mwrd am presentation 9-30-2016

45
2006 R&D SEMINAR SERIES WELCOME TO THE SEPTEMBER EDITION OF THE 2016 M&R SEMINAR SERIES

Upload: others

Post on 14-Jan-2022

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MWRD AM Presentation 9-30-2016

2006 R&D SEMINAR SERIES

WELCOMETO THE SEPTEMBER EDITION

OF THE 2016 M&R SEMINAR SERIES

Page 2: MWRD AM Presentation 9-30-2016

BEFORE WE BEGIN∗ SAFETY PRECAUTIONS PLEASE FOLLOW EXIT SIGN IN CASE OF EMERGENCY EVALUATION AUTOMATED EXTERNAL DEFIBRILLATOR (AED) LOCATED OUTSIDE

∗ PLEASE SILENCE CELL PHONES OR SMART PHONES

∗ QUESTION AND ANSWER SESSION WILL FOLLOW PRESENTATION

∗ PLEASE FILL EVALUATION FORM

∗ SEMINAR SLIDES WILL BE POSTED ON MWRD WEBSITE (www. MWRD.org: Home Page ⇒ Reports ⇒ M&R Data and Reports ⇒ M&R Seminar Series ⇒ 2016 Seminar Series)

∗ STREAM VIDEO WILL BE AVAILABLE ON MWRD WEBSITE (www.MWRD.org: Home Page ⇒ MWRDGC RSS Feeds)

Page 3: MWRD AM Presentation 9-30-2016

Gregory Hottinger, P.E.Current: Asset Management Program Director, for the Milwaukee Metropolitan

Sewerage District (MMSD), Milwaukee, WI

Experience: Worked the last 11 years for the MMSD with positions in project management, construction management and for the last 4+ years as the Asset Management Program Director. Prior to joining the MMSD , worked for a light gauge steel manufacturer, several consulting firms and the MWRDGC. My early career focused on structural design in the power, industrial and wastewater industries.

Education: Bachelor of science in Civil Engineering from the University of Wisconsin – Milwaukee

Professional: Professional engineer registered in the State of WisconsinMember of the American Society of Civil Engineers and Member of the Institute of Asset Management.

Page 4: MWRD AM Presentation 9-30-2016

Asset Management at Milwaukee Metropolitan Sewerage District

(MMSD)

Greg Hottinger, P.E. - MMSDAsset Management Program Director

Page 5: MWRD AM Presentation 9-30-2016

Asset Management

ISO 55000 Definition :

“coordinated activity of an organization to realize value from assets”

5

Page 6: MWRD AM Presentation 9-30-2016

1.1 Million Population411 Square Miles 28 CommunitiesPossible Extension –

Raymond & Caledonia

MMSD Planning Area

6

Page 7: MWRD AM Presentation 9-30-2016

Water Reclamation

Facilities

Conveyance & Storage

Watercourse & Flood

Management

Green Infrastructure

Administrative Facilities

MMSD Asset Systems

7

Page 8: MWRD AM Presentation 9-30-2016

Jones Island & South Shore WRF 575 MGD Daily Max Flow Interplant Solids Pipeline 11 mile pipeline for biosolids

transferMilorganite Processing 130 tons/day

Water Reclamation Facilities & Biosolids Handling

8

Page 9: MWRD AM Presentation 9-30-2016

Approx. 300 miles of interceptor sewer 6% combined, 94% separate 8 inch to 150 inch

Inline Storage System (“Deep Tunnel”) 32 miles 17 ft to 32 ft diameter 521 MG storage

Conveyance & Storage System

9

Page 10: MWRD AM Presentation 9-30-2016

Flood management for approx. 129 miles of waterwaysSix watersheds350 acres of land

Watercourse & Flood Management

10

Page 11: MWRD AM Presentation 9-30-2016

10 – 15 year easements 21.5 MG of rainfall capture capacity

– Since 2002Goal – 740 MG

Green Infrastructure

11

Page 12: MWRD AM Presentation 9-30-2016

MMSD HQ & LabWRF Administrative

Buildings Other Admin. Buildings 13th & College 25th & Canal KK & Milwaukee River

Flushing Stations

Administrative Facilities

12

Page 13: MWRD AM Presentation 9-30-2016

•Stipulation w/WDNR requires CMOM Program2002

•CMOM Gap Analysis completed2005

•AM started as part of CMOM program2007

Asset Management Driver

13

Page 14: MWRD AM Presentation 9-30-2016

Early Years (2007-2012)

Conveyance Focused

Limited Staff

Limited Scope

14

Page 15: MWRD AM Presentation 9-30-2016

Conveyance Information

GIS System Sewer Inspections15

Page 16: MWRD AM Presentation 9-30-2016

Process & Technology

Root Cause Analysis

Asset Database System 16

Page 17: MWRD AM Presentation 9-30-2016

Staff understanding

Connection to organization’s goals

Authority to make changes

Clear tasks, timelines, resources

Early Challenges

17

Page 18: MWRD AM Presentation 9-30-2016

Goals Tasks Resources

2013 - Re-evaluate Program

18

Page 19: MWRD AM Presentation 9-30-2016

Tool Comparison to water/wastewater AM best

practices 150 questions – 7 core elements

MMSD Process Interviewed 35 people (Cross Divisional) Summarized results – one analysis

