Entech Laboratories DRAFT ENVIRONMENTAL IMPACTASSESSMENT REPORT FOR THE PROPOSED PROJECT OF RESIN MANUFACTURING PLANT [ Project/Activity No.- 5(f), Cat.-‘B’ ] M/s. Kemz Resibond Private Limited Survey No: 84/1,84/2, Village: Fofadiya, Tal: Dabhoi, Dist:Vadodara-391210 Prepared By ENTECH LABORATORIES [ISO 9001:2008, NABL Accredited Laboratory/ GPCB recognized Env. Auditor (Sch-II)] Laboratory : 33,34 Kushal Estate, Sanket Industrial Estate, Village - Moraiya, Taluka - Sanand, Ahmedabad 382213 Gujarat. Office: 202, Trade Square, Opp. Torrent Power House, Sabarmati, Ahmedabad - 380013

Upload: others

Post on 17-Nov-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M/s. Kemz Resibond Private Limited

Entech Laboratories

DRAFT ENVIRONMENTAL IMPACTASSESSMENT REPORT

FOR THE PROPOSED PROJECT OFRESIN MANUFACTURING PLANT

[ Project/Activity No.- 5(f), Cat.-‘B’ ]

M/s. Kemz Resibond Private LimitedSurvey No: 84/1,84/2, Village: Fofadiya, Tal: Dabhoi,

Dist:Vadodara-391210

Prepared ByENTECH LABORATORIES

[ISO 9001:2008, NABL Accredited Laboratory/ GPCB recognized Env. Auditor (Sch-II)]Laboratory : 33,34 Kushal Estate, Sanket Industrial Estate, Village - Moraiya, Taluka -

Sanand, Ahmedabad 382213 Gujarat.

Office: 202, Trade Square, Opp. Torrent Power House, Sabarmati, Ahmedabad - 380013

Page 2: M/s. Kemz Resibond Private Limited

Entech Laboratories

INDEXSr no. Title

Table of ContentsList of TablesList of Figures

List of AnnexureTOR & It’s Compliance

Executive SummaryChapter-1: Introduction 1-161.1. PREAMBLE 11.2. Purpose of EIA 11.3. Objectives of EIA study 21.4. Project Proponent 21.5. Location 51.6. Study Area 101.7. Nearest location from the site 101.8. Scope and Methodology of EIA 121.9. Regulatory Framework 131.10. Structure of EIA 141.11. Photographs of the project site 16Chapter-2: Project Description 17-542.1. Introduction 172.2. Location of the Project 172.3. Justification of proposed activity 172.4. Promoters and their background 182.5. Infrastructure facilities 182.6. Land use Breakup for total plot area 192.7. Product Details 202.8. Packing and final application of products 202.9. Raw materials requirement 212.10. Properties of raw materials & products 222.11.1. Physical and chemical properties of the raw material & product 232.11.2. Storage details of raw material & products 252.11.3. Transportation details of raw material & product 272.11.4. Project Cost 272.11.5. Project Implementation Schedule 272.12. Manufacturing process details, chemical reaction and mass balance 282.13. Water requirement & wastewater generation 382.13.1 Wastewater management 402.13.2 Characteristics of effluent 402.14. Details of effluent treatment plant 412.15. Flue gas emission 422.16. Process gas emission 432.17. Fuel requirement 432.18. Fugitive emission control 442.18.1. VOC management plan 442.18.2. Odour control action plan 45

Table of Contents

Page 3: M/s. Kemz Resibond Private Limited

Entech Laboratories

2.19. Hazardous waste management 452.20. Noise pollution 462.21. List of hazardous chemicals 472.22. Safety & occupational measure for storage & handling of the raw material &

product48

2.23. Action plan for transportation of raw materials and products including hazardous chemicals

49

2.24. Cost of the project 502.25. Power requirement 512.26. Man power 512.27. Green belt development 512.28. Scheme for rain water harvesting 532.29. Solvent management system 54Chapter-3: Base line environment quality 55-1103.1. Introduction 553.2. Study Area 553.3. Environmental standards of the region 603.4. Air environment 633.4.1. Ambient air quality (AAQ) in the study area 633.4.1.1. The location of AAQ stations 633.4.1.2. Base line data 65

Photographs showing AAQ monitoring 743.4.1.3. Sample analysis 753.5. Meteorology 763.6. Baseline Data 763.6.1. Ambient Temperature 763.6.2. Wind Speed 763.6.3. Wind Direction 763.6.4. Relative Humidiy 783.6.5. Rain Fall 783.6.6. Mixing Height 793.7. Atmospheric stability 793.8. Noise Environment 803.9. Water Quality 833.9.1. Baseline data collection of ground water & surface water 83

Photographs of water sampling 883.10. Land Environment 893.10.1. Geology & Hydrogeology 893.10.2. Characteristics of soils 92

Photographs of soil sampling 943.11. Land use pattern 963.12. Hydrology 983.13. Ecology 1013.13.1. Period of the study area 1013.13.2. Methodology 1013.13.3. Topography of the study area 1023.13.4. Floral diversity 1023.14. Socio Economic Environment 107

Page 4: M/s. Kemz Resibond Private Limited

Entech Laboratories

3.15. Traffic Survey 110Chapter-4: Anticipated Environmental Impacts & Mitigation Measures 111-1474.1. Introduction 1114.2. Impact Identification 1124.3. Impact prediction and assessment with mitigative measures 1184.4. Impact on Air environment & Mitigation Measures 1194.5. Impact on Water Environment & Mitigation Measures 1364.6. Impact of Soild/Hazardous waste & Mitigation Measures 1384.7. Impact on Noise Environment & Mitigation Measures 1404.8. Impact on Land Environment & Mitigation Measures 1424.9. Impact on Ecology & Mitigation Measures 1444.10. Impact on Socio-Economic Environment & Mitigation Measures 1464.11. Impact on Occupational Health & Safety & Mitigation Measures 147Chapter-5: Analysis of Alternatives 148-1495.1. Site Alternative 1485.2. Alternative for Technologies 149Chapter-6: Environmental Monitoring Program 150-1536.1. Introduction 1506.2. Objectives of Environment Monitoring Program 1506.3. Post project Environment Monitoring Program 1516.4. Administrative actions & documentation 1536.5. Budgetary Provisions 153Chapter-7: Additional Studies 154-1797.1 Public Consultation 1547.2 Risk Assessment 1547.2.1. Introduction 1547.2.2. Storage and Handling 1567.2.3. Risk rating 1577.2.4. Procedure for treatment of workers affected during accident 1597.3. Hazards and their control measures 1607.4. Risk identification 1617.4.1. Maximum credible loss accident scenarios 1617.4.2. Damage criteria 1627.5. Risk assessment and consequence analysis 1627.5.1. Software used for calculations 1627.6. Preventive measures 1637.6.1. Site selection 1637.6.2. Choice of technology 1637.6.3. Equipment design 1637.6.4. Plant layout 1647.6.5. Safety awareness for key management 1647.6.6. Safety training for all operational staff 1647.6.7. Safety audits and inspections 1657.7. Mitigation measures 1657.7.1. Personal protective equipment 1657.7.2. Medical facilities 1677.7.3. Firefighting systems 1677.7.4. Emergency control centre 167

Page 5: M/s. Kemz Resibond Private Limited

Entech Laboratories

7.8. Checklist of Do’s and Don’ts 1687.9. Disaster management plan 1697.9.1. Objectives of emergency procedures 1697.9.2. Basis of plan and handling of emergency 1697.9.3. Information about emergency and subsequent actions 1707.9.4. Instructions to employees 1707.9.5. Instructions to contractors 1717.9.6. Mitigation of consequences during major accident 1717.10. Emergency control centre with list of equipment and accessories 1717.10.1. Documents 1717.10.2. Personal protective equipment 1727.10.3. Equipment list 1727.11. Information regarding key persons and their responsibilities during

emergency172

7.11.1. Site main controller 1727.11.2. Incident controller 1737.11.3. Technical staff / department head 1737.11.4. Employees near the spot (incident area) 1737.11.5. Personnel officer 1737.11.6. Engineering services key personnel 1747.11.7. Security & fire in-charge 1747.11.8. First aid attendants 1747.11.9. Safety officer 1747.11.10. Emergency organization for idle hours 1757.11.10.1

Security 175

7.11.11. List of important authorities with their role in emergency and telephone numbers

175

7.11.12. Information about external communication system 1757.11.13. Announcement system details 1757.11.14. Outside important addresses and phone numbers 1757.11.15. Rehearsal and updation of plan 1767.12. Occupational health and safety program for the project 1767.12.1. Medical aid scheme 1777.13. Leak Detection And Repair (LDAR) 1777.14. Details of various SOP’s prepared 1787.15. Fire control plan 179Chapter-8: Project Benefits 180-1828.1. Improvements in the Infrastructure 1808.2. Employment potential 1808.3. Corporate Social Responsibility (CSR) & socio-economic development 1808.4. Direct revenue earning to the national and state exchequer 182

Chapter-9: Environment Cost Benefit Analysis 1839.1. Cost Benefit Analysis 183Chapter-10: Environmental Management Plan (EMP) 184-19610.1. Introduction 18410.2. The Environmental Management Plan (EMP) 18410.3. Scope & objectives of EMP 185

Page 6: M/s. Kemz Resibond Private Limited

Entech Laboratories

10.4. Administrative actions 18610.4.1. Operational philosophy 18610.4.2. Management Support –Environment Policy 18610.4.3. Environmental Management Cell 18710.5. Mitigative Measures 18810.6. In-House Laboratory 19010.7. Greenbelt development 19010.8. Occupational health and safety 19210.9. Expenditure on Environmental Matters 19310.10. Concept of waste minimization, recycle / reuse / recover techniques, energy

conservation and natural resources conservation194

Chapter-11: Summary of Env. Impacts & Conclusion 197-20211.1. Introduction 19711.2. Salient features of the project 19811.3. Air environment 20011.4. Water Environment 20011.5. Noise environment 20111.6. Hazardous wastes 20111.7. Ecology 20111.8. Socio-Economic Environment 20111.9. Land Use 20211.10 Conclusion 202Chapter-12: Disclosure Of Consultants Engaged 203-205

Page 7: M/s. Kemz Resibond Private Limited

Entech Laboratories

LIST OF TABLES Page No.Table 1.1 List of Directors 3Table 1.2 Nearest Location from the site 10Table 1.3 Nearest industries from the project site 11Table 2.1 Location of the project site 17Table 2.2 Details of sources 18Table 2.3 List of Plant & Machineries 19Table 2.4 Land use break-up for total plot area 19Table 2.5 List of Products 20Table 2.6 Packing and final application of products 20Table 2.7 Details of raw materials 21Table 2.7.1

Project implementation schedule 27

Table 2.8 Details of water consumption & effluent generation 38Table 2.9 Characteristics of industrial effluent 40Table 2.10 Details of proposed effluent treatment plant units 41Table 2.11 Flue gas stack details 42Table 2.12 Emission rate of the pollutants 42Table 2.13 Fuel details 43Table 2.14 Details of hazardous wastes 45Table 2.15 Typical noise levels of equipment 46Table 2.16 List of hazardous chemicals 47Table 2.17 Capital cost & recurring cost of the project 50Table 2.18 Power requirement 51Table 2.19 Details of man power 51Table 2.20 Land area breakup and estimation of runoff 53Table 2.21 Details of solvent 54Table 3.1 Name of villages in study area 57Table 3.2 National Ambient Air Quality Standards 60Table 3.3 Indian Standard Specification for Drinking water 61Table 3.4 Ambient Air Quality Standards with respect to noise 62Table 3.5 Locations of ambient air quality monitoring stations 63Table 3.6 Ambient Air Quality Analysis Results 65Table 3.7 Ambient Air Quality Analysis Report for the Month of March to May 2019 66Table 3.8 Details of ambient air quality monitoring & analysis procedures 75Table 3.9 Wind Rose (Frequency Distribution Data) 78Table 3.10 Relative Humidity 78Table 3.11 Rainfall pattern at vadodara rain gauge station 78Table 3.12 Hourly mixing depth over Indian region 79Table 3.13 Stability classification 79Table 3.14 Maximum ambient noise levels within study area 80Table 3.15 Ambient Noise analysis in the study report 82Table 3.16 Locations of water quality monitoring stations 84Table 3.17 Water quality analysis reports 85Table 3.18 Analysis results of soil samples 93Table 3.19 Land use distribution in study area (10 km Radial Zone) 96Table 3.20 Methodology adopted for the evaluation of biodiversity status of the study

region101

Table 3.21 Flora & Fauna in the study area 102Table 3.22 Demography of the study area 108Table 3.23 Traffic Counts 110Table 3.24 Existing Traffic Scenario and Level of Services 110

Page 8: M/s. Kemz Resibond Private Limited

Entech Laboratories

Table 4.1 Impact identification matrix 113Table 4.2 Impact prediction matrix 115Table 4.3 Basis of emission rate calculations 121Table 4.4 Maximum computed ground level concentration at project site 124Table 4.5 Cumulative concentrations due to incremental GLC's 125Table 4.6 1st highest 24-hr Average Concentration values of PM (µg/m3) 126Table 4.7 1st highest 24-hr Average Concentration values of SO2 (µg/m3) 129Table 4.8 1st highest 24-hr Average Concentration values of NOX (µg/m3) 132Table 4.9 Solid/Hazardous waste generation and disposal mode 138Table 6.1 Environmental monitoring plan 151Table 6.2 Break up of budget for environmental monitoring plan 153Table: 7.1 Storage details of raw material & products 156Table: 7.2 Storage and disposal of solid / hazardous waste 156Table: 7.3 Overall severity/consequence 157Table: 7.4 Occurrence frequency/probability 157Table: 7.5 Risk rating 158Table: 7.6 Hazards and its control measure 160Table: 7.7 Earthquake control measures 161Table: 7.8 Flood control measures 161Table: 7.9 List of Proposed Personal Protective Equipments 166Table: 7.10

List of proposed fire fighting equipment’s 167

Table: 8.1 Proposed planned social activities 181Table 10.1 List of major laboratory instruments 190Table 10.2 Budgetary expenditure for GBD 191Table 10.3 Expenditure on environmental matters 193

Page 9: M/s. Kemz Resibond Private Limited

Entech Laboratories

LIST OF FIGURES Page No.Figure 1.1 Map of Gujarat State & Project Location 6Figure 1.2 Google image showing corner co-ordinates of proposed plant 6Figure 1.3 Google image with 5 & 10 km radius around the plant 7Figure 1.4 Plant Layout 8Figure 1.5 Topography Map 9Figure 2.1 Water balance diagram 39Figure 2.2 Effluent Treatment Plant Diagram 41Figure 3.1 Study area map of base line study for 5 km and 10 km radius 58Figure 3.2 Toposheet 59Figure 3.3 Locations map of the AAQ monitoring station 64Figure-3.4 Wind rose diagram for the month of March– April – May 2019 77Figure 3.5 Land use / land cover map of 5 km & 10 km radius area around project site 97Figure 4.1 Isoplathes of PM concentration for 24hrs 128Figure 4.2 Isoplathes of SO2 concentration for 24hrs 131Figure 4.3 Isoplathes of NOx concentration for 24hrs 134Figure10.1 Environmental Management Cell 187

Page 10: M/s. Kemz Resibond Private Limited

Entech Laboratories

LIST OF ANNEXURES

Annexure- I Copy of Granted TOR, Dated: 30/07/2019

Annexure- II ToR Compliance Report

Annexure- 1 CTE From GPCB

Annexure- 2 NA Certificate

Annexure- 3 Undertaking for complying the three conditions, Water consumption <25 m3/Day, Fuel Consumption < 25 TPD, not covered under category of MAH

Annexure- 4 Land Possession Documents (LPD)

Annexure- 5 CGWA Application Copy

Annexure- 6 Undertaking for underground drainage connection will not be taken and will be achieve Zero Liquid Discharge

Annexure- 7 NOC Letter from BEIL Infrastructure Limited (For TSDF & CHWIF)

Annexure- 8 MSDS of raw materials & products

Annexure-A Consultant’s Certificate of accreditation (High Court stay order)

Annexure-B NABL accreditation Certificate

Annexure-C EMS Adequacy Certificate

Annexure-D Undertaking by the EIA consultant

Annexure-E Undertaking by the Project Proponent

Page 11: M/s. Kemz Resibond Private Limited
Page 12: M/s. Kemz Resibond Private Limited
Page 13: M/s. Kemz Resibond Private Limited
Page 14: M/s. Kemz Resibond Private Limited
Page 15: M/s. Kemz Resibond Private Limited
Page 16: M/s. Kemz Resibond Private Limited
Page 17: M/s. Kemz Resibond Private Limited
Page 18: M/s. Kemz Resibond Private Limited
Page 19: M/s. Kemz Resibond Private Limited
Page 20: M/s. Kemz Resibond Private Limited
Page 21: M/s. Kemz Resibond Private Limited
Page 22: M/s. Kemz Resibond Private Limited

TOR conditions & It’s ComplianceClarifications, information and data as required in Terms of Reference (ToR) and Terms of Reference (TOR) was obtained in hard copy vide letter no SEIAA/GUJ/TOR/5(f)/1093/2019, dated 30-07-2019. TOR copy is attached as Annexure- I

A tabular chart with index for point wise compliance is as given below:Sr.No.

ToR Point Compliance Report

Page No.

1 Details with respect to justification for proposed expansion: (1) To address proportionate availability of space forproduction plant. (2) To address proportionate availability ofstorage area for raw materials finished goods, utilities and goods carrier movement within premises. (3) To address proportionate captive/common infrastructure available to accommodate additional load due to proposed expansion. (4) Environment impact and its mitigation measures for common/ captive infrastructure due to proposed production.

Please refer Chapter 2, Section 2.6 and Chapter 10, Section 10.5

19 & 188-189

2. Compliance of MoEF&CC’s OM dated 01/05/2018 regarding “Corporate Environment Responsibility” (CER). Fund allocation for Corporate Environment Responsibility (CER) shall be made as per MoEFCC’s O.M. No. 22-65/2017-IA.III dated 01/05/2018 for various activities therein. The details of fund allocation and activities for CER shall be incorporated in EIA/EMP report.

Please referChapter 8,Table 8.1

181

3. Explore the use of renewable energy to the maximum extent possible. Details of provisions to make the project energy-efficient through energy efficient devices and adoption of modes of alternative eco-friendly sources of energy like solar water heater, solar lighting etc. Measures proposed for energyconservation.

Please refer Chapter 10, Section 10.10

194-195

4 Leak Detection and Repairing Programme (LDAR) for all the volatile organic solvent proposed for use in-house with detailed chemical properties including vapour pressure. LDAR shall endeavour prevention of losses of solvents to the bestminimum extent.

Please referChapter 7,Section 7.13

177-178

5 Safety precautions including flame proof electric fittings to be taken to avoid fire hazard during unloading, storage,transportation, handling and processing of Solvents.

Please referChapter 2,Section 2.22

48

6 Submit CTE (NOC) from GPCB & NA copy stating that Sr. No. 84/1, 84/2, Village: Fofadiya, Taluka, Dabhoi, Dist. Vadodara shall be utilized for establishment of Chemical Industry

Please refer Annexure 1 & Annexure 2

--

7 Legal undertaking stating that unit is complying the three conditions (i.e. water consumption less than 25 m3/d, fuel consumption less than 25 TPD, and not covered in the category of MAH units as per the Management Storage, Import of Hazardous Chemicals Rules (MSIHC Rules) 1989) as per the amendment \to EIA Notification, 2006 vide SO 1599 (E) dated 25/06/2014.

Please refer Annexure 3

--

8 A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on

-- --

Page 23: M/s. Kemz Resibond Private Limited

the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided.

9 PP shall ensure participation of people during Public Hearing with equality in gender so as to encourage woman participation in Public hearing and the necessary allocation of funds for the same. Should be provided.

-- --

10 Unit shall provide Adequate Stack Height with Single Stage Evaporator along with suitable APCM considering type ofEmission.

Please refer Chapter 2,Section 2.15,Table 2.11

42

Sr.No.

ToR Point Compliance Report

Page No.

1 A tabular chart with index for point-wise compliance of below mentioned TORs.

--

2 Executive summary of the project - giving a prima facie idea of the objectives of the proposal, use of resources, justification, etc. ln addition, it should provide a compilation of EIA report, including EMP and the post -project monitoring plan in brief.

Executive Summary in English is given in EIA reportafter TOR compliance

--

3 Justification for selecting the proposed product and unit size. Please refer Chapter-2, Section 2.3

17

4 Land requirement for the project including its break up for various purposes, its availability and optimization.

Please refer Chapter-2, Section 2.6, Table 2.4

19

5 Land possession documents. Copy of NA order showing permission to use the project land for industrial purpose. lf located in GIDC, copy of plot holding certificate obtained from GIDC Authority.

Please refer Annexure 4: Land Possession Documents

Annexure 2: Copy of NA

--

6 Location of the project site and nearest habitats with distances from the project site to be demarcated on a toposheet (1: 50000 scale).

Please refer chapter 1,Figure 1.5

9

7 Topography details of the project area. Please refer Chapter-1, Figure 1.5

9

8 Geological features and geo-hydrological status of the study area. Please refer Chapter-3, Section 3.10.1 for Geological features, Section 3.12 for hydrological status

89-91 and 98-101

Page 24: M/s. Kemz Resibond Private Limited

9 ln case of project located outside notified area: Legal Undertaking stating that unit is complying the three conditions [i.e. water consumption less than 25 M3/day; Fuel consumption less than 25 TPD; and not covered in the category of MAH units as per theManagement, Storage, import of Hazardous Chemical Rules (MSIHC Rules), 1989] as per the amendment to EIA Notification, 2006 vide SO 1599 (E) dated 25/06/2014.

Please refer Annexure:3

--

10 Present land use pattern of the study area shall be given based on satellite imagery.

Please refer Chapter-3, Section 3.11

96-97

11 Layout plan of the factory premises clearly demarcating various units within the plant. Provision of separate entry & exit and adequate margin all round the periphery for unobstructed easy movement of the emergency vehicle / fire tenders without reversing back. Mark the same in the plant layout.

Please refer Chapter-1, Figure 1.4

8

12 Technical details of the plants along with details on best available technologies (BAT), proposed technology and reasons for selecting the same.

Please refer Chapter-2, Section 2.12

28-37

13 Product spectrum (Proposed products along with production Capacity) and processes.

Please refer Chapter-2, Section 2.7, Table 2.5

20

14 Chemical name of each proposed product to be manufactured. Details on end use of each product. (Provide CAS number of all the products & raw materials. ln case of Dyes, Cl number).

Please refer Chapter-2, Section 2.10

22-23

15 Details on raw materials, source and storage within the premises. Please refer Chapter-2, Section 2.11.3 & 2.11.2

25-27

16 Details of complete manufacturing process / operations of each product along with chemical reactions, process flow diagram describing each unit processes and unit operations along with material balance, consumption of raw materials etc.

Please refer Chapter-2, Section 2.12

28-37

17 Details on strategy for the implementation of cleaner production activities.

Unit has incorporated necessary considerations in project planning.

--

18 Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Permission obtained from the concern authority for supply of raw water.

Please refer Chapter-2, Section 2.13, Please refer Annexure 5

38

19 Undertaking stating that no bore well shall be dug within the premises (lf project is located within the industrial estate).

Not Applicable --

20 Details on water balance including quantity of effluent generated, recycled & reused. Details of methods to be adopted for the water conservation.

Please refer Chapter-2, Figure 2.1

39

21 Efforts to minimize effluent discharge and to maintain quality of receiving water body.

Unit will maintain ZLD.

--

22 Explore the possibilities for Zero Liquid Discharge (ZLD) option Unit will maintain --

Page 25: M/s. Kemz Resibond Private Limited

for the proposed project. ZLD.23 Segregation of waste streams, characterization and quality with

specific treatment and disposal of each stream including action plan for maximum recycle of treated waste water and minimum discharge for effluent.

Please refer Chapter-2, Section 2.14,Table 2.10

41

24 Capacity of ETP in KL/Day. Details of ETP including dimensions of each unit along with schematic flow diagram. lnlet, transitional and treated effluent qualities with specific efficiency of each treatment unit in reduction in respect of all concerned/regulated environmental parameters. lnlet effluent quality should be based on worst case scenario considering production of most polluting products that can be manufacturedin the plant concurrently.

Please refer Chapter-2, Section 2.14 andTable 2.10

41

25 In case of discharge into GIDC Drainage/Pipeline:i. Copy of permission letter with quantity (KL/day) from the concern authority of drainage network/pipeline with confirmation for spare capacity available to take additional effluent.

Not Applicable --ii. Characteristics of the combined effluent and treated water to be sent to Common pipeline with reference to the MoEFCC/CPCB/GPCB discharge norms.iii. Provision for Continuous Monitoring System for waste water discharge.

26 ln case of waste water sent to Common Facilities (CF) like CETP MEE, Spray Dryer etc.a. Details of Common facilities including (1) Total capacity of the CF (2) Copy of CC&A of the CF. (3) Actual load at present (Qualitative and Quantitative - KL per day) (4) Booked quantity & Spare capacity of CF (5) Copies of XGN generated inspection reports with analysis reports of theWater/Air/Hazardous samples collected by GPCB (Last 2 year). Copies of instructions issued by GPCB in last 2 year and point wise compliance thereof. (6) Copies of Show- cause notices,closure notices etc. served by the GPCB and its compliance (6) Recommendations and suggestions of the last two Environment Audit reports of CETP and its compliance report. (7)Common Facility Up gradation scheme, if any. Not Applicable --b. Status of compliance to the 18(1) (b) direction issued by the CPCB with respect to CETP compliance & CEPI area action plan along with relevant supportive document.c. Give status of compliance of Environmental norms of existingCommon lnfrastructure i.e. CETP, MEE & Spray Dryer (Whichever is applicable) in which you are a member.d. Submit adequacy of Common infrastructure i.e. CETP, MEE & Spray Dryer for additional load (Whichever is applicable) along with written confirmation/membership certificate mentioning thesame (Total consented quantity, total quantity booked so far, quantity booked for the unit, spare " quantity available).

27 ln case of Zero Liquid Discharge (ZLD) :i. Action plan for 'Zero' discharge of effluent shall be included. Notarized undertaking for assuring that underground drainage connection will not be taken in the unit and there shall be no

Please refer Chapter-2, Section 2.14 and

41

Page 26: M/s. Kemz Resibond Private Limited

effluent discharge outside the plant premises. Annexure 6

ii. Economical and technical viability of the effluent treatment system to achieve Zero Liquid Discharge (ZLD).

Please refer Chapter-2, Section 2.14

41

iii. Certification of adequacy of proposed ZLD scheme through credible institutes of National repute.

Please refer Annexure C

--

iv. To estimate & monitor ground water quality & its contamination status, piezometer wells, one on up gradient of the groundwater flow and other three on the down gradient side of the ground water flow of the proposed project at different depth based on available ground water depth shall be established and all the parameters mentioned in IS 10:500 for potable water standard shall be monitored.

Please refer Chapter-3, Table 3.17

85-86

28 ln case of in-house MEE/Spray dryer for waste water treatment: Capacity of MEE/Spray dryer in KL/hr, Technical details of MEE including evaporation capacity, steam required for evaporation, adequacy of the proposed boiler to supply steam for evaporation in addition to the steam required for the process etc.Techno-economical viability of the evaporation system. Control measures proposed for the evaporation system in order to avoid/reduce gaseous emission VOC from evaporation of industrial effluent containing solvents & other chemicals.

Not Applicable --

29 Technical details of ATFD/Crystallizer/spray Dryer, RO/NF system etc. (lf any).

Not Applicable --

30 Details of the treatability and feasibility of wastewater to be disposed off by means of spray dryer and its impact on environment and Human Health.

Not Applicable. Treated water is 100 % evaporated.

--

31 Undertaking stating that a separate electric meter will be provided for the waste water treatment system viz. ETP, RO, MEE, Spray dryer etc. (Whichever is applicable)

We will provide separate electric meter with ETP.

--

32 Economical and technical viability of the effluent treatment system.

Please refer Chapter-2, Section 2.14

41

33 Plans for management, collection and disposal of waste streams to be generated from spillage, leakages, vessel washing, used container washing etc. Measures proposed for preventing effluent discharge during unforeseen circumstances

34 Action plan for reuse of liquid waste streams like Spent acids, Poly Aluminium Chloride etc. Within premises to convert into valuable products instead of sending outside to actual end-users.

Not Applicable --

35 Adequacy of the proposed EMS with respect to the pollution load envisaged in terms of Air, Water and hazardous waste.

Please refer Annexure C

--

36 On season Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated.

Please refer Chapter-3, Section 3.6

76-79

37 Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and basedon corresponding likely impacts VECs (Valued EnvironmentalComponents) may be identified Baseline studies may be conducted within the study area for all the concerned/identifiedVECs and likely impacts will have to be assessed for their

Please refer Chapter-4, Section 4.2

112-117

Page 27: M/s. Kemz Resibond Private Limited

magnitude in order to identify mitigation measures.38 One complete season base line ambient air quality data (except

monsoon season) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards (NAAQS) as well as project specific parameters like NH3, HCl, Cl2 , HBr, VOC etc. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre-dominant downwind direction at a location where maximum ground level concentration is likely to occur.

Please refer Chapter-3, Table 3.7

66-73

39 Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The windrose showing pre-dominant wind direction should also be indicated on the map. lmpact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modeling should be superimposed on satellite image / geographical area map.

Please refer Chapter-4, Section 4.4, Figure 4.1 to 4.3 (Contour Map)Figure 3.4 (Windrose Diagram)

77 & 128-134

40 Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls.

Please refer Chapter 3, Table 3.15 and Chapter 4, Section 4.7

82 & 140-141

41 Specific details ofa) Process gas emission from each unit process with its quantification.

Please refer Chapter 2, Section 2.16

43

b) Air pollution Control Measures (APCM) proposed for process gas emission. Adequacy of the air pollution control measures (APCM) for process gas emission measures to achieve GPCB norms.

Please refer Chapter 2, Section 2.16

43

c) Details of the utilities required. Please refer Chapter 2, Table 2.3

19

d) Type and quantity (MT/Hr & MT/Day) of fuel to be used foreach utility.

Please refer Chapter 2, Table 2.13

43

e) Flue gas emission rate emission from each utility. Please refer Chapter 2, Table 2.12

28-37

f) Air Pollution Control Measures (APCM) proposed to each of the utility along with its adequacy

Not Applicable --

g) List the project specific sources of fugitive emission along with its quantification and proposed measures to control it.

Please refer Chapter 2, Section 2.18

44

h) Details on tail gas treatment.(If any) Not Applicable --

42 Provision of CEMS (Continuous Emission Monitoring system). Not Applicable --

Page 28: M/s. Kemz Resibond Private Limited

We are not falling in any category which require to install CEMS

43 Action plan for odour control to be submitted. Please refer Chapter 2, Section 2.18.2

45

44 Management plan for hazardous/Solid waste including storage, handling, utilization and safe disposal as per the Hazardous and Other Wastes (Management and Transboundary Movement) Rules 2016- CPCB guidelines in respect of specific treatment, such as solar evaporation, incineration, etc. need to be followed.

Please refer Chapter 2, Table 2.14

45

45 How the manual handling of the hazardous wastes will be minimized? Methodology of de-contamination and disposal of discarded containers and its record keeping.

Please refer Chapter 2, Section 2.23

49

46 Management of by-products which fall under the purview of(Management and Transboundary Movement) Rules 2016 asPer the said rules and necessary permissions from the concern authority.

Not Applicable --

47 Membership of Common Environmental infrastructure like TSDF, Common incineration Facility (CHWIF), MEE, Spray dryer etc.

We will apply for membership after obtained CCA from the board. We have already taken NOC from BEIL Infrastructure Limited. Please refer Annexure 7.

--

48 Name and quantity of each type of solvents to be used for proposed production. Details of in-house solvent recovery system including mass balance, solvent loss, recovery efficiency (% recovery), feasibility of reusing the recovered solvents etc for each type of solvent.

Please refer Chapter 2, Section 2.29

54

49 Appropriate monitoring network has to be designed and proposed, to assess the possible residual impacts on VECs.

Please refer Chapter 6, Table 6.1

151-152

50 A detailed EMP including the protection and mitigation measures for impact on human health and environment as well as detailed monitoring plan and environment management cell proposed for implementation and monitoring of EMP. The EMP should also include the concept of waste-minimization, recycle/reuse/recover techniques, energy conservation and natural resource conservation. Total capital cost and recurring cost/annum earmarked for environment pollution control measures.

Please refer Chapter 10, Section 10.5,Section 10.4.3,Section 10.10 and Table 10.3

187-196

51 Details of in-house monitoring capabilities and the recognized agencies if proposed for conducting monitoring.

Please refer Chapter 10, Section 10.6

190

52 Permission from PESO, Nagpur for storage of solvents, other toxic chemicals, if any

Not Applicable --

53 Occupational health impacts on the workers and mitigation Please refer 147 & 192

Page 29: M/s. Kemz Resibond Private Limited

measures proposed to avoid the human health hazards along with the personal protective equipment to be provided. Provision of industrial hygienist and monitoring of the occupational injury to workers as well as impact on the workers. Plan for periodicmedical checkup of the workers exposed. Details of work place ambient air quality monitoring plan as per Gujarat Factories Rules.

Chapter 4, Section 4.11 and Chapter 10, Section 10.8

54 Details on volatile organic compounds (VOCs) from the plant operations and occupational safety and health protection measures. Proposal for Leak Detection and Repair (LDAR) program as per the CPCB guidelines.

Please referChapter 2,Section 2.18.1 and Chapter 7, Section 7.13

44 & 177-178

55 Risk assessment including prediction of the worst-case scenario and maximum credible accident scenarios should be carried out The worst-case scenario should take into account the maximumInventory of storage at site at any point of time. The risk contours should be plotted on the plant layout map clearly showing which of the facilities would be affected in case of an accident taking place. Based on the same, proposed safeguard measures including On-Site / Off-Site Emergency plan should be provided.

Please referChapter 7, Section 7.2

154-159

56 MSDS of all the products and raw materials. Please refer Annexure 8

--

57 Details of hazardous characteristics and toxicity of raw materials and products to be handled and the control measures proposed to ensure safety and avoid the human health impacts. This shall include the details of Antidotes also.

Please refer Chapter 2, Section 2.11.1and Section 2.22

23-24 & 48

58 Details of quantity of each hazardous chemical (including solvents) to be stored, Material of Construction (MoC) of major hazardous chemical storage tanks, dyke details, threshold storage quantity as per schedules of the Manufacture, Storage & lmport of Hazardous Chemicals Rules of major hazardous chemicals, size of the biggest storage tank to be provided for each raw material & product etc. How the manual handling of the hazardous chemicals will be minimized?

Please refer Chapter 2, Section 2.11.2

25-26

59 Details of the separate isolated storage area for flammable chemicals. Details of flame proof electrical fittings, DCP extinguishers and other safety measures proposed. Detailed fire control plan for flammable substances and processes showing hydrant pipeline network, provision of DG Sets, fire pumps, jockey pump, toxic gas detectors etc.

Please refer Chapter 7, Section 7.15

179

60 Submit checklist in the form of Do's & Don'ts of preventive maintenance, strengthening of HSE, manufacturing utility staff for safety related measures.

Please refer Chapter 7,Section 7.8

168-169

61 Specify safety precautions to be taken for Chemical storage, process and handling & transportation hazard.

Please refer Chapter 2, Section 2.22

48

62 Details on workers training before engaging work, periodical, in-house, outside etc.

Please refer Chapter 2, Section 2.26

51

63 Details on various SOP to be prepared. Please refer Chapter 7, Section 7.14

178

Page 30: M/s. Kemz Resibond Private Limited

64 Details on safety audit to be carried out and their compliance status.

Not Applicable(As we will carry out safety audit by safety organization after we will start operation of plant.)

--

65 Specific safety measures to be taken for general Public living in the vicinity.

Please refer Chapter 7, Section 7.2.4

159

66 Details on hazard identification i.e. HMOP, HAZAN, Fault tree analysis, Event tree analysis, Checklist, Audit etc. to be adopted for the safety operation of the plant.

Please refer Chapter 7, Section 7.3

160-161

67 Detection and monitoring of VOC's / gases. Please refer Chapter 3, Table 3.7

66-73

68 Detailed five year greenbelt development program including annual budget, planning schedule, species, width of plantations, number of trees to be planted, area under green belt development [with map], budgetary outlay etc. along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby areas and elsewhere.

Please refer Chapter 2, Section 2.27 and Chapter 10, Section 10.7

51-52 & 190-191

69 Action plan for the greenbelt development - species, width of plantations, planning schedule, etc., in accordance to CPCB published guidelines.

Please refer Chapter 10, Section 10.7

190-191

70 Detailed socio-economic development measures including community welfare program most useful in the project area for the overall improvement of the environment. Submit a detailed plan for social corporate.

Please refer Chapter 8, Table 8.1

181

71 (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so it may be detailed in the EIA report. (b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? lf so it may be detailed in the ElA.

Not Applicable --

72 What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given.

Please refer Chapter 10, Section 10.4.3

187

73 Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report.

Not Applicable We will develop the system for the same.

--

74 Phase wise project implementation schedule with bar chart and time frame, in terms of site development, infrastructure provision, EMS implementation etc.

Please referChapter 2,Table 2.7.1

27

75 Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

Not Applicable --

76 An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEFCC OM dated 05/10/2011 and an

Please referAnnexure: D & E

--

Page 31: M/s. Kemz Resibond Private Limited

undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEFCC OM dated 04/08/2009.

77 All documents to be properly referenced with index and continuous page numbering.

All documents are referenced with Index (Provided below ToR compliance) and continuous page numbering.

--

78 Where data are presented in the Report especially in Tables, the period in which the data were collected and the sources should be indicated.

Mentioned in all the analysis data.

--

79 Project Proponent shall enclose all the analysis/testing reports of water, air, soil, noise etc. using the MoEFCC/NABL accredited laboratories. All the original analysis/testing reports should be available during appraisal of the Project.

Enclosed in Chapter 3

--

80 ln case of Expansion of the projecta. Need for the proposed expansion should be justified in detail.

Not Applicable --

b. Adequacy of existing EMS (Environmental Management System).c. Explore the possibility to achieve Zero Liquid Discharge (ZLD) for existing as well as proposed activity.d. Records of any legal breach of Environmental laws i.e. details of show- cause notices, closure notices etc. Served by the GPCB to the existing unit in last five years and actions taken then after for prevention of pollution.e. Copies of Environmental Clearances obtained for the existing plant, its point wise compliance report.f. Environmental audit reports for last 3 years and compliance of its recommendations/Suggestions. (lnclude latest audit report and its compliance.)g. Copy of Consent to Operate (CC&A) obtained along with point wise compliance status of all the conditionsstipulated therein.h. Compliance of MoEFCC circulars vide No: J-11011/618/2010-lAll (l) dated 30/05/2012 and J-110113/41/2006-IA-l(l) dated 20/10/2009.i. Copies of XGN generated inspection reports with analysis reports of the water/Air/Hazardous samples collected by GPCB (Last 2 year). Copies of instructions issued by GPCB in last 2 year and point wise compliance thereof.

81 ln case of project is located in Ankleshwar-Panoli, Vatva-Narol & Vapi GIDC.(A) Compliance of MOEFCC's OM no. J-11013/5/2010-lA.ll (l) daled 25/11/2016 regarding lifting of moratorium on the consideration of projects for environmental clearance.

Not Applicable --(B) Compliance of direction under section 18 (1) (b) of the Water (Prevention and Control of Pollution) act, 1974 issued by CPCB dated 31/0312016 regarding compliance of CETP.a) Action initiated by GPCB, if any, against proposed unit regarding non-compliance of prescribed standards under the

Page 32: M/s. Kemz Resibond Private Limited

various environmental laws.b) Performance of CETP with respect to current hydraulic load & prescribed standards with No Objection Certificate of CETP regarding incorporation of the proposed unit for acceptance of waste water.c) Performance of TSDF site with respect to current load & prescribed standards with No Objection Certificate of TSDF site regarding incorporation of the proposed unit for acceptance of hazardous waste to the common infrastructure.d) Copies of quarterly action report taken for the above points submitted to the CPCB.e) Report of GPCB which have conducted monitoring as per the said direction by CPCB dated 31/03/2016.

Page 33: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited I

EXECUTIVE SUMMARYProject Name: Kemz Resibond Private LimitedProject: Proposed Resin manufacturing Plant

Manufacturing Capacity: Total capacity 1270 MT/Month

Location: Survey No: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

Corporate Office Address: 7, Shivabhi Shopping, Maneja, Vadodara-390013

1. INTRODUCTION:

M/s. Kemz Resibond Private Limited is a proposed unit at Survey No: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.The unit intends to manufacture Synthetic Organic Resins viz. Unsaturated Polyester Resin, Alkyd Resin, Epoxy Resin, Saturated Polyester Resin, Vinyl Ester Resins total to the tune of 1270 MT/Month.

Looking at prospective market scenario and considering the large market demand of the Resins in the domestic as well as global market, the company is keen to set up industrial unit for Resin manufacturing.

The proposed project falls under Category “5(f) – B” as stated in Environment Impact Assessment Notification Published on 14th September, 2006. Hence, project proponent has to obtain the Environmental Clearance from the State Level Environmental Impact Assessment Authority, Gujarat.

2. PROJECT DESCRIPTION:

This proposal is prepared for the purpose of resin manufacturing capacity of 1270 MT/Monthto fulfill the present demands of resin in the market.

Indigenous raw materials & Chemicals are available from local market. Due to Developed location, proposed resin activity will be facilitated with good infrastructure and other facilities such as availability of skilled as well as unskilled workforce, contractors, superior communication facilities, transportation facilities etc.

The total land area of the company is 7551.74 m2. Total available gardening area is 1667 m2.

The details of proposed products along with the capacity & end use are listed below in Table 2.1

Page 34: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited II

Table 2.1 Details of Product

Sr. No. Name of Product CAS No. Total Quantity

(MT/Month)

Final Application of

Product1 Unsaturated Polyester Res in 26123-45-5 1000

Artificial Quartz Stone & Marble

Stone

2 Alkyd Resin 63148-69-6 120

3 Epoxy Resin 24969-06-0 50

4 Saturated Polyester Res in 61926-16-7 50

5 Vinyl Ester Resin 68002-44-8 50

Raw material consumption is given in Table 2.2

Table 2.2 Details of Raw material

Sr. no.

Name of the Products Name of the Raw Materials CAS No. QuantityMT/Month

1 UNSATURATED POLYESTER RESIN

Glycol( MEG/DEG/PG/NPG)

107-21-1 271

Acid Anhydride (PA/IPA/PTA/AA)

85-44-9 264

Maleaic Anhydride (MA) 108-31-6 156Styrene Monomer 100-42-5 400

2 ALKYD RESIN Castor Oil/Linseed Oil/Soya bean Oil

8001-79-4/8001-26-1/8001-22-7

34.32

Glycerin/MEG/Pentaerithritol/NPG/ Trimethalol Propane

56-81-5 23.28

Acid Anhydride(PA/MA/AA/Resin)

85-44-9/108-31-9

37.8

Xylene 1330-20-7 303 SATURATED POLYESTER

RESINAcid Anhydride (IPA/PTA) 121-91-5 24.5

5 Sodium Di Methyl SulfoIsopthate

(DMS Salt)

3965-55-7 13.5

Glycol( MEG/DEG/PG/NPG) 107-21-1 23Di Butyl Tin Oxide 818-08-6 0.5

4 EPOXY RESIN Epoxy Resin 24969-06-0 30Bisphenol-A 80-05-7 7.5Caustic Soda 1310-73-2 0.005

Xylene 1330-20-7 12.55 VINYL ESTER RESIN Epoxy Resin 24969-06-0 15

Bisphenol A 80-05-7 7Methacrylic Acid 79-41-4 5.5Styrene Monomer 100-42-5 22.5

Page 35: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited III

Water Requirement: The water requirement for Proposed project will be sourced from Borewell and application has been already submitted to Central Ground Water authority. For the project, water is only required for Cooling, Gardening & Domestic use. For proposed project total water requirement will be 5.5 KLD (Industrial: 0.5 KLD + Gardening: 3 KLD + Domestic: 2 KLD).

Wastewater Generation: There will be zero discharge of Industrial effluent. Total industrial waste water generation will be 3.55 KLD. The waste water will be generated from process due to water extraction process and also in form of Cooling Blow down which will be treated in ETP having treatment units like collection cum neutralization tank and finally evaporated in evaporator. Unit will achieve Zero Liquid Discharge by evaporated in evaporator.

Table 2.3 Details of Water requirement and Wastewater generation

Sr.No.

Category Water consumption

(KL/Day)

Wastewater Generation (KL/Day)

Mode of Disposal

1 Domestic 2 1.2 To soak pit

2 Gardening 3 Nil

2 Process

a Process NIL 3.5 To ETPFollowed byEvaporationb Cooling 0.5 0.05

Total 5.5 4.75

Fuel, energy & Stack: Electricity will be supplied by Madhaya Gujarat Vij Company Ltd (MGVCL). Load requirement will be 125 KVA from MGVCL. DG Sets will be used as standby back-up supply for emergency conditions & safe shutdowns. The unit having emergency power supply provision by one D. G. Set of 100 KVA. Unit has proposed to install Thermic Oil Heater (4 Lac Kcal/Hr) in which LDO (44 Lit/Hr) will be used as fuel.Unit has proposed to install Reactors (3 Nos.) & Blenders (3 Nos.) in which scrubber will be installed as APCM to control of VOCs for exceptional cases if it is generated.

Table 2.3 Details of Flue gas stack

Sr. No.

Name of Unit Stack height

(m)

Type Of Fuel

Quantity of Fuel

Parameter Air Pollution Control System

01 Thermic Oil Heater

12 LDO 44Lit/Hr PMSO2

N.A.

Page 36: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited IV

(4 Lac Kcal/Hr) NOx

02D.G. Set

(100 KVA)(Standby Use)

6 HSD 10 Lit. /Hr Acoustic Enclosure

Table 2.3 Details of Process gas stack

Sr. No.

Name of Unit Stack height

(m)

Parameter Air Pollution Control System

01 Reactors (Sealed Vessels)

3 Nos.

Close Circuit System VOCs

Scrubber

02Blenders3 Nos.

Hazardous Waste: Following hazardous waste will be generated

Table 2.4 Details of Hazardous waste generation and its management

Sr. No.

Type of Hazardous

Waste

Source Cat. No.

Quantity(MT/Year)

Management

01 ProcessWaste/Residue

Process 21.1 35 Collection, Storage and Reuse and Non-Reusable disposed to CHWIF Site.

02 ETP Sludge ETP Plant 35.3 4 Collection, Storage and Disposal atTSDF Site.

03 EvaporationResidue

From Evaporator

37.3 3 Collection, Storage and disposal at CHWIF Site.

04 Used Oil Lubrication/D.G.set

5.1 0.05 Collection, Storage and reuse as Lubricant withinPremises.

05 Discardeddrums/bags

MaterialHandling

33.1 5 Collection, Storage and Sold to Recycler

3. BASELINE ENVIRONMENT QUALITY:

For the present EIA study, the area falling within 10 km radial distance from project site has been selected and was carried out in summer Season during March-2019 to May -2019. The sampling locations were selected on the basis of surface influence, demographic influence and meteorological influence and based on CPCB guideline. Ambient air monitoring was

Page 37: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited V

collected from 8 locations including Project site and meteorological station was installed at Project site. 8 Ground water samples, 1 surface water sample, 7 noise monitoring samples &8 soil sample were collected including for project site (Please refer table 3.1).

Table 3.1: Sampling and Monitoring Locations

Name of village/ location

Direction w.r.t.Project site

Approx. distance

from project

site (km)

Environmental Attributes

monitored*

Type of area

1 Project Site (A1) -- -- A, GW, S, N, MET

Industrial

2 Puniyad (A2) NWW 2.75 A, GW, S, N Residential

3 Menpur (A3) N 2.05 A, GW, S, N Residential

4 Raman Gamdi(A4)

NW 6.79 A, GW, S, N Residential

5 Kayavarohan (A5) E 3.8 A, GW, SW, S, N

Residential

6 Dhanora (A6) SWW 4.92 A, GW, S, N Residential

7 Karjan (A7) SWW 9.42 A, GW, S Commercial

8 Gandhara (A8) S 3.13 A, GW, S Residential

Map of study area showing sampling & monitoring locations are illustrated below in Figure.Seismology: According to the Seismic-zoning Map of India [IS 1893 (Part I):2002], the study region falls in Zone III – Fairly Medium Intensity.

Land Use Pattern: The land use pattern of the study area comprised of the major with Crop land, Fallow land, Grass land etc. with about settlements with 12 m2.

Google image shows the study area of 10 km radius sampling & monitoring locations

Page 38: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited VI

Meteorology & Micrometeorology: Continuous monitoring with hourly data recording throughout the study period Micro controller based Automatic Weather station with data logger was installed at Project Site that monitored Surface Temperature, Relative Humidity, Wind Speed & direction and rain fall data.

Ambient Air Quality: Ambient Air Quality Monitoring was carried out for 3 months. Parameters Particulate Matter10 (PM10), Particulate Matter2.5 (PM2.5), Sulphur Dioxide (SO2), Oxide of Nitrogen (NOx), was measured on the basis of 24 hourly monitoring periods, Volatile Organic Compound (VOC) was measured on the basis of 8 hourly monitoring and Noise level were measured based on grab sampling.

Page 39: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited VII

Table 3.2: Summary of Ambient Air Quality

Sr no. Sampling

Location

Statistical index PM10 PM2.5 SO2 NO2 VOC

µg/m3

1 Project Site (A1)

Average

(Min-Max)

75.6

(69.2-80.6)

35.8

(30.4-41.9)

20.6

(18.2-24)

33.9

(29.3-38.5)

BDL

(DL=1)

98th Percentile 80.2 40.79 23.5 38.2

2 Puniyad (A2) Average

(Min-Max)61.7

(54.6-68.9)27.8

(22.3-32.5)13.4

(9.8-15.1)25.8

(20.2-28.9)BDL (DL=1)

98th Percentile 67.5 31.8 14.8 28.3

3 Menpur (A3) Average

(Min-Max)

63.5

(56.6-70.2)

25.7

(21.1-30.5)

12.0

(9.1-14.5)

28.7

(24.1-32.2)

BDL

(DL=1)

98th Percentile 68.8 29.9 14.2 31.5

4 Raman Gamdi(A4)

Average

(Min-Max)54.2

(50.2-60.2)

17.7

(14.1-21.5)

13.6

(11.2-16.3)

24.6

(21.2-28.9)

BDL

(DL=1)

98th Percentile 59.0 21.0 15.8 28.3

5 Kayavarohan(A5)

Average

(Min-Max)

64.7

(59.9-70.6)

28.2

(22.1-33.7)

18.2

(15.5-20.2)

35.3

(30.2-39.5)

BDL

(DL=1)

98th Percentile 70.4 32.7 19.8 38.7

6 Dhanora (A6) Average

(Min-Max)

67.6

(56.3-76.6)

28.8

(24.2-36.7)

16.7

(12.2-21.2)

32.7

(24.2-38.5)

BDL

(DL=1)

98th Percentile 75.49 34.86 20.74 38.22

7 Karjan (A7) Average

(Min-Max)50.1

(40.2-64.2)21.9

(17.7-25.9)13.3

(11.3-16.2)27.1

(20.2-30.9)BDL (DL=1)

98th Percentile 62.22 25.57 15.69 30.71

8 Gandhar(A8)

Average

(Min-Max)

55.8

(50.6-60.9)

16.3

(11.9-19.2)

11.4

(9.3-13.9)

21.6

(14.9-25.1)

BDL

(DL=1)

98th Percentile 60.9 19.1 13.7 25.0

Standard 100

(24 hrs.)

60

(24 hrs.)

80

(24 hrs.)

80

(24 hrs.)

2

(8 hrs.)

BDL: Below Detectable LimitAll pollutant parameters are found below prescribed norms of AAQM circular. VOC found below detectable limit at all locations.

Page 40: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited VIII

Water Environment:

Study area falls in command area of Narmada Canal. It was observed that ground water is supplied to house hold via tank. At some places Canal water, ground water and pond water are major sources of irrigation water.

At all locations ground water is utilized for domestic as well as drinking purpose. As per Drinking water standard of IS: 10500 ground water of all the locations can be used for domestic purpose. The water can be used for drinking purpose after proper treatment of hardness (softener/ boiling of water); TDS & chlorides (RO); bacteria (UV/ boiling of water); as alkalinity is not so high than standard it can be removed along with TDS.

Large dia, collector type wells, generally for regional water supply or for industrial uses are common in sandy beds of Mahi and Orsang rivers. Category of dabhoi taluka is safe for ground water extraction.

Soil Environment:

The soil of Vadodara district can be broadly classified into three groups. They are black soils, alluvial soils and hilly soils.

Soil texture of the study area is either salty loam or clay which is moderately well drained fine soils on very gently sloping alluvial plain with moderate erosion. pH value is found to be moderately alkaline. Organic Carbon is found to be medium to high which indicates soil of the some area is poor in fertility and some of them are fertile soil. Available potassium is medium to high and available phosphorous is found to be very low to high. Soil is salt-free.

Noise Environment:

The noise level measurement was carried out by using Noise Meter for eight locations in day and night time, including project site and are found within prescribed norms.

Ecology & Biodiversity:

The trees, herbs, shrubs and major crops, observed during the biological survey conducted within study area. During study 88 flora observed belongs to 48 Family are enumerated from the study area.

Among the enumerated flora in the study area, no rare and endangered flora was observed.

The agriculture is major land use of the study area. During study 67 fauna observed belongs to 41Family are enumerated from the study area.

This report is based on a short duration study. The following lists are obviously incomplete. It does not include many other species which might occur in this part of Vadodara District, either as resident or as migrant in the other seasons of years. This data is based on the survey conducted.

Page 41: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited IX

Socio- Economic Structure: The Project Influence Area (PIA) has total population of 49815 per 2011 census. As per the 2011 census, the area is having facilities in terms of education, communication, and health services and banking facilities. All the basic amenities like post, telephone, transportation, drinking water, school, health center/dispensary, electricity are available in almost all the villages of the study area.

4. ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES:

There may be various types of environmental impact arising due to the proposed project. Various environmental concerns due to proposed project are as below.

(1) Air Environment(2) Water Environment(3) Noise Environment(4) Land/Soil Environment(5) Ecology(6) Socio Economic Environment(7) Health & Safety

Air:

Impact during Construction Phase: Main Impacts during construction period is dusting and Air Pollution from vehicles. The impact during construction phase will be short term and reversible.

The main sources of emission during the construction period are the movement of equipment at site and dust emitted during handling, grading, earthwork, and exhaust emissions from vehicles and equipment deployed during the construction phase is also likely to result in marginal increase in the levels of SO2, NOx and SPM.

Impact during Operation phase: The air modelling software is used to evaluate the air emission due to the flue gas from stack attached to TFH in to the environment as it may affect beyond the project industrial boundary. The model stimulates the relationship between air pollutants emission, meteorology and air chemistry, all of which are determined by formulating impact scenario.

As mentioned above TFH will be installed for Proposed Project. The AERMOD is used and inserted the ground level concentration in Table 4.1

Page 42: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited X

Table 4.1: Maximum Computed Ground Level Concentration At Project Site

Sr.No.

Description ValueConcn *( µg/m3)

Co-ordinatesX (m) Y (m)

A PM1 1st Highest 24 hr. Result 1.35560 321.39 383.022 2nd Highest 24 hr. Result 1.33896 383.02 321.39

B SO21 1st Highest 24 hr. Result 2.54827 321.39 383.022 2nd Highest 24 hr. Result 2.51574 383.02 321.39

C NOx1 1st Highest 24 hr. Result 0.85586 321.39 383.022 2nd Highest 24 hr. Result 0.84487 383.02 321.39

The maximum computed ground level concentration at project site is mentioned in Table 4.1 and cumulative concentrations due to incremental GLC’s are mentioned in Table 4.2.

Table 4.2: Cumulative Concentrations Due To Incremental GLC's

Pollutant

MaximumBaseline

Conn

( g/m3)

IncrementalConn due to

Proposed Project

( g/m3)

Resultant Conn

( g/m3)

NAAQStandards( g/m3)

PM 88.66 1.35560 90.0156 100

SO2 33.62 2.54827 36.16827 80

NOx 48.7 0.85586 49.55586 80

Page 43: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited XI

Water :

The unit will segregate the waste streams for effective treatment. Domestic Wastewater @ 1.2 KL/day will be disposed off through Soak Pit/Septic Tank System. Industrial Effluent generation @ 3.5 KL/day will be sent to ETP for Primary treatment and then it will be evaporated in Evaporated System. So, unit will achieve Zero Liquid Discharge, will not have impact on water environment.

The water requirement for Proposed project will be sourced from Borewell and application for the same has been already submitted.

Noise :

There will be slightly increase in noise level during construction phase due to construction activity and movement of vehicles. But it is restricted to construction phase only and it will occur during daytime, when construction activities will be in progress.

Land :

In proposed unit needs to do Excavation for plant activity. Unit will do construction activity for proposed foundation work. Hence there will be minor impact on the surrounding soil environment and there will be only change in Land Use Pattern for the project site.Hence, due to the proposed project the land use pattern; land cover and topography of the area will be changed only for the project premises.

Ecology:

Any construction activity brings changes in some components of the local Terrestrial ecosystem. The proposed project will not involve removal of any vegetation from the soil and loosening of the topsoil generally causes soil erosion as it is. However, such impacts will be confined to the plant site and will be minimized through paving and water sprinkling and greenbelt development. Thus, there will no major adverse impacts are envisaged on ecological environment due to project activities.

Socio Economic:

Local people involved as contract labors will have benefits of getting employment. Proposed project will generate temporary employment for personnel during operational phase. Due to proposed project there is no major negative impact on socio economic environment.

Health & Safety:

The impact on health and safety hazard is due to Fire, handling of raw material and products. The company will provide sufficient fire fighting system. Therefore, no adverse impact is anticipated.

Page 44: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited XII

5. ANALYSIS OF ALTERNATIVES

The alternatives analysis plays a key role for evaluation of the proposed technologies. Other two land was selected for proposed project but both are dropped because of one was found gouchar land and other was taken by some trust. Finally, the unit has selected this land which is fulfilling all criteria for setting up the proposed project. Also from all the available technologies latest and best technology with automated machinery will be selected.

6. ENVIRONMENT MONITORING PROGRAMME:

The Project Proponent has planned out the Environmental Monitoring Programme with budgetary allocations annually. The Company has planned for five years fund allocation under the Corporate Environmental Responsibility as per the MoEF&CC circular.

7. RISK ASSESSMENT (RA), CONTENT OF ON-SITE EMERGENCY PLAN (ONEP), HEALTH & SAFETY MEASURES

The probable hazards are Leakages of Hazardous chemicals, Spillage of Acid/Alkali, during charging/transfer of chemicals and also due to electrical spark in solvent storage area which are addresses along with preventive measures in the RA study.

Project Proponent will prepare the onsite Emergency Plan for such hazardous chemicals handling. The content of the On-site Emergency Plan are as per the requirement of GFR. Details of possibilities of occupational health hazard from the proposed manufacturing activities and proposed measure to prevent are addressed in the chapter for acute and chronic health effect and its preventive measures are addressed. Same way, Hazardous Characteristics and toxicity of raw materials and products and proposed measures to control it are addressed.

8. PROJECT BENEFITS

The proposed project activities will become beneficial to the surrounding area or community in terms of infrastructure, employment, social development and other benefits.

9. COST BENEFIT ANALYSIS

Environmental cost benefit analysis is not applicable and therefore the same has not been carried out.

