Presentation on
TRANSPORTATION IN INDIA - CHALLENGES INFUTURE
By
Prof. S. L. DhingraTransportation Systems Engineering
Civil Engineering Department
Indian Institute of Technology, Bombay
Organised by
Research Scholars Forum
Indian Institute of Technology Bombay
23rd Oct. 2002, Institute Auditorium
-
8/7/2019 mum pune
2/68
Overview
National Highway Development Projects (NHDP)
Pradhan Mantri Gram Sadak Yojana (PMGSY)
Urban Transport Projects
-
8/7/2019 mum pune
3/68
National Highways Development Project (NHDP)
-
8/7/2019 mum pune
4/68
jGolden Quadrilateral - Comprising NHs Connecting
Delhi, Mumbai, Chennai, and Kolkata.
Length - 5,952 Kms
Year of Completion - 2003
jNorth-South & East-West Corridor - Comprising NHsConnecting Srinagar to Kanyakumari and Silchar to
Porbandar.
Length - 7,300 KmsYear of Completion - 2007
Total Estimated Cost = Rs.54,000 Crores (at 1999 Prices)
jGolden Quadrilateral - Comprising NHs Connecting
Delhi, Mumbai, Chennai, and Kolkata.
Length - 5,952 Kms
Year of Completion - 2003
jNorth-South & East-West Corridor - Comprising NHsConnecting Srinagar to Kanyakumari and Silchar to
Porbandar.
Length - 7,300 KmsYear of Completion - 2007
Total Estimated Cost = Rs.54,000 Crores (at 1999 Prices)
-
8/7/2019 mum pune
5/68
Mumbai--Pune Expressway
-
8/7/2019 mum pune
6/68
Mumbai--Pune Expressway Map
-
8/7/2019 mum pune
7/68
-
8/7/2019 mum pune
8/68
-
8/7/2019 mum pune
9/68
Environment Protection
All conditions for environment are followed.
One thousand trees trans planted.
Extensive tree plantation , and median verge
plantation plant. Separate dumping area is acquired for surplus
material.
Separate land is acquired forlabour camp.
Provision of recycling material and used forwork.
Provision for additionallead for transport of
surplus material.
-
8/7/2019 mum pune
10/68
Special item to use surplus rock gabbian, rock
embankment.
Murum from adjoining land and dumping blackcotton soil from road creation of new fertile
agriculture land.
Rain water drainage .
Terracing to quarry area.
Continued
-
8/7/2019 mum pune
11/68
Social Problem
Tendency of villagers to cross expressway, use
of cycles & two wheelers in spite the provision of
cart track & pedestrians crossing
Tendency to overtake wrong side over speeding
Observing no lane discipline
-
8/7/2019 mum pune
12/68
Advantages of the Expressway
Time savings - Mumbai-Pune distance will be coveredin 2 hours as against 4 to 6 hours in the presentsituation
Estimated fuel and other savings to the extent ofRs.500 crores per year
Reduction in environmental pollution due to vehiclesrunning at rated capacity and less fuel consumption
Reduction in Accidents
-
8/7/2019 mum pune
13/68
Reduction in Accidents
Savings in travel time
Saving in fuel
Fast crossing of Khandala Ghat
Economic development through speedy traffic
Reduction in pollution
Continued
-
8/7/2019 mum pune
14/68
-
8/7/2019 mum pune
15/68
Pradhan Mantri Gram Sadak Yojana
Aiming for Rural Transformation
-
8/7/2019 mum pune
16/68
Only 48 % of villages are connected by all-weather roads.
Nearly 50 % of villages lack proper connectivity.
Proper rural road connectivity is a must for development. Why ?
Benefits economic, social, political etc.
Rural people can have easy access to
Trade
Education
Health
Employment
Current Scenario & need for
providing road connectivity: the PMGSY Approach
-
8/7/2019 mum pune
17/68
The Highlights of PMGSY
(Pradhan Mantri Gram Sadak Yojana)
Investment of Rs. 60,000 Crore
Road Connectivity (All-weather roads) Goals:
- villages with population of more than 1000 (by 2003).
- villages with population more than 500 (by 2007).
Nearly 1,00,000 villages to be covered.
Around 30 Crore (300 Million) people would be benefited.
10 Crore (100 Million) people expected to cross poverty line
Hence, there is a need to plan for optimal rural road
networks to achieve the objectives of integrated rural
development.
-
8/7/2019 mum pune
18/68
Urban Transport Projects
-
8/7/2019 mum pune
19/68
Flyovers
Bandra-Worli sea link
Western Freeway link/
Hajiali-Wilson college viaduct
Metro System (TCS Study) Elevated Railway System (by E. Sreedharan)
MUTP II (MRVC Study)
Mass Transit System (by MMRDA)
Thane MRTS
Sky Bus
-
8/7/2019 mum pune
20/68
-
8/7/2019 mum pune
21/68
Mumbai : high traffic density , high traffic
congestion.
