n figure a13.1...figure a13.1.7a dmrb stage 3 eiar modelled fluvial flood depth impact map with...
TRANSCRIPT
D
D
D
D
D
D
D
D
SWF04 (Sc reta n Burn)
SWF03 (Beec hwood Burn) SWF05
SWF04 (Sc reta n Burn)
SWF02 (Inshes Burn)
SWF10 (Tower Burn)
SWF09
SWF08 (Ca irnla w Burn)
SWF02 (Inshes Burn)
SWF04 (Sc reta n Burn)
C08
SWF07
SWF06
SWF01 (Mill Burn)
SWF08 (Ca irnla w Burn)
SWF11
SWF12
C09
C04
C07
C03
C02
C05
C06
C01C10
SWF02 (Inshes Burn)
Cra d leha ll Business Park
SWF05
SWF03 (Beec hwood Burn)
A9
INV ERNESS
HIGHL AND MAIN
L INE RAIL WAY
SMITHTON
CU L L ODEN
A96
INSHES
INV ERNESS CAMPU S
ABERDEEN TO INV ERNESSRAIL WAY L INE
MORAY FIRTH
CRADL EHAL L
RESAU RIE
STRATTON
C1032 BARN CHU RCH ROAD
B9006 CU L L ODENROAD
RAIGMOREINTERCHANGE
U 1124 CAU L FIEL DROAD
INV ERNESS RETAILAND BU SINESS PARK
U 1058 CAU L FIEL DROAD NORTH
A
?
N
© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres
Figure A13.1.7a
L egend
A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing
D SuDS Outfall LocationsMod elled Flood L evel Differenc e (m )d uring the 0.5% AEP (200-year) p lus CCevent
> -0.1 Major Beneficial-0.1 to -0.05 Moderate Beneficial-0.05 to -0.01 Minor Beneficial-0.01 to 0.01 Negligible0.01 to 0.05 Minor Adverse0.05 to 0.1 Moderate Adverse> 0.1 Major Adverse
Client
ProjectA9/A96 Inshes to Sm ithton
95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000
www.jacobs.com
Rev
Drawing title
Scale
Drawing number
Jacobs No.DO NOT SCAL E@ A3
© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.
B2103501BIM No.
Figure A13.1.7a
DMRB Sta ge 3 EIARMod elled Fluvia l Flood Dep th Im p a c t Ma pwith Prop osed Sc hem e (With Mitigation)
C00
Drawing Status A – APPROV ED AS STAGE COMPL ETESheet 1 of 4
1:12,500
Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/DwnDGCKLEIAR Publication MUC00 SEPT 2019 CS
A9-A96IS-JAC-EGN-XXX-FG-EN-1339
Proposed Scheme(DMRB Stage 3 design)
Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.