national departments infrastructure annexure number ...ec - no department name provided f13 nc -...

142
Infrastructure Annexure Number National Dept. of Public Works F1 Environment Annexure Number Dept of Environmental Affairs (DEA) F2 Dept of Water Affairs & Forestry (DWAF) F99 Dept of Public Works (DPW) F3 Dept of Agriculture (DoA) F4 Dept of Tourism (NDT) F5 Community Works Sector (DCoG) Annexure Number Dept of Cooperative Governance F6 Infrastructure Annexure Number EC - Dept. of Roads & Public Works F7 EC - Dept of Transport F8 EC - Dept. of Health F9 EC - Dept. of Education F10 EC - Dept of Economic Affairs F11 EC - Dept of Social Development F12 EC - No Department Name Provided F13 NC - Dept. of Transport, Road & Public Works F14 WC - Dept. of Public Works, Road & Transport F15 FS - Dept. of Police, Roads & Transport F16 FS - Dept. of Provincial and Local Government (DPLG) F17 FS - Dept. of Education F18 FS - Dept. of Tourism, Environmental and Economic Affairs F19 FS - No Dept. Name Provided F20 FS - Dept. of Local Government & Housing F21 FS - Dept. of Sports, Recreation, Arts & Culture F22 FS - Dept. of Public Works and Rural Development F23 FS - Dept. of Agriculture F24 FS - Dept. of Health F25 FS - Provincial Treasury F26 FS - Dept. of Public Safety,Security and Liason F27 MP - Dept. of Transport & Roads F28 GP - Dept. of Public Transport, Roads and Works (DPTRW) F29 GP - Dept. of Housing F30 LP - Dept. of Local Gov & Housing F31 LP - Dept. of Health and Social Development F32 KN - Dept. of Public Works F33 KN - Dept. of Education F34 KN - Dept. of Health F35 KN - Dept. of Transport F36 NW - Dept. of Transport F37 NW - Dept. of Public Works F38 Environment & Culture Annexure Number EC - Dept of Health F39 EC - Dept of Economic Development F40 EC - No Dept. Name Provided F41 NC - Public Works, Roads and Transport F42 NC - Dept. of Economic , Environmental Affairs and Tourism F43 WC - No Dept. Name Provided F44 NATIONAL DEPARTMENTS PROVINCIAL DEPARTMENTS

Upload: others

Post on 20-Oct-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

  • Infrastructure Annexure NumberNational Dept. of Public Works F1

    Environment Annexure NumberDept of Environmental Affairs (DEA) F2Dept of Water Affairs & Forestry (DWAF) F99Dept of Public Works (DPW) F3Dept of Agriculture (DoA) F4Dept of Tourism (NDT) F5

    Community Works Sector (DCoG) Annexure NumberDept of Cooperative Governance F6

    Infrastructure Annexure NumberEC - Dept. of Roads & Public Works F7EC - Dept of Transport F8EC - Dept. of Health F9EC - Dept. of Education F10EC - Dept of Economic Affairs F11EC - Dept of Social Development F12EC - No Department Name Provided F13NC - Dept. of Transport, Road & Public Works F14WC - Dept. of Public Works, Road & Transport F15FS - Dept. of Police, Roads & Transport F16FS - Dept. of Provincial and Local Government (DPLG) F17FS - Dept. of Education F18FS - Dept. of Tourism, Environmental and Economic Affairs F19FS - No Dept. Name Provided F20FS - Dept. of Local Government & Housing F21FS - Dept. of Sports, Recreation, Arts & Culture F22FS - Dept. of Public Works and Rural Development F23FS - Dept. of Agriculture F24FS - Dept. of Health F25FS - Provincial Treasury F26FS - Dept. of Public Safety,Security and Liason F27MP - Dept. of Transport & Roads F28GP - Dept. of Public Transport, Roads and Works (DPTRW) F29GP - Dept. of Housing F30LP - Dept. of Local Gov & Housing F31LP - Dept. of Health and Social Development F32KN - Dept. of Public Works F33KN - Dept. of Education F34KN - Dept. of Health F35KN - Dept. of Transport F36NW - Dept. of Transport F37NW - Dept. of Public Works F38

    Environment & Culture Annexure NumberEC - Dept of Health F39EC - Dept of Economic Development F40EC - No Dept. Name Provided F41NC - Public Works, Roads and Transport F42NC - Dept. of Economic , Environmental Affairs and Tourism F43WC - No Dept. Name Provided F44

    NATIONAL DEPARTMENTS

    PROVINCIAL DEPARTMENTS

  • FS - Sport, Recreation, Arts and Culture F45FS - Local Government and Housing (DLG&H) F46FS - Social Development F47FS - Tourism, Environmental and Economic Affairs F48FS. Dept. of Public Works, Roads and Transport F49FS - Dept. of Agriculture, F50MP - Dept. of Agriculture and Land Administration F51MP - No Dept. Name Provided F52MP - Dept. of Roads & Transport F53GP - Dept. of Education F54GP - Dept. of Agriculture, Conservation and Environment F55GP - Agriculture and Environmental Affairs F56GP - Arts, Culture and Tourism F57GP - No Department Name Provided F58LP - Dept. of Agriculture F59LP - Dept. of Limpopo Economic Development, Environment and Tour (LEDET) F60LP - No Dept. Name Provided F61LP - Dept. of the Premier F62LP - Health F63KN - Agriculture and Environmental Affairs (DAEA) F64KN - No Dept. Name F65

    Social Annexure NumberEC - Dept. of Social Development F66EC - Dept. Education F67NC - Dept. of Social Development F68NC - Health F69NC - Safety and Liaison F70WC - Dept. of Education F71WC - Dept. of Health F72WC - No Dept. Name Provided F73WC - Dept. of Social Development F74WC - Dept. of Community Safety F75FS - Economic Development F76FS - Dept. Social Development F77FS - Dept. Health F78FS - No Dept. Name Provided F79FS - Education F80FS - Sport, Arts and Culture F81FS - Public Safety,Security and Liason F82MP - Dept of Social Services & Health F83MP - Safety and Security F84MP - No Dept. Name Provided F85MP - Culture, Sports and Recreation F86GP- Dept of Social Development F87GP- Dept of Health F88GP - Agriculture and Environmental Affairs F89GP - No Department Name Provided F90LP - Dept. of Health and Social Development F91LP - Dept. of Education F92LP - No Dept. Name Provided F93KN - Education F94NW - Dept. of Public Works F95NW - Dept. of Education F96NW - Dept. of Social Development F97NW - Dept. of Health F98

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 2

    Infrastructure

    Totals : R 10,588,931 R 3,357,271 36

    Organisation : Public Works

    Average manual workers daily

    wage rate:

    R 45.00

    Annexure F1

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Victoria West PrisonNot part of a programme Public Works UbuntuPixley ka Seme R 6,666,868 R 2,023,092 17NC

    Williston Police Station RenovatiNot part of a programme Public Works Karoo HooglandNamakwa R 3,922,063 R 1,334,179 19NC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 100

    Environmental & Culture

    Totals : R 397,854,032 R 116,551,752 8,720

    Organisation : Enviromental Affairs

    Average manual workers daily

    wage rate:

    R 67.02

    Annexure F2

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    AP1 - Mkhambathi Nature ReservPeople and Parks Enviromental Affairs QaukeniO.R.Tambo R 6,000,000 R 14,945 29EC

    WC - Wftc Agulhas National ParkWorking for the Coast Environmental Affairs and To Cape AgulhasOverberg R 3,791,553 R 932,074 65WC

    KZN - Wftc Umgababa to TongaaWorking for the Coast Enviromental Affairs eThekwini MetroeThekwini Metro R 3,000,000 R 957,164 98KN

    LP - Schuinsdraai Nature ReserveWorking for Tourism Enviromental Affairs Greater Marble HallSekhukhune R 4,000,000 R 557,391 59LP

    NC - Wftc Alex Bay, Port NollothWorking for the Coast Enviromental Affairs RichtersveldNamakwa R 2,291,467 R 786,711 56NC

    NC - WftC SANParks Groen and Working for the Coast Enviromental Affairs KamiesbergNamakwa R 2,180,968 R 1,010,892 54NC

    WC - Kuyasa Pilot CDM ProjectSustainable Land Based (Workin Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 2,314,790 R 2,059,308 101WC

    WC - Wftc Knysna National Park Working for the Coast Enviromental Affairs KnysnaEden R 1,970,683 R 470,187 40WC

    WC - Wftc Melkbosstrand to HouWorking for the Coast Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 3,793,215 R 803,773 101WC

    WC - Wftc Table Mountain NatioWorking for the Coast Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 1,475,407 R 431,565 48WC

    WC - WftC West Coast (SaldanhaWorking for the Coast Enviromental Affairs West Coast DMAWest Coast R 6,096,784 R 1,631,850 200WC

    EC - Wftc van Stadens river to TsWorking for the Coast Enviromental Affairs KougaCacadu R 1,346,704 R 143,316 64EC

    NW - Domestic Waste Collection Working on Waste Enviromental Affairs MafikengCentral R 14,387,176 R 3,546,000 72NW