10. ENVIRONMENT MANAGEMENT PLAN

The Environmental Management Plan (EMP) consists of a set of mitigation, monitoring and institutional measures to be taken during the design, construction and operation (post construction) stages of the project. The plan also includes the actions needed for implementation of these measures. The probable impacts identified & the mitigation measures envisaged for protection of Environmental Components during the construction and operational phase are as also tabulated in the Chapter 10.

Page 45: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited XIII

11. SUMMARY OF ENV. IMPACTS & CONCLUSION

M/s. Kemz Resibond Private Limited. is a proposed unit located at Survey No:84/1,84/2,Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

Salient features of the Project:

Sr. No Contents Details1 Name of the Project: M/s. Kemz Resibond Private Limited

Survey No:84/1,84/2,Village:Fofadiya, Tal:Dabhoi,Dist:Vadodara-391210

2 Details of Applicant Ms. Ankita Agrawal(Director)3 Status Kemz Resibond Pvt. Ltd. is a proposed unit intend to

manufacture various resins at Survey No:84/1,84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

For this the unit has applied for obtaining Environment Clearance from SEIAA-Gujarat.

CTE is also granted for the same from GPCB.4 Total Plot area

( sq. meter)Proposed: 7551.00 Sq. m.

5 Capital Investment of theProject, Rs. in Crores

Proposed: 4.7238 crores

6 Capital cost for EMP, Rs. in Lakhs

14.1 Lacs

7Recurring cost for EMP,Rs. in Lakhs

12.25 Lacs

8 Employment opportunity Proposed: 20

9 Green belt Development Proposed: 1667 .Sq. m.

10 Pollution control measures adoptedEffluent disposal Domestic Wastewater is 1.2 KL/day will be

disposed off through Soak Pit/Septic Tank System.Total Industrial Effluent of 3.5 KL/day will be collected neutralized in the ETP and then evaporated.

Flue gas emission control Adequate stack height will be provide.

Stack monitoring facilities for the periodic monitoring of the stack to verify the compliance of the stipulated norms.

Page 46: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA Report of M/s Kemz Resibond Private Limited XIV

Process gas emissioncontrol

Scrubber will provide with Reactors & Blenders.

Fugitive emissioncontrol We will provide the scrubber with blender due to any rarely circumstances if acid fumes will generate.

Hazardouswaste management

All the hazardous waste will be collected, stored, handled, transported and disposed as per the Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016, amended time to time etc. are major Act/rules/notification applicable to industry.

11Expenditure for CSR & CERactivities

Rs. 9.5 Lacs

Conclusion:

Negligible impact will occur on air quality & all the required air pollution control system will be provided.There will be no ecological damage.No adverse impact will occur on water environment.Local employment opportunities will increase.Various other environment parameters like Forest/National Park/Sanctuary and Historical/Religious place will not be affected.Environment Management Plant has been formulated to control all the pollutant parameters and Environment Management Cell has been set-up to ensure that these parameters do not exceed the norms set out by the concerned authorities.After commissioning of the proposed project, the Environment Management Cell will take care of all the pollution control measures.

Thus It is concluded on a positive note that due to the adequate provision and efficient operation of proposed environmental management systems and after the implementation of the proposed mitigation measures and environmental management plans, the project activities during the operation phase would have manageable & largely have minor impacts on the environment, and on balance the project would be beneficial to surrounding communities and the region.

12. DISCLOSURE OF CONSULTANT:

Details of the Environmental Consultant and its experts details and NABL Accredited laboratories are addressed in EIA report.

Page 47: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 1

CHAPTER 1

INTRODUCTION

1.1 PREAMBLE

M/s. Kemz Resibond Private Limited is a proposed unit located at Survey No: 84/1,84/2,Village: Fofadiya, Tal: Dabhoi, Dist:Vadodara-391210.The unit intends to manufacture Synthetic organic Resins viz. Unsaturated Polyester Resin, Alkyd Resin, Epoxy Resin,Saturated Polyester Resin, Vinyl Ester Resin.

The proposed site is well connected with National highway-48 whereas nearest city isVadodara located at a distance of @ 30Km.The nearest Village is Nana Fofadiya at distanceof @ 900m. There is no National park, Sanctuary or Forest land in surrounding 10Km radius.The project doesn’t fall under CRZ boundaries.

The proposed project fall under Project/ Activity No.- 5(f) Synthetic Organic Chemicals- and fall under “Category-B” as stated in Environmental Impact Assessment Notification dated 14/ 09/ 2006 and hence Environmental Clearance is mandatory and required to be obtained as “Category-B” project from SEAC, Gujarat.

In order to assess the Environmental Impacts of the proposed project, Kemz Resibond Private Limited entrusted Entech Laboratory, Ahmedabad to undertake Draft Environmental Impact Assessment Study for various components of the Environment viz., Air, Water, Noise, Land and Socio-economics. This Report presents base line data collected for March – April – May 2019 for Air, Water, Noise, Land etc., for identification and assessment of the impacts.

1.2 PURPOSE OF EIA

Environmental Impact Assessment (EIA) is the process of evaluating likely environmental impacts, both positive and negative, of a new or expansion project by taking into account natural, social and economic aspects. It also comprises of suggesting mitigation measures, for the possible negative impacts, before implementation of the project.

The purpose of the EIA study is to identify existing environmental condition in the study area, predicting and assessing environmental impacts due to the proposed project and suggesting measures to mitigate the adverse impacts and to delineate a comprehensive environment management plan along with recommendations and suggestions. The different activities that are likely to take place in the proposed project have been identified and mitigation measures have been proposed.

On 27th January 1994, the Union Ministry of Environment and Forests (MoEF), Government of India, under the Environmental (Protection) Act 1986, promulgated EIA Notification making Environmental Clearance (EC) mandatory for expansion or modernization of any activity or for setting up new projects listed in Schedule of the notification and its subsequent amendments.

On 14 th September 2006, a new legislation was passed, which has objectives such as “To formulate a transparent, decentralized and efficient regulatory mechanism; to incorporate necessary environmental safeguards at planning stage; to involve stakeholders in the public consultation process and to identify developmental projects based on impact potential instead of the investment criteria”

Page 48: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 2

As per the provisions of the new re-engineered EIA Notification of 2006, the company requires to obtain prior Environmental Clearance from the State Level Environmental Appraisal Authority or from the Ministry of Environment & Forests, New Delhi as stated in the said Notification.

This Proposed project falls under Synthetic organic Chemical Industry which is listed in Schedule and falls under Clause No. 5 (f) of Category “B” (Located outside notified Industrial area) of Schedule as stated in Environmental Impact Assessment Notification published on 14th September 2006 and its vide amendment.

For this the industry is required to submit an Environmental Impact Assessment Study report to State Pollution Control Board. As the unit is located in outside the notified area it does require the Process of Public Hearing.

As a part of Environmental Clearance process for proposed new project, Kemz ResibondPrivate Limited has uploaded and submitted relevant documents, namely Form - 1 (as per the EIA Notification, 2006, as amended), along with a Pre-Feasibility Report and proposed Terms of Reference (ToRs) for carrying out environmental studies, to the State Expert Appraisal Committee (SEAC) vide letter no. SEIAA/GUJ/TOR/5(f)/1093/2019 dated 30 July 2019. Proposal was accepted on 17/04/2019 by SEIAA. Based on the information contained in the documents submitted, the project has been awarded file no. SIA/GJ/IND2/34668/2019. Presentation was made during the 508th State Expert Appraisal Committee (Industry) meeting held on 24th May 2019 at Gandhinagar, Gujarat. ToR were finalized to conduct the Environmental Impact Assessment (EIA) & Environmental Management Plan (EMP) studies, vide its letter dated 30 July 2019

This report is prepared based on Generic Structure of EIA Document’s given in Appendix III and IIIA to EIA Notification dated 14th September 2006.

1.3 OBJECTIVES OF EIA STUDY

The Environmental study undertaken is aimed at identifying existing Environmental conditions; predicting Environmental impacts associated with the proposed new project and suggesting mitigation measures to mitigate the adverse Environmental impacts. The different activities that are likely to take place have been analyzed and proposed mitigation measures are assessed for their adequacy. Proposed mitigation measures have been considered where necessary.

The study also aims at reflecting the acceptability of the project to different stockholders and at incorporating the concerns raised by them into impact assessment and of the subsequent comprehensive Environmental management Plan and suggest the preventive and mitigative measures to minimize the adverse impacts on the environment and to maximize the beneficial impacts.

1.4 PROJECT PROPONENT

M/s. Kemz Resibond Private Limited is a Small scale proposed unit intend to manufacturing various types Resin. Now, looking at prospective market scenario and considering the large market demand of the Products, the company is keen to manufacture proposed product.

M/s. Kemz Resibond Private Limited is promoted by a team of directors. List of directors is given in TABLE 1.1.

Page 49: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 3

TABLE NO. 1.1 LIST OF DIRECTORS

Sr.No.

Name Designation Residential Address

1 Mr. Kushank Agrawal Director I-203, Shivabhi Luxuria, Near Jijimata Temple, Makarpura Road,Maneja, Vadodara.

2 Dr. Ankita Agrawal Director I-203,Shivabhi Luxuria,Near Jijimata Temple,Makarpura Road, Maneja,Vadodara.

3 Mr. Brij Vallabh Das Agrawal Director I-203,Shivabhi Luxuria, Near Jijimata Temple,Makarpura Road, Maneja, Vadodara.

IMPORTANCE OF THE PROJECT TO THE COUNTRY, REGION:

The UPR are widely used in the building & construction industry. The growth of the construction industry is an important indicator of a country’s development, as it createsinvestment opportunities across various related sectors. This growth in the constructionindustry is projected to propel the demand for FRP (Fiber glass reinforced plastic) products.This would lead to growth in demand for UPRs in diverse applications. They are widely usedas thermo setting resins with better product performance then another resins such as epoxy,vinyl ester, acrylics, amides and alkyd resins. They are easy to manufacture, cost-effective,easy to processing for conversion into a finished product and readily modified for specific use. Buildings & construction, pipes & tanks and automotive industries make extensive use of various UPRs for making FRP fuel storage tanks, cooling tower components, artificial marble quartz, beams, ladder rails, boat hulls, decks and small automobile parts (both interior andexterior).

Vinyl ester is another variety of resin, whose important property is resistance to moisture andoffers commercial barrier coating. These resins are costlier than UPR. But, their corrosionresistance, mechanical and thermal properties are much better than that of UPR. Therefore,the acceptance of epoxy, vinyl ester, acrylic and poly urethane resins are becoming are whichis strait impact in the growth of the UPR market.

Demand and Supply Gap:Rising global demand for paints & coatings in various industrial applications is one of themajor drivers for growth of there in a market. Unsaturated polyester resins (UPR) are knownfor their commercial usage in fibreglass reinforced plastics (FRP) which are utilized inbuilding & constructions, marine, wind energy, electrical & electronics, pipes & tanks and automotive/transportation. The unsaturated polyester resin market in India is suspended togrow substantially in the next five years. The market is mainly driven by domesticconsumption basically by government, NGOs and civic bodies. The Indian unsaturatedpolyester resin market showed strong growth in the last couple of years due to strong GDPgrowth, increased manufacturing activity and core-sector growth.

Imports v/s Indigenous Production:

Page 50: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 4

The state and pattern of growth of the economy determine there is in requirement. The requirements of resin may be fulfilled either through indigenous production and/or throughimports. It is not possible for a developing country to import huge quantities of resin becauseof foreign exchange constraints whereas it is better for a country to be self-sufficient in itsresin requirements. The products manufactured will substitute the imports, saving foreignexchange to India.

Export Possibility:There may be large opportunities to become a global supplier of quality resin. Also there exists abundant market opportunities in the neighbouring regions of Asia, Africa and the Middle East.

Domestic/Exports Markets:The finished goods will be sold in domestic market and would be largely exported to theRegulated International Market as per demand.

Employment generation (Direct & Indirect) due to the project:

The proposed project will generate direct employment to 20 personnel initially.

Page 51: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 5

1.5 LOCATION

M/s. Kemz Resibond Private Limited is located at Survey No: 84/1, 84/2, Village:Fofadiya, Tal:Dabhoi, Dist:Vadodara-391210.

The co-ordinates of site are given below:

Latitude Longitude

A 22 5’08.47” N 73 12’47.77” EB 22 05’08.30” N 73 2’49.33” EC 22 5’03.41” N 73 2’49.43” ED 22 5’03.37” N 73 12’47.80”E

Please refer Figure No. 1.1 for Map of Gujarat State and project location.Please refer Figure No. 1.2for Google Image of Kemz Resibond Private LimitedPlease refer Figure No. 1.3 for 5 km & 10 km radius map of project site.Please refer Figure No. 1.4 for Plant Layout.Please refer Figure No.1.5for Topography Map of Kemz Resibond Private Limited

Page 52: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 6

FIGURE NO.1.1 MAP OF GUJARAT STATE.

FIGURE NO.1.2 GOOGLE IMAGE OF KEMZ RESIBOND PRIVATE LIMITED

Page 53: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 7

FIGURE NO. 1.3 5 & 10 KM RADIOUS MAP OF THE PROJECT SITE

Page 54: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 8

FIGURE NO.1.4LAYOUT PLAN

Page 55: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 9

FIGURE NO.1.5Topography Map of Kemz Resibond Private Limited

Project Site,M/s. Kemz Resibond Private Limited

Page 56: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 10

1.6 STUDY AREA

To decide whether proposed action is likely to cause significant adverse environmental effects; the concept of EIA is practiced. Before proceeding the baseline Environmental status, it is important to know the boundary limits and framework where data can be effectively utilized in impact assessment.

In keeping with the nature and size of the industry, based on submitted TOR and additional terms of Reference Issued by State Level environment impact Assessment Authority, Gujarat the study area for detailed studies is an area within a radius of 10 Kms with the Project Site at the centre. A Map of the Study Area is presented in Figure No. 1.3

1.7 NEAREST LOCATION FROM THE SITE

TABLE NO: 1.2NEAREST LOCATIONS FROM THE SITE

Sr.No.

Features Description Distance(Km)

1 Nearest village/City/Industrial Area

Nana Fofadiya 0.9

2 Nearest town Vadodara 22N3 Water Body Creek / Nalah /

lake /Pond /reservoir /canal/ Rivers / Stream / Estuary / Sea

Kayavarohan Lake 3.6 Km

4 Highway SH 161NH 48

2.73 Km2.86 Km

5 Railway Station Karjan 12 Km SW6 Airport Vadodara 30 Km N7 National park / wild life

sanctuary / Reserve Forest landNo National park / wild life sanctuary / Reserve Forest land within 10 km radius.

--

8 CRZ applicability Not Applicable --

Note: All the above mention distances are aerial distances from the project site.

Page 57: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 11

TABLE NO. 1.3NEAREST INDUSTRIES FROM THE PROJECT SITE

Sr. No.

Name of industries Type of product/Industry Address Approx Distance from the project site (Km)

1. Orbit fabrics Private Limited

Wearing apparel Manglej 4

2. Brooks lab Pharmaceutical Manglej 4

3. KYB Conmat Machinery production Manglej 4

4. Jct electronic Private Limited

Electronic Kandari 4.5

5. Agni Private Limited Fire fighting solutions Kandari 7

6. Patel fibre & cellulose Cellulose fibre Karjan 6

7. Shivam pipes Cement pipes Karjan 8

8. Dwarikadhish steel Steel items Karjan 6

9. Act agro chem Private Limited

Agro chemicals Sadhli road 7

10. Electrotherm (i) Ltd Ductile iron pipe making Karjan 9

11. Standard belex Private Limited

Customized structures Por 6

12. Clad metal technology Private Limited

Metal tubes Raman gamdi 2

13. Nandinee Private Limited Fibre tanks Fofaliya 0.2

14. Conmat oil & gas Private Limited

Oil & gas services Fofaliya 1.5

15. Brent wood Various construction items Fofaliya 2

16. Invac cast Ltd Mining & metals company Fofaliya 2.25

17. Flexathermenpanllow Private Limited

Axial expansion joint Bamangam 3

18. Adheshwar metal Private Limited

Steel pipe manufacturing Raman gamdi 6

19. Delts engineers Pneumatic valve manufacturers

Raman gamdi 5

20. KCM Technologies Private Limited

Hydraulic equipment Por 6.5

Page 58: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 12

1.8 SCOPE & METHODOLOGY OF EIA:

An attempt has been made to carry out a Draft Environmental Impact AssessmentStudy for M/s.Kemz Resibond Private Limited. The Scope of EIA adopted for KemzResibond Private Limited is based on the TOR approved by SEIAA, Gujarat . The copy of the same is attached here with.

Under the scope of EIA, it covers:

A brief description of project site, its surrounding environment and proposed project facilities.To endow with detail description of the raw materials and manufacturing process for proposed products.Collection and Assessment of existing environmental baseline status based on the project information, field survey relating to air quality, meteorology, water quality, socio-economic aspects, flora & fauna, existing land use pattern etc. within study area.Identification of Impacts due to the proposed project. Prediction and evaluation of the environmental impacts that may result from project development.Outline the Environmental Management Plan (EMP) to mitigate the adverse impacts due to the proposed project.Preparation of Risk Assessment Report.

METHODOLOGY FOR EIA:

The methodology adopted for carrying out the Environmental Impact Assessment for the proposed project has been based on the Guidelines issued by Ministry of Environment and Forest (MOEF). An effective EIA calls for identification of environmental parameters likely to be impacted, depending on the activities to be carried out during construction and operation phase of the project.

Generation and collection of baseline data for valued Environmental components as per approved TOR.

Identification and quantification of significant Environmental impacts due to the project and associated activities.

Evaluation of impacts due to proposed activities and preparation of an Environmental impact statement.

Preparation of appropriate Environmental Management Plan (EMP) surrounding strategies for minimizing identified adverse impacts along with budgetary provisions to be made by the project authorities for implementation of mitigation measures.

Delineation of post Environmental Quality Monitoring Programme (EQMP) along with organizational setup required for monitoring the effectiveness of mitigation measures.

Page 59: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 13

1.9 REGULATORY FRAMEWORK:

Prior to implementation of proposed expansion project, it will be necessary to acquire all the necessary clearance from the Government of India, as per the applicable national regulations. With respect to prevention and control of environmental pollution, thefollowing Acts and Rules of MoEF govern the proposed project activity:

The Water (Prevention & Control of Pollution) Act, 1974.The Water (Prevention & Control of Pollution) Cess Act, 1977.The Air (Prevention & Control of Pollution) Act, 1981.The Environment (Protection) Rules, 1986 and its amendments from time to timeThe Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2008.The MSIHC (Manufacture, Storage and Import of Hazardous Chemicals) Rules, 1989.The Noise Pollution (Regulation and Control) Rules, 2000 and its Amendments.The Batteries (Management and Handling) Rules, 2001The Energy Conservation Act, 2001.The National Environment Appellate Authority Act, 1997.The Public Liability Insurance Rules, 1991.The Factories Act, 1948.The Petroleum Act, 1934 and the Petroleum Rules, 2002.Chemical Accidents (Emergency Planning, Preparedness and Response) Rules, 1996The Gas Cylinder Rules, 2004The Static and Mobile Pressure Vessels (unfired) Rules, 1981The Motor Vehicle act, 1988 and The Central Motor Vehicle Rules, 1989Environment Impact Assessment Notification S. O. No. 1533 (E) dated 14th September, 2006 and subsequent Amendments.

STANDARDS:

NAAQS by CPCB, 18th November 2009Drinking water: IS: 10500

Page 60: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 14

1.10 STRUCTURE OF EIA:

This EIA report has been prepared on the basis of available on-site primary data (survey/ monitoring) and secondary/literature data. The EIA report contains project features, baseline environmental setup, assessment of environmental impacts, and formulation of mitigation measures, environmental management and monitoring plan with risk & assessment Report.

The report includes 12 Chapters. The structure of the EIA Report with necessary tables, drawings and annexure is as follows:

Chapter 1: Introduction

This chapter provides background information on need of project, need of EIA study and brief of the project. The scope and EIA methodology adopted in Preparations of EIA report have also been described in this Chapter. It also covers the identification of project & project proponent, brief description of nature, size, location of the project and its importance to the country and the region. Scope of the study details about the regulatory scoping carried out as per the generic structure given in the EIA Notification, 2006.

Chapter 2: Project Description

This chapter deals with the project details of the proposed products, with type of project, need for the project, location, size & magnitude of operation including associated activities required by and for the project, proposed schedule for approval and implementation, including technical details of raw material, quality and quantity etc.

Chapter 3: Description of the Environment

This chapter presents the existing environmental status of the study area around the proposed project including topography, drainage pattern, water environment, geological, climate, transport system, land use, flora & fauna, socio-economic aspects, basic amenities etc. Environmental assessment of the project site in regard to its capability to receive the proposed project is also discussed in this Chapter.

Chapter 4: Anticipated Environmental Impacts and Mitigation Measures

This chapter describes the overall impacts of the proposed project activities and underscores the areas of concern, which need mitigation measures. It predicts the overall impact of the proposed project on different components of the environment viz. air, water, land, noise, biological, and socio-economic.

Chapter 5: Analysis of Alternatives (Technology & site)

This chapter describes the site selection criteria and analysis of proposed alternative technologies.

Chapter 6: Environmental Monitoring Program

Technical aspects of monitoring the effectiveness of mitigation measures have been given in this Chapter.

Page 61: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 15

Chapter 7: Additional Studies

This chapter deals with the Public consultation & Risk assessment carried out for the proposed manufacturing plant. Unit is not located in notified area so, public consultation is required.

Chapter 8: Project Benefits

This chapter deals with the benefits to the local surrounding people due to proposed project.

Chapter 9: Environment cost benefit Analysis

During the scoping stage; no recommendation of environmental cost benefit analysis is suggested by the appraisal committee.

Chapter 10: Environmental Management Plan

This chapter details the inferences drawn from the environmental impact assessment exercise. It describes the overall impacts of the proposed activities during construction and operation phases and underscores the areas of concern, which need mitigation measures. It also provides mitigation and control measures for environmental management plan (EMP) for minimizing the negative environmental impacts and to strengthen the positive environmental impacts of the proposed project.

Chapter 11: Summary & Conclusion

This chapter provides the summary and conclusions of the EIA study of the Proposed project with overall justification for implementation of the project and also explanation of how, adverse effects will be mitigated.

Chapter 12: Disclosure of Consultants Engaged

This chapter provides the disclosure of consultants engaged to carry out the EIA study along with other additional studies.

Page 62: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 16

1.11 PHOTOGRAPHS OF THE PROJECT SITE.

Page 63: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 17

CHAPTER 2

PROJECT DESCRIPTION

2.1 INTRODUCTION

M/s. Kemz Resibond Private Limited. is a proposed unit located at SurveyNo:84/1,84/2, Village: Fofadiya, Tal: Dabhoi, Dist:Vadodara-391210. The unit intends to manufacture Synthetic Resins viz. Unsaturated Polyester Resin, Alkyd Resin, Epoxy Resin, Saturated Polyester Resin, Vinyl Ester Resins total to the tune of 1270MT/ Month.

2.2 LOCATION

The location of the project is as shown here in Table No. 2.1.

TABLE NO. 2.1 LOCATION OF THE PROJECT SITE

Sr. No.

Description Information

1 Geographical Location Latitude : 22°05’05.35”Longitude : 22°05’05.35”

2 Survey. No. 84/1,84/23 Village Fofadiya4 Taluka Dabhoi5 District Vadodara6 State Gujarat

2.3 JUSTIFICATION OF PROPOSED ACTIVITY

Looking at prospective market scenario and considering the large market demand of the Resins in the domestic as well as global market, the company is keen to set up industrial unit for Resin manufacturing.

To meet the current market requirement Kemz Resibond Private Limited. has intended to set up proposed Resin manufacturing unit at SurveyNo:84/1,84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

Page 64: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 18

2.4 PROMOTERS & THEIR BACKGROUND

Sr.

No.Name Designation Address

1 Mr. Kushank Agrawal Director I-203, Shivabhi Luxuria, NearJijimata Temple, Makarpura Road, Maneja, Vadodara.

2 Dr. Ankita Agrawal Director I-203, Shivabhi Luxuria, NearJijimata Temple, Makarpura Road, Maneja, Vadodara.

3 Mr. Brij Vallabh Das Agrawal

Director I-203, Shivabhi Luxuria, NearJijimata Temple, Makarpura Road, Maneja, Vadodara.

2.5 INFRASTRUCTURE FACILITIES

The project site is surrounded by industrial units. Indigenous raw materials & Chemicals are available from local market. Due to Developed location, proposed resin activity will be facilitated with good infrastructure and other facilities such as availability of skilled as well as unskilled workforce, contractors, superior communication facilities, transportation facilities etc.

Availability of basic facilities like water, fuel, power, man power and raw materials in nearby areas.There is no rehabilitation and re-settlement involved.Nearest city Vadodara is 22 km away from the location, which is having connectivity with other parts of the country by road, rail& air.The unit is well connected with National Highway (NH-48). Karjan Railway station is 12.0 Km away from the site.No national park or wildlife habitat falls within 10 km radial distance from the project site.Availability of good communication and transportation facilities.

The details of resources are mentioned in Table No. 2.2.

TABLE NO. 2.2DETAILS OF SOURCES

Sr. no.

Project Requirements

Total Source/Remarks

1 Land 7551.74 m2 --2 Total Fresh Water 5.5 KL/Day Borewell3 Power 125 KW Madhya Gujarat Vij

Company Limited4 Fuel Requirement

A LDO 44 Lit/Hr TraderB HSD 10 Lit/Hr Trader

Page 65: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 19

TABLE NO. 2.3LIST OF PLANT MACHINERIES FOR PROPOSED PRODUCTION ACTIVITY

Sr. No. Name of equipment Size Quantity1 Thermic Oil Heater 4 Lac Kcal/Hr 1 Nos.2 D.G Set 100 KVA 1 Nos.3 Reactors 6 KL 3 Nos.4 Blenders 10 KL 3 Nos.5 Pumps -- As per requirement6 Vacuum pump -- 1 set7 Air Compressor -- 1 no.8 Nitrogen plant -- 1 no.9 Oil extractors with filters -- 1 set10 ETP with evaporator -- 1 set11 Cooling system with pump -- 3 set12 Drier and pulverizer -- 1 set

2.6 LAND USE BREAK-UP FOR TOTAL PLOT AREA

The proposed land area break-up w.r.t. plant machineries, EMS, Green Belt, safety aspect, raw material & product storage is shown at Figure No. 1.4 and listed in Table No. 2.4.

TABLE NO. 2.4LAND USE BREAK-UP FOR TOTAL PLOT AREA

Sr. No. Particulars LAND AREA(Sq. m.)

% of Land Use

1 Built up area 1604 21.242 Parking Area 995 13.183 Garden/green belt area 1667 22.074 Worker Hosing Colony 3000 39.735 Internal Roads 285.74 3.78

Total 7551.74 100.00

Page 66: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 20

2.7 PRODUCT DETAIL

List of products & capacity are given in the Table No. 2.5

TABLE NO. 2.5LIST OF PRODUCTS

Sr. No.

Product Name CAS No. Total Quantity (MT/Month)

1. Unsaturated Polyester Resin 26123-45-5 10002. Alkyd Resin 63148-69-6 120

3. Epoxy Resin 24969-06-0 50

4. Saturated Polyester Resin 61926-16-7 50

5. Vinyl Ester Resin 68002-44-8 50

TOTAL 1270

2.8 PACKING AND FINAL APPLICATION OF PRODUCTS

TABLE NO. 2.6PACKING AND FINAL APPLICATION OF PRODUCTS

Sr. No.

Name of Product Type of Packing Final Application of Product

1 Unsaturated PolyesterResin

Drums/carboys

Artificial Quartz Stone & Marble Stone

2 Alkyd Resin Drums/carboys3 Epoxy Resin Drums/carboys

4Saturated Polyester Resin Drums/carboys/syn

thetic bags5 Vinyl Ester Resin Drums/carboys

Page 67: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 21

2.9 RAW MATERIALS REQUIREMENT

List of Raw Materials, with consumption for manufacturing of proposed products, is given in Table No. 2.7.

TABLE NO.2.7DETAILS OF RAW MATERIALS

Sr. No. Product name Name of Raw material

Quantity Total

(MT/Month)

1UNSATURATED POLYESTER RESIN (1000MT/Month)

Glycol(MEG/DEG/PG/NPG)

271

Acid Anhydride(PA/IPA/PTA/AA) 264MaleaicAnhydride(MA) 156Styrene Monomer 400

2 ALKYD RESIN(120MT/Month)

CastorOil/Linseed Oil/Soya bean Oil

34.32

Glycerin/MEG/Pentaerithritol/NPG/ TrimethalolPropane

23.28

AcidAnhydride(PA/MA/AA/Rosin)

37.8

Xylene 30

3SATURATEDPOLYESTER RESIN (50MT/Month)

AcidAnhydride(IPA/PTA) 24.55Sodium Di Methyl SulfoIsopthate(DMSSalt)

13.5

Glycol( MEG/DEG/PG/NPG) 23Di ButylTinOxide 0.5

4 EPOXYRESIN(50MT/Month)

EpoxyResin 30Bisphenol-A 7.5CausticSoda 0.005Xylene 12.5

5VINYLESTERRESIN(50MT/Month

EpoxyResin 15Bisphenol A 7MethacrylicAcid 5.5StyreneMonomer 22.5

Page 68: M/s. Kemz Resibond Private Limited
Page 69: M/s. Kemz Resibond Private Limited
Page 70: M/s. Kemz Resibond Private Limited
Page 71: M/s. Kemz Resibond Private Limited
Page 72: M/s. Kemz Resibond Private Limited
Page 73: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 27

2.11.3 TRANSPORTATION DETAILS OF RAW MATERIAL & PRODUCT:

All raw materials &

products

State Means of Transportation

Source

Liquid/Solid Tankers/Drums/Sealed Containers/Synthetic bags

From Local vendors/Selling to local vendors

2.11.4 PROJECT COST

Total project cost is 4.7238 Crore. Breakup of investment is given as below:

Sr. No. Name of Assets Total Estimated Investment (Rs. In Lakhs)

1 Land 63.022 Factory Building 161.543 Plant & Machinery 247.82

Grand Total 472.38

2.11.5 PROJECT IMPLEMENTATION SCHEDULE

Implementation of project within a pre-determined time frame is an important factor for the success of a project. Timely implementation may save on various costs like interest, administrative overheads and helps to realize the goals as per pre-determined objectives.

The implementation of the project will involve major activities like preparation of specification / drawings, issue of tenders, receipt of quotations, scrutiny of tenders, placing of orders, construction, delivery & erection, test trial runs of various items. Completion of the project will take place after getting the necessary clearances from concerned authorities.

TABLE 2.7.1: PROJECT IMPLEMENTATION SCHEDULE

Sr.No.

Particulars Expected date of commencement

Expected date of completion

1 Land Already acquired -2 Civil Works 15 days from EC Within 90 days from EC

Plant & Machinery & Other fixed assets3 Placement of orders As soon as EC receive4 Equipment Delivery 75 days from EC 90 days from EC5 Erection & installation 75 days from EC 120 days from EC6 Trial Production 120 days from EC 135 days from EC7 Start of commercial production 135th day from EC onwards

Page 74: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 28

2.12 MANUFACTURING PROCESS DETAILS, CHEMICAL REACTION AND MASS BALANCE

1. UNSATURATED POLYESTER RESIN

Process Description:

In SS reactor charge Dihydroxy glycol and Dicarboxylic acids. Raise Temperature up to 160

°C with continuous agitation. Reflux at 160 °C in about 2 hours (approx). Remove the

reaction water continuously to allow temperature to rise to 220°C. Check the sample for acid

value.

Start vacuum distillation for removing access water/volatiles from reactor. Stop

vacuumdistraction and start cooling. Add inhibitor. Further cool to 160 °C.

Discharge liquid resin from reactor into blender containing styrene monomer. During

discharge resin temperature in blender should not increase 70°C. Circulate the water in jacket

of blender to reduce blender temperature. Cool to room temperature. Testing like viscosity,

gel time etc is carried out. Adjust if necessary.

Weighted & packed in drums or carboys

Page 75: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 29

Chemical Reaction:

Page 76: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 30

Mass Balance:

2. ALKYD RESIN:

Process Description:

Charge Caster oil/ Linseed oil/ Soya bean oil and Glycerin/ MEG/ pentaerithritol/ Neo penta

glycol/ trimethalol, along with Pthaliec anhydride/ Maliec anhydride/adipic acid/rosin into the

Reactor.

Raise Temperature up to 160°C with continuous agitation. Reflux at 16°C in about 2

hours(approx). Remove the reaction water continuously to allow temperature to rise to 260°C.

Check the sample for acid value.

Start vacuum distillation for removing access water/volatiles from reactor.

Stopvacuum distraction and start cooling. Add inhibitor. Further cool to 160°C.

Discharge solid resin from reactor into blender containing xylene. Circulate the water in

jacket of blender to reduce blender temperature. Cool to room temperature.

Weighted & packed in drums or carboys.

REACTION VESSEL(160 °C To 200 °C)(Approx 2 Hr)

GLYCOL: 261.5 MT/MonthACID ANHYDRIDE: 264 MT/MonthMALEIC ANHYDRIDE: 156 MT/Month

BLENDERSTYRENE MONOMER:400 MT/Month

WATER91.5 KL/Month Dryer

EVAPORATION LOSS:91.5 KL/Month

GLYCOL RECOVERED9 MT/Month

UNSATURATED POLYESTER RESIN: 1000 MT/Month

Page 77: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 31

Chemical Reaction:

Material Balance:

REACTION VESSEL(160 °C To 260 °C)(Approx 2 Hr)

CASTOR OIL/LINSEED OIL/SOYA BEAN OIL: 34.32 MT/Month

GLYCERIN/MEG/PENTAERITHRITOL/NPG/ TRIMETHALOL PROPANE: 22.8MT/Month

ACID ANHYDRIDE: 37.8 MT/Month

BLENDERXYLENE: 30 MT/Month

WATER5.4 KL/Month Dryer

EVAPORATION LOSS:4.92 KL/Month

GLYCERIN/ MEG/ PENTAERITHRITOL/ NPG/ TRIMETHALOL PROPANERECOVERED0.48 MT/Month

ALKYD RESIN: 120 MT/Month

Page 78: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 32

3. EPOXYRESIN

Process Description:

Charge Epoxy resin and Bisphenol A in reactor. Heat to 170°C and maintaintemperature for

2-4 hours. Check epoxy equivalent weight. Cool it to 80°C. Dilute it in xylene and cool to

room temperature. Testing will be carried out and packedin drums and carboys.

Chemical Reaction:

Page 79: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 33

Material Balance

4. Saturated Polyester Resin

Process Description:

Charge Isophthalic acid/purified terephthalic acid and 5 sodium dimethylisophthalate, along

with di-ethylene glycol/polyethylene glycol and mono ethyleneglycol with di butyl tin oxide

in reactor.

The mass will be heated to 165°C where methanol/water will start coming out andmass

viscosity will be start increasing. The methanol/water will be condensedand removed. The

mass heated up to 200°C and vacuum is applied and excessglycols and water will be

removed. The polymer will be discharged in trays.

Crushed, pulverized and packed in bags

REACTION VESSEL(170 °C)(Approx 2 -4Hr)

EPOXY RESIN: 30 MT/Month

BISPHENOL A: 7.5 MT/Month

CAUSTIC SODA: 0.005 MT/Month

BLENDERXYLENE: 12.5 MT/Month

EPOXY RESIN: 50 MT/Month

Page 80: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 34

Chemical Reaction:

Page 81: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 35

Material Balance

IPA/PTA: 24.25 MT/MonthDMS Salt: 13.25 MT/MonthDEG/PG: 11.25 MT/MonthMEG/NPG: 11.25 MT/Month

Methanol : 10.5 MT/Month

SATURATED POLYESTER RESIN (50 MT/Month)

REACTION VESSEL(165 °C)

TRANS ESTERIFICATIONREACTOR

TRAYS

CRUSHING

PULVERIZING

PACKING

Page 82: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 36

5. VINYL ESTER RESIN

Process Description:

Charge Epoxy resin and Bisphenol A in reactor. Heat to 170 °C and maintain temperature for

2-4 hours. Check epoxy equivalent weight. Cool it to 100 °C. Add Methacrylic acid and

additives in reactor. Maintain the temperature for 4-6 hours. Cool to 80 °C.

Discharge solid resin from reactor into blender containing styrene monomer. During

discharge resin temperature in blender should not increase 70 °C.Circulate the water in jacket

of blender to reduce blender temperature. Cool to room temperature. Testing like viscosity,

gel time etc is carried out. Adjust if necessary.

Weighted & packed in drums or carboys

ReactionChemistryReaction Chemistry

Page 83: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 37

Material Balance:

REACTION VESSEL(170 °C)(Approx 2 -4Hr)

EPOXY RESIN: 15.13 MT/Month

BISPHENOL A: 6.89 MT/Month

METHACRYLIC ACID: 5.25 MT/Month

BLENDERSTYRENE MONOMER: 22.5 MT/Month

VINYL ESTER RESIN: 50 MT/Month

Page 84: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 38

2.13 WATER REQUIREMENT & WASTEWATER GENERATION

M/s Kemz Resibond Private Limited. is proposed unit and the source of water for proposed activity will be Bore-well.Water Balance Diagram is shown at Figure No. 2.1

TABLE NO. 2.8DETAILS OF WATER CONSUMPTION & EFFLUENT GENERATION

Sr.No.

Category Water consumption

(KL/Day)

Wastewater Generation (KL/Day)

Mode of Disposal

1 Domestic 2 1.2 To soak pit

2 Gardening 3 Nil

2 Process

a Process NIL 3.5 To ETPFollowed byEvaporation

b Cooling 0.5 0.05

Total 5.5 4.75

1. Total water requirement for the project:5.5KLD2. Domestic water Consumption will be around 2 KLPD and sewage generated will be

disposed to soak pit @1.2 KLPD.3. Gardening water consumption will be 3.0 KLPD.4. Industrial effluent generation will be 3.55 KLPD which will be treated in ETP having

treatment units like collection cum neutralization tank and finally evaporated in evaporator. Unit will achieve Zero Liquid Discharge by evaporated in evaporator.

Page 85: M/s. Kemz Resibond Private Limited
Page 86: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 40

2.13.1 WASTEWATER MANAGEMENT

Domestic Wastewater @ 1.2KL/day will be disposed off through Soak Pit System.

Industrial Effluent generation @ 3.55 KL/day will be sent to ETP for Primary treatment and then it will be evaporated in Evaporated System.

So, unit will achieve Zero Liquid Discharge.

2.13.2 CHARACTERISTICS OF EFFLUENT:

The characteristics of wastewater & final outlet would be as follows:

TABLE NO. 2.9CHARACTERISTICS OF INDUSTRIAL EFFLUENT

Sr.No

EffluentParameters Results

ETP Inlet ETP Outlet(Before Evaporation)

1. pH <5 7-7.52. SS (mg/L) 350 1523. TDS (mg/L) 3645 14184. COD (mg/L) 2300 422.55. BOD (mg/L) 1011 525

Page 87: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 41

2.14 DETAILS OF EFFLUENT TREATMENT PLANT:

Industrial effluent will be treated in an Effluent Treatment Plant (ETP) having evaporation system. Industrial effluent generated due to various industrial process/activity will be collected in collection cum neutralization tank for the collection of effluent & neutralize the effluent. pH which is generally 7 will be checked. From holding tank, the effluent will be pumped into evaporation system to evaporate the effluent. The sludge/Residue remaining after evaporation will be collected in plastic (HDPE) bags and stored. This will ultimately sent to the landfill (TSDF) site for the ultimate disposal.

TABLE NO.2.10DETAILS OF PROPOSED EFFLUENT TREATMENT PLANT UNITS

Sr. No.

Name of Unit Nos.Size (m)

1 Collection cumNeautrilization Tank

1 1.5X1.5x 2.0(+0.5FB)

2 Evaporation system 1 Capacity: 300liter/hour

FIGURE NO. 2.2EFFLUENT TREATMENT PLANT DIAGRAM

1

2

Page 88: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 42

2.15 FLUE GAS EMISSION :

LDO will be used as a fuel in Thermic Oil Heater.

Stand by DG set will be intermittent source of flue gas emission with use of HSD (10Lit/Hr) & operated only during power failure.

The details regarding flue gas emission are given at Table No. 2.11

TABLE NO.2.11FLUE GAS STACKDETAILS

Sr. No.

Name of Unit Stack height

(m)

Type Of Fuel

Quantity of Fuel

Parameter Air Pollution Control System

01 Thermic Oil Heater(4 Lac

Kcal/Hr)

12 LDO 44Lit/Hr

PMSOxNOx

N.A.As we are

using LDO as a fuel

02D.G. Set

(100 KVA)(Standby Use)

6 HSD 10 Lit. /Hr Acoustic Enclosure

TABLE 2.12EMISSION RATE OF THE POLLUTANTS

Sr.No.

Stack attached to Type of Fuel

Dia.(m)

Height (m)

Exit Velocity (m/sec)

Emission Rates (gm/s)SPM

(*)SO2(**)

NOX(***)

1 Thermic Fluid Heater (2 Lac Kcal/Hr)

LDO 0.3 12 8.0 0.058 0.110 0.037

2 D.G. set-I (100 KVA)

HSD 0.15 6 6.0 0.010 0.018 0.006

Note: (*) Based on maximum expected concentration of SPM-150 mg/Nm3 in Flue gas stack

(**) Based on maximum expected concentration of SO2-100 ppm in Flue gas stack

(***) Based on maximum expected concentration of NOx- 50 ppm in Flue gas stack

Page 89: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 43

2.16 PROCESS GAS EMISSION:

Electricity will be used as fuel in Reactors & Blenders. There will be no any process gas emissions from unit as reactors and blenders will be in closed vessels with closed circuit system.

Sr. No.

Name of Unit Stack height

(m)

Parameter Air Pollution Control System

01 Reactors (Sealed Vessels)

3 Nos.

Close Circuit System VOCs

Scrubber

02Blenders3 Nos.

2.17 FUEL REQUIREMENT

The details of fuels used for the project are given in Table No. 2.13 .

TABLE 2.13FUEL DETAILS

Sr. No Name of Fuel Qty.01 LDO 44Lit/Hr02 Diesel 10 Lit. /Hr

Page 90: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 44

2.18 FUGITIVE EMISSION CONTROL:

Fugitive emission could occur from the vehicle movement, storage yard of raw materials and finished products.

The storage quantity is low since only 7 days inventory will be maintained at site and proper handling methods will be adopted.

Emissions from transport of vehicles would occur to a certain extent. The emissions from traffic movements is controlled by proper planning of the transport of raw materials and finished products to and from the factory premises. All the roads inside the plant is concreted to reduce any dust emissions.

During the production, the industry will carry out regular monitoring of fugitive emissions as per the factories Act.

Measures taken for fugitive emission control:

Proper storage of raw materials, products and fuels.Scrubber will provide with blenders.Ensuring closed feeding and sampling.Establishing SOPs for start-up, shut down and maintenance operational procedures.Regular work place monitoring and ambient air quality monitoring as per post project monitoring plan.Various types of solvents are used in the manufacturing process. These are handled in closed conditions. Good ventilation will be provided to reduce the concentration at the work place/room.

2.18.1 VOC MANAGEMENT PLAN

The VOC emission in unit may occur at different stages of solvent handling such as solvent storage, loading, unloading etc. The fugitive emissions of organic chemicals and VOCs mainly occur due to tank breathing losses, Leaking pipe fitting and valves, during maintenance operations. Following measures will be adopted to ensure compliance and further reduction.

The fugitive emissions in terms of handling losses are reduced by proper storage and handling.Hazardous chemicals will be stored as per standard criteria.Periodically monitoring will be carried out.Proper ventilation in storage & production area will be provided and all materials will be stored inSuitable packing to prevent contamination of air due to particulates & volatile emissions from storage container & area.Enclosed system & efficient procedures for materials charging will be provided.SOP’s for start-up, shut down, operation & maintenance will be established & maintained in all relevant area of works.

Page 91: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 45

2.18.2 ODOUR CONTROL ACTION PLAN

Causes of odour during handling and storage, are various raw materials. To control odour following precautions will be taken

Chemicals will be stored in leak free container.Avoiding the solid/hazardous waste storage inventory.Spraying of chemicals wherever required to avoid odour.During ETP operation, due to acidic water some minor odour will be generate. To avoid this scenario, quality of influent waste water (COD, temperature, pH etc.) is maintained within desired limit.

2.19 HAZARDOUS WASTE MANAGEMENT

The hazardous wastes generated by the industry & Method of Management and Handling is given in Table No. 2.14.

TABLE NO. 2.14DETAILS OF HAZARDOUS WASTES

Sr. No.

Type of Hazardous

Waste

Source Cat. No. Quantity(MT/Year)

Management

01 ProcessWaste/Residue

Process 21.1 35 Collection, Storage and Reuse and Non-Reusable disposed to CHWIF Site.

02 ETP Sludge/ ETP Plant 35.3 4 Collection, Storage and Disposal atTSDF Site.

03 EvaporationResidue

From Evaporator

37.3 3 Collection, Storage and disposal at CHWIF Site.

04 Used Oil Lubrication/D.G.set

5.1 0.05 Collection, Storage and reuse as Lubricant withinPremises.

05 Discardeddrums/bags

MaterialHandling

33.1 5 Collection, Storage and Sold to Recycler

Page 92: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 46

2.20 NOISE POLLUTION

The typical Noise levels of equipment. As indicated by the Equipment manufacturers are given in Table No. 2.15

TABLE NO. 2.15TYPICAL NOISE LEVELS OF EQUIPMENT

Sr. No.

Name of Machinery/Unit Noise level in dB

1. Pumps 60-652. Compressor 65-75

The following measures have been taken to reduce the noise levels to acceptable limits:

i) Sound producing equipment are enclosed in the sound proofing enclosure to give residual sound pressure level of 85 dB(A) and

ii) Providing suitable ear protecting devices for working personnel.

Details of measures proposed for noise pollution abatement & its monitoring.

Noise levels will be monitored and records of same will be maintained, at day and night at 4-6 locations, fortnightly internally and monthly by third party (GPCB recognized Env. Agency). Also periodically workers will be examined for their hearing ability and accordingly corrective actions will also made if required. Good working conditions will be developed to avoid chances of Noise Pollution. Regular maintenance of machineries, machine guarding and enclosures for the Noisy machines will be done to avoid Noise Pollution. Even though Noisy machines will be strictly be operated in day time only.Effective green belt will be developed to minimize effect of Noise Pollution to surroundings. Required PPEs will be given to workers.

Page 93: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 47

2.21 LIST OF HAZARDOUS CHEMICALS

The Raw Materials, which are termed as Hazardous Chemicals as per the "Manufacturing, Storage and Import of Hazardous Chemicals Rules, 1989”, are as listed in Table No. 2.16

TABLE NO. 2.16LIST OF HAZARDOUS CHEMICALS

Name of Hazardous Chemical

Quantity will be stored at a

time (MT)

Threshold Quantity in (MT)

Description

Diethylene Glycol 12 197 (Sch-1, Part-II) Colorless clear viscous liquid with sweet taste and no odor,

easily soluble in water, methanol, diethyl ether.

Monoethylene Glycol 12 267 (Sch-1, Part-II) Colourless, odourless liquid at 20ºC

Propylene Glycol 12 540 (Sch-1, Part-II) Clear colorless oily liquid with no odor and taste,

soluble in water and acetone.Styrene Monomer 10 583 (Sch-1, Part-II) Colorless clear viscous liquid

with sweetish, aromatic odor, very slightly soluble in cold

water.Phthalic Anhydride 15 508 (Sch-1, Part-II) White colored crystals with

acrid and choking odor, very slightly soluble in cold water

and diethyl ether.Maleic Anhydride 15 352 (Sch-1, Part-II) White colored crystals,

soluble in water, while veryslightly soluble in methanol.

Page 94: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 48

2.22 SAFETY & OCCUPATIONAL MEASURE FOR STORAGE & HANDLING OF THE RAW MATERIAL & PRODUCT:

Use of proper PPE

Dyke wall will be provided to all above ground storage tank.

Fire hydrant system will be installed.

Safety shower and eye washer will be installed near storage area.

Flame proof Electrical fittings will be provided at flammable storage area.

Proper selection of MOC for chemicals storage tank.

Earthing/bonding will be provided for static charges.

Flame arrestor will be provided on flammable material storage tank vent.

Level gauge and level measurement instrument will be provided on material storage tank.

Safety permit system followed for loading, unloading of hazardous chemical.

Authorized person will only be permitted in storage tank area.

NFPA label, capacity and content will be displayed on storage tank.

Good ventilation will be provided.

MOC of pumps, valves, pipes etc. will be acid/corrosion proof.

Page 95: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 49

2.23 ACTION PLAN FOR TRANSPORTATION OF RAW MATERIALS AND PRODUCTS INCLUDING HAZARDOUS CHEMICALS:

Following safety precautions are suggested during transportation of hazardous chemicals in tankers / or other vehicles, while unloading, transportation and meeting the emergencies arising out of leakages and spillages of hazardous materials:

Safety Instructions for Transportation of Hazardous Materials:

The name of the chemical along with pictorial sign denoting the dangerous goods should be marked on the vehicle and the packing material.The name of the transporter, his address and telephone number should be clearly written on the road tanker and on the vehicle.The tanker or vehicle should not be used to transport any material other than what is written on it.Only trained drivers and cleaners should transport hazardous chemicals.The transporter and the manufacturer must ensure the safe transportation of the material.The Tanker / Vehicle should be checked for its fitness and safe condition before loading.During loading and unloading, the tanker/vehicle should be braked and isolated against any movement, while loading/unloading, use safety appliances.The tanker / vehicle should not be overloaded beyond the weight permitted by Transport authorities.Check for leakages from the line connections / containers before starting and Stopping the filling operations.Drive the vehicles carefully, especially in crowded localities and on Bumpy roads.Do not apply sudden break.The tanker / vehicle should not be parked for long time on the way and especially in crowded places. Park the vehicle away from residential areas

Tankers:

The tankers are checked for its fitness and safe condition before loading.During loading and unloading, the tanker should be braked and isolated against any movement, while loading/unloading, use safety appliances.Check for leakages from the line connections before starting and stopping the filling operations.Drive the vehicles carefully, especially in crowded localities and on bumpy Roads.Do not apply sudden break.The tanker should not be parked for long time on the way and especially in Crowded Places. Park the vehicle away from residential areas.

Page 96: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 50

2.24 COST OF THE PROJECT

The total project cost will be 4.7238 cr including Land ,Building, Plant machinery & Others. Total capital and recurring cost towards Environmental protection Measures per annum will be 14.1 lacs & 12.28 lacs respectively.

Table No.–2.17CAPITAL COST & RECURRING COST OF THE PROJECT

Sr.No

System Approximate recurring cost per annum

(in Lacs)

Approximate capital cost

(Rs. In Lacs)

Basis for cost estimates

1 Air pollution control 0.36 2 The capital cost would include cost of providing adequate height of the stack, ladder and platform, Air Pollution Control Systems and recurring cost would include cost of monitoring of air environment.

2 Water pollution control -- 8 Capital cost would include cost of ETP, Evaporation cost of Spray Drying etc. In capital cost civil work, mechanical work, Electrical work and piping work is included. Recurring cost is for operational phase.

3 Noise pollution monitoring

0.06 -- The recurring cost would include cost of noise monitoring.

4 Solid and hazardous waste management

0.18 3 Capital cost would include cost of providing storage space for hazardous waste and membership of TSDF Fee. Recurring cost would include cost of land filling and transportation.

5 Environment monitoring and management

0.6 -- The recurring cost would be incurred on hiring of consultants and payment of various statutory fees to regulatory agencies.

6 Green belt 1.44 1.10 Development of Greenbelt including Gardening and Plantation

7 Occupational health (OHC)

0.64 -- Occupational health check up of Employees and workers

Total 3.28 14.1

Page 97: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 51

2.25 POWER REQUIREMENT

TABLE 2.18POWER REQUIREMENT

Electricity DG Set(KVA)

Required Proposed Connected Load (KVA)

Source 100

125 Madhaya Gujarat Vij Company Ltd.

2.26 MAN POWER

The requirement of personnel for the Plant is met with keeping in view the following:Technical support of Plant, including Process Control and InstrumentationSmooth and efficient operation of PlantEffective co-ordination between the various Departments within the Plant Optimum organization with well-defined and judicious job distributionOptimum utilization of different grades of workmen and supervisory staff and Maximum capacity utilization of facilities.

Total Manpower at Kemz Resibond Private Limited will be summarized in Table No. 2.19

TABLE NO. 2.19DETAILS OF MAN POWER

Total Workers in all Shifts

Male Female Total

20 -- 20

2.27 GREEN BELT DEVELOPMENT

The development of Green Belt is an important aspect for any plant because:It acts as a 'Heat Sink'It improves the Ambient Air Quality by controlling SPM in airIt helps in noise abatement for the surrounding areaIt helps in settlement of new birds and insects within itself It increases the aesthetic value of Site.Total plot area is 7551.74 Sq. meter. From that they had planning for gardening and plantation for 1667 Sq. Meter.

Page 98: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 52

Unit will develop 10 trees in 1st year, 9 trees in 2nd year, 4 trees in 3rd year, 1 trees in 4th year, 1 trees in 5th year.The tree species selected for the plantation will be pollutant tolerant ,fast growing, wing firm, deep rooted and ever green. The company will select pollutant tolerant plant species. For example, Asopalav, Neem Tree, Ambo, Bamboo etc.They will also develop plantation as per the MoEF guidelines all along the periphery of plant so that these trees perform as natural barrier and bring down the fugitive emission and stop carryover of dust along with wind current.The tree species selected for the plantation will be pollutant tolerant, fast growing, wing firm, deep rooted, and ever green. The company will select pollutant tolerant plant species.

They will also develop plantation as per the MoEF guidelines all along the periphery of plant so that these trees perform as natural barrier and bring down the fugitive emission and stop carryover of dust along with wind current.

Trees to be planted:

Scientific Name Common Name Habit No. Of trees planted

Mangifera indica L. Ambo Tree 2Chamaedorea sifrizii Bamboo Tree 5Alstoniascholaris. Saptaparni Tree 2Roystonea regia Bottle palm Tree 5Bougainvillea Bougainvel Shrub ClumpsAzadirachta indicaA.Juss Neem Tree Tree 3Duranta repensvariegata

Duranta repens -- 3

Dypsis lutescens Butterfly palm -- ClumpsPlumeriarubra L. Champo Tree 2Terminaliacatappa L. Badam Tree 1divaricata jasmine -- ClumpsPolyalthia longifolia Asopalav Tree 2

Five Years greenbelt development plan:

Plantation Period in year 1st 2nd 3rd 4th 5th Total No. of Plants to be Planted 70 70 40 10 10 200Yearly tree plantation (%) 35 35 20 5 5 100%

Capital cost (Rs.) 38500 38500 22000 5500 5500 1,10,000

Page 99: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 53

2.28 SCHEME FOR RAIN WATER HARVESTING

For rainwater harvesting calculations, areas like process and storage, Go-down, scrap yard etc. are excluded due tohaving chances of contamination.

Runoff water generated from Roof Top (admin block), Road area and green belt area can be used to store rain water for reuse. As per IMD data average rainfall of Vadodara is 855 mm/annum (0.855 m). The estimated runoff quantum using different run off coefficient applicable for roof top, Green belt and Roads is given below

TABLE NO. 2.20LAND AREA BREAKUP AND ESTIMATION OF RUNOFF

Sr.

No.

Title Area, m2

Rainfall intensity

(m)

Runoff coefficient

Runoff generated

(m3)1 Roof top

(office building)

420 0.855 0.8 287.28

2 Road 3.78 0.855 0.5 1.6163 Greenbelt 1667 0.855 0.2 285.06

Total 574

From the above it is inferred that ~574 m3 effective run off water may likely to be available that can be stored in the proposed tank for reuse. Average rainwater available per day = 574 m3/365 days =1.57 m3/day. The likely storing capacity of proposed pond/tank will be 1 m× 1 m× 2 m i.e. to store ~1.57 m3/day

Page 100: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 54

2.29 SOLVENT MANAGEMENT SYSTEM

In the manufacturing process Styrene and Xylene are used as solvents to dissolve solid resin and to make finished product in form of liquid solution and all process occur in blender in air tight container and below evaporation point. i.e 70 °C. However, for accidently leakages the solvent from blender goes recovery through scrubber and reuse.

The solvent consumption is shown at Table No. 2.21

TABLE NO. 2.21DETAILS OF SOLVENT

Sr.No.

Name of the

product

SolventName

SolventUsed (t/t)

Production Capacity (t/Month)

SolventUsed (t/Month)

1 Unsaturated Polyester

Resin

Styrene Monomer

0.4 1000 400

2 Alkyd Resin

Xylene 0.25 120 30

3 Epoxy

Resin

Xylene 0.25 50 12.5

4 Vinyl Ester Resin

Styrene Monomer

0.45 50 22.5

TOTAL 1220 465

Page 101: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 55

CHAPTER: 3

BASE LINE ENVIRONMENT QUALITY

3.1. INTRODUCTION

Preparation of EIA study needs a datum on which the evaluation can be done. It is necessary to collect data about different environmental attributes that are being affected by the development of the region which, in turn, defines an existing environmental quality of the region to serve as the datum.

Base line data requirement is also necessary to identify environmentally significant issues as well as to enumerate the critical environmental changes that are occurred due to the industrial development of the region.

Here an attempt has been made to collect the information about an existing environment on the below mentioned eight major environmental attributes:

I - Air EnvironmentII - Meteorology III - Water EnvironmentIV - Hydro-geomorphologyV - NoiseVI - Land EnvironmentVII - Ecology VIII - Socio-economic

3.2. STUDY AREA

The study area for Baseline Environmental Quality is the area with a radius of 10 Kms keeping project site as a centre. The same is shown in Figure No. 3.3 and the villages falls under the same is listed in Table No. 3.1.

SCOPE OF THE STUDY AREA

Sr.No.

Environmental Attributes

Description

1 Land use 10 km radius buffer area from the project site as per the EIA requirements

2 Geology & Soils Once during study period3 Geo-Hydrology Once during study period4 Site specific

Hourly Meteorological data

For the following parameters :Temperature (inWind speed (kmph)Wind direction (deg)Relative HumidiyRainfall (mm)Mixing Height

5 Ambient Air Quality Monitoring

For the following parameters :PM10PM2.5NOx

Page 102: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 56

SO2VOC

Monitoring Duration : Twice in a weekMonitoring Station : Total 8 locations within study including Project site

Location: Project Site, Puniyad, Menpur, Raman Gamdi, Kyavarohan, Dhanora, Karjan, Gandhar

6 Ground Water sampling For ground water samples: Max. 8 sampling locations as mentioned Below – once during the period from March 2019 to May 2019 Parameters: pH, Temperature, Turbidity, Total Solid (TS), Total Suspended Solids (TSS), Total Dissolved Solids (TDS), Electrical Conductivity (EC), Dissolved Oxygen (DO), Total Hardness (as CaCO3), Calcium Hardness, Magnesium Hardness, Total Alkalinity ( as CaCO3), Calcium (as Ca), Magnesium (as Mg), Chloride (as Cl), Sulphate (as SO4), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD), Fluoride as F, Colour, Odor, Taste, Sodium as Na, Potassium as K, Iron as Fe & Copper as CuLocation: Project Site, Puniyad, Menpur, Raman Gamdi, Kyavarohan, Dhanora, Karjan, Gandhar

7 Surface Water sampling For surface water samples: Max.1 sampling locations asmentioned Below – once during the period from March 2019 to May 2019 Parameters: pH, Temperature, Turbidity, Total Solid (TS), Total Suspended Solids (TSS), Total Dissolved Solids (TDS), Electrical Conductivity (EC), Dissolved Oxygen (DO), Total Hardness (as CaCO3), Calcium Hardness, Magnesium Hardness, Total Alkalinity ( as CaCO3), Calcium (as Ca), Magnesium (as Mg), Chloride (as Cl), Sulphate (as SO4), Chemical Oxygen Demand (COD), Biological Oxygen Demand (BOD), Fluoride as F, Colour, Odor, Taste, Sodium as Na, Potassium as K, Iron as Fe & Copper as CuLocation: Kayavarohan Lake

8 Soil sampling For soil samples: Total 8 locations within study area including Project siteParameter : Particle size Distribution, Sand, Silt, Clay, Texture, Porosity, Water holding capacity, Organic carbon (OC), Calcium as Ca, Magnesium as Mg, Sodium as Na, Cation Exchange Capacity, Electrical Conductivity, Available Nitrogen, Available Potassium, Available PhosphorusLocation: Project Site, Puniyad, Menpur, Raman Gamdi, Kyavarohan, Dhanora, Karjan, Gandhar

9 Leq Noise levelmeasurement readings

Daytime and nighttime readings at max.7 sampling locations as mentioned above - once during the periodLocation: Project Site, Puniyad, Menpur, Raman Gamdi, Kyavarohan, Dhanora, Nr. Highway

10 Ecology & Biodiversity Once during study period of terrestrial and aquatic life.11 Socioeconomic Study Once during study period12 Risk and Hazard

AnalysisPhysical verification of site once during study period

Page 103: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 57

TABLE NO. 3.1NAME OF VILLAGES IN STUDY AREA.

