mutr hv optimization
DESCRIPTION
MuTr HV Optimization. RIKEN/RBRC Itaru Nakagawa. Goal. Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%. Gain can be similar to chambers, but noise distributions are unique from chamber to chamber. - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/1.jpg)
1
MuTr HV Optimization
RIKEN/RBRCItaru Nakagawa
![Page 2: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/2.jpg)
2
Goal
• Find out HV to achieve Noise RMS/MIP peak (N/S) = 1%.
• Gain can be similar to chambers, but noise distributions are unique from chamber to chamber.
• Historically MuTR has been operated with only three HV settings (St1=1875V, St2=1900V, St3=1925V)
• Vary HV channel by channel basis to set N/S ~ 1%.
![Page 3: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/3.jpg)
3
Cosmic Data TakingHV Setting # Triggers
-30 V 2M
Nominal (St1:1875V, St2:1900V, St3:1925V) 3M
+15V 3M+30V 3M+50V 3M
•Dedicated Measurements : Dec.23 ~ Jan. 11•MuIDLL1 N1D||S1D trigger : 60Hz ~ 120Hz •Work area: phnxmutr@va020:/data2/SubSystems/phnxmutr/itaru/MipAna•README for instruction
Event Selection:1. Peak Strip ADC of Cluster. 2. No track required.
![Page 4: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/4.jpg)
4
North Arm
![Page 5: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/5.jpg)
5
Station-1Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2 Gap-3
![Page 6: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/6.jpg)
6
Station-2Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2 Gap-3
![Page 7: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/7.jpg)
7
Station-3Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2
![Page 8: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/8.jpg)
8
MIP Peak Positions @ Nominal HV
oct1oct2 oct3 oct4 oct5 oct6 oct7 oct8
gap1gap2 gap3
St-1
St-2
St-3
![Page 9: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/9.jpg)
9
Pedestal RMS (North Station-1)
![Page 10: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/10.jpg)
10
Plane Averaged Pedestal RMS [ch]
oct1oct2 oct3 oct4 oct5 oct6 oct7 oct8St-1
St-2
St-3
![Page 11: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/11.jpg)
11
Noise RMS/MIP Peak @ Nominal HV
St-1
St-2
St-3
![Page 12: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/12.jpg)
12
N/S .vs Operation Voltage
Noise RMS / MIP Peak ADC [%]
St-1
St-2
St-3
Nom
inal
+ A
dditi
onal
Vol
tage
[V]
Linear Fit
nominal+15V
+30V+50V
-30V N/S : 2% -> 1% Needs additional 110V
![Page 13: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/13.jpg)
13
N/S~1% Required Voltage : Nominal + ?V
St-1
St-2
St-3
+50V limit
St-2, St-3 planes are averagedover common HV chain
![Page 14: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/14.jpg)
14
South Arm
![Page 15: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/15.jpg)
15
Station-1Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2 Gap-3
![Page 16: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/16.jpg)
16
Station-2Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2 Gap-3
![Page 17: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/17.jpg)
17
Station-3Oct.1
Oct.2
Oct.3
Oct.4
Oct.5
Oct.6
Oct.7
Oct.8
Gap-1 Gap-2
![Page 18: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/18.jpg)
18
MIP Peak Positions @ Nominal HV
oct1oct2 oct3 oct4 oct5 oct6 oct7 oct8
gap1gap2 gap3
St-1
St-2
St-3
![Page 19: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/19.jpg)
19
Plane Averaged Pedestal RMS
oct1oct2 oct3 oct4 oct5 oct6 oct7 oct8St-1
St-2
St-3
![Page 20: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/20.jpg)
20
Noise RMS/MIP Peak @ Nominal HV
St-1
St-2
St-3
![Page 21: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/21.jpg)
21
N/S .vs Operation Voltage
Noise RMS / MIP Peak ADC [%]
St-1
St-2
St-3
Nom
inal
+ A
dditi
onal
Vol
tage
[V]
Linear Fitnominal
+15V+30V+50V
-30V
![Page 22: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/22.jpg)
22
N/S~1% Suggested Voltage : Nominal + ?V
St-1
St-2
St-3
![Page 23: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/23.jpg)
23
HV Configuration File
phoncs@va011:~/hv_stuff/hvcontrol_MutrN(S)
Copy & paste
![Page 24: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/24.jpg)
24
Study From Run9
Run09 Run11
Data Beam Cosmic
HV Scan Nominal, +25V, +50V -30V, Nominal, +15V, +30V, +50VN/S 1.5% 1.0%
![Page 25: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/25.jpg)
25
HV Set to be N/S ~ 1.5% (North)
![Page 26: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/26.jpg)
26
Cosmic vs Beam (Absolute)
![Page 27: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/27.jpg)
27
SN vs HV (North)
nominal
+25V
+50V
![Page 28: MuTr HV Optimization](https://reader036.vdocuments.net/reader036/viewer/2022062719/56813240550346895d98afc6/html5/thumbnails/28.jpg)
28
Conclusion
• MuTr Gain .vs HV were evaluated using HV scan data with cosmic
• HVs are optimized to set N/S to be 1%.• New HV will be configured soon.• Will confirm N/S really comes as it desired
with further data taking.• Need to confirm with beam data as well.