nasa's facilities program€¦ · • 16 foot transonic wind tunnel, larc (2011) • 2x2 foot...

16
NASA’s Facilities Program Scott Robinson, P.E. National Aeronautics and Space Administration January 9, 2013

Upload: others

Post on 20-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

NASA’s Facilities Program

Scott Robinson, P.E.National Aeronautics and Space Administration

January 9, 2013

Page 2: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

What has NASA Been Up To?

2

Page 3: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

NASA Facilities• NASA Manages:

• 10 Centers and 3 component sites within the US

• 4900 Buildings & Other Complex Structures

• 48 million SF• Over 329,000 Acres

Curiosity Rover

Sugar Volt Hybrid Propulsion Aircraft

International Space Station3

Page 4: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

4

NASA Sites

Ames ResearchCenterMountain View, CA

Dryden Flight Research CenterEdwards, CA

Jet Propulsion LaboratoryPasadena, CA

Johnson Space CenterHouston, TX

Stennis Space CenterStennis, MS

Marshall Space Flight CenterHuntsville, AL

Glenn Research CenterCleveland, OH

Kennedy Space CenterCape Canaveral, FL

NASA HeadquartersWashington, DC

Goddard SpaceFlight CenterGreenbelt, MD

Other NASA sites:Deep Space Network(Madrid, Australia, Other miscellaneous sites)

Michoud Assembly FacilityNew Orleans, LA

White Sands Test FacilityWhite Sands, NM

Wallops Flight FacilityChincoteague, VA

Langley Research CenterHampton, VA

Page 5: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

NASA’s Facilities Strategy

• Renew NASA’s facilities over a 40 year period• Support core technical capabilities• Support missions in a smaller, more flexible environment

• Reduce environmental impact from facilities (construction and operations)

• Reduce operating costs

5

Page 6: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Start with Master Plans

6

BEFORE

AFTER

New Rehab

Langley Research Center “Vital” Concept

Page 7: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Establish 5 Year PlansCenter Example Projects

Ames Revitalize ARMSEF, Consolidated Laboratory

Dryden Replace Maintenance Facility, Repair Research Aircraft Integration Facility

Goddard Launch Command Center, Replace Space Instrument Development Facility

Glenn Replace Operations Support Building, Replace Research Offices, Repair Utilities at Space Integrated Environmental Test Facility

Jet Propulsion Lab

Consolidated Data Center, Flight Electronics Integration Facility

Johnson Replace Life Sciences Building

Kennedy Replace Central Office Building, Consolidated Data Center

Langley Consolidated Lab Facility

Marshal Revitalize Steam Distribution System, Replace Central Office Building

Stennis Replace High Pressure Industrial Water System, Replace Sanitary Sewer System, Replace Test Stand Control Center

http://www.nasa.gov/news/budget/index.html7

Page 8: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

8

NASA Construction Program

• Institutional Construction– Repair of existing roads, utility systems, airstrips, etc.

• Demolition– Demolition of un‐needed facilities

• Recapitalization– Replacement of failing infrastructure

• Direct Program Support Construction– Construction that directly supports technical requirements for space operations or research programs

The Program has 4 Major Components:

Approximately $360 million + program support

Page 9: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Institutional Construction• Major repairs of existing infrastructure

• Roads• Distribution systems• Fire protection• Building repairs

• Risk reduction

Hydrogen Pumps, SSC

Liquid Nitrogen System, JPL

HV Transformers, ARCLarge Altitude Simulation System, WSTF

9

Page 10: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Sustainable Demolition

10

F1 Engine Test Stand, MSFC

Page 11: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Sustainable Demolition• Maximize recycling• Maximize waste diversion• Minimize site impact• Save money

16 ft Wind Tunnel, LaRC Power House, Plum Brook Station

Wind Tunnel, ARC

11

Page 12: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Fiscal Year Buildings and Structures Demolished

Buildings and Structures Disposed of by Transfer or Other 

Means

Total Buildings and Structures Disposed

FY 10 80 34 114

FY 11 62 10 72

FY 12 49 48 97

Total 191 92 283

12

Sustainable Demolition

Example Facilities Demolished:

• Nuclear Reactor, PBS (2012)• Vertical Processing Facility, KSC (2010)• 16 Foot Transonic wind Tunnel, LaRC (2011)• 2x2 Foot Transonic Wind Tunnel, ARC (2011)• B1 & B3 Test Stands, PBS, (2011)

• 14 Foot Transonic Wind Tunnel, ARC (2009)• Propulsion Structures Lab, GRC, (2009)• 30x60 Foot Wind Tunnel, LaRC (2012)• Building 2 Research Lab, GSFC (2012)• Building 111 Test Facility, MAF (2010)

Page 13: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Recapitalization• Replaces NASA failing infrastructure and key facilities 

• Modernizes • Consolidates • Improves efficiency

• 30 sustainable buildings with nearly 1.7 million SF of sustainable space•1 Net Zero Energy Facility• In 2013 NASA will add twelve buildings to its sustainable inventory; adding 800,000 SF of sustainable space.

Exploration Science Building, GSFC

Consolidated Office Building, JSC

13

“New Town” Office Building, LaRC

Propellants North, Net Zero Energy Facility, KSC

Collaborative Support Facility, ARC

Page 14: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Direct Program Support

Modernizing the Space Communication System

• Providing capabilities in direct support of programs• Multi‐purpose Crew Vehicle• Space Launch System• Commercial Space Launch Systems• James Webb Space Telescope• Deep Space Network

Launch Complex 39B, KSCHorizontal Integration Facility, Wallops Island

Hydro Impact Basin, LaRC14

Page 15: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot

Unique Projects and Initiatives

15

• Commercial Space Launch Act• Enhanced Use Lease• Using science to inform facilities work

Dragon Launch, KSC

Solar Power Partnership FPL & KSC

Earth Science Modeling of Climate Change

Page 16: NASA's Facilities Program€¦ · • 16 Foot Transonic wind Tunnel, LaRC (2011) • 2x2 Foot Transonic Wind Tunnel, ARC (2011) • B1 & B3 Test Stands, PBS, (2011) • 14 Foot