Sr. No. Name of Village Distance from Project Site

1. NANA FOFADIYA 0.9 Km2. POR 6.56 Km3. PUNIYAD 2.75 Km4. MENPUR 2.05 Km5. RAMAN GAMDI 6.69 Km6. KAYAVAROHAN 3.8 Km7. BAMANGAM 2.90 Km8. CHHATTRAL 9.22 Km9. RUVAD 6.60 Km10. KANDRI 6.52 Km11. KASHIPURA 6.59 Km12. KARJAN 9.91 Km13. VEMAR 9.16 Km14. NANA FOFADIYA 0.9 Km15. POR 6.56 Km16. PUNIYAD 2.08 Km17. MENPUR 2.03 Km18. RAMAN GAMDI 6.67 Km19. KAYAVAROHAN 4.00 Km20. BAMANGAM 2.90 Km21. DHANORA 4.92 Km22. RUVAD 6.60 Km23. KANDRI 6.52 Km24. KASHIPURA 6.59 Km25. KARJAN 9.42 Km26. VEMAR 9.16 Km

Page 104: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 58

FIGURE NO. 3.1STUDY AREA MAP OF BASE LINE STUDY FOR 5 KM AND 10 KM RADIUS

Page 105: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 59

FIGURE NO. 3.2

Page 106: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 60

3.3. ENVIRONMENTAL STANDARDS OF THE REGION

NATIONAL AMBIENT AIR QUALITY STANDARDSTable 3.2 : National Ambient Air Quality Standards

Pollutants Time-weighted average

Concentration in ambient airIndustrial, Residential, Rural and others area

Ecologically Sensitive area (Notified by CentralGovernment)

Method of Measurement

Sulphur Dioxide (SO2) µg/m3

Annual Average*

50 20 Improved west and GaekeUltraviolet fluorescence

24 hours** 80 80Oxides of Nitrogen as (NO2) µg/m3

AnnualAverage*

40 30 Modified Jacob &Hochheiser (Na-Arsenate)Chemiluminescence24 hours** 80 80

Particulate Matter (Size less than 10 µm or PM10) µg/m3

Annual Average*

60 60 GravimetricTOEMBeta attenuation24 hours** 100 100

Particulate Matter (Size less than 2.5µm or PM2.5) µg/m3

Annual Average*

40 40 GravimetricTOEMBeta attenuation24 hours** 60 60

Ozone (O3)µg/m3

8 hours ** 100 100 UV photometricChemiluminescenceChemical Method

1hours** 180 180

Lead (Pb)µg/m3

Annual Average*

0.50 0.50 AAS/ICP method after sampling on EPM 2000 or equivalent filter paperED-XRF using Teflon filter

24 hours** 1.0 1.0

Carbon Monoxide (CO) mg/m3

8 hours** 02 02 Non Dispersive Infra Red (NDIR) spectroscopy1 hour** 04 04

Ammonia(NH3)µg/m3

Annual Average*

100 100 ChemiluminescenceIndophenol Blue Method

24 hours** 400 400Benzene (C6H6)µg/m3

Annual* 05 05 Gas chromatography based continuous analyzerAdsorption and desorption followed by GC analysis

Benzo(a)Pyrine (BaP)-particulate phase only,µg/m3

Annual* 01 01 Solvent extraction followed by HPLC/GC analysis

Arsenic (As),µg/m3

Annual* 06 06 AAS/ICP method after sampling on EPM 2000 or equivalent filter paper

Nickel (Ni)µg/m3

Annual* 20 20 AAS/ICP method after sampling on EPM 2000 or equivalent filter paper

*Annual Arithmetic mean of minimum 104 measurements in a year taken twice a week 24 hourly at uniform interval.

**24 hourly/8 hourly or 01 hourly values, as applicable, shall be complied with 98% of the time in a year. 2% of the time the time, they may exceed the limits but not two consecutive days of monitoring.

Page 107: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 61

WATER QUALITY STANDARDS

Table 3.3: Indian Standard Specification for Drinking water

Sr.No.

Parameters Desirable Limit Permissible Limit in the Absence of

Alternate SourceI Essential Characteristics1. Colour, Hazen Units, Max. 5 252. Odour Unobjectionable -3. Taste Agreeable -4. Turbidity, NTU, Max. 5 105. pH value 6.5-8.5 No Relaxation6. Total Hardness (as CaCO3) mg/l, Max. 300 6007. Iron (as Fe) mg/ l, Max. 0.3 1.08. Chlorides (as Cl) mg/l, Max. 250 10009. Residual Free Chlorine, mg/l, Min. 0.2* -II Desirable Characteristics10. Dissolved Solids, mg/l, Max. 500 200011. Alkalinity (as CaCO3), mg/l, Max. 200 60012. Sulphate (as SO4) mg/l, Max. 200 40013. Nitrate (as NO3) 50 No Relaxation14. Fluoride (as F) mg/l, Max. 1.0 1.515. Calcium (as Ca) mg/l, Max. 75 20016. Magnesium (as Mg) mg/l, Max. 30 10017. Copper (as Cu) mg/l, Max. 0.05 1.518. Manganese (as Mn) mg/l, Max. 0.1 0.319. Mercury (as Hg) mg/l, Max. 0.001 No Relaxation20. Cadmium (as Cd) mg/l, Max. 0.01 No Relaxation21. Selenium (as Se) mg/l, Max. 0.01 No Relaxation22. Arsenic (As As) mg/l, Max. 0.05 No Relaxation23. Lead (as Pb) mg/l, Max. 0.05 No Relaxation24. Zinc (as Zn) mg/l, Max. 5 1525. Aluminium (as Al) mg/l, Max. 0.03 0.226. Boron (as B) mg/l, Max. 1 527. Chromium (as Cr) mg/l, Max. 0.05 No Relaxation28. Cyanide (as CN) mg/l, Max. 0.05 No Relaxation29. Phenolic Compounds (as C6H5OH) mg/l,

Max.0.001 0.002

30. Anionic Detergents (as MBAS) mg/l, Max. mg/l, Max.

0.2 1.0

31. Mineral Oil mg/l, Max. 0.01 0.0332. Pesticides Absent 0.00133. Radioactive Materials

a. Alpha Emitters, Bq/I, Max.b. Beta Emitters, Pci/I, Max

--

0.10.037

Page 108: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 62

AMBIENT NOISE QUALITY STANDARDS

Table 3.4: Ambient Air Quality Standards with respect to noise

Category of Area Limits Leq, dB(A)

Day Time Night Time

Industrial 75 70

Commercial 65 55

Residential 55 45

Silence 50 40

Page 109: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 63

3.4. AIR ENVIRONMENT3.4.1. AMBIENT AIR QUALITY (AAQ) IN THE STUDY AREA

The collection of base line information for Air Environment includes identification of specific air pollutants being released into the atmosphere having significant impact on neighbourhood. The Ambient Air Quality status, with respect to the identified air pollutants, has been studied at eight major locations including project site. This has been done through Air Quality surveillance program and based on TOR.

The back-ground air quality for PM10, PM2.5, Sulphur Dioxide (SO2)and Oxides of Nitrogen (NOx) was monitored. The monitoring for these parameters has been done at sites located in different directions and situated within the suspected impact zone, in and around the existing project site. We had considered minimum one monitoring station in the upwind direction and minimum one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur.

3.4.1.1. THE LOCATION OF AAQ STATIONS

The locations of the AAQ stations are based on prevailing meteorology, pollution source and available infrastructure facilities. One station has been particulary set-up in down winddirection.

Thus, monitoring has been done at eight sampling stations located in different directions and situated within the suspected impact zone in and around the existing project site.

The locations map of the AAQ monitoring station is shown in Figure No. 3.3 and tabulated in Table No. 3.5.

TABLE NO. 3.5.LOCATIONS OF AMBIENT AIR QUALITY MONITORING STATIONS

Sr. No. Locations Direction Distance in KM

1 Project Site -- --2 Puniyad NWW 2.083 Menpur N 2.034 Raman Gamdi NW 6.675 Kayavarohan E 4.06 Dhanora SWW 4.927 Karjan SWW 9.918 Gandhara S 3.13

Page 110: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 64

FIGURE NO. 3.3LOCATIONS MAP OF THE AAQ MONITORING STATION

Page 111: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 65

3.4.1.2. BASE LINE DATA

At every sampling station, important parameters namely PM10, PM2.5, Sulphur Dioxide (SO2) and Oxides of Nitrogen (NOx) were monitored. The results are given in Table No.3.7. The minimum, mximum, Average and 98 % of PM10, PM2.5, SO2 and NOx are as shown in Table No 3.6

TABLE NO.3.6Ambient Air Quality Analysis Results

(Minimum, Maximum, Average And 98 %) For Individual Location

Sr. no.

Sampling Location

Distance &

Direction

PM10 PM2.5 SO2 NOX VOC

01 Project Site -- Max. 80.6 41.9 24 38.5 BDLMin 69.2 30.4 18.2 29.3 BDLAvg. 75.6 35.8 20.6 33.9 BDL98 % 80.2 40.79 23.5 38.2 BDL

02 Puniyad 2.08 km in NWW

Max. 68.9 32.5 15.1 28.9 BDLMin 54.6 22.3 9.8 20.2 BDLAvg. 61.7 27.8 13.4 25.8 BDL98 % 67.5 31.8 14.8 28.3 BDL

03 Menpur 2.03 km in N

Max. 70.2 30.5 14.5 32.2 BDLMin 56.6 21.1 9.1 24.1 BDLAvg. 63.5 25.7 12.0 28.7 BDL98 % 68.8 29.9 14.2 31.5 BDL

04 Raman Gamdi

6.67 km in NW

Max. 60.2 21.5 16.3 28.9 BDLMin 50.2 14.1 11.2 21.2 BDLAvg. 54.2 17.7 13.6 24.6 BDL98 % 59.0 21.0 15.8 28.3 BDL

05 Kayavarohan 4.0 km in E

Max. 70.6 33.7 20.2 39.5 BDLMin 59.9 22.1 15.5 30.2 BDLAvg. 64.7 28.2 18.2 35.3 BDL98 % 70.4 32.7 19.8 38.7 BDL

06 Dhanora 4.92 km in SWW

Max. 76.6 36.7 21.2 38.5 BDLMin 56.3 24.2 12.2 24.2 BDLAvg. 67.6 28.8 16.7 32.7 BDL98 % 75.49 34.86 20.74 38.22 BDL

07 Karjan 9.91 km in SWW

Max. 64.2 25.9 16.2 30.9 BDLMin 40.2 17.7 11.3 20.2 BDLAvg. 50.1 21.9 13.3 27.1 BDL98 % 62.22 25.57 15.69 30.71 BDL

08 Gandhara 3.13 km in S

Max. 60.9 19.2 13.9 25.1 BDLMin 50.6 11.9 9.3 14.9 BDLAvg. 55.8 16.3 11.4 21.6 BDL98 % 60.9 19.1 13.7 25.0 BDL

Page 112: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 66

Table No.3.7Ambient Air Quality Analysis Report for the Month of March to May 2019

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :

EIA Study for M/S Kemz Resibond Private Limited. Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Project site(A1) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 10.8 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 04-03-2019 77.3 36.3 20.6 36.8 BDL2 07-03-2019 77.4 39.5 18.5 32.9 BDL3 11-03-2019 79.4 30.4 19.2 30.2 BDL4 14-03-2019 76.3 34.9 21.8 36.7 BDL5 18-03-2019 76.2 33.7 19.2 31.6 BDL6 21-03-2019 79.1 36.3 22.1 31.1 BDL7 25-03-2019 73.8 38.4 21.2 33.1 BDL8 28-03-2019 73.5 33.2 19.4 29.6 BDL9 01-04-2019 71.6 34.3 22.3 37.2 BDL10 04-04-2019 75.3 34.4 18.7 29.9 BDL11 08-04-2019 71.8 32.9 20.4 31.8 BDL12 11-04-2019 76.5 34.2 19.8 34.7 BDL13 15-04-2019 76.2 33.5 24.0 35.6 BDL14 18-04-2019 80.6 41.9 19.5 36.7 BDL15 22-04-2019 79.3 38.8 21.1 33.1 BDL16 25-04-2019 72.2 32.1 20.3 36.9 BDL17 29-04-2019 74.5 34.4 18.2 29.3 BDL18 02-05-2019 77.9 39.4 23.1 38.5 BDL19 06-05-2019 79.7 36.7 22.3 37.9 BDL20 09-05-2019 73.3 32.4 19.5 33.4 BDL21 13-05-2019 70.6 38.8 20.8 34.5 BDL22 16-05-2019 79.6 37.4 22.9 34.6 BDL23 20-05-2019 69.2 39.0 19.8 36.4 BDL24 23-05-2019 76.8 35.6 20.3 32.8 BDL

Max. 80.6 41.9 24 38.5 -Min. 69.2 30.4 18.2 29.3 -

Average 75.6 35.8 20.6 33.9 -98th Percentile 80.2 40.79 23.5 38.2 -

Page 113: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 67

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Puniyad (A2) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 12.0 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 04-03-2019 66.3 30.2 9.8 25.6 BDL2 07-03-2019 62.2 28.9 11.5 24.9 BDL3 11-03-2019 68.9 32.5 13.2 28.2 BDL4 14-03-2019 58.2 30.7 14.1 27.2 BDL5 18-03-2019 66.9 28.2 13.2 26.5 BDL6 21-03-2019 64.3 28.9 12.5 22.1 BDL7 25-03-2019 63.8 27.1 11.1 26.6 BDL8 28-03-2019 65.2 28.6 13.8 24.8 BDL9 01-04-2019 60.3 26.3 12.8 20.2 BDL10 04-04-2019 59.2 23.9 13.5 26.3 BDL11 08-04-2019 54.6 22.3 13.9 27.4 BDL12 11-04-2019 62.5 27.2 14.3 28.9 BDL13 15-04-2019 61.2 27.5 14.9 28.1 BDL14 18-04-2019 60.6 24.9 13.2 26.2 BDL15 22-04-2019 68.8 29.7 15.1 28.1 BDL16 25-04-2019 62.2 27.1 14.3 27.5 BDL17 29-04-2019 59.6 25.1 14.7 25.9 BDL18 02-05-2019 60.9 23.7 13.8 28.1 BDL19 06-05-2019 64.9 29.9 13.3 24.5 BDL20 09-05-2019 60.3 26.4 14.5 22.1 BDL21 13-05-2019 66.6 30.8 14.8 26.9 BDL22 16-05-2019 64.2 30.2 13.5 25.6 BDL23 20-05-2019 60.4 29.7 14.2 26.2 BDL24 23-05-2019 65.2 30.6 14.6 23.9 BDL

Max. 68.9 32.5 15.1 28.9 -Min. 54.6 22.3 9.8 20.2 -

Average 61.7 27.8 13.4 25.8 -98th Percentile 67.5 31.8 14.8 28.3 -

Page 114: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 68

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Menpur (A3) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 10.5 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 05-03-2019 65.8 27.2 13.2 28.5 BDL2 08-03-2019 62.2 22.9 14.5 31.9 BDL3 12-03-2019 69.9 27.5 10.2 32.2 BDL4 15-03-2019 65.2 24.7 9.1 26.2 BDL5 19-03-2019 60.9 22.2 9.2 28.5 BDL6 22-03-2019 66.3 26.9 10.5 25.1 BDL7 26-03-2019 68.8 22.1 11.1 30.6 BDL8 29-03-2019 70.2 30.2 13.8 29.8 BDL9 02-04-2019 66.3 29.3 14.3 28.2 BDL10 05-04-2019 62.2 23.4 14.5 26.3 BDL11 09-04-2019 65.6 28.9 10.9 28.4 BDL12 12-04-2019 59.5 25.2 11.3 30.9 BDL13 16-04-2019 62.2 30.5 10.9 30.1 BDL14 19-04-2019 58.6 21.9 12.2 31.2 BDL15 23-04-2019 60.8 27.7 14.1 28.1 BDL16 26-04-2019 66.2 24.1 9.3 29.5 BDL17 30-04-2019 66.5 21.1 11.2 31.9 BDL18 03-05-2019 64.9 26.7 13.8 31.1 BDL19 07-05-2019 60.9 23.9 14.3 29.5 BDL20 10-05-2019 65.3 26.4 12.5 24.1 BDL21 14-05-2019 56.6 26.8 13.8 28.9 BDL22 17-05-2019 60.2 24.2 12.5 24.6 BDL23 21-05-2019 58.2 28.7 11.2 28.2 BDL24 24-05-2019 62.2 24.6 12.2 27.9 BDL

Max. 70.2 30.5 14.5 32.2 -Min. 56.6 21.1 9.1 24.1 -

Average 63.5 25.7 12.0 28.7 -98th Percentile 68.8 29.9 14.2 31.5 -

Page 115: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 69

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Raman Gamdi (A4)

Method Of Sampling : IS 5182/USEPA Guidelines

Type of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 10.7 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 05-03-2019 54.3 18.2 12.2 26.5 BDL2 08-03-2019 59.2 20.4 11.5 28.9 BDL3 12-03-2019 54.9 21.5 14.2 24.2 BDL4 15-03-2019 60.2 20.7 14.1 21.2 BDL5 19-03-2019 55.9 17.2 12.2 21.5 BDL6 22-03-2019 50.3 17.9 13.5 23.1 BDL7 26-03-2019 55.8 18.1 14.1 23.6 BDL8 29-03-2019 50.2 18.2 15.8 22.8 BDL9 02-04-2019 56.3 19.3 12.3 23.2 BDL10 05-04-2019 52.2 18.4 13.5 21.3 BDL11 09-04-2019 55.6 16.9 11.9 23.4 BDL12 12-04-2019 50.5 17.2 12.3 26.9 BDL13 16-04-2019 56.2 15.5 14.9 25.1 BDL14 19-04-2019 52.6 14.9 15.2 23.2 BDL15 23-04-2019 57.8 16.7 14.1 23.1 BDL16 26-04-2019 52.2 14.1 16.3 21.5 BDL17 30-04-2019 52.5 17.1 11.2 24.9 BDL18 03-05-2019 50.9 18.7 13.8 26.1 BDL19 07-05-2019 54.9 15.9 14.3 28.5 BDL20 10-05-2019 58.3 19.4 15.5 22.1 BDL21 14-05-2019 52.6 16.8 14.8 26.9 BDL22 17-05-2019 50.2 17.2 13.5 28.6 BDL23 21-05-2019 56.2 16.7 12.2 25.2 BDL24 24-05-2019 50.2 18.6 12.2 28.9 BDL

Max. 60.2 21.5 16.3 28.9 -Min. 50.2 14.1 11.2 21.2 -

Average 54.2 17.7 13.6 24.6 -98th Percentile 59.0 21.0 15.8 28.3 -

Page 116: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 70

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S Kemz Resibond Private Limited..Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210.

Location : Kayavarohan (A5)

Method Of Sampling : IS 5182/USEPA Guidelines

Type of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 11.1 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 06-03-2019 62.3 30.2 18.2 34.5 BDL2 09-03-2019 65.2 30.9 15.5 36.9 BDL3 13-03-2019 60.9 31.5 19.2 34.2 BDL4 16-03-2019 66.2 33.7 18.1 37.2 BDL5 20-03-2019 65.9 31.2 20.2 39.5 BDL6 23-03-2019 60.3 30.9 19.5 36.1 BDL7 27-03-2019 64.8 27.1 18.1 34.6 BDL8 30-03-2019 69.2 28.2 17.8 36.8 BDL9 03-04-2019 65.3 26.3 19.3 39.2 BDL10 06-04-2019 63.2 25.4 18.5 37.3 BDL11 10-04-2019 62.6 26.9 17.9 34.4 BDL12 13-04-2019 68.5 27.2 17.3 36.9 BDL13 17-04-2019 70.2 28.5 18.9 32.1 BDL14 20-04-2019 70.6 24.9 19.2 30.2 BDL15 24-04-2019 63.8 26.7 19.1 36.1 BDL16 27-04-2019 68.2 27.1 18.3 38.5 BDL17 01-05-2019 61.5 22.1 18.2 30.9 BDL18 04-05-2019 59.9 24.7 16.8 34.1 BDL19 08-05-2019 64.9 26.9 16.3 36.5 BDL20 11-05-2019 64.3 27.4 18.5 38.1 BDL21 15-05-2019 69.6 28.8 19.8 30.9 BDL22 18-05-2019 64.2 30.2 18.5 35.6 BDL23 22-05-2019 62.4 31.7 18.2 30.2 BDL24 25-05-2019 60.2 28.6 17.2 36.9 BDL

Max. 70.6 33.7 20.2 39.5 -Min. 59.9 22.1 15.5 30.2 -

Average 64.7 28.2 18.2 35.3 -98th Percentile 70.4 32.7 19.8 38.7 -

Page 117: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 71

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Dhanora (A6) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 11.8 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 06-03-2019 56.3 25.2 12.2 34.5 BDL2 09-03-2019 70.2 28.9 16.5 37.9 BDL3 13-03-2019 64.9 26.5 14.2 32.2 BDL4 16-03-2019 73.2 32.7 18.1 36.2 BDL5 20-03-2019 65.9 30.2 15.2 34.5 BDL6 23-03-2019 60.3 26.9 13.5 32.1 BDL7 27-03-2019 64.8 28.1 14.1 36.6 BDL8 30-03-2019 70.2 29.2 18.8 28.8 BDL9 03-04-2019 65.3 25.3 16.3 24.2 BDL10 06-04-2019 69.2 28.4 18.5 28.3 BDL11 10-04-2019 70.6 26.9 19.9 30.4 BDL12 13-04-2019 65.5 24.2 14.3 34.9 BDL13 17-04-2019 70.2 27.5 15.9 28.1 BDL14 20-04-2019 76.6 30.9 20.2 30.2 BDL15 24-04-2019 71.8 31.7 19.1 28.1 BDL16 27-04-2019 64.2 28.1 16.3 36.5 BDL17 01-05-2019 60.5 26.1 14.2 34.9 BDL18 04-05-2019 68.9 27.7 16.8 35.1 BDL19 08-05-2019 71.9 30.9 19.3 38.5 BDL20 11-05-2019 70.3 31.4 17.5 29.8 BDL21 15-05-2019 65.6 26.8 15.8 35.9 BDL22 18-05-2019 70.2 28.2 18.5 34.6 BDL23 22-05-2019 74.2 36.7 21.2 30.2 BDL24 25-05-2019 64.2 29.6 15.2 36.9 BDL

Max. 76.6 36.7 21.2 38.5 -Min. 56.3 24.2 12.2 24.2 -

Average 67.6 28.8 16.7 32.7 -98th Percentile 75.49 34.86 20.74 38.22 -

Page 118: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 72

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Karjan (A7) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 13.2 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 05-03-2019 46.3 25.2 12.2 28.5 BDL2 08-03-2019 40.2 22.9 14.5 26.9 BDL3 12-03-2019 54.9 23.5 12.2 24.2 BDL4 15-03-2019 53.2 21.7 15.1 27.2 BDL5 19-03-2019 59.9 21.2 16.2 26.5 BDL6 22-03-2019 54.3 24.9 14.5 27.1 BDL7 26-03-2019 50.8 21.1 13.1 25.6 BDL8 29-03-2019 54.2 25.2 13.8 24.8 BDL9 02-04-2019 58.3 22.3 12.3 20.2 BDL10 05-04-2019 53.2 24.4 14.5 28.3 BDL11 09-04-2019 50.6 21.9 12.9 27.4 BDL12 12-04-2019 59.5 20.2 11.3 25.9 BDL13 16-04-2019 42.2 24.5 12.9 29.1 BDL14 19-04-2019 40.6 18.9 13.2 30.2 BDL15 23-04-2019 45.8 23.7 14.1 26.1 BDL16 26-04-2019 40.2 21.1 12.3 24.5 BDL17 30-04-2019 44.5 20.1 13.2 28.9 BDL18 03-05-2019 48.9 22.7 11.8 26.1 BDL19 07-05-2019 44.9 25.9 14.3 30.5 BDL20 10-05-2019 40.3 19.4 13.5 28.1 BDL21 14-05-2019 47.6 19.8 12.8 26.9 BDL22 17-05-2019 50.2 19.2 11.5 28.6 BDL23 21-05-2019 52.2 17.7 12.2 30.2 BDL24 24-05-2019 64.2 18.6 14.2 30.9 BDL

Max. 64.2 25.9 16.2 30.9 -Min. 40.2 17.7 11.3 20.2 -

Average 50.1 21.9 13.3 27.1 -98th Percentile 62.22 25.57 15.69 30.71 -

Page 119: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 73

TEST REPORT

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Location : Gandhra (A8) Method Of Sampling : IS 5182/USEPA GuidelinesType of Sampling : Grab Sampling Sampling Done By : Entech TeamDescription Of Sample : Ambient Air

Average Wind Speed : 11.1 m/sec

Sampling Duration : 24 Hour Relative Humidity : 26%Test Method for PM10 : IS 5182(P-23) 2012

Test Method for PM2.5 : Lab SOP NO.28 2014 (Based on USEPA)

Test Method for SO2 : IS 5182(P-2) 2012

Test Method for NO2 : IS 5182(P-6)2012

Sr.No

Date ofSampling

ParametersPM10

(µg/m3)PM2.5(µg/m3)

SO2(µg/m3)

NOx(µg/m3)

VOC(PPM)

1 04-03-2019 56.3 18.2 10.2 16.5 BDL2 07-03-2019 60.2 15.9 9.5 14.9 BDL3 11-03-2019 60.9 18.5 11.2 19.2 BDL4 14-03-2019 54.2 13.7 10.1 21.2 BDL5 18-03-2019 60.9 15.2 10.2 20.5 BDL6 21-03-2019 54.3 16.9 12.5 23.1 BDL7 25-03-2019 60.8 17.1 11.1 20.6 BDL8 28-03-2019 54.2 16.2 10.8 22.8 BDL9 01-04-2019 60.3 15.3 12.3 21.2 BDL10 04-04-2019 56.2 16.4 12.5 24.3 BDL11 08-04-2019 51.6 11.9 13.9 23.4 BDL12 11-04-2019 55.5 17.2 11.3 24.9 BDL13 15-04-2019 59.2 18.5 10.9 21.1 BDL14 18-04-2019 50.6 15.9 11.2 20.2 BDL15 22-04-2019 55.8 17.7 10.1 22.1 BDL16 25-04-2019 52.2 15.1 9.3 22.5 BDL17 29-04-2019 58.5 18.1 12.2 23.9 BDL18 02-05-2019 55.9 15.7 11.8 25.1 BDL19 06-05-2019 50.9 18.9 11.3 21.5 BDL20 09-05-2019 53.3 17.4 11.5 23.1 BDL21 13-05-2019 56.6 16.8 12.8 21.9 BDL22 16-05-2019 58.2 19.2 13.5 23.6 BDL23 20-05-2019 52.2 12.7 13.2 20.2 BDL24 23-05-2019 51.2 13.6 10.2 22.9 BDL

Max. 60.9 19.2 13.9 25.1 -Min. 50.6 11.9 9.3 14.9 -

Average 55.8 16.3 11.4 21.6 -98th Percentile 60.9 19.1 13.7 25.0 -

Page 120: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 74

PHOTOGRAPHS SHWOING AAQ MONITORING

Page 121: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 75

3.4.1.3. SAMPLE ANALYSIS

Monitoring and testing of ambient air quality were carried out for various parameters namely PM10,PM2.5, SO2 and NOx by using Respirable Dust Sampler (RDS). Twenty four-hourly samples were collected for PM10 ,PM2.5 and for SO2 & NOx 8 hourly samples were collected for the month of March – April – May -2019.

The sampling and testing of Ambient Air Quality Parameters were carried out as per relevant parts of IS: 5182. The brief details of testing procedures adopted are given in Table No.3.8.

TABLE NO. 3.8

DETAILS OF AMBIENT AIR QUALITY MONITORING & ANALYSIS PROCEDURES

Parameter Ambient Air Quality Monitoring & Analysis Procedure

PM10 Gravimatric Method, IS:5182, 11255 & Operational Manual of Instrument

PM2.5 Gravimatric Method & Operational Manual of InstrumentNOx Jacob & Hochheiser Method.

Absorption in dilute NaOH and then estimating colorimetric with Sulphanilamide N(1-Nepthyl) Ethylene Diamine Dihydrochloride and Hydrogen Peroxide (IS : 5182 Part II : 1975)

SO2 Improved West & Gaeke Method.Absorption in Mercury Sodium Tetra Chloride followed by colorimetric estimation using P-Rosaniline Hydrochloride and Formaldehyde(IS : 5182 Part II : 1969)

Page 122: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 76

3.5. METEOROLOGY

Meteorological conditions, of the site, regulates the transport and diffusion of air-pollutants released into the atmosphere. Ambient temperature, wind speed, wind direction and atmospheric stability are called primary or basic Meteorological Parameters because the dispersion and diffusion of pollutants depend mainly on these Parameters. Humidity, precipitation, pressure and visibility are secondary Meteorological Parameters as this control the dispersion of the pollutants indirectly by affecting primary Parameters.

3.6. BASELINE DATA

Meteorological data were obtained from our own meteorological station kept at project site.for the parameters namely ambient temperature, wind speed, wind direction, relative humidity for the period March, April and May 2019. The Wind Rose diagram for the month of March, April and May 2019 is shown in FIGURE NO. 3.4.

3.6.1. Ambient Temperature

The monthly variations of monthly highest and monthly lowest temperatures recorded are as follows:

Location –Project site Temperature, oCMarch 2019 April 2019 May 2019

Maximum 37.10 40.20 40.90Minimum 18.40 22.90 26.50

3.6.2. Wind Speed

Wind speed determines the rate of diffusion and travel time of air pollutants. The results of monitoring are as follows:

Location –Project Site Wind Velocity, Km/hrMarch 2019 April 2019 May 2019

Maximum 10.1 7.80 33.3Minimum Calm Calm Calm

3.6.3. Wind Direction

This is important in air pollution since it determines the direction of transport of air pollutants. The mean wind direction will be indicative of the direction of travel of the pollutants.

The meteorological parameters namely: ambient temperature, wind speed, wind direction and stability class were obtained from our own meteorological station kept at Project Site for the Period of March – April – May - 2019.As specific mixing heights were not available, mixing height based on CPCB publication “Spatial Distribution of Hourly Mixing Depth over Indian Region”, PROBES/88/2002-03 has been used.

The windrose diagram is shown in Figure No. 3.4

Page 123: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 77

FIGURE NO. 3.4

WINDROSE DIAGRAM FOR THE MONTH OF March– April – May 2019

Page 124: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 78

TABLE NO.3.9WIND ROSE (FREQUENCY DISTRIBUTION DATA)

Directions / Wind Classes (m/s)

Wind Speed (m/s)0.50 -2.10

2.10 - 3.60 3.60 - 5.70 5.70 -8.80

8.80 -11.10

>= 11.1 Total

348.75 - 11.25 52 40 4 0 0 0 9611.25 - 33.75 52 40 4 0 0 0 9633.75 - 56.25 19 16 2 0 0 0 3756.25 - 78.75 14 10 0 0 0 0 2478.75 - 101.25 16 11 3 0 0 0 30101.25 - 123.75 79 12 2 0 0 0 93123.75 - 146.25 121 13 5 0 0 0 139146.25 - 168.75 50 1 0 0 0 0 51168.75 - 191.25 42 11 0 0 0 0 53191.25 - 213.75 86 137 49 5 0 0 277213.75 - 236.25 187 286 142 8 0 0 623236.25 - 258.75 99 122 19 2 0 0 242258.75 - 281.25 115 70 7 1 0 0 193281.25 - 303.75 34 12 0 1 0 0 47303.75 - 326.25 25 34 4 0 0 0 63326.25 - 348.75 50 43 4 0 0 0 97

Sub-Total 1041 858 245 17 0 0 2161Calms 46

Missing/Incomplete 1Total 2208

3.6.4. Relative Humidiy (RH)

Mean Monthly Relative Humidity for Meteorological station kept at project site. is given in Table No.3.10

TABLE NO.3.10RELATIVE HUMIDITY

Month Relative Humidity ( % )Minimum Maximum

March 2019 2.4 61.5April 2019 2.0 75.5May 2019 6.3 93.0

3.6.5. Rain FallTABLE NO.3.11

RAINFALL PATTERN AT VADODARA RAIN GAUGE STATIONYears Rainfall (mm)

2013 8392014 9172015 4832016 8552017 1183

Average 856

Page 125: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 79

3.6.6. Mixing Height

As specific mixing heights were not available, mixing height based on CPCB publication “SPATIAL DISTRIBUTION OF HOURLY MIXING DEPTH OVER INDIAN REGION”, PROBES/88/2002-03 has been tabulated in Table No.3.12.

TABLE NO.3.12HOURLY MIXING DEPTH OVER INDIAN REGION

Hour of the Day Mixing Height(mts.)

5 506 507 1008 4009 50010 50011 100012 100013 100014 100015 100016 100017 100018 50019 500

3.7. ATMOSPHERIC STABILITY

The hourly occurrence of various stability classes at project site is determined by wind direction fluctuation method by employing on-line instrument.

The stability classification system based on wind direction fluctuation method is as follows.

Relationship between and stability class as suggested by Slade (1965) is given in Table No.3.13

TABLE NO. 3.13STABILITY CLASSIFICATION

Stability Class (degrees)A > 22.5B 22.4 - 17.5C 17.4 - 12.5D 12.4 - 7.5E 7.4 - 3.5F < 3.5

Page 126: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 80

3.8. NOISE ENVIRONMENT

Noise, often defined as unwanted sound, interferes with speech communication, causes annoyance, distracts from work and disturbs sleep thus deteriorating quality of human environment.

The noise is generated from multiple sources such as medium and heavy industries, urban activities in the commercial and human settlements, and vehicular traffic in the region.

The noise level in the study area has been measured through Leutron sound level meter for a period of one day for 30 minutes interwal at each monitoring station.

In the study area noise levels were monitored in eight locations at different locations for day and night time and are given Table No.3.14

TABLE NO.3.14MAXIMUM AMBIENT NOISE LEVELS WITHIN STUDYAREA

Sr.No

Name of the Location

Categoryof Area/zone

DayTime in Leq dB (A)

CPCBStandard DayTime

Night Time in Leq dB

(A)

CPCBStandard

Night time1. Project Site Industrial 53.2 75dB(A) 48.1 70dB(A)2. Puniyad Residential 49.4 55dB(A) 43.5 45dB(A)3. Menpur Residential 48.1 55dB(A) 42.3 45dB(A)4. Raman gamdi Residential 47.6 55dB(A) 42.7 45dB(A)5. Kayavarohan Residential 48.7 55dB(A) 43.6 45dB(A)6. Dhanora Residential 49.3 55dB(A) 42.1 45dB(A)

Page 127: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 81

In order to assess the noise levels in the study area, monitoring was carried out at eight different locations within 10 km radius of the study area. The noise monitoring locations are shown in Figure No. 3.3 and monitoring location mentioned in Table 3.14. Noise levels were recorded and computed for equivalent noise levels for day-equivalent, night-equivalent & day-night equivalent.

Sound Pressure Levels (SPL) measurements were recorded at eight locations. The readings were taken for every hour for 24-hrs. The day noise levels have been monitored during 6 am to 10 pm and night noise levels during 10 pm to 6 am at all the locations covered in the study area.

Day time Noise Levels (Lday)

The day time noise level were between 44-60 dB(A), which is well below the permissible limit.

Night time Noise Levels (Lnight)

Industrial Zone:The night time noise level in the Project site was observed between 38-51dB(A), which is well below the permissible limits).

Page 128: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 82

TABLE NO.3.15

AMBIENT NOISE ANALYSIS IN THE STUDY AREA

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project :EIA Study for M/S Kemz Resibond Private Limited. Survey No.: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, dist: Vadodara-391210

Description Of Sample : Ambient Noise Sample Done By: Entech TeamDate of Sampling : As Mention Below Sample Duration: 24 HoursReference Method: IS 9989: 2016Details of Sampling : -

Sr.No

Date ofSampling Location Category

Noise Level, dB(A)Day Time Night Time

Recorded level dB (A)

Leq

Limits in

dB(A)

Recorded level dB(A)

Leq

Limits in

dB(A)

1 04/03/2019 Project Site(N1) Industrial 53.2 75 48.1 65

2 07/03/2019 Puniyad (N2) Residential 49.4 55 43.5 45

3 12/03/2019 Menpur (N3) Residential 48.1 55 42.3 45

4 15/03/2019 Raman Gamdi(N4) Residential 47.6 55 42.7 45

5 20/03/2019Kayavarohan

(N5)Residential

48.7 55 43.6 45

6 23/03/2019 Dhanora (N6) Residential 49.3 55 42.1 45

Sample Code

Sampling Location Date Time

Noise Level in dBA10 m from

Edge of The Road

20 m From Edge of The Road

TN1 Nr. Highway 19-03-2019Day 78.6 73.2

Night 72.1 68.4

Page 129: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 83

3.9. WATER QUALITY

Water is the most vital resource for all kinds of life. It should not only be available in sufficient quantity but should be of good quality as well. Defilement of water, as a result of human activities, industrial activities and consequent pollution of water, cause deterioration of the water environment.

3.9.1 BASELINE DATA COLLECTION OF GROUND WATER & SURFACE WATER

Physico-chemical Parameters have been used for assessing the base line quality of ground water environment and identification of impacts due to the proposed project.

Methodology for Water Quality Monitoring

The Samples, under all categories, were analysed for various Parameters specified by the Department of Environment. For the collection, preservation and analysis, APHA/IS methods were followed. The requisite Procedures, laid down in APHA/IS methods, were adopted for preserving the Samples with suitable preservative chemicals. The Samples were analysed within the time limits prescribed for each Parameter.

Ground water sources covering 10-km radial distance were examined for physico-chemical, heavy metals and bacteriological parameters in order to assess the effect of industrial and other activities on ground water and surface water. The samples were analyzed as per the procedures specified in 'Standard Methods for the Examination of Water and Wastewater' published by American Public Health Association (APHA).

Samples for chemical analysis were collected in polyethylene carboys. Samples for bacteriological analysis were collected in sterilized glass bottles. Selected physicochemical and bacteriological parameters have been analyzed for projecting the existing water quality status in the study area. Parameters like pH and temperature were analyzed at the time of sample collection.

The details of ground water sampling locations are given in Table No. 3.16 and sampling locations of ground water quality monitoring are shown in Figure 3.3. The physico - chemical characteristics of the ground water samples are presented in the Table No. 3.17.

The monitoring has been done at eight sampling stations located in different directions andsituated within the suspected impact zone in and around the project site.

Page 130: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 84

TABLE NO. 3.16

LOCATIONS OF WATER QUALITY MONITORING STATIONS

Sr. No.

Type of sample Water sample location

1 Ground Water Project Site2 Ground Water Puniyad3 Ground Water Menpur4 Ground Water Raman gamdi5 Ground Water Kayavarohan6 Ground Water Dhanora7 Ground Water Karjan8 Ground Water Gandhar9 Surface Water Kayavarohan Lake

Page 131: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 85

TABLE NO.3.17WATER QUALITY ANALYSIS REPORTS

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project : EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya,Tal: Dabhoi, Dist: Vadodara-391210

Monitoring done by: Entech Team Sample Packing/Seal: Satisfactory.Mode of Sampling: Grab Sampling Quantity of Sample: 5 ltr In Plastic CarboyType of Sample: Water SampleDetails of Sample:

Sample Code Description of Sample Date of

SamplingDate of Sample

ReceiptAnalysis

Start DateAnalysis End

DateGW1 Ground Water Of Project Site 25/05/2019 26/05/2019 27/05/2019 03/06/2019GW2 Ground Water Of Puniyad 25/05/2019 26/05/2019 27/05/2019 03/06/2019GW3 Ground Water Of Menpur 25/05/2019 26/05/2019 27/05/2019 03/06/2019GW4 Ground Water Of Raman

Gamdi25/05/2019 26/05/2019 27/05/2019 03/06/2019

Sr.No. Parameters Unit GW1 GW2 GW3 GW4

1. pH - 7.3 8.0 7.9 7.72. Temperature °C 25.4 25.3 25.2 25.83. Turbidity NTU 2.0 2.0 2.1 2.24. Total Solid (TS) mg/L 1414 934 1014 3775. Total Suspended Solids (TSS) mg/L 20 12 8.0 7.06. Total Dissolved Solids (TDS) mg/L 1394 922 1006 3707. Electrical Conductivity (EC) µmhos/cm 2706 1889 2010 7638. Dissolved Oxygen (DO) mg/L 5.3 5.2 5.1 5.49. Total Hardness (as CaCO3) mg/L 240 246 250 89

10. Calcium Hardness mg/L 170 168 179 6811. Magnesium Hardness mg/L 70 78 71 2112. Total Alkalinity ( as CaCO3) mg/L 282 281 275 7213. Calcium (as Ca) mg/L 68 67 71 2714. Magnesium (as Mg) mg/L 17 18 18 5.815. Chloride (as Cl) mg/L 328 256 269 9316. Sulphate (as SO4) mg/L 266 235 226 31

17. Chemical Oxygen Demand (COD) mg/L 18 12 18 8

18. Biological Oxygen Demand (BOD) mg/L 6.0 5.0 6.0 BDL

19. Fluoride as F mg/L 0.52 0.38 0.48 0.2320. Colour Hazen Colorless Colorless Colorless Colorless21. Odor -- Odorless Odorless Odorless Odorless22. Taste -- Agreeable Agreeable Agreeable Agreeable23. Sodium as Na mg/L 120 110 120 4824. Potassium as K mg/L 3.2 3.3 3.0 1.225. Iron as Fe mg/L N.D. N.D. N.D. N.D.26. Copper as Cu mg/L N.D. N.D. N.D. N.D.

Page 132: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 86

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project : EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya,Tal: Dabhoi, Dist: Vadodara-391210.

Monitoring done by: Entech Team Sample Packing/Seal: Satisfactory.Mode of Sampling: Grab Sampling Quantity of Sample: 5 ltr In Plastic CarboyType of Sample: Water SampleDetails of Sample:

Sample Code Description of Sample Date of

SamplingDate of Sample

ReceiptAnalysis

Start DateAnalysis End

DateGW5 Ground Water Of

Kayavarohan25/05/2019 26/05/2019 27/05/2019 03/06/2019

GW6 Ground Water Of Dhanora 25/05/2019 26/05/2019 27/05/2019 03/06/2019GW7 Ground Water Of Karjan 25/05/2019 26/05/2019 27/05/2019 03/06/2019GW8 Ground Water Of Gandhra 25/05/2019 26/05/2019 27/05/2019 03/06/2019

Sr.No. Parameters Unit GW5 GW6 GW7 GW8

1. pH - 8.0 7.5 7.7 7.72. Temperature °C 25.4 25.5 25.3 25.53. Turbidity NTU BDL BDL 2.0 BDL4. Total Solid (TS) mg/L 736 2445 2212 7665. Total Suspended Solids (TSS) mg/L BDL 25 18 BDL6. Total Dissolved Solids (TDS) mg/L 736 2420 2194 7667. Electrical Conductivity (EC) µmhos/cm 1437 2624 3835 15768. Dissolved Oxygen (DO) mg/L 5.0 4.9 5.1 5.09. Total Hardness (as CaCO3) mg/L 115 335 294 12510. Calcium Hardness mg/L 77 168 149 8011. Magnesium Hardness mg/L 38 167 145 4512. Total Alkalinity ( as CaCO3) mg/L 98 286 264 9813. Calcium (as Ca) mg/L 30 90 59 3214. Magnesium (as Mg) mg/L 9.2 96 35 1015. Chloride (as Cl) mg/L 289 823 712 26216. Sulphate (as SO4) mg/L 156 413 372 160

17. Chemical Oxygen Demand (COD) mg/L 8 20 20 8

18. Biological Oxygen Demand (BOD) mg/L BDL 6.3 86.3 BDL

19. Fluoride as F mg/L 0.35 0.55 0.56 0.4020. Colour Hazen Colorless Colorless Colorless Colorless21. Odor -- Odorless Odorless Odorless Odorless22. Taste -- Agreeable Agreeable Agreeable Agreeable23. Sodium as Na mg/L 86 116 102 8924. Potassium as K mg/L 1.6 3.8 3.1 1.925. Iron as Fe mg/L N.D. N.D. N.D. N.D.26. Copper as Cu mg/L N.D. N.D. N.D. N.D.

Page 133: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 87

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujrat.

Name of Project : EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, Village: Fofadiya,Tal: Dabhoi, Dist: Vadodara-391210.

Monitoring done by: Entech Team Sample Packing/Seal: Satisfactory.Mode of Sampling: Grab Sampling Quantity of Sample: 5 ltr In Plastic CarboyType of Sample: Water SampleDetails of Sample:

Sample Code Description of Sample Date of

SamplingDate of Sample

ReceiptAnalysis

Start DateAnalysis End

DateSW1 Surface water Of

Kayavarohan Lake20/03/2019 21/03/2019 21/03/2019 28/03/2019

Sr.No. Parameters Unit SW11. pH - 7.92. Temperature °C 28.23. Colour Hazen BDL4. Odor -- Unobjectionable5. Taste - Agreeable6. Turbidity NTU 7.67. Total Solid (TS) mg/L 10388. Total Suspended Solids (TSS) mg/L 629. Total Dissolved Solids (TDS) mg/L 976

10. Electrical Conductivity (EC) µS/cm 178911. Dissolved Oxygen (DO) mg/L 7.612. Biological Oxygen Demand (BOD) mg/L 8.213. Chemical Oxygen Demand (COD) mg/L 24.014. E. Coli MPN / 100 ml 27.115. Total Hardness (as CaCO3) mg/L 14216. Calcium Hardness mg/L 4317. Magnesium Hardness mg/L 9918. Total Alkalinity ( as CaCO3) mg/L 19819. Carbonate mg/L BDL20. Bi-Carbonate mg/L 19621. Sodium (as Na) mg/L 13022. Potassium (as K) mg/L 1923. Magnesium (as Mg) mg/L 39.624. Calcium (as Ca) mg/L 17.225. Chloride (as Cl) mg/L 27926. Sulphates (as SO4) mg/L 36.327. Total Phosphorous (as P) mg/L 12.228. Phosphate (as PO4) mg/L 3.229. Nitrate (as NO3) mg/L 12.230. Nitrite (as NO2) mg/L 1.431. Fluoride (as F) mg/L 0.41

Page 134: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 88

PHOTOGRAPHS OF WATER SAMPLING

Page 135: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 89

3.10. LAND ENVIRONMENT

3.10.1 GEOLOGY & HYDROGEOLOGY:

Probable sources of ground water pollution are percolation of treated & untreated effluent; hazardous waste (from storage area/generation source); and spillage of chemicals & fuel. The source of water is ground water hence increase in water demand during expansion will lead to depletion in ground water levels.The study area is a part of flat alluvial plain with an average elevation of 38m from Mean Sea Level of Village: Fofaliya Taluka: Dabhoi District: Vadodara, showing rugged to flat topography.The area is covered by quaternary alluvium which is made up of alternate layers of clay and sand. The alluvium formation is underlain by basalt of Deccan trap of upper Cretaceous to lower Eocene.It is observed that sediments at shallow depths up to 65 to 95 m. In general are uniform in character and composed of medium to fine sand, silt with minor clay lenses.Geohydrologically the area is suitable for the construction of shallow tube wells. The investigation area is characterized by variable groundwater conditions. The groundwater in the multi aquifer system occurs under unconfined to semi-confined conditions. Aquifer upto 75.00 depth is considered to be under unconfined condition.On the basis of survey carried out in the area, it is observed that permeable water bearing zones are expected to occur below a depth of 50m. Static Water level (SWL) in the tube wells varies from 35 to 40 m. b.g.l. Due to the medium scale pumping imposed on the aquifer system in and around the area, water level is more or less stable i.e not declining. At present, the drawdown is about 2.0 – 3.0 m annually. A study was carried out to see the impact on groundwater due to small and short duration pumping after constructing proposed Industry.Drawdown of pumping tube-well is about 1.88m at a pumping rate of 120LPM. Thetotal dissolved salts in ground water around investigated area varies from 950 ppm to 1250ppm.

Due to, for ground water balancing rain Water harvesting structures should be continuous pumping of ground water as well as in the absence of surface water sources and scary rainfallimplemented in the proposed area.

GEOLOGICAL FEATURES OF GUJARAT

Page 136: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 90

Existing Tube Well of the Study and surrounding area

SrNo.

Location Depth Drilled(m)

SWL(m)

PWL(M.)

Discharge(LPM)

ESP(HP)

TDS(ppm)

1 Nana Fofaliya (Opposite

proposed area)

76 35 37 110 02 1200

2 Kayavaran 86 38 42 350 20 1000

3 Menpura 92 40 44 400 20 950

4 Puniyad 76 37 39 120 02 1250

5 Proposed area tube-well

76 35 39 120 02 1200

Geologically, entire area is covered with recent age deposits of fluvial and marine origin.Major part of the study area is covered with dark alluvial deposits which consist thickness of more than 200 m in the study area.The Narmada and the Mahi are the chief rivers of the district, flow along the north western and southern boundary respectively. The study area is drained by the Narmada river and it's tributaries.Ground water flow is found to be westerly towards river Mahi under confined conditions & so tube wells drilled in north-western or in south-western part, yield more ground water as compared to those drilled in eastern or in South eastern parts of the study area.Underground piping for effluent transfer is avoided as far as possible. Pucca flooring is done in ETP area to avoid any type of leakage that can be percolated into ground water. Hazardous waste is segregated at source and stored in hazardous waste storage area with impervious flooring.Unit will install rain water harvesting system within premises to collect and recharge rainwater. Rain water from proposed construction and paved area shall be recharged.

Source: Water Resources Dept from http://guj-nwrws.gujarat.gov.in/

Page 137: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 91

TYPE OF SOILS

The soils are medium black soil to deep black soil.in nature. In general the soils are poor to medium in fertility and water retention capacity. Soils are characterized by black to dark black loamy and clay loams of adequate to poor permeability.

pH value is found to be moderately alkaline.Organic Carbon is found to be medium to high which indicates soil of the some area is poor in fertility and some of them are fertile soil. Available potassium is medium to high and available phosphorous is found to be very low to high. Soil is salt-free.During operation activity the impact of air, water and solid & hazardous waste pollution on soil causes direct/ indirect effect on soil.Storage and handling of chemicals and hazardous waste may contaminate the soil. All the necessary control measures are provided for handling, storage and disposal, like designated storage area, leachate collection system etc. Thus, there will not be any significant impact of solid/hazardous waste on the soil environment. The effluent generated from domestic is disposed through soak pit; but soak pit is cleaned regularly to avoid soil pollution.

Page 138: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 92

3.10.2 CHARACTERISTICS OF SOILS

BASE LINE DATA

The soil samples were collected from different places in the study area. The soil samples are taken from eight villages.

The present study on soil quality establishes the baseline characteristics in the study area surrounding the project site. The study has been addressed with the following objectives.

To determine the baseline characteristicsTo determine the soil characteristics of plant site and surrounding areas with in 10 km radius.To determine the impact of industrialization/Urbanization on soil characteristics.To determine the impacts on soils from agricultural productivity point of view.At each sampling site, the samples were collected at random at a depth of 15 cms and mixed together to form a composite sample. Large stones, gravels and plant roots were removed from soil.

The homogenized soil samples collected at different locations were packed in a polyethylene plastic bag and sealed. The sealed samples were sent to laboratory for analysis. The important physical, chemical parameter concentrations were determined from all samples. The soil was then crushed and water suspension was prepared. The supernatant liquid was then subjected to Physico-Chemical analysis.

Standard Procedures were followed for analysis. The results of soil analysis are tabulated in Table No. 3. 18

Page 139: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 93

TABLE NO.3.18ANALYSIS RESULTS OF SOIL SAMPLES

Name & Address of Client :

ENTECH LABORATORIES.33,34, Kushal Estate, Saket Industrial Estate, Village: Moraiya, Ta: Sanand, Dist: Ahmedabad, Gujarat.

Name of Project : EIA Study for M/S. Kemz Resibond Private Limited.Survey No.: 84/1, 84/2, village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210

Monitoring done by: Entech Team Packing/Seal: Satisfactory.Quantity of Sample: 1Kg In Plastic BagType of Sample: Soil SampleDetails of Sample:

SampleCode Description of Sample Date of Sampling

Date of Sample Receipt

Analysis Start Date

Analysis End Date

S1 Soil Sample Of Project Site

25/05/2019 26/05/2019 27/05/2019 03/06/2019

S2 Soil Sample Of Puniyad 25/05/2019 26/05/2019 27/05/2019 03/06/2019S3 Soil Sample Of Menpur 25/05/2019 26/05/2019 27/05/2019 03/06/2019S4 Soil Sample Of Raman

Gamdi25/05/2019 26/05/2019 27/05/2019 03/06/2019

S5 Soil Sample Of Kayavarohan

25/05/2019 26/05/2019 27/05/2019 03/06/2019

S6 Soil Sample Of Dhanora 25/05/2019 26/05/2019 27/05/2019 03/06/2019S7 Soil Sample Of Karjan 25/05/2019 26/05/2019 27/05/2019 03/06/2019S8 Soil Sample Of Gandhra 25/05/2019 26/05/2019 27/05/2019 03/06/2019

Sr. No. Parameters Unit S1 S2 S3 S4 S5 S6 S7 S8

1. Particle size Distribution

Qualitative

a. Sand 42 41.0 43.0 42 50 46 47.0 49b. Silt 20 31.0 25.6 21.0 30 21 25.0 24.8c. Clay 32 29 28 29 36 30 28 34

2. Texture Clay Sand Clay

Sandy Clay

Clay Loam

Sandy Clay

Sandy Clay Clay Clay

3. Porosity % 30 33 31 32 44 39 30 42

4. Water holding capacity % 53 49 44 46 40 47 45 50

5. Organic carbon (OC) % 1.1 1.3 0.9 1.2 1.0 1.2 0.9 1.0

6. Calcium as Ca mg/kg 35 28 25 29 41 26 30 327. Magnesium as Mg mg/kg 14 13 14 08 18 11 19 188. Sodium as Na mg/kg 45 43 33 31 40 28 23 24

9. Cat ion Exchange Capacity

meq/100g 36 28 30 35 31 22 28 30

10. Electrical Conductivity µS/cm 164 86 118 132 123 98 112 120

11. Available Nitrogen mg/kg 49 43 38 36 47 39 38 48

12. Available Potassium mg/kg 36 30 29 29 36 29 28 36

13. Available Phosphorus mg/kg 8.7 7.6 5.8 6.9 8.1 7.4 6.6 6.3

Page 140: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 94

PHOTOGRAPHS OF SOIL SAMPLING

Page 141: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 95

Analysis of the samples collected show that:

Porosity of soil samples were in the range of 32% (Project Site) to 46% (Kayavarohan Village) and Water Holding Capacity (WHC) of Soil samples were in the range of 40% (Kayavarohan Village) to 53% (Project Site).

Cation Exchange Capacity (CEC) of Soil samples were in range of 28meq/100gm (DhanoraVillage) to 36meq/100gm (Kayavarohan Village)

Electrical Conductivity of Soil samples were in range of 54dS/m (Karjan Village) to 164dS/m (Kayavarohan).

Percentage of total Organic Carbon is observed in between 0.8 to 1.0 indicating that On an avg. sufficient in nature.

Page 142: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 96

3.11 LAND USE PATTERN

Remote Sensing is a process of identification and demarcation of various earths’ objects from a distance without directly coming into contact with them. Remote sensing is largely concerned with the measurement of electromagnetic radiation from the sun, which is reflected, scattered, and emitted by the objects on the surface of the earth. Different objects on the surface of the earth reflect different amounts of the electromagnetic spectrum. The potential of remote sensing in natural resources mapping basically depends on spatial, radiometric and temporal resolution of the sensor. Thus the satellite remote sensing with its capability of repetitive coverage, multi-spectral imaging, synoptic view and low cost can play an important role in the delineation of various landuse landcover classes.

The Study Area up to 10 kms radius from the proposed project Site is considered. The locations is shown in Figure No. 3.1.

The important land uses, as classified by the Census Records, are the Grass land, Crop land, Fallow land, scrub land, barren land, trees, waterbody, settlements and industrial area.

Landuse and landcover distribution in the study area has been estimated using the satellite imagery of generated from Landsat ETM+ scene of October 2006 (Refer: Figure 3.7). The landuse and landcover pattern of the study area (10 km radial zone) has been studied by the same. The land use distribution in the study area (10 km radial zone) is presented in Table 3.19.

Table 3.19:

Land Use Distribution in Study Area (10 km Radial Zone)

Land Use/Land Cover Area sq km %Grass Land 42.08 13.39Crop Land 154.97 49.33

Fallow Land 43.94 13.99Scrub Land 23.90 7.61Barren Land 5.80 1.85

Trees 28.08 8.94Waterbody 1.51 0.48Settlement 12.37 3.94Industry 1.52 0.48

Total 314.16 100

Page 143: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 97

FIGURE NO. 3.5LAND USE / LAND COVER MAP OF 10 KM RADIUS AREA AROUND

PROJECT SITE

Page 144: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 98

3.12 HYDROLOGY

Ground water occurs in alluvium formation. Though ground water occurs in all types of formation but most productive aquifer is quaternary sediments (alluvium). The main aquifer are alluvium and blown sand ones. Alluvium is an important formation with regards to the development of ground water in view of occurrence of highly permeable granular beds. Ground water occurs under both unconfined and confined conditions. The yield of the tube well varies from 120 lpm to 400 lpm.

The unconfined aquifer occurs in the upper horizons down to a maximum depth of 95mtr consisting of medium to coarse grained sand. The thickness of aquifer varies between 24m and 36m in general.

Geo-hydrologically study area is a part of Village: Fofaliya, Taluka: Dabhoi, District: Vadodara is suitable for the construction of shallow tube-well and recharge wells for artificial recharge/rain water harvesting structure. Construction of rain water harvesting structure will be helpful to maintain the Static Water level.

Level of groundwater development

Page 145: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 99

Vulnerability of Industrialization & Urbanization

Vulnerability of Salinity Ingress

Page 146: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 100

The Vadodara district has main three hydrogeological provinces, Aravalli terrains, Deccan trap & associated Cretaceous sediments terrains and Alluvium areas.

Unit has installed rain water harvesting system within premises to collect and recharge rainwater. Rain water from proposed construction and paved area shall be recharged.

