Multi-Level Workforce Planningin Call Centers
Arik Senderovich
Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum
Industrial Engineering & Management Technion
January 2013
![Page 2: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/2.jpg)
2
Outline
1. Introduction to Workforce Planning2. Multi-Level Workforce Planning in Call
Centers• Our theoretical framework – MDP • Three Multi-Level Models: Main Results• The Role of Service Networks• Summary of Numerical Results and
comparison to reality
3. Insights into Workforce Planning
![Page 3: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/3.jpg)
3
Workforce Planning Life-cycle
Literature Review: Robbins (2007)
![Page 4: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/4.jpg)
4
Workforce Planning Levels
![Page 5: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/5.jpg)
5
Top-Level Planning• Planning Horizon: Quarters, Years,…• Planning periods: Weeks, Months,…• Control: Recruitment and/or promotions• Parameters:• Turnover rates (assumed uncontrolled)• Demand/Workload/Number of Jobs on an aggregate level• Promotions are sometimes uncontrolled as well (learning)• Costs: Hiring, Wages, Bonuses etc.
• Operational regime is often ignored
Literature Review: Bartholomew (1991)
![Page 6: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/6.jpg)
6
Low-Level Planning• Planning horizon: Months • Planning periods: Events, Hours, Days,….• Control: • Daily staffing (shifts, 9:00-17:00,…) • Operational regime (work scheduling and routing, managing
absenteeism,…)
• Parameters:• Staffing constraints (shift lengths, work regulations,…)• Operational Costs (shifts, extra-hours, outsourcing,…)• Absenteeism (On-job, shift)• Detailed level demand
Literature Review: Dantzig (1954); Miller et al. (1974); Pinedo (2010)
![Page 7: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/7.jpg)
7
Multi-Level Planning• A single dynamic model that accounts for both
planning levels:• Low-Level staffing levels do not exceed aggregate
constraints • Top-Level employed numbers adjusted to meet
demand at low-level time resolution
• Dynamic Evolution:
Literature Review: Abernathy et al., 1973; Bordoloi and Matsuo, 2001; Gans and Zhou, 2002
t t+1
t+2Meet
Demand
Recruit/Promote
![Page 8: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/8.jpg)
8
Workforce Planning in Call Centers
• High varying demand (minutes-hours resolution)• Tradeoff between efficiency and service level• High operational flexibility - dynamic shifts• Low employment flexibility - agents learn several
weeks• Multiple skills (Skills-Based Routing)
Models were validated against real Call Center data
![Page 9: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/9.jpg)
9
• Modeling Workforce Planning in Call Centers via Markov Decision Process (MDP) in the spirit of Gans and Zhou, 2002:
• Control: Recruitment into skill 1 • Uncontrolled: Learning and Turnover• Formal definitions and optimal control
The Theoretical Framework
1 2 m…?
Turnover
Learning
Learning
Turnover
Turnover
![Page 10: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/10.jpg)
17
Applying Three Multi-Level Planning Models
• Validating assumptions and estimating parameters using real Call Center data
• The role of Service Networks in Workforce Planning
• Numerical results – Models vs. Reality
![Page 11: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/11.jpg)
18
Test Case Call Center: An Israeli Bank• Inbound Call Center (80% Inbound calls)•Operates six days a week• Weekdays - 7:00-24:00, 5900 calls/day• Fridays – 7:00-14:00, 1800 calls/day
• Top-Level planning horizon – a quarter• Low-Level planning horizon– a week • Three skill-levels:• Level 1: General Banking• Level 2: Investments• Level 3: Consulting
![Page 12: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/12.jpg)
19
Model1: Base Case Model
Assumptions:• Single agent skill (no learning/promotion)• Deterministic and stationary turnover rate• Recruitment lead-time of one month – Reality• Formulation and Statistical Validation
![Page 13: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/13.jpg)
39
Service Networks in Workforce Planning• During shifts: agents go on breaks, make
outgoing calls (sales, callbacks) and perform miscellaneous tasks• More (half-hour) staffing is required• Israeli bank policy: • Only breaks and some miscellaneous tasks are
recognized • Outgoing calls and other back-office work are
important, but assumed to be postponed to “slow” hours
• Factor of 11% compensation at Top-Level workforce (uniform over all shift-types, daytimes etc.)
• We use Server Networks to analyze agent’s utilization profile
![Page 14: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/14.jpg)
40
Newly hired agentAgent 227, Whole day
October 4th, 2010
![Page 15: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/15.jpg)
41
Old timer
Agent 513, Whole dayOctober 4th, 2010
![Page 16: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/16.jpg)
42
Model1: Theoretical Results
• Theorem 1:• There exists an optimal solution for the equivalent
LPP • The “hire-up-to” target workforce is provided
explicitly (recursive calculation)• The LPP solution minimizes the DPP as well
• Algorithm 1:1. Solve the unconstrained LPP and get b* (target
workforce vector, over the entire planning horizon).
2. Calculate the optimal hiring policy by applying Theorem 1.
3. Hire by the optimal policy for periods t = 1,…,T-1
![Page 17: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/17.jpg)
43
Model1: Top-Down vs. Bottom-Up
![Page 18: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/18.jpg)
44
Model2: Full Model
• Model 1 is extended to include 3 skill-levels• Stationary turnover and learning• Inner recruitment “solves” unattainability
![Page 19: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/19.jpg)
47
Model2: Theoretical Results
• Theorem 2:• There exists an optimal solution for the
equivalent LPP • The “hire-up-to” target workforce is not
explicitly provided (LPP solution is the target workforce)• LPP Solution minimizes the DPP as well
![Page 20: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/20.jpg)
48
Model3: Controlled Promotions
• Both hiring and promotions are controlled (between the three Levels)• The LPP is not necessarily solvable• If the LPP is solvable then its solution is optimal for the DPP as well
![Page 21: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/21.jpg)
49
Numerical Results: Models and Reality
![Page 22: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/22.jpg)
50
Total Workforce
![Page 23: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/23.jpg)
51
Comparing Total Costs
![Page 24: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/24.jpg)
52
Models vs. Reality…
![Page 25: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/25.jpg)
53
Models vs. Reality• Uniformly high service levels (5%-15%
aban. rate)• Absenteeism is accurately estimated
(influences peak-hours with high absenteeism rate)• No overtime assumed – in reality each
person is equivalent to more than one full-time employee• Having all that said – let us observe reality…
![Page 26: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/26.jpg)
54
In reality – growth is gradual
Recruitment in large numbers is usually impossible
![Page 27: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/27.jpg)
55
Insights on Workforce Planning
• A simple model can be of value, so if possible solve it first• Planning Horizons are to be selected: • Long enough to accommodate Top-Level
constraints (hiring, turnover,…) • Short enough for statistical models to be up to
date • Improve estimates through newly updated data
• Workforce planning is a cyclical process: 1. Plan a single quarter (or any planning horizon
where assumptions hold) using data2. Towards the end of planning period update
models using new data (demand modeling, staffing function, turnover, learning, absenteeism…)
![Page 28: Multi-Level Workforce Planning in Call Centers Arik Senderovich Examination on an MSc thesis Supervised by Prof. Avishai Mandelbaum Industrial Engineering](https://reader036.vdocuments.net/reader036/viewer/2022062518/56649e4a5503460f94b3dfa8/html5/thumbnails/28.jpg)
56
The End