INSTALLED CAPACITY
NORTHERN :- 53.7 GW
EASTERN :- 26.3 GW
SOUTHERN :- 52.8 GW
WESTERN :- 64.4 GW
NORTH-EASTERN :- 2.45 GW
TOTAL 200 GW
REGIONAL
GRIDS
Total 3,287,263 sq. km area
More than 1 Billion people
SOUTHERN
REGION
WESTERN
REGION
EASTERN
REGION
NORTHERN
REGIONNORTH-
EASTERN
REGION
REGIONAL
GRIDS
Area : 1010,000 SQ KMS
Population : 330 Million
Peak Demand : 41 GW
Max energy Consumption:280 BU
Area : 951470 SQ KMS
Population : 244 Million
Peak Demand : 42.4 GW
Max energy consumption :288 BU
Area : 636280 SQ KMS
Population : 232 Million
Peak Demand : 37.2 GW
Max energy consumption :250BU
Area : 433680 SQ KMS
Population : 240 Million
Peak Demand : 17.2 GW
Max energy consumption:105BU
Area : 255,090 SQ KMS
Population : 40 Million
Peak Demand : 2.2GW
Max energy consumption : 11BU
Total 3,287,263 sq. km area
More than 1 Billion people
Peak Demand: 136 GW
Energy Requirement :
934BU
NLDC:
Ensure integrated operation of
National Grid
RLDC:
Ensure integrated operation of
Regional Grid
SLDC:
Ensure integrated operation of State
Grid31
5
Power System Hierarchy
NEW Grid
SouthGrid
South
West
North
East
Northeast
Five Regional Grids
Five Frequencies
October 1991
East and Northeast
synchronized
March 2003
West synchronized
With East & Northeast
August 2006
North synchronized
With Central Grid
Central Grid
Five Regional Grids
Two Frequencies
Renewable: 24.5 GW
Installed Capacity: 200 GW
SR Synch
By 2013-14
Inter – Regional
Capacity:
27.95 GW
• 765kV/400kV lines: about
1,11,000 ckm
• 220kV lines: about 135,000
ckm
• HVDC Bipole (±500kV): 8900
ckms – 4 nos.
• HVDC Back-to-back: 7 nos.
(3000MW)
Transmission Network - Present
Need of new initiatives in Transmission
Projected Power Scenario
** Source- Planning commission report on IEP
Present Generation Capacity & Demand - 200 GW & 136 GW
# Considering 9% GDP growth rate
205GW
Coal – In Central India
‾ Chhattisgarh : 58000 MW
‾ Orissa : 30000 MW
‾ Jharkhand : 15000 MW
‾ Madhya Pradesh:16000 MW
Hydro – In North Eastern &
Northern Himalayan region
Coastal based
‾ Andhra Pradesh: 24000 MW
‾ Tamil Nadu : 10000 MW
‾ Gujarat : 11000 MW
Expected Installed Capacity (2025) : 6,00,000MW
Lara
Expected Generating Stations - 2025
Partabpur
Talcher/Ib Valley
Krishnapatnam
NEPAL
KorbaBhopalIndore
Tadri
Girye
Kaiga
Thiruvananthapuram
Pipavav
Kudankulam
SR
Bangalore
Kayamkulam
WR
Tarapur
Mumbai
Cuddalore
Ennore
Akaltara
Raipur
Hyderabad
RAPP
Gandhinagar
Mudra
Delhi
Ludhiana
NR
Jaipur
Jammu
Sasan
Vindhyachal
Lucknow
Load Centre Based Generation
Ultra-Mega Generation
Hydro Based Generation
Coastal Generation
Coal Based generation
Nuclear generation
BhubaneswarDarlipali
Vizag
Simhadri
LEGEND
Load-Centre
NERGuwahati
Koderma
SIKKIM
Kolkata
ER
PatnaNECK
CHICKEN
BHUTAN
DESHBANGLA
MY
AN
MM
AR
Mangalore
KozhikodeSouth MadrasChennai
Energy resources (coal, water etc.) unevenly distributed
Energy Resources Map
Need of new initiatives in Transmission
Increased role of ISTS power transfer
Need of long distance Transmission system
Minimum use of land and Right-of-Way
Optimal cost per MW transmission
Optimal Transmission Losses
Adequate margin – to cater trading, contingencies