The depth to water is greater in upland areas whereas in valley portion and shallow grounds, the levels are very close to surface. In hilly terrain of eastern, north- east and south-east part of the district, spring zones are seen in stream river section; also along the section of the Mahi, the Narmada and the Orsang rivers. The piezometric surface, mainly in alluvium areas of western half the district also follows the gentle gradient corresponding to subsurface configuration of deep aquifer zones.

Inferences drawn from the data collected by the analysis and investigation carried out in the area are listed below.

Geomorphologically, the study area is flat in nature.Geologically, the area is underlain by Quaternary/Tertiary continental sediments alluvium and older formations. These sediments are mainly consisted by coarse Sand, gravel, clay .The occurrence and movement of groundwater is mainly controlled by intergranular pore space.Sub-surface geology of the area shows permeable and fully developed aquifer system.The quaternary aquifers are generally coarse to fine grained Sand with occasional gravel bed.Un-confined to Semi-confined ground Water level in the study area ranges around from 35 to 40 m. The yield of Tube-wells varies from 120 to 400 lpm.The depth of production tube wells in general varies from78 to 90 m. The study area falls under safe category.

RECOMMENDATIONS:-

Based on the geological & geohydrological study the following recommendations are drawn

for augmenting ground water and balancing ground water by means of rain water harvesting

structure.

Existing one tube-well is capable to fulfil present per annum fresh groundwater requirement.

The area is suitable for rain water harvesting by constructing recharge well, water bodies

like ponds, check dams, nalla bund, gully plug in nearby villages.

The aquifer are un-confined to semi-confined/confined having intake capacity of clear water

approximate 4LPS i.e. 14.4 m^3 per hour. One recharge bore-well can store approximate

10368 m^3 clear rain water in 30days.

Page 147: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 101

Suggested for constructing one recharge tube well having depth 60m to 70m and pipe Dia

200mm.

The available gross rain fall recharge is 5762 m3 which is three times of the Water to be

recharged .

The study area falls under SAFE category as per GWRE report 2009 approved by CGWA

Delhi if the study area lies under safe category as per CGWA guidelines (w.e.f 15/12/2010)

for evaluating of proposal for ground water balance in such areas, ground water

development is permitted only 100% of recharge quantity or recharge to ground water

should be 50% of the ground water pumped through tube-well.

Presently it seems no impact on groundwater level due to small pumping of 5500 liters per

day.

3.13 ECOLOGY

Environmental Impact Assessments is necessary for industrial projects for new, expansion or for modernization activities. Proper assessment of biological environment and compilation of its taxonomical data is essential for the impact prediction.

The climatic, edaphic and biotic variations with their complex interrelationship and composition of the species, which are adapted to these variations, have resulted in different vegetation cover, characteristic of each region. The ecology of the study area is briefly discussed in this subsection. The study is mostly surrounded by the rural area. The land usepattern used to show the major portion covered by irrigated land.

A base line Survey has been carried out to appraise the terrestrial flora and fauna within study areas of 10 km radius around the site of the industry. The study area includes villages as shown in the following table.

3.13.1 PERIOD OF THE STUDY AREA:

The base line study for identification of floral and faunal biodiversity of the terrestrial environment of the study area was conducted in the Month of March, 2019.

3.13.2 METHODOLOGY:

The methodology adopted for the evaluation of biodiversity status of the study region is as given below. The sampling plots for the survey were selected randomly in the suitable habitats within the study area.

Table 3.20: Methodology adopted for the evaluation of biodiversity status of the study region

Plants Tree 10 meter radius circular plot

Page 148: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 102

Shrubs 10 meter radius circular plotHerbs 1 meter x 1 meter square plot

BirdsTerrestrial Point centered quadrate in 10 meter radius Aquatic Total count & Folk count

HerpetofaunaTerrestrial / Aquatic 10 meter radius circular plot Indirect evidence Survey in the village with the help of pictorial

representation Mammals Direct Count Line transect and Round transect

Indirect evidence Surveys in the villages with the help of pictorial representation

3.13.3 TOPOGRAPHY OF THE STUDY AREA:

Topography of the region was characterized by fields. Most of the land were planted with different plants and for agriculture as well as utilized for industries. No natural forest area was observed in the study area. (Please refer Figure: 3.6 Land use pattern showing the Project site and surrounding area)

3.13.4 FLORAL DIVERSITY:

The trees, herbs, shrubs and major crops, observed during the biological survey conducted within study area. During study 88 flora observed belongs to 48 Family are enumerated from the study area. Wheat (Triticum aestivum L.), cotton (Gossypium arboreum L.) & Castor (Ricinus communis L.) etc. mainly crops found in the study area.Among the enumerated flora in the study area, no rare and endangered flora was observed

The agriculture is major land use of the study area. During the study period (March, 2019), the cultivable lands of different area were observed with different crops.

Table 3.21: FLORA IN THE STUDY AREA

Scientific Name Family Local nameRanunculus sceleratus L. Ranunculaceae JaldhanaNymphea stellata Wild. Nympheaceae Lal poynaNymphoides peltatum

Nelumbo nucifera Gaertn. Nelumbonaceae Vado Kamalful

Polygala erioptera DC. Polygalaceae PatsanPortulaca olearacea L. Portulacaceae Moti LuniPortulaca quadrifida L. Zini Luni

Polycarpaea corymbosa (L.) Lam.Caryophyllaceae

Jangli soaSpergula arvensis L. Corn spurrey

Bergia odorata Edgew. Elatinaceae OkhradCorchorus aestuans L. Tiliaceae ChunchCorchorus olitorius L. ChunchOxalis corniculata L. Oxalidaceae ChangeriTribulus terrestris L. Zygophyllaceae Bethu Gokhru

Page 149: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 103

Cayratia carnosa (Lam.) Gagnep. Vitaceae Kath katumboCissus quadrangularie L. Hadsakal

Alyscirpus monilifer (L.) DC.Fabaceae

JhuhighasDesmodium triflorum L. Zino Pandadio

Sesbania bispinosa Jacq)W.F.Wight IkadAmmannia baccifera L. Lythraceae Agio

Ammannia multiflora Roxb. Zino agioLudwigia parviflora Roxb. Onagraceae Panlavang

Trapa bi-spinosa Roxb. TrapaceaeGlinus lotoides L.

MolluginaceaeMitho okhrad

Mollugo pentaphylla L. JhrasOldenlandia corymbosa L. Rubiaceae Parpat

Borreria aricularis L. GanthiyuAcanthospermum hispidum DC.

Astreceae

Zinku gadriyou

Amberboa ramosa (Roxb.) Jeffry. MankadmariAgeratum conzoides L. Dholi sadodi

Echinops echinatus Roxb. Ut kantoEclipta prostrata (L.) L. Manf. Jal bhangro

Grangea mederaspatana (L) Poir. ZinkimundiLaunaea procumbens (Roxb.) Ramayya Moti

bhoypattriParthenium hysterosporus L. Gajargas

Dyerophytum indicum (Gib. Ex Wt.) O. Plumbaginaceae Rato chitrakPlumbago zeylanica L. ChitrakAnagallis arvensis L.

Primulaceae

Khet fuliLeptadenia reticulata (Retz.) W & A. Dodi

Pergularia daemia (Forsk.) Chiov. Chamar dudhali

Enicostema littorale Bl. Gentianaceae MamejvoConscora diffusa (Vahl.) R. Zinkukariatu

Coldenia procumbens L. Boraginaceae OkhradHeliotropium indicum L. Hathi sundha

Convorvulus microphyllus (Roth.)Sieb.ex.Spr. Convolvulaceae

Sankhavali

Evolvulus alsinoides L. Kali sankhavoli

Datura innoxa Mill. Solanaceae Kalo dhanturoBacopa monnieri (L) Pennell.

Scrophulariaceae

JalnaveriBonaya veronicaefolia Spr. Parpati

Kixia ramossisima (Wall.) Janch. Bhit gilodiLindergia urticaefolia Lehm. Bhit chattiOrobanche aegyptica Pers. Orobanchaceae VakubmbhoAndrographis ehioides L. Acanthaceae Kariyatu

Andrographis paniculata Wall. Lilu kariyatuPhyla nodiflora (L) Greene. Verbenaceae Rathvelio

Anisomeles indica (L) O. Ktze. Lamiaceae Chodharo

Page 150: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 104

Leucas cephalotes (Roxb. Ex Roth.) Spr. KuboOcimum gratissimum L. Avchi bavchi

Ocimum sanctum L. TulsiBoerhavia diffusa L.

NyctaginaceaeSatodi

Polygonum glabrum Willd. ShrrulPolygonum plebeium R. Br. Zinko okhrad

Acalypha indica L. Euphorbiaceae KappiHydrilla verticillata (L.f.) Royal. Hydrocharitaceae Kureli

Ceretophyllam demersum L. CeretophyllaceaeEichhornia crassipes Mart.

PontederiaceaeVallisnaria spirallis L. JalsarpolianAsparagus recemosus Willd. Liliaceae SatavariAsphodelus tenuifolius Cav. DungaroCommelina benghalensis L. Commelinaceae Motu

sismuliyuLemna verticellata Hegelm. Lemnaceae

Thypha angustata Bory. Thyphaceae Gha bajariuSegittaria segitifolia L. Alismataceae -

Potamogeton nodosus Poir. Potamogetonaceae -Eriocaulon sp. Ericulaceae -

Cyperus difformis L. Cent.

Cyperaceae

ChiyoCyperus rotundus L.Scirpus ciliaris L. -

Scirpus littoralis Auct. -Apluda mutica L.

PoaceaeBhangoru

Aristida adscensionis L. LapduAristida funiculate Trin. & Rupr. Laso lampdo

Cajanus cajan (L.) Millsp. Leguminosae TuvarTriticum aestivum L. Poaceae Wheat

Gossypium herbaceum L. Malvaceae KapaasRicinus communis L. Euphorbiaceae CastorFicus benghalensis Moraceae vad

Fauna:

During the survey, a total of 67 species belonging to 41 families were noted in the study area. Most of the species are of common occurrence. List of fauna observed during study period are given in Table 3.21.

Table 3.21: FAUNA IN THE STUDY AREA

Scientific Name Family Local nameAnas clypeata Anatidae Northern Shoveler

Anas poecilorhyncha Spot billed duckAnas querquedula GarganeyArdea purpurea Ardeidae Purple heronArdeolagrayii Pond heron

Page 151: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 105

Egrettagarzetta Little egretMesophoyxintermedia Median Egret

Elanuscaeruleus Accipitridae Black winged kiteMilvusmigrans Black kite

Pernis ptilorhyncus Oriental Honey Buzzard

Acridium sp. Tetrigidae Pigmy locustDelias eucharis Pieridae Common JezebelColotis amata Small Salmon Arab

Belenois aurota PioneerMycterialeucocephala Ciconiidae Painted StorkOrthotomussutorius Cisticolidae Tailor bird

Priniasocialis Ashy priniaColumba livia

Columbidae

Blue rock pigeonStreptopeliadecaocto Eurasian Collard

DoveSpilopeliasenegalensis Laughing Dove

Streptopeliatranquebari ca Red Turtle-doveCentropussinensis Cuculidae Crow- pheasant

Eudynamysscolopaceus Indian koelCorvus macrorhynchos Corvidae Jungle Crow

Corvussplendens Common crowLonchuramalabarica Estrildidae Indian silverbilDicrurus macrocercus Discruidae Black drongo

Turdoidesstriatus Leiothrichidae Jungle babblerHirundosmithii Hirundinidae Wire tailed

SwallowMeropsorientalis Meropidae Green bee- eater

Nectarinia asiatica Nectariniidae Purple sunbirdFrancolinus pondicerianus Phasianidae Grey francolin

Tachybaptus ruficollis Podicipedidae Little GrebePycnonotuscafer Pycnonotidae Red vented bulbul

Pycnonotus leucotis White-eared bulbulActitishypoleucos Scolopacidae Common sandpiper

Tringa glareola Wood SandpiperAcridotheresginginianus Sturnidae Bank myna

Acridotherestristis Common mynaSturnuspagodarum Brahminy StarlingPseudibispapillosa Threskiornithidae Red-naped Ibis

Threskiornismelanoceph alus Oriental White IbisConocephalus sp. Tettigoniidae GrasshopperBelenois aurota Pieridae PioneerDelias eucharis Common Jezebel

Catopsilia pomona Common emigrantDanauschrysippus Nymphalidae Plain tigerMuscadomestica Muscidae House fly

Catochrysops strabo Lycaenidae Forget-me-not

Page 152: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 106

Prosotas dubiosa Tailless LineblueOrthetrum sp. Libellulidae Skimmer dragonfly

Gryllusbimaculatus Gryllidae Field cricketGryllusdomecticus House cricket

Camponotuscompressus Formicidae Black antOecophyllasmaragdina Red ant

Anopheles sp. Culicidae MosquitoApisdorsata Apidae Honey beeApisflorea Honey bee

Boselaphustragocamelus Bovidae Blue bullSimia entellus Cercopithecidae Hanuman Langur

Felischaus Felidae Jungle catHerpestesedwardsi Herpestidae Common

mongooseCalotesversicolar Agamidae Garden lizard

Ptyas mucosa Colubridae Indian Rat SnakeNajanaja Elapidae Common cobra

Lissemyspunctata Trionychidae Indian Flapshell Turtle

Varanusbengalensis Varanidae Common Indian Monitor Lizard

Page 153: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 107

3.14 SOCIO-ECONOMIC ENVIRONMENT

Existing baseline status of the socio-economic profile of the study area with

reference to demographic structure, provision of basic amenities, health status

incorporating economic pattern in the nearby rural areas (10 km radius) were

undertaken, it was used in assessing the impact of the project on socio-economic

environment.

Basic infrastructures are available within area like Schools, Colleges, Hospitals &

a community facility even nearby area of the project site is also developed.

Findings of study area based on Census 2011 and field survey:

Total population : 49815

Males: 25908

Females: 23907

Sex ratio : 927

Average literacy rate: 81%

Economical profile of the area depends on Industrial job and agricultural

activities.

Infrastructure facility like roads, transportation, electricity connection, bank, post-

office, school etc available in village.

Education facility like anganwadi and primary school available in village and for

further education facility getting from Kayavarohan and Karjan.

Main source of the drinking water is bore well and some villages are having

Narmada canal as water source and ground water as a domestic purpose uses.

Page 154: M/s. Kemz Resibond Private Limited
Page 155: M/s. Kemz Resibond Private Limited
Page 156: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 110

3.15 Traffic Survey

To determine current traffic volumes on the road, the traffic studies have been accomplished. This study gives an idea about expected future traffic volumes as a part of overall impact assessment forthe project. The traffic densities may vary based on working days and time, and also may vary in day and night times. This survey was conducted during normal working day to get details of traffic density. NH-48 is 2.86 km from project site, hence traffic density study was conducted at said location. The vehicles moving in both the directions were counted continuously for 24 hours at one location. The vehicles were counted every hour and recorded under respective category. The maximum traffic count in an hour is termed as peak hour traffic. The vehicles were categorized under various heads like heavy motor vehicles such as buses, trucks and tankers, light motor vehicles (cars, jeeps), three wheelers (auto rickshaws, tempo etc.) two wheelers (scooters, motor cycles) etc. The summary of daily traffic density in terms of PCU for the locations were monitored during the study period is summarized below. It was observed that the cars/jeeps and trucks/buses forms the major volume of the traffic. The overall total traffic PCU of this road is minimal. The present level of traffic in terms of Passenger Car Units (PCU) at these locations as per the conversion factors stipulated by Indian Road Congress (IRC) is presented below:

Table 3.23: Traffic Counts

Type of Vehicles

Peak hr. traffic on NH-48 Near FofadiyaBamangam to Manglej

Manglej to Bamangam

Vehicle Nos. PCU Vehicle Nos. PCUHeavy (Bus, Truck, etc) 165 495 165 496Light (Car, Jeep, Pickup Van etc.) 205 205 203 2033 Wheeler (Rickshaw) 107 107 108 1082 Wheeler (Scooter, motorcycle, cycle etc) 152 76 156 78Total 629 883 632 885

Table: 3.24 Existing Traffic Scenario and Level of Services

Particular Existing Traffic Scenario and Level of ServicesBamangam to Manglej Manglej to Bamangam

Road type 6 lane with dividerCapacity as per IRC 4300 (PCU’s /h)Existing total volume during peak hr (PCU) 883 885Existing volume / capacity ratio 0.2 0.2Level of Service “A” Very Good “A” Very Good

DiscussionThe above traffic reveals the LOS (Levels of Service) as “A” Very Good for the NH-48, which is a 6 lane road with divider. Increase in traffic due to proposed expansion in facility will be taken care by the six lane road.

Page 157: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 111

CHAPTER 4

ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES

4.1 INTRODUCTION

Environmental Impact Assessment (EIA) is an activity or an attempt to identify, predict, evaluate and communicate the likely environmental impacts of the proposed project on the surrounding environment.

The major element involved in the process of Environmental Impact Assessment is the Identification of impacts as it forms the basis for quantification and evaluation of impacts. In this section, the impacts on the environment, either beneficial or deleterious due to the proposed project have been identified. The aspects of the environment, which are likely to be disturbed or damaged due to the proposed project, are represented as parameters.

Prediction of impacts is the most important component in the Environmental Impact Assessment studies for quantification and evaluation of impacts. Several scientific techniques and methodologies are available to predict impacts of developmental activities on physical, ecological and socio-economic environments. Such predictions are superimposed over the baseline (pre-project) status of environmental quality to derive the ultimate (post-project) scenario of environmental conditions. The prediction of impacts helps in minimizing the impacts on environmental quality during the post project execution.

The identified impacts for various components of environment viz. air, noise, water, land, socio-economy etc. are presented herewith. EIA is an activity or an attempt to identify, predict, evaluate and communicate the likely environmental impacts of the activity/project on the environment.

ENVIRONMENTAL IMPACT ASSESSMENT STUDY INCLUDES:

Identification of all the probable impacts (be it positive or negative) of the various activities involved in the completion of the project.

Classification of the probable impacts i.e. positive or negative, reversible or irreversible, short term or long term.

Evaluation of the probable impacts i.e. qualitative and quantitative assessment of the likely impacts.

Communication to the general public, interested parties, controlling authorities (Government or Municipality) through a Public Hearing process, revealing all the probable impacts, which are likely to occur due to the Proposed project, on the environment. It also includes the mitigation measures of those impacts, which are inevitable.

This chapter presents the identification, prediction and evaluation of impacts with mitigation measures of the proposed expansion project of M/s. Kemz Resibond Private Limited on the identified parameters in the baseline environmental status.

Page 158: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 112

4.2 IMPACT IDENTIFICATION

Considering that identification of significant environmental impact is essential in the preparation of EIA report, an attempt has been made here through the use of “Activity Effect” Matrix.

IDENTIFICATION MATRIXThe impact identification matrix is shown in the Table No. 4.1. For simplicity the entire project has been divided into two phases:

1. Construction Phase

2. Operation Phase

Various activities belonging to each phase have been grouped separately and arranged in Columns. The environmental Factor or Parameter, which are anticipated to be impacted, has been arranged in Rows. A preliminary scrutiny has been done and the cells, which fall at the junction of the ‘Activity’ and ‘Factor’, that have possible interaction with each other, have been ‘marked’.

The matrix thus establishes the possible ‘cause-effect’ relationship and identifies the environmental factors likely to be impacted and activities responsible for the same. The impact identified may be positive and negative, short term and long term, reversible and irreversible, minor and major. This determination will be done at prediction stage.

A. Construction Phase

Unit will carry out construction activity for manufacturing area, internal roads, housing colony etc. will be done. The various activities involved in construction phase of a proposed project are listed below:Transportation of construction materials required for modification of existing structure ExcavationMaterial handlingMinor civil construction/Modification of existing civil structure.Erection/Installations of equipment and machineryEmployment of labourGreen belt development

B. Operational Phase

The activities involved in the operation phase of the proposed project are listed below:Raw material handling and StorageProduct Manufacturing Utility ConsumptionProduct Handling & StorageTransportationEffluent GenerationGaseous EmissionsHazardous Waste Generation EmploymentGreen belt development

Page 159: M/s. Kemz Resibond Private Limited
Page 160: M/s. Kemz Resibond Private Limited
Page 161: M/s. Kemz Resibond Private Limited
Page 162: M/s. Kemz Resibond Private Limited
Page 163: M/s. Kemz Resibond Private Limited
Page 164: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 118

4.3 IMPACT PREDICTION AND ASSESSMENT WITH MITIGATIVE MEASURES:

This section is devoted to the prediction and assessment of impacts, which are the most important components of EIA. Such predictions are superimposed over the base-line status of the environmental quality to derive the ultimate environmental scenario.

Prediction involves determination of the nature and extent of the probable impacts due to the proposed Project. Here it is determined, whether the likely environmental impacts are:

1. Positive or Negative2. Long term or Short term

Prediction of impacts during the construction and operational phase is as Shown in Table No 4.2.

Unit will establish full infrastructure for the proposed plant. However, there will be short term negligible impacts during this phase and mitigation measures for the same are proposed as under.

Based on Environmental Impact Analysis, the Environmental Impacts under this step are quantitatively and qualitatively assessed.

Quantitative assessment with the help of a mathematical model has been done wherever possible. In other cases, the impact assessment has been qualitative which is based on available scientific knowledge and judgment.

The mathematical model used for prediction in the present study includes “Aermod view” model for ambient air quality. For other cases i.e. Water, Noise, Land/Soil, Ecology, Socioeconomic etc., the available scientific knowledge and judgments have been used.

Page 165: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 119

4.4 IMPACT ON AIR ENVIRONMENT

A. Impact during Construction Phase:-

The impacts during construction phase will be short-term impacts as they will be limited to the period of construction.

These activities may result in temporary increase in SPM levels, primarily, in the working environment.

Main Impacts during construction period is dusting and Air Pollution from vehicles.

There will be impact on Air Environment during construction phase and also during operation phase. The impact during construction phase will be short term and reversible.

The main sources of emission during the construction period are the movement of equipment at site and dust emitted during handling, grading, earthwork, and exhaust emissions from vehicles and equipment deployed during the construction phase is also likely to result in marginal increase in the levels of SO2 , NOx, SPM and CO.

B. Mitigation measures during Construction Phase :-

The activities like site development, construction and vehicular traffic contribute to increase in SPM and NOx concentrations. The mitigation measures recommended to minimize the impacts are:

Water sprinkling in construction area. Proper maintenance of vehicles and construction equipment.Proper traffic management to be follow during loading and unloading of construction

material.The heights, from which materials will be dropped, will be the minimum practical height to

limit fugitive dust generation.Tree plantation in the area earmarked for greenbelt development.

Hence, the impacts on ambient air quality during construction phase will be marginal temporarily and reversible in nature (for short duration) and restricted to small plant area only.

Page 166: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 120

C. Impact during Operational Phase:-

The impacts on air quality from project depend on various factors like design capacity, configuration, process technology, raw material, fuel to be used, air pollution control measures, operation and maintenance. Apart from the above, other activities associated with transportation of fuel, raw materials and finished products, storage facilities and material handling within the plant premises may also contribute to air pollution.

1. Source of Air Pollution

The operational phase activities are expected to have long - term impacts on the air quality. The main sources from project are Flue gas emission, Process gas emission, Fugitive emission etc.

i. Flue gas Emissions

Thermic Fluid Heater will be the main sources of emissions from the Plant. The unit is going to use LDO as a fuel in TFH.

Further, it may be noted that the impacts due to utility operations would be negligible as the LDO will be used as fuel.

PM, SO2 and NOx are the main air pollutants generated from the TFH. The emissions TFH Stack is given in Table No. 4.3.

For control of flue gas emissions below permissible limit, the unit will provide adequate stack height.

Based on the above stated facts, predictions related to the Ground Level Concentrations (GLCs) have taken into account the flue gas emissions from the proposed flue gas stack.

ii. Process/Fugitive Emissions

Reactors & Blenders will be the minor source of process emission from the plant. VOCs are the air pollutants generated from the blender during loading of material and for the same scrubber will be provided.

Scrubber will be provide with the reactors & blenders to control of VOCs.

Fugitive emission details with its mitigation measures:Entire process will be carried out in the closed reactors with proper maintenance of

pressure and temperature. No any type of major process gas emission from proposed unit. In proposed resin manufacturing process, First the raw materials will be mixed in the closed reactor vessel. Once the desired parameters will be achieved, the product will be cooled and transferred to blender with very slow rate. In blender equipped with water jacket, unit willmaintain temperature less than 70°C means below the vaporization point of Styrene Monomer / Xylene. However, unit has proposed to provide the scrubber with blender due to any rarely circumstances if acid fumes will generate.

Page 167: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 121

TABLE NO.4.3BASIS OF EMISSION RATE CULATIONS

Sr.No.

Stack attached to

Type of Fuel

Dia.(m)

Height (m)

Exit Temp. ( C)

Exit Velocity (m/sec)

Emission Rates (gm/s)PM

(*)SO2(**)

NOX(***)

1 Thermic Fluid Heater

LDO 0.3 12 160 8.0 0.058 0.110 0.037

2 D G Set- 1 (500 kVA)

HSD 0.15 6 210 6.0 0.010 0.018 0.006

Note: (*) Based on maximum expected concentration of PM-150 mg/Nm3in Flue gas stack

(**) Based on maximum expected concentration of SO2-100 ppm in Flue gas stack

(***) Based on maximum expected concentration of NOx-50 ppm in Flue gas stack

Page 168: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 122

iii. Prediction of Impacts on Air Environment

The concentration of pollutants at the ground level has been computed using computer model viz. AERMOD to assess the impact of source emissions from the proposed stack which will be installed. Mathematical modeling is an established and accepted technique to predict the air quality.

In this study, impact on environment due to the proposed plant has been assessed with the help of Mathematical modeling following the Central Pollution Control Boards Guidelines. The mathematical model used for conducting the study is the latest version of AERMOD developed by the Lakes Environmental Software, which is entirely in line with the requirements of Central Pollution Control Board, New Delhi.

A mathematical model developed by the Environmental Protection Agency (EPA) is used for calculating GLCs. This is based, on the original Gaussian Plume Model equation but is defined in terms related to atmospheric phenomenon. The average and maximum Ground Level Concentrations (GLCs) have been determined for SPM, SO2 ,and NOx, . The average 24hrs. concentrations have been determined in polar grid of 100 up to 3600 for a distance of 500m, 1000m, 2000m, 2500m, 3000m, 3100 m, 3400m, 4000m, 5000m, 7500m, and 10000 m. has been calculated based on the micro-meteorological data collected from the meteorological station kept at the project site of M/s. Kemz Resibond Private Limited

Methodology :

Prediction of GLC values are made by using AERMOD software approved by U.S. Environmental Protection Agency (USEPA) and has adopted it as its regulatory model since 2005. In point source emissions, the stacks are subjected to plume rise which again is dependent on force of buoyancy and momentum. The higher is the plume rise or stack, the lesser will be ground level concentrations (GLC’s).The emissions when released into the atmosphere are subjected to transportation, dispersion, transformation, and fall out and wash out and finally reach the ground level at a particular distance and concentrations. The relationship between the source of emissions and its magnitude with the ground level concentrations (GLC’s) at receptor points is governed by air dispersion models which take into the account by the source strength, plume rise, atmospheric stability, mixing height, wind velocity, terrain and other meteorological conditions. The comparison between the predicted and field sampled downwind concentrations for SPM, SO2 ,and NOx (µg/m3) will be carried out in this study to predict the average downwind ground level concentrations (GLC’s)

Data Used for Computation

Stack emissions data have been used for prediction of short-term incremental GLC values of PM, SO2 & NOx, using the meteorological data collected during the March – April – May 2019. Details of the data used for computations are given below

Meteorological Data

The meteorological data recorded continuously during the month of March 2019 to May 2019, on hourly basis. AERMOD model requires hourly surface data values for wind speed, wind direction, temperature, relative humidity and cloud cover. Both data files for the surface and profile files were then used to generate the meteorological file required by the AERMOD dispersion model using the AERMET meteorological pre-processor. This AERMET has three

Page 169: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 123

stages to process the data. The first stage extracts meteorological data and assesses data quality through a series of quality assessment checks. The second stage merges all data available for 24-hour periods and writes these data together in a single intermediate file. The third and final stage reads the merged meteorological data and estimates the necessary boundary layer parameters for dispersion calculations by AERMOD.

Dispersion Modeling Results

The 24 hourly average ground level concentration (GLC) values from plant have been computed for PM, SO2 & NOx, considering topographical features around the plant and applicable stability classes. The maximum 24 hourly average GLC values for PM, SO2 & NOx, from plant are given in Table No. 4.4. Corresponding isopleths plotted are shown in Figure 4.1 to Figure No. 4.3 for of PM, SO2 & NOx.

iv. Predicted 24-hourly short term incremental ground level concentration

The results of the GLCs are given in the Table No. 4.4

When the above stated GLCs results are added in to the average ambient air parameters it gives overall AAQ of the surrounding study area.

Air quality contours are shown in the Figure No. 4.1 to 4.3

Page 170: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 124

TABLE NO.4.4

MAXIMUM COMPUTED GROUND LEVEL CONCENTRATION AT

PROJECT SITE

Sr.No.

Description ValueConcn *( µg/m3)

Co-ordinatesX (m) Y (m)

A PM1 1st Highest 24 hr. Result 1.35560 321.39 383.022 2nd Highest 24 hr. Result 1.33896 383.02 321.39

B SO21 1st Highest 24 hr. Result 2.54827 321.39 383.022 2nd Highest 24 hr. Result 2.51574 383.02 321.39

C NOx1 1st Highest 24 hr. Result 0.85586 321.39 383.022 2nd Highest 24 hr. Result 0.84487 383.02 321.39

Note :-(*) This predicted maximum Ground Level Concentration (GLC) is based on worst case scenario, considering maximum stack emission limit of SPM-150 mg/Nm3, SO2 100 PPM and NOx-50 PPM. As the actual emissions will be well below this predicted GLCs.

Page 171: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 125

TABLENO. 4.5CUMULATIVE CONCENTRATIONS DUE TO INCREMENTAL GLC's

Pollutant

MaximumBaseline

Conn

( g/m3)

IncrementalConn due to Proposed

Project ( g/m3)

Resultant Conn

( g/m3)

NAAQStandards( g/m3)

PM 88.66 1.35560 90.0156 100

SO2 33.62 2.54827 36.16827 80

NOx 48.7 0.85586 49.55586 80

With this marginal contribution due to the proposal of the project, the levels of PM, SO2 & NOx will remain below the 24 –hourly ambient air quality standards for SO2 & NOx (80

3) and PM103) prescribed by CPCB. The operation of plant is not likely to

cause any significant impact on the ambient air quality of the study area.

The Dispersion modeling assumptions are considered as follows:

1. The receptor locations for 36 wind directions starting with 10 degrees and incrementing with 100 up to 3600 for a distance of 500m, 1000m, 2000m, 2500m, 3000m, 3100 m, 3400m, 4000m, 5000m, 7500m, and 10000 m. has been taken for the Air Quality Modelling.

2. The impacts of the pollutants were identified up to 10000 meters.3. The terrain of the study area was considered as FLAT.4. Stability Class was evaluated based on Temperature Profile and Cloud Cover.5. The mathematical equations used for the dispersion modelling assumes that the earth surface

acts as a perfect reflector of plume and physic-chemical process, such as dry and wet deposition, and chemical transformation of pollutants are negligible.

6. The micro-meteorological data viz. Temperature, Wind Speed and Wind Direction has been collected from the meteorological station kept at the project site of M/s. Kemz Resibond Private Limited.

RESULTS OF THE AERMOD MODEL

The overlapped Isopleths on Google Image of the same is shown as at Figure No. 4.1 to 4.3. & concentration values are shown in Table No. 4.6 to 4.10.

Page 172: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 126

TABLE NO. 4.6 1ST HIGHEST 24-HR AVERAGE

CONCENTRATION VALUES OF PM (µg/m3)

Direction O Distance (meters)500 1000 2000 2500 3000

360 0.19029 0.14099 0.19405 0.17227 0.1509710 0.39735 0.19875 0.14942 0.13241 0.11602 20 0.87795 0.32521 0.22071 0.18729 0.17080 30 1.16630 0.74150 0.57292 0.47304 0.39586 40 1.35560 0.63256 0.58814 0.53243 0.47474 50 1.33896 0.82010 0.76795 0.68113 0.59622 60 0.45878 0.36950 0.34714 0.30060 0.26014 70 0.35171 0.23956 0.33087 0.29055 0.2520880 0.39086 0.27775 0.45045 0.42837 0.3963390 0.32988 0.21704 0.18688 0.16059 0.13770 100 0.14317 0.15440 0.21597 0.18857 0.16284110 0.12336 0.06809 0.03714 0.03036 0.02567120 0.14366 0.17985 0.14829 0.12358 0.11901130 0.19207 0.07154 0.02980 0.03342 0.03449 140 0.19288 0.14388 0.07249 0.05560 0.04576 150 0.14037 0.23347 0.18955 0.15238 0.12379 160 0.16293 0.09552 0.13931 0.12484 0.11010 170 0.17700 0.21447 0.35712 0.36240 0.35040180 0.16342 0.14826 0.12571 0.11144 0.10036190 0.16075 0.16660 0.19961 0.18835 0.17409200 0.16692 0.22634 0.29768 0.25736 0.22027 210 0.14188 0.05623 0.07128 0.07983 0.08146220 0.08314 0.03732 0.01992 0.01843 0.02142 230 0.05876 0.01578 0.02862 0.03464 0.04057 240 0.07437 0.01937 0.00750 0.00704 0.00665 250 0.09340 0.12138 0.13800 0.12113 0.10587 260 0.10019 0.05535 0.05517 0.04294 0.03347 270 0.18116 0.10130 0.05556 0.03788 0.02649 280 0.40993 0.48304 0.51620 0.46427 0.40885 290 0.27315 0.12696 0.11633 0.10193 0.08836 300 0.20557 0.13837 0.15458 0.15867 0.16917310 0.16208 0.22598 0.24364 0.21344 0.22672320 0.18111 0.10321 0.08282 0.09515 0.09853 330 0.17708 0.12576 0.07900 0.08341 0.08706 340 0.15312 0.11669 0.08113 0.09677 0.10303 350 0.14528 0.07739 0.04469 0.04385 0.03866

Page 173: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 127

1ST HIGHEST 24-HR AVERAGE CONCENTRATION VALUES OF PM (µg/m3)

Direction O Distance (meters)3500 4000 5000 7500 10000

360 0.13238 0.11667 0.09247 0.05755 0.0398210 0.10873 0.10173 0.08788 0.06149 0.0451720 0.15353 0.13964 0.11926 0.08097 0.0580030 0.33586 0.28852 0.22080 0.13162 0.08984 40 0.41820 0.37034 0.29559 0.18543 0.12862 50 0.52051 0.45776 0.36217 0.22506 0.15581 60 0.22650 0.19881 0.15695 0.09763 0.06776 70 0.21902 0.19148 0.14974 0.09139 0.0683980 0.35733 0.32132 0.26182 0.17352 0.1297990 0.13021 0.12281 0.10725 0.07606 0.05644 100 0.14098 0.12494 0.09956 0.06243 0.04357110 0.02423 0.02498 0.02435 0.02408 0.02572120 0.11286 0.10550 0.09065 0.06217 0.04475130 0.03057 0.02682 0.02053 0.01786 0.01900140 0.03847 0.03247 0.02404 0.02356 0.02477150 0.10210 0.08548 0.06232 0.04270 0.03657160 0.09698 0.08577 0.06831 0.05247 0.05600170 0.32122 0.29224 0.24110 0.15753 0.11181180 0.08467 0.07197 0.05345 0.03008 0.02057190 0.15461 0.13772 0.11053 0.07476 0.05929200 0.18906 0.16341 0.13474 0.10192 0.09145 210 0.07557 0.06933 0.05772 0.03728 0.03109220 0.02250 0.02249 0.02263 0.02482 0.02719 230 0.04583 0.04997 0.05267 0.04443 0.03583 240 0.00641 0.00632 0.00600 0.00325 0.00438250 0.09272 0.08121 0.06382 0.03938 0.02739 260 0.02998 0.02720 0.02348 0.01995 0.01917 270 0.01899 0.01398 0.00812 0.00478 0.00521280 0.35899 0.31691 0.25177 0.15666 0.10807 290 0.07503 0.06394 0.04717 0.02547 0.01948300 0.15831 0.14609 0.12246 0.07968 0.06389 310 0.21925 0.20835 0.18179 0.13189 0.11547320 0.09342 0.08726 0.07398 0.04991 0.04101 330 0.08294 0.07783 0.06723 0.05807 0.04700340 0.09949 0.09450 0.08347 0.06036 0.04519 350 0.03358 0.02983 0.02915 0.02782 0.02775

Page 174: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 128

FIGURE NO. 4.1ISOPLATHES OF PM CONCENTRATION FOR 24HRS

Page 175: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 129

TABLE NO. 4.71ST HIGHEST 24-HR AVERAGE

CONCENTRATION VALUES OF SO2 (µg/m3)

Direction O Distance (meters)500 1000 2000 2500 3000

360 0.35822 0.26203 0.36406 0.32348 0.2836410 0.74830 0.37342 0.28035 0.24865 0.21799 20 1.65139 0.61196 0.41390 0.35154 0.31965 30 2.19159 1.38937 1.07646 0.88903 0.74406 40 2.54827 1.18235 1.10218 0.99890 0.89130 50 2.51574 1.53194 1.43988 1.27836 1.11969 60 0.86319 0.69319 0.65168 0.56469 0.48890 70 0.66149 0.44581 0.62121 0.54592 0.4738480 0.73212 0.51564 0.84308 0.80230 0.7424990 0.62029 0.40848 0.35101 0.30181 0.25811 100 0.26914 0.28753 0.40561 0.35437 0.30614110 0.23171 0.12791 0.06976 0.05702 0.04820120 0.26859 0.33649 0.27857 0.23227 0.22262130 0.36104 0.13455 0.05547 0.06250 0.06470 140 0.36347 0.26948 0.13607 0.10430 0.08566 150 0.26408 0.43681 0.35615 0.28645 0.23279 160 0.30632 0.17783 0.26164 0.23462 0.20702 170 0.33302 0.39775 0.66759 0.67872 0.65694180 0.30711 0.27622 0.23504 0.20734 0.18691190 0.30182 0.31076 0.37293 0.35174 0.32499200 0.31431 0.42050 0.55870 0.48342 0.41395 210 0.26719 0.10576 0.13258 0.14917 0.15258220 0.15658 0.07022 0.03748 0.03330 0.03870 230 0.11070 0.02970 0.05212 0.06358 0.07497 240 0.14004 0.03646 0.01357 0.01281 0.01217 250 0.17518 0.22670 0.25911 0.22746 0.19878 260 0.18880 0.10234 0.10330 0.08048 0.06278 270 0.34149 0.19022 0.10457 0.07132 0.04988 280 0.76839 0.90017 0.96752 0.87119 0.76770 290 0.51313 0.23851 0.21845 0.19154 0.16609 300 0.38560 0.25970 0.28993 0.29600 0.31663310 0.30421 0.42194 0.45743 0.40099 0.42398320 0.34017 0.19381 0.15352 0.17726 0.18402 330 0.33227 0.23612 0.14835 0.15598 0.16317 340 0.28748 0.21894 0.15076 0.18072 0.19291 350 0.27265 0.14525 0.08362 0.08222 0.07256

Page 176: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 130

1ST HIGHEST 24-HR AVERAGE CONCENTRATION VALUES OF SO2 (µg/m3)

Direction O Distance (meters)3500 4000 5000 7500 10000

360 0.24879 0.21934 0.17389 0.10828 0.0749410 0.20386 0.19087 0.16504 0.11561 0.0849720 0.28764 0.26191 0.22392 0.15222 0.1091030 0.63132 0.54240 0.41516 0.24755 0.16900 40 0.78547 0.69579 0.55563 0.34878 0.24201 50 0.97787 0.86025 0.68087 0.42332 0.29315 60 0.42581 0.37385 0.29522 0.18371 0.12753 70 0.41182 0.36010 0.28168 0.17195 0.1283380 0.66935 0.60187 0.49043 0.32513 0.2433590 0.24403 0.23035 0.20138 0.14298 0.10571100 0.26510 0.23443 0.18686 0.11725 0.08186110 0.04369 0.04508 0.04408 0.04408 0.04766120 0.21137 0.19775 0.17012 0.11684 0.08415130 0.05739 0.05038 0.03859 0.03273 0.03517140 0.07187 0.06056 0.04350 0.04312 0.04578150 0.19204 0.16080 0.11726 0.07991 0.06860160 0.18240 0.16135 0.12853 0.09623 0.10367170 0.60240 0.54822 0.45251 0.29588 0.21010180 0.15775 0.13413 0.09966 0.05618 0.03847190 0.28849 0.25688 0.20619 0.13962 0.11089200 0.35541 0.30727 0.24957 0.18888 0.17002 210 0.14171 0.13009 0.10841 0.07010 0.05790220 0.04068 0.04074 0.04119 0.04578 0.05060 230 0.08510 0.09312 0.09853 0.08337 0.06733 240 0.01180 0.01170 0.01118 0.00608 0.00813250 0.17406 0.15248 0.11985 0.07399 0.05148 260 0.05499 0.04986 0.04305 0.03683 0.03564 270 0.03575 0.02632 0.01529 0.00872 0.00964280 0.67436 0.59551 0.47332 0.29470 0.20335 290 0.14100 0.12017 0.08866 0.04785 0.03601300 0.29663 0.27395 0.22989 0.14975 0.11934 310 0.41027 0.39001 0.34060 0.24513 0.21527320 0.17461 0.16320 0.13853 0.09363 0.07610 330 0.15558 0.14608 0.12629 0.10872 0.08816340 0.18649 0.17728 0.15674 0.11349 0.08502 350 0.06307 0.05538 0.05442 0.05210 0.05169

Page 177: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 131

FIGURE NO. 4.2ISOPLATHES OF SO2 CONCENTRATION FOR 24HRS

Page 178: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 132

TABLE NO. 4.81ST HIGHEST 24-HR AVERAGE

CONCENTRATION VALUES OF NOX (µg/m3)

Direction O Distance (meters)500 1000 2000 2500 3000

360 0.12034 0.08783 0.12223 0.10862 0.0952510 0.25140 0.12541 0.09413 0.08350 0.07321 20 0.55469 0.20557 0.13895 0.11804 0.10728 30 0.73602 0.46638 0.36151 0.29858 0.24990 40 0.85586 0.39672 0.36998 0.33538 0.29929 50 0.84487 0.51397 0.48339 0.42923 0.37600 60 0.28995 0.23273 0.21882 0.18964 0.16420 70 0.22219 0.14947 0.20859 0.18334 0.1591480 0.24574 0.17281 0.28295 0.26929 0.2492390 0.20834 0.13722 0.11787 0.10136 0.08665 100 0.09039 0.09642 0.13621 0.11901 0.10282110 0.07781 0.04295 0.02343 0.01915 0.01619120 0.09013 0.11292 0.09355 0.07801 0.07471130 0.12126 0.04519 0.01860 0.02097 0.02172 140 0.12213 0.09045 0.04569 0.03502 0.02875 150 0.08870 0.14659 0.11961 0.09621 0.07819 160 0.10288 0.05963 0.08786 0.07880 0.06953 170 0.11186 0.13328 0.22401 0.22781 0.22054180 0.10314 0.09263 0.07887 0.06951 0.06268190 0.10135 0.10424 0.12512 0.11800 0.10902200 0.10560 0.14095 0.18759 0.16234 0.13902 210 0.08977 0.03552 0.04445 0.05005 0.05122220 0.05260 0.02359 0.01259 0.01111 0.01291 230 0.03719 0.00997 0.01741 0.02127 0.02510 240 0.04705 0.01225 0.00453 0.00428 0.00407 250 0.05881 0.07606 0.08701 0.07638 0.06675 260 0.06344 0.03427 0.03467 0.02702 0.02108 270 0.11475 0.06388 0.03513 0.02396 0.01676 280 0.25795 0.30188 0.32479 0.29251 0.25779 290 0.17232 0.08010 0.07336 0.06433 0.05578 300 0.12946 0.08720 0.09734 0.09929 0.10626310 0.10215 0.14155 0.15360 0.13466 0.14227320 0.11423 0.06508 0.05144 0.05944 0.06173 330 0.11156 0.07929 0.04981 0.05234 0.05477 340 0.09653 0.07351 0.05053 0.06063 0.06475 350 0.09155 0.04877 0.02806 0.02760 0.02436

Page 179: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 133

1ST HIGHEST 24-HR AVERAGE CONCENTRATION VALUES OF NOx (µg/m3)

Direction O Distance (meters)3500 4000 5000 7500 10000

360 0.08356 0.07367 0.05841 0.03637 0.0251710 0.06844 0.06408 0.05542 0.03883 0.0285420 0.09655 0.08793 0.07519 0.05113 0.0366530 0.21203 0.18217 0.13944 0.08315 0.05677 40 0.26377 0.23367 0.18661 0.11715 0.08129 50 0.32840 0.28891 0.22868 0.14219 0.09847 60 0.14302 0.12557 0.09916 0.06171 0.04284 70 0.13832 0.12095 0.09461 0.05776 0.0430980 0.22467 0.20202 0.16462 0.10914 0.0817090 0.08192 0.07734 0.06762 0.04802 0.03551100 0.08904 0.07871 0.06274 0.03937 0.02749110 0.01457 0.01503 0.01471 0.01474 0.01597120 0.07094 0.06639 0.05712 0.03924 0.02827130 0.01927 0.01692 0.01296 0.01095 0.01178140 0.02411 0.02031 0.01452 0.01441 0.01533150 0.06450 0.05401 0.03939 0.02682 0.02303160 0.06127 0.05420 0.04318 0.03218 0.03473170 0.20224 0.18406 0.15194 0.09936 0.07056180 0.05290 0.04498 0.03343 0.01885 0.01291190 0.09677 0.08616 0.06916 0.04684 0.03721200 0.11937 0.10320 0.08361 0.06328 0.05700 210 0.04757 0.04368 0.03640 0.02354 0.01942220 0.01357 0.01359 0.01376 0.01533 0.01697 230 0.02852 0.03123 0.03306 0.02799 0.02261 240 0.00395 0.00392 0.00375 0.00204 0.00273250 0.05845 0.05120 0.04024 0.02485 0.01729 260 0.01839 0.01667 0.01440 0.01233 0.01195 270 0.01201 0.00884 0.00514 0.00291 0.00323280 0.22646 0.20000 0.15897 0.09899 0.06831 290 0.04736 0.04036 0.02978 0.01607 0.01206300 0.09957 0.09197 0.07719 0.05030 0.04004 310 0.13769 0.13090 0.11433 0.08217 0.07220320 0.05859 0.05476 0.04650 0.03144 0.02550 330 0.05224 0.04905 0.04241 0.03649 0.02960340 0.06260 0.05952 0.05263 0.03812 0.02856 350 0.02118 0.01856 0.01826 0.01749 0.01733

Page 180: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 134

FIGURE NO. 4.3ISOPLATHES OF NOx CONCENTRATION FOR 24HRS.

Page 181: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 135

v. Assessment of Impact on Air Quality

Base line study reveals that the levels of various pollutants like PM, SO2 and NOx etc. in the ambient air of surrounding study area are well within the limits stipulated by National Ambient Air Quality (NAAQ) Standard for Residential, Rural and other areas.

It can be seen from Table No. 4.4 that the maximum predicted 24 hours GLC(s) of all the pollutants i.e., PM, SO2 and NOx and its incremental concentrations on baseline value is below the NAAQS.

Thus, it can be concluded that, with proposed emissions from the Plant, the Ambient Air Quality within the industrial premises as well as in the surrounding study area will not exceed the NAAQ standards and hence there is no significant adverse impact on Ambient Air Quality.

D. Mitigation Measures for Air Environment during Operational Phase

The industry will take measures for reduction of fugitive emissions emanating out of process reactions by providing vent condensers.

Good ventilation will be provided to reduce the work room concentrations.

Fugitive emissions will be reduced by providing vent condensers to all the reactors.

Adequate stack height of 12 m will be provided to the TFH.

Stack monitoring facilities for t he periodic monitoring of the stack to verify the compliance of the stipulated norms.

For control of process gas emissions scrubbing system will be provided with suitable scrubbing media.

In order to minimize the air pollution, unit will develop greenbelt in and around its premises.

Page 182: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 136

4.5 WATER ENVIRONMENT

A. Impact During Construction Phase

Impact on water quality during construction phase / foundation work will be marginal and confined to use of water by workers only.

The existing sewer facility will be utilized by the temporary construction workforce or mobile toilets will get arranged for workers and proper site management will minimize the surface water runoff and soil erosion.

The water required for construction will be met by Water Tanker at site.

The quality of both surface and groundwater may also deteriorate in regard to the labour camps likely to be developed during the construction phase if proper solid waste management practices are not adopted. Good housekeeping should be practiced like handling and disposing of solid waste i.e. debris to enter from drainage column.

The baseline status of water quality in the core and buffer zone area has been established through sampling and analysis of various water quality parameters as part of the baseline environmental monitoring. Water samples collected from 14 locations in the core and the buffer zone of 10 km radius of the project area during the study period. The prime objective of the baseline water quality study was to establish the existing water quality in the study area and to evaluate the anticipated impact of the proposed project activity on water quality and to suggest appropriate mitigation measures for implementation. This will also be useful for assessing the conformity to the standards of water quality during the construction and implementation/ operational phase of the project. The contamination of groundwater might occur due to the irrational disposal of liquid wastes.

Mitigation measures :

Adequate sanitation facilities will be provided to the workers.

The existing sewer facility will be utilized by the temporary construction workforce or mobile toilets will get arranged for workers.

Proper site management will minimize the surface water runoff and soil erosion.

Good housekeeping should be practiced like handling and disposing of solid waste

Page 183: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 137

B. Impact During Operation Phase

The unit will segregate the waste streams for effective treatment.

Domestic Wastewater @ 1.2 KL/day will be disposed off through Soak Pit/Septic Tank System.

Industrial Effluent generation @ 3.5 KL/day will be sent to ETP for Primary treatment and then it will be evaporated in Evaporated System.

So, unit will achieve Zero Liquid Discharge.

Thus, it can be concluded that negligible impact on surrounding water environment is caused. Further, it is emphasized that all precautionary measures have to be strictly adhered as mentioned in the Environmental Management Plan given in Chapter 10, to maintain ground water quality within norms in the future.

C. Mitigation Measures for Water Environment during Operational Phase :-

Skilled manpower will be deployed for continuous and efficient operation of ETP.

Domestic wastewater will be disposed of through soak pit system via septic tank.

Minimization of water use providing drip system for gardening.

Use of high-pressure hoses for cleaning the floor and process equipment to reduce the amount of wastewater generated during washings.

Page 184: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 138

4.6 SOLID/ HAZARDOUS WASTE :

A. Impact of Solid / hazardous waste during Construction Phase:-

Improper disposal of debris, used oil, faulty and replaced spares, tyres and tubes and diesel for DG sets will result in surface and groundwater contamination and in turn affects the drainage of the area. As such proper housekeeping programme needs to be formulated for proper disposal of solid and liquid wastes.

B. Impact of Solid / hazardous waste during Operation Phase:-

The details of hazardous waste to be generated from the proposed project, is mentioned at Chapter -2. The proposed practice of storage of generated hazardous waste, in a closed room having an impervious bottom, and disposed of as per the prescribed guidelines will be continued for the generation of hazardous waste. Hence, the impact due to the same will be negligible as the handling of hazardous waste to be generated will be disposed as per guidelines. The details of solid/Hazardous waste details are shown in below Table No.4.9.

TABLE 4.9SOLID/HAZARDOUS WASTE GENERATION AND DISPOSAL MODE

Sr. No.

Type of Hazardous

Waste

Source Cat. No. Quantity (MT/Year)

Management

01 ProcessWaste/Residue

Process 21.1 35 Reuse and Non-Reusable disposed to CHWIF Site

02 ETP Sludge ETP Plant 35.3 4 Collection, Storage and Disposal at TSDF Site

03 Evaporation Residue

From Evaporator

37.3 3 Collection, Storage and Disposal at CHWIF Site

03 Used Oil Lubrication/D.G. set

5.1 0.05 Collection, Storage and reuse as Lubricant withinpremises.

04 Discardeddrums/bags

MaterialHandling

33.1 5 MT Collection, Storage and Sold To Recycler

Page 185: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 139

C. Measures for hazardous/solid waste during Operational phase :-

To reduce the quantity of solid/hazardous waste generation as well as possible contamination of land(soil) due to spillages/leakages from the plant operations, following Mitigationmeasures will be implemented:

There will not be any leakages/spillage from the raw-materials storage and from the storage of generated effluent from the project.

The generated Hazardous waste will be stored on floor with suitable packing and this dedicated area will be covered with the roof.

There cordson quantity of hazardous waste generation and disposal will be maintained for each category and possibilities will be explored for minimization and reuse.

Classification of waste

Collection, Storage, Transportation & disposed/sale to authorized recycler or re-user.

Data Management and Reporting

Personnel Training to the workers and employees.

The leakages of oil spills from machinery shall be collected in leak proof barrels and then disposed of to SPCB authorized dealers.

Page 186: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 140

4.7 NOISE ENVIRONMENT :-

A. Impact during Construction Phase

There will be slightly increase in noise level during construction phase due to construction activity and movement of vehicles. But it is restricted to construction phase only and it will occur during daytime, when construction activities will be in progress.

B. Mitigation measures during Construction Phase :-

Recommended mitigation measures are:

Good maintenance of vehicles and construction equipment.

Restriction of construction activities to day time only.

All vehicles entering the project site will be informed to maintain speed limits and not blow horns unless it is required.

The noise generated from construction machinery will be kept low by keeping the moving parts serviced and properly lubricated.

Plantation of trees around the plant boundary to attenuate the noise.

C. Impact during Operational Phase :-

As per observations, the Ambient Noise Level is within norms of Industrial Area. With the implementation of the mitigation measures proposed, the noise levels at plant boundaries will be well below the limits specified for industrial areas.

The major sources contributing to Noise pollution during the plant operation will be Compressor, TFH, Pumps etc. The operation of the equipment will generate noise ranging between 70-80 dB (A). The occasional noise is being attenuated by the development of green belt in and around the industry, which will be taken up right from the construction phase. Also ear protecting devices will be provided for personnel working in high noise generating zone.

The main sources of noise pollution in the plant are TFH, Reactors, DG Set, and other Noise generating units. Vehicular movements during operation phase for loading/unloading of raw materials and finished products and transporting activity may also increase noise level. Noise levels in the ambient air are well within the permissible limits given by the National Ambient Noise level standards as confirmed during baseline study. Leq values of the noise levels within the plant premises will be kept less than 75db [A] [during day time] and 70db[B] [during night time] which will be within the permissible limit.

Thus, there is practically no impact on surrounding environment.

Page 187: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 141

D. Mitigation Measures for Noise level during Operational Phase :

To minimize the noise pollution the unit proposes the following noise control measures:

Noise suppression measures such as enclosures, buffer sand or protective measures will be provided if required (wherever noise level is more than 90 dB(A)).

Employees will be provided with earplugs or earmuffs where exposure is 85 dB (A) or more.

Vehicles will be regularly maintained and optimum use of the same will be made.

Extensive oiling, lubrication and preventive maintenance is be carried out for the machineries and equipment to reduce noise generation and will be adopted for proposed expansion.

For DG Set and other high noise generating equipment acoustic enclosures shall be provided and also will be provide sufficient Green Belt Development area.

Page 188: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 142

4.8 LAND/SOIL ENVIRONMENT :

A. Impact during Construction Phase:-

In proposed unit needs to do Excavation for plant activity. Unit will do construction activity for proposed foundation work. Hence there will be minor impact on the surrounding soil environment and there will be only change in Land Use Pattern for the project site.

Present Land use of the site is open land. Proposed production activity will be done in premises of the unit. Hence, there will be change of existing land use pattern only for the project site.

The activities of proposed products will be confined within the plant site premises. During construction works, top soil generated from various activities like excavation etc. will be stored and preserved to use it during restoration period as far as possible. There will be no disposal of wastewater on land. Hazardous wastes will be stored at earmarked area with impervious flooring, shed and spillage/ leakage collection system to eliminate rainwater contamination, chances of overflow / spillages going on to the land and thus land/ soil contamination.

B. Mitigation measures during Construction Phase :-:

The earthen material generated during excavations and site grading periods, will be properly dumped and slope stabilization shall be taken. The topsoil generated during construction shall be preserved and reused for plantations.

Hence, no significant negative impact is envisaged on the surrounding soil quality due to presence of solid / hazardous waste within the plant premises.

C. Impact during Operation Phase

Source emission, wastewater and hazardous waste generation from any project activity affects the soil environment.

The impact due to air causes direct/indirect effect on soil. The emissions of SPM during operation will be effectively controlled. There will be practically no effect on the soil quality due to air emissions.

Domestic effluent will be discharged to soak pit and septic tank system. Wastewater generated from the Industrial activity will be treated in Effluent Treatment Plant and finally it will be evaporated in the Evaporation System

As per the Hazardous Waste (Management & Handling) Amendment Rules, 2016, all necessary control steps for each type of Hazardous Wastes generated will be taken for the proposed project activity.

Hence, due to the proposed project the land use pattern; land cover and topography of the area will be changed only for the project premises.

Page 189: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 143

D. Mitigation Measures during Operational Phase :

The unit will use LDO as a fuel for TFH and ha ve a stack height of 12 m respectively. There will be no process gas emissions from the proposed product manufacturing.

Effluent water generated from all streams of the proposed project will be treated in Primary Treatment plant and finally treated effluent will be evaporated in the Evaporation System.

Solid / hazardous waste generated is being stored separately in Hazardous Waste storage area within the factory premises and disposed as per guidelines.

The hazardous waste storage area has non-percolating RCC floor and covered roof.

Any spillage of raw material, water and waste water resulting in local contamination of soil, such soil will be recovered from ground and will be sent as hazardous waste for final disposal to TSDF site. All possible recyclable/reusable wastes shall be reused/ recycled within the premises itself.

Greenbelt development shall be taken in and around the premises so as to avoid soil erosion.

Page 190: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 144

4.9 ECOLOGY:

A. Impact during Construction Phase

Any construction activity brings changes in some components of the local Terrestrial ecosystem. These adverse impacts are restricted to the project Construction site and to some extent it's immediate surroundings.

The proposed project will not involve removal of any vegetation from the soil and loosening of the topsoil generally causes soil erosion as it is. However, such impacts will be confined to the plant site and will be minimized through paving and water sprinkling and greenbelt development. Thus, there will no major adverse impacts are envisaged on ecological environment due to project activities.

B. Mitigation measures during construction phase :

During construction, small shrubs in the plant premises are required to be cleared. The measures required to be undertaken to minimize the impact on the ecology are:

The felling of trees will be kept at minimum.Adequate Greenbelt will be developed.

C. Impact during Operation Phase :-

Impacts on terrestrial ecosystem can occur due to operation of the any industrial project mainly from air emissions, liquid effluents as well as hazardous wastes generation, which can interfere with the biotic and abiotic components of the ecosystem and may induce injurious effects when concentrations exceed permissible standards.

The proposed project will be carried out on land within M/s. Kemz Resibond Private Limitedwithout cutting of any trees. The proposed project does not alter the crop pattern and natural vegetation of the surrounding area.

Due to the safe control technology of air pollutants, liquid effluents and hazardous wastes disposal, no impact on the surrounding ecology is anticipated.

Development of additional greenbelt/green area will improve the ecological Environment of the surrounding areas.

Page 191: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 145

Prediction of impacts is based both on the direct and indirect; short-term as well as long-term; reversible and irreversible impacts that are most likely to occur owing to the industrial activity during establishment and operation. The ecological factors that are considered most significant as far as the impact on flora and fauna are concerned:

1. Whether there shall be any reduction in species diversity.

2. Whether there shall be any habitat loss or fragmentation.

3. Whether there shall be any risk or threat to the rare or endangered or endemic or threatened (REET) species.

4. Whether there shall be any impairment of ecological functions such as (i) disruption of food chains (ii) decline in species population and/or (iii) alterations inpredator-prey relationships.