    EC - Wftc Tsitsikamma National Working for the Coast Enviromental Affairs Aberdeen Plain DMACacadu R 3,979,517 R 414,087 46EC

    Agulhas NP: PEP: DevelopmentPeople and Parks Enviromental Affairs StellenboschCape Winelands R 3,020,327 R 483,407 80WC

    AP3 - Siyathemba Environmental Working for Tourism Enviromental Affairs SiyathembaPixley ka Seme R 336,110 R 101,605 18NC

    AP3 - WC - Dev. of Driftsands NPeople and Parks Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 86,008 R 25,070 9WC

    EC - Makana Greening & BeautifiPeople and Parks Enviromental Affairs MakanaCacadu R 4,005,617 R 777,262 72EC

    NYS - Western CapeSustainable Land Based (Workin Enviromental Affairs Overberg DMAOverberg R 3,458,526 R 1,035,837 153WC

    WC - Wftc West Coast National PWorking for the Coast Enviromental Affairs Saldanha BayWest Coast R 3,924,314 R 650,219 39WC

    Westie's Cave ProjectCommunity Participation Environmental Affairs and To Maluti a PhofungThabo Mofutsanyane R 1,757,250 R 1,757,250 25FS

    LP - Bathlebeni Soil ConservationSustainable Land Based (Workin Enviromental Affairs Greater TzaneenMopani R 1,183,812 R 895,301 103LP

    WC - WftC West Coast (SaldanhaWorking for the Coast Environmental Affairs and To West Coast DMAWest Coast R 12,138,620 R 7,013,320 41WC

    EC - Street Cleaning & Greening People and Parks Enviromental Affairs King Sabata DalindyeboO.R.Tambo R 6,000,000 R 2,738,496 242EC

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    WC - Wftc Wilderness National PWorking for the Coast Enviromental Affairs GeorgeEden R 1,993,666 R 480,166 53WC

    LP - Mankweng Waste ManagemWorking on Waste Enviromental Affairs PolokwaneCapricorn R 1,864,097 R 1,410,685 53LP

    WC - Wftc Agulhas National ParkWorking for the Coast Enviromental Affairs Cape AgulhasOverberg R 4,192,704 R 1,258,374 56WC

    AP1 - River Rehabilitation for 5 FSustainable Land Based (Workin Enviromental Affairs DihlabengThabo Mofutsanyane R 723,651 R 622,076 76FS

    AP2 - GSLWP Land RehabilitatioSustainable Land Based (Workin Enviromental Affairs St Lucia ParkUmkhanyakude R 4,927,000 R 377,136 171KN

    WC - WftC SE Metro (StrandfontWorking for the Coast Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 2,991,639 R 952,697 68WC

    EC - Wftc Mthatha mouth to MngWorking for the Coast Enviromental Affairs NyandeniO.R.Tambo R 2,000,000 R 297,243 105EC

    AP1 - Botanical Gardens - MakanPeople and Parks Enviromental Affairs MakanaCacadu R 500,388 R 2,008,002 46EC

    AP3 - Gauteng Clean Zone AmbaWorking on Waste Enviromental Affairs City of Tshwane MetroCity of Tshwane Metro R 1,136,154 R 695,474 139GP

    EC - Wftc Cintsa Mouth to Kei RiWorking for the Coast Enviromental Affairs Great KeiAmatole R 3,492,093 R 684,521 58EC

    KZN - iSimangaliso Coast CareWorking for the Coast Enviromental Affairs MtubatubaUmkhanyakude R 3,166,664 R 304,020 97KN

    EC - Hluleka Nature Reserve UpgPeople and Parks Enviromental Affairs NyandeniO.R.Tambo R 4,000,000 R 937,507 10EC

    KZN - Wftc Port Edward to ScottWorking for the Coast Enviromental Affairs UmzumbeUgu R 3,472,363 R 446,140 65KN

    KZN - Usuthu Gorge Eco-TourisWorking for Tourism Enviromental Affairs JoziniUmkhanyakude R 586,211 R 242,383 33KN

    EC - Mnquma Clean-up and GreeWorking on Waste Environmental Affairs and To MnqumaAmatole R 2,595,333 R 1,794,833 58EC

    EC - Mnquma Clean-up and GreeSustainable Land Based (Workin Enviromental Affairs MnqumaAmatole R 3,340,219 R 911,539 57EC

    EC - Mthamvuna Nature Reserve Working for Tourism Enviromental Affairs MbizanaO.R.Tambo R 1,567,109 R 1,168,808 46EC

    EC - Mhlontlo Waste Recycling (Working on Waste Enviromental Affairs MhlontloO.R.Tambo R 4,696,752 R 1,788,766 85EC

    EC - Wftc Mbashe to Kei river (0Working for the Coast Enviromental Affairs MnqumaAmatole R 2,285,358 R 433,696 70EC

    EC - Ntlangano Community NaturPeople and Parks Enviromental Affairs MhlontloO.R.Tambo R 1,800,000 R 638,948 35EC

    EC - Sakhisizwe Greening ProjectSustainable Land Based (Workin Enviromental Affairs SakhisizweChris Hani R 3,643,296 R 912,441 73EC

    EC - Wftc Keis/hoek river to CintWorking for the Coast Enviromental Affairs Buffalo CityAmatole R 1,514,098 R 825,890 50EC

    EC - Wftc Mngazi to Manteku RiWorking for the Coast Enviromental Affairs Port St JohnsO.R.Tambo R 676,893 R 542,908 76EC

    EC - Wftc Mthamvuna to MantekWorking for the Coast Enviromental Affairs MbizanaO.R.Tambo R 3,357,380 R 555,601 56EC

    EC - Wftc Ntlonyana to Mthatha Working for the Coast Enviromental Affairs MbhasheAmatole R 1,215,897 R 487,170 53EC

    EC - Addo PR Project - Phase 2People and Parks Enviromental Affairs Sunday's River ValleyCacadu R 3,623,979 R 2,764,992 112EC

    GP-JOHANNESBURG COLLECWorking on Waste Enviromental Affairs Johannesburg MetroJohannesburg Metro R 1,008,243 R 137,526 26GP

    KZN - Usuthu Gorge Eco-TourisWorking for Tourism Environmental Affairs and To JoziniUmkhanyakude R 1,206,807 R 846,129 16KN

    EC-REHAB OF KSD WASTE SIWorking on Waste Enviromental Affairs King Sabata DalindyeboO.R.Tambo R 4,696,752 R 506,379 98EC

    FS - Upgrading of Seekoeivlei NaWorking for Tourism Enviromental Affairs PhumelelaThabo Mofutsanyane R 4,000,000 R 122,140 28FS

    FS - Golden Gate PR Project - PhPeople and Parks Enviromental Affairs Golden Gate Highlands National Thabo Mofutsanyane R 5,100,359 R 2,140,953 105FS

    LP - 2010 Polokwane Waste CollWorking on Waste Enviromental Affairs PolokwaneCapricorn R 4,000,000 R 1,268,214 251LP

    WC - Karoo PR Project - Phase 2People and Parks Enviromental Affairs Beaufort WestCentral Karoo R 3,000,000 R 900,000 36WC

    Maintanance of Resorts & ReservWorking for Tourism Environmental Affairs and To Maluti a PhofungThabo Mofutsanyane R 1,000,000 R 198,588 20FS

    WC - Table Mountain PR Project Working for the Coast Enviromental Affairs City of Cape Town MetroCity of Cape Town Metro R 6,784,980 R 649,993 89WC

    EC - Middelburg WasteWorking on Waste Enviromental Affairs Inxuba YethembaChris Hani R 6,500,000 R 1,898,416 64EC

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    NC - Street Cleaning & Greening Working on Waste Enviromental Affairs Ga SegonyanaKgalagadi R 6,000,000 R 1,322,944 257NC

    EC-Clean up of Motherwell (phasWorking on Waste Enviromental Affairs Nelson Mandela Bay MetroNelson Mandela Bay Metro R 3,010,800 R 1,631,568 78EC

    NC-Kgalagadi PR Project-Phase 2People and Parks Enviromental Affairs MierSiyanda R 8,958,546 R 4,153,687 207NC

    WC - Wftc Plettenburg Bay to CaWorking for the Coast Enviromental Affairs GeorgeEden R 4,231,574 R 1,268,318 73WC

    LP-Street Cleaning and Greening Working on Waste Enviromental Affairs Greater GiyaniMopani R 6,000,000 R 1,109,674 270LP

    MP - Kruger National Park PR PrPeople and Parks Enviromental Affairs Kruger Park South (MP)Ehlanzeni R 6,420,442 R 455,981 230MP

    NW - Madikwe Tourism DevelopPeople and Parks Enviromental Affairs Moses KotaneBojanala R 1,770,117 R 1,127,630 18NW

    NW - 2010 Rustenburg Waste ColWorking on Waste Enviromental Affairs RustenburgBojanala R 1,680,000 R 1,106,080 173NW

