MUNDRA PORT
![Page 2: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/2.jpg)
CONTENTSINTRODUCTION HISTORYMANAGEMENT TEAMMODE OF CONNECTIVITYTERMINAL INFRASTRUCTUREEQUIPMENTSBERTH & WHARFACHIEVEMENTS
![Page 3: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/3.jpg)
INTRODUCTION Mundra Port is located in the north of Gulf of
Kutch, Gujarat.Draft ranges from 15 to 32 meters.It has 8 multipurpose berths.It is capable of handling Super Post Panamax and
Capesize.Port has SPM which is capable of handling VLCCs
and ULCCs.It Exports Clinker, Salt, Automobile, Container etc. Imports are Coal, Iron Ore, Mineral, Containers,
Fertilizer, etc.
![Page 4: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/4.jpg)
HISTORYThe Adani Group was founded in the year
1988 under the leadership of Gautam Adani.Company was incorporated as Gujarat Adani Port
Limited May 26, 1998.The name of Company was changed to Mundra
Port on July 7, 2006.It is one of the largest privately managed port in
India, promoted by Adani Group.
![Page 5: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/5.jpg)
Management team
Chief Executive Officer Ramji Krishnan
Head- Operations Jibu K. Itty
Head - Engineering Services Anil Deshpande
![Page 6: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/6.jpg)
Head- marketing & CFS Chetan Shah
Head - Information Technology Ravindra Nyamati
Head - Finance Rajesh Samdani
![Page 7: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/7.jpg)
Head - HR & Admin Renold Pinto
Head - QHSE&Training Capt. Jitendra Verma
![Page 8: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/8.jpg)
Mode of ConnectivityRail Connectivity.Road connectivity.Air Connectivity.Pipeline connectivity.
![Page 9: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/9.jpg)
Rail ConnectivityIt has 117 km rail way line.5 locomotives, 9 sidings for general cargo, 3
sidings for containers, 3 sidings for agri commodities, 5 sidings for coal and lines available for handling black and white oil.
Home
![Page 10: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/10.jpg)
Road ConnectivityIt is connected to National & State Highway.It also has 70 km of arterial and sub arterial
network.
Home
![Page 11: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/11.jpg)
Air Connectivity The nearest commercial airports to Mundra
SEZ are at Bhuj (65 km) and Kandla (60 km). There is also a plan to upgrade this facility to
an international Air Cargo Hub.
Home
![Page 12: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/12.jpg)
Pipeline ConnectivityAdani Mundra Port is a port of choice for
crude and other liquid cargo bound for the northern hinterland.
Pipelines have been laid to Bhatinda.
Home
![Page 13: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/13.jpg)
Terminal infrastructure
Capacity Reefer pointsTotal terminal areaYard stacking areaTrailer parking
On site Rail tracks
1100000 TEUs332 live plug points 37 hectors24 hectorsN.A.( direct handling, no
parking required)03 tracks, handling
capacity per track 3 trains / Day
![Page 14: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/14.jpg)
Equipments
Quayside Cranes (6 Nos.)Yard side Equipment : Rubber Tyred Gantry Reach stackers Empty Handlers Forklifts
![Page 15: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/15.jpg)
Berth & wharf
Berth Length : 632 meters, 8 berths.Depth Alongside: 14.5 meters ( Amended on
monthly basis )Height (ISLW to Top of Cope): 8.5 metersBollards: Total 33 bollards, Bollard No. 1 having
300 Ton and 2 to 33 having 150 Ton capacity.Swinging Basin: 600 meters diameterChannel Length: 1835 meters (Buoyed channel
entrance to end of MICT)Channel Depth: 14.5 meters
![Page 16: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/16.jpg)
Achievements05 OCTOBER, 2010 MICT achieved ISO
28000:2007 certification for Supply Chain Security Management System.
01 OCTOBER, 2010 Finalist in PORT OF THE YEAR AWARDS 2007 by LLOYDS LIST.
11 SEPTEMBER, 2010 BEST CONTAINER CARGO SEA PORT 2007 award by GUJARAT LOGISTICS & ECONOMIC TIMES.
![Page 17: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/17.jpg)
PRESENTED BY-
![Page 18: mundra port](https://reader033.vdocuments.net/reader033/viewer/2022061618/555c91fdd8b42a85758b4b4c/html5/thumbnails/18.jpg)