Negative Impacts:

As there is change in the land use and land cover on account of the proposed project, the proposed action is not going to have any direct and significant negative impacts of flora and fauna or biodiversity.

Most probable Scenario:

As stated earlier, it is a new project there will be change in the land use and land cover within the project site. No damage is going to be done to the existing green cover within the project site. Except for a few weeds, there are only cultivated plants and no RET species in the core area. No species is going to be lost on account of the proposed project. No direct or indirect damage is expected to the flora and fauna of the buffer zone. Further, as there are no rare or endangered or endemic or threatened (REET) species, the project does not pose any threat to the flora and fauna of the study area. As the industry is required to operate and maintain the emissions and effluents within the limits specified by the CPCB / SPCB, the effects of the industry on the flora and fauna of the buffer zone may be negligible. Neither the storm water nor the effluent water nor any other kind of rain or waste water from the industry shall get in to the drinking water resources.

D. Mitigation Measures during Operational Phase :-

The measures required to be undertaken to minimize the impact on the ecology are:

The felling of trees will be kept at minimum.Adequate Greenbelt will be developed.

Page 192: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 146

4.10 SOCIO ECONOMIC ENVIRONMENT:

Like any other project, the proposed project is also expected to have certain positive and negative impacts on socio-economic environment.

A. Impact during Construction Phase

Local people involved as contract labors will have benefits of getting employment. Proposed project will generate temporary employment for personnel during operational phase.

Impact on Socio-Economic Environment

Due to proposed project there is no major negative impact on socio economic environment.

The proposed Project will require workforce of 20 persons during plant operations. Thus industrial activity will boost up the commercial and economical status of the locality to some extent and the overall impacts on socio- economic environment due to the proposed expansion are positive in nature and accrue to the community on the long-terms basis.

B. Impact during Operational Phase :-

The proposed project will generate direct employment. The indirect employment will be generated by way of transportation, shopkeepers and other casual employment. Implementation of this plant will also reduce production loss due to shortage of power.

Thus, the Proposed project will have significant positive impacts on the employment pattern of the study area.

During the erection phase short term direct or indirect employment will be generated. Project Proponent shall give first preference to the Local people wherever found suitable for all the jobsin the plant operations. Economic status of the local people will improve due to the increased employment & business opportunities, thereby making a positive impact to the Local Economy, educational, medical and housing facilities in the study area will considerably improve. Thus, the proposed project will have significant positive impact on the socio-economic environment.

C. Mitigation Measures for Socio-Economy :-

Due to proposed project the employment generation will be around 20 persons including skilled, semi-skilled & unskilled labour and office staff. Local qualified personnel can be employed.Under CSR Budget, the proponent has allotted 9.5 lacs to take up welfare activities.

Page 193: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 147

4.11 HEALTH & SAFETY :

A. Impact during Construction Phase

Health problems are also likely to be experienced in the area as a result of Immigrant labor being careless about personal hygiene and also mosquito and fly-borne infections usually prevalent in the rural areas. Such Problems will be minimized by provision of adequate sanitary and health services.

B. Impact during Operational Phase :-

The impact on health and safety hazard is due to Fire, handling of raw material and products. The company will provide sufficient fire fighting system. Therefore, no adverse impact is anticipated.

C. Mitigation measures for Health & Safety :-

1. Provision of periodic medical checkup with first aid facilities for all the employees is necessary.

2. Protective equipment will be regularly checked and will be kept easily accessible and easilyworkable during emergency.

3. Various types of fire extinguishers such as (Foam type, DCP, water, CO2 type) will be providing inside the factory premises.

4. Provide sufficient fire fighting system.

5. Health Problems will be minimized by provision of adequate sanitary and health services.

Page 194: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 148

CHAPTER 5

ANALYSIS OF ALTERNATIVES

5.1 SITE ALTERNATIVES

The alternatives analysis plays a key role for evaluation of the proposed technologies. M/s. Kemz Resibond Private Limited. is a proposed unit located at Survey No: 84/1, 84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210. The unit intends to manufacture Synthetic Organic Res ins.

During search of land by the unit for proposed Project, one land at survey no. 672, ParikhaVillage, Dabhoi Taluka, but there was GOUCHAR land between survey no. 672 and road,So it was left by the unit and after that the unit had found another land at survey no. 627, Parikha Village, Dabhoi Taluka. It was found that during the year 1951, the land was given by some trust by their ancestors, so it was again dropped.

Finally, the unit has selected this land which is fulfilling all criteria for setting up the proposed project. The proposed unit is in an area of 7551 Sq. meter and will have al l the infrastructure facilities very near by the plant. Land, water sources, material transportation and power etc.are available without any difficulty and the site is also well connected to NH - 48 (Chennai –Delhi).

The supporting factors for site selection:

1. There is no protected area notified under the Wild Life (Protect ion) Act (1972) & Eco-sensitive area notified under Section 3 of the Environment (Protection) Act- 1986 exists within 10 Km radius areas from the Plant Site.

2. The raw materials required for the production of all the proposed products is easily available in the vicinity of the project site because of the proximity to the industrial chemical markets at Bharuch, Ankleshwar, Vadodara and Padra . This will reduce both the cost of raw material transportation and the associated risk.

3. Plant is well connected to NH-48 (Mumbai – Delhi).

4. Availability of trained and skilled manpower nearby because of the proximity to various industrial areas and city/town.

Page 195: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 149

5.2 ALTERNATIVES FOR TECHNOLOGIES :

The technology proposed by M/s. Kemz Resibond Private Limited. for manufacturing of proposed products is based on latest and best available technology with automated machinery over manual machineries so far in the market to achieve maximum yield with minimum pollution generation and fugitive emission.

The unit is conscious about product quality and equally about the environmental aspects and resource conservations. The unit has adopt concept of 3R for waste reduction and will replace/upgrade their existing plant and machineries from time to time with the Best Available Technology.

Page 196: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 150

CHAPTER 6

ENVIRONMENTAL MONITORING PROGRAMME

6.1 INTRODUCTION

Based on the findings of the Environmental Impact Assessment study, various mitigation measures have been proposed, which have been detailed out in Environmental Management Plan (EMP). In order to monitor the impacts and efficacy of these plans monitoring of various environmental attributes have been proposed during and after the completion of the management plans.

A well-defined environmental monitoring programme would be employed with trained and qualified staff of Environmental Management Cell of the proposed project to monitor the environmental attributes of the area with respect to EMP as well as the guidelines of the GPCB/CPCB. Environmental monitoring schedule proposed to be adopted by the project.

Environmental monitoring program covers various areas like:

Ambient air qualityProcess /Flue Gas StacksWater quantity and qualityEffluent qualityNoiseSoil characteristicsEcology, etc.

6.2 OBJECTIVES OF ENV. MONITORING PROGRAM

The objective of the monitoring will be as follows:

To confirm the statutory compliance

To verify the results of the impact assessment study with respect to the proposedproject.

To study the trend of concentration values of the parameters, which have been, identified as critical and planning the mitigate measures.

To check and assess the efficacy of pollution control equipment.

To implement the EMP, a structured Environment Management Cell (EMC) interwovenwith the management system will be created.

EMC will undertake regular monitoring of the proposed pollution control system andconduct yearly audit of the environmental performance of the system. It will also checkthat the stipulated measures are being satisfactory implemented and operated.

Page 197: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 151

6.3 POST PROJECT ENV. MONITORING PROGRAM

Details of Environmental Monitoring Program are provided at Table No. 6.1.

TABLE NO. 6.1

ENVIRONMENTAL MONITORING PLAN

Sr. No. Aspect Source of Impact

Monitoring Method and it’s

ParametersFrequency Executing

AgencyMonitoring

Agency

1.0 CONSTRUCTION PHASE 1.1 Local

Manpower Absorption

Construction Work

Contractor’s report

Daily Contractor Kemz Resibond

1.2 Air Quality Transportation of construction materials and Construction activity

Monitoring of PM, SO2 and NOx

Weekly Kemz Resibond

GPCB/ Recognized Env. Agency

1.3 Public Health Dust, Noise, Movement of labours

Regular medical checkup

Monthly Contractors Kemz Resibond

2.0 OPERATION PHASE 2.1 Water

Quality & Quantity

Raw water & Ground water quality within the Project Area

As per IS:10500 Quarterly Kemz Resibond

GPCB/ Recognized Env. Agency

2.2 Effluent Quality

Quality of Treated effluent Send to Evaporation System to achieve Zero Liquid discharge.

ETP sample collection & quality analysis

Daily (Internal); Monthly (Third Party)

Kemz Resibond

GPCB/ Recognized Env. Agency

2.3 Ambient Air Quality

3 within premises PM10, PM2.5, SO2, NOx and as specified by SPCB

Quarterly Kemz Resibond

GPCB/ Recognized Env. Agency

2.4 Flue Gas Stack

Thermic Fluid Heater PM, SO2, NOx Quarterly Kemz Resibond

GPCB/ Recognized Env. Agency

2.5 Work Area 3 within plant area VOC and as specified by Factory Inspectorate

Quarterly Kemz Resibond

GPCB/ Recognized Env. Agency

2.6 Noise Level All prominent locations Noise levels Noise levels Kemz GPCB/

Page 198: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 152

within the premises Quarterly Quarterly Resibond Recognized Env. Agency

2.7 Hazardous Waste Management

ETP sludge &Evaporation Residue

General parameters Quarterly

General parameters Quarterly

Kemz Resibond

GPCB/ Recognized Env. Agency

Generation of used drums, bags and records of their dispatch to approved vendors.

Maintain Records Daily Kemz Resibond

GPCB/ Recognized Env. Agency

Generation of waste oil and theirtreatment

Maintain Records Daily Kemz Resibond

GPCB/ Recognized Env. Agency

2.8 OccupationalHealth

Pre-employmentcheck-up

Vision, Audiometry,Spirometry, Urine,Complete blood count,etc.

Once at the time of appointment

Kemz Resibond

Factory Inspector

Periodical check up Vision, Audiometry,Spirometry, Urine, RBS,Liver function tests(LFT),Complete blood count,Anemia, etc.

Age <30 yrs: once in5 years; 31-40 yrs,once in 4years;41-50 yrs: once in 2years; above >50 yrs, once in a year

Post-employmentcheck-up

Vision, Audiometry,Spirometry, ChestSkiagram, Urine,Complete blood count,etc.

Once at the time of relieving

2.9 Safety Whole unit Safety Audit Yearly Kemz Resibond

Factory Inspector

2.10 Greenbeltdevelopment

Within the premisesand in plant vicinity

Plant growth andsurvival rate

Periodic Kemz Resibond

--

Page 199: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 153

6.4 ADMINISTRATIVE ACTIONS & DOCUMENTATION

Records of the monitoring program shall be kept on regular basis for all aspects of the monitoring. Separate records for water, wastewater, solid waste, air, emission, soil & manure shall be prepared and preserved regularly.

Immediately upon the completion of monitoring as per the planned schedule, report shall be done & necessary documents shall be forwarded to the concern person. Methodology of monitoring (sampling & analysis) shall be prepared as separate documents as SOP (Standard Operating Procedure) wherever required.

Environmental statements &/or performance report/compliance report/audit report as per conditions of EC and CC&A shall be prepared and submitted to the concern authority as per the guidelines provided by the authorities within the stipulated timeframe. CC&A and other statutory permission/consents must be obtained & renewed timely as per legal provision & guidelines. Similarly, all necessary report & forms shall be prepared and submitted to the concern authority as per the statutory requirement of Environmental Acts/rules, Factory Act & MSIHC rules.

Reporting of accident & other requirements shall be made in prescribed format well within stipulated time frame as per statutory requirements & guidelines.

6.5 BUDGETARY PROVISIONS

The budget for Environmental Monitoring shall be Rs.1,12,800 Per Year and detailed break-up is provided in Table No. 6.2.

TABLE NO. 6.2BREAK UP OF BUDGET FOR ENVIRONMENTAL MONITORING

PLANSr.No.

Activity Quantity peryear

Budget perQuantity

(Rs)

Total Budget

(Rs)1 Ambient Air Monitoring 8 1500 120002 Stack Gas Monitoring 8 2000 160003 Haz. Waste Sample 4 1200 48004 Soil Sample 4 2500 100005 Ground Water Sample 4 1000 40006 Health Monitoring 20 3200 640007 Noise monitoring 4 500 2000

TOTAL 11900 112800

The industry will engage recognized laboratories to carry out all necessary monitoring parameters. Qualified staff has been appointed for the purpose of Operation and maintenanceof the pollution control facilities. Stand-by facilities are provided to all the facilities so as toensure fail proof treatment.

Page 200: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 154

CHAPTER-7

ADDITIONAL STUDIES

7.1 PUBLIC CONSULTATION

The proposed project M/s. Kemz Resibond Private Limited. falls under the Project/Activity No. 5(f) of Category ‘B’ as stated in the Environmental Impact Assessment Notification dated 14/09/2006 and therefore Environmental Clearance for these products is required to be obtained. The Application in Form-1 was made to State Level Environment Impact Assessment Authority (SEIAA), Gujarat for obtaining the related Environmental Clearance. The proposal was considered by State Expert Appraisal Committee (SEAC) in its meeting held on 24th May 2019 and has issued the recommendations to SEIAA. SEIAA has issued Terms of Refrences (TORs) for carrying out Environmental Impact Assessment study vide letter No. SEIAA/ GUJ/ TOR/5(f)/1093/2019, Dated: 30/07/2019.

All the aspects of the TORs are incorporated in the draft EIA/EMP report, the same may be submitted to the Gujarat Pollution Control Board (GPCB) for conducting public hearing/public consultation as per EIA Notification, 2006 as well as MoEF&CC’s O.M. J-11011/321/2016-IA .II (I), 27-04-2018.

7.2 RISK ASSESSMENT

7.2.1 INTRODUCTION

Industrial activities including production, storage, handling, transportation and operational practices presents levels of hazards to workforce, population and environment at large due to accidents, spills, leaks etc. These accidents results in personal and financial loss. The assessment of the threat posed, its control and prevention through good design, management and operational controls is of primal importance.

The QRA report signifies that trained & skilled employees and supporting services can achieve improved safety & productivity levels. Together they can also achieve low maintenance cost, optimized use of Raw materials and negligible rejections/ wastes.

The project is advised to equip with a well-planned Disaster Management Plan as an essential Mitigation Control Measure.

Substantial information is given in the chapter preventive measures of QRA, for choosing Plant and Equipment which will ensure PRODUCT SAFETY.

A good Legal & Regulatory Compliance Register shall be planned and be in place. All the Rules and Regulations of the land shall be strictly followed to achieve a hindrance free operation of the plant from the statutory point of view.

A good Safety Manual shall be planned and be in place. All the requirements of Safety & Health of the operating plant shall be an essential part of the manual. The Safety manual will serve as a good communication medium to the employees of the plant. The systems to be

Page 201: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 155

complied by the operating level employees as part of their responsibilities and the operational requirements of the system will be readily available in the manual at their disposal.

Risk Assessment study includes predictions of the Worst Case Scenario (catastrophic failure) and Maximum Credible Accident Scenario along with damage distances and preparedness plan for effectively combating such situations. The report also discusses and demarcates the vulnerable zones and a detailed fire control plan for flammable substances.

No plan is complete or total of its requirements and its scope of improvement is a continuous process. Hence, the Risk Assessment Report is to be reviewed and updated as and when:

any expansion, alteration, or extension of the plant is planned / implementedan incident has occurred and been dealt with, based on feedback gathered on any shortcomings in the handling of the situationany feedback is received from the users of the report

Risk Assessment is therefore defined as a continuous and integrated process of identification, evaluation, and measurement of risks, along with their potential impact on the organization.

Objectives of Risk Assessment:

Risk analysis follows an extensive hazard analysis. It involves the identification and assessments of risks to the neighbouring population is exposed to as a result of hazards present. This requires a thorough knowledge of failure probability, credible accident scenario, vulnerability of population etc. Much of this information is difficult to get or generate. Consequently, the risk analysis is often confined to maximum credible accident studies.

Risk assessment is carried out for the following objectives:1. To identify hazard and risk resulting from the hazards2. To study and foresee the effects of such risks on the workers, public, property and environment and to find out necessary control measures to prevent or minimize risk.3. To comply the legal requirement by various safety and environment laws of the country like.

The Factories Act, 1948 / The Gujarat Factories Act, 1963The Environment Protection Act and Rules, 1986Hazardous waste (Management & Handling) Rules, 1989Public Liability Insurance Act & Rules,1991Chemical Accident, (Emergency, planning, preparedness and response) Rules, 1996.

4. To get the necessary information for Emergency planning and evacuation.

The benefits of risk assessment include the following:

Mitigation or reduction of the risk of an incident.Mitigation of the severity and/or consequences by way of improved process techniques, fire protection systems, arrangements of storage, inventory monitoring to fit production requirements.Confidence building in employees by improving competency.Preparedness and prompt response to deal with any accident

Page 202: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 156

7.2.2. STORAGE AND HANDLING

All raw materials are stored in the designated storage location. List of Product along with its details of properties and storage are presented herewith in Table 7.1 to Table 7.3

Table 7.1: STORAGE DETAILS OF RAW MATERIAL & PRODUCTS:

Sr. No. Chemical State Means ofStorage

Total Capacity

(MT)22. Unsaturated Polyester Resin Liquid Drums/Tank 22

23. Alkyd Resin Liquid Drums 1124. Epoxy Resin Liquid Drums 1125. Saturated Polyester Resin Liquid/

solidDrums/Bags 11

26. Vinyl EsterResin Liquid Drums 1127. MEG Liquid Drums/Tank 1228. DEG Liquid Drums/Tank 1229. PG Liquid Drums 1230. Phthalic/Isothalic Anhydride Solid Bags 1531. Maleaic Anhydride Solid Bags 1532. Styrene Monomer Liquid Drums 1033. Castor Oil Liquid Drums 4.534. Linseed Oil Liquid Drums 4.535. Soya bean Oil Liquid Drums 4.536. Glycerin/Pentaerithritol/NPG/

Trimethalol PropaneLiquid Drums 4.5

37. Xylene Liquid Drums 1038. 5 Sodium Di Methyl SulfoIsopthate

(DMS Salt)Liquid Drums 4.5

39. Di Butyl Tin Oxide Soild Bags 0.25040. Bisphenol-A Liquid Drums 1041. Caustic Soda Solid Bags 0.25042. Methacrylic Acid Liqiud Drums 4.5

Table 7.2: STORAGE AND DISPOSAL OF SOLID / HAZARDOUS WASTE

Sr. No.

Name of Solid Waste

Category No.

QuantityMT/Year

Storage of Waste

Method of Disposal

1 Process Waste / Residue

21.1 35 Bags Collection, Storage and Reuse and Non-

reusable disposed to CHWIF site.

2. ETP Sludge 35.3 4 Bags Collection, Storage and Disposal at TSDF Site

3. Evaporation Residue

37.3 3 Bags Collection, Storage and Disposal at CHWIF

Page 203: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 157

Site4. Used Oil 5.1 0.05 Drums Collection, Storage and

Reuse as Lubricant within Premises.

5. Discarded Drums/Bags

33.1 5 Hazardous waste storage

area

Collection, Storage and sold to recycler.

7.2.3 RISK RATING

The consequences on various environmental receptors have been ranked into 5 levels ranging from insignificant to catastrophic consequence and are given in table below:

Table 7.3: OVERALL SEVERITY/CONSEQUENCE

ConsequenceCategory

Magnitude Ranking

ExtremelyMild

The activities and their environmental impacts are judged to be very short term & reversible change

±1

Mild The activities and their environmental impacts are judged to be short term & reversible change

±2

Moderate The activities and their environmental impacts are judged to be long term & reversible change

±3

Severe The activities and their environmental impacts are judged to be long term & irreversible change

±4

Most Severe The activities and their environmental impacts are judged to be permanent & irreversible change

±5

After identifying the consequence severity, the probability of occurrence also needs to be estimated to arrive at a complete picture of environmental impact risk. Table below provide probability/likelihood ratings on a scale of 1 to 5. These ratings are used for estimating the likelihood of each occurrence.

Table 7.4: OCCURRENCE FREQUENCY/PROBABILITY

Category Ranking Occurrence FrequencyVery Likely 5 Has happened more than once per year at the location

Likely 4 Has happened at the locationSomewhat

Likely3 Has happened once in organization or more than one per

year in industryUnlikely 2 Heard of in the industryHighly

Unlikely1 Never heard of in the industry

The level of risk is calculated by multiplying the consequence score and the probability of occurrence together. Thus Risk Rating = Consequence Score × Probability of Occurrence

Page 204: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 158

Table 7.5: RISK RATING

Sr. No.

Source Scenarios Failure Mechanism

Risk Consequence

Probability Severity Risk Rating

1 Leakages of Hazardous chemicals

During charging of raw materials, during unloading of product and from storage area

Fire 2 3 6

2 Spillage of Acid / Alkali

During charging of raw materials, during unloading of product and from storage area

Fire 2 2 4

3 Risk during transfer of Chemicals

Spillages and leakages

Fire 3 2 6

4 Risk due to electrical spark in solvent storage area

Electrical fault Fire 1 4 4

LEGEND

PROBABILITY: SEVERITY: RISK RATING:(PROBABILITY x SEVERITY)

1 – HIGHLY UNLIKELY 1 – EXTREMELY MILD2 – UNLIKELY 2 – MILD3 – SOMEWHAT LIKELY 3 – MODERATE4 – LIKELY 4 – SEVERE5 – VERY LIKELY 5 – MOST SEVERE

Fire protection/ control / mitigation measures are incorporated (under execution).Hence, M/s. Kemz Resibond Private Limited. can be categorized as a medium hazard industry who can manage their risks through invoking on-site emergency plan. The scope for Off-site emergency is visualized as a remote possibility.

During the navigation of above sequence of activities, it is drawn to the understanding that the storage & handling are to be closely associated. This will ensure, the associated preventive / mitigating facilities planned and installed for managing the projected risk scenarios will be serving the desired objectives.

The in-house regulatory measures for implanting safety shall be appropriate to the risks, and to be handled by trained persons for the purpose. SOPs are to be documented and identified people are to be trained. Regular mock drills shall be planned and executed, as a preparation/ precaution for dealing with emergency operations.

Page 205: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 159

7.2.4 PROCEDURE FOR TREATMENT OF WORKERS AFFECTED DURING ACCIDENT

Like:Gas Leakages / Breathing of Solvent/Acidic Fumes Skin Burning due to chemical contactAccident due to chemical spillage Fire hazardous Electric Shock

Special Safety Precaution:Provide proper fire extraction & fire hose at risk area. Wear safety glasses or a face shield if splashing may occurSkin contact requires immediate washing of the affected area with soap and waterRegular work zone monitoringPeriodic health checkup programs have to be Organized and records maintained

Treatment of worker after fire accident :

Burn of skin requires immediate flushing of the contaminated area with soap and water at a sink or emergency shower for a good fifteen minutes. Remove clothing. In case of eye burn, promptly flush eye with copious amount of water for 15 minutes (lifting upper and lower lids occasionally) and obtain medical attention. Company should have tie up with nearest hospital for emergency treatment. It is recommended to provide the safety shower and eyewash station in plant.

Page 206: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 160

7.3 HAZARDS AND THEIR CONTROL MEASURES

While hazards of other type along with safety measures, flood control measures and earthquake control measures are given in Table 7.6 Table 7.7 & Table 7.8 respectively.

Table 7.6: HAZARDS AND ITS CONTROL MEASURE

Sr. No.

Name of the Possible Hazards & Emergency

It’s Source & Reasons

Its Effect on persons property & environment

Control Measures Provided

1. Gas Leakages / Breathing of Solvent/Acidic Fumes

From Reaction vessel, From storage tank, During loading & unloading of material

Lungs, Eye, Skin irritation, Corrosion of wall & roof, Leaves damage

SOP for loading & unloading of materials, closed containers, suction system with pump

2. Skin Burning due to chemical contact

Due to leakages in tank, During loading of material

Skin irritation Provision of body shower, first aid facility

3. Accident due to chemical spillage

Due to improper loading & unloading of materials

Lungs, Eye, Skin irritation

Provision of eyeshower, Provision of spill kit at process area

4. Fire hazardous Due to solvent leakages

Burning of any body parts

Provision of fire extinguisher, sand buckets

5. Electric Shock Due to short circuit, open electric connection

Difficulty in breathing &heartbeat, In major effect person can dye

Provision of flame proof electric fitting

Page 207: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 161

Table 7.7: EARTHQUAKE CONTROL MEASURES

Sr. No.

Hazard Safety Precautions Emergency Control

1 Electric shock

All electric line cut off / switch off from main supplyHand siren use to declare emergencyShock proof hand gloves should be used if needed

Stop electric powerInform site main controllerfor outside help

2 Fire Minimum stock of Hazardous chemicalEarthquake proof building

Stop the leakageInform site main controller for outside help

Table 7.8: FLOOD CONTROL MEASURES

Sr. No.

Hazard Safety Precautions Emergency Control

2 Slippery Surface Clean the working placeKeep away all persons at safe assembly points Evacuate all persons through emergency exit door immediately

Start the emergency water tapping

7.4 RISK IDENTIFICATION

Identification of risks is done qualitatively and quantitatively through the selection of hazardous substances and by studying the manufacturing process, to arrive at possible failures and their inherent causes. Probability of risk occurrence is also ascertained in order to determine the MAXIMUM CREDIBLE ACCIDENT SCENARIO and the WORST CASE SCENARIO.The risks are then analyzed quantitatively in terms of probability, and severity. The risks have also been rated according to the matrix R = Probability x Severity.

7.4.1 MAXIMUM CREDIBLE LOSS ACCIDENT SCENARIOS

A Maximum Credible Accident (MCA) can be characterized as the worst credible accident. In other words: an accident in an activity, resulting in the maximum consequence distance that is still believed to be possible. AMCA-analysis does not include a quantification of the probability of occurrence of the accident. Another aspect, in which the pessimistic approach of MCA studies appears, is the atmospheric condition that is used for dispersion calculations. As per the reference of the study, weather conditions having an average wind speed of 3.0 m/s have been chosen.

The Maximum Credible Loss (MCL) scenarios have been developed for the Facility. The MCL cases considered, attempt to include the worst “Credible” incidents- what constitutes a credible incident is always subjective. Nevertheless, guidelines have evolved over the years and based on basic engineering judgment, the cases have been found to be credible and modeling for assessing vulnerability zones is prepared accordingly. Only catastrophic cases have been considered and not partial or small failures (as is the case in Quantitative Risk Assessment where contributions from low frequency - high outcome effect as well as high frequency - low outcome events are distinguished). The objective of the study is emergency planning, hence only holistic & conservative assumptions are used for obvious reasons.

Page 208: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 162

Hence though the outcomes may look pessimistic, the planning for emergency concept should be borne in mind whilst interpreting the results.

7.4.2 DAMAGE CRITERIA

In consequence analysis, use is made of a number of calculation models to estimate the physical effects of an accident (spill of hazardous material) and to predict the damage (lethality, injury, material destruction) of the effects. The calculations can roughly be divided in three major groups:

1. Determination of the source strength parameters;2. Determination of the consequential effects;3. Determination of the damage or damage distances.

7.5 RISK ASSESSMENT AND CONSEQUENCE ANALYSIS

7.5.1 SOFTWARE USED FOR CALCULATIONS

ALOHA (Areal Locations of Hazardous Atmospheres):Aloha is a computer program designed especially for use by people responding to chemical accidents, as well as for emergency planning and training. ALOHA can predict the rates at which chemical vapors may escape into the atmosphere from broken gas pipes, leaking tanks, and evaporating puddles. It can then predict how a hazardous gas cloud might disperse in the atmosphere after an accidental chemical release.

ALOHA is an air dispersion model, which you can use as a tool for predicting the movement and dispersion of gases. It predicts pollutant concentrations downwind from the source of a spill, taking into consideration the physical characteristics of the spilled material. ALOHA also accounts for some of the physical characteristics of the release site, weather conditions, and the circumstances of the release. Like many computer programs, it can solve problems rapidly and provide results in a graphic, easy-to-use format. This can be helpful during an emergency response or planning for such a response.

ALOHA provides output as amount of chemical discharged from the source as well as its concentration in air it takes in to account different levels of concentrations for a specified chemical. Different concentration levels are given below:

ERPG 1: is the maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to 1 hour without experiencing other than mild transient adverse health effects or perceiving a clearly defined, objectionable odor.

ERPG 2: is the maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to 1 hour without experiencing or developing irreversible or other serious health effects or symptoms which could impair an individual's ability to take protective action.

ERPG 3: is the maximum airborne concentration below which it is believed that nearly all individuals could be exposed for up to 1 hour without experiencing or developing life-threatening health effects.

Page 209: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 163

IDLH: The Immediately Dangerous to Life or Health (IDLH) level. A chemical's IDLH is an estimate of the maximum concentration in the air to which a healthy worker could be exposed without suffering permanent or escape-impairing health effects.

7.6 PREVENTIVE MEASURES

The 4 E of hazards and prevent accidents are as follows:Engineering and technological innovation to improve reliabilityExperience in the study of hazards and operations- Risk analysisEnforcement of decisions on study results – Preventive mechanismsEducation, awareness, and practice in prevention of accidents (Training & drills)

Various measures will be adopted at each stage of the project for ensuring safety of people, environment, and property.

These measures include the following:Site selectionChoice of technologyEquipment design incorporating domestic and international safety codesPlant layout with utmost consideration given to operational safety aspectsIncorporation of interlocks and protection systems in plant designSafety awareness for key management personsSafety training of all operational, maintenance staffRegular safety monitoring - Audits and inspections

7.6.1 SITE SELECTION

The plant is located near State high way No. 161. The site soil conditions are rigid and safe, complying with the requirements of the load bearing capacity of various installations.

7.6.2 CHOICE OF TECHNOLOGY

The process is carefully chosen for reducing wastes, reducing the risk to human beings and the environment. It is the proven one and acknowledged internationally.

7.6.3 EQUIPMENT DESIGN

Electrical

1. Plant areas are segregated into zone areas as per the hazards present, with adequate distances to separate the two zones vide Petroleum Rules.

2. Areas designated as Zone - 0, 1 areas will have all electrical fixtures including lighting fixtures, switches, junction boxes, cable glands, etc. of approved make and flame proof type.

3. For standby power diesel generator of adequate capacity will be installed with auto-start facility in case of power trip/failure. This DG set will be located far away from the processing area.

4. All tanks, pumps, tankers and pipelines are properly earthed and bonded for electrical continuity and prevention of static electric charges. Double earthing will be provided to drain electrical charge to two independent earth pits.

5. All incomers to the electrical panels including MCCs and PCCs will have air circuit breakers of adequate capacity for electrical protection of equipment’s connected to the outgoing feeders.

Page 210: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 164

6. All feeders in MCCs and PCCs will have user point identification at both termination ends for easy tracking of faults and rectification.

7. Adequate ventilation fans will be provided in electrical panels for effective heat dissipation.8. Earthing pits locations and requirements with looping grids shall be provided as per the legal

and regulatory requirements.9. Overhead cable routing will take into account safe distances from buildings and facilities.

Underground cabling shall be marked with metal markers as per the regulatory requirements.10. All panels will have incomer earth fault relay.11. Lightning arrestors will be provided on top of all structures.12. All cables running on trays at elevation shall be properly dressed up and tied with clamps for

rigidity.13. All areas of plant and machinery and roads including all open operating areas are illuminated

sufficiently to carry out operations round the clock.

7.6.4 PLANT LAYOUT

1. Administrative office is located away from process plants and storage tanks.2. Security office is located close to gate and away from process plants and storage area.3. Canteen is located close to administrative office and away from process plants.4. Adequate number of safety showers and eye wash fountains are provided in areas close to

storage facilities and process plants and on each floor wherever necessary5. A separate area has been provided on site in the upwind direction for emergency evacuation-

Assembly Points.6. Interconnecting roads within the plot are made circular so that more than one get-away is

available at any point.7. Flame proof areas have been isolated from the non-flame proof areas.8. DG room and electrical transformer located away from administrative office, process plant

and storage area.9. Fire hydrant system covers the entire operating area of the plant.10. Warning boards will be put up in areas where entry is restricted11. No Smoking boards will be put up at the entrance and at other locations throughout the plant12. Boards showing the numbers and contact details of government / district officials as well as

fire department, police department, district commissioner, etc. will be installed at security gate as well as in the operational area.

13. Battery-cum-electrically operated emergency alarms will be made available.14. Speed breakers and speed limit signs will be displayed as required

7.6.5 SAFETY AWARENESS FOR KEY MANAGEMENT

1. Key management personnel will be made aware from the beginning of the project of the key issues regarding the safety in design and operation of the plant.

2. Discussions on safe handling of hazchems have been carried out with various safety experts, technical collaborators and with overseas suppliers through conference calls.

7.6.6 SAFETY TRAINING FOR ALL OPERATIONAL STAFF

1. All operational staff will be given safety training as a compulsory part of their induction program.

2. Safety training will include, among other things, the following important aspects:a. awareness of hazards of individual chemicals through study of MSDSb. correct usage of Personal Protective Equipment (PPE)

Page 211: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 165

c. explanation of the hazards and risks present in the premises, as well as their analysisd. impact on safety, health, and environment due to improper handling of hazardous chemicalse. guidelines for safety in operationsf. Checklist of Do’s and Don’t’s

7.6.7 SAFETY AUDITS AND INSPECTIONS

1. Regular safety audit will be conducted to ascertain the safety levels followed in the plant and suggestions for improvement

2. Special safety audits will be conducted whenever there are process-related equipment / operational changes made in the plant

3. Testing and inspection of high pressure equipment with periodical hydro testing and thickness testing will be carried out during maintenance shutdown.

4. Testing of pressure safety valves and setting will be carried out regularly during maintenance shutdown

5. Calibration of control valves, instruments as and when required, but at least once in a year during maintenance shutdown

6. Testing of electrical measurements, such as earthing resistance, will be carried as per requirement.

7. Testing of all fire hydrant installations, fire extinguishers, fire pumps, fire water level monitors will be carried regularly.

7.7 MITIGATION MEASURES

Risk mitigation involves the reduction of the likelihood of a loss occurring due to an accident and the reduction of the severity of such a loss.

Several risk mitigation measures have been taken into consideration in the planning of this project:

Personal Protective EquipmentMedical facilitiesHandling of leakages and spillsFirefighting systemEngineering controlsEmergency Control CentreDisaster Management Plan

7.7.1 PERSONAL PROTECTIVE EQUIPMENT

Personal protective equipment (PPE) are needed to protect individuals from injury. Several types of PPE are necessary for providing the optimum protection to individuals from the various risks. In addition to the PPE which will be used for regular plant operation, the following PPE has been selected for preservation at the plant’s Emergency Control Centre room for use in case of emergency:

Page 212: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 166

Table 7.9: LIST OF PROPOSED PERSONAL PROTECTIVE EQUIPMENTS

Sr. No. Equipment Quantity1. Self-contained Breathing Apparatus (SCBA) 2 set2. Face masks/Dust Mask 20 sets3. Fire Fighting suits 2 sets4. Helmets 20 pieces5. Gloves 40 pairs6. Eyes Goggles 10 sets

A. Training

i. Induction Trainingii. Special Trainingiii. On Job trainingiv. Training for Self Contained Breathing Apparatus and Emergency Life Saving

Apparatus

B. Body Protection (Non Respiratory)

v. Protecting Clothingvi. Head Protection (Safety Helmet)vii. Face & Eye Protectionviii. Ear Protectionix. Hand Protection

x. Foot Protection

C. General Protection

1. Safety Belt: double harness full body safety belt is compulsory for work at height.2. Safety Net: used for work at height.3. Safety Shower: for first aid treatment in case of chemical exposure on body4. Eye Washer Fountains: for first aid treatment in case of eye exposure.

D. Care of PPE’s

Each and every personal protective equipment will be visual checked by the user for its integrity before its use and, if any defects are observed, the concerned supervisor should be promptly informed and the defects corrected or PPE replaced.Self contained breathing apparatus will be inspected and details of the inspection and maintenance recorded.All employees should familiarize themselves with different types of PPEs available in the company.When not in use, PPE should be carefully stored in a designated place. Do not put it in tool box where it is likely to be damaged or allow it to lie in an open place where it may collect dust. Store PPE in a safe place well covered, away from sunlight and dust.Do not use the PPE’s other than its purpose or don’t temper with any PPE’s.

Page 213: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 167

7.7.2 MEDICAL FACILITIES

Medical facilities are needed to provide immediate medical attention to people who may be exposed to certain health risks during an accident.

1. First Aid Centre will be located at the Workers Facility near the administrative building and canteen.

2. A doctor will visit the plant periodically.3. First Aid Centre will be equipped with a safety shower, eye wash centre and oxygen-

administering facility, etc.4. Medicines and antidotes for relevant hazardous chemicals will be stored for 5 persons.5. The contact numbers of all nearby hospitals and medical facilities will be kept and put up

on a board in the First Aid Centre.6. A general agreement for immediate treatment will be made between the nearest hospital

and the plant.

7.7.3 FIREFIGHTING SYSTEMS

Due to the handling of various chemicals in the plant, it is necessary to provide an effective and efficient fire fighting system. A map of the fire fighting installations is given in the plant site layout. Unit will provide two types of fire extinguisher one is foam type and one is Co2 .

M/s. Kemz Resibond Private Limited. management shall take into consideration fire prevention measures at the project planning and during plant commissioning stage to avoid any outbreak of fire. But looking to the hazardous nature of manufacturing operation shall be handled and processed, the chances of outbreak of fire is however less but cannot be refuted. Hence to avoid such a scenario, a well laid fire protection system will be provided in the factory. List of proposed fire fighting equipment’s are given in table below:

TABLE 7.10: LIST OF PROPOSED FIRE FIGHTING EQUIPMENT’S

Sr. No. Name of Equipment Type Quantity(Nos.)

1. Foam type fire extinguishers 5 kg 12. Co2 type fire extinguishers 10 kg 13. Fire Sand Bucket Stand of Six

Bucket1

7.7.4 EMERGENCY CONTROL CENTRE

The Emergency Control Centre is a designated room that shall be occupied by the Incident Controller, the final authority to give directives, coordinate with various teams, communicate with district government agencies, and to deal with an emergency inside the plant. The following documents and equipment shall be kept here for the use of the Incident Controller during an emergency:

Updated drawings and P&I diagrams of plantSite layout plan showing raw materials and finished products storage area, security gates, assembly points, process plants, utility building and other areas of the plantDisaster Management PlanList of key plant operating personnel

Page 214: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 168

Telephone numbers and contact details of key plant operating personnelTelephone numbers and contact details of district government officials and emergency officesPersonal Protective Equipment for emergency useFire extinguishers (Co2 & Foam filled)

7.8 CHECKLIST OF DO’S AND DON’TS

Suitable notices / boards displayed at several locations indicating appropriate hazards warning as well as Do’s and Don’ts for ensuring operational and personal Safety for information of workers / staff and visitors.

Do’s Don’tsFor good physical condition, check the vessels expected to be used in the process.

Don’t use the vessels expected to be used in the process without checking.

Check the availability of utilities required till the end of the batch / job.

Don’t fail to check the availability of utilities required till the end of the batch / job

Check for proper manpower available till the entire operation in over.

Don’t work without enough and proper man power.

Time schedule should prepare for material flow on basis of the process.

Don’t use the material without Prepare time schedule of material flow on basis of the process.

Monitor the temperature and pressure if possible

Don’t perform without Monitoring the temperature and pressure during process.

Familiarize the worker about what is the job on hand.

Don’t keep the workers under wraps about what is the job on hand.

The worker or operator should have sufficient Knowledge of the materials handling.

Don’t let the worker / operator do the work having lack of sufficient knowledge of the materials handled.

Visual instructions should properly display for Characteristics of the chemicals.

Don’t use the chemical with unknown characteristics or having unreadable label.

Ensure proper training of personnel. Don’t let the personnel do the work without giving proper training.

Ensure sufficient numbers of safety devices are available.

Don’t work without sufficient numbers of safety devices.

Ensure the workers wear proper PPE of adequate grade.

Don’t let the workers do work without wearing proper PPE of adequate grade.

Demarcation of the chemical storage area for chemical in test.

Don’t use material that is under testing for production.

Ensure removal of used containers from workspaces.

Don’t store used containers at workspaces.

Prepare and follow the safe work instruction.

Don’t breach the safe work instruction.

Record every incident that led to an accident irrespective of the seriousness of the accident and analyze the same to improvise the system continuously.

Don’t try to conceal information regarding missed accidents or small injuries.Remember every and any mishap can be fatal if not for yourself for others.

Never work bare foot or without safety shoes.

Don’t work bare foot or without safety shoes.

Page 215: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 169

Never use mobile phones in work zones. Don’t use mobile phones in work zones.operational aspect that has been identified.

Open or use containers only on written instruction.

Don’t open or use containers on which instruction are not written.

Verify the label with the instruction before use.

Don’t work without Verifying the label with the instruction before use.

Participate wholeheartedly in all safety related exercises an keep yourself updated.

Don’t ever even thinking of evading safety instructions.

Reactors must be closed tightly during time of reaction

Don’t open reactor while reaction is ongoing

Keep material safety data sheet in locations where chemicals are being handledand study it.

Don’t mix waste chemicals in the same storage containers because mixing twoOr more waste chemicals in the one container can cause violent reactions.

Segregate toxic, flammable chemicals and keep them under control

Don’t store acetic acid or acetic anhydride, which are highly flammable, with acids.

Be sure to store chemicals and hazardous materials away from heat or flames,and take steps to eliminate ignition sources nearby.

Don’t allow spillages of the chemicals from drum while transferring

7.9 DISASTER MANAGEMENT PLAN

7.9.1 OBJECTIVES OF EMERGENCY PROCEDURES

Measures those are required to be taken during emergency are co-ordination of activities with many departments/ services and outside resources.

The objective of the procedure is to define role of key personnel of different services during major emergency to be effectively utilized to:

1. Safeguard lives2. Contains of incident and bring it under control3. Minimize damage to property & neighboring environment4. Rescue & treatment of casualties & evacuation of persons to safe areas5. Identification of affected persons, information to relatives and extending necessary assistance.6. Preservation of information, records etc. which will help in investigation7. Welfare assistance to casualties8. Providing relevant information to police, district authorities and news media9. Mobilizing inside resources10. Initiating and organizing evacuation of affected persons

Collecting latest status, other information and requirement

7.9.2 BASIS OF PLAN AND HANDLING OF EMERGENCY

1. It is not possible to envisage and detail every action, which should be taken during an emergency. The basic philosophy is to get key personnel of necessary discipline who have the knowledge and background to assess the situation and give directions as per the objectives as quickly as possible.

Page 216: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 170

2. The plan identifies the services/departments required to combat emergencies and also identifies the key persons to discharge the duties.

3. Key personnel have been identified for emergencies and are responsible for providing necessary assistance.

4. Any outside assistance, which company shall get, shall be co-ordinate by the main site controller on duty.

5. Messages via telephones are restricted to key personnel only. This is required to keep the telephones free for key personnel to contact for necessary feed-back.

6. Senior person who arrives on scene is automatically in charge for the service group. He should not leave the site without entrusting the charge to his deputy. All the key personnel should be available at the main control room. All key personnel of other services will report to main site controller, who will co- ordinate between various departments and outside agencies.

7.9.3 INFORMATION ABOUT EMERGENCY AND SUBSEQUENT ACTIONS

1. Any person noticing fire/explosion/release of hazardous gases should shout FIRE, FIRE or HELP, HELP and will activate the emergency bell

2. Inform respective control rooms3. The Executive in-charge along with the concerned Dept. Head will immediately rush to the

incidence site to assess and take immediate action required to control the source of incidence. They will also inform Security and Safety personnel to come to the place of disaster/emergency and assist them.

4. If he feels that the situation is likely to escalate and may lead to emergency will communicate following minimum information to all senior persons.

Brief description of incident.Status & seriousness of the situationActions immediately taken.Immediate assistance required.All key personnel of respective services, depending on nature of emergency will arrive at site to take charge of positions.

7.9.4 INSTRUCTIONS TO EMPLOYEES

The plan assumes certain discipline at site during emergency as given below;

1. Do not get panick2. Do not approach the scene of disaster as a spectator3. Do not engage phones/ P.A. system unnecessarily4. Non-essential personnel to gather at security gate after receiving instructions5. Do not move here & there unnecessarily6. Do not approach unnecessarily to get information or more inquiry7. Remain at your working place unless called and be attentive to instructions8. Ensure that all contract laborers working in the premises are immediately sent to main security gate. They will receive further instructions from main site controller

All non - essential staff members should gather at safe assembly point after assessing the wind direction (from the wind sock, stack of boiler chimney) and wait for further instructions which will be communicated through PA system or by other available means.

Page 217: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 171

7.9.5 INSTRUCTIONS TO CONTRACTORS

The plan assumes certain discipline at site during emergencies as given below;

1. Do not get panick2. Do not approach the scene of disaster as a spectator3. Do not engage phones/ P.A. system unnecessarily4. Non-essential personnel to gather at security gate after receiving instructions5. Do not move here & there unnecessarily.6. Do not approach unnecessarily for information or more inquiry.7. Remain at your working place unless called and be attentive to instructions8. Ensure that all contract laborers working in the premises are immediately sent to main

security gate. They will receive further instructions from main controller. All should gather at safe assembly points after assessing the wind direction (from the wind sock, stack of boiler chimney) and wait for further instructions which will be communicated through PA system or by other available means.

9. All fabricator contractors should ensure that all welding machines are switched off and all cylinders are closed before leaving the working area.

10. All civil contractors should be gathered at assembly points after declared emergency.

7.9.6 MITIGATION OF CONSEQUENCES DURING MAJOR ACCIDENT

No major hazard installation can ever be absolutely safe. Even if a hazard assessment has been carried out, if the hazards have been detected and appropriate measures have been taken, the possibility of an accident cannot be completely ruled out. So safely systems provide measures, which can mitigate the consequences of accident or emergency situation. In order to be able to initiate counter measures in the event of an accident, company shall install various safety systems to mitigate the consequences during Major Accident are as under:

1. Emergency Control members available in the plant2. ECC room with full equipped with Fire Fighting Equipment3. Alarm System and method of reporting / declaring emergency4. Regular rehearsal of emergency preparedness5. Training to all employees regarding emergency preparedness6. MSDS of all hazardous chemicals are available in safety department and in concerned

department.

7.10 EMERGENCY CONTROL CENTRE WITH LIST OF EQUIPMENT AND ACCESSORIES

Safety Office in front of Operation Building will act as Emergency Control Center. It is equipped with all necessary accessories as mentioned below.

7.10.1 DOCUMENTS

Site PlanDisaster Control Plan copyList of essential telephone numbersList firefighting equipmentShift Schedule of Emergency Control members

Page 218: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 172

7.10.2. PERSONAL PROTECTIVE EQUIPMENT

A. Sets (Breathing Apparatus)Face MasksHand glovesGum bootsGogglesHelmetsSafety beltsApronsFire proximity suit

7.10.3. EQUIPMENT LIST

Internal / External TelephonePortable alarmTorchesEmergency Cupboard with necessary PPEArtificial RespiratorRacer watches (STOP WATCH)Gas Detector TubeStatic Charge MeterGas Mask

7.11 INFORMATION REGARDING KEY PERSONS AND THEIR RESPONSIBILITIES DURING EMERGENCY

7.11.1 SITE MAIN CONTROLLER

After getting information of emergency, the site main controller will rushed to the Emergency Control Center immediately.

1. On reaching he will assess the magnitude of the situation in consultation with Incident Controller and decide whether inside or outside help are to be called (i.e. Fire Service, Police, and Ambulance etc.).

2. Ensure that key persons are called in.3. Give guidance and direction in vital and important activities to control the emergency

situation.4. Direct to close down and evacuation of the plants in consultation with Incident controller and

key personnel.5. If necessary arrange for evacuation of neighboring population.6. Inform the Government authorities such as Collector, MC, Factory Inspector, Health Officer

& medical Officer and request them for their help as situation demands.7. Give prime importance to human life and guidance in organizing the rescue operations as

well as ensure whether injured people getting proper medical attention in time.8. Always be in touch with the Incident Controller to get further progress and decide further

plan.9. On completion of emergency situation declare the normalcy through Administrative Officer.10. Control the re-occupation of the affected areas on discontinuation of emergency.11. Do not permit to re-start the plant unless it is safe.12. Give authentic statement of the incident to News Media & Government Authorities.

Page 219: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 173

7.11.2 INCIDENT CONTROLLER

1. Take the charge of situation and assess the magnitude of the event2. Control and guide all the operations with priorities to the Safety of Personnel, minimize

pollution, loss of material and loss to the plant equipment and property.3. Provide advice and guide to the Fire Fighting and Rescuing squad and Fire Brigade while

they arrive.4. Establish communication with emergency control center.5. Report on all significant developments to the emergency control center through

phone/Messenger.6. Ensure that evacuation of the areas in the factory getting affected is complete.7. After the emergency situation is brought under control, assure that the necessary evidence for

further investigation in the incident is preserved and inform Site Controller regarding control of emergency.

7.11.3 TECHNICAL STAFF / DEPARTMENT HEAD

1. As soon as informed, rush to the spot and take charge of the situation till senior group arrives.

2. Ensure that emergency siren is raised which gives information to Security, Safety, Administration Staff and Technical Staff.

3. On arrival of Incident Controller, inform him about the gravity of the situation and then to work under his guidance to control the situation.

4. Ensure that only experienced and essential people remains at the location for controlling, while others to be evacuated from the scene.

7.11.4 EMPLOYEES NEAR THE SPOT (INCIDENT AREA)

The employees near affected area, under the guidance of the Incident Controller shall1. Tackle the emergency as per laid down procedures for the area bearing in mind the

requirements of the situation called for by the progress of the emergency.2. Remove all non-essential employees (who are not assigned any emergency duty) shall

evacuate the area and gather at the specified assembly points.3. Stop the operations as per the information of the Incident Controller.

7.11.5 PERSONNEL OFFICER

1. When emergency declared immediately rushed to emergency control center.2. Basically he will work as a Liaison Officer and will stationed at emergency control center

during emergency. He will work under the direction of Site Controller.3. To ensure that the casualty receives adequate attention at first aid center, also ensure

additional help if require from Government authorities or outside agencies.4. Arrange transport facility for injured personnel to get timely medical help.5. He will also arrange for head count at assembly points and will inform Site Controller.6. Also be in touch with the Security and Other Departments for help.7. Will check the Roll call from Time Office for availability of trained personnel during

emergency situation at the site.8. Determine the need to inform statutory authorities of the accident and fill the necessary

forms for submission with consultation of the Site Controller.9. When emergency is prolonged, arrange for the relief of personnel as well as inform the

families of injured persons and organize refreshments / catering facility.

Page 220: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 174

7.11.6 ENGINEERING SERVICES KEY PERSONNEL

1. When emergency declared, immediately proceed to Emergency Control Center.2. Ensure the availability of electrical wiremen, utility, maintenance employees and drivers.3. Ensure the water supply & electric power generator in case of power failure.4. Be in touch with the Site controller / Incident Controller to extend help as and when

required.5. Ensure availability of Light Motor Vehicles as well as Fork Lifts, JCBs etc.6. Arrange the vehicle as per required by Administrative / Personnel Officer.

7.11.7 SECURITY & FIRE IN-CHARGE

1. When emergency declared, ensure that the Fire man in the fire station and Security guards at the maingate are sufficient.

2. On getting instruction from Site Controller/Incident controller, cordon the affected area to maintain lawand order.

3. As per instruction from Site Controller/ Incident controller, arrange to start the fire hydrant pump.

4. Ensure the following duties by Security Guards;Stop all vehicles and visitors entering into the factory, except any Government authorities such as FireBrigade, Police, Factory Inspector, Medical Staff and inform the Administrative Officer on their arrival.If any press reporter and local Leader comes at the main gate, take them to the Administration Office.Do not allow any vehicle to park at the main gate or nearby at main road.Assure that the entrance of the gate is clear for thorough fare. In Similar way control/ guide internaltraffic for smooth operations.Act according instructions given by Personnel and Administrative Officer.Ensure that all essential personnel evacuated and assembled at Assembly points.Arrange effective security nearby the incident place.

7.11.8 FIRST AID ATTENDANTS

1. As per the instructions given by the Incident Controller, arrange the supply of additional emergency related equipment to the incident place. Give necessary First Aid treatment to the affected persons immediately.

2. Inform the Personnel and Administration Officer regarding the severity of injury and advise for furthermedical help if necessary.

3. Ask for additional trained First-Aider, if required.4. On arrival of Doctor, assist him to give medical treatment to the affected people.

7.11.9 SAFETY OFFICER

1. On hearing emergency siren rush to the spot and assume the position of incident controller and take care of the situation till a senior personnel arrives and on their arrival work with them in team, extending their own expertise.

2. Give instructions and guideline to the people involved in control measures. As well as help in providing required PPE.

3. Give instructions to the safety attendants.4. Brief the Site Main Controller about the progress of control measures.5. Advise site controller regarding type of help required from outside.

Page 221: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 175

6. Give instructions to other department through internal phones /Communication Officer.7. Make arrangement to carry out monitoring whenever necessary and appraise results to the

concerned seniors.

7.11.10 EMERGENCY ORGANIZATION FOR IDLE HOURS

7.11.10.1 SECURITY

1. After getting information through emergency hooter inform at least two senior persons at their residence by telephone/messenger.

Site controllerSafety OfficerIncident controller.Technical Staff/Senior Staff

2. Assure that the front side of the gate is clear for thoroughfare.3. Act according to the instructions of Incident Controller/Senior Officers4. Inform Emergency Control Center for emergency.

7.11.11 LIST OF IMPORTANT AUTHORITIES WITH THEIR ROLE IN EMERGENCY AND TELEPHONE NUMBERS

List of important authorities with their role in emergency and telephone numbers will be prepared and placed wherever required.

7.11.12 INFORMATION ABOUT EXTERNAL COMMUNICATION SYSTEM

1. Communication will be through Emergency Central Alarm System.2. Telephones: An EPABX unit will be installed to connect all departments internally.

Company will also provide mobile connections to all important personnel at site.3. STD Phone & Fax/Telex: Will be provided at important places4. In the event of failure of telephone system: Communication officer will arrange special

messengers for communication Minimum one vehicle with driver/trained security personnel are available in the company premises round the clock.

Unit will communicate through our Administration department by unit’s vehicle to nearby community.

7.11.13 ANNOUNCEMENT SYSTEM DETAILS

During emergency it is necessary that the alarm should be heard by all employees wherever they work, for that speakers will be placed at various locations within plant.

7.11.14 OUT SIDE IMPORTANT ADDRESSES AND PHONE NUMBERS

List of important addresses in the nearby area such as hospitals, ambulance services, fire fighting services, Government personnel (District Helpline, District EOCRescue & Relief, district collector, zilla panchayat, police station and emergency control services and their telephone numbers will be prepared and will be displayed outside emergency control room.

Page 222: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 176

7.11.15 REHEARSAL AND UPDATION OF PLAN

1. Regular mock drills will be organized. Shortfalls in actions observed during drill will be explained to participants and will be corrected accordingly.

2. Any shortcomings regarding On–Site Emergency Plan observed during such drills will be corrected and incorporated in On-Site Emergency Plan and same will be communicated to all.

3. The On-Site Emergency Plan will be updated after any significant development in factory or change in the law.

7.12 OCCUPATIONAL HEALTH AND SAFETY PROGRAM FOR THE PROJECT

The factory will take all reasonably practicable measures to minimize the risk of such accident incompliance with the legal obligation under the relevant safety.All building plans and installations are as per relevant acts and duly approved by competent government authorities.Process and Equipment will be designed by qualified and experienced professionals and fabricated to applicable national / international codes with stage wise inspection.Safety features such as fire extinguisher and suitable Personal Protective Equipment (PPE) shall be provided. Regular operations and testing of fire extinguishers shall be carried out.Periodic inspection and testing of pressure vessels, equipment, machineries and equipment handling substances.Training of workers and Staff for fire fighting, work permit system, first aid, safe handling of materials and integrating safety, in all activities.Accident / Incident reporting system and information of employees about the same for better awareness.Suitable notices / boards displayed at several locations indicating appropriate hazardswarning as well as DOs and DON’T for ensuring operational and personal Safety for information of workers / staff and visitors.

For the safety of the workers, personal protective equipments like hand gloves, helmets, safety shoes, goggles, aprons etc. & Ear protecting devices like earplugs/earmuffs will be provided. Nose mask will be provided at places, where there is possibility of dust generation.

List of Personnel Protective Equipment

1. Face Masks2. Ear Plunge3. Hand Gloves4. Gum Boots5. Goggles6. Helmets7. Aprons8. Fire Proximity Suit

Company shall adequately install fire-fighting system in different sections of the plant.

Some of the safeties precautionary measures shall be taken for manufacturing process are listed below:

Page 223: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 177

1. Safety Relief Valve, Rupture disk, temperature scanner, pressure indicator, and flow meter will be installed to vessel wherever required.

2. Cooling / Chilling water circulation arrangement will be provided to avoid abrupt increase of pressure and control heat and high temperature.

3. Auto control system (ACS) to Monitor & Control.4. Vent will be connected with scrubber as per the requirement.5. PPE will be provided to workers during charging of various raw materials and exhaust

ventilation lines will be provided as per requirement.6. Necessary interlocking and alarm system will be installed wherever required.

7.12.1 MEDICAL AID SCHEME

For outside help, company authority will make a mutual understanding with the following authorities to extend their help whenever an emergency occurs;

1. Doctors from Civil Hospital2. Police Station3. Fire Brigade

Time to time company shall inform/impart training to concerned employees for awareness about chemicals and its hazards and the precautionary measures on their part. An emergency guide will be provided to each employee, which gives guidance to him or her during an emergency.

7.13 LEAK DETECTION AND REPAIR (LDAR)

Leak Detection and Repair (LDAR) is a program implemented to comply with environmentalregulations for reducing the fugitive emissions of targeted chemicals into the environment. Inaddition to control fugitive emissions, LDAR Program also helps the industries to reduceunwanted losses of chemicals and thereby conserving energy & increasing their profitability.

Following steps are followed for effective implementation of LDAR Program:

1. Identification of volatile chemicals which may contribute in VOCs:

In existing plant, following are the list of chemicals which may contribute in VOCs.STYRENE MONOMERXYLENEEPOXYN RESIN

2. Identification of all the probable sources of leakage; such as valves, pumps, andConnectors.

List of the sources of probable leakage is as follows:Valves/FlangesPump glands handling above chemicalsPump sealsLPDs (Low Point Drains)HPVs (High Point Vents)

A list of all such items shall be made and same shall be incorporated in the checklist for LDAR.

Page 224: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 178

3. Selection of appropriate method for leak detection:Considering the nature of the chemical; only visual check is required for leak detection of individual chemicals.

4. Scheduling and checklist for Leak Detection:- Daily visual inspection of complete pipelines and equipment for abnormality and leakages.- Planned maintenance of all the equipment will be incorporated for reducing breakdowns and leakages.- Anti-splash tapes will be place on flanges to avoid heavy leaks due to rupture of gaskets.-Procurement and installation of pipelines and pumps will be such that their design pressure will be higher than working pressure.These liquids will be transfer in close system using appropriate pipes and pumps.After transfer of these liquids, will be empty their pipelines and drain down into their home tank, so that in case of pipeline failure, there is no leak of liquid to atmosphere.Seamless pipelines will be procure and install for handling such liquids.No container containing such the liquids will be store with lid left open.These liquids will be store in well ventilated space and in cool conditions.Leakless valves will be use to handle the liquids.SOP and training will be establish for handling, transfer operation and bleeding of system if any.Routing of pipeline to be such that pipelines will have minimum bends and low points where there are chances of creating vapor packets.Duration and capacity of storing all such material will be as minimum as possible so that there will be reduction of chances of emissions.Temporary repair and containment of any leaks will be done as soon as it occur.