    MP - Barberton Medicinal Plants Sustainable Land Based (Land C Enviromental Affairs UmjindiEhlanzeni R 7,816,108 R 312,053 15MP

    NW-TAUNG CHILDSKULL INFPeople and Parks Enviromental Affairs Greater TaungBophirima R 2,549,665 R 253,857 73NW

    FS - 2010 Mangaung Waste ColleWorking on Waste Enviromental Affairs MangaungMotheo R 4,000,000 R 896,766 252FS

    KZN - KwaMashu Indigenous PlaSustainable Land Based (Workin Enviromental Affairs eThekwini MetroeThekwini Metro R 515,133 R 111,248 14KN

    Comprehensive Rural DevelopmeCASP - Comprehensive Agricult Environmental Affairs and To MkhondoGert Sibande R 16,000,000 R 13,308,730 116MP

    EC - CTC Nelson Mandela Bay Working on Waste Enviromental Affairs Nelson Mandela Bay MetroNelson Mandela Bay Metro R 1,380,000 R 807,850 94EC

    LP-Street Cleaning and Greening Working on Waste Enviromental Affairs ThulamelaVhembe R 6,000,000 R 1,053,297 273LP

    KZN - Natal National Botanical GPeople and Parks Enviromental Affairs The uMsunduziUMgungundlovu R 620,066 R 274,970 50KN

    EC - Tshani-Mankosi Phase 2Sustainable Land Based (Workin Enviromental Affairs NyandeniO.R.Tambo R 4,750,000 R 1,290,892 61EC

    EC - Tshani mankosi - new phase Working for the Coast Environmental Affairs and To NyandeniO.R.Tambo R 4,500,000 R 100,000 5EC

    EC-GREENING KSD MUNICIPWorking on Waste Environmental Affairs and To King Sabata DalindyeboO.R.Tambo R 5,000,000 R 100,000 144EC

    AP1 - Alien Clearing Greater St LPeople and Parks Environmental Affairs and To St Lucia ParkUmkhanyakude R 211,867 R 233,447 126KN

    EC - UMTATA DAM TOURISMWorking for Tourism Environmental Affairs and To King Sabata DalindyeboO.R.Tambo R 6,957,480 R 541,067 59EC

    EC - Wftc Tsitsikamma National Working for the Coast Environmental Affairs and To Aberdeen Plain DMACacadu R 38,733,976 R 565,760 44EC

    KZN - iSimangaliso Coast CareWorking for the Coast Environmental Affairs and To MtubatubaUmkhanyakude R 3,166,672 R 201,900 78KN

    AP3 - Borakalalo - Bush Camps aSustainable Land Based (CASP) Environmental Affairs and To MadibengBojanala R 151,205 R 7,211,033 25NW

    EC - UMTATA DAM TOURISMWorking for Tourism Enviromental Affairs King Sabata DalindyeboO.R.Tambo R 11,516,028 R 996,838 270EC

    EC - Wftc Nelson Mandela (08/11Working for the Coast Enviromental Affairs Nelson Mandela Bay MetroNelson Mandela Bay Metro R 1,320,387 R 593,241 88EC

    FS - Street Cleaning & Greening -Working on Waste Enviromental Affairs MantsopaMotheo R 12,866,588 R 2,980,206 284FS

    EC - Greening - King Sabata DaliPeople and Parks Enviromental Affairs King Sabata DalindyeboO.R.Tambo R 3,731,342 R 2,897,002 168EC

    EC - Wftc keiskammahoek to KenWorking for the Coast Enviromental Affairs NdlambeCacadu R 2,273,112 R 992,445 70EC

    EC - Mhlontlo Waste Recycling (Working on Waste Environmental Affairs and To MhlontloO.R.Tambo R 4,696,752 R 878,453 76EC

    EC - Wftc Keis/hoek river to CintWorking for the Coast Environmental Affairs and To Buffalo CityAmatole R 3,984,590 R 1,021,282 93EC

    EC - Hluleka Nature Reserve UpgPeople and Parks Environmental Affairs and To NyandeniO.R.Tambo R 4,533,075 R 613,056 6EC

    EC - BEACH PUBLIC FACILITIWorking for the Coast Environmental Affairs and To Port St JohnsO.R.Tambo R 1,988,339 R 44,875 57EC

    NYS - GautengSustainable Land Based (Workin Enviromental Affairs Johannesburg MetroJohannesburg Metro R 3,436,929 R 719,746 197GP

    NYS - West CoastSustainable Land Based (Workin Enviromental Affairs West Coast DMAWest Coast R 1,747,754 R 174,425 88WC

    WC - Wftc West Coast National PWorking for the Coast Environmental Affairs and To Saldanha BayWest Coast R 1,211,989 R 220,867 16WC

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    WC - Wftc Rooiels to Quion ProjWorking for the Coast Enviromental Affairs OverstrandOverberg R 204,537 R 156,318 60WC

    LP - Mapungubwe PR Project - PPeople and Parks Enviromental Affairs MusinaVhembe R 4,474,768 R 2,314,371 52LP

    WC - Wilderness PR Project - PhaPeople and Parks Enviromental Affairs GeorgeEden R 1,112,289 R 254,144 27WC

    EC - WftC SANParks Woody CapWorking for the Coast Enviromental Affairs NdlambeCacadu R 3,132,969 R 808,347 84EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 2

    Environmental & Culture

    Totals : R 16,133,000 R 813,400 99

    Organisation : Public Works

    Average manual workers daily

    wage rate:

    R 78.00

    Annexure F3

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Salvakop Cleaning ProjectWorking on Waste Public Works City of Tshwane MetroCity of Tshwane Metro R 133,000 R 133,000 20GP

    Mohokare cleaning campaignWorking on Waste Public Works MohokareXhariep R 16,000,000 R 680,400 79FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Environmental & Culture

    Totals : R 892,523 R 160,418 146

    Organisation : Agriculture

    Average manual workers daily

    wage rate:

    R 63.33

    Annexure F4

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Berg River ProjectNot part of a programme Agriculture DrakensteinCape Winelands R 523 R 482 26WC

    MasibambisaneSustainable Land Based (Land C Agriculture The uMsunduziUMgungundlovu R 172,000 R 78,140 65KN

    MophophomaSustainable Land Based (Land C Agriculture NongomaZululand R 720,000 R 81,796 55KN

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 32

    Environmental & Culture

    Totals : R 95,431,193 R 26,894,366 1,535

    Organisation : Tourism

    Average manual workers daily

    wage rate:

    R 66.84

    Annexure F5

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    EC - Manqondo Tourism Info. CeWorking for Tourism Tourism King Sabata DalindyeboO.R.Tambo R 1,811,107 R 925,223 25EC

    EC - Wonkumuntu Tourism ProjeWorking for Tourism Tourism King Sabata DalindyeboO.R.Tambo R 4,394,593 R 1,545,382 77EC

    IP - Qaukeni Great Place Cultural Working for Tourism Tourism QaukeniO.R.Tambo R 2,281,591 R 897,813 55EC

    NC - Kamiesburg Tourism DevelWorking for Tourism Tourism KamiesbergNamakwa R 1,879,000 R 240,000 40NC

    IP - O.R. Tambo Heritage RouteWorking for Tourism Tourism MbizanaO.R.Tambo R 2,452,307 R 1,049,140 302EC

    FS - Lekgalong La MantsopaWorking for Tourism Tourism MantsopaMotheo R 5,428,572 R 1,133,113 101FS

    FS - Accomodation Facilities at Working for Tourism Tourism Maluti a PhofungThabo Mofutsanyane R 182,412 R 99,181 17FS

    EC - Bulhoek Massacre Heritage Working for Tourism Tourism LukanjiChris Hani R 2,271,807 R 1,368,731 72EC

    FS - Information and Business CeWorking for Tourism Tourism MasilonyanaLejweleputswa R 2,000,000 R 980,000 22FS

    FS - Maluti Thusa Bato TrailWorking for Tourism Tourism Maluti a PhofungThabo Mofutsanyane R 3,000,000 R 900,000 30FS

    EC - Xonxa AquaculturalSustainable Land Based (Land C Tourism Emalahleni ECChris Hani R 1,242,709 R 88,686 14EC

    EC - Lake Gariep and PK le RouxWorking for Tourism Tourism GariepUkhahlamba R 101,880 R 50,940 24EC

    EC - AbaThembu Cultural CalabaWorking for Tourism Tourism Emalahleni ECChris Hani R 3,652,868 R 1,267,407 57EC

    EC - Maluti Hiking and Horse TraWorking for Tourism Tourism UmzimvubuAlfred Nzo R 1,285,156 R 235,812 43EC

    EC - Bongolo Dam TourismWorking for Tourism Tourism LukanjiChris Hani R 85,900 R 42,980 19EC

    FS - Building a Guesthouse in QwWorking for Tourism Tourism Maluti a PhofungThabo Mofutsanyane R 2,700,000 R 1,900,000 40FS

    Huntington Village Tourism ProjeWorking for Tourism Tourism BushbuckridgeEhlanzeni R 2,801,725 R 15,960 12MP

