national positioning navigation and timing architecture
DESCRIPTION
National Positioning Navigation and Timing Architecture Civil GPS Service Interface Committee Meeting Karen Van Dyke, DOT/RITA/Volpe Center Lt Col Patrick Huested, National Security Space Office 15 September 2008. Overview. PNT Architecture Background Architecture Development - PowerPoint PPT PresentationTRANSCRIPT
UNCLASSIFIED
National Positioning Navigation and Timing Architecture
Civil GPS Service Interface Committee MeetingKaren Van Dyke, DOT/RITA/Volpe Center
Lt Col Patrick Huested, National Security Space Office
15 September 2008
2
UNCLASSIFIED
Overview
• PNT Architecture Background
• Architecture Development
• Guiding Principles
• Recommendations
• Next Steps
3
UNCLASSIFIED
Foundations
RITA
FAA
FHWA
FRA
DOC
NIST
DHS
USCG
DOI
DOS
NCO
NASA
NII
USAF
AFSPC
USA
USMC
USN
USNO
NGA
NSA
STRAT
JS
AT&L/S&T
PBFA
SAF/USA
SMDC
NRL
SMC
JPDO
““NSSO develop a NSSO develop a National PNT National PNT Architecture”Architecture”
““NPCO will NPCO will initiate an effort initiate an effort
with NSSO”with NSSO”
““RITA will lead RITA will lead effort on behalf of effort on behalf of DOT for the civil DOT for the civil
community”community”
ASD/NII MemoASD/NII Memo23-Jan-200623-Jan-2006
ASD/NII MemoASD/NII Memo23-Jan-200623-Jan-2006
NPEC NPEC Action ItemsAction Items26-Jan-200626-Jan-2006
NPEC NPEC Action ItemsAction Items26-Jan-200626-Jan-2006
DOT/RITA DOT/RITA MemoMemo
14-Mar-200614-Mar-2006
DOT/RITA DOT/RITA MemoMemo
14-Mar-200614-Mar-2006
PNT Architecture PNT Architecture TORTOR
11-Jul-200611-Jul-2006
PNT Architecture PNT Architecture TORTOR
11-Jul-200611-Jul-2006
More Effective & Efficient PNT and an Evolutionary More Effective & Efficient PNT and an Evolutionary Path for Government Provided Systems & ServicesPath for Government Provided Systems & Services
More Effective & Efficient PNT and an Evolutionary More Effective & Efficient PNT and an Evolutionary Path for Government Provided Systems & ServicesPath for Government Provided Systems & Services
4
UNCLASSIFIED
Primary Objective
Near & Mid Term Near & Mid Term Decisions Guided Decisions Guided
by Architectureby Architecture
Near & Mid Term Near & Mid Term Decisions Guided Decisions Guided
by Architectureby Architecture
Based on Based on Long Term Long Term
VisionVision
Based on Based on Long Term Long Term
VisionVision
Without Without Enterprise Enterprise
Architecture Architecture StrategyStrategy
Without Without Enterprise Enterprise
Architecture Architecture StrategyStrategy
Ca
pab
ility
Ca
pab
ility
Should-Be Should-Be ArchitectureArchitecture
Evolved Evolved Baseline Baseline
(EBL)(EBL)
As-Is As-Is ArchitectureArchitecture System EmphasisSystem Emphasis
ArchitectureArchitectureEmphasisEmphasis
NowNow 5 Years5 Years 10 Years10 Years 15 Years15 Years 20 Years20 Years
“…“…provide more effective and efficient PNT capabilities focused onprovide more effective and efficient PNT capabilities focused on the 2025 timeframe and an evolutionary path for government the 2025 timeframe and an evolutionary path for government provided systems and services.” provided systems and services.” -- Terms of Reference-- Terms of Reference
“…“…provide more effective and efficient PNT capabilities focused onprovide more effective and efficient PNT capabilities focused on the 2025 timeframe and an evolutionary path for government the 2025 timeframe and an evolutionary path for government provided systems and services.” provided systems and services.” -- Terms of Reference-- Terms of Reference
5
UNCLASSIFIED
Scope
Military
Homeland
Security
Civil
Commercial
Space
Air
Surface
Sub-Surface
Location Based Services
Tracking
Survey
Scientific
Recreation
Transportation
Machine Control
Agriculture
Weapons
Orientation
Communications and Timing
GNSS
GNSS
Augmentation
Terrestrial
NAVAIDS
Onboard /
User Equip
Networks
Military
Civil
Commercial
International
USERS DOMAIN MISSIONS PROVIDERSSOURCES
Broad Scope Required Innovative Approaches and Focused Analysis Efforts
6
UNCLASSIFIED
Primary PNT Gaps
• Gaps primarily drawn from military’s PNT Joint Capabilities Document, with additions and modifications from parallel civil community documents and discussions
– Operations in Physically Impeded Environments
– Operations in Electromagnetically Impeded Environments
– Higher accuracy with integrity
– Notification of Hazardously Misleading Info (Integrity)
– High Altitude/Space Position and Orientation
– Geospatial information - access to improved GIS data (regarding intended path of travel)
– Insufficient modeling capability
7
UNCLASSIFIED
Cumulative Process
Data GatheringData GatheringConcept DevelopmentConcept Development
Analysis & AssessmentAnalysis & Assessment
Needs & Gaps