5. Methods for rectification of identified leaks:For all identified leaks, closure shall be ensured with the help of maintenance department and records for the same shall be maintained.

7.14 DETAILS OF VARIOUS SOP’S PREPARED:

Procedure/ guideline for effective and efficient handling, treatment and disposal of liquid effluent & Hazardous waste

Procedure/ guideline for effective and efficient operation of air pollution control equipments

Procedure/ guideline for proper inspection and maintenance of safety equipments in thepremises

Procedure for safe handling of fire extinguisher guidelines for working at height or on fragileroof or false ceiling

Procedure for safe handling of liquid chemical at site

Guidelines & procedure for handling and storage of hazardous chemicals

Guideline/ procedure for spillage control of liquid chemicals

Page 225: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 179

7.15 FIRE CONTROL PLAN

M/s. Kemz Resibond Private Limited. has considered fire prevention measures at the project planning stage for its upcoming new facility to avoid any outbreak of fire By looking to the hazardous nature of process and the chemicals that are handled and processed, the chances of outbreak of fire cannot be totally ignored. Hence to tackle such a situation, company has developed proposed, well-resourced and adequate fire protection system/fire fighting network.

The company has planned to keep the different types of fire extinguishers at variousconspicuous locations.

Other Fire fighting Measures to be updated for the new facilities shall be:

Flame detectors, smoke / temperature actuated heat detectors with alarms, automaticsprinkler system, shall be installed at conspicuous locations as per the requirements.Company shall have Fire Water Tank of adequate capacity to combat the emergency, if arise.Working staff will be trained to operate CO2 and foam extinguishers.DG set shall be made available as a separate power backup for fire network, in case ofemergency or power failure.Factory Layout shall be designed in such a way, that it will have a provision for separate entry and exist with adequate margin all around the periphery for unobstructed easy movement of the emergency vehicle / fire tenders without reversing back.

Ways To Minimize The Manual Handling Of The Hazardous Chemicals:

1. Fork lifts are used for unloading chemical barrels/carboys, their movements within plant,handling carboys, bulk chemical bags, etc.2 Cranes, hoists, pallet trucks, conveyors, etc. are used as per the requirement, to eliminatemanual handling.3 Lifting tools & tackles are used, wherever required.4 SOPs, work instructions are prepared and followed.5 Trainings are provided to relevant staff, operators, workers for the risk associated withmanual handling of hazardous chemicals, ways to overcome those risk, etc.

Page 226: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 180

CHAPTER - 8

PROJECT BENIFITS

The proposed project activities will become beneficial to the surrounding area or community in terms of infrastructure, employment, social development and other benefits as described here under;

8.1 IMPROVEMENTS IN INFRASTRUCTURE

There will be increase in some small scale businesses like tea stall, catering services/hotels, grocery, sweet marts, cycle shop etc. in the study area.

8.2 EMPLOYMENT POTENTIAL

Due to proposed project direct employment of about 20 and indirect about 70 will be generated. Thus, the activities of proposed project will require considerable manpower which will be beneficial to employment structure of local area as maximum recruitments will be done from local area on merit basis. Local people will be given preference for almost all the jobs in the Plant, direct as well as indirect.

Economic status of the local people will be improved due to the increased business opportunities, thereby, making a positive impact. Educational, medical and housing facilities in the study area will considerably improve. Therefore, social infrastructure of the study area will be improved.

8.3 CORPORATE SOCIAL RESPONSIBILITY (CSR) & SOCIO-ECONOMIC DEVELOPMENT

Due to the proposed Project, facilities are likely to grow with the development. There is a positive effect due to improved communication and health services, which have lead to economic prosperity, better educational opportunities and access to better health and family welfare facilities. There will be beneficial effect on human settlement due to employment opportunities from the industry.

Local quality of life will be improved. This factor combined with all other mitigation measures like proper treatment and disposal of wastewater, hazardous waste and gaseous emission has minimized the adverse impact on ecology and had a beneficial impact on human settlement and employment opportunities. There has been a beneficial impact on the local socio-economic environment.

The increasing industrial activity will boost the commercial and economical status of the locality up to some extent.

Page 227: M/s. Kemz Resibond Private Limited
Page 228: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 182

8.4 DIRECT REVENUE EARNING TO THE NATIONAL AND STATE EXCHEQUER

This project will contribute additional revenue to the Central & State exchequer in the form of Central GST & State GST. Thus, the project will help the Government by paying taxes from time to time, which is a part of revenue and thus, will help in developing the area. Demand of the proposed products in foreign market is also significant, which will boost the export potential of the company as well as country. Export oriented units plays vitalrole in development of economy as well as local physical infrastructure for further boostingof industrial development with sustainable approach as the industries need to maintain good environment & safety condition to get better foreign market.

Page 229: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 183

CHAPTER - 9

ENVIRONMENT COST BENIFIT ANALYSIS

9.1 COST BENEFIT ANALYSIS

As per EIA Notification 14-09-2006, this Chapter of the ‘Environmental Cost Benefit Analysis’ is applicable only if it is recommended at the Scoping stage. However, as per the TOR points issued by SEAC, vide their letter Ref. No.: SEIAA/ GUJ/TOR/5(f)/1093/2019, Dated: 30/07/19, Environmental Cost Benefit Analysis is not applicable and therefore the same has not been carried out.

Page 230: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 184

CHAPTER 10

ENVIRONMENTAL MANAGEMENT PLAN

10.1 INTRODUCTION

Environmental Management Plan is considered to be an Integral component of EIA process. EMP is essentially a road map that describes how the impact mitigation measures suggested in earlier chapters, will be implemented along with other measures concerned during different life cycle phases of project

Any industrial development is associated with certain positive impacts as well as some negative impacts on the environment. However, the negative or adverse impacts cannot possibly rule out scientific development. At the same time, adverse impacts cannot be neglected.

The Environmental Management Plan describes, in brief, the management's plan for proper and adequate implementation of treatment and control system for air and liquid pollutants and for maintaining the environment. It also includes development of green belts around the plant, proper safety of the workers, noise control, fire protection systems and measures.

10.2 THE ENVIRONMENTAL MANAGEMENT PLAN (EMP)

The Environmental Management Plan (EMP) consists of a set of mitigation, monitoring and institutional measures to be taken during the design, construction and operation (post construction) stages of the project. The plan also includes the actions needed for implementation of these measures. Overall objective of EMP:

Prevention: Measures aimed at impeding the occurrence of negative environmental impacts and/or preventing such an occurrence having harmful environmental impacts.Reduction at Source: Reduction at source by adopting Best Available Technology.Minimization: Limiting or reducing the degree, extent, magnitude, or duration of adverse impacts.

The major components of the Environmental Management Plan are:Mitigation of potentially adverse impacts.Monitoring during project implementation and operation.Implementation schedule and environmental cost estimates.Integration of EMP with project planning, design, construction and operation.

The EMP has been designed keeping in view the regulatory and other requirements to ensure the following:Minimum disturbance to the native flora and fauna.Compliance with the air, water, soil and noise quality norms.Conservation of water to the extent possible.Encourage the socio-economic development.

Page 231: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 185

10.3 SCOPE & OBJECTIVES OF EMP

The main objective of Environmental Management Plan is to warrant that the industrial development in an identified particular study area needs to be entangled with judicious utilization of non-renewable resources and to ensure that the stress/load on the ecosystem is within its permissible assimilative capacity.

The main objectives in formulating this environmental management plan are:

To comply with all regulations stipulated by the Central / State Pollution Control Boards related to air emissions and liquid effluents discharges as per air and water pollution control laws.

To treat all the pollutants viz., liquid and gaseous which contribute to the degradation of the environment with appropriate technology.

To handle hazardous wastes as per the Hazardous Waste (Management and Handling & Transboundary Rules, 2016 of the Environment (Protection) Act, 1986.

To promote further afforestation in the surrounding areas of the Plant.

To create good working conditions (devoid of air and noise pollution) for employees.

To reduce fire and accident hazards.

Perspective budgeting and allocation of funds for environment management expenditure.

Continuous development and search for innovative technologies for a cleaner and better environment.

Page 232: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 186

10.4 ADMINISTRATIVE ACTIONS:

10.4.1. OPERATIONAL PHILOSOPHY

Philosophy behind designing the Environment Management Plan for a particular project is that all the activities being undertaken at the plant should be in complete compliance with all applicable laws, regulations, standards and guidelines. In order to achieve this, the management of the KEMZ RESIBOND has been established a resource base for the management of health, safety, environment and social issues at operation phase of the project. Technically qualified and experienced staff is in-charge of this activity and has planning to hire more qualified staff if needed in future expansion. Success of the Environment Management Plan is due to following aspects:

1. Management Support;

2. Efficiency of Environment Management Cell;

3. Acceptability of resulting environmental quality.

10.4.2 MANAGEMENT SUPPORT –ENVIRONMENT POLICY

To implement and facilitate the Environment Management System for any project, one of the most important aspects is management support. An Environmental Policy covering following aspects shall be laid down prior to commencement of proposed project:

The corporate policy for Environmental Management is to create sound and eco-friendly environment for sustainable development at all production projects, plan new projects with environment-friendly considerations, plan regulative, ameliorative and mitigative measures to protect environment and fully merge into the overall corporate policy for achieving the targeted business goals of the Corporation.

Objectives: The environmental policy is framed specifically to fulfill the following objectives:

Create a work environment which enhances/motivates production and productivity. Create a residing environment for the enjoyment and peace of employee. Encourage safe and scientific operations and other well-established engineering practices.

Promoting awareness amongst the employees and the neighborhood population for adopting environmentally friendly acceptable procedures and restricting environmental degradation and pollution to the barest minimum.

Page 233: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 187

10.4.3 ENVIRONMENTAL MANAGEMENT CELL

Kemz Resibond will formulate an Environmental Management Cell for its proposed unit. All the project activities will be monitored to ensure the appropriate implementation of all environmental mitigation activities and to identify areas where environmental management plan compliance is not satisfied. For effective implementation of the monitoring program, it is also necessary to have a permanent organizational set-up.

Unit will set-up permanent environmental management cell (EMC) for the effective implementation and monitoring of environmental management system. The unit will assign responsibility to officer from various disciplines and cadres to perform and co- ordinate the activities concerned with management and implementation of environmental control measures. The environmental management cell (EMC) propose to set-up by unit is given here below in Figure No. 10.1

FIGURE NO. 10.1ENVIRONMENTAL MANAGEMENT CELL

Director

EHS Manager

Executive EHS

Supervisor & Operators

Page 234: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 188

10.5 MITIGATIVE MEASURES

The probable impacts identified & the mitigation measures envisaged for protection of Environmental Components during the construction and operational phase are as tabulated in the table below:

Activity Environme-ntal

Impacts

Mitigation measures Remarks

Construction Phase:Erection of Plant Machineries

AirNoiseSocio Economic

Well maintained vehicles will be used.Metalled Road for Vehicle MovementWell maintained equipment will be utilized to prevent noise generation.Local labour will be hired for the work so that housing arrangement will be avoided.

Implementationresponsibility:Kemz Resibond

Operation Phase:Manufacturingof Products

AirLandWaterNoise

Ensure proper handling of all chemical by introducing spill control procedures.Ensure usages of PPE’s by workers.Strictly following the appropriate spill control procedures.The charging of the hazardous chemical will be done through very carefully. MSDS of Raw material & products will be displayed at storage & handling area.Water usage will be strictly by putting water meter plant wise. Monitored data will be analyzed and reviewed time to time.Contaminated solid waste will be sent to approve TSDF Facilities.Storage area will be designed in line with the factory Act requirement.

Implementationresponsibility:Kemz Resibond

Operation ofThermic Fluid Heater

• Air• Noise• Water

Ensure proper preventive maintenance of fuel firing system and optimization of air fuel ratio.Ensure proper maintenance of machinery to reduce noise levelAfter clean up of spillage ensure that disposed it properly.Provision of Adequate Stack Height. Ensure usage of Personal Protective Equipments.

Implementationresponsibility:Kemz Resibond

Operation ofCooling Tower

Air• Water

Ensure proper maintenance of machinery to reduce noise level

Page 235: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 189

• Noise Blow down is being sent in ETP provided within premises

Storage, Handling & Transportation of Raw materials and Products

Air• Water• Land

Chemical to be stored in accordance with the rules and regulations of the Safety Department. Separate storage area for solid/liquid raw materials. Install proper facilities to prevent rain/storm water contamination during the storage of solid raw materials.Ensure disposal of used drums, bags as per the rules/regulations.

Implementationresponsibility:Kemz Resibond

Transportation of all the raw materials,Finished products &Hazardous wastes.

AirWaterLand

Work will be given to Trained/Approved Transports for the transportation of the raw materials/products.

Ensure availability of MSDS of all the raw materials and finished products to the Off-site Emergency team.

Implementationresponsibility:Kemz Resibond

Development and maintenance of green belt

• Air• Land

Ensure development and maintenance of proper green belt as proposed.

Direct / Indirect Employment

• Socio Economicissue

Continue policy of local employment according to the skill and availability of the manpower

Page 236: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 190

10.6 IN-HOUSE LABORATORY

KEMZ RESIBOND has proposed to develop an in-house laboratory facility for plant performance and continuous up gradation and optimization of plant operation. List of major instruments available in laboratory are given below.

TABLE NO.10.1LIST OF MAJOR LABORATORY INSTRUMENTS

Sr.No.

Name of Equipment Quantity

1. Ford cup for viscosity testing in process 1 Nos.

2. Chilling bath lab scale for viscosity checking 1 Set

3. Mettler toledo microweighing balance for solid %, acid value & Other testing requirements

1 Set

4. Heating oven for checking solid content. 1 Set

5. Gelation timer for peak exotherm & geltime determination ofResin

1 Set

10.7 GREENBELT DEVELOPMENT

The unit is proposing green belt area of 1667 Sq.m. The purpose of a green belt around the plant site is to capture the fugitive emissions emanating from Plant operations, attenuate the noise generated and improve the aesthetics.

SELECTION OF TREES

The choice of trees species, suitable for plantation at the Industry Site, has been governed by the following guiding factors:

1. As per guidelines issued by Ministry of environment & Forests for greenbelt development.

2. As per the study carried out by our FAE in Ecological & Biodiversity.

3. The tree must be tolerant to all the pollutants present in the area.

4. The tree should be able to grow and thrive on soil of the areas, be evergreen, in habitat, having minimum of leaf fall.

5. The tree must be tall in peripheral curtain plantation and with large and spreading canopy in the primary and secondary attenuation zones.

6. The tree should possess extensive foliar area to provide maximum impinge surface for continued efficient adsorption and absorption of pollutants.

Page 237: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 191

7. The tree should be fast growing and indigenous.

8. The tree should maintain ecological, land and hydrological balance of the region.

Total plot area is 7551 Sq. meter. From that they had done planning for gardening and plantation for 1667 Sq. Meter.

The tree species selected for the plantation will be pollutant tolerant ,fast growing, wing firm, deep rooted and ever green.

The company will select pollutant tolerant plant species. For example, Asopalav, Neem Tree etc.

Budgetary expenditure for the greenbelt development has been depicted in the Table No. 10.2

TABLE NO. 10.2BUDGETARY EXPENDITURE FOR GBD

Sr.

No.

Parameter Capital Cost in

Rs.

Annual

recurring

Amount in Rs.

1 Site Development &

Plant/Seeds

1,10,000 --

2 Plant Care -- 1,44,000

Page 238: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 192

10.8 OCCUPATIONAL HEALTH AND SAFETY

Following measures will be adopted in the plant:

Inspection and maintenance of pollution control systems regularly.All safety measures such as safety appliances, training, safety awards, posters, slogans related to safety.The workers exposed to noisy sources area will be provided with ear muffs/plugs.Adequate facilities for drinking water and toilets in insufficient numbers will be provided to the employees.Fire proof aprons and necessary personnel protective appliances and equipment will be provided to the concerned personnel.Pre-medical examination and periodical examination will be carried out once in a year and records are maintained in Form No-32 & 33 as per GFR. PFT, LFT, Cardiac as well as Haematological & Urine test will be carried out during pre-placement and periodical examination.Isolation of drinking water & refreshment area including canteen etc. from the area of hazardous materials storage & handling Chemical Safety Booklet/Documents for all hazardous chemicals will be prepared and safety Booklet/Documents thus prepared has been made available well before commissioning of the project to all employees working with chemicals.Chemical safety booklet includes all necessary details like permissible exposure level/limit, Health effect, symptoms of toxic effects on human health, on-site first aid and necessary medical treatment guidelines etc.All required & necessary health manual & procedures for all activities will be developed and implemented. Such Manual & Procedures shall be made available to all concern employees.Preparation & implementation of Emergency action plan including on-site & off-site emergency management plan. Strict Prohibition of match box, lighters, clothes having potential of static charges as well as smoking in plant & storage area.Regular safety audit will be planned and necessary improvement will be taken as suggested by auditor.Properly designed & designated storage area and provision of good handling equipment and procedures will be ensured before commissioning plant. Mechanical handling system & arrangement wherever possible to avoid manual handling & so to avoid issues of MSDS. Wherever, automatic system is not possible, adequate manual handling facilities like trolley & Crain to reduce the stress of pulling -pushing and lifting to prevent or minimize the chances of issues related with MSDS.Provision of ergonomic design of all facilities wherever possible (e.g. chairs, tables, working platforms, self and position & height of display screens & panel etc.) to prevent or minimize the chances of issues related with MSDS Management will provide all necessary PPEs, safety equipment/materials to ensure healthy & safe work conditions. Regular inspection for the safety procedures and use of PPEs & Safety equipment/material will be done by the management/safety officer. Necessary training programs & audit will be done on regular basis to prevent impacts of the operational activities on human health as well as to improve workplace condition & safe work system.

Page 239: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 193

10.9 EXPENDITURE ON ENVIRONMENTAL MATTERS

The Table No. 10.3 table gives the expenditure to be incurred by M/s. Kemz Resibond on environmental matters.

TABLE NO.10.3EXPENDITURE ON ENVIRONMENTAL MATTERS

Sr.No

System Approximate recurring cost

per annum(in Lacs)

Approximate capital cost

(Rs. In Lacs)

Basis for cost estimates

1 Air pollution control

0.36 2 The capital cost would include cost of providing adequate height of the stack, ladder and platform, Air Pollution Control Systems and recurring cost would include cost of monitoring of air environment.

2 Water pollution control

-- 8 Capital cost would include cost of ETP, Evaporation cost of Spray Drying etc. In capital cost civil work, mechanical work, Electrical work and piping work is included. Recurring cost is for operational phase.

3 Noise pollution monitoring

0.06 -- The recurring cost would include cost of noise monitoring.

4 Solid and hazardous waste management

0.18 3 Capital cost would include cost of providing storage space for hazardous waste and membership of TSDF Fee. Recurring cost would include cost of land filling and transportation.

5 Environment monitoring and management

0.6 -- The recurring cost would be incurred on hiring of consultants and payment of various statutory fees to regulatory agencies.

6 Green belt 1.44 1.10 Development of Greenbelt including Gardening and Plantation.

7 Occupational health (OHC)

0.64 -- Occupational health check up of Employees and workers

Total 3.28 14.10

Page 240: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 194

10.10 CONCEPT OF WASTE MINIMIZATION, RECYCLE / REUSE / RECOVER TECHNIQUES, ENERGY CONSERVATION AND NATURAL RESOURCES CONSERVATION.

WASTE MINIMIZATION, RECYCLE /REUSE / RECOVER TECHNIQUES:

Unit shall to do moping in their unit instead of washing of water.Unit should try to minimize the excess raw material in batch, so it will reduces the unreacted raw material in effluent generation. Ultimately, it will reduce the concentration of effluent.Unit shall provide fix pipeline in their unit to minimize the leakages.Good House Keeping: Proper housekeeping practices make the system easier and less costly.Roof water harvesting system shall be adopted to reduce the fresh water requirement.Cleaner production technology may be adopted for the resource conservation and pollution control.

Cleaner production practices Process vessels:

Liquid raw material will be charged by pumping and closed loops and dosing will be done by metering system to avoid odour.Double mechanical seals will be provided to the process vessels having agitator for reduction of odour and leakages.

Storage tanks

Storage tanks for products as well as raw materials will be fitted with appropriate control devices to avoid possible odours / leakages.

House keeping:

Keep work areas clean.Keep exits and entrances clear.Use proper waste collection containers.Cleanup spills and leaks off’s any type quickly and properly.Follow up preventive predictive maintenance.

Page 241: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 195

ENERGY CONSERVATION:

Energy Conservation and Energy Efficiency are separate, but related concepts. Energy conservation is achieved when growth of energy consumption is reduced, measured in physical terms. Energy Conservation can, therefore, be the result of several processes or developments, such as productivity increase or technological progress. On the other hand Energy efficiency is achieved when energy intensity in a specific product, process or area of production or consumption is reduced without affecting output, consumption or comfort levels. Promotion of energy efficiency will contribute to energy conservation and is therefore an integral part of energy conservation promotional policies.

Energy efficiency means using less energy to perform the same function. Various measures taken will be as follows:

First step to conserve energy is to identify source of energy utilization.

Variable frequency drives (VFD) in pumps, whenever required is provided to save energy.

Use of low loss transformer instead of conventional transformer.

As far as possible the unit is planning to use solar street lights in the factory premises which is the renewable energy.

Proper air to fuel ratio is maintained for the maximum efficiency of thermic fluid heater.

Good insulation practice has been adopted to prevent heat losses.

Regular cleaning to the lamps and fixtures is done to get better illumination in the plant.

To avoid loss of precious quantum of energy, regular maintenance/ servicing is provided to all the equipments.

Unit is planning to conduct energy audit regularly as a tool for monitoring purpose.

Page 242: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 196

REUSE / RECYCLE:

Used oil from the plant & machineries is reused as a lubricant within plant and excess, if any is sold to authorize recyclers.

GOOD HOUSEKEEPING:

Good housekeeping means changing existing practices or introducing new ways of operating and maintaining equipment. Proper good housekeeping can prevent accidents, spillages and leakages, raw material & product loses. For Good housekeeping following practices are adopted.

All the materials are stored in compatible group.

All pits, sumps are properly covered or securely fenced.

Appropriate tools are provided for handling of all the materials.

Regular training is given to all workforces.

All the passages, floors and stairways are maintained in good condition. The systemis made available to deal with any spillage at the plant. Sufficient disposable bins are clearly marked and these are suitably located in the plant.

In the plant, precaution and instructions are displayed at strategic locations. Proper working instructions are given to all the workers in factory.

Roads/walkway within the plant is maintained neat and clean. Walkways are clearly marked and free from obstructions.

Page 243: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 197

CHAPTER 11

SUMMARY OF ENV. IMPACTS & CONCLUSION

11.1 INTRODUCTION

The environmental impacts of projects or actions generally encompass a broad range of impact from Air and Noise pollution to affect on employment and neighborhood as well as on social structure. All of these impacts vary in magnitude as well as in their beneficial or adverse classification. As a result, a natural question arises as to what is the “collective” or “overall” environmental impact of the project or action taken. Is the project beneficial or is it adverse? To answer such a question requires a comparison of these impacts and to some extent subjective evaluation of those impacts which are more important than others.

Kemz Resibond Private Limited.is a proposed unit intend to manufacture various resins Survey No:84/1,84/2,Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

The unit intends to manufacture Synthetic Organic Resins viz. Unsaturated Polyester Resin, AlkydResin, Epoxy Resin, Saturated Polyester Resin, VinylEster Resins, total to the tune of 1250 MT/ Month.

In order to assess the potential environmental impacts arising due to proposed project, the promoter has assigned the work of EIA to M/s. Entech Laboratories, Ahmedabad (for collecting the information on existing environmental conditions and assess the impacts on environment due to proposed project expansion and suggest the environmental safeguards and mitigation measures).

Page 244: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 198

11.2 SALIENT FEATURES OF THE PROJECT

Sr. No Contents Details1 Name of the Project: M/s. Kemz Resibond Private Limited

SurveyNo:84/1,84/2,Village:Fofadiya, Tal:Dabhoi,Dist:Vadodara-391210

2 Details of Applicant Ms. Ankita Agrawal(Director)

3 Status Kemz Resibond Private Limited. is a proposed unit intend to manufacture various resins at Survey No:84/1,84/2, Village: Fofadiya, Tal: Dabhoi, Dist: Vadodara-391210.

For this the unit has applied for obtaining Environment Clearance from SEIAA-Gujarat.

CTE is also granted for the same from GPCB.4 Total Plot area

( sq. meter)Proposed: 7551.00 Sq. m.

5 Capital Investment of theProject, Rs. in Crores

Proposed: 4.7238 crores

6 Capital cost for EMP, Rs.in Lakhs 14.1 Lacs

7Recurring cost for EMP,Rs. in Lakhs 12.25 Lacs

8 Employment opportunity Proposed: 20

9 Green belt Development Proposed: 1667 Sq. m.

10 Pollution control measures adoptedEffluent disposal Domestic Wastewater is 1.2 KL/day will be

disposed off through Soak Pit/Septic Tank System.Total Industrial Effluent of 3.5 KL/day will be collected neutralized in the ETP and then evaporated.

Flue gas emission control Adequate stack height will be provide.

Stack monitoring facilities for the periodic monitoring of the stack to verify the compliance of the stipulated norms.

Process gas emissioncontrol

There will be no process gas emission from the process as all process will be done in closed vessels with close circuit system.

Page 245: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 199

Fugitive emission control Unit will provide the scrubber with blender due to any rarely circumstances if acid fumes will generate.

Hazardous waste management

All the hazardous waste will be collected, stored, handled, transported and disposed as per the Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016, amended time to time etc. are major Act/rules/notification applicable to industry.

11Expenditure for CSR & CERactivities

Rs. 9.5 Lacs

Page 246: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 200

Environment Impact Assessment as detailed in previous chapter can now be concise to impact statement given below.

11.3 AIR ENVIRONMENT

Meteorological data collected during the study period March–April–May 2019 confirms that climatic Status of the study area is consistent with the regional meteorology.

Average concentration of ambient air quality parameters such as PM10, PM 2.5, SO2, NOxin the surrounding study area are well within the permissible limits as prescribed in the National Ambient Air Quality (NAAQ) Standards for respective residential rural areas and industrial areas.

Further, it has may be noted that the impacts due to utility operations would be negligible as the LDO will be used as fuel. Hence, there would not be any major impacts due to emission. Adequate stack height with stack monitoring facilities will be provided. There are no any type of major process gas emissions.

Evaluated GLCs due to the proposed air pollution load. When added to the monitored existing ambient air quality, provides the expected ambient air quality when the fuel quantity will increase in proposed utility and the same indicates that expected AAQ are well within the permissible limit of National Ambient Air Quality Standards for residential rural areas as well as industrial areas.

It is concluded from the above that there will be a minor impact on the AAQ of the surrounding environment due to operation of the proposed expansion project.

11.4 WATER ENVIRONMENT

M/s. Kemz Resibond is a proposed unit and the source of water for proposed project will be from Bore-well.

The quality of the water was tested at eight locations in the study area. The ground water norms were compared to IS: 10500 (1991) for evaluation. The Industry generates process effluent apart from, Cooling Tower blow down and domestic effluent.

Wastewater Generation & Disposal:

Total wastewater generation will be 4.7 KLPD. Domestic Wastewater is 1.2 KL/day will be disposed of through Soak Pit/Septic Tank System.Total Industrial Effluent to the tune of 3.5 KL/day will be collected neutralized in the ETP and then evaporated.

Thus, it can be concluded that negligible impact on surrounding water environment is caused. Further, it is emphasized that all precautionary measures have to be strictly adhered as mentioned in the Environmental Management Plan given in Chapter 10, to maintain ground water quality within norms in the future.

Page 247: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 201

11.5 NOISE ENVIRONMENT

Base line data indicates that noise levels in the study area are not on higher sides. Noise level in and around plant site were measured. Measured noise levels within premises indicate that overall noise levels are within the Damage Risk Criteria. The company will provide ear-protecting devices/ earplugs for working personnel exposed to high noise level. It can be concluded that there will be no impact on the noise level of the surrounding environment.

11.6 HAZARDOUS WASTES

As per the Hazardous Waste (Management & Handling) Amendment Rules, 2016, all necessary control steps for each type of Hazardous Wastes generated from the proposed project will be taken. Therefore, no impact of hazardous wastes generation on surrounding soil environment is anticipated.

11.7 ECOLOGY

The proposed project will be carried out on land without cutting of any trees. Also, the project site is located in non-agricultural land devoid of any permanent eco-system. So, it does not alter the crop pattern and natural vegetation of the surrounding area. Due to the safe control technology of air pollutants, liquid effluents and solid/hazardous wastes disposal, no impact on the surrounding ecology is anticipated.

11.8 SOCIO - ECONOMIC ENVIRONMENT

The proposed project will generate direct employment 20 persons. The indirect employment will be generated by way of transportation, shopkeepers and other casual employment. Implementation of this plant will also reduce production loss due to shortage of power.

Thus, the proposed project will have significant positive impacts on the employment pattern of the study area.

Page 248: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 202

11.9 LAND USE

Source emission, wastewater and hazardous waste generation from any project activity affects the soil environment.

Soil samples have been collected from 8 locations to ascertain its physical and chemical characteristics within study area. Physical parameter suggested that type of soil within study area is black cotton.

The plot is non a gricultural land and industrial activity will be c ar r ie d out for resin manufacturing. There are no ecosensitive areas such as forest, national park, wildlife sanctuary, biosphere reserves and wildlife corridors etc. located within 10km radius of project area.

The impact due to air causes direct/indirect effect on soil. The emissions of Particulate Matter during operation will be effectively controlled. There will be practically no effect on the soil quality due to air emissions.

Domestic effluent will be discharged to soak pit and septic tank system. Wastewater generated from the Industrial activity will be treated in Effluent Treatment Plant and then evaporated. The Hazardous Solid Waste will be disposed to TSDF site.

As per the Hazardous Waste (Management & Handling) Amendment Rules, 2016, all necessary control steps for each type of Hazardous Wastes generated will be taken for the proposed project.

Hence, due to the proposed project the, land use pattern; land cover and topography of the area will not be changed

11.10 CONCLUSION

It can be concluded on a positive note that due to the adequate provision and efficient operation of Environmental Management Systems and after the implementation of the proposed mitigation measures and environmental management plans, the proposed project activities during the construction and operation phase would have manageable & largely have reversible impacts on the environment, and on balance the project would be beneficial to surrounding communities and the region.

Page 249: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 203

CHAPTER 12

DISCLOSURE OF CONSULTANT

Declaration By Consultant Organization Preparing EIA Report:

Project proponent M/s. Kemz Resibond Private Limited.Project Site Survey No. 84/1, 84/2, Vill. Fofadiya,

Taluka: Dabhoi, Dist: Vadodara Gujarat.Type of project Resin manufacturing unit

Category of project as perEIA notification

5(f) – B- Synthetic Organic Chemicals

EIA Consultant Organization

Entech Laboratories

Contact Information Office: 202, Trade Square, Opp. Torrent Power House,Dharmnagar, Sabarmati, Ahmedabad-380005, Gujarat, India, Phone: 079-2757 2758

Phone 9824012121E-mail [email protected] Court Order SCA No. 2728 of 2018 (Please see Annexure A)

Laboratory engaged in the EIA Project:Laboratory Organization

Entech LaboratoriesNABL Accredited Laboratory33,34 Kushal Estate, Sanket Industrial Estate, Village -Moraiya, Taluka Sanand, Ahmedabad 382213 Gujarat, India

Declaration by the head of the Consultant Organization

I, Prakash Vaghela, hereby confirm that the experts prepared the EIA of “Kemz Resibond Private Limited.” I also confirm that I shall be fully accountable for any misleading information mentioned in this statement.

Name:Mr. Prakash VaghelaDesignation:CEOConsulting Organization Name:Entech LaboratoriesAddress: 202, Trade Square, Opp. Torrent Power House, Dharmnagar, Sabarmati,Ahmedabad-380005Date: 28-11-2019

Declaration by NABL Approved Laboratory for Analysis(1) NABL Accreditation certificate by En-Tech Laboratories, Sanand Ahmedabad annexed as Annexure-B.

Page 250: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 204

Disclosures of Consultants

I, hereby, certify that I was part of the EIA team in the following expertise that developed the EIAof M/s. Kemz Resibond Private Limited

EIA Co-Ordinator:

The name of EIA co-ordinator is Mr. Prakash Vaghela. In support Team Members along with their role in the project is given as per following:

EIA Team Member

Qualification with Experience

in Area

Sign Involvement in the Work of EIA

Mr. Prakash Vaghela

B.E. (Environment), PGDIS, LLB

Risk Assessment, Site visit and prediction of impact on land use pattern, identified source of generation of Hazardous Waste and its disposal methods, Mitigation measures for management of hazardous waste, identified waste generation sources and preparing environmental management plan, identification of impact & mitigation measures and EIA report preparation

Mr. Dipak Jadav

B. Sc. Chemistry Water pollution prevention, control and prediction of impacts- Identification of surface water sampling stations, water requirement/demand calculation, identification of impacts and relevant mitigation measures, assisting in preparation of management plan and report writing

Mr. Joshua Anand

Master of Technology in Geomatics, Bachelor of Technology in Civil (Water Resource Engineering)

Development of land use map of study area, prepare land use classification and prediction of impact on land use pattern

Mr. Haresh Makwana

B.Sc. PDIS Meteorology, air quality modelling and prediction- Data collection, assistance in report preparation for AAQM modelling and water sample monitoring for EIA with help of external agency

Page 251: M/s. Kemz Resibond Private Limited

Entech Laboratories

Draft EIA report of M/s. Kemz Resibond Private Limited 205

Mr. MaksoodMansoori

B.E. (Mechanical)

Site visit, understanding and representing ground water conditions, identification of impacts, suggestion of mitigation measures and contribution of EIA documentation

Mr. Mahesh Solanki

B.E. (Chemical) Risk assessment and hazard management - Assistance in identification of impacts & mitigation measures, safety during construction and operational phase and report writing.

Mr. Anant Patel MSC (Environment Biotechnology)

Identification of impacts & mitigation measures for Ecology and biodiversity, flora and fauna and contribution in EIA documentation with help of external agency

Mr. Jigar H Joshi

B.E Electrical, PDIS, PDIETM

Identified potential hazards of proposed activities; Consequence analysis and Suggestion of mitigative and safety measures for Hazards identified.

Ms. Riddhi Soni B.E Environment Monitoring and identification of sampling location and evaluation of results and EIA report preparation with help of external agency.

Mrs. Viral Chauhan

B.A. , M.A. Sociology

Site visit, evaluation of socieo-economic status of study area, social economic issues arise due to proposed project and contribution in EIA documentation with help of external agency

Page 252: M/s. Kemz Resibond Private Limited

ANNEXURE-1

CTE FROM GPCB

Page 253: M/s. Kemz Resibond Private Limited

NET Payment Receipt

Address : , Survey No:84/1, 84/2, Vill: Fofaliya, Tal: Dabhoi, Dist: Vadodara, Fofaliya, Vadodara Pin : 391210

Bank Details

Transaction No

Application: 163817(ECC)-dd/MM/yyyy

ICO-1782188177

QICO7900735609

PCB ID: 72906-Kemz Resibond Pvt. Ltd

Payment Id 231798

Payment Date 23/08/2019

Date : 26/08/2019

Paid Amount 15000

Status Success

Remarks Success

Type

Referance No

MIS Date

163817 (Environment Clearance)

EC -ECC-CCA

-

Page 254: M/s. Kemz Resibond Private Limited
Page 255: M/s. Kemz Resibond Private Limited

ANNEXURE-2

NA CERTIFICATE

Page 256: M/s. Kemz Resibond Private Limited
Page 257: M/s. Kemz Resibond Private Limited
Page 258: M/s. Kemz Resibond Private Limited
Page 259: M/s. Kemz Resibond Private Limited
Page 260: M/s. Kemz Resibond Private Limited
Page 261: M/s. Kemz Resibond Private Limited
Page 262: M/s. Kemz Resibond Private Limited
Page 263: M/s. Kemz Resibond Private Limited
Page 264: M/s. Kemz Resibond Private Limited
Page 265: M/s. Kemz Resibond Private Limited
Page 266: M/s. Kemz Resibond Private Limited

ANNEXURE-3Undertaking for complying the three conditions, Water

consumption <25 m3/Day, Fuel Consumption < 25 TPD, not covered under category of MAH

Page 267: M/s. Kemz Resibond Private Limited
Page 268: M/s. Kemz Resibond Private Limited

ANNEXURE-4

LAND POSSESSION DOCUMENTS (LPD)

Page 269: M/s. Kemz Resibond Private Limited
Page 270: M/s. Kemz Resibond Private Limited
Page 271: M/s. Kemz Resibond Private Limited
Page 272: M/s. Kemz Resibond Private Limited
Page 273: M/s. Kemz Resibond Private Limited
Page 274: M/s. Kemz Resibond Private Limited
Page 275: M/s. Kemz Resibond Private Limited
Page 276: M/s. Kemz Resibond Private Limited

ANNEXURE-5

CGWA APPLICATION COPY

Page 277: M/s. Kemz Resibond Private Limited
Page 278: M/s. Kemz Resibond Private Limited

ANNEXURE-6Undertaking for underground drainage connection will not be taken and will be

achieve Zero Liquid Discharge

Page 279: M/s. Kemz Resibond Private Limited
Page 280: M/s. Kemz Resibond Private Limited

ANNEXURE-7

NOC LETTER FROM BEIL INFRASTRUCTURE LIMITED (FOR

TSDF & CHWIF)

Page 281: M/s. Kemz Resibond Private Limited
Page 282: M/s. Kemz Resibond Private Limited
Page 283: M/s. Kemz Resibond Private Limited

ANNEXURE-8

MSDS OF RAW MATERIALS & PRODUCTS

Page 284: M/s. Kemz Resibond Private Limited
Page 285: M/s. Kemz Resibond Private Limited
Page 286: M/s. Kemz Resibond Private Limited
Page 287: M/s. Kemz Resibond Private Limited
Page 288: M/s. Kemz Resibond Private Limited

File

No:

PLC

/329

28 O

ctob

er 20

02

NA

TIO

NA

L IN

DU

STR

IAL

CH

EM

ICA

LS

NO

TIF

ICA

TIO

N A

ND

ASS

ESS

MEN

T SC

HEM

E

(NIC

NA

S)

FULL

PU

BLIC

RE

POR

T

4949

892

Sat

ura

ted

Po

lyes

ter

Res

in

Thi

s A

sses

smen

t ha

s b

een

com

pile

d in

acc

orda

nce

wit

h th

e pr

ovi

sion

s o

f th

e In

dus

tria

l C

hem

ical

s (N

otif

icat

ion

and

A

sses

smen

t) A

ct 1

989

(Cw

lth)

(th

e A

ct)

and

Reg

ulat

ions

. T

his

legi

slat

ion

is a

n A

ct o

f th

e C

om

mo

nwea

lth

of A

ustr

alia

. T

he N

atio

nal

Indu

stri

al C

hem

ical

s N

otif

icat

ion

and

Ass

essm

ent S

chem

e (N

ICN

AS)

is a

dm

inis

tere

d b

y th

e D

epar

tmen

t of

Hea

lth

and

Ag

ein

g, a

nd c

ond

ucts

the

risk

ass

essm

ent

for

pub

lic h

ealth

and

occ

upat

iona

l he

alth

and

saf

ety.

Th

e as

sess

men

t of

env

iron

men

tal

risk

is

cond

uct

ed b

y th

e D

epar

tmen

t of t

he E

nvir

onm

ent a

nd H

erita

ge.

For

the

purp

oses

of

sub

sect

ion

78(1

) o

f the

Act

, thi

s F

ull P

ubli

c R

epor

t m

ay b

e in

spec

ted

at:

Lib

rary

N

atio

nal

Occ

upat

ion

al H

ealt

h an

d Sa

fety

Com

mis

sio

n 25

Co

nsti

tutio

n A

venu

e C

AN

BE

RR

A A

CT

26

00

AU

ST

RA

LIA

To

arra

nge

an a

ppoi

ntm

ent c

ont

act

the

Lib

rari

an o

n T

EL

+ 6

1 2

627

9 1

161

or +

61

2 6

279

1163

.

Thi

s F

ull P

ubli

c R

epor

t is

ava

ilab

le f

or

view

ing

and

dow

nloa

ding

fro

m th

e N

ICN

AS

web

site

or

avai

labl

e on

req

uest

, fre

e of

cha

rge,

by

con

tact

ing

NIC

NA

S. F

or r

eque

sts

and

enq

uiri

es p

leas

e co

nta

ct th

e N

ICN

AS

Ad

min

istr

atio

n C

oor

dina

tor

at:

Str

eet

Ad

dres

s:

3

34 -

336

Ill

awar

ra R

oad

MA

RR

ICK

VIL

LE

NSW

22

04, A

UST

RA

LIA

. P

osta

l A

ddre

ss:

G

PO

Box

58

, SY

DN

EY

NSW

200

1, A

US

TR

AL

IA.

TE

L:

+

61

2 85

77 8

800

F

AX

+ 6

1 2

8577

88

88.

Web

site

:

w

ww

.nic

nas.

gov

.au

Dire

ctor

C

hem

icals

Not

ifica

tion

and

Ass

essm

ent

TABL

E O

F C

ONT

ENT

S

FU

LL

PU

BL

IC R

EPO

RT

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

.....

.....

......

.....

......

41.

APP

LIC

AN

T A

ND

NO

TIF

ICA

TIO

N D

ET

AIL

S..

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

.42.

IDE

NT

ITY

OF

CH

EM

ICA

L...

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

....4

3.C

OM

POS

ITIO

N..

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

.....

.....

......

....

44.

INT

RO

DU

CT

ION

AN

D U

SE I

NFO

RM

AT

ION

......

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

......

.....

......

...4

5.P

RO

CE

SS A

ND

RE

LE

ASE

IN

FOR

MA

TIO

N...

......

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

...5

5.1.

Dis

trib

utio

n, T

rans

port

and

Sto

rage

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

.....

55.

2.O

pera

tion

Des

crip

tion.

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

..5

5.3.

Occ

upa

tiona

l exp

osu

re...

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

......

....5

5.4.

Rel

ease

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

.....

......

.....

65.

5.D

ispo

sal.

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

......

.....

.....

..6

5.6.

Pub

lic

exp

osur

e...

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

......

......

...6

6.P

HY

SIC

AL

AN

D C

HE

MIC

AL

PR

OP

ER

TIE

S...

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

...6

7.T

OX

ICO

LO

GIC

AL

INV

EST

IGA

TIO

NS

......

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

...8

8.E

NV

IRO

NM

EN

T...

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

......

.....

89.

RIS

K A

SSE

SSM

EN

T...

......

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

......

..8

9.1.

Env

iro

nmen

t.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

......

.89.

1.1.

Env

iro

nmen

t – e

xpo

sure

ass

essm

ent.

......

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.89.

1.2.

Env

iro

nmen

t – e

ffec

ts a

sses

smen

t...

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

....8

9.1.

3.E

nvir

onm

ent –

ris

k c

hara

cter

isat

ion

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

....8

9.2.

Hum

an h

ealt

h...

......

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

......

......

......

89.

2.1.

Occ

upa

tiona

l hea

lth

and

safe

ty –

exp

osu

re a

sses

smen

t....

.....

......

.....

......

.....

.....

......

.....

......

.....

....8

9.2.

2.P

ubli

c he

alth

– e

xpo

sure

ass

essm

ent.

......

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.99.

2.3.

Hum

an h

ealt

h -

effe

cts

asse

ssm

ent.

......

......

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

......

....9

9.2.

4.O

ccu

patio

nal h

ealt

h an

d sa

fety

– r

isk

char

acte

risa

tion

.....

......

.....

.....

......

.....

.....

......

.....

......

.....

....9

9.2.

5.P

ubli

c he

alth

– r

isk

char

acte

risa

tion

......

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

......

.....

......

.....

....9

10.

CO

NC

LUS

ION

S .

.....

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

......

.....

......

.....

.....

.....

.....

....9

10.1

.H

azar

d c

lass

ific

atio

n...

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

......

.910

.2.

Env

iro

nmen

tal

risk

ass

essm

ent.

.....

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

.....

910

.3.

Hum

an h

ealt

h ri

sk a

sses

smen

t.....

......

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

..9

10.3

.1.

Occ

upa

tiona

l hea

lth

and

safe

ty...

......

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

....9

10.3

.2.

Pub

lic

heal

th..

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.911

. M

AT

ER

IAL

SA

FET

Y D

AT

A S

HE

ET

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

...9

11.1

.M

ater

ial

Safe

ty D

ata

She

et..

.....

......

.....

......

.....

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.....

......

......

....9

11.2

.L

abel

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

.....

.....

......

......

......

....

1012

. R

EC

OM

ME

ND

AT

ION

S...

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

...10

12.1

.S

eco

ndar

y no

tifi

catio

n...

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

......

..10

13.

BIB

LIO

GR

APH

Y...

......

......

.....

......

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

......

.....

.....

......

.....

.11

Page 289: M/s. Kemz Resibond Private Limited

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 3

of 1

0

FULL

PU

BLIC

RE

POR

T

4949

892

Satu

rate

d Po

lyes

ter R

esin

1.

AP

PL

ICA

NT

AN

D N

OT

IFIC

AT

ION

DE

TA

ILS

APP

LIC

ANT

(S)

T

he V

alsp

ar (A

ustr

alia

) C

orpo

rati

on P

ty L

imit

ed o

f 20

3 P

ower

Str

eet,

Gle

nden

nin

g, N

SW 2

761

.

NO

TIFI

CATI

ON C

ATE

GOR

Y

The

not

ifie

d p

oly

mer

mee

ts t

he P

LC

crit

eria

.

EX

EMPT

INFO

RM

ATI

ON (

SEC

TIO

N 7

5O

F TH

E A

CT)

D

ata

item

s an

d de

tails

cla

imed

ex

emp

t fro

m p

ubl

icat

ion:

C

hem

ical

na

me

and

sy

nony

ms,

m

olec

ular

for

mul

a,

poly

mer

co

nst

itue

nts,

w

eigh

t pe

rcen

tage

of

po

lym

er c

onst

ituen

ts a

nd re

sidu

al m

ono

mer

s.

VA

RIAT

ION

OF

DA

TA R

EQU

IREM

ENT

S (S

ECTI

ON

24

OF

THE

ACT

)

No

var

iati

on t

o th

e sc

hed

ule

of d

ata

requ

irem

ents

is

clai

med

.

PRE

VIO

US N

OTI

FICA

TION

IN A

UST

RALI

A B

Y A

PPLI

CAN

T(S)

N

one

NO

TIFI

CATI

ON IN

OTH

ER C

OUN

TRIE

S

No

ne

2.

IDE

NT

ITY

OF

CH

EM

ICA

L

MA

RKET

ING

NA

ME

(S)

49

498

92 S

atu

rate

d P

olye

ster

Res

in

MET

HO

DS O

F D

ETEC

TION

AN

D D

ETER

MIN

ATI

ON

AN

ALY

TICA

LM

ETH

OD

IR

Rem

arks

T

he n

otif

ier

has

pro

vide

d an

IR

spe

ctru

m f

or t

he n

otif

ied

poly

mer

.

3.

CO

MP

OS

ITIO

N

PURI

TY

Hig

h

HA

ZAR

DOU

S IM

PUR

ITIE

SN

one

RES

IDU

AL

MO

NOM

ERS

All

resi

dual

mo

nom

ers

are

bel

ow t

he r

elev

ant

cut-

offs

for

cla

ssifi

cati

on o

f th

e n

otif

ied

poly

mer

as

a ha

zard

ous

sub

stan

ce (

NO

HSC

, 19

99a)

.

4.

INT

RO

DU

CT

ION

AN

D U

SE I

NF

OR

MA

TIO

N

MO

DE O

F IN

TRO

DU

CTIO

N O

F N

OTI

FIED

PO

LYM

ER (1

00%

) O

VER

NEX

T 5

YEA

RS

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 4

of 1

0

T

he p

olym

er w

ill b

e m

anuf

actu

red

at t

he n

otif

ier’

s pl

ant i

n D

and

enon

g, V

ic.

MA

XIM

UM I

NTR

OD

UCT

ION

VO

LUM

E OF

NO

TIFI

ED P

OLY

MER

(10

0%)

OV

ER N

EXT

5 Y

EARS

Yea

r 1

2 3

4

5 T

onne

s21

2

1 21

21

2

1

USE

T

he n

otif

ied

po

lym

er is

a c

ompo

nent

of

indu

stri

al P

VC

pro

duct

s fo

r fl

oori

ng.

5.

PR

OC

ES

S A

ND

RE

LE

AS

E I

NF

OR

MA

TIO

N

5.1.

D

istr

ibut

ion

, Tra

nspo

rt a

nd S

tora

ge

IDEN

TITY

OF

MA

NUFA

CTU

RER/

REC

IPIE

NTS

The

no

tifie

d ch

emic

al

wil

l be

m

anuf

actu

red

at

the

not

ifie

r’s

plan

t in

D

ande

nong

, V

IC,

and

refo

rmu

late

d in

to P

VC

flo

orin

g at

Arm

stro

ng W

orld

Ind

ustr

ies,

in B

raes

ide,

VIC

.

TRA

NSP

ORTA

TIO

N A

ND P

ACK

AGIN

G

The

not

ifie

d po

lym

er w

ill

be p

acke

d in

itial

ly in

200

kg

stee

l co

ntai

ner

s. A

fter

cru

shin

g, i

t is

rep

ack

ed

into

25

kg h

essi

an b

ags

and

stor

ed a

t th

e m

anuf

actu

rer’

s si

te u

ntil

req

uire

d by

the

cust

om

er.

5.2.

O

per

atio

n D

escr

iptio

n

Poly

mer

Man

ufac

ture

The

pol

ymer

is

man

ufa

ctur

ed i

n a

bat

ch p

roce

ssin

g o

pera

tion

in a

n en

clo

sed

hea

ted

reac

tion

ves

sel

fitte

d w

ith

stir

ring

and

an

ove

rhea

d co

nden

ser

syst

em u

nder

neg

ativ

e pr

essu

re.

Whe

n th

e re

acti

on i

sco

mpl

ete,

th

e re

actio

n ve

ssel

is

cool

ed t

o a

roun

d 1

50-1

80º

C a

nd

the

liqu

id p

olye

ster

is

dis

char

ged

into

20

5 li

tre

open

hea

ded

dru

ms

and

allo

wed

to

coo

l. D

urin

g co

olin

g th

e po

lyes

ter

soli

difi

es (

200

kg

). A

bat

ch o

f res

in is

app

roxi

mat

ely

7 to

nnes

. C

rush

ing

Pro

cess

Afte

r m

anuf

actu

re,

the

notif

ied

poly

mer

is

tran

spor

ted

as 2

00 k

g so

lid

lum

ps i

n op

en h

eade

d st

eel

dru

ms

to a

cru

shin

g c

ontr

acto

r’s

site

. T

he

poly

mer

res

in i

s cr

ush

ed i

nto

lum

ps o

f 25

to

10

0 m

m

diam

eter

and

pac

ked

into

25

kg h

essi

an s

acks

. P

rodu

ct M

anuf

actu

reT

he n

otif

ied

poly

mer

is

wei

ghe

d in

to a

co

ntai

ner

and

ad

ded

to t

he m

ixer

with

oth

er in

gre

dien

ts.

The

ingr

edie

nts

are

blen

ded

in a

Ban

bury

typ

e cl

ose

d m

ixer

the

n fo

rmed

via

cal

ende

r ro

lls.

The

no

tifie

dpo

lym

er c

ompr

ises

abo

ut 1

0% o

f th

e fi

nish

ed p

rodu

ct.

5.3.

O

ccu

patio

nal e

xpos

ure

Nu

mbe

r a

nd C

ateg

ory

of W

ork

ers

Ca

tego

ry o

f Wor

ker

Num

ber

Exp

osur

e D

ura

tion

E

xpos

ure

Fre

quen

cy

O

per

ato

r –

bat

ch p

roce

ssin

g

4

1-2

hou

rs

3 pe

r ye

ar

Q

C T

estin

g 1

1

-2 h

ours

3

per

year

Supe

rvis

ion

1

1

-2 h

ours

3

per

year

Dri

ver

s –

Tru

ck d

eliv

erie

s 1

Cru

shin

g pl

ant o

pera

tors

4-6

hou

rs

3 pe

r ye

ar

Exp

osur

e D

eta

ils

Poly

mer

Man

ufac

ture

Dur

ing

load

ing

of

ingr

edie

nts,

the

mix

er v

esse

l is

un

der

nega

tive

pre

ssur

e to

min

imis

e ex

posu

re t

o th

e po

lym

er i

ngre

dien

ts.

The

not

ifie

d p

oly

mer

is s

olid

at

the

conc

lusi

on o

f th

e m

anuf

actu

ring

pro

cess

. N

o cl

ean

ing

of

the

reac

tor

vess

el o

r fe

ed l

ines

occ

urs

as t

he r

esid

ual

is i

ncor

pora

ted

into

the

fol

low

ing

batc

h. D

erm

al e

xpos

ure

to th

e no

tifi

ed p

olym

er d

ue to

spi

lls o

r spl

ash

es m

ay o

ccur

du

ring

dis

char

ge o

f th

e p

olym

er f

rom

the

reac

tor

vess

el.

Cru

shin

g P

roce

ssA

s th

e p

olym

er i

s so

lid,

exp

osur

e w

ill b

e li

mit

ed.

Som

e ex

pos

ure

may

occ

ur t

o du

sts

crea

ted

dur

ing

crus

hing

.

Page 290: M/s. Kemz Resibond Private Limited

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 5

of 1

0

Pro

duct

Man

ufac

ture

The

not

ifie

d po

lym

er i

s so

lid

whe

n ad

ded

to

the

mix

er,

and

is e

xtru

ded

bou

nd i

n s

heet

s of

vin

yl

floo

rin

g.

Som

e po

tent

ial e

xist

s fo

r ex

posu

re to

du

st.

5.4.

R

elea

se

REL

EASE

OF

CH

EMIC

AL A

T S

ITE

Pol

ymer

Pro

duc

tion

Sit

eT

he p

rodu

ctio

n ve

ssel

s h

ave

ove

rhea

d co

nden

sers

ins

tall

ed. I

t is

esti

mat

ed t

hat

appr

oxi

mat

ely

348

kg

of d

istil

late

wil

l be

colle

cted

per

pro

duct

ion

batc

h (7

ton

nes

of

resi

n), t

his

dist

illa

te m

ay c

onta

in tr

ace

amou

nts

of t

he n

otif

ied

pol

ymer

and

its

mon

om

ers.

Th

e co

nden

sers

will

als

o co

llec

t an

y du

st g

ener

ated

in

the

mix

ing

proc

ess

thus

gen

erat

ing

a sm

all

amou

nt o

f so

lid

was

te.

Sin

ce t

he n

otif

ied

poly

mer

wil

l be

com

pat

ible

wit

h th

e n

ext b

atch

of

mat

eria

l pr

odu

ced,

the

equi

pmen

t is

not

cle

aned

aft

er t

he p

oly

mer

is

pro

duce

d. S

ome

was

te n

otif

ied

poly

mer

may

be

gene

rate

d d

ue t

o sp

ills

dur

ing

the

prod

ucti

on p

roce

ss,

part

icul

arly

dur

ing

dru

m fi

llin

g.

Cru

shin

g S

iteT

he e

mpt

y d

rum

s, w

hich

con

tain

ed th

e po

lym

er r

esin

, m

ay c

onta

in t

race

am

ount

s o

f po

lym

er.

Dur

ing

the

crus

hing

pro

cess

(o

ff-s

ite)

ther

e is

the

pos

sibi

lity

of

the

gene

ratio

n of

pol

ymer

du

st o

r fi

ne

poly

mer

sha

rds.

N

o in

dica

tion

has

bee

n gi

ven

as t

o th

e w

aste

man

agem

ent

at t

he c

rush

ing

sit

e, b

ut

pres

umab

ly t

here

wil

l be

a d

ust

su

ppre

ssio

n sy

stem

in-

pla

ce,

whi

ch m

ay o

nly

be

fine

wat

er s

pray

s. I

fth

is i

s so

, the

n th

e du

st/s

hard

s w

ill

be p

reve

nted

fro

m l

eavi

ng t

he s

ite

and

wil

l th

en b

e co

llec

ted

and

st

ore

d fo

r di

spo

sal.

REL

EASE

OF

CH

EMIC

AL F

RO

M U

SE

Gen

eral

ly a

ny s

pilt

po

lym

er r

esin

will

be

swep

t up

an

d, i

f n

ot c

onta

min

ated

, ad

ded

to t

he p

roce

ss.

Dur

ing

the

pro

duct

ion

of

the

floo

ring

, th

e no

tifi

ed p

olym

er w

ill o

nly

be

pres

ent

in s

olid

was

tes

(ie

floo

rin

g o

ff-c

uts)

.

The

em

pty

hess

ian

bags

may

hav

e tr

ace

amo

unts

of

pol

ymer

res

in i

n th

e fo

rm o

f du

st.

5.5.

D

isp

osal

Poly

mer

Pro

duc

tion

Site

The

dis

tilla

te a

nd

othe

r aq

ueou

s w

aste

s w

ill

be

sent

to

a th

erm

al o

xidi

ser

wh

ere

they

wil

l be

bur

nt

pro

duci

ng o

xide

s o

f car

bon

and

wat

er v

apou

r.

Any

so

lid w

aste

s ge

nera

ted

duri

ng

pro

duct

ion

wil

l be

col

lect

ed a

nd s

ent

to l

andf

ill.

Ann

ual

ly t

his

will

eq

uate

to a

ppro

xim

atel

y 24

kg.

Cru

shin

g S

iteT

he e

mpt

y dr

um

s, a

nd

any

trac

e p

olym

er,

will

eith

er b

e re

fille

d w

ith p

oly

mer

res

in o

r w

ill g

o to

la

ndfi

ll.

Any

co

llect

ed d

ust

or s

har

ds a

re li

kely

to

be

sent

to l

andf

ill.

Flo

orin

g M

anuf

actu

rer

Any

con

tam

inat

ed s

plit

resi

n an

d f

loor

ing

off-

cuts

will

be

sen

t to

lan

dfil

l. T

he

emp

ty h

essi

an w

ill b

e se

nt t

o la

ndf

ill.

5.6.

P

ubl

ic e

xpo

sure

Publ

ic e

xpo

sure

to

the

noti

fied

che

mic

al i

s o

nly

likel

y to

occ

ur

if th

ere

is a

sp

ill o

f th

e so

lid

mat

eria

l du

rin

g tr

ansp

ort

to a

nd f

rom

the

cru

shin

g pl

ant,

or

duri

ng

tran

spor

t to

the

cus

tom

er s

ite.

T

he p

ublic

m

ay h

ave

low

-lev

el c

onta

ct w

ith p

rodu

cts

mad

e fr

om t

he re

sin.

6.

PH

YS

ICA

L A

ND

CH

EM

ICA

L P

RO

PE

RT

IES

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 6

of 1

0

App

eara

nce

at

20o C

and

101

.3 k

Pa

Cle

ar, m

oder

atel

y ye

llow

gra

nule

s

Mel

ting

Po

int

> 9

0o C

Den

sity

13

60 k

g/m

3

Sol

utio

n/E

xtra

ctio

n B

ehav

iou

r 7.

9 g/

L a

t 20

o C

R

emar

ks

One

(1

) g

of

the

gro

und

pol

ymer

res

in w

as a

dde

d to

10

0 m

L o

f d

eio

nise

d w

ater

an

d st

irre

d w

ith

a m

agne

tic

stir

rer f

or 2

4 ho

urs

. A

fter

thi

s th

e m

ixtu

re w

as f

ilter

ed

to r

emov

e an

y so

lid

mat

eria

l an

d th

e re

sult

ant f

iltra

te w

as d

ried

and

the

res

ulta

nt

mat

eria

l (t

he d

isso

lved

pol

ymer

resi

n) w

as w

eigh

ed.