    FS - Infrastructure Development Working for Tourism Tourism Maluti a PhofungThabo Mofutsanyane R 3,426,791 R 1,296,926 63FS

    EC - Cebe Campsite Phase 2Working for Tourism Tourism MnqumaAmatole R 9,013,000 R 4,141,562 22EC

    EC - Rock Art Tourism Phase 2Working for Tourism Tourism Kou-KammaCacadu R 1,178,691 R 1,060,368 70EC

    KZN - Isibhubhu ProjectWorking for Tourism Tourism NongomaZululand R 7,722,000 R 2,000,000 30KN

    WC - Dev. Donkey Track Route iWorking for Tourism Tourism CederbergWest Coast R 2,818,822 R 1,910,305 174WC

    EC - Lake Gariep DevelopmentWorking for Tourism Tourism KopanongXhariep R 98,040 R 49,020 15FS

    LP - Ngove Cultural Centre and TWorking for Tourism Tourism Greater GiyaniMopani R 6,433,500 R 21,840 13LP

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    24 Rivers CBNRM(Phase 2)Working for Tourism Tourism MogalakwenaWaterberg R 7,433,500 R 16,800 12LP

    LP - Phiphidi Waterfall ProjectWorking for Tourism Tourism ThulamelaVhembe R 1,882,104 R 104,473 37LP

    LP - Khalanga Guest LodgeWorking for Tourism Tourism Greater TzaneenMopani R 13,000,000 R 49,810 24LP

    FS - Road Signage for Tourism AtWorking for Tourism Tourism MantsopaMotheo R 244,389 R 166,349 9FS

    LP - Mukumbani Falls Project (PhPeople and Parks Tourism ThulamelaVhembe R 1,608,010 R 259,527 53LP

    FS - Black Water Fly Fishing & TWorking for Tourism Tourism Maluti a PhofungThabo Mofutsanyane R 474,544 R 259,877 19FS

    KZN - Tourism Attractions NtuzuNot part of a programme The Presidency eThekwini MetroeThekwini Metro R 2,400,480 R 1,790,761 42KN

    EC- MAGWA FALLS PUBLIC FWorking for Tourism Tourism QaukeniO.R.Tambo R 125,695 R 1,026,380 2EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 20

    Community Works (DCoG)

    Totals : R 81,755,539 R 20,364,233 23,086

    Organisation : NULL

    Average manual workers daily

    wage rate:

    R 42.75

    Annexure F6

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    WRDM Community Work PrograCommuinty based NULL West Rand DMAWest Rand R 2,468,000 R 183,000 390GP

    Koppies CWPCommuinty based NULL NgwatheFezile Dabi R 6,202,000 R 1,729,100 1522FS

    BUSHBUCKRIDGE CWPCommuinty based Public Works BushbuckridgeEhlanzeni R 7,310,769 R 6,457,910 3470MP

    Bokfontein Community Work ProCommuinty based NULL MadibengBojanala R 4,901,000 R 115,000 994NW

    LephephaneCommuinty based Public Works Greater TzaneenMopani R 5,226,000 R 2,594,600 2115LP

    MzimvubuCommuinty based NULL UmzimvubuAlfred Nzo R 7,709,539 R 1,669,975 2204EC

    Randfontein Community Works PCommuinty based NULL Mogale CityWest Rand R 2,469,000 R 315,450 1004GP

    Tjakastad Community Work ProgCommuinty based NULL Albert LuthuliGert Sibande R 7,495,000 R 1,096,225 1241MP

    Senqu CWPCommuinty based NULL SenquUkhahlamba R 9,969,231 R 1,220,575 2887EC

    Randfontein War on Poverty CWNot part of a programme NULL Mogale CityWest Rand R 2,095,000 R 145,000 364GP

    Munsieville Community Work PrCommuinty based NULL Mogale CityWest Rand R 3,279,000 R 258,950 1128GP

    City of Johannesburg CWP RegioCommuinty based NULL Johannesburg MetroJohannesburg Metro R 2,578,000 R 350,150 623GP

    Westonaria Community Work ProCommuinty based NULL WestonariaWest Rand R 2,469,000 R 133,000 26GP

    Meriting Community Work ProgrCommuinty based NULL RustenburgBojanala R 3,280,000 R 410,550 829NW

    Merafong Community Work ProgCommuinty based NULL West Rand DMAWest Rand R 246,000 R 1,125,000 1281GP

    Merafong War on Poverty CommCommuinty based NULL West Rand DMAWest Rand R 2,095,000 R 98,000 201GP

    Elliotdale CWPCommuinty based NULL MbhasheAmatole R 3,655,384 R 906,650 931EC

    Gariep CWPNot part of a programme NULL GariepUkhahlamba R 2,492,308 R 916,432 697EC

    Msunduzi Community Work ProgCommuinty based NULL The uMsunduziUMgungundlovu R 2,492,308 R 224,091 716KN

    RUSTENBURG CWPCommuinty based NULL RustenburgBojanala R 3,323,000 R 414,575 463NW

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 17

    Infrastructure

    Totals : R 311,512,647 R 75,018,943 21,406

    Organisation : EC - Department of Public Works

    Average manual workers daily

    wage rate:

    R 55.14

    Annexure F7

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    O.R.Tambo Household ContractorLabour Intensive Programme EC - Department of Public Wo R 24,000,000 R 6,230,216 3649EC

    Cradock: Police Station: ConstrucNational Youth Service Public Works Inxuba YethembaChris Hani R 52,658,269 R 12,523,299 112EC

    Hankey: Magistrate Office: ConstNational Youth Service Public Works KougaCacadu R 17,767,765 R 2,249,734 49EC

    Zwelitsha:Magistrate Office: RANational Youth Service Public Works Buffalo CityAmatole R 10,363,673 R 1,160,395 59EC

    Port Elizabeth: Algoa Park SAPS:National Youth Service Public Works Nelson Mandela Bay MetroNelson Mandela Bay Metro R 13,700,000 R 1,651,159 28EC

    Port Elizabeth: Algoa Park SAPS:National Youth Service Public Works Nelson Mandela Bay MetroNelson Mandela Bay Metro R 9,223,780 R 1,773,951 23EC

    Alfred Nzo Household ContractorLabour Intensive Programme EC - Department of Public Wo R 23,000,000 R 4,744,506 2933EC

    East London: Woodbrook SAPS: National Youth Service Public Works Buffalo CityAmatole R 39,783,630 R 9,656,493 40EC

    Chris hani Household ContractorLabour Intensive Programme EC - Department of Public Wo R 21,655,140 R 7,989,355 4201EC

    Landscaping at Gorvenment BuildLabour Intensive Programme EC - Department of Public Wo R 3,880,211 R 116,285 34EC

    Sakhisizwe Household - Cacadu Community based EC - Department of Public Wo R 26,000,000 R 13,178,400 3330EC

    Gubenxa Access Road Phase TwLabour Intensive Programme EC - Department of Public Wo R 5,500,000 R 58,880 28EC

    Routine Maintenance of R63Labour Intensive Programme EC - Department of Public Wo R 2,231,681 R 1,251,635 40EC

    Ukhahlamba Household ContractLabour Intensive Programme EC - Department of Public Wo R 26,000,000 R 4,954,629 2993EC

    AptcodNULL EC - Department of Public Wo R 3,716,500 R 1,773,000 396EC

    EC-National Youth ServiceNational Youth Service EC - Department of Public Wo R 6,032,000 R 400,000 399EC

    Amathole Household ContractorsLabour Intensive Programme EC - Department of Public Wo R 26,000,000 R 5,307,004 3092EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 8

    Infrastructure

    Totals : R 254,800,524 R 12,380,869 708

    Organisation : EC - Transport

    Average manual workers daily

    wage rate:

    R 110.70

    Annexure F8

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Re-gravelling of BaviaanskloofLabour Intensive Programme EC - Transport R 9,899,884 R 399,884 107EC

    Zithulele Hospital Access 09-10Labour Intensive Programme EC - Transport R 88,900,640 R 8,432,000 206EC

    Road Ranger Programme - O.R. TCommunity based EC - Transport R 26,000,000 R 729,000 81EC

    Road Ranger Programme - Alfred Community based EC - Transport R 26,000,000 R 635,992 71EC

    Road Ranger Programme - Joe GqCommunity based EC - Transport R 26,000,000 R 392,995 44EC

    Road Ranger Programme - CacadCommunity based EC - Transport R 26,000,000 R 215,997 24EC

    Road Ranger Programme - Chris Community based EC - Transport R 26,000,000 R 999,000 111EC

    Road Ranger ProgrammeCommunity based EC - Transport R 26,000,000 R 576,000 64EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 5

    Infrastructure

    Totals : R 64,473,002 R 22,466,750 162

    Organisation : EC - Department of Health

    Average manual workers daily

    wage rate:

    R 65.00

    Annexure F9

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Qiba ClinicLabour Intensive Programme EC - Department of Health R 7,557,000 R 39,241 20EC

    Repairs to Nu8 Clinic in MotherwLabour Intensive Programme EC - Department of Health R 1,241,512 R 258,733 4EC