Implementation – Equipment availability, manpower
Future Transmission Planning
- Consideration
Change in Generation Profile
Central Sector State Sector Private Sector Total
21222 (34%) 21355(34%) 19797(32%) 62374
28600 (28%) 14400(15%) 57000 (57%) 100000
XI
XII
Road Map for Indian Power System
• Creation of 11 no. High Capacity Trans. Corridors for 55
IPPs (55,000 MW)
• Ultra Trans. System for 6 UMPPs (24000MW)
• Transmission system for DVC generation projects
(5000MW)
• Transmission system for Evacuation of power from
NER & Bhutan
Few Major Transmission Projects
Sl. No. Cluster/Corridor No. of IPPs Installed Capacity
(MW)
LTOA Granted (MW)
1 Orissa 7 10090 6080
2. Jharkhand 5 4540 4084
3, Sikkim 9 2358 2358
4 Bilaspur+MP 6 4370 4160
5. Chattisagrh 13 15485 15185
6. Krishnapatnam 4 4600 3072
7. Tuticorin 2 2600 2045
8. Srikakulam 2 3960 3760
9. Cuddlore/Nagapattinam 3 3570 2987
10. Vemagiri 4 5400 5150
11. Common Transmission
system in WR and NR
Total 55 56973 48881
Transmission Corridors for IPPs
High Capacity Transmission Corridor
NEYVELI
RAICHUR
RAMAGUNDAM
VIJAYAWADA
CHANDRAPUR
KORADI
KORBAKORBA(W)
VINDHYACHAL
SATPURA
RIHAND
ANPARA OBRA
RENGALI
FARAKKA
KAHAL-
TALCHER
MUNIRABAD
N'SAGAR
URI
MAITHON
MADRAS
TEHRI
DHAULIGANGA
CHAMERA
N.JHAKRI
AURAIYA
KAIGA
MADURAI
UDUMALPET TRICHY
SALEM
BANGALORE
CUDDAPAH
GOOTY
HYDERABAD
GAZUWAKA
ASOJ
DHULE
BHILAI
ITARSI
JAIPUR
KANPUR
LUCKNOW
JEYPORE
J
JEERAT
DURGAPUR
NORTH TRICHUR
KISHENPUR
WAGOORA
MOGA
BHIWANI
BIHAR-
KHAMMAM
BAREILLY
HISSAR
NALLAGARH
PANIPAT
MALERKOTLA
DEHGAM
INDRAVATI
DADRI
JAMSHEDPUR
PROPOSED HIGH CAPACITY TRANSMISSION
LEGEND
BALLABGARH
BAWANA
MURADNAGAR
MANDAULAMEERUT
BASSI(RSEB)
PANKI
JALANDHAR
IIIII
GANDHAR
STPS
DULHASTI
PAMPORE
SALALI&II
JAMMU
SARNAHAMIRPUR
SIUL
PONG
RAPP-B
ANTA
DAUSA
CHITTORGARH
UDAIPUR
KOLAR
BAHOOR
KAYAMKULAM
PALLOM
EDAMON
KOLASIBAGARTALA
AGARTALA GPP
MALDA
KUMARGHAT
BADARPUR IMPHAL
JIRIBAM
AIZWAL
ZEMABAWK
HAFLONG
LOKTAK
KAMENG
RAMMAM
SILIGURI
PURNEA
KHLIEHRIAT
CHUKHA
BONGAIGAON BIRPARA
DALKHOLA
SAMAGURI
BALIPARA
TEZPUR
KOPILI DIMAPUR
DOYANG
MARIANI
ITANAGAR
KHANDONG
MISA
RANGANADI
GOHPUR
ZIRO
DEOMALI
KATHALGURI
KAKRAPAR
BHARUCH
KAWAS
NAVSARIVALTHAN
NAGDA
VAPI
HOSUR
SHARIF
MERAMUNDALI
BARIPADA
STPS
KOLAGHAT
ALLAHABAD
SINGRAULI
LUDHIANA PATIALA
KAITHAL
BUDHI-PADAR
NELLORE
KURNOOLNARENDRA
KOLHAPUR
MAPUSA
TRIVANDRUM
BHIWADI
SATNA
UNNAO
GORAKHPUR(PG)
MUZAFARPUR
TALAB H U T A N
SEONI
FATEHBAD
MAINPURI
SIPAT
KHANDWA
RAJGARH
SSAROVAR
BOISARTARAPUR
DAVANGERE HIRIYUR
GAON
SUBHASGRAM
AMRITSAR
BHATAPARA
WARANGAL
ALAMANTHI
MALEKOTTAYUR
PONDICHERRY
PUGALUR
MYSORE
KOZIKODE
DELHI
KUDANKULAM
TIRUNELVELI
MUVATTAPUZHA
BARHPATNA
MAU
(PG)
(UP)
(UP)
KOTA RAPP-C&DKANKROLI
PARBATI
KOLDAM
PALLATANAGBPP
RANCHI
AKOLA
URI-II
-II
BAHDURGARH
JODHPUR
KISHENGANGA
ARASUR
MAHBOOB NAGAR
SOLAPUR(PG)
PARLI(N)PUNE
LONIKHAND
KALWA
B'SPUR
DAMOH
KARAMSADLIMBDI
RANCHODPURA
ZERDA
KARAD
SOLAPUR
BHILWARA
MERTA
ALISTONG
WAMPOH
-III
GANGTOK
MELLI
TALGUPPA
HASSAN
KARAIKUDI
VEMAGIRI
PARLI
RAJKOT
NAVI MUMBAI
KHADOLI
SHUJALPUR
KHARADPADA
MAGARWADA
AMARGARH
CHANDAKA
TEESTA-V
RANGIT
NKSTPP
FATEHPUR
BISHWANATH