Environment, Technology& Evolved Baseline
Community InvolvementCommunity InvolvementArchitecture Development Team,
Subject Matter Experts,Small Working Groups
& Industry
Trade Space, Features & Architectures
Analytical Framework
8
UNCLASSIFIED
VVECTORECTORInterchangeable SolutionsInterchangeable Solutions
VVECTORECTORInterchangeable SolutionsInterchangeable Solutions
VVISIONISIONUS Leadership in Global PNTUS Leadership in Global PNT
VVISIONISIONUS Leadership in Global PNTUS Leadership in Global PNT
Guiding Principles
SSTRATEGYTRATEGYGreater Common DenominatorGreater Common Denominator
SSTRATEGYTRATEGYGreater Common DenominatorGreater Common Denominator
VVECTORECTORMultiple PhenomenologiesMultiple Phenomenologies
VVECTORECTORMultiple PhenomenologiesMultiple Phenomenologies
VVECTORECTORSynergy of PNT & CommunicationsSynergy of PNT & Communications
VVECTORECTORCooperative Organizational StructuresCooperative Organizational Structures
9
UNCLASSIFIED
US Leadership in Global PNTUS Leadership in Global PNTUS Leadership in Global PNTUS Leadership in Global PNT
Vision
• Based on a foundation of national policy
• Efficiently develop and field the best technologies and systems (e.g. cost, schedule, acceptable risks, user impact)
• Promulgate stable policies (commitment to funding, commitment to performance, advanced notice of change, etc)
• Foster innovation through competition within the commercial sector
• Ensure robust and enduring inter-agency coordination and cooperation
• Maximize the practical use of military, civil, commercial and foreign systems and technologies
• Judiciously develop and apply standards and best practices
10
UNCLASSIFIED
Strategy
• Recommendations
– Maintain GPS as a cornerstone of the National PNT Architecture
– Monitor PNT signals to verify service levels, observe environmental effects, detect anomalies, and identify signal interference for near real-time dissemination
– Transition or divest US GNSS augmentation assets that are unnecessarily redundant after capability is available from GPS modernization or other methods
– Continue to investigate methods to provide high-accuracy-with-integrity solutions for safety-of-life applications
– Develop a national approach to protect military PNT advantage
The US can Best Achieve Efficiency and Effectiveness The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approachthrough a Greater Common Denominator Approach
The US can Best Achieve Efficiency and Effectiveness The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator Approachthrough a Greater Common Denominator Approach
11
UNCLASSIFIED
Vector: Multiple Phenomenologies
• Recommendations– Encourage appropriate development and employment of equipment that integrates
information from diverse sources and information paths
– Assess the potential for the use of foreign PNT systems for safety-of-life applications and critical infrastructure users and, as appropriate, develop clear standards and criteria for their use
– Continue military PNT exclusive use policy while studying development of capabilities to enable military use of other signals
– Promote standards for PNT pseudolites and beacons to facilitate interchangeability and avoid interference
– Study evolution of space-based and terrestrial PNT capabilities to support diversity in PNT sources and information paths
– Ensure critical infrastructure precise time and time interval users have access to and take advantage of multiple available sources
1111Use Multiple Phenomenologies to the Use Multiple Phenomenologies to the
Maximum Extent Practical to Ensure Robust AvailabilityMaximum Extent Practical to Ensure Robust Availability
Use Multiple Phenomenologies to the Use Multiple Phenomenologies to the Maximum Extent Practical to Ensure Robust AvailabilityMaximum Extent Practical to Ensure Robust Availability
12
UNCLASSIFIED
Vector: Interchangeable Solutions
• Recommendations
– Use participation in international PNT-related activities to promote the interchangeability of PNT sources while assuring compatibility
– Evolve standards, calibration techniques, and reference frames to support future accuracy and integrity needs
– Identify and develop common standards that meet users’ needs for PNT information exchange, assurance and protection
– Establish common standards that meet users’ needs for the depiction of position information for local and regional operations
2222Strive for Interchangeable Solutions to Strive for Interchangeable Solutions to
Enhance Efficiency and Exploit Source DiversityEnhance Efficiency and Exploit Source Diversity
Strive for Interchangeable Solutions to Strive for Interchangeable Solutions to Enhance Efficiency and Exploit Source DiversityEnhance Efficiency and Exploit Source Diversity