WERF SAM-GAP Analysis

19

Page 20: MWRD AM Presentation 9-30-2016

SAM-GAP ResultsQuality Elements Weighted Gap Rank

AM Plans (AMP) 44 1

People Issues (People) 29 2

Organizational Issues (Org) 19 3

Information Systems (Info Sys) 16 4

Data and Knowledge (D&K) 16 4

Process and Practices (P&P) 15 5

Service Delivery (Service Del) 10 6

20

Page 21: MWRD AM Presentation 9-30-2016

Implementation StrategyProgram Structure/Steering

CommitteeCommission PolicyAsset Management Plans (AMP’s) –

Facilities Plan

GAP Analysis - Action Items

21

Page 22: MWRD AM Presentation 9-30-2016

Implementation Strategy

Task List Staffing Forecast

1

1

1

1

1

1

1

2

3

4

1

1

1

2

2

0 2 4 6 8

2014

2015

2016

2017

2018

Total AM Staff

Year

Program Director

Analyst

DatabaseCoordinator

22

Page 23: MWRD AM Presentation 9-30-2016

StrategicCommission/Steering

Committee– Org. Goals/AM Comm. Policy

TacticalAM Teams– KPI’s/AM

Strategy/AMP’s

OperationalBusiness Units – PI’s/SOP’s

Program Structure

23

Page 24: MWRD AM Presentation 9-30-2016

Executive Director

Finance

Engineering

PlanningOperations & Maintenance

Water Quality

Information Technology

Steering Committee

24

Page 25: MWRD AM Presentation 9-30-2016

Program guidanceReview and approve high-level

documentsApprove AM staffing

recommendationsQuarterly meetings

Steering Committee - Duties

25

Page 26: MWRD AM Presentation 9-30-2016

Asset Management can be defined as a management strategy developed to achieve the following objectives:∗ Utilize assets to provide defined levels of service∗ Maintain a level of risk acceptable to the

organization∗ Achieve service level and risk objectives at the

lowest life cycle cost

Commission Policy

26

Page 27: MWRD AM Presentation 9-30-2016

Answer the following questions: What is my required level of service? What is the current state of my assets? Which assets are critical to sustained

performance? What are my best operations, maintenance

and capital improvement program investment strategies?

Asset Management Plans (AMPs)

27

Page 28: MWRD AM Presentation 9-30-2016

1. Levels of Service (LOS)2. Future Demand3. Assessment of Existing Facilities4. Business Risk Assessment5. Risk Management Strategies6. Optimized Plan7. Financial Summary8. Plan Improvement and Monitoring

Facilities Plan - Asset Management Basis

28

Page 29: MWRD AM Presentation 9-30-2016

Permit/Legal Energy Environmental Improvements

Customer Service Safety

Financial Management Effectiveness

Level of Service Categories

29

Environmental

Social

Economic

Page 30: MWRD AM Presentation 9-30-2016

Permit/Legal –SSO events/year

Energy - % of energy from renewable

sources

Environmental Improvements –Total GI capacity

installed (MG)

Customer Service – Odor

complaints/year

Safety – # of buildings in 1%

probability floodplain

Financial – Annual tax levy increase

Management Effectiveness –AMP’s updated

annually

Level of Service - Metrics

30

Environmental

Social

Economic

Page 31: MWRD AM Presentation 9-30-2016

RisksCondition

Capacity Performance

Cost

Assess Facilities

31

Page 32: MWRD AM Presentation 9-30-2016

RISK = LIKELIHOOD OF FAILURE X CONSEQUENCE OF FAILURE

Risk Based

Consequence

Like

lihoo

d

Very Low Very High

Very HighHigh

Moderate

Low

Minimal

Very Low 32

Page 33: MWRD AM Presentation 9-30-2016

Focus on highest risks Perform Business Case Evaluation (BCE) Alternatives include: Rehabilitation Replacement Operational Change Revised Maintenance Program/Policy

Evaluate Risks & Identify Alternatives

33

Page 34: MWRD AM Presentation 9-30-2016

Prioritize Investments

34

Page 35: MWRD AM Presentation 9-30-2016

Capital Budget Forecast

35

Page 36: MWRD AM Presentation 9-30-2016

Long Range Rehab/Replace Costs

36

Conveyance Pipe Replacement Forecast

Cost

Estimated Rehab/Replace Year

Page 37: MWRD AM Presentation 9-30-2016

I/I Reduction (PPII)

Stormwater / Flood Management

Green Infrastructure

Conveyance

ISS/WRF

Integrated Water Management – Long Term Thinking

37

Page 38: MWRD AM Presentation 9-30-2016

Holistic Approach

∗ What mix of management strategies is most cost effective at reducing risk and meeting LOS goals?

GI

Storm Water/ Flood

Management

Conveyance Capacity

PPII

ISS/WRF

38

Page 39: MWRD AM Presentation 9-30-2016

Information - how can staff access & use it?

39

Web-based asset database

Page 40: MWRD AM Presentation 9-30-2016

AMP - SUBSYSTEM DASHBOARD

40

Page 41: MWRD AM Presentation 9-30-2016

Conveyance – Interactive Mapping

41

Page 42: MWRD AM Presentation 9-30-2016

WRF’s – Lidar Scans, Building Information Modeling (BIM)

42

Page 43: MWRD AM Presentation 9-30-2016

Improved communication Access to information – break-down silos Risk based decision making tied to org. goals Improved information to support financial

planning Consistent, repeatable process developed for

continuous improvement Line of sight – staff knowledge promotes

ownership

Benefits of AM

43

Page 44: MWRD AM Presentation 9-30-2016

Take approach of how can I help you – build bridges Cultural change takes time Never too soon to get started - It will never be

perfect Data clean-up is labor intensive

Lessons Learned

44

Page 45: MWRD AM Presentation 9-30-2016

45

QUESTIONS?