    Livingstone HospitalNew AccideNot part of a programme EC - Department of Health R 31,673,514 R 21,970,946 81EC

    EMS Satelite Base EngcoboLabour Intensive Programme EC - Department of Health R 10,394,519 R 16,480 10EC

    St. Elizabeth proffessional AccomEPWP Provincial EC - Department of Health R 13,606,456 R 181,350 47EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 10

    Infrastructure

    Totals : R 72,614,264 R 6,334,913 198

    Organisation : EC - Department of Education

    Average manual workers daily

    wage rate:

    R 67.46

    Annexure F10

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Damane SPSLabour Intensive Programme EC - Department of Education R 1,349,592 R 19,435 11EC

    Elizabeth RoosLabour Intensive Programme EC - Department of Education R 15,414,033 R 4,527,954 48EC

    Brooksnek JSSNULL EC - Department of Education R 2,257,842 R 36,000 14EC

    Renovations to St. AidensLabour Intensive Programme EC - Department of Education R 4,213,463 R 1,447,143 11EC

    St. Peters JSSLabour Intensive Programme EC - Department of Education R 1,172,469 R 43,900 14EC

    BakaneniLabour Intensive Programme EC - Department of Education R 5,024,490 R 79,550 19EC

    Cofimvaba Senior Secondary SchLabour Intensive Programme EC - Department of Education R 29,875,071 R 74,407 33EC

    Motherwell High SchoolFacilities and Infrastructure Dev EC - Department of Education R 6,289,283 R 5,580 2EC

    Luvuyo Lerumo SSS (ECP04/1/1Labour Intensive Programme EC - Department of Education R 3,394,946 R 94,519 32EC

    East Upper Qolombolo JSSLabour Intensive Programme EC - Department of Education R 3,623,077 R 6,425 14EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 3,512,480 R 293,360 100

    Organisation : EC - Department of Economic Affairs

    Average manual workers daily

    wage rate:

    R 80.00

    Annexure F11

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Matatiele fencing ProjectEPWP Provincial EC - Department of Economic R 3,512,480 R 293,360 100EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Infrastructure

    Totals : R 12,560,976 R 448,020 45

    Organisation : EC - Department of Social Development

    Average manual workers daily

    wage rate:

    R 50.83

    Annexure F12

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Lubala ECDCLabour Intensive Programme EC - Department of Social Dev R 900,000 R 16,000 10EC

    Enkuselweni Place of SafetyEPWP Provincial EC - Department of Social Dev R 10,632,502 R 386,420 15EC

    Place of Safety1Labour Intensive Programme EC - Department of Social Dev R 1,028,473 R 45,600 20EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 2

    Infrastructure

    Totals : R 76,130,644 R 18,245,294 133

    Organisation : NULL

    Average manual workers daily

    wage rate:

    R 33.00

    Annexure F13

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Port Elizabeth: SAPS: ConstructioNational Youth Service NULL Nelson Mandela Bay MetroNelson Mandela Bay Metro R 65,392,961 R 15,551,014 55EC

    East London: Fort Glamorgan PrisNational Youth Service NULL Buffalo CityAmatole R 10,737,683 R 2,694,280 78EC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 13

    Infrastructure

    Totals : R 100,913,379 R 13,131,641 503

    Organisation : NC - Public Works, Roads and Transport

    Average manual workers daily

    wage rate:

    R 74.92

    Annexure F14

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Klipfontein StormwaterNot part of a programme NC - Public Works, Roads and R 405,000 R 92,980 17NC

    Head office paving project in KimNot part of a programme NC - Public Works, Roads and R 280,000 R 79,340 22NC

    John Taole Gaetsewe District MuLabour Intensive Programme NC - Public Works, Roads and R 2,495,742 R 2,495,742 37NC

    Paving and cleaning at TswaraganEPWP Provincial NC - Public Works, Roads and R 6,000,000 R 146,780 37NC

    Kerb making project in Williston, Not part of a programme NC - Public Works, Roads and R 1,300,000 R 553,420 48NC

    Construction of a new CommunitLabour Intensive Programme NC - Public Works, Roads and R 10,558,550 R 95,106 14NC

    The Contraction of a bulk sewer pLabour Intensive Programme NC - Public Works, Roads and R 17,514,450 R 1,362,684 15NC

    Pampierstad sewer reticulationMIG NC - Public Works, Roads and R 22,767,736 R 454,427 23NC

    Extension of the Jan-Kempdorp wMIG NC - Public Works, Roads and R 23,933,242 R 1,427,469 20NC

    Schmidtsdriftb paving of access rLabour Based Construction Prog NC - Public Works, Roads and R 4,200,000 R 1,456,033 41NC

    Schmidtsdrift paving of access roaLabour Based Construction Prog NC - Public Works, Roads and R 4,200,000 R 764,503 8NC

    Mathlomola Access RoadLabour Based Construction Prog NC - Public Works, Roads and R 5,227,490 R 2,983,134 43NC

    Maintenance of road reservesLabour Intensive Programme NC - Public Works, Roads and R 2,031,169 R 1,220,022 178NC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 50

    Infrastructure

    Totals : R 549,968,103 R 87,167,617 2,026

    Organisation : WC - Transport and Public Works

    Average manual workers daily

    wage rate:

    R 110.58

    Annexure F15

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    C574.36: Overload Control at RaLabour Intensive Programme WC - Transport and Public Wo R 4,303,403 R 472,683 18WC

    Paarl:R/MT 921/2009 OP5742 - Not part of a programme WC - Transport and Public Wo R 818,862 R 397,757 43WC

    C574.39: Overload Control at KlaLabour Intensive Programme WC - Transport and Public Wo R 2,842,673 R 258,769 22WC

    C574.38: Overload Control at SoNot part of a programme WC - Transport and Public Wo R 3,560,182 R 254,255 25WC

    C574.37: Overload Control at VreLabour Intensive Programme WC - Transport and Public Wo R 2,834,546 R 169,439 16WC

    Ceres: R/MT 704/2008 LearnershiNot part of a programme WC - Transport and Public Wo R 1,175,277 R 148,539 11WC

    C880.04: Table Bay Boulevard ULabour Intensive Programme WC - Transport and Public Wo R 23,921,123 R 6,559,598 187WC

    Ceres: R/MT 703/2008 LearnershiNot part of a programme WC - Transport and Public Wo R 1,383,821 R 242,746 13WC

    Ceres: R/MT 718/2008 LearnershiNot part of a programme WC - Department of Transport R 525,076 R 16,497 10WC

    Ceres: R/MT 721/2008 LearnershiNot part of a programme WC - Transport and Public Wo R 536,620 R 259,909 23WC

    Paarl: R/MT 751/2008 MR277 anNot part of a programme WC - Transport and Public Wo R 233,230 R 32,643 11WC

    C837.02: Upgrade of MR582 km Labour Intensive Programme WC - Transport and Public Wo R 7,729,211 R 665,762 10WC

    Paarl: R/MT 754/2008 TR31/1andNot part of a programme WC - Transport and Public Wo R 355,857 R 988 1WC

    Ceres: R/MT 732/2008 PortervilleNot part of a programme WC - Transport and Public Wo R 122,236 R 50,707 6WC

    C574.35: Overload Control at SwLabour Intensive Programme WC - Transport and Public Wo R 4,594,722 R 309,400 18WC

    C574.34: Overload Control at JooLabour Intensive Programme WC - Transport and Public Wo R 4,252,791 R 382,753 19WC

    C574.33: Overload Control at VisLabour Intensive Programme WC - Transport and Public Wo R 3,660,201 R 270,766 22WC

    C733.03 Upgrade TR2/2 HezeldeLabour Intensive Programme WC - Transport and Public Wo R 15,003,598 R 5,732,474 60WC

    C574.32: Overload Control at BeaLabour Intensive Programme WC - Transport and Public Wo R 3,285,396 R 406,766 17WC

    C865.04: Flood Damage Repairs tNot part of a programme WC - Transport and Public Wo R 26,756,772 R 7,116,339 79WC

    C880:Koeberg Interchange UpgraLabour Intensive Programme WC - Transport and Public Wo R 188,475,169 R 18,542,821 401WC

    C708.07: N2 Eastbound Rehab kLabour Intensive Programme WC - Transport and Public Wo R 15,448,964 R 220,731 119WC

    C586: Pniel- Simondium Rehab Labour Intensive Programme WC - Transport and Public Wo R 51,155,000 R 13,440,554 108WC

    C794.01: White Bridge-Knysna RLabour Intensive Programme WC - Transport and Public Wo R 32,115,530 R 427,200 187WC

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Paarl: R/MT 919/2009 TR27/1, TNot part of a programme WC - Transport and Public Wo R 223,375 R 75,881 15WC

    Oudtshoorn: R/MT 804/2008 MRNot part of a programme WC - Department of Transport R 360,544 R 82,359 12WC

    C776.02: Gansbaai - Elim Labour EPWP Provincial WC - Transport and Public Wo R 13,877,599 R 6,942,092 125WC