Whether we need flyovers?Whether we need flyovers?
Geographical Layout : only N-S flow and very
heavy traffic
Consequent delays - city entry & exit
Necessity of improving speeds on N-S Corridors
Need to quickly reach starting points of proposed
Expressways to Pune, Nashik & Ahmedabad
from city centre
-
8/7/2019 mum pune
22/68
Flyovers on the 3 Main Routes
1. Western Express Highway (WEH)
2. Eastern Express Highway (EEH)
3. Sion-Panvel Express Way
City Central Corridor developed by appropriate flyovers
Elevated Road from J.J. Hospital to Crawford Market
City Western Corridor-Flyovers on SB Marg
Estimated cost is Rs. 1550 crores
Of these 50 flyovers, 29 have been completed.
Project FeaturesProject Features
-
8/7/2019 mum pune
23/68
-
8/7/2019 mum pune
24/68
-
8/7/2019 mum pune
25/68
Air Pollution in Mumbai
Sectorwise distribution of Pollution:Transport 64%
Power 4%Domestic 15%Industrial 17%
Ambient Air Quality at Mahim Junction:
8090 107Nox
2001144 3170SPM
8043 120SO2
Limits(microgm/Nm3)
Observed(microgm/Nm3)
Item
-
8/7/2019 mum pune
26/68
-
8/7/2019 mum pune
27/68
-
8/7/2019 mum pune
28/68
Link connects Western Expressway at MahimLink connects Western Expressway at Mahim
junction to Khan Abdul Gaffar Khan Roadjunction to Khan Abdul Gaffar Khan Road
Bridge length: 4 kmBridge length: 4 km (0.5 main + 3.5 approach bridge)(0.5 main + 3.5 approach bridge)
Solid approach road at Bandra: 1.8 kmSolid approach road at Bandra: 1.8 km (including(including
toll plaza)toll plaza)
CarriagewayCarriageway -- 8 lanes8 lanes
Cable stayed bridge of 500m length on single pylonCable stayed bridge of 500m length on single pylon
Salient Features:Salient Features:
ContCont
-
8/7/2019 mum pune
29/68
Viewers gallery at the top of central pylon atViewers gallery at the top of central pylon at
150m height with access via capsule lift from150m height with access via capsule lift frompile cappile cap
Advanced Traffic control and surveillanceAdvanced Traffic control and surveillance
systemsystem Estimated basic cost: Rs 650 croresEstimated basic cost: Rs 650 crores
Link proposed to be extended to Nariman PointLink proposed to be extended to Nariman Point
A minimum clearance of 20 meters will beA minimum clearance of 20 meters will beprovided for main spans for marine trafficprovided for main spans for marine traffic
-
8/7/2019 mum pune
30/68
Fuel savings worth Rs. 100 crores per annumFuel savings worth Rs. 100 crores per annum
Savings in travel time upto 20Savings in travel time upto 20 -- 30 minutes30 minutes
Reduction in air, noise & sound pollutionReduction in air, noise & sound pollution
Reduction of Nox by 43% & CO by more than 75%Reduction of Nox by 43% & CO by more than 75%No adverse effect on tides, fisheries and livelihood ofNo adverse effect on tides, fisheries and livelihood of
fishermenfishermen
Ease in driving with reduced mental tension andEase in driving with reduced mental tension and
overall improvement in the quality of life.overall improvement in the quality of life.Reduced accidents.Reduced accidents.