LOWERSUBANSIRI
BHINMAL
GURGAON
RAMPUR
SILCHARMAITHON RBSASAN
MUNDRA
JETPUR
AMRELI
MUMBAI LOC
BHADRAWATI
BYRNIHAT
SONIPAT
K'WANGTOO
BACHCHAU
GAYA
TUTICORIN JV
KRISHNAPATANAM UMPP
NORTH CHENNAI JV
SIKAR
RATANGARH
BASPA
PANCHKULAPOOLING STN
JATTI KALAN
LUCKNOW
BAREILLY
DASUYA
MAHRANIBAGHGNOIDA
KODERMA
BOKARO
MEJIA
FROM SIKKIMMELLI
BEHRAMPUR
PUNE
A'BAD
NEEMRANA
MANESAR
DEHRADUNBAGPAT
GAJWEL
TILAIYYA
ROORKEE
SAHARANPUR
ROORKEE
KASHIPUR
SASARAM
VARANASI
WR POOL
ANGUL
PADGHEAURANGABAD
RAIPUR
RAIGARH
WARDHA
INDORE
GWALIOR
BINA
JABALPUR POOL
JABALPUR DHARAMJAYGARH
JHARSUGUDA
CORRIDORS UNDER VARIOUS IPP'S
CHAMPA
KISHANGANJ
AGRA
Transmission Corridor for Chhattisgarh IPPs (Corridor - V)
BHOPAL
JAIPUR
JHARKHANDPOOL
CHARIALI
ALIPURDUAR
PUNATSANGCHU-I
Transmission Corridor for Orissa IPPs (Corridor - I)
Transmission Corridor for Jharkhand IPPs (Corridor - II)
Transmission Corridor for Tuticorin IPPs (Corridor - VII)
Transmission Corridor for Sikkim IPPs (Corridor - III)
NABINAGAR
SRIKAKULAM
NELLORE
BANGALORE
MADHUGIRI
CHEYYUR UMPP
Transmission Corridor for Krishnapatnam IPPs (Corridor - VI)
TIRUVALAM
NAGAPATTINAM
KURUKSHETRA
VADODRA
BALIA
B'SAHAR
ORAI
Transmission Corridor for Chhattisgarh & MP IPPs (Corridor - IV)
PIRANA
Transmission Corridor for Srikakulam IPPs (Corridor - VIII)
Transmission Corridor for Southern Region IPPs (Corridor - IX)
Transmission Corridor for Vemagiri IPPs (Corridor - X)
Transmission Corridor for Nagapattinam/Cuddalore IPPs
TUTICORIN
NARENDRA
VEMAGIRI
Tr. Lines, Voltage level End of 11th Plan
(Ckm)
Estimated additions
in 12th Plan
(Ckm)
765 KV 7,612 25000-30000
HVDC Bi-pole 11,078 4000 - 6000
400 KV 1,25,000 50000
220 KV 1,50,000 40000
Total Tr. Lines 2,93,852 119,000 –
126,000
Transmission Addition Programme
Sub-Stn. Voltage level End of 11th
Plan
(MVA/MW)
Estimated
addition in 12th
Plan
(MVA/MW)
765 KV 53,000 110,000
HVDC 14,700 16,000 -22,000
400 KV 145,000 80,000
220/230 KV 230,000 95,000
Inter Regional Transfer
Capacity
28,000 65,000
Transmission Addition Programme
Transmission Line : 50,000 ckm
• 765kV – 17120 ckm
• 400kV – 22000 ckm
• 220kV/132kV – 1230 ckm
• HVDC - 9630 ckm
Substations : about 109,400 MVA (60 nos.)
• 765kV – 88,000 MVA
• 400kV – 7560 MVA
• 220kV/132kV – 840 MVA
• HVDC - 13,000 MVA
Expansion Programme in next 6-7 Years
(POWERGRID)
Road Map for Indian Power System
• Creation of reliable repairing facilities & development
of indigenous manufacturing capacity
• Need to establish reliable testing facilities for EHV and
UHV
• Development of Smart Grid for real-time monitoring of
dynamic state and optimal utilisation of facilities
Issues & Challenges
Road Map for Indian Power System
• Issues concerning availability of RoW and land are
becoming critical –
– Resistance of people, terrains in areas of mountains and
forest
• Sector to grow from 173 GW to 600 GW in next 20
years – Even 765kV system may not be good enough.
New methods have to be found out
• Cable manufacturers need to Research & develop
cables which could be more cost effective
• With increasing magnitude of power transmission,
new challenges of proper O&M
Issues & Challenges