    Ceres: Source Link 12682/05 SupNot part of a programme WC - Transport and Public Wo R 506,991 R 208,988 12WC

    Ceres: Source Link 12682/04 SupNot part of a programme WC - Transport and Public Wo R 270,881 R 151,452 9WC

    Ceres: Source Link 12682/03 SupNot part of a programme WC - Transport and Public Wo R 423,477 R 266,077 10WC

    Ceres: Source Link 12682/02 SupNot part of a programme WC - Transport and Public Wo R 548,247 R 293,137 20WC

    Ceres: Source Link 12682/01 SupNot part of a programme WC - Transport and Public Wo R 698,599 R 382,705 21WC

    Paarl: R/MT 924/2009 MR279 - Not part of a programme WC - Transport and Public Wo R 998,585 R 66,337 18WC

    Paarl: R/MT 915/2009 MR209 - Not part of a programme WC - Transport and Public Wo R 197,490 R 70,023 8WC

    Paarl: R/MT 916/2009 MR177 - Not part of a programme WC - Transport and Public Wo R 248,919 R 102,719 16WC

    Oudtshoorn: R/MT 101/2010 - RoNot part of a programme WC - Transport and Public Wo R 818,982 R 108,732 21WC

    C574.40: Overload Control at MoLabour Intensive Programme WC - Transport and Public Wo R 2,863,550 R 268,053 13WC

    C865.08: Flood Damage to GeelhNot part of a programme WC - Transport and Public Wo R 10,382,650 R 907,124 21WC

    733.04 Upgrade TR2/2 BroadlandNot part of a programme WC - Transport and Public Wo R 70,938,938 R 11,657,473 63WC

    C811.01: Uniondalepoort Flood DNot part of a programme WC - Transport and Public Wo R 20,543,529 R 2,714,113 82WC

    Paarl: R/MT 784/2008 MR277 - Not part of a programme WC - Transport and Public Wo R 1,532,237 R 149,603 8WC

    C648.15: RRM DRE Paarl - RoadNot part of a programme WC - Transport and Public Wo R 1,228,205 R 397,266 1WC

    C648.14: RRM DRE Paarl - GrassNot part of a programme WC - Transport and Public Wo R 1,891,207 R 346,775 8WC

    C648.13: RRM DRE Paarl - GrassNot part of a programme WC - Transport and Public Wo R 1,233,843 R 219,247 8WC

    C648.12: RRM DRE Paarl - InstalNot part of a programme WC - Department of Transport R 1,930,278 R 176,613 10WC

    C648.10: RRM DRE Paarl - TR2/Not part of a programme WC - Transport and Public Wo R 2,143,868 R 1,096,391 23WC

    C648.09: RRM DRE Paarl - TR2/Not part of a programme WC - Transport and Public Wo R 4,599,913 R 269,323 20WC

    C648.08: RRM DRE Paarl- TR2/Labour Intensive Programme WC - Transport and Public Wo R 2,823,019 R 598,966 19WC

    C648.07:RRM DRE Paarl- TR11/Labour Intensive Programme WC - Transport and Public Wo R 4,288,486 R 987,212 18WC

    C789.01 Flood Damage GenadenNot part of a programme WC - Transport and Public Wo R 9,304,432 R 2,248,857 19WC

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 6

    Infrastructure

    Totals : R 133,118,483 R 55,560,429 165

    Organisation : Department of Police, Roads and Transport

    Average manual workers daily

    wage rate:

    R 83.33

    Annexure F16

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Construction of Naledi Transport Facilities and Infrastructure Dev Department of Police, Roads a R 8,118,483 R 3,020,722 57FS

    REGRAVELING OF ROADS IN EPWP Provincial Department of Police, Roads a R 25,000,000 R 17,500,000 25FS

    REGRAVELING OF ROADS IN EPWP Provincial Department of Police, Roads a R 25,000,000 R 7,297,272 17FS

    REGRAVELING OF ROADS IN EPWP Provincial Department of Police, Roads a R 25,000,000 R 5,234,448 18FS

    REGRAVELING OF ROADS IN EPWP Provincial Department of Police, Roads a R 25,000,000 R 9,825,842 25FS

    REGRAVELING OF ROADS IN EPWP Provincial Department of Police, Roads a R 25,000,000 R 12,682,146 23FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Infrastructure

    Totals : R 15,474,132 R 11,708,112 561

    Organisation : Provincial and Local Government

    Average manual workers daily

    wage rate:

    R 66.67

    Annexure F17

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Maluti-A-Phofung Community WCommuinty based Provincial and Local Governm Maluti a PhofungThabo Mofutsanyane R 2,096,000 R 219,600 518FS

    Upgrading of waste water treatmeMIG Provincial and Local Governm KopanongXhariep R 6,778,132 R 6,069,963 10FS

    Snake ParkMIG Provincial and Local Governm MoqhakaFezile Dabi R 6,600,000 R 5,418,549 33FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 4

    Infrastructure

    Totals : R 120,155,536 R 84,048,175 151

    Organisation : Department of Education

    Average manual workers daily

    wage rate:

    R 83.84

    Annexure F18

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    BFN - Maboloka Primary SchoolFacilities and Infrastructure Dev Department of Education R 5,463,963 R 38,500 25FS

    Thaba Nchu - Refentse schoolFacilities and Infrastructure Dev Department of Education R 34,908,855 R 26,026,253 53FS

    BFN - Gonyane SchoolLabour Based Construction Prog Department of Education R 36,130,581 R 28,954,762 21FS

    Harrismith - Kgetha Tsebo PrimarFacilities and Infrastructure Dev Department of Education R 43,652,137 R 29,028,660 52FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 20,608,000 R 9,827,626 15

    Organisation : Tourism, Environmental and Economic Affairs

    Average manual workers daily

    wage rate:

    R 80.00

    Annexure F19

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Installation of sewer for 4000 erveMIG Tourism, Environmental and E MoqhakaFezile Dabi R 20,608,000 R 9,827,626 15FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 12,000,000 R 2,440,562 11

    Organisation : NULL

    Average manual workers daily

    wage rate:

    R 12.80

    Annexure F20

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Road SignsLabour Intensive Programme NULL MangaungMotheo R 12,000,000 R 2,440,562 11FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Infrastructure

    Totals : R 19,840,000 R 7,015,815 43

    Organisation : Local Government and Housing

    Average manual workers daily

    wage rate:

    R 73.33

    Annexure F21

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    mONYAKENG PAVING OF ROMIG Local Government and Housin NalaLejweleputswa R 8,000,000 R 4,059,852 9FS

    Kgotsong Paved RoadMIG Local Government and Housin NalaLejweleputswa R 8,000,000 R 1,821,381 26FS

    Nala : Monyakeng roads Ph 1MIG Local Government and Housin NalaLejweleputswa R 3,840,000 R 1,134,581 8FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Infrastructure

    Totals : R 33,764,660 R 13,800,815 125

    Organisation : Department of Sports, Arts, Culture and Recreation

    Average manual workers daily

    wage rate:

    R 90.00

    Annexure F22

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Construction of Edenville LibraryFacilities and Infrastructure Dev Department of Sports, Arts, Cu R 8,678,660 R 5,707,354 28FS

    Upgrading of water reticulation nLabour Intensive Programme Sport, Recreation, Arts and Cu MasilonyanaLejweleputswa R 6,846,000 R 2,533,470 83FS

    Upgrading of gravel streets to surf-Not part of a programme- Sport, Recreation, Arts and Cu MasilonyanaLejweleputswa R 18,240,000 R 5,559,990 14FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 68

    Infrastructure

    Totals : R 123,532,963 R 41,446,088 2,350

    Organisation : Public Works and Rural Development

    Average manual workers daily

    wage rate:

    R 103.07

    Annexure F23

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Free State Road Maintenance - ThContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 34FS

    Free State Roadn Maintenance - NContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - BoLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - MContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    Free State Road Maintenance - KoContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 31FS

    FS Road P22/1 Maintenance - LeContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 31FS

    Free State Road Maintenance - MContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 34FS

    Free State Road Maintenance - BlContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 33FS

    FS Road P35/1 Maintenance - GreContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    Free State Road Maintenance - NkNot part of a programme Public Works and Rural Devel R 1,806,000 R 594,000 31FS

    Free State Maintenance - Paleit TrContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - KeContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 29FS

    FS CDP P52/1 Bethulie to SmithfContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 38FS

    Free State Road Maintenance - EContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FS CDP Road Maintenance - P54/Contractor Development Public Works and Rural Devel R 1,806,000 R 594,000 37FS

    Jacobsdal Cleaning of StreetsEPWP Provincial Letsemeng R 1,799,589 R 598,768 50FS

    Free State Road Maintenance - MContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    Upgrading of smithfield crecheContractor Development Public Works and Rural Devel R 657,428 R 6,780 6FS

    Henneman 200 WorkersEPWP Provincial Public Works and Rural Devel R 3,293,400 R 707,550 164FS

    FOOD FOR WASTE PROJECTEPWP Provincial Public Works and Rural Devel R 514,000 R 192,810 58FS