Techno Economic FeasibilityTechno Economic Feasibility
-
8/7/2019 mum pune
31/68
Existing Situation: Distance from Lovegrove Jn to Mahim Junction = 7.7 km
Traffic Signals = 23 Nos Travel time:
Morning peak hour = 35 min
Evening peak hour = 38 min
Average Journey Speed = 13 kmph
Savings due to Sea Link Direct Cost savings = Rs 14.11 per car
(fuel, tyre,wear & tear, lubricants,etc) Travel time savings = 29 min per car
Time value @ Rs 100/hr = Rs 48.43 /car
Hence, total savings = Rs 62.59 /car
-
8/7/2019 mum pune
32/68
-
8/7/2019 mum pune
33/68
-
8/7/2019 mum pune
34/68
-
8/7/2019 mum pune
35/68
GPOGPO
sewrisewri
CSTCST
MPTMPT
BandraBandra
WorliWorli
Wadala
WESTERNWESTERN
FREE WAYFREE WAY
SEA LINKSEA LINK
BANDRABANDRAWORLIWORLI
SEA LINKSEA LINK
Hutatma ChowkHutatma Chowk
Gateway of IndiaGateway of India
Senapati Bapat MargSenapati Bapat Marg
Savarkar MargSavarkar Marg
Ambedkar MargAmbedkar Marg
Western railWestern rail
Central railCentral rail
Harbour railHarbour rail
Rafi Ahmed Kidwai MargsRafi Ahmed Kidwai Margs
The Fourth CorridorThe Fourth Corridor
-
8/7/2019 mum pune
36/68
-
8/7/2019 mum pune
37/68
Attributes
Bridge spans to be provided withBridge spans to be provided with adequate verticaladequate vertical
and Horizontal clearanceand Horizontal clearance
EcoEco--friendly Sea linkfriendly Sea link -- no effect on tidal conditionsno effect on tidal conditions
Cable stayed bridges and viaductsCable stayed bridges and viaducts
-- Improve aesthetics of the coastal areaImprove aesthetics of the coastal area
-- No Visual Intrusion from sea shoreNo Visual Intrusion from sea shore
Modern Traffic Surveillance SystemModern Traffic Surveillance System
Minimum land reclamation, only near approachesMinimum land reclamation, only near approaches
-
8/7/2019 mum pune
38/68
Benefits
Vehicular pollution will be reducedVehicular pollution will be reduced
Overall Improvement in environmentOverall Improvement in environment
Reduction in PollutionReduction in Pollution
Reduction in AccidentsReduction in Accidents
Improvement in the existing transport systemImprovement in the existing transport system
and living conditionsand living conditions
Traffic will be dispersedTraffic will be dispersed
-
8/7/2019 mum pune
39/68
-
8/7/2019 mum pune
40/68
To reduce the surface traffic.
To cater to the increase in traffic due to
the emergence of Worli as business andindustrial center.
To decrease the level of pollution.
To reduce the heavy load on local
railways and buses.
Why do we need metro system?
-
8/7/2019 mum pune
41/68
Salient Features:Location (7th corridor) Colaba to Kurla
Length 22.4 Kms
Average number of commuters per 24,20,000day on a weekdays
Travel time 39 min.
Number of intermediate stations 24
Peak hour demand 50,689Drainage will be taken care by sumps and automatic
pumps.
-
8/7/2019 mum pune
42/68
-
8/7/2019 mum pune
43/68
Value and life of assets under major heads or groups
NOTE : N.A. denotes Not Applicable.
Sr.
No.
Major Head or Group Cost
Crores
Life in
Years
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
DPR
Land
Running Tunnels
Other Underground Cavities
Miscellaneous works in
Tunnels
Carshed Works
Cut and Cover construction
Administrative Office
Building
Ballastless Tracks
Residential quarters
Temporary track connection
Power supply
Electrical equipments
S & T equipments
Rolling stock
General charges
Contingencies
50.00
500.00
1177.05
633.77
344.09
114.42
242.60
20.00
46.51
27.00
25.00
89.60
1045.95
366.87
1950.00
554.40
216.22
N.A.
Infinite
100
100
100
50
50
50
15
50
50
40
20
15
30
N.A.
N.A.
Total 7423.48
-
8/7/2019 mum pune
44/68
S. No. Main HeadAmount(Rs. Crores)
1.
2.
3.
4.5.
6.
7.
8.
Preliminary expenses
Land and right of way
Structural engineering works
Power supply and electrical equipmentsSignaling and telecom equipments
(including automatic fare collection and checking
system)
Rolling stock
Total
Add general charges, (supervision and direction) @8.33%
Total
Add contingencies
Total
50.00
500.00
2650.44
1135.55366.87
1950.00
6652.86
554.40
7207.26
216.22
7423.48
Abstract estimate for 7th corridor
-
8/7/2019 mum pune
45/68
MRVCMRVC
-
8/7/2019 mum pune
46/68
Components
Increase in corridors
Longer (12 rake) EMUs
Station area improvement schemes Removal of level crossings
The resettlement and relocation of theproject affected persons and structures
all along Central and Western Railwaycorridors and the Harbour Line
Total cost of the project is 5618.36 crores.
To
-
8/7/2019 mum pune
47/68
To
Kasara
To Karjat/ Khopoli
Kalyan
Diva Jn.
THANE
Kurla
Belapur
Panvel
To Karjat
To Roha
Virar
Andheri
Santacru
z
DADAR
BANDRA
Mumba
i
Central
Churchgate
Mumbai CST
To Dahanu
Rd.
Turbhe
CENTRAL RAILWAY
LOCAL LINE
THROUGH LINE
HARBOUR LINE
OTHER LINES
WESTERN RAILWAY
LOCAL LINE
THROUGH LINE
5TH LINE
Vasai
Rd.
Wadala Rd.