Onl

y br

ief

det

ails

are

ava

ilab

le a

nd t

his

wo

uld

see

m t

o b

e a

very

hig

h s

olu

bilit

y fo

r a

larg

ely

hyd

roph

obi

c po

lym

er d

espi

te t

he p

rese

nce

of s

ome

carb

oxyl

ic a

cid

gro

ups.

Par

ticl

e S

ize

20-1

00 m

m d

iam

eter

R

emar

ks

P

arti

cle

size

ha

s be

en

dete

rmin

ed f

or

the

poly

mer

fo

llow

ing

crus

hin

g.

T

he

part

icle

s ar

e la

rge

and

not

insp

irab

le,

how

ever

, a

smal

l qu

antit

y o

f fi

ne p

artic

les

may

be

pro

duce

d.

Fla

mm

abi

lity

N

ot fl

amm

able

Exp

losi

ve

Pro

per

ties

N

ot e

xplo

sive

Hyd

roly

sis

as

a F

unct

ion

of p

H

Not

det

erm

ined

R

emar

ks

T

he

noti

fied

po

lym

er

cont

ains

es

ter

func

tion

alit

ies

that

co

uld

be e

xpec

ted

to

und

ergo

hyd

roly

sis

und

er e

xtre

me

pH

con

diti

ons.

How

ever

, in

the

env

iron

men

tal

pH r

ange

of 4

–9, s

igni

fica

nt h

ydro

lysi

s is

un

likel

y to

occ

ur.

Par

titi

on C

oeff

icie

nt (

n-o

ctan

ol/w

ater

) N

ot d

eter

min

ed

R

emar

ks

T

he

noti

fied

pol

ymer

is

rela

tive

ly s

olub

le,

thus

ind

icat

ing

it w

ill

part

itio

n in

to t

he

wat

er p

hase

(how

ever

see

com

men

ts a

bove

).

Ads

orpt

ion/

Des

orp

tion

N

ot d

eter

min

ed

R

emar

ks

T

he

notif

ied

poly

mer

is

like

ly t

o h

ave

som

e m

obil

ity i

n so

il du

e to

its

rel

ativ

e so

lubi

lity.

Dis

soci

ati

on C

onst

ant

Not

det

erm

ined

R

emar

ks

T

he

notif

ied

pol

ymer

co

ntai

ns c

arbo

xyli

c fu

ncti

onal

ities

, w

hich

are

exp

ecte

d to

ha

ve t

ypic

al a

cid

ity.

Page 291: M/s. Kemz Resibond Private Limited

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 7

of 1

0

7.

TO

XIC

OL

OG

ICA

L I

NV

EST

IGA

TIO

NS

No

Tox

icol

ogic

al d

ata

wer

e su

bmitt

ed.

Acc

ord

ing

to t

he M

SD

S, t

he a

cute

exp

osu

re t

o th

e po

lym

er m

ay c

ause

m

ild t

o m

oder

ate

irri

tati

on o

f th

e ey

es a

nd m

ild

irri

tatio

n of

the

sk

in.

Der

mat

itic

eff

ects

may

res

ult

from

pr

olo

nged

ex

posu

re.

Vap

ours

fro

m t

he h

eate

d re

sin

may

be

irri

tatin

g to

the

res

pira

tory

tra

ct.

Ing

estio

n m

ay

caus

e ga

stro

-int

esti

nal d

istu

rban

ces

and

be s

ligh

tly

irri

tati

ng to

the

muc

ous

mem

bran

es.

8.

EN

VIR

ON

ME

NT

No

eco

toxi

colo

gica

l da

ta w

ere

subm

itte

d.

9.

RIS

K A

SSE

SSM

EN

T

9.1.

E

nvir

onm

ent

9.1.

1.

Env

iron

men

t – e

xpos

ure

asse

ssm

ent

Rel

ease

It i

s an

ticip

ated

tha

t ve

ry l

ittle

of

the

not

ifie

d po

lym

er w

ill

be r

elea

sed

to t

he e

nvir

onm

ent (

see

sect

ion

5.4

). T

he m

ajo

rity

of

the

notif

ied

poly

mer

will

be

inco

rpor

ated

int

o flo

orin

g m

ater

ials

, w

hich

at

the

end

of t

hei

r us

eful

liv

es w

ill

be d

ispo

sed

of

to l

andf

ill.

Onc

e in

corp

ora

ted

in t

he

floo

rin

g m

ater

ial t

he n

otif

ied

po

lym

er w

ill b

e co

ntai

ned

in a

n in

ert

mat

rix

.

Fat

e

In l

andf

ill,

it i

s ex

pect

ed t

hat

the

was

te n

eat

pol

ymer

fro

m t

he t

wo

pro

duct

ion

stag

es m

ay b

e m

obil

e, d

ue it

s re

lati

vely

hig

h w

ater

sol

ubil

ity,

bu

t at

very

low

con

cent

ratio

ns.

The

pol

ymer

wil

l ev

entu

ally

deg

rade

thr

oug

h bi

otic

and

abi

otic

pro

cess

es t

o gi

ve w

ater

vap

our

and

oxi

des

of

carb

on.

The

po

lym

er w

ill n

ot b

e re

leas

ed f

rom

th

e fl

oori

ng m

ater

ials

, bu

t ov

er t

ime

the

floo

ring

m

ater

ials

will

slo

wly

deg

rade

due

to b

ioti

c an

d a

bio

tic p

roce

sses

.

9.1.

2.

Env

iron

men

t – e

ffec

ts a

sses

smen

t

S

ome

of t

he le

acha

te fr

om th

e la

ndfi

ll m

ay r

each

the

aqua

tic

com

par

tmen

t bu

t th

is w

ill

be a

t ve

ry

low

con

cent

rati

ons

and

in a

ver

y di

ffus

e m

anne

r. T

her

e ar

e no

eco

toxi

city

dat

a, h

owev

er, i

t is

un

like

ly th

at t

he p

olym

er w

ill b

e to

xic

to a

quat

ic o

rgan

ism

s at

the

lev

els

at w

hich

it m

ay e

nte

r th

ew

ater

bod

ies.

The

pol

ymer

is

not

expe

cted

to c

ross

bio

logi

cal

mem

bra

nes

due

to i

ts h

igh

mo

lecu

lar

wei

ght,

an

d as

su

ch s

houl

d no

t bio

accu

mul

ate

(Co

nnel

l, 19

90)

.

9.1.

3.

Env

iron

men

t – r

isk

ch

arac

teri

sati

on

T

akin

g in

to a

ccou

nt th

e us

e an

d re

leas

e p

atte

rns,

as

spec

ifie

d in

the

not

ific

atio

n, t

he r

isk

pose

d by

the

not

ifie

d p

oly

mer

is e

xpec

ted

to b

e lo

w.

9.2.

H

um

an h

ealt

h

9.2.

1.

Occ

upa

tio

nal h

ealt

h an

d sa

fety

– e

xpo

sure

ass

essm

ent

D

erm

al a

nd o

cula

r ex

pos

ure

can

occ

ur d

uri

ng c

erta

in f

orm

ulat

ion

and

man

ufac

turi

ng

proc

esse

s.

How

ever

, ex

posu

re t

o si

gnif

ican

t am

oun

ts o

f th

e no

tifie

d p

olym

er i

s li

mite

d be

caus

e of

the

en

gine

erin

g co

ntro

ls (

clos

ed r

eact

ion

vess

el,

extr

acti

on

vent

ilati

on)

and

pers

ona

l pr

ote

ctiv

e eq

uipm

ent

wor

n by

wor

ker

s.

Safe

ty b

oots

, co

vera

lls a

nd s

afet

y gl

asse

s ar

e re

quir

ed in

all

are

as,

and

addi

tiona

l eq

uipm

ent

such

as

dus

t m

ask

, air

sup

plie

d ho

od,

chro

me

leat

her

or P

VC

glo

ves,

fa

ce s

hiel

ds o

r ha

rd h

ats

are

requ

ired

dur

ing

reac

tor

oper

atio

ns a

nd b

atch

pro

cess

ing

pro

cedu

res.

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 8

of 1

0

Dur

ing

tran

spor

t an

d st

orag

e, w

ork

ers

are

unl

ikel

y to

be

expo

sed

to t

he n

otif

ied

pol

ymer

exc

ept

whe

n pa

ckag

ing

is a

ccid

enta

lly b

reac

hed.

F

orkl

ift

driv

ers

will

wea

r sa

fety

gla

sses

and

ch

rom

e le

ath

er g

lov

es.

Wor

kers

at

the

crus

hing

pla

nt

may

be

exp

osed

to

dus

ts g

ener

ated

in

the

crus

hin

g pr

oces

s, a

nd

shou

ld w

ear

prot

ecti

ve c

loth

ing,

incl

udi

ng d

ust

mas

ks, g

ogg

les

and

cove

ralls

.

9.2.

2.

Pu

blic

hea

lth

– e

xpos

ure

asse

ssm

ent

T

he

notif

ied

poly

mer

will

no

t be

avai

labl

e to

the

pub

lic.

Mem

bers

of

the

pub

lic

may

com

e in

to

cont

act w

ith p

rodu

cts

cont

aini

ng t

he n

otif

ied

poly

mer

.

9.2.

3.

Hu

man

hea

lth

- e

ffec

ts a

sses

smen

t

T

he

notif

ied

poly

mer

mee

ts t

he P

LC

cri

teri

a an

d th

eref

ore

low

haz

ard

is e

xpec

ted

due

to t

he la

ck

of r

eact

ive

gro

ups

and

the

inab

ilit

y of

the

pol

ymer

to p

enet

rate

bio

logi

cal m

embr

anes

. D

ust

may

be

gen

erat

ed d

urin

g th

e cr

ush

ing

pro

cess

.

9.2.

4.

Occ

upa

tio

nal h

ealt

h an

d sa

fety

– r

isk

cha

ract

eris

atio

n

T

he

OH

S ris

k pr

esen

ted

by t

he n

otif

ied

pol

ymer

is

expe

cted

to

be l

ow, h

owev

er,

ther

e is

a r

isk

of e

xpo

sure

to

mec

hani

cally

-gen

erat

ed d

usts

dur

ing

the

crus

hin

g pr

oces

s. T

he n

otif

ied

pol

ymer

m

ay b

e pr

esen

t in

for

mul

atio

ns c

onta

inin

g h

azar

dou

s in

gre

dien

ts.

If

thes

e fo

rmu

lati

ons

are

clas

sifi

ed

as

haza

rdou

s to

hea

lth

in

acco

rdan

ce

wit

h th

e N

OH

SC

A

ppro

ved

Cri

teri

a fo

r C

lass

ifyi

ng H

azar

dou

s S

ubst

ance

s, w

ork

plac

e pr

acti

ces

and

con

trol

pro

cedu

res

con

sist

ent

with

pr

ovi

sion

s o

f Sta

te a

nd T

erri

tory

haz

ardo

us

sub

stan

ces

legi

slat

ion

mus

t be

in o

pera

tion

.

9.2.

5.

Pu

blic

hea

lth

– r

isk

ch

arac

teri

sati

on

T

he

notif

ied

poly

mer

wil

l no

t b

e av

aila

ble

to t

he p

ubli

c.

Mem

bers

of

the

publ

ic m

ay m

ake

derm

al c

onta

ct w

ith

pro

duct

s co

ntai

nin

g th

e no

tifi

ed p

oly

mer

at l

ow c

once

ntra

tion

s.

How

ever

, th

e ri

sk t

o pu

blic

hea

lth w

ill b

e ne

glig

ible

bec

ause

the

notif

ied

poly

mer

is

bou

nd w

ithin

a m

atri

x

and

unli

kely

to b

e bi

oava

ilab

le.

10.

C

ON

CL

USI

ON

S –

ASS

ES

SME

NT

LE

VE

L O

F C

ON

CE

RN

FO

R T

HE

EN

VIR

ON

ME

NT

A

ND

H

UM

AN

S

10.1

. H

aza

rd c

lass

ific

ati

on

B

ased

on

the

av

aila

ble

dat

a th

e no

tifi

ed p

olym

er i

s no

t cl

assi

fied

as

haza

rdou

s un

der

the

App

rove

d C

rite

ria

for

Cla

ssify

ing

Haz

ard

ous

Su

bsta

nce

s (N

OH

SC. ,

19

99b)

10.2

. E

nvir

onm

enta

l ris

k as

sess

men

t

Th

e po

lym

er i

s no

t co

nsid

ered

to p

ose

a r

isk

to t

he e

nvi

ronm

ent

base

d on

its

rep

orte

d us

e p

atte

rn.

10.3

. H

um

an h

ealt

h r

isk

asse

ssm

ent

10.3

.1.

Occ

upa

tiona

l hea

lth

and

safe

ty

T

her

e is

L

ow

C

once

rn

to

occu

pati

onal

he

alth

an

d sa

fety

un

der

th

e co

nditi

ons

of

the

occu

pati

onal

set

tings

des

crib

ed.

10.3

.2.

Pu

blic

hea

lth

Th

ere

is N

eglig

ible

Con

cern

to p

ublic

hea

lth w

hen

use

d as

des

crib

ed.

11.

M

AT

ER

IAL

SA

FE

TY

DA

TA

SH

EE

T

11.1

. M

ater

ial S

afet

y D

ata

She

et

T

he

MS

DS

of

the

noti

fied

pol

ymer

pro

vide

d by

the

not

ifie

r w

as in

acc

ord

ance

with

the

NO

HS

C

Na

tion

al C

ode

of P

ract

ice

for

the

Pre

para

tion

of

Mat

eria

l Sa

fety

Da

ta S

heet

s (N

OH

SC, 1

994

a).

It i

s p

ubli

shed

her

e as

a m

atte

r of

pub

lic r

ecor

d. T

he

accu

racy

of

the

info

rmat

ion

on t

he M

SD

S

rem

ains

the

res

pon

sibi

lity

of

the

appl

ican

t.

Page 292: M/s. Kemz Resibond Private Limited

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 9

of 1

0

11.2

. L

abel

Th

e la

bel

for

the

noti

fied

pol

ymer

pro

vide

d b

y th

e no

tifi

er w

as i

n ac

cord

ance

wit

h th

e N

OH

SC

N

atio

nal

Cod

e o

f P

ract

ice

for

the

Lab

elli

ng o

f W

orkp

lace

Sub

stan

ces

(NO

HSC

, 19

94b)

. T

he

accu

racy

of t

he i

nfor

mat

ion

on t

he la

bel

rem

ains

the

resp

onsi

bili

ty o

f th

e ap

plic

ant.

12.

R

EC

OM

ME

ND

AT

ION

S

C

ONT

ROL

MEA

SUR

ESO

ccu

patio

nal H

ealt

h an

d Sa

fety

N

o sp

ecifi

c en

gine

erin

g co

ntro

ls,

wor

k p

ract

ices

or

pers

onal

pro

tect

ive

equi

pmen

t ar

e re

quir

ed f

or t

he s

afe

use

of t

he n

otif

ied

pol

ymer

its

elf,

how

ever

, th

ese

shou

ld b

e se

lect

ed o

n th

e ba

sis

of a

ll in

gred

ient

s in

the

form

ula

tion

.

Em

ploy

ers

shou

ld e

nsu

re t

hat

the

foll

owin

g p

erso

nal

pro

tect

ive

equi

pmen

t is

use

d b

y w

orke

rs t

o m

inim

ise

occ

upat

ion

al e

xpo

sure

to

the

dus

ts g

ener

ated

dur

ing

the

cru

shin

g pr

oce

ss n

otif

ied

chem

ical

D

ust

mas

ks, g

oggl

es, c

over

alls

.

Gui

danc

e in

se

lect

ion

of

per

son

al

pro

tect

ive

equ

ipm

ent

can

be

obta

ined

fr

om

A

ustr

alia

n, A

ustr

alia

n/N

ew Z

eala

nd

or o

ther

ap

prov

ed s

tan

dard

s.

A c

opy

of t

he M

SDS

shou

ld b

e ea

sily

acc

essi

ble

to

emp

loye

es.

If p

rodu

cts

and

mix

ture

s co

ntai

nin

g t

he n

otif

ied

poly

mer

are

cla

ssif

ied

as

haza

rdo

us t

o he

alth

in

acco

rdan

ce w

ith

the

NO

HS

C A

ppro

ved

Cri

teri

a f

or C

lass

ifyin

g H

azar

dou

s Su

bsta

nce

s, w

orkp

lace

pra

ctic

es a

nd c

ontr

ol p

roce

dur

es c

onsi

sten

t w

ith p

rovi

sion

s o

f S

tate

an

d T

erri

tory

haz

ardo

us s

ubst

ance

s le

gisl

atio

n m

ust

be in

op

erat

ion

.

Env

iro

nmen

t

The

fol

low

ing

cont

rol

mea

sure

s sh

ould

be

impl

emen

ted

by t

he o

pera

tor

to m

inim

ise

envi

ron

men

tal

expo

sure

dur

ing

(man

ufac

ture

and

use

) of

the

not

ifie

d p

oly

mer

: M

inim

ise

dust

pro

duct

ion

du

ring

cru

shin

g v

ia t

he u

se o

f fin

e w

ater

sp

rays

, C

ont

ain

and

swee

p up

any

spi

lt m

ater

ial,

D

o no

t all

ow it

to e

nter

any

sto

rmw

ater

dra

ins

or n

atur

al w

ater

bod

ies.

Dis

posa

l The

not

ifie

d p

olym

er s

houl

d b

e di

spos

ed o

f by

land

fill

or

inci

nera

tion

.

Em

erge

ncy

proc

edu

res

Spi

lls/r

elea

se o

f th

e no

tifie

d po

lym

er s

hou

ld b

e h

andl

ed b

y co

ntai

nmen

t an

d th

en s

wep

t up

, pl

aced

in s

eala

ble

con

tain

er,

and

disp

ose

d of

to

land

fill,

or r

ecyc

led

if p

ossi

ble.

12.1

. S

econ

dar

y n

otif

icat

ion

Th

e D

irec

tor

of C

hem

ical

s N

otif

icat

ion

and

Ass

essm

ent

mu

st b

e no

tifi

ed i

n w

riti

ng w

ithi

n 28

da

ys b

y th

e no

tifi

er, o

ther

im

port

er o

r m

anuf

actu

rer:

(1)

Und

er S

ecti

on 6

4(1

) of

the

Act

; if

th

e no

tifi

ed p

oly

mer

is

intr

oduc

ed i

n a

chem

ical

for

m t

hat

does

not

mee

t th

e P

LC

cr

iter

ia.

or

Oct

obe

r 20

02

NIC

NA

S

FU

LL P

UB

LIC

RE

PO

RT

: P

LC/3

29

Pag

e 10

of 1

0

(2)

Und

er S

ecti

on 6

4(2

) of

the

Act

:-

if a

ny o

f th

e ci

rcum

stan

ces

list

ed i

n th

e su

bsec

tion

ari

se.

The

Dir

ecto

r w

ill t

hen

deci

de w

heth

er s

econ

dary

not

ific

atio

n is

req

uire

d.

No

addi

tiona

l sec

ond

ary

noti

fica

tion

con

diti

ons

are

stip

ula

ted.

13.

B

IBL

IOG

RA

PH

Y

Co

nnel

l D.

W.

(199

0)

Gen

eral

cha

ract

eris

tics

of

orga

nic

com

poun

ds w

hich

exh

ibit

bio

accu

mul

atio

n. I

n C

onn

ell

D. W

., (E

d)

Bio

accu

mul

atio

n o

f Xen

obio

tic C

ompo

unds

. CR

C P

ress

, B

oca

Rat

on,

USA

.

Nat

ion

al O

ccup

atio

nal

Hea

lth

and

Safe

ty C

omm

issi

on (

1994

a) N

atio

nal

Cod

e o

f Pr

acti

ce f

or t

he P

repa

rati

on o

f M

ater

ial

Safe

ty D

ata

She

ets

[NO

HS

C:2

011

(199

4)]

. Aus

trali

an G

ove

rnm

ent P

ubli

shin

g S

ervi

ce, C

anb

erra

.

Nat

ion

al O

ccup

atio

nal

Hea

lth

and

Safe

ty C

omm

issi

on

(199

4b)

Nat

iona

l C

ode

of P

ract

ice

for

the

Lab

ellin

g of

W

orkp

lace

Sub

stan

ces

[NO

HS

C:2

012

(19

94)]

. Au

stra

lian

Gov

ernm

ent

Pub

lish

ing

Ser

vice

, C

anbe

rra.

Nat

ion

al

Occ

upa

tiona

l H

ealth

an

d S

afet

y C

om

mis

sion

(1

999a

) L

ist

of

Des

igna

ted

Haz

ardo

us

Subs

tanc

es

[NO

HS

C:1

0005

(19

99)]

. Au

stra

lian

Gov

ernm

ent

Pub

lish

ing

Ser

vice

, C

anbe

rra.

Nat

ion

al O

ccup

atio

nal

Hea

lth

and

Safe

ty C

omm

issi

on (

199

9b)

App

rove

d C

rite

ria

for

Cla

ssif

ying

Haz

ard

ous

Sub

stan

ces

[NO

HS

C:1

008

(19

99)]

. A

ustr

alia

n G

over

nmen

t Pu

blis

hing

Ser

vice

, C

anbe

rra.

Page 293: M/s. Kemz Resibond Private Limited

MA

TE

RIA

L S

AFE

TY

DA

TA

SH

EE

TW

est S

yste

m In

c.

MSD

S #1

05-1

3aLa

st R

evis

ed:

26A

PR13

1.CH

EMIC

AL P

RO

DUC

T AN

D C

OMP

ANY

IDEN

TIFI

CATI

ON

PROD

UCT

NAM

E:..

......

......

......

......

......

......

......

.WES

T SY

STEM

®10

5 Ep

oxy

Resin

PROD

UCT

CODE

:....

......

......

......

......

......

......

.....1

05CH

EMIC

AL F

AMI

LY:..

......

......

......

......

......

......

...Ep

oxy R

esin.

CHEM

ICAL

NAM

E:...

......

......

......

......

.......

......

....B

isph

enol

A b

ased

epo

xy re

sin.

FORM

ULA

:.....

......

......

......

......

......

......

......

......

...No

t app

licab

le.

MAN

UFAC

TUR

ER:

EMER

GENC

Y TE

LEPH

ONE

NU

MBE

RS:

Wes

t Sys

tem

Inc.

Tran

spor

tatio

n10

2 Pa

tters

on A

ve.

CHEM

TREC

:.....

......

......

...80

0-42

4-93

00 (U

.S.)

Bay

City

, MI 4

8706

, U.S

.A.

703-

527-

3887

(Int

erna

tiona

l)Ph

one:

866

-937

-879

7 or

989

-684

-728

6No

n-tra

nspo

rtatio

nww

w.we

stsys

tem

.com

Poiso

n Ho

tline:

......

......

.....

800-

222-

1222

2.HA

ZAR

DS ID

ENTI

FICA

TION

EMER

GENC

Y OV

ERVI

EW

WAR

NING

May

cau

se s

kin

irrita

tion.

May

cau

se e

ye ir

ritat

ion.

May

caus

e al

lergic

reac

tion.

Cle

ar,v

isco

usliq

uid w

ith m

ild o

dor.

PRIM

ARY

ROU

TE(S

) OF

ENTR

Y:...

......

......

......

......

......

......

......

......

...Sk

in co

ntact

.

POTE

NTIA

L HE

ALTH

EFF

ECT

S:

ACUT

E IN

HAL

ATIO

N:..

......

......

......

......

......

......

......

......

......

......

......

....If

pro

duct

is h

eate

d, va

pors

gen

erat

ed c

an c

ause

hea

dach

e, n

ause

a,

dizz

ines

s an

d po

ssib

le re

spira

tory

irrit

ation

if in

haled

in h

igh

conc

entra

tions

.

CHRO

NIC

INHA

LATI

ON:

......

......

......

......

......

.......

......

......

......

......

......

Repe

ated

exp

osur

e to

high

vapo

r con

cent

ratio

ns m

ay c

ause

irrit

ation

of

pre-

exist

ing lu

ng a

llerg

ies a

nd in

crea

se th

e ch

ance

of d

evel

oping

alle

rgy

sym

ptom

s to

this

prod

uct.

ACUT

E SK

IN C

ONTA

CT:.

......

......

......

......

......

......

......

......

......

......

......

May

cau

se a

llerg

ic sk

in re

spon

se in

cer

tain

indi

vidua

ls. M

ay c

ause

m

oder

ate

irrita

tion

to th

e skin

suc

h as

redn

ess

and

itchin

g.

CHR

ONIC

SKI

N CO

NTAC

T:...

......

......

......

......

......

......

......

......

......

......

May

cau

se s

ensit

izatio

n in

susc

eptib

le in

divid

uals.

May

cau

se m

oder

ate

irrita

tion

to th

e sk

in.

EYE

CONT

ACT

:....

......

......

......

......

......

......

......

......

......

......

......

......

.....

May

cau

se ir

ritat

ion.

INGE

STIO

N:...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

Low

acu

te o

ral to

xicity

.

SYM

PTO

MS

OF

OVE

REX

POSU

RE:

......

......

......

......

......

.......

......

......

.Pos

sible

sen

sitiza

tion a

nd s

ubse

quen

t alle

rgic

reac

tions

usu

ally

seen

as

redn

ess

and

rash

es.

MED

ICA

L CO

NDIT

IONS

AG

GRA

VATE

D BY

EXP

OSU

RE:

......

......

....P

re-e

xistin

g sk

in a

nd re

spira

tory

disor

ders

may

be

aggr

avat

ed b

y exp

osur

e to

this

pro

duct

. Pr

e-ex

isting

lung

and

skin

alle

rgie

s may

incr

ease

the c

hanc

e of

dev

elop

ing

aller

gic s

ympt

oms

to th

is pr

oduc

t.

3.CO

MPO

SITI

ON

/INFO

RM

ATIO

N O

N H

AZA

RDOU

S IN

GRE

DIE

NTS

INGR

EDIE

NT N

AME

CAS

#CO

NCEN

TRAT

ION

(%)

Prop

ane,

2,2

-bis[

p-(2

,3-e

poxy

prop

oxy)

phen

yl]-,

pol

ymer

s25

085-9

9-8

60-1

00Be

nzyl

alco

hol

100-

51-6

10-3

0Ph

enol

-form

alde

hyde

pol

ymer

glyc

idyl

ethe

r28

064-1

4-4

1-10

4.FI

RST

AID

ME

ASUR

ES

FIR

ST A

ID F

OR

EYES

......

......

......

......

......

.......

......

......

......

......

......

.....

Flus

h im

med

iate

ly w

ith w

ater

for a

t lea

st 1

5 m

inute

s. C

onsu

lt a p

hysic

ian.

FIR

ST A

ID F

OR

SKIN

......

......

......

......

......

......

......

......

......

......

......

......

.Rem

ove

cont

amin

ated

clo

thing

. W

ipe

exce

ss fr

om s

kin. A

pply

wate

rless

sk

in cle

aner

and

then

was

h wi

th s

oap

and

wate

r. C

onsu

lt a

phys

ician

if e

ffect

s occ

ur.

FIR

ST A

ID F

OR

INH

ALAT

ION

......

......

......

......

......

......

......

......

......

......

Rem

ove

to fr

esh

air i

f effe

cts o

ccur

.

FIR

ST A

ID F

OR

ING

ESTI

ON...

......

......

......

......

......

......

......

......

......

.....

No a

cute

adv

erse

hea

lth e

ffect

s exp

ecte

d fro

m a

mou

nts

inge

sted

und

er

norm

al co

nditio

ns o

f use

. Se

ek m

edica

l atte

ntio

n if a

sign

ifican

t am

ount

is in

gest

ed.

Wes

t Sys

tem

Inc.

Page

2of

4W

EST

SYST

EM®

105 R

esin

MSD

S #1

05-1

3aLa

st R

evis

ed:

26A

PR13

5.FI

RE

FIG

HTIN

G M

EAS

URE

S

FLAS

H P

OIN

T:...

......

......

......

......

.......

......

......

......

......

......

......

......

......

.>20

0°F

(Tag

Clo

sed

Cup)

EXTI

NGUI

SHI

NG

MEDI

A:.

......

......

......

......

......

......

......

......

......

......

.....

Foam

, car

bon d

ioxid

e (C

O 2),

dry

chem

ical.

SPE

CIA

L FI

RE F

IGHT

ING

PRO

CED

URES

:....

......

......

......

......

......

.....

Wea

r a s

elf-c

onta

ined

bre

athi

ng a

ppar

atus

and

com

plete

full-b

ody

pers

onal

pr

otec

tive

equi

pmen

t. C

lose

d co

ntain

ers

may

rupt

ure

(due

to b

uildu

p of

pre

ssur

e) w

hen

expo

sed

to e

xtre

me

heat

.

FIR

E A

ND E

XPLO

SIO

N HA

ZARD

S:.

......

......

......

......

......

......

......

......

.Dur

ing a

fire

, sm

oke

may

cont

ain th

e or

igin

al m

ater

ials

in a

dditio

n to

co

mbu

stio

n pro

ducts

of v

aryin

g co

mpo

sition

whi

ch m

ay b

e to

xic a

nd/o

r irri

tatin

g. C

ombu

stion

pro

duct

s may

incl

ude,

but

are

not

lim

ited

to:

phen

olics

, car

bon

mon

oxide

, car

bon

diox

ide.

6.AC

CIDE

NTA

L RE

LEAS

E M

EASU

RES

SPIL

L OR

LEA

K PR

OCE

DURE

S:..

......

......

......

......

......

......

......

......

....S

top

leak

with

out a

dditi

onal

risk.

Dik

e an

d ab

sorb

with

iner

t mat

eria

l (e.g.

, sa

nd) a

nd c

ollec

t in

a su

itabl

e, clo

sed

cont

ainer

. W

arm

, soa

py w

ater

or n

on-fla

mm

able

, saf

e so

lvent

may

be

used

to c

lean

resi

dual.

7.HA

NDLI

NG A

ND S

TOR

AGE

STO

RAGE

TEM

PERA

TURE

(min

./max

.):...

......

......

......

......

.......

......

..40

°F (4

°C) /

120

°F (4

9°C)

STO

RAGE

:....

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.Sto

re in

coo

l, dr

y pla

ce.

Stor

e in

tight

ly se

aled

con

tain

ers t

o pr

even

t m

oistu

re a

bsor

ptio

n an

d lo

ss o

f vol

atile

s. E

xces

sive

heat

over

long

per

iods

of t

ime

will

degr

ade

the

resi

n.

HAND

LING

PR

ECA

UTIO

NS:.

......

......

......

......

......

......

......

......

......

......

Avoid

pro

long

ed o

r rep

eate

d sk

in co

ntac

t. W

ash

thor

ough

ly af

ter h

andl

ing.

Laun

der c

onta

min

ated

clot

hing

befo

re re

use.

Avo

id in

hala

tion

of v

apor

s fro

m h

eate

d pr

oduc

t. P

reca

utio

nary

step

s sh

ould

be

take

n wh

en cu

ring

prod

uct i

n la

rge

quan

titie

s. W

hen

mix

ed w

ith e

poxy

cur

ing a

gent

s th

is pr

oduc

t cau

ses

an e

xoth

erm

ic, w

hich

in la

rge

mas

ses,

can

prod

uce

enou

gh

heat

to d

amag

e or

igni

te s

urro

undi

ng m

ater

ials

and

emit f

umes

and

vap

ors

that

var

y wi

dely

in co

mpo

sition

and

toxic

ity.

8.EX

POS

URE

CO

NTRO

LS/P

ERS

ONA

L PR

OTE

CTI

ON

EYE

PRO

TECT

ION

GUI

DEL

INES

:....

......

......

......

......

......

......

......

......

.Saf

ety

glass

es w

ith s

ide

shiel

ds o

r che

mica

l spla

sh g

oggl

es.

SKIN

PRO

TECT

ION

GUI

DEL

INE

S:...

......

......

......

......

.......

......

......

......

Wea

r liqu

id-pr

oof,

chem

ical r

esist

ant g

love

s (ni

trile-

buty

l rub

ber,

neop

rene

, bu

tyl r

ubbe

r or n

atur

al ru

bber

) and

full

body

-cov

ering

clot

hing.

RESP

IRAT

ORY

/VEN

TILA

TION

GUI

DELI

NES

:.....

......

......

......

......

......

Goo

d ro

om ve

ntila

tion

is us

ually

ade

quat

e fo

r mos

t ope

ratio

ns. W

ear a

NI

OSH/

MSH

A ap

prov

ed re

spira

tor w

ith a

n or

gani

c vap

or c

artri

dge

whe

neve

r exp

osur

e to

vapo

r in

conc

entra

tions

abo

ve a

pplic

able

limits

is li

kely.

Note

: W

est S

yste

m, I

nc. h

as c

ondu

cted

an

air s

ampl

ing

study

usin

g th

is pr

oduc

t or s

imila

rly fo

rmula

ted

prod

ucts

. Th

e re

sults

indi

cate

that

the

com

pone

nts

sam

pled

for (

epich

loroh

ydrin

, ben

zyl a

lcoho

l)wer

e ei

ther

so

low

that

they

wer

e no

t det

ecte

d at

all o

r the

y we

re si

gnific

antly

belo

w

ADDI

TION

AL P

ROTE

CTIV

E M

EASU

RES

:.....

......

......

......

......

......

......

Prac

tice

good

cau

tion

and

pers

onal

clea

nline

ss to

avo

id sk

in a

nd e

ye

cont

act.

Avoi

d sk

in co

ntac

t whe

n re

mov

ing

glove

s and

oth

er p

rote

ctive

equ

ipm

ent.

Was

h th

orou

ghly

afte

r han

dling

. Gen

eral

ly sp

eakin

g, w

orkin

g cle

anly

and

follo

wing

bas

ic pr

ecau

tiona

ry m

easu

res

will

grea

tly m

inim

ize th

e po

tent

ial f

or h

arm

ful e

xpos

ure

to th

is pr

oduc

t und

er n

orm

al us

e co

nditi

ons.

OCC

UPA

TION

AL E

XPO

SUR

E L

IMIT

S:...

......

......

......

......

......

......

......

Not e

Expo

sure

Lev

el (P

EL) o

r the

ACG

IH G

uidel

ines f

or in

form

atio

n on

spe

cific

ingre

dien

ts.

9.PH

YSI

CAL

AND

CHEM

ICA

L PR

OPE

RTI

ES

PHYS

ICAL

FO

RM:.

......

......

......

......

......

......

......

......

......

......

......

......

....L

iquid

.CO

LOR:

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...Cl

ear.

ODO

R:...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

...M

ild.

BOIL

ING

PO

INT:

......

......

......

......

......

.......

......

......

......

......

......

......

......

.> 4

00°F

MEL

TIN

G PO

INT/

FREE

ZE P

OIN

T:...

......

......

......

......

.......

......

......

......

.No

data

.VI

SCO

SITY

:.....

......

......

......

......

......

......

......

......

......

.......

......

......

......

....1

000

(cP)

pH:.

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

....N

o da

ta.

SOLU

BIL

ITY

IN W

ATER

:....

......

......

......

......

......

......

......

......

......

......

...Sl

ight

.SP

ECI

FIC

GRA

VITY

:.....

......

......

......

......

......

......

......

......

......

.......

......

..1.

15BU

LK D

ENS

ITY:

......

......

......

......

......

.......

......

......

......

......

......

......

......

.9.6

(pou

nds/

gallo

n)VA

POR

PR

ESSU

RE:..

......

......

......

......

......

......

......

......

......

......

.......

.....

< 1

mm

Hg @

20°

C.VA

POR

DEN

SITY

:.....

......

......

......

......

......

......

......

......

......

......

......

......

.Hea

vier t

han

air.

% V

OLA

TILE

BY

WEI

GHT

:....

......

......

......

......

......

......

......

......

......

......

ASTM

D 2

369-

07wa

s us

ed to

det

erm

ine

the

Vola

tile C

onte

nt o

f mix

ed

epox

y re

sin

and

hard

ener

. Re

fer t

o the

har

dene

r's M

SDS

for i

nfor

mat

ion a

bout

the

tota

l vola

tile c

onte

nt o

f the

resin

/har

dene

r sys

tem

.

10.

STAB

ILIT

Y AN

D RE

ACTI

VITY

STAB

ILIT

Y:...

......

......

......

......

......

......

......

......

......

......

......

......

......

......

.Sta

ble.

Page 294: M/s. Kemz Resibond Private Limited

Wes

t Sys

tem

Inc.

Page

3of

4W

EST

SYST

EM®

105 R

esin

MSD

S #1

05-1

3aLa

st R

evis

ed:

26A

PR13

HAZA

RDO

US P

OLYM

ERIZ

ATIO

N:..

......

......

......

......

......

......

......

......

..W

ill no

t occ

ur b

y its

elf, b

ut a

mas

s of

mor

e th

an o

ne p

ound

of p

rodu

ct p

lus

an a

lipha

tic a

mine

will

caus

e irr

ever

sibl

e pol

ymer

izat

ion w

ith si

gnific

ant h

eat b

uild

up.

INCO

MPA

TIBI

LITI

ES:.

......

......

......

......

......

......

......

......

......

......

......

.....

Stro

ng a

cids,

bas

es, a

mine

s an

d m

erca

ptan

s ca

n ca

use

polym

eriz

ation

.

DECO

MPO

SIT

ION

PRO

DUC

TS:.

......

......

......

......

......

......

......

......

......

.Car

bon

mon

oxid

e, ca

rbon

dio

xide

and

phe

nolic

smay

be

prod

uced

dur

ing

unco

ntro

lled

exot

herm

ic re

actio

ns o

r whe

noth

erwi

sehe

ated

to d

ecom

posi

tion.

11.

TOXI

COLO

GICA

L IN

FORM

ATI

ON

No s

pecif

ic or

al, in

halat

ion o

r der

mal

toxic

olog

y da

ta is

kno

wn fo

r thi

s pr

oduc

t. S

pecif

ic to

xicolo

gy in

form

ation

for a

bisp

heno

l-A b

ased

ep

oxy

resi

n pr

esen

t in t

his p

rodu

ct is

indic

ated

belo

w:

Ora

l:....

......

......

......

......

......

......

......

......

......

......

...LD

50

>500

0 mg

/kg

(rat

s)In

hala

tion:

......

......

......

......

......

.......

......

......

......

...No

Dat

a.De

rmal:

......

......

......

......

......

.......

......

......

......

......

.LD 5

0=

20,0

00 m

g/kg

(sk

in ab

sorp

tion

in ra

bbits

)

TERA

TOLO

GY:

......

......

......

......

......

......

......

......

.-A

(DG

EBP

A) d

id n

ot ca

use

birth

def

ects

or o

ther

adv

erse

ef

fect

s on

the

fetu

s whe

n pr

egna

nt ra

bbits

wer

e ex

pose

d by

skin

cont

act,

the

most

likel

y ro

ute

of e

xpos

ure,

or w

hen

preg

nant

rats

or r

abbit

s we

re

expo

sed

oral

ly.

REPR

ODU

CTIV

E E

FFEC

TS:..

......

......

......

......

...

MUT

AGEN

ICIT

Y:...

......

......

......

......

.......

......

......

.DG

EBPA

in a

nima

l mut

agen

icity

stu

dies

were

neg

ative

. In

vitro

mut

agen

icity

te

sts w

ere

nega

tive

in so

me

case

s an

d po

sitiv

e in

oth

ers.

CARC

INO

GEN

ICIT

Y:NT

P...

......

......

......

......

.......

......

......

......

......

......

......

......

......

......

....P

rodu

ct no

t list

ed.

IARC

......

......

......

......

......

.......

......

......

......

......

......

......

......

......

......

Prod

uct n

ot li

sted.

OSH

A...

......

......

......

......

.......

......

......

......

......

......

......

......

......

......

.Pro

duct

not l

isted

.

No in

gred

ient o

f thi

s pro

duct

pre

sent

at l

evels

gre

ater

than

or e

qual

to 0

.1%

is id

entif

ied a

s a

carci

noge

n or

pot

entia

l car

cinog

en b

y OS

HA,

NTP

or IA

RC.

Man

y st

udies

hav

e be

en c

ondu

cted

to a

sses

s th

e po

tent

ial c

arci

noge

nicit

y of d

iglyc

idyl e

ther

of b

isphe

nol-A

. Al

thou

gh so

me

weak

evid

ence

of

car

cinog

enic

ity h

as b

een

repo

rted

in a

nim

als, w

hen

all o

f the

dat

a ar

e co

nside

red,

the

weig

ht o

f evid

ence

doe

s no

t sho

w th

at D

GEBP

A is

carc

inog

enic.

Ind

eed,

the

mos

t rec

ent r

evie

w of

the

avai

lable

dat

a by

the

Inte

rnat

iona

l Age

ncy f

or R

esea

rch

on C

ance

r (IA

RC)h

as

conc

lude

d th

at D

GEB

PA

is no

t cla

ssifi

ed a

s a

carc

inog

en.

Epich

loro

hydr

in, a

n im

purit

y in

this

prod

uct (

<5 p

pm) h

as b

een

repo

rted t

o pr

oduc

e ca

ncer

in la

bora

tory

anim

als a

nd to

pro

duce

mut

agen

ic ch

ange

s in

bac

teria

and

cult

ured

hum

an c

ells.

It h

as b

een

esta

blish

ed b

y th

e Int

erna

tiona

l Age

ncy

for R

esea

rch

on C

ance

r (IA

RC) a

s a

prob

able

hum

an ca

rcin

ogen

(Gro

up 2

A) b

ased

on

the

follo

wing

con

clusio

ns:

hum

an e

vide

nce

inad

equa

te; a

nimal

evid

ence

su

fficie

nt.

It ha

s be

en c

lass

ified a

s an

ant

icipa

ted h

uman

car

cinog

en b

y th

e Na

tiona

l Tox

icolo

gy P

rogr

am (N

TP).

Note

: It

is un

likel

y tha

t nor

mal

use

of

this

prod

uct w

ould

resu

lt in

mea

sura

ble e

xpos

ure

conc

entra

tions

to th

is su

bsta

nce.

12.

ECOL

OGI

CAL

INFO

RMA

TIO

N

In th

e no

n-cu

red

liqui

d for

m th

is pr

oduc

t may

cau

se lo

ng-te

rm h

arm

if re

leas

ed to

the

envi

ronm

ent.

Prev

ent e

ntry

into

sew

ers

and

natu

ral w

ater

s.

Mov

emen

t and

Par

tition

ing:

Bioc

once

ntra

tion

pote

ntial

is m

oder

ate

(BC

F be

twee

n 10

0 an

d 30

00 o

r Log

Kow

bet

ween

3 a

nd 5

).

Degr

adati

on a

nd T

rans

form

ation

:Th

eore

tical

oxyg

en d

eman

d is

calc

ulate

d to

be

2.35

p/p

. 20

-day

bioc

hem

ical o

xyge

n de

man

d is

<2.5

%.

Ecot

oxic

olog

y:M

ater

ial is

mod

erat

ely t

oxic

to a

quat

ic or

ganis

ms o

n an

acu

te b

asis.

LC5

0/EC

50 b

etwe

en 1

and

10

mg/

L in

mos

t sen

sitive

sp

ecie

s.

13.

DISP

OSA

L CO

NSID

ERA

TIO

NS

WAS

TE D

ISPO

SAL

MET

HOD:

......

......

......

......

......

......

......

......

......

.....

Evalu

ation

of t

his p

rodu

ct u

sing

RCRA

crit

eria

show

s th

at it

is n

ot a

ha

zard

ous w

aste

, eith

er b

y lis

ting

or c

hara

cter

istic

s, in

its p

urch

ased

form

. It

is th

e re

spon

sibilit

y of

the

user

to d

eterm

ine

prop

er d

ispo

sal

met

hods

.

Incin

erat

e, re

cycl

e (fu

el b

lendi

ng) o

r rec

laim

may

be

pref

erre

d m

etho

ds w

hen

cond

ucte

d in

acco

rdan

ce w

ith fe

dera

l, sta

te an

d lo

cal r

egul

ation

s.

14.

TRA

NSPO

RTA

TIO

N IN

FORM

ATIO

N

DOT

Non-

Bulk

SHIP

PING

NAM

E:..

......

......

......

......

......

......

......

......

......

......

.......

......

....N

ot re

gula

ted.

TECH

NICA

L SH

IPPI

NG N

AME

:.....

......

......

......

......

......

......

......

......

.....

Not a

pplic

able

.

Wes

t Sys

tem

Inc.

Page

4of

4W

EST

SYST

EM®

105 R

esin

MSD

S #1

05-1

3aLa

st R

evis

ed:

26A

PR13

HAZA

RD C

LASS

:.....

......

......

......

......

......

......

......

......

......

......

......

......

...No

t app

licab

le.

U.N.

/N.A

. NUM

BER

:.....

......

......

......

......

......

......

......

......

......

.......

......

....N

ot a

pplic

able

.PA

CKI

NG

GROU

P:...

......

......

......

......

.......

......

......

......

......

......

......

......

.Not

app

licab

le.

IMD

GSH

IPPI

NG N

AME

:.....

......

......

......

......

......

......

......

......

......

.......

......

......

.Env

ironm

enta

lly h

azar

dous

sub

stanc

e, liq

uid,

n.o.

s.TE

CHNI

CAL

SHIP

PING

NAM

E:..

......

......

......

......

......

......

......

......

......

..Ep

oxy R

esin.

HAZA

RD C

LASS

:.....

......

......

......

......

......

......

......

......

......

......

......

......

...Cl

ass

9.U.

N. N

UM

BER:

......

......

......

......

......

.......

......

......

......

......

......

......

......

....U

N30

82.

PAC

KIN

G GR

OUP:

......

......

......

......

......

.......

......

......

......

......

......

......

....P

G II

I.Em

S Nu

mbe

r: ...

......

......

......

......

......

......

......

......

......

......

......

......

......

...F-

A, S

-FM

ARIN

E PO

LLUT

ANT

......

......

......

......

......

.......

......

......

......

......

......

.....

Yes

ICAO

/IATA

SHIP

PIN

G NA

ME:

......

......

......

......

......

......

......

......

......

......

......

......

......

.Env

ironm

enta

lly h

azar

dous

sub

stanc

e, liq

uid,

n.o.

s.TE

CHNI

CAL

SHIP

PING

NAM

E:..

......

......

......

......

......

......

......

......

......

..Ep

oxy R

esin.

HAZA

RD C

LASS

:.....

......

......

......

......

......

......

......

......

......

......

......

......

...Cl

ass

9.U.

N. N

UM

BER:

......

......

......

......

......

.......

......

......

......

......

......

......

......

....U

N30

82.

PAC

KIN

G GR

OUP:

......

......

......

......

......

.......

......

......

......

......

......

......

....P

G II

I.M

ARIN

E PO

LLUT

ANT:

......

......

......

......

......

......

......

......

......

......

......

.....

Yes

15.

REGU

LATO

RY

INFO

RMAT

ION

OSH

A S

TATU

S:...

......

......

......

......

.......

......

......

......

......

......

......

......

.....

Irrita

nt.

TSCA

STA

TUS:

......

......

......

......

......

......

......

......

......

......

......

......

......

....A

ll com

pone

nts a

re li

sted

on T

SCA

inve

ntor

yor

oth

erw

ise co

mpl

y with

TS

CA re

quire

men

ts.

Cana

da W

HM

IS C

lass

ifica

tion:

......

......

......

......

......

......

......

......

......

...D2

B-T

oxic

mate

rial c

ausi

ng o

ther

toxi

c effe

cts.

CEPA

Che

mic

alIn

vent

ory

Stat

us:..

......

......

......

......

......

......

......

......

..Al

l com

pone

nts

are

liste

d or

are

oth

erw

ise c

ompl

iant w

ith C

EPA

re

quire

men

ts.

SARA

TIT

LE II

I:SE

CTI

ON

313

TOXI

C C

HEM

ICAL

S...

......

......

......

......

......

......

....N

one

(dem

inim

us).

STAT

E RE

GUL

ATO

RY

INFO

RM

ATIO

N:Th

e foll

owin

g ch

emica

ls ar

e sp

ecific

ally

liste

d or

oth

erw

ise re

gula

ted

by in

divid

ual s

tates

. Fo

r det

ails

on y

our r

egul

ator

y re

quire

men

ts yo

u sh

ould

co

ntac

t the

app

ropr

iate

agen

cy in

your

sta

te.

COM

PONE

NT

NAM

E/C

AS N

UMB

ERCO

NCEN

TRAT

ION

STAT

E CO

DEEp

ichlo

rohy

drin

106-

89-8

< 5p

pm1 CA

Benz

yl al

coho

l10

0-51

-6M

A, P

A, N

J

1.

Thes

e su

bsta

nces

are

kno

wn

to th

e sta

te o

f Cal

iforn

ia to

caus

e ca

ncer

or re

prod

uctiv

e ha

rm, o

r bot

h.

16.

OTH

ER IN

FOR

MAT

ION

REAS

ON

FOR

ISSU

E:...

......

......

......

......

.......

......

......

......

......

......

......

..Ch

ange

s mad

e in

Secti

on14

and

15.

PREP

ARED

BY:

......

......

......

......

......

.......

......

......

......

......

......

......

......

..G

. M. H

ouse

APPR

OVE

D BY

:....

......

......

......

......

......

......

......

......

......

......

......

......

.....

G. M

. Hou

seTI

TLE:

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

......

Heal

th, S

afet

y &

Env

ironm

enta

l Man

ager

APPR

OVA

L DA

TE:.

......

......

......

......

......

......

......

......

......

......

......

......

...Ap

ril 26

, 201

3SU

PERS

EDE

S DA

TE:.

......

......

......

......

......

......

......

......

......

......

......

.....

Mar

ch 9,

201

2M

SDS

NUM

BER

:.....

......

......

......

......

......

......

......

......

......

......

......

......

...10

5-13

a

This

info

rmat

ion

is fu

rnish

ed w

ithou

t war

rant

y, e

xpre

ssed

or i

mpl

ied, e

xcep

t tha

t it is

acc

urat

e to

the

best

know

ledg

e of

Wes

t Sys

tem

Inc.

The

dat

a on

th

is sh

eet i

s rel

ated

only

to th

e sp

ecific

mat

eria

l des

igna

ted

here

in.

Wes

t Sys

tem

Inc.

ass

umes

no

lega

l res

pons

ibilit

y fo

r use

or r

elia

nce

upon

thes

e da

ta.

Page 295: M/s. Kemz Resibond Private Limited
Page 296: M/s. Kemz Resibond Private Limited
Page 297: M/s. Kemz Resibond Private Limited
Page 298: M/s. Kemz Resibond Private Limited
Page 299: M/s. Kemz Resibond Private Limited
Page 300: M/s. Kemz Resibond Private Limited
Page 301: M/s. Kemz Resibond Private Limited
Page 302: M/s. Kemz Resibond Private Limited
Page 303: M/s. Kemz Resibond Private Limited
Page 304: M/s. Kemz Resibond Private Limited
Page 305: M/s. Kemz Resibond Private Limited

p. 1

10

0

He

alt

h

Fir

e

Re

ac

tiv

ity

Pe

rso

na

lP

rote

cti

on

2 1 0 H

Mat

eria

l Saf

ety

Dat

a Sh

eet

Pro

pyle

ne g

lyco

l MSD

S

Sect

ion

1: C

hem

ical

Pro

duct

and

Com

pany

Iden

tific

atio

n

Prod

uct N

ame:

Pro

pyle

ne

glyc

ol

Cat

alog

Cod

es:

SLP

1162

, SL

P2

974

CAS

#: 5

7-5

5-6

RTE

CS:

TY

2000

000

TSC

A: T

SC

A 8

(b)

inve

ntor

y: P

rop

yle

ne g

lyco

l

CI#

: No

t app

licab

le.

Syno

nym

: 1

,2,-

pro

pane

diol

, 1,2

-dih

ydr

oxy

prop

ane

Che

mic

al N

ame:

Pro

pyle

ne

Gly

col

Che

mic

al F

orm

ula:

CH

3CH

OH

CH

2OH

Con

tact

Info

rmat

ion:

Scie

ncel

ab.c

om, I

nc.

1402

5 S

mith

Rd.

Hou

sto

n, T

exa

s 77

396

US

Sal

es:

1-80

0-90

1-72

47In

tern

atio

nal

Sal

es:

1-2

81-4

41-4

400

Ord

er

Onl

ine:

Sci

ence

Lab

.com

CHE

MTR

EC (2

4HR

Em

erge

ncy

Tele

phon

e), c

all:

1-80

0-4

24-9

300

Inte

rnat

iona

l CH

EMTR

EC,

cal

l: 1-

703

-52

7-38

87

For n

on-e

mer

genc

y as

sist

ance

, cal

l: 1-

281

-44

1-44

00

Sect

ion

2: C

ompo

sitio

n an

d In

form

atio

n on

Ingr

edie

nts

Com

posi

tion:

Nam

eC

AS #

% b

y W

eigh

t

Pro

pyle

ne

gly

col

57-5

5-6

100

Toxi

colo

gica

l Dat

a on

Ingr

edie

nts:

Pro

pyle

ne

glyc

ol:

OR

AL

(LD

50)

: A

cute

: 20

000

mg

/kg

[Rat

]. 2

2000

mg/

kg [M

ouse

].D

ER

MA

L (L

D5

0):

Acu

te: 2

0800

mg/

kg [R

abbi

t].

Sect

ion

3: H

azar

ds Id

entif

icat

ion

Pote

ntia

l Acu

te H

ealth

Effe

cts:

Haz

ard

ous

in

cas

e of

inge

stio

n. S

light

ly h

aza

rdou

s in

ca

se o

f sk

in c

ont

act

(irr

itant

, per

mea

tor)

, of

eye

con

tact

(irr

itant

), o

fin

hala

tion

.

Pote

ntia

l Chr

onic

Hea

lth E

ffect

s:S

ligh

tly h

aza

rdo

us i

n ca

se

of s

kin

con

tact

(se

nsiti

zer)

. CA

RC

INO

GE

NIC

EF

FE

CT

S:

No

t ava

ilabl

e. M

UTA

GE

NIC

EF

FE

CT

S:

Not

ava

ilabl

e. T

ER

ATO

GE

NIC

EF

FE

CT

S: N

ot a

vaila

ble

. DE

VE

LO

PM

EN

TA

L T

OX

ICIT

Y:

No

t ava

ilabl

e. T

he

subs

tanc

e m

ay b

eto

xic

to c

entr

al n

erv

ous

sys

tem

(C

NS

). R

epea

ted

or p

rolo

nge

d e

xpo

sure

to

the

su

bsta

nce

can

pro

duce

tar

get

org

ans

dam

age

.

Sect

ion

4: F

irst A

id M

easu

res

Eye

Cont

act:

Page 306: M/s. Kemz Resibond Private Limited

p. 2

Che

ck fo

r an

d re

mov

e a

ny

con

tact

len

ses.

Im

me

diat

ely

flu

sh e

yes

wit

h ru

nni

ng w

ate

r fo

r at

leas

t 15

min

utes

, ke

epin

g ey

elid

sop

en. C

old

wat

er m

ay b

e u

sed.

Get

med

ica

l atte

ntio

n.

Skin

Con

tact

:In

ca

se o

f co

ntac

t, im

med

iate

ly f

lush

ski

n w

ith p

len

ty o

f w

ate

r. C

over

the

irrit

ate

d sk

in w

ith a

n em

ollie

nt. R

emov

e c

onta

min

ate

dcl

othi

ng a

nd s

hoes

. C

old

wa

ter

ma

y b

e u

sed

.Wa

sh c

loth

ing

befo

re re

use.

Th

orou

ghly

cle

an s

hoes

bef

ore

reu

se.

Get

me

dic

alat

ten

tion.

Serio

us S

kin

Cont

act:

Was

h w

ith

a d

isin

fect

ant

soa

p an

d co

ver

the

con

tam

ina

ted

sk

in w

ith a

n an

ti-b

acte

rial c

rea

m.

See

k im

med

iate

med

ica

lat

ten

tion.

Inha

latio

n:If

inh

aled

, re

mov

e to

fres

h a

ir. I

f not

bre

ath

ing

, giv

e a

rtifi

cia

l res

pira

tion.

If b

reat

hin

g is

diff

icu

lt, g

ive

oxy

gen

. Ge

t me

dica

lat

ten

tion.

Serio

us In

hala

tion:

No

t ava

ilabl

e.

Inge

stio

n:D

o N

OT

indu

ce v

om

iting

unl

ess

dire

cted

to d

o so

by

me

dic

al p

ers

onn

el. N

ever

giv

e a

nyth

ing

by

mo

uth

to a

n u

nco

nsc

iou

spe

rso

n. If

larg

e q

uan

titie

s o

f th

is m

ate

rial a

re s

wal

low

ed, c

all

a ph

ysic

ian

imm

edia

tely

. Lo

ose

n tig

ht c

loth

ing

su

ch a

s a

colla

r,tie

, bel

t or w

aist

band

.

Serio

us In

gest

ion:

No

t ava

ilabl

e.

Sect

ion

5: F

ire a

nd E

xplo

sion

Dat

a

Flam

mab

ility

of t

he P

rodu

ct: M

ay b

e co

mb

ustib

le a

t hig

h te

mpe

ratu

re.

Aut

o-Ig

nitio

n Te

mpe

ratu

re: 3

71°

C (

699

.8°F

)

Flas

h Po

ints

: C

LO

SE

D C

UP

: 99°

C (

210

.2°F

). O

PE

N C

UP

: 107

°C (2

24.6

°F) (

Cle

vela

nd)

.

Flam

mab

le L

imits

: LO

WE

R: 2

.6%

UP

PE

R:

12.5

%

Prod

ucts

of C

ombu

stio

n: T

hese

pro

duc

ts a

re c

arb

on o

xide

s (C

O,

CO

2).

Fire

Haz

ards

in P

rese

nce

of V

ario

us S

ubst

ance

s: S

ligh

tly f

lam

mab

le to

flam

mab

le in

pre

senc

e o

f he

at.

Expl

osio

n Ha

zard

s in

Pre

senc

e of

Var

ious

Sub

stan

ces:

Ris

ks o

f exp

losi

on o

f th

e pr

oduc

t in

pre

sen

ce o

f m

ech

ani

cal i

mp

act:

No

t ava

ilab

le. R

isk

s o

f exp

losi

on

of t

he p

rod

uct i

npr

ese

nce

of

stat

ic d

isch

arg

e: N

ot a

vaila

ble.

Fire

Fig

htin

g M

edia

and

Inst

ruct

ions

:S

MA

LL F

IRE

: Use

DR

Y c

hem

ica

l po

wd

er.

LAR

GE

FIR

E:

Use

wa

ter

spra

y, fo

g o

r fo

am. D

o no

t use

wat

er je

t.

Spec

ial R

emar

ks o

n Fi

re H

azar

ds:

Whe

n he

ate

d to

de

com

posi

tion

it e

mits

ac

rid s

mok

e a

nd

irrit

atin

g fu

me

s.

Spec

ial R

emar

ks o

n Ex

plos

ion

Haz

ards

: No

t ava

ilabl

e.

Sect

ion

6: A

ccid

enta

l Rel

ease

Mea

sure

s

Smal

l Spi

ll:D

ilute

wit

h w

ate

r an

d m

op

up,

or

abso

rb w

ith

an in

ert

dry

ma

teri

al a

nd p

lace

in

an a

ppr

opr

iate

was

te d

isp

osal

co

nta

ine

r.F

inis

h c

lean

ing

by

spre

adi

ng w

ate

r on

the

con

tam

ina

ted

su

rfac

e a

nd

disp

ose

of a

cco

rdin

g to

loca

l and

regi

onal

aut

hor

ityre

quire

men

ts.