    Upgrading of 4th Council ChambLabour Intensive Programme Public Works and Rural Devel R 3,696,267 R 3,303,765 11FS

    Renotations to Boaramelo CombiContractor Development Public Works and Rural Devel R 397,889 R 297,500 6FS

    Upgrading of G Lefu Community EPWP Provincial Public Works and Rural Devel R 315,447 R 118,885 6FS

    Upgrading of Willem Green COmEPWP Provincial Public Works and Rural Devel R 579,947 R 426,041 6FS

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Free State Road Maintenance - PhContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 32FS

    Upgrading of Rouxville CommuniEPWP Provincial Public Works and Rural Devel R 446,033 R 323,000 6FS

    Free State Road Maintenance - PhContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 35FS

    Construction of Access Road in JaLabour Intensive Programme Public Works and Rural Devel R 4,896,000 R 1,444,475 119FS

    Bethany New Five Classroom conContractor Development Public Works and Rural Devel R 4,722,699 R 1,176,575 15FS

    NYS - CentlecNational Youth Service Public Works and Rural Devel R 1,145,000 R 9,240 13FS

    Upgrading of boshoff hallContractor Development Public Works and Rural Devel R 195,447 R 70,780 6FS

    Construction of Barolong HallContractor Development Public Works and Rural Devel R 6,768,910 R 1,456,921 16FS

    UPGRADING OF THE JACOBSContractor Development Public Works and Rural Devel R 341,948 R 267,000 11FS

    Upgrading of Edenburg CommuniEPWP Provincial Public Works and Rural Devel R 391,626 R 356,000 6FS

    FSCDP Routine Maint S345 SmitContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 34FS

    Free State Road Maintenance - P. Contractor Development Public Works and Rural Devel R 1,806,000 R 594,000 30FS

    FS S119 Road Maintenance - ShatLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 39FS

    FS Road S132 Maintenance - HenContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 34FS

    FS Road S132 Maintenance - ThaContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 38FS

    Free State Road Maintenance - SoContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FS Road S135 Maintenance - ReeContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 37FS

    FS Road S127 Maintenance - SibeContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 37FS

    Free State Road Maintenance - MContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 41FS

    FS Road S127 Maintenance - MaLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 35FS

    FS Road S345 Maintenance - BaeContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - S7Contractor Development Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - AfContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 38FS

    Free State Road Maintenance - TlContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    Free State Road Maintenance - AuContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 25FS

    Free State Road Maintenance - BiContractor Development Public Works and Rural Devel R 1,806,000 R 396,000 28FS

    FS Road S136 Maintenance - Re-Labour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FS CDP R726 Road Maintenance Labour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 39FS

    FS Road P7/3/2, Maintenance - MLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 39FS

    FS Road P7/3 Maintenance - Go tContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FS Road P8/1 Maintenance - QabLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FSDCP Road R30 - P55/1, R702 -Contractor Development Public Works and Rural Devel R 1,806,000 R 594,000 33FS

    FS Road Maintenance R701 GarieLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 35FS

    FS Road Maintenance of R701- IhContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 35FS

    Free State Road Maintenance - HlContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 38FS

    FS CDP Road R717 Maintenance Labour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 31FS

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Free State Road Maintenance - S JContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 30FS

    Free State Roadn Maintenance - TContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 35FS

    Free State Road Maintenance - NtContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 36FS

    Free State Road Maintenance - UContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 40FS

    FS CDP Road S119 Maintenance Labour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 33FS

    FS Road S119 Maintenance - CreLabour Intensive Programme Public Works and Rural Devel R 1,806,000 R 594,000 39FS

    Free State Road Maintenance - NgContractor Development Public Works and Rural Devel R 1,806,000 R 594,000 33FS

    Free State Road Maintenance - GuContractor Development Public Works and Rural Devel R 1,265,333 R 594,000 34FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 3,485,436 R 3,143,794 38

    Organisation : Agriculture

    Average manual workers daily

    wage rate:

    R 70.00

    Annexure F24

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    BFN: Glen College: Phase 1 UpgrEPWP Provincial Agriculture MangaungMotheo R 3,485,436 R 3,143,794 38FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 2

    Infrastructure

    Totals : R 160,045,262 R 14,994,492 69

    Organisation : Department of Health

    Average manual workers daily

    wage rate:

    R 75.00

    Annexure F25

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    BFN - Pelonomi Hospital changesFacilities and Infrastructure Dev Department of Health R 25,649,624 R 25,270 19FS

    Boitumelo Hospital ContractLabour Intensive Programme Health MoqhakaFezile Dabi R 134,395,639 R 14,969,222 50FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 8,678,661 R 5,351,234 28

    Organisation : Treasury

    Average manual workers daily

    wage rate:

    R 70.00

    Annexure F26

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Edenville LibraryLabour Intensive Programme Treasury NgwatheFezile Dabi R 8,678,661 R 5,351,234 28FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 2

    Infrastructure

    Totals : R 16,601,223 R 3,583,922 125

    Organisation : Public Safety,Security and Liason

    Average manual workers daily

    wage rate:

    R 85.00

    Annexure F27

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Construction of Naledi Transport Facilities & Infrastructure Devel Public Safety,Security and Lia NalediMotheo R 8,118,483 R 3,020,722 25FS

    Upgrading of gravel road to cocreLabour Intensive Programme Public Safety,Security and Lia NgwatheFezile Dabi R 8,482,740 R 563,200 100FS

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 79

    Infrastructure

    Totals : R 548,974,890 R 65,565,441 1,097

    Organisation : MP - Department of Roads and Transport

    Average manual workers daily

    wage rate:

    R 70.13

    Annexure F28

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 294,000 10MP

    Siyatentela Road Maintanance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 6MP

    Siyatentela Road Maintainance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 13MP

    Siyatentela Road Maintenance(MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 20MP

    Siyatentela Road Maintenance(BhLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 882,000 12MP

    Siyatentela Road Maintenance(MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 882,000 12MP

    Siyatentela Road Maintenance(KLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 1,764,000 18MP

    Siyatentela Road Maintenance(GeLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 882,000 15MP

    Siyatentela Road Maintenance(KaLabour Intensive Programme MP - Department of Roads and R 5,000,000 R 441,000 8MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 18MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 5,000,000 R 2,646,000 8MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 16MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 5,555,640 R 1,925,813 7MP

    Siyatentela (Mdladla)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 5,600 8MP

    Siyatentela (Magogeni)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,350,000 7MP

    Siyatentela (Driekoppies)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 4MP

    Siyatentela (Nhlengesha)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 5MP

    Siyatentela Roads Maintenance MLabour Intensive Programme MP - Department of Roads and R 5,969,250 R 441,000 39MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 308,000 18MP

    Siyatentela (Coner)Labour Intensive Programme MP - Department of Roads and R 8,350,000 R 1,354,000 12MP

    Siyatentela Road Maintenance(SkLabour Intensive Programme MP - Department of Roads and R 5,000,000 R 147,000 7MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 8,350,000 R 159,600 9MP

    Siyatentela (Mekemeke)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,350,000 8MP

    Siyatentela (Mahushu)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 200,000 19MP

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Siyatentela Road Maintanance MLabour Intensive Programme MP - Department of Roads and R 8,350,000 R 441,000 25MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 8,350,000 R 30,000 21MP

    Siyatentela (Caledonia)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 600,000 28MP

    Siyatentela Road Maintenance(PieLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 147,000 12MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 8,350,000 R 441,000 3MP

    Siyatentela Road Maintenace (SkiLabour Intensive Programme MP - Department of Roads and R 5,000,000 R 1,764,000 21MP

    Siyatentela (Nkomeni)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 200,000 14MP

    Siyatetela Road Maintanance MpLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 294,000 5MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 294,000 26MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 294,000 10MP

    Siyatentela Road Maintanance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 294,000 14MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 14MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 7MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 10,000,000 R 250,000 12MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 8,350,000 R 441,000 3MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 441,000 19MP

    Siyatentela (Mgobodzi)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 5MP

    Siyatentela (Dingleydale)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 17MP

    Siyatentela (Mthakathi)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 18MP

    Siyatentela (Zoeknog)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 18MP

    Siyatentela (Piet Retief)Labour Intensive Programme MP - Department of Roads and R 8,350,000 R 1,354,000 24MP

    Siyatentela (Bereta)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 10MP

    Siyatentela (Tsuvulani)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 14MP

    Siyatentela (Setlhare)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 24MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 6,000,000 R 435,000 17MP

    Siyatentela (Hebron)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 9MP

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 441,000 6MP

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 450,100 13MP

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 441,000 24MP

    Siyatentela Road Mantainance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 294,000 21MP

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 441,000 10MP

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 294,000 14MP

    Siyatentela Road Maintanance MLabour Intensive Programme MP - Department of Roads and R 5,000,000 R 441,000 16MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 147,000 30MP

    Siyatentela (Dwarsloop)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 10MP

