 1

    . 2 0

    PROPERTY LINE

    5M SETBACK

    PROPERTY LINE

    5MS

    ETBACK

    30.75

    0 10 20 30Parcel A-3 Dimension Plan @ 1:1000

  • 8/10/2019 MP Guideline Book1208(1)

    83/98

    Introduction Master Plan Summary Site Development & Landscape Guidelines Building Guidelines Individual Parcel Guidelines Administrative Framework

    Sewoon District 4 Design Guidelines

    83

    Parcel A-3

    A-2

    A-3

    A-4

    A-4

    A-2

    A-1

    EXTENT OFSUBWAY LINE

    BELOW

    PEDESTRIANPASSAGE/

    EASEMENT

    PEDESTRIANPASSAGE/EASEMENT

    2 STORYPORCH ZONE

    4 . 0

    0

    5.00

    4 . 0

    0

    5.00

    2 STORYPORCH ZONE

    EXISTING ENTRY TO BELOW-GRADE RETAIL ARCADE

    POTENTIAL BRIDGECONNECTION ABOVE-

    ALIGN WITH PARCEL A-4

    SETBACK LINE

    SETBACK LINE

    ELEV. ELEV.

    4 . 0

    0

    LOWER LEVELS OF ADJACENTCENTRAL MULTI-LEVEL COURT-SEE P.XX FOR DESCRIPTION ANDTREATMENT OF THIS SPACE

    6.17

    5