Larg

e Sp

ill:

Ab

sorb

with

an

ine

rt m

ater

ial a

nd p

ut t

he s

pille

d m

ater

ial i

n a

n ap

pro

pria

te w

aste

dis

posa

l. F

inis

h c

lean

ing

by s

pre

adi

ng w

ate

ron

the

cont

am

inat

ed

surf

ace

and

allo

w to

eva

cua

te th

roug

h th

e s

ani

tary

sys

tem

. Be

care

ful

that

the

pro

duc

t is

not

pre

sent

at

aco

nce

ntra

tion

lev

el a

bove

TLV

. Che

ck T

LV o

n th

e M

SD

S a

nd w

ith lo

cal a

uth

orit

ies.

Sect

ion

7: H

andl

ing

and

Stor

age

p. 3

Prec

autio

ns:

Ke

ep a

wa

y fr

om h

eat.

Ke

ep a

wa

y fr

om s

our

ces

of

igni

tion

. Em

pty

cont

aine

rs p

ose

a fi

re r

isk

, eva

por

ate

the

resi

due

un

der

afu

me

ho

od. G

roun

d al

l eq

uipm

ent c

ont

aini

ng m

ate

rial.

Do

not

inge

st.

Do

not b

rea

the

gas

/fum

es/

vap

or/s

pra

y. W

ear

su

itab

lepr

otec

tive

clo

thin

g. I

n ca

se o

f ins

uffi

cie

nt v

entil

atio

n, w

ear

su

itab

le re

spira

tory

eq

uipm

ent

. If

inge

sted

, se

ek m

edi

cal

advi

ceim

med

iate

ly a

nd s

how

the

con

tain

er o

r th

e la

bel.

Avo

id c

ont

act

with

ski

n a

nd e

yes

. Ke

ep a

way

fro

m in

com

pat

ible

s su

ch a

sox

idiz

ing

age

nts,

red

ucin

g a

gent

s, a

cid

s, a

lka

lis, m

ois

ture

.

Stor

age:

Hyg

rosc

opi

c. K

eep

con

tain

er t

ight

ly c

los

ed. K

eep

con

tain

er in

a c

ool

, wel

l-ve

ntila

ted

are

a. D

o n

ot s

tore

ab

ove

23

°C (7

3.4

°F).

Sect

ion

8: E

xpos

ure

Cont

rols

/Per

sona

l Pro

tect

ion

Engi

neer

ing

Con

trol

s:P

rovi

de

exh

aus

t ve

ntil

atio

n or

oth

er e

ngin

eerin

g co

ntro

ls to

kee

p th

e a

irbo

rne

con

cen

trat

ions

of v

apo

rs b

elo

w t

heir

res

pect

ive

thre

sho

ld li

mit

valu

e. E

nsu

re t

hat e

yew

ash

sta

tions

and

sa

fety

sho

we

rs a

re p

roxi

mal

to th

e w

ork

-sta

tion

loca

tion.

Pers

onal

Pro

tect

ion:

Sp

lash

go

ggle

s. L

ab

coa

t. V

apo

r re

spira

tor.

Be

sure

to

use

an

appr

ove

d/ce

rtifi

ed r

esp

irato

r or

equ

iva

lent

. Glo

ves.

Pers

onal

Pro

tect

ion

in C

ase

of a

Lar

ge S

pill:

Sp

lash

go

ggle

s. F

ull

sui

t. V

apor

re

spir

ato

r. B

oot

s. G

love

s. A

se

lf c

onta

ined

bre

athi

ng a

ppar

atus

sh

ould

be

use

d to

avo

idin

hala

tion

of

the

pro

duc

t. S

ugge

sted

pro

tect

ive

clo

thin

g m

igh

t not

be

su

ffici

ent

; co

nsu

lt a

spe

cia

list B

EFO

RE

ha

ndlin

g th

ispr

oduc

t.

Expo

sure

Lim

its:

TW

A: 1

0 (m

g/m

3) f

rom

AIH

A C

onsu

lt lo

cal a

uth

orit

ies

for

acc

epta

ble

expo

sure

lim

its.

Sect

ion

9: P

hysi

cal a

nd C

hem

ical

Pro

pert

ies

Phys

ical

sta

te a

nd a

ppea

ranc

e: L

iqu

id. (

Oily

liq

uid.

)

Odo

r: P

ract

ical

ly O

dor

less

.

Tast

e: P

ract

ical

ly T

aste

less

.

Mol

ecul

ar W

eigh

t: 7

6.1

g/m

ole

Col

or:

Co

lorle

ss. C

lear

pH (1

% s

oln/

wat

er):

No

t ava

ilabl

e.

Boi

ling

Poin

t: 18

8°C

(3

70.4

°F)

Mel

ting

Poin

t: -

59°C

(-7

4.2

°F)

Crit

ical

Tem

pera

ture

: N

ot a

vaila

ble.

Spec

ific

Gra

vity

: 1.0

36

(Wa

ter

= 1

)

Vapo

r Pr

essu

re:

0 kP

a (@

20°

C)

0.0

8 m

mH

g a

t 20

C 0

.129

mm

Hg

at 2

5 C

Vapo

r De

nsity

: 2.

62 (

Air

= 1

)

Vola

tility

: N

ot a

vaila

ble.

Odo

r Thr

esho

ld:

No

t ava

ilabl

e.

Wat

er/O

il D

ist.

Coef

f.: T

he p

rod

uct i

s m

ore

sol

ubl

e in

wa

ter;

log(

oil/

wat

er) =

-0.

9

Ioni

city

(in

Wat

er):

No

t ava

ilabl

e.

Dis

pers

ion

Prop

ertie

s: S

ee s

olub

ility

in w

ater

, ace

ton

e.

Page 307: M/s. Kemz Resibond Private Limited

p. 4

Solu

bilit

y: S

olub

le in

co

ld w

ate

r, h

ot w

ate

r, a

ceto

ne.

Sect

ion

10: S

tabi

lity

and

Rea

ctiv

ity D

ata

Stab

ility

: T

he p

rod

uct i

s s

tabl

e.

Inst

abili

ty T

empe

ratu

re:

No

t ava

ilabl

e.

Con

ditio

ns o

f Ins

tabi

lity:

Inco

mpa

tible

ma

teri

als,

exc

ess

hea

t, e

xpo

sure

to

mo

ist

air o

r w

ate

r

Inco

mpa

tibili

ty w

ith v

ario

us s

ubst

ance

s: R

eac

tive

with

ox

idiz

ing

age

nts,

red

ucin

g a

gent

s, a

cids

, al

kalis

.

Cor

rosi

vity

: N

on-

cor

rosi

ve in

pre

sen

ce o

f gl

ass

.

Spec

ial R

emar

ks o

n Re

activ

ity:

Hyg

rosc

opi

c; k

eep

con

tain

er t

ight

ly c

lose

d. I

nco

mp

atib

le w

ith c

hlo

rofo

rma

tes,

stro

ng a

cids

(n

itric

aci

d, h

ydro

flulo

ric a

cid

),ca

ustic

s, a

liph

atic

am

ines

, is

ocy

ana

tes,

str

ong

oxid

izer

s, a

cid

anh

ydri

des,

silv

er n

itrat

e, r

edu

cin

g ag

ents

.

Spec

ial R

emar

ks o

n Co

rros

ivity

: No

t ava

ilabl

e.

Poly

mer

izat

ion:

Will

no

t occ

ur.

Sect

ion

11: T

oxic

olog

ical

Info

rmat

ion

Rou

tes

of E

ntry

: Abs

orb

ed th

rou

gh s

kin

. Ey

e co

nta

ct.

Toxi

city

to A

nim

als:

Acu

te o

ral t

oxic

ity (

LD

50)

: 18

500

mg

/kg

[Ra

bbit]

. Acu

te d

erm

al t

oxic

ity (

LD50

): 2

080

0 m

g/k

g [R

abbi

t].

Chr

onic

Effe

cts

on H

uman

s: M

ay c

ause

da

ma

ge to

the

follo

win

g o

rga

ns:

cen

tral

ner

vou

s sy

stem

(CN

S).

Oth

er T

oxic

Effe

cts

on H

uman

s:H

aza

rdo

us i

n ca

se

of in

gest

ion.

Slig

htly

ha

zard

ous

in c

ase

of s

kin

co

nta

ct (i

rrita

nt, p

erm

eato

r),

of in

hala

tion

.

Spec

ial R

emar

ks o

n To

xici

ty to

Ani

mal

s: N

ot a

vaila

ble.

Spec

ial R

emar

ks o

n Ch

roni

c Ef

fect

s on

Hum

ans:

Ma

y af

fect

ge

netic

ma

teria

l (m

uta

geni

c).

May

ca

use

adve

rse

repr

odu

ctiv

e e

ffect

s an

d bi

rth

defe

cts

(ter

ato

geni

c) b

ase

d on

anim

al te

st d

ata.

Spec

ial R

emar

ks o

n ot

her T

oxic

Eff

ects

on

Hum

ans:

Acu

te P

ote

ntia

l Hea

lth E

ffec

ts:

Ski

n: M

ay c

aus

e m

ild s

kin

irrit

atio

n. It

ma

y be

abs

orb

ed th

rou

gh th

e sk

in a

nd

caus

e s

yste

mic

effe

cts

sim

ilar

to t

hose

of i

nges

tion

. Eye

s: M

ay c

aus

e m

ild e

ye

irrit

atio

n w

ith

som

e im

med

iate

, tra

nsit

ory

stin

ging

, lac

rim

atio

n,

blep

haro

spa

sm,

and

mild

tra

nsi

ent

co

nju

nctiv

al h

yper

em

ia. T

her

e is

no

res

idu

al d

isc

omfo

rt o

r inj

ury

onc

e it

is w

ash

ed

awa

y. I

nhal

atio

n: M

ay

cau

se r

esp

irat

ory

tra

ct ir

rita

tion

. In

gest

ion

: It

may

ca

use

gast

roin

tes

tina

l tra

ct ir

rita

tion.

It m

ay

affe

ctbe

havi

or/c

ent

ral

nerv

ous

syst

em(C

NS

de

pre

ssio

n, g

ene

ral a

nes

thet

ic,

con

vuls

ion

s, s

eiz

ure

s, s

om

nol

enc

e, s

tupo

r, m

usc

leco

ntra

ctio

n o

r sp

astic

ity,

co

ma

), b

rain

(ch

ange

s in

su

rfac

e E

EG

), m

etab

olis

m, b

lood

(in

tra

vasc

ula

r he

mol

ysis

, whi

te b

loo

dce

lls -

dec

reas

ed n

eutr

ophi

l fu

nctio

n),

resp

iratio

n (r

esp

irato

ry s

timu

latio

n, c

hro

nic

pulm

ona

ry e

dem

a, c

yan

osis

), c

ard

iova

scul

ar

syst

em

(hyp

ote

nsio

n, b

rady

card

ia,

arrh

ythm

ias,

ca

rdia

c a

rres

t), e

ndo

crin

e sy

ste

m (

hypo

glyc

emia

), u

rinar

y sy

ste

m (

kid

neys

),an

d liv

er.

Chr

oni

c P

ote

ntia

l He

alth

Eff

ects

: S

kin

: Pro

long

ed o

r re

peat

ed s

kin

con

tact

may

ca

use

alle

rgic

con

tact

der

mat

itis.

Ing

esti

on: P

rolo

nged

or

rep

eate

d in

ges

tion

may

ca

use

hyp

erg

lyce

mia

an

d m

ay

affe

ct b

eha

vio

r/C

NS

(sy

mp

tom

s si

mila

r to

tha

tof

ac

ute

ing

estio

n).

Inh

alat

ion:

Pro

lon

ged

or r

epea

ted

inha

latio

n m

ay a

ffect

beh

avio

r/C

NS

(with

sym

pto

ms

sim

ilar

to in

gest

ion

),an

d sp

leen

Sect

ion

12: E

colo

gica

l Inf

orm

atio

n

Ecot

oxic

ity:

Eco

toxi

city

in w

ate

r (L

C50

): >

5000

mg/

l 24

hou

rs [G

old

fish]

. >1

0000

mg/

l 48

hour

s [g

uppy

]. >

100

00 m

g/l 4

8 ho

urs

[wat

er f

lea]

.

BOD

5 an

d C

OD:

No

t ava

ilabl

e.

p. 5

Prod

ucts

of B

iode

grad

atio

n:P

oss

ibly

haz

ard

ous

sh

ort t

erm

deg

rad

atio

n p

rod

ucts

are

not

like

ly. H

owev

er,

lon

g te

rm d

egra

dat

ion

pro

duc

ts m

ay

aris

e.

Toxi

city

of t

he P

rodu

cts

of B

iode

grad

atio

n: T

he p

rod

ucts

of d

egra

dat

ion

are

less

tox

ic th

an th

e p

rod

uct

itse

lf.

Spec

ial R

emar

ks o

n th

e Pr

oduc

ts o

f Bio

degr

adat

ion:

No

t ava

ilabl

e.

Sect

ion

13: D

ispo

sal C

onsi

dera

tions

Was

te D

ispo

sal:

Sect

ion

14: T

rans

port

Info

rmat

ion

DOT

Cla

ssifi

catio

n: N

ot a

DO

T c

ontr

olle

d m

ate

rial (

Un

ited

Sta

tes

).

Iden

tific

atio

n: N

ot a

pplic

able

.

Spec

ial P

rovi

sion

s fo

r Tra

nspo

rt: N

ot a

pplic

able

.

Sect

ion

15: O

ther

Reg

ulat

ory

Info

rmat

ion

Fede

ral a

nd S

tate

Reg

ulat

ions

:P

enn

sylv

ania

RT

K: P

rop

yle

ne g

lyco

l Min

nes

ota

: P

rop

yle

ne g

lyco

l TS

CA

8(b

) in

vent

ory

: Pro

pyle

ne

gly

col

Oth

er R

egul

atio

ns: E

INE

CS

: T

his

pro

duc

t is

on

the

Eur

ope

an In

ven

tory

of E

xis

ting

Com

me

rcia

l Che

mic

al S

ubs

tanc

es.

Oth

er C

lass

ifica

tions

:

WHM

IS (C

anad

a):

No

t co

ntro

lled

und

er W

HM

IS (

Ca

nada

).

DSC

L (E

EC):

R21

/22-

Har

mfu

l in

con

tact

with

ski

n a

nd if

sw

allo

wed

. S2

4/2

5- A

void

co

nta

ct w

ith s

kin

and

eye

s.

HM

IS (U

.S.A

.):

Hea

lth H

azar

d: 2

Fire

Haz

ard:

1

Rea

ctiv

ity: 0

Pers

onal

Pro

tect

ion:

h

Nat

iona

l Fir

e Pr

otec

tion

Asso

ciat

ion

(U.S

.A.):

Hea

lth: 0

Flam

mab

ility

: 1

Rea

ctiv

ity: 0

Spec

ific

haza

rd:

Prot

ectiv

e Eq

uipm

ent:

Glo

ves

. Lab

co

at.

Vap

or r

esp

irat

or.

Be

sur

e to

use

an

app

rov

ed/c

ert

ifie

d re

spir

ato

r or

equi

vale

nt.

Sp

lash

go

ggle

s.

Sect

ion

16: O

ther

Info

rmat

ion

Ref

eren

ces:

-Haw

ley,

G.G

.. T

he C

ond

ense

d C

hem

ical

Dic

tion

ary,

11

e e

d., N

ew Y

ork

N.Y

., V

an

Nos

tra

nd R

eino

ld, 1

987.

-S

AX

, N

.I.

Dan

gero

us

Pro

per

ties

of

Ind

utria

l Ma

teri

als

. Tor

onto

, Va

n N

ostr

and

Rei

nold

, 6e

ed.

19

84. -

The

Sig

ma

-Ald

rich

Lib

rary

of

Che

mic

al S

afe

ty D

ata

, Edi

tion

II. -

Sup

plie

r M

SD

S -

LO

LI -

RT

EC

S -

HS

DB

Page 308: M/s. Kemz Resibond Private Limited

p. 6

Oth

er S

peci

al C

onsi

dera

tions

: N

ot a

vaila

ble.

Cre

ated

: 10

/10/

200

5 08

:24

PM

Last

Upd

ated

: 06

/09/

201

2 12

:00

PM

The

info

rmat

ion

abo

ve is

bel

ieve

d t

o be

acc

ura

te a

nd r

epre

sen

ts t

he

best

info

rma

tion

cu

rren

tly a

vaila

ble

to u

s. H

ow

eve

r, w

em

ake

no

war

ran

ty o

f me

rcha

nta

bilit

y or

an

y ot

her w

arra

nty

, exp

ress

or

imp

lied,

with

res

pec

t to

suc

h in

form

atio

n, a

nd

we

ass

um

eno

liab

ility

re

sulti

ng f

rom

its

us

e. U

ser

s sh

ould

ma

ke t

hei

r ow

n in

vest

igat

ions

to

de

term

ine

the

sui

tabi

lity

of

the

info

rma

tion

for

the

ir pa

rtic

ula

r pur

pose

s. I

n no

eve

nt s

hall

Sci

ence

Lab

.com

be

liab

le fo

r a

ny c

laim

s, lo

sse

s, o

r da

ma

ges

of a

ny t

hird

par

ty o

r fo

rlo

st p

rofi

ts o

r a

ny s

peci

al,

indi

rect

, inc

ide

ntal

, co

nse

quen

tial o

r exe

mpl

ary

dam

age

s, h

owso

eve

r aris

ing

, ev

en if

Sci

ence

Lab

.com

has

been

ad

vise

d o

f the

po

ssib

ility

of

such

da

mag

es.

Page 309: M/s. Kemz Resibond Private Limited
Page 310: M/s. Kemz Resibond Private Limited
Page 311: M/s. Kemz Resibond Private Limited
Page 312: M/s. Kemz Resibond Private Limited
Page 313: M/s. Kemz Resibond Private Limited
Page 314: M/s. Kemz Resibond Private Limited
Page 315: M/s. Kemz Resibond Private Limited
Page 316: M/s. Kemz Resibond Private Limited
Page 317: M/s. Kemz Resibond Private Limited
Page 318: M/s. Kemz Resibond Private Limited
Page 319: M/s. Kemz Resibond Private Limited
Page 320: M/s. Kemz Resibond Private Limited
Page 321: M/s. Kemz Resibond Private Limited
Page 322: M/s. Kemz Resibond Private Limited
Page 323: M/s. Kemz Resibond Private Limited
Page 324: M/s. Kemz Resibond Private Limited
Page 325: M/s. Kemz Resibond Private Limited
Page 326: M/s. Kemz Resibond Private Limited
Page 327: M/s. Kemz Resibond Private Limited
Page 328: M/s. Kemz Resibond Private Limited
Page 329: M/s. Kemz Resibond Private Limited
Page 330: M/s. Kemz Resibond Private Limited
Page 331: M/s. Kemz Resibond Private Limited
Page 332: M/s. Kemz Resibond Private Limited
Page 333: M/s. Kemz Resibond Private Limited
Page 334: M/s. Kemz Resibond Private Limited
Page 335: M/s. Kemz Resibond Private Limited
Page 336: M/s. Kemz Resibond Private Limited
Page 337: M/s. Kemz Resibond Private Limited
Page 338: M/s. Kemz Resibond Private Limited
Page 339: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

1of

10

Aeg

is R

egul

ator

y In

c.

Sect

ion

1: ID

ENTI

FIC

ATIO

N

Prod

uct N

ame:

Dim

ethy

l Sul

fide

(DM

S)Sy

nony

ms:

Dim

ethy

l sul

phid

e.Pr

oduc

t Use

:S

ee T

echn

ical D

ata

She

et.

Res

tric

tions

on

Use

:N

ot a

vaila

ble.

M

anuf

actu

rer/

Supp

lier:

Gay

lord

Che

mic

al C

ompa

ny, L

LC18

80 F

airla

wn

Rd

Tusc

aloo

sa, A

L 35

401

Uni

ted

Sta

tes

Emer

genc

y Ph

one:

CH

EM

TR

EC (U

SA

): (8

00) 4

24-9

300

Cus

tom

er S

ervi

ce: G

aylo

rd C

hem

ical C

ompa

ny, L

LC:

(985

) 649

-546

4 (8

:00a

m -

5:00

pm C

ST)

(205

) 342

-065

2 (N

ight

s an

d W

eeke

nds)

Dat

e of

Pre

para

tion

of S

DS:

Oct

ober

18,

201

7

Sect

ion

2: H

AZA

RD(

S) I

DEN

TIFI

CATI

ON

GHS

INFO

RM

ATIO

N

Cla

ssifi

catio

n:Fl

amm

able

Liq

uids

, Cat

egor

y 2

LAB

EL E

LEM

ENTS

Haz

ard

Pict

ogra

m(s

):

Sign

al W

ord:

Dan

ger

Haz

ard

Stat

emen

ts:

Hig

hly

flam

mab

le li

quid

and

vap

or.

Prec

autio

nary

Sta

tem

ents

Prev

entio

n:K

eep

away

from

hea

t, ho

t sur

face

s, s

park

s, o

pen

flam

es a

nd o

ther

igni

tion

sour

ces.

No

smok

ing.

K

eep

cont

aine

r tig

htly

clos

ed.

Gro

und

and

bond

con

tain

er a

nd re

ceiv

ing

equi

pmen

t. U

se e

xplo

sion

-pro

of e

lect

rical

, ven

tilat

ing,

and

ligh

ting

equi

pmen

t. U

se n

on-s

park

ing

tool

s.

Take

act

ion

to p

reve

nt s

tatic

dis

char

ges.

W

ear p

rote

ctiv

e gl

oves

, pro

tect

ive

clot

hing

and

eye

pro

tect

ion.

Res

pons

e:IF

ON

SK

IN (o

r hai

r): T

ake

off i

mm

edia

tely

all

cont

amin

ated

clo

thin

g. R

inse

ski

n w

ith w

ater

or s

how

er.

In c

ase

of fi

re: U

se d

ry c

hem

ical

, CO

2, w

ater

spr

ay o

r re

gula

r foa

mto

ext

ingu

ish.

Stor

age:

Sto

re in

a w

ell-v

entil

ated

pla

ce. K

eep

cool

.

Dis

posa

l:D

ispo

se o

f con

tent

s/co

ntai

ner i

n ac

cord

ance

with

app

licab

le r

egio

nal,

natio

nal

and

loca

l law

s an

d re

gula

tions

.

Page 340: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

2of

10

Aeg

is R

egul

ator

y In

c.

Haz

ards

Not

Oth

erw

ise

Cla

ssifi

ed:

Not

app

licab

le.

Ingr

edie

nts

with

Unk

now

n To

xici

ty:

Non

e.

This

mat

eria

l is

cons

ider

ed h

azar

dous

by

the

OSH

A H

azar

d C

omm

unic

atio

n S

tand

ard,

(29

CFR

19

10.1

200)

.

This

mat

eria

l is

cons

ider

ed h

azar

dous

by

the

Haz

ardo

us P

rodu

cts

Reg

ulat

ions

.

Sect

ion

3: C

OM

POSI

TIO

N / I

NFO

RMAT

ION

ON

ING

RED

IEN

TS

Haz

ardo

us In

gred

ient

(s)

Com

mon

nam

e / S

ynon

yms

CAS

No.

% w

t./w

t.M

etha

ne, 1

,1'-t

hiob

is-

Dim

ethy

l sul

fide;

DM

S75

-18-

310

0Im

purit

ies

/ Sta

biliz

ing

addi

tives

:Non

e kn

own.

Sect

ion

4: F

IRST

-AID

MEA

SUR

ES

Inha

latio

n:If

inha

led:

Rem

ove

pers

on to

fres

h ai

r and

kee

p co

mfo

rtab

le fo

r bre

athi

ng.

Cal

l a p

oiso

n ce

nter

or d

octo

r if y

ou fe

el u

nwel

l. Ac

ute

and

dela

yed

sym

ptom

s an

d ef

fect

s:M

ay c

ause

resp

irato

ry ir

ritat

ion.

S

igns

/sym

ptom

s m

ay in

clud

e co

ugh,

sne

ezin

g, n

asal

dis

char

ge,

head

ache

, hoa

rsen

ess,

and

nos

e an

d th

roat

pai

n. E

xces

sive

inha

latio

n m

ay c

ause

hea

dach

e, d

izzin

ess,

con

fusi

on, l

oss

of a

ppet

ite a

nd/o

r los

s of

co

nsci

ousn

ess.

Vap

or in

hala

tion

may

cau

sem

oder

ate

eye,

nos

e, a

nd

thro

at ir

ritat

ion,

mak

ing

it un

likel

y th

at in

divi

dual

s w

ill to

lera

te m

oder

ate

to

high

con

cent

ratio

ns. H

eada

che

and

decr

ease

d ab

ility

to c

once

ntra

te m

ay

occu

r.Ey

e Co

ntac

t:If

in e

yes:

Rin

se c

autio

usly

with

wat

er fo

r at l

east

20

min

utes

. Rem

ove

cont

act l

ense

s, if

pre

sent

and

eas

y to

do.

Con

tinue

rin

sing

. If e

ye ir

ritat

ion

pers

ists:

Get

med

ical

adv

ice/

atte

ntio

n.

Acut

e an

d de

laye

d sy

mpt

oms

and

effe

cts:

May

cau

se e

ye ir

ritat

ion.

S

igns

/sym

ptom

s m

ay in

clud

e re

dnes

s, s

welli

ng, p

ain,

tear

ing,

and

blu

rred

or

haz

y vi

sion

. Sk

in C

onta

ct:

If on

ski

n (o

r hai

r): T

ake

off i

mm

edia

tely

all

cont

amin

ated

clo

thin

g. R

inse

sk

in w

ith w

ater

or s

howe

r. C

all a

poi

son

cent

er o

r doc

tor i

f you

feel

unw

ell.

Was

hco

ntam

inat

ed c

loth

ing

befo

re re

use.

Acut

e an

d de

laye

d sy

mpt

oms

and

effe

cts:

May

cau

sesk

in ir

ritat

ion.

S

igns

/sym

ptom

s m

ay in

clud

e lo

caliz

ed r

edne

ss, s

wel

ling,

and

itch

ing.

In

gest

ion:

If sw

allo

wed

: Cal

l a p

oiso

n ce

nter

or d

octo

r if y

ou fe

el u

nwel

l. If

vom

iting

oc

curs

nat

ural

ly, h

ave

vict

im le

an fo

rwar

d to

redu

ce th

e ris

k of

asp

iratio

n.

Do

NO

T in

duce

vom

iting

unl

ess

dire

cted

to d

o so

by

med

ical

per

sonn

el.

Nev

er g

ive

anyt

hing

by

mou

th to

an

unco

nsci

ous

pers

on.

Acut

e an

dde

laye

d sy

mpt

oms

and

effe

cts:

May

cau

se g

astro

inte

stin

al

irrita

tion.

Sig

ns/s

ympt

oms

may

incl

ude

abdo

min

al p

ain,

sto

mac

h up

set,

naus

ea, v

omiti

ng a

nd d

iarr

hea.

G

ener

al A

dvic

e:In

cas

e of

acc

iden

t or

if yo

u fe

el u

nwel

l, se

ek m

edic

al a

dvic

e im

med

iate

ly

(sho

w th

e la

bel o

r SD

S w

here

pos

sibl

e).

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

3of

10

Aeg

is R

egul

ator

y In

c.

Not

e to

Phy

sici

ans:

Sym

ptom

s m

ay n

ot a

ppea

r im

med

iate

ly.

Sect

ion

5: F

IRE-

FIGH

TING

MEA

SUR

ES

FLAM

MAB

ILIT

Y AN

D EX

PLO

SIO

N IN

FORM

ATIO

NH

ighl

y fla

mm

able

liqu

id a

nd v

apor

. Will

be

easi

ly ig

nite

d by

hea

t, sp

arks

or f

lam

es. V

apor

s m

ay

form

exp

losi

ve m

ixtu

res

with

air.

Vap

ors

may

trav

el to

sou

rce

of ig

nitio

n an

d fla

sh b

ack.

Mos

t va

pors

are

hea

vier

than

air.

The

y wi

ll sp

read

alo

ng g

roun

d an

d co

llect

in lo

w o

r con

fined

are

as

(sew

ers,

bas

emen

ts, t

anks

). V

apor

exp

losi

on h

azar

d in

door

s, o

utdo

ors

or in

sew

ers.

Run

off t

o se

wer

may

cre

ate

fire

or e

xplo

sion

haz

ard.

Con

tain

ers

may

exp

lode

whe

n he

ated

. Man

y liq

uids

ar

e lig

hter

than

wat

er.

If ta

nk, r

ail c

ar o

r tan

k tru

ck is

invo

lved

in a

fire

, ISO

LATE

for 8

00 m

eter

s (1

/2 m

ile) i

n al

l di

rect

ions

; als

o, c

onsi

der i

nitia

l eva

cuat

ion

for 8

00 m

eter

s (1

/2 m

ile) i

n al

l dire

ctio

ns.

Fire

invo

lving

Tan

ks o

r Ca

r/Tr

aile

r Loa

ds: F

ight

fire

from

max

imum

dis

tanc

e or

use

unm

anne

d ho

se h

olde

rs o

r m

onito

r no

zzle

s. C

ool c

onta

iner

s w

ith fl

oodi

ng q

uant

ities

of w

ater

unt

il w

ell a

fter

fire

is o

ut. W

ithdr

aw im

med

iate

ly in

cas

e of

risi

ng s

ound

from

ven

ting

safe

ty d

evic

es o

r di

scol

orat

ion

of ta

nk. A

LWAY

S st

ay a

way

from

tank

s en

gulfe

d in

fire

. For

mas

sive

fire

, use

un

man

ned

hose

hol

ders

or m

onito

r noz

zles

; if t

his

is im

poss

ible

, with

draw

from

are

a an

d le

t fire

bu

rn.

Sens

itivi

ty to

Mec

hani

cal I

mpa

ct:

This

mat

eria

l is

not s

ensi

tive

to m

echa

nica

l im

pact

. Se

nsiti

vity

to S

tatic

Dis

char

ge:

Take

actio

n to

pre

vent

sta

tic d

isch

arge

s. T

his

mat

eria

l is

sens

itive

to s

tatic

dis

char

ge.

ME

ANS

OF

EXTI

NCTI

ONSu

itabl

e Ex

tingu

ishi

ng M

edia

:S

mal

l Fire

: Dry

che

mic

al, C

O2,

wat

er s

pray

or

regu

lar f

oam

.

Larg

e Fi

re: W

ater

spr

ay, f

og o

r reg

ular

foam

. Mov

e co

ntai

ners

from

fire

are

a if

you

can

do it

with

out r

isk.

Uns

uita

ble

Extin

guis

hing

Med

ia:

Do

not u

se s

traig

ht s

trea

ms.

CA

UTI

ON

: Thi

spr

oduc

t has

a ve

ry lo

w fl

ash

poin

t: U

se o

f wat

er s

pray

whe

n fig

htin

g fir

e m

ay b

e in

effic

ient

. Pr

oduc

ts o

f Com

bust

ion:

Oxi

des

of c

arbo

n. O

xides

of s

ulph

ur.

Prot

ectio

n of

Fir

efig

hter

s:Fi

re w

ill pr

oduc

e irr

itatin

g, c

orro

sive

and

/or t

oxic

gas

es.

Vap

ors

may

cau

se d

izzi

ness

or s

uffo

catio

n.R

unof

f fro

m fi

re

cont

rol o

r dilu

tion

wat

er m

ay c

ause

pol

lutio

n. W

ear p

ositi

ve

pres

sure

sel

f-con

tain

ed b

reat

hing

app

arat

us (

SCB

A).

Stru

ctur

al fi

refig

hter

s' p

rote

ctiv

e cl

othi

ng w

ill on

ly p

rovi

de

limite

d pr

otec

tion.

Sect

ion

6: A

CCI

DEN

TAL

REL

EASE

MEA

SUR

ES

Emer

genc

y Pr

oced

ures

: A

s an

imm

edia

te p

reca

utio

nary

mea

sure

, iso

late

spi

ll or

leak

are

a fo

r at l

east

50

met

ers

(150

feet

) in

all d

irect

ions

. Kee

p un

auth

oriz

ed p

erso

nnel

aw

ay. S

tay

upw

ind.

Kee

p ou

t of l

ow

area

s. V

entila

te c

lose

d sp

aces

bef

ore

ente

ring.

ELI

MIN

ATE

all

igni

tion

sour

ces

(no

smok

ing,

flar

es, s

park

s or

flam

es in

im

med

iate

are

a). A

ll eq

uipm

ent u

sed

whe

n ha

ndlin

g th

e pr

oduc

t m

ust b

e gr

ound

ed.

Page 341: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

4of

10

Aeg

is R

egul

ator

y In

c.

Pers

onal

Pre

caut

ions

:D

o no

t tou

ch o

r wal

k th

roug

h sp

illed

mat

eria

l. U

se p

erso

nal

prot

ectio

n re

com

men

ded

in S

ectio

n 8.

En

viro

nmen

tal P

reca

utio

ns:

Pre

vent

ent

ry in

to w

ater

way

s, s

ewer

s, b

asem

ents

or c

onfin

ed

area

s.

Met

hods

for C

onta

inm

ent:

Sto

p le

ak if

you

can

do

it w

ithou

t risk

. A v

apor

sup

pres

sing

foam

m

ay b

e us

ed to

red

uce

vapo

rs.

Met

hods

for C

lean

-Up:

Abs

orb

or c

over

with

dry

ear

th, s

and

or o

ther

non

-com

bust

ible

m

ater

ial a

nd tr

ansf

er to

con

tain

ers.

Use

cle

an n

on-s

park

ing

tool

s to

col

lect

abs

orbe

d m

ater

ial.

Oth

er In

form

atio

n:S

ee S

ectio

n 13

for d

ispo

sal c

onsi

dera

tions

.

Sect

ion

7: H

AND

LIN

G A

ND

STO

RAG

E

Han

dlin

g:D

o no

t sw

allo

w. A

void

bre

athi

ng m

ist,

vapo

urs,

or s

pray

. Kee

p aw

ay fr

om h

eat,

hot s

urfa

ces,

sp

arks

, ope

n fla

mes

and

oth

er ig

nitio

n so

urce

s. N

o sm

okin

g. K

eep

cont

aine

r tig

htly

clo

sed.

G

roun

d an

d bo

nd c

onta

iner

and

rece

ivin

g eq

uipm

ent.

Use

non

-spa

rkin

g to

ols.

Tak

e ac

tion

to

prev

ent s

tatic

dis

char

ges.

Was

h th

orou

ghly

afte

r han

dlin

g. U

se o

nly

outd

oors

or

in a

wel

l-ve

ntila

ted

area

. S

ee S

ectio

n 8

for i

nfor

mat

ion

on P

erso

nal P

rote

ctiv

e Eq

uipm

ent.

Stor

age:

Sto

re in

a w

ell-v

entil

ated

pla

ce.K

eep

cont

aine

r tig

htly

clo

sed.

Kee

p co

ol. S

tore

lock

ed u

p. S

tore

aw

ay fr

om in

com

patib

le m

ater

ials

. See

Sec

tion

10 fo

r inf

orm

atio

n on

Inco

mpa

tible

Mat

eria

ls.

Kee

p ou

t of t

he re

ach

of c

hild

ren.

Se

ctio

n 8:

EXP

OSU

RE

CO

NTR

OLS

/ PE

RSO

NAL

PRO

TEC

TION

Expo

sure

Gui

delin

esC

ompo

nent

Dim

ethy

l sul

fide

(DM

S)[

CA

S N

o.75

-18-

3]AC

GIH

:10

ppm

(TW

A);

(200

1)O

SHA:

No

PEL

esta

blis

hed.

PEL:

Per

mis

sibl

e E

xpos

ure

Lim

itTW

A: T

ime-

Wei

ghte

d Av

erag

e

Engi

neer

ing

Con

trol

s:U

se v

entil

atio

n ad

equa

te to

kee

p ex

posu

res

(airb

orne

leve

ls

of d

ust,

fum

e, v

apou

r, ga

s, e

tc.)

belo

w r

ecom

men

ded

expo

sure

lim

its. U

se e

xplo

sion

-pro

of e

lect

rical

, ven

tilat

ing,

an

d lig

htin

g eq

uipm

ent.

PER

SON

AL P

ROTE

CTI

VE E

QUI

PME

NT (P

PE)

Eye/

Face

Pro

tect

ion:

Wea

r ch

emic

al s

afet

y go

ggle

s. E

nsur

e th

at e

yew

ash

stat

ions

are

clo

se to

the

wor

ksta

tion

loca

tion.

Use

equ

ipm

ent

for e

ye p

rote

ctio

n th

at m

eets

the

stan

dard

s re

fere

nced

by

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

5of

10

Aeg

is R

egul

ator

y In

c.

CS

A S

tand

ard

CA

N/C

SA-Z

94.3

-92

and

OSH

A re

gula

tions

in

29 C

FR 1

910.

133

for

Per

sona

l Pro

tect

ive

Equi

pmen

t. H

and

Pro

tect

ion:

Wea

r pro

tect

ive

glov

es.

But

yl o

r nitr

ile ru

bber

glo

ves

are

reco

mm

ende

d.C

onsu

lt m

anuf

actu

rer s

peci

ficat

ions

for

furth

er in

form

atio

n.

Skin

and

Bod

y P

rote

ctio

n:W

ear p

rote

ctiv

e cl

othi

ng. F

lam

e re

sist

ant c

loth

ing

that

mee

ts

the

NFP

A 2

112

and

CAN

/CG

SB 1

55.2

0 st

anda

rds

is

reco

mm

ende

d in

are

as w

here

mat

eria

l is s

tore

d or

han

dled

. R

espi

rato

ry P

rote

ctio

n:If

engi

neer

ing

cont

rols

and

ven

tilat

ion

are

not s

uffic

ient

to

cont

rol e

xpos

ure

to b

elow

the

allo

wabl

e lim

its th

en a

n ap

prop

riate

NIO

SH

/MS

HA

app

rove

d ai

r-pu

rifyi

ng re

spira

tor

that

mee

ts th

e re

quire

men

ts o

f CSA

Sta

ndar

d C

AN/C

SA

-Z9

4.4-

11, w

ith o

rgan

ic v

apor

car

tridg

e, o

r sel

f-con

tain

ed

brea

thin

g ap

para

tus

mus

t be

used

. Sup

plie

d ai

r bre

athi

ng

appa

ratu

s m

ust b

e us

ed w

hen

oxyg

en c

once

ntra

tions

are

lo

w o

r if a

irbor

ne c

once

ntra

tions

exc

eed

the

limits

of t

he a

ir-pu

rifyin

g re

spira

tors

. G

ener

al H

ygie

ne C

onsi

dera

tions

:H

andl

e ac

cord

ing

to e

stab

lishe

d in

dust

rial h

ygie

ne a

nd

safe

ty p

ract

ices

. Con

sult

a co

mpe

tent

indu

stria

l hyg

ieni

st to

de

term

ine

haza

rd p

oten

tial a

nd/o

r the

PPE

man

ufac

ture

rs to

en

sure

ade

quat

e pr

otec

tion.

Sect

ion

9: P

HYSI

CAL

AND

CH

EMIC

AL P

ROPE

RTIE

S

Appe

aran

ce:

Cle

ar, c

olor

less

liqu

id.

Col

our:

Col

orle

ss.

Odo

ur:

Ste

nch.

Odo

ur T

hres

hold

:2.

5pp

mPh

ysic

al S

tate

:Li

quid

. pH

:N

otav

aila

ble.

Mel

ting

Poin

t / F

reez

ing

Poin

t:-9

8 °C

(-1

44.4

°F)

Initi

al B

oilin

g Po

int:

37.3

°C (

99.1

°F)

Boi

ling

Ran

ge:

Not

ava

ilabl

e.Fl

ash

Poin

t:-4

9 °C

(-5

6.2

°F)

Evap

orat

ion

Rat

e:N

ot a

vaila

ble.

Flam

mab

ility

(sol

id, g

as):

Not

app

licab

le.

Low

er F

lam

mab

ility

Lim

it:2.

2 %

Upp

er F

lam

mab

ility

Lim

it:19

.7 %

Vapo

r Pr

essu

re:

53.2

kP

a at

20

°C (

68 °

F)

103.

4 kP

a at

38

°C (1

00 °F

)

Page 342: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

6of

10

Aeg

is R

egul

ator

y In

c.

Vapo

r De

nsity

:2.

1 (A

ir =

1)

Rel

ativ

e De

nsity

:0.

85 (W

ater

= 1

) So

lubi

litie

s:In

solu

ble

in w

ater

.

Parti

tion

Coe

ffici

ent:

n-O

ctan

ol/W

ater

:lo

g P

ow: 0

.84

Auto

-igni

tion

Tem

pera

ture

:20

5 °C

(40

1 °F

)

Dec

ompo

sitio

n Te

mpe

ratu

re:

Not

ava

ilabl

e.

Visc

osity

:N

ot a

vaila

ble.

Perc

ent V

olat

ile, w

t. %

:N

ot a

vaila

ble.

VOC

con

tent

, wt.

%:

Not

ava

ilabl

e.D

ensi

ty:

Not

ava

ilabl

e.C

oeffi

cien

t of W

ater

/Oil

Dis

tribu

tion:

Not

ava

ilabl

e.

Sect

ion

10: S

TABI

LITY

AN

D RE

ACTI

VITY

Rea

ctiv

ity:

Con

tact

with

inco

mpa

tible

mat

eria

ls. S

ourc

es o

f ign

ition

. Exp

osur

e to

he

at.

Che

mic

al S

tabi

lity:

Sta

ble

unde

r nor

mal

sto

rage

con

ditio

ns.

Poss

ibili

ty o

f Haz

ardo

us

Rea

ctio

ns:

Non

e kn

own.

Con

ditio

ns to

Avo

id:

Con

tact

with

inco

mpa

tible

mat

eria

ls. S

ourc

es o

f ign

ition

. Exp

osur

e to

he

at.

Inco

mpa

tible

Mat

eria

ls:

Oxi

dize

rs.

Haz

ardo

us D

ecom

posi

tion

Prod

ucts

:N

ot a

vaila

ble.

Sect

ion

11: T

OXI

COLO

GIC

AL

INFO

RM

ATI

ON

EFFE

CTS

OF

ACUT

E EX

POSU

RE

Prod

uct T

oxic

ity

Ora

l:33

00 m

g/kg

(rat

)D

erm

al:

> 50

00 m

g/kg

(rab

bit)

Inha

latio

n:40

250

mg/

m³ (

rat);

4H

Com

pone

nt T

oxic

ityC

ompo

nent

CAS

No.

LD50

ora

lLD

50 d

erm

alLC

50

Dim

ethy

l sul

fide

75-1

8-3

3300

mg/

kg (r

at)

> 50

00 m

g/kg

(rab

bit)

4025

0 m

g/m

³ (ra

t); 4

H

Like

ly R

oute

s of

Exp

osur

e:E

ye c

onta

ct. S

kin

cont

act.

Inha

latio

n. In

gest

ion.

Ta

rget

Org

ans:

Ski

n. E

yes.

Gas

troin

test

inal

trac

t. R

espi

rato

ry s

yste

m.

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

7of

10

Aeg

is R

egul

ator

y In

c.

Sym

ptom

s (in

clud

ing

dela

yed

and

imm

edia

te e

ffect

s)In

hala

tion:

May

cau

se r

espi

rato

ry ir

ritat

ion.

Sig

ns/s

ympt

oms

may

incl

ude

coug

h, s

neez

ing,

na

sal d

isch

arge

, hea

dach

e, h

oars

enes

s, a

nd n

ose

and

thro

at p

ain.

Exc

essi

ve

inha

latio

n m

ay c

ause

hea

dach

e, d

izzi

ness

, con

fusi

on, l

oss

of a

ppet

ite a

nd/o

r los

s of

con

scio

usne

ss. V

apor

inha

latio

n m

ay c

ause

mod

erat

e ey

e, n

ose,

and

thro

at

irrita

tion,

mak

ing

it un

likel

y th

at in

divi

dual

s w

ill to

lera

te m

oder

ate

to h

igh

conc

entr

atio

ns. H

eada

che

and

decr

ease

d ab

ility

to c

once

ntra

te m

ay o

ccur

.Ey

e:M

ay c

ause

eye

irrit

atio

n. S

igns

/sym

ptom

s m

ay in

clud

e re

dnes

s, s

wel

ling,

pai

n,

tear

ing,

and

blu

rred

or h

azy

visi

on.

Skin

:M

ay c

ause

ski

n irr

itatio

n. S

igns

/sym

ptom

s m

ay in

clud

e lo

caliz

ed re

dnes

s, s

wel

ling,

an

d itc

hing

. In

gest

ion:

May

cau

se g

astro

inte

stin

al ir

ritat

ion.

Sig

ns/s

ympt

oms

may

incl

ude

abdo

min

al p

ain,

st

omac

h up

set,

naus

ea, v

omiti

ng a

nd d

iarrh

ea.

Skin

Sen

sitiz

atio

n:N

ot a

vaila

ble.

R

espi

rato

ry S

ensi

tizat

ion:

Not

ava

ilabl

e.

Med

ical

Con

ditio

ns

Aggr

avat

ed B

y Ex

posu

re:

Not

ava

ilabl

e.

EFFE

CTS

OF

CHRO

NIC

EXP

OS

URE

(from

sho

rtan

d lo

ng-te

rm e

xpos

ure)

Targ

et O

rgan

s:S

kin.

Eye

s. G

astro

inte

stin

al tr

act.

Res

pira

tory

sys

tem

. C

hron

ic E

ffect

s:P

rolo

nged

or

repe

ated

con

tact

may

dry

ski

n an

d ca

use

irrita

tion.

C

arci

noge

nici

ty:

This

pro

duct

doe

s no

t con

tain

any

car

cino

gens

or p

oten

tial

carc

inog

ens

as li

sted

by

ACG

IH, I

ARC

, OS

HA

, or N

TP.

M

utag

enic

ity:

Dim

ethy

l sul

fide

was

not

mut

agen

ic to

Sal

mon

ella

typh

imur

ium

or

Esc

heric

hia

coli

(bac

teria

l rev

erse

mut

atio

n as

say)

in v

itro,

with

or

with

out m

etab

olic

act

ivat

ion.

It w

as a

lso

nega

tive

in a

DN

A d

amag

e an

d re

pair

assa

y us

ing

Sal

mon

ella

typh

imur

ium

. Dim

ethy

l sul

fide

was

no

t mut

agen

ic in

an

in v

ivo

mou

se m

icro

nucl

eus

stud

y.R

epro

duct

ive

Effe

cts:

Dim

ethy

l sul

fide

had

no e

ffect

on

mal

e or

fem

ale

repr

oduc

tive

orga

ns

follo

win

g re

peat

ed o

ral d

osin

g in

rat

s fo

r up

to 1

4 we

eks.

Whe

n pr

egna

nt r

ats

wer

e do

sed

with

dim

ethy

l sul

fide

from

ges

tatio

n da

ys 6

to

19

via

gava

ge a

t dos

es a

s hi

gh a

s 10

00 m

g/k

g bw

/day

, no

mat

erna

l to

xici

ty, e

mbr

yo-f

etal

or d

evel

opm

enta

l tox

icity

or t

erat

ogen

icity

was

ob

serv

ed.

Dev

elop

men

tal E

ffect

sTe

rato

geni

city

:N

ot a

vaila

ble.

Embr

yoto

xici

ty:

Not

ava

ilabl

e.

Toxi

colo

gica

lly S

yner

gist

ic M

ater

ials

:N

ot a

vaila

ble.

Page 343: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

8of

10

Aeg

is R

egul

ator

y In

c.

Sect

ion

12: E

CO

LOG

ICAL

INFO

RMAT

ION

Ecot

oxic

ity:

Onc

orhy

nchu

s m

ykis

s(R

ainb

ow tr

out):

LC

50 =

213

mg/

L, 9

6-hr

;D

aphn

ia m

agna

: EC

50 =

29

mg/

L, 4

8-hr

;D

aphn

ia m

agna

: EC

50 =

81

mg/

L, 4

8-hr

;P

seud

okirc

hner

iella

sub

capi

tata

: EC

50 =

23

to >

113

.7 m

g/L,

96-

hr.

Pers

iste

nce

/ D

egra

dabi

lity:

Dim

ethy

l sul

fide

is p

hoto

degr

aded

by

reac

tion

with

hyd

roxy

l rad

ical

s in

the

atm

osph

ere

with

a h

alf-

life

of 2

.8 d

ays

(cal

cula

ted)

. E

xper

imen

tal s

tudi

es s

how

dim

ethy

l sul

fide

is ra

pidl

y de

grad

ed in

su

nlig

ht (n

atur

al a

nd s

imul

ated

) for

min

g a

num

ber o

f bre

akdo

wn

prod

ucts

incl

udin

g su

lfur

diox

ide.

Dim

ethy

l sul

fide

does

not

hyd

roly

ze

with

hyd

rolys

is h

alf-l

ives

of >

1 y

ear

at p

H 4

, 7 a

nd 9

.B

ioac

cum

ulat

ion

/ Ac

cum

ulat

ion:

A lo

w b

ioac

cum

ulat

ion

pote

ntia

l is

expe

cted

bas

ed o

n th

e pa

rtiti

on

coef

ficie

nt L

og K

ow o

f 0.9

19. D

imet

hyls

ulfid

e is

read

ily

biod

egra

dabl

e (6

7.4%

deg

rade

d ov

er 2

8 da

ys; O

ECD

TG

301

D).

Mob

ility

in E

nviro

nmen

t:Fu

gaci

ty m

odel

Lev

el II

I ind

icat

es d

imet

hyl s

ulfid

e w

ill di

strib

ute

in

air,

wat

er a

nd s

edim

ent d

epen

dent

on

the

rout

e of

the

emis

sion

. Fu

gaci

ty m

odel

Lev

el II

I dis

tribu

tion

with

100

% o

f the

dim

ethy

l sul

fide

rele

ased

to a

ir is

: 98.

6% (a

ir), 1

.3%

(wat

er),

0.1%

(soi

l) an

d <0

.01%

(s

edim

ent);

with

100

% o

f the

dim

ethy

l sul

fide

rele

ased

to w

ater

the

dist

ribut

ion

is: 8

.6%

(air)

, 91.

2% (w

ater

), 0.

01%

(soi

l) an

d 0.

2%

(sed

imen

t); w

ith 1

00%

of t

he d

imet

hyl s

ulfid

e re

leas

ed to

soi

l the

di

strib

utio

n is

: 39.

4% (a

ir), 7

.2%

(wat

er),

53.4

% (s

oil)

and

0.01

%

(sed

imen

t).

Fuga

city

mod

el L

evel

III d

istri

butio

n w

ith e

qual

rele

ase

of d

imet

hyl

sulfi

de to

air,

wat

er a

nd s

oil i

s: 2

8.1%

(air)

, 57.

2% (w

ater

), 14

.6%

(s

oil)

and

0.1%

(sed

imen

t).O

ther

Adv

erse

Effe

cts:

Not

ava

ilabl

e.

Sect

ion

13: D

ISPO

SAL

CO

NSID

ERA

TIO

NS

Dis

posa

l Ins

truct

ions

:D

ispo

sal s

houl

d be

in a

ccor

danc

e wi

th a

pplic

able

regi

onal

, nat

iona

l an

d lo

cal l

aws

and

regu

latio

ns. L

ocal

regu

latio

ns m

ay b

e m

ore

strin

gent

than

regi

onal

or n

atio

nal r

equi

rem

ents

.

Sect

ion

14: T

RAN

SPO

RT IN

FOR

MAT

ION

U.S

. Dep

artm

ent o

f Tra

nspo

rtat

ion

(DO

T)Pr

oper

Shi

ppin

g Na

me:

UN

1164

, DIM

ETH

YL S

ULF

IDE,

3, P

G II

Cla

ss:

3U

N Nu

mbe

r:U

N11

64Pa

ckin

g G

roup

:II

Labe

l Cod

e:

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

9of

10

Aeg

is R

egul

ator

y In

c.

Can

ada

Tran

spor

tatio

n of

Dan

gero

us G

oods

(TD

G)

Prop

er S

hipp

ing

Nam

e:U

N11

64, D

IMET

HYL

SU

LFID

E, 3

, PG

IIC

lass

:3

UN

Num

ber:

UN

1164

Pack

ing

Gro

up:

IILa

bel C

ode:

IMD

G T

rans

port

Info

rmat

ion

Prop

er S

hipp

ing

Nam

e:U

N11

64, D

IMET

HYL

SU

LFID

E, 3

, PG

IIC

lass

:3

UN

Num

ber:

UN

1164

Pack

ing

Gro

up:

IILa

bel C

ode:

Flas

h po

int:

-49

°C (

-56.

2 °F

) (C

lose

d C

up)

EmS

Num

ber:

F-E

, S-D

ICA

O/IA

TATr

ansp

ort I

nfor

mat

ion

Prop

er S

hipp

ing

Nam

e:U

N11

64, D

IMET

HYL

SU

LFID

E, 3

, PG

IIC

lass

:3

UN

Num

ber:

UN

1164

Pack

ing

Gro

up:

IILa

bel C

ode:

Flas

h po

int:

-49

°C (

-56.

2 °F

) (C

lose

d C

up)

Sect

ion

15: R

EGUL

ATO

RY IN

FOR

MAT

ION

Che

mic

al In

vent

orie

s

US

(TS

CA)

The

com

pone

nts

of th

is p

rodu

ct a

re in

com

plia

nce

with

the

chem

ical

not

ifica

tion

requ

irem

ents

of

TSC

A.C

anad

a (D

SL)

The

com

pone

nts

of th

is p

rodu

ct a

re in

com

plia

nce

with

the

chem

ical

not

ifica

tion

requ

irem

ents

of

the

NSN

Reg

ulat

ions

und

er C

EPA

, 199

9.

Page 344: M/s. Kemz Resibond Private Limited

Dim

eth

yl S

ulfid

e (D

MS

)SA

FETY

DAT

A SH

EET

Dat

e of

Pre

para

tion:

Oct

ober

18,

201

7

Page

10

of 1

0A

egis

Reg

ulat

ory

Inc.

Fede

ral R

egul

atio

ns

Uni

ted

Stat

esTh

is S

DS

has

been

pre

pare

d to

mee

t the

U.S

. OS

HA

Haz

ard

Com

mun

icat

ion

Stan

dard

, 29

CFR

191

0.12

00.

SARA

Titl

e III

No

com

pone

nts

are

liste

d.

Stat

e R

egul

atio

nsM

assa

chus

etts

US

Mas

sach

uset

ts C

omm

onw

ealth

's R

ight

-to-K

now

Law

(App

endi

x A

to 1

05 C

ode

of

Mas

sach

uset

ts R

egul

atio

ns S

ectio

n 67

0.00

0)C

ompo

nent

CAS

No.

RTK

Lis

tD

imet

hyl s

ulfid

e(D

MS

)75

-18-

3E

Not

e: E

= E

xtra

ordi

nar

ily H

aza

rdou

s S

ubst

anc

e

New

Jer

sey

US

New

Jer

sey

Wor

ker a

nd C

omm

unity

Rig

ht-to

-Kno

w A

ct (

New

Jer

sey

Stat

ute

Ann

otat

ed

Sec

tion

34:5

A-5)

Com

pone

ntC

AS N

o.R

TK L

ist

Dim

ethy

l sul

fide

(DM

S)

75-1

8-3

SH

HS

Not

e: S

HH

S =

Spe

cia

l Hea

lth H

aza

rd S

ubs

tan

ce

Penn

sylv

ania

US

Pen

nsyl

vani

a W

orke

r and

Com

mun

ity R

ight

-to-K

now

Law

(34

Pa. C

ode

Cha

p. 3

01-3

23)

Com

pone

ntC

AS N

o.R

TK L

ist

Dim

ethy

l sul

fide

(DM

S)

75-1

8-3

EN

ote:

E =

Env

iron

men

tal H

aza

rd

Cal

iforn

iaC

alifo

rnia

Pro

p 65

:Th

is p

rodu

ct d

oes

not c

onta

in c

hem

ical

s kn

own

to th

e St

ate

of C

alifo

rnia

to

cau

se c

ance

r, bi

rth d

efec

ts o

r oth

er re

prod

uctiv

e ha

rm.

Sect

ion

16: O

THER

INFO

RM

ATIO

N

Dis

clai

mer

:Th

e in

form

atio

n co

ntai

ned

in th

is d

ocum

ent a

pplie

s to

this

spe

cific

mat

eria

l as

supp

lied.

It m

ay

resp

onsi

bilit

y to

sat

isfy

one

self

as to

the

suita

bilit

y an

d co

mpl

eten

ess

of th

is in

form

atio

n fo

r th

eir

own

part

icul

ar u

se.

Dat

e of

Pre

para

tion

of S

DS:

Oct

ober

18,

201

7Ve

rsio

n:

1.2

GHS

SD

SPr

epar

ed b

y:Ae

gis

Regu

lato

ry In

c.

Phon

e: (5

19) 4

88-0

351

ww

w.a

egis

reg.

com

Page 345: M/s. Kemz Resibond Private Limited
Page 346: M/s. Kemz Resibond Private Limited
Page 347: M/s. Kemz Resibond Private Limited
Page 348: M/s. Kemz Resibond Private Limited
Page 349: M/s. Kemz Resibond Private Limited
Page 350: M/s. Kemz Resibond Private Limited
Page 351: M/s. Kemz Resibond Private Limited
Page 352: M/s. Kemz Resibond Private Limited

He

alt

h

Fir

e

Re

ac

tiv

ity

Pe

rso

na

lP

rote

cti

on

3 0 2 J

Page 353: M/s. Kemz Resibond Private Limited
Page 354: M/s. Kemz Resibond Private Limited
Page 355: M/s. Kemz Resibond Private Limited
Page 356: M/s. Kemz Resibond Private Limited
Page 357: M/s. Kemz Resibond Private Limited
Page 358: M/s. Kemz Resibond Private Limited
Page 359: M/s. Kemz Resibond Private Limited

ANNEXURE-ACONSULTANT’S CERTIFICATE OF

ACCREDITATION (HIGH COURT STAY ORDER)

Page 360: M/s. Kemz Resibond Private Limited

ANNEXURE A

Page 361: M/s. Kemz Resibond Private Limited

ANNEXURE-B

NABL ACCREDITATION CERTIFICATE

Page 362: M/s. Kemz Resibond Private Limited
Page 363: M/s. Kemz Resibond Private Limited
Page 364: M/s. Kemz Resibond Private Limited
Page 365: M/s. Kemz Resibond Private Limited
Page 366: M/s. Kemz Resibond Private Limited
Page 367: M/s. Kemz Resibond Private Limited
Page 368: M/s. Kemz Resibond Private Limited
Page 369: M/s. Kemz Resibond Private Limited
Page 370: M/s. Kemz Resibond Private Limited
Page 371: M/s. Kemz Resibond Private Limited
Page 372: M/s. Kemz Resibond Private Limited
Page 373: M/s. Kemz Resibond Private Limited
Page 374: M/s. Kemz Resibond Private Limited

ANNEXURE-C

EMS ADEQUACY CERTIFICATE

Page 375: M/s. Kemz Resibond Private Limited
Page 376: M/s. Kemz Resibond Private Limited
Page 377: M/s. Kemz Resibond Private Limited
Page 378: M/s. Kemz Resibond Private Limited
Page 379: M/s. Kemz Resibond Private Limited
Page 380: M/s. Kemz Resibond Private Limited
Page 381: M/s. Kemz Resibond Private Limited
Page 382: M/s. Kemz Resibond Private Limited

ANNEXURE-D

UNDERTAKING BY THE EIA CONSULTANT

Page 383: M/s. Kemz Resibond Private Limited
Page 384: M/s. Kemz Resibond Private Limited

ANNEXURE-E

UNDERTAKING BY THE PROJECT PROPONENT

Page 385: M/s. Kemz Resibond Private Limited