    Siyatentela Road Maintenance (HLabour Intensive Programme MP - Department of Roads and R 10,000,000 R 333,332 10MP

  • Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Siyatentela Road Maintanance MEPWP Provincial MP - Department of Roads and R 5,000,000 R 294,000 16MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 2,400,000 R 799,999 12MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,833,332 12MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 10,000,000 R 250,000 12MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 10,000,000 R 333,332 10MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 2,400,000 R 800,000 12MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 10,000,000 R 250,000 22MP

    Siyatentela (Mbumba)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 8MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 10,000,000 R 250,000 17MP

    Siyatentela (Magudu)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,350,000 8MP

    Siyatentela Road Maintenance MLabour Intensive Programme MP - Department of Roads and R 2,400,000 R 600,000 8MP

    Siyatentela (Makoko)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 400,000 14MP

    Siyatentela (Siligane)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 200,000 13MP

    Siyatentela (Mpakeni-Daantjie)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 200,000 18MP

    Siyatentela (Matsulu)Labour Intensive Programme MP - Department of Roads and R 2,400,000 R 200,000 7MP

    Siyatentela (Arthurstone)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 32MP

    Siyatentela (Greenvalley)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 10MP

    Siyatentela (Arthurseat)Labour Intensive Programme MP - Department of Roads and R 10,000,000 R 1,890,000 13MP

    Siyatentela Road Maintenance MEPWP Provincial MP - Department of Roads and R 10,000,000 R 333,333 10MP

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 11

    Infrastructure

    Totals : R 330,810,825 R 54,719,459 909

    Organisation : GP - Public Transport, Roads and Works

    Average manual workers daily

    wage rate:

    R 86.19

    Annexure F29

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Gauteng youth service programmeNULL GP - Public Transport, Roads a R 5,091,657 R 89,100 55GP

    Simunye Primary SchoolLabour Intensive Programme GP - Public Transport, Roads a R 34,146,159 R 8,222,943 56GP

    Thulasizwe Primary SchoolNot part of a programme GP - Public Transport, Roads a R 56,959,416 R 140,360 61GP

    Winnie Mandela Primary SchoolEPWP Provincial GP - Public Transport, Roads a R 25,984,172 R 73,616 42GP

    Rietvallei P SchoolLabour Intensive Programme GP - Public Transport, Roads a R 10,047,674 R 108,360 25GP

    Sekhulisile Primary SchoolEPWP Provincial GP - Public Transport, Roads a R 14,761,346 R 64,960 52GP

    Kathehong Primary SchoolEPWP Provincial GP - Public Transport, Roads a R 17,040,529 R 33,100 19GP

    Bronkhorspruit primary SchoolLabour Intensive Programme GP - Public Transport, Roads a R 50,910,872 R 939,043 61GP

    Natalspruit Hospital Phase IILabour Intensive Programme GP - Public Transport, Roads a R 14,600,000 R 1,280,400 292GP

    K 71Voortrekker RoadFacilities and Infrastructure Dev GP - Public Transport, Roads a R 91,669,000 R 43,593,865 217GP

    BOLANI ROADSLabour Intensive Programme GP - Public Transport, Roads a R 9,600,000 R 173,712 29GP

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 4

    Infrastructure

    Totals : R 52,205,389 R 13,712,770 175

    Organisation : GP - Housing

    Average manual workers daily

    wage rate:

    R 77.50

    Annexure F30

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Kwathema CCCLabour Intensive Programme GP - Housing R 4,605,979 R 1,338,130 23GP

    IMPUMELELO EXTENSION 2Subsidised Housing GP - Housing R 17,189,280 R 6,334,469 7GP

    TSHEPISO NORTH EXTENSIOLabour Intensive Programme GP - Housing R 11,419,730 R 460,000 6GP

    MAMELODI EXTENSION 8Subsidised Housing GP - Housing R 18,990,400 R 5,580,171 139GP

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 2,000,000 R 380,000 13

    Organisation : LP - Dept of Local Government and Housing

    Average manual workers daily

    wage rate:

    R 90.00

    Annexure F31

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Upgrading of street & stormwater Labour Intensive Programme LP - Dept of Local Governmen R 2,000,000 R 380,000 13LP

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 11

    Infrastructure

    Totals : R 139,587,763 R 15,185,090 234

    Organisation : LP - Department of Health and Social Development

    Average manual workers daily

    wage rate:

    R 74.00

    Annexure F32

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Construction of staff accommodatLabour Intensive Programme LP - Department of Health and R 15,000,000 R 477,889 18LP

    Construction of Staff AccommodaHousing Delivery LP - Department of Health and R 2,511,312 R 3,360 3LP

    Construction of Community BaseCommunity based LP - Department of Health and R 10,052,366 R 2,089,911 16LP

    Construction of Community RehaCommunity based LP - Department of Health and R 6,458,672 R 71,760 13LP

    construction of Community BasedCommunity based LP - Department of Health and R 9,688,007 R 487,571 10LP

    Construction of Treatment Centre Facilities and Infrastructure Dev LP - Department of Health and R 5,000,000 R 1,887,346 34LP

    Women of Calvary Drop In CentrLabour Intensive Programme LP - Department of Health and R 9,660,260 R 500,000 14LP

    Construction of staff AccommodaHousing Delivery LP - Department of Health and R 2,350,684 R 545,166 11LP

    Construction of Mtsetweni ChildrLabour Based Construction Prog LP - Department of Health and R 40,404,025 R 521,045 30LP

    Construction of Childdrens HomeLabour Intensive Programme LP - Department of Health and R 22,962,437 R 4,211,837 69LP

    Civil Works at Thabazimbi HospitLabour Intensive Programme LP - Department of Health and R 15,500,000 R 4,389,206 16LP

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 3

    Infrastructure

    Totals : R 14,527,901 R 8,538,959 58

    Organisation : KN - Department of Public Works

    Average manual workers daily

    wage rate:

    R 70.00

    Annexure F33

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Mtubatuba Works DepotLabour Based Construction Prog KN - Department of Public Wo R 9,772,391 R 8,348,079 5KN

    Umkhanyakude Works District OfLabour Based Construction Prog KN - Department of Public Wo R 4,255,510 R 185,000 47KN

    Maintenance of information signs Vukuzakhe KN - Department of Public Wo R 500,000 R 5,880 6KN

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 1

    Infrastructure

    Totals : R 150,000 R 48,340 8

    Organisation : KN - Department of Education

    Average manual workers daily

    wage rate:

    R 65.00

    Annexure F34

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Labour Supply on various roads PLabour Intensive Programme KN - Department of Education R 150,000 R 48,340 8KN

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 5

    Infrastructure

    Totals : R 75,680,199 R 3,488,007 155

    Organisation : KN - Department of Health

    Average manual workers daily

    wage rate:

    R 74.00

    Annexure F35

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Efaye clinicLabour Based Construction Prog KN - Department of Health R 10,071,200 R 81,400 15KN

    Samungu ClinicLabour Based Construction Prog KN - Department of Health R 1,900,884 R 16,000 11KN

    Nhlwathi ClinicLabour Based Construction Prog KN - Department of Health R 2,550,301 R 359,130 4KN

    Appelsbosch HospitalLabour Based Construction Prog KN - Department of Health R 5,153,783 R 2,529,996 13KN

    Port Shepstone HospitalLabour Based Construction Prog KN - Department of Health R 56,004,031 R 501,480 112KN

  • Expanded Public Works Programme (EPWP)(Cumulative : 1 April 2010 to 30 June 2010) Project ReportList of projects per National and Provincial Departments

    Goverment Sector :

    Number of Projects : 14

    Infrastructure

    Totals : R 196,732,223 R 52,880,630 38,043

    Organisation : KN - Dept of Transport

    Average manual workers daily

    wage rate:

    R 72.32

    Annexure F36

    Project NameProgramme Name Department Local Municipality NameDistrict Municipality Name Budget (Including Professional Fees)

    Expenditure 1 April 2010 to 30 June 2010

    (Including Professional Fees)

    Gross number of work opportunities

    created

    Province Abbreviation

    Zibambele - Ladtsmith RegionZibambele KN - Dept of Transport R 21,392,311 R 13,673,179 9977KN

    Zibambele Empangeni RegionZibambele KN - Dept of Transport R 45,761,550 R 18,911,535 13813KN

    Zibambele Durban RegionZibambele KN - Dept of Transport R 84,717,577 R 10,426,038 7255KN

    Zibambele- Pietermaritzburg RegiZibambele KN - Dept of Transport R 38,251,640 R 9,713,769 6940KN

    Guardrail installation on Road P4EPWP Provincial KN - Dept of Transport R 422,250 R 32,400 10KN

    Drain Cleaning and Verge on P47EPWP Provincial KN - Dept of Transport R 200,000 R 11,475 9KN

    Drain cleaning on Road P47/3/01EPWP Provincial KN - Dept of Transport R 100,000 R 17,280 6KN

    Guardrail installation on Road D1Labour Intensive Programme KN - Dept of Transport R 175,800 R 9,720 6KN

    Sidewalk Construction on D1721EPWP Provincial KN - Dept of Transport