Borivali
Vashi Nerul
Uran
Mumbai Suburban System MapMumbai Suburban System Map
-
8/7/2019 mum pune
48/68
Benefits
Increase in capacity by about 35%
Higher frequency of train services duringpeak hours
Reduction in journey time
Improvement in the flow of passengers andvehicles in and selected stations
Rail ProjectRail Project
Cont
Cont
-
8/7/2019 mum pune
49/68
NonNon--Rail ProjectsRail Projects
Reduction in traffic congestion, increase invehicular speeds and reduction in delays
Increased carrying capacity for bus usersSafe and smooth flow of vehicular and
pedestrian traffic
Minimizing delays and accidents
Improved environment through reduction inair pollution
-
8/7/2019 mum pune
50/68
Comparison between different modes of transport
In terms of land usage railway is 24 times moreefficient than road.
Railway transport are 6 times more energy
efficient than road transport.
Bus travel is 5 times more costlier than
railways.
Road traffic is a major source of air pollution
and noise pollution.Bus takes about 50% more time during peak
hours as compared to rail.
-
8/7/2019 mum pune
51/68
-
8/7/2019 mum pune
52/68
MMRDAMMRDA
-
8/7/2019 mum pune
53/68
MTS Alignment C
C1 CST to Mahalaxmi
C2 Mahalaxmi to Bandra
C3 Bandra to Andheri station
C4 Andheri to Charkop village
C5 Andheri station to Ghatkopar
C6 Mulund to Sahar Airport
Alignment C is split into following 6 sectionsAlignment C is split into following 6 sections
-
8/7/2019 mum pune
54/68
-
8/7/2019 mum pune
55/68
Salient Features
Maximum link flow is 51,000 per direction
per hour.
Network length is 57 km.
Elevated section 45 km
Underground section 12 km
Total cost is Rs 118,885 million.
-
8/7/2019 mum pune
56/68
Andheri-Ghatkopar Alignment
LengthLength -- 9 km9 km
Elevated sectionElevated section -- 8.1 km8.1 km
Underground sectionUnderground section 0.9 km0.9 km
Investment costInvestment cost -- Rs. 820 croresRs. 820 crores
Operating costOperating cost -- Rs. 31 croresRs. 31 crores
Peak hour ridership passengersPeak hour ridership passengers 40,00040,000
Investment cost Rs. Per pass kmInvestment cost Rs. Per pass km 40,09140,091
Output passOutput pass--km per million Rupeeskm per million Rupees 24.9424.94
Economic internal rate of returnEconomic internal rate of return 11.14%11.14%
-
8/7/2019 mum pune
57/68
-
8/7/2019 mum pune
58/68
Thane is one of the fastest growing cities. Thecity, spread over an area of 128 sq.km. has apopulation of 15.5 lakhs.
High travel demand.
Population doubling every decade.
City expected to hit 30 lakhs by 2031.
Development has increased the traffictremendously.
Need:Need:
-
8/7/2019 mum pune
59/68
An MRTS that is.
ConvenientConvenient
ComfortableComfortable
FastFast
Environment friendly duringEnvironment friendly during
construction and operationconstruction and operation
-
8/7/2019 mum pune
60/68
Existing Traffic Scenario
T
raffic Volumes at entry/ exit toT
hane City LBS Marg - 31758 PCUs
Eastern Expressway - 53481 PCUs
Modal Split in Thane
IPT
Car
Bus
2-WCycle
Bus & IPT together cater to about 65% trips
(30.46 %)(33.28 %)
(12.75 %)(8.15 %) (15.36 %)
-
8/7/2019 mum pune
61/68
-
8/7/2019 mum pune
62/68
30m wide circular MRTS corridor proposed through major
work and industrial area
Total Route Length - 21 kmElevated - 12.25 kmSurface Level - 8.75 km
Total stations - Eleven (11)On ground - 8Elevated Stations - 3
Estimated Project Cost: Rs 1000 crores
Modern Traffic Management & Surveillance Systems
Environmentally better system
-
8/7/2019 mum pune
63/68
-
8/7/2019 mum pune
64/68
Cross-sectional view of Sky Bus
-
8/7/2019 mum pune
65/68
Salient Features of Sky BusSalient Features of Sky Bus
Maximum traffic carrying capacity: 15000 pphpd
can be upgraded to 30000 pphpd.
Dimension of Sky Bus (L*W*H): 8*2.8*2.4Capacity of Sky Bus: 250 passenger
Maximum permissible speed: 100 Kmph
Acceleration: 1.3 m/sec2
Minimum clearance above road level: 6 meters
-
8/7/2019 mum pune
66/68
Proposed route of Sky Bus
-
8/7/2019 mum pune
67/68
Meeting the demand
Reducing the demand
East west corridors
Worli area Rail connection
Colaba area Rail connection
Churchgate-CST connection Integration of these systems to meet the total
travel demand
To Summarize
-