13
UNCLASSIFIED
Vector: Synergy of PNT & Communications
• Recommendation
– Identify and evaluate methods, standards and potential capabilities for fusion of PNT with communications
3333Pursue, where Appropriate, Fusion of PNT with Pursue, where Appropriate, Fusion of PNT with New and Evolving Communications CapabilitiesNew and Evolving Communications Capabilities
Pursue, where Appropriate, Fusion of PNT with Pursue, where Appropriate, Fusion of PNT with New and Evolving Communications CapabilitiesNew and Evolving Communications Capabilities
14
UNCLASSIFIED
Vector: Cooperative Organizational Structures
• Recommendations
– Develop a national PNT coordination process
– Identify and leverage centers of excellence for PNT phenomenology and applications
– Define, develop, sustain, and manage a PNT modeling and simulation core analytical framework
4444Promote Interagency Coordination & Cooperation to Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information SharingEnsure the Necessary levels of Information Sharing
Promote Interagency Coordination & Cooperation to Promote Interagency Coordination & Cooperation to Ensure the Necessary levels of Information SharingEnsure the Necessary levels of Information Sharing
15
UNCLASSIFIED
Recommendation Tree
VisionVision
StrategyStrategy
VectorsVectors
Rec
om
men
da
tio
ns
Rec
om
men
da
tio
ns
Synergy of PNT & Synergy of PNT & CommunicationsCommunications
Cooperative Cooperative Organizational Organizational
StructuresStructures
GPS – An GPS – An Architecture Architecture CornerstoneCornerstone
Augmentation Augmentation Transition Transition
OpportunitiesOpportunities
PNT Signal PNT Signal Monitoring & Monitoring &
DisseminationDissemination
Multiple Multiple PhenomenologiesPhenomenologies
Interchangeable Interchangeable SolutionsSolutions
Standards & Standards & Reference FramesReference Frames
Grids & Grids & Coordinate Coordinate SystemsSystems
Info Exchange, Info Exchange, Assurance & Assurance &
ProtectionProtection
Interchangeability Interchangeability with Foreign PNT with Foreign PNT
SourcesSources
Integrated User Integrated User EquipmentEquipment
Civil Use of Civil Use of Foreign PNTForeign PNT
US Military Use of US Military Use of Non-Military Non-Military
SignalsSignals
Evolution of PNT Evolution of PNT CapabilitiesCapabilities
Synergy of PNT & Synergy of PNT & CommunicationsCommunications
National PNT National PNT Coordination Coordination
ProcessProcess
Protect Strategic Protect Strategic AdvantageAdvantage
Critical Critical Infrastructure & Infrastructure &
TimeTime
High Accuracy High Accuracy with Integritywith Integrity
US Leadership in Global PNTUS Leadership in Global PNT
The US can Best Achieve Efficiency and Effectiveness through a The US can Best Achieve Efficiency and Effectiveness through a Greater Common Denominator ApproachGreater Common Denominator Approach
PNT Pseudolites PNT Pseudolites & Beacons& Beacons
Phenomenology & Phenomenology & Application Application ChampionsChampions
Modeling & Modeling & Simulation Simulation FrameworkFramework
1919
1818
17171616
1414
1313
1212
1515
88
77
66
99
1010
1111
33
22
11
44
55
332211 44
16
UNCLASSIFIED
ImplementationImplementation
ImplementationImplementation
CY2008
Q1 Q2 Q3 Q4
IPR IPR AIM AIM
Transition PlanningTransition PlanningTransition PlanningTransition Planning
AGM AGM
v1v1v1v1
v2v2v2v2
vvNNvvNN
On-GoingOn-GoingProcessProcess
Architecture Effort and Schedule
ArchitectureArchitectureDevelopmentDevelopment
TransitionTransitionPlanningPlanning
ArchitectureArchitectureDevelopmentDevelopment
TransitionTransitionPlanningPlanning
ArchitectureArchitectureDevelopmentDevelopment
TransitionTransitionPlanningPlanning
A Plan to Achieve the Should-Be Architecture
is Produced & Implementation Begins
Effort Re-Examines the PNT Environment and Crafts and
Implements the Next 20-Year Should-Be Architecture
The National PNT Architecture Effort Employs an Iterative, Interagency Process to Plan US Leadership in Global PNT
The National PNT Architecture Effort Employs an Iterative, Interagency Process to Plan US Leadership in Global PNT
Should-Be Should-Be ArchitectureArchitectureShould-Be Should-Be
ArchitectureArchitecture
Transition Plan provided to agenciesTransition Plan provided to agencies
v1v1v1v1
Should-Be Should-Be ArchitectureArchitectureShould-Be Should-Be
ArchitectureArchitecture
v2v2v2v2
Effort Repeats--the Next New Should-Be
Architecture is Developed, Planned, and Implemented
17
UNCLASSIFIED
Next Steps
• Workshop(s) to Obtain Public Feedback on Recommendations– First “Industry Day” session in conjunction with the 2008 Institute of Navigation
(ION) Global Navigation Satellite System (GNSS) conference.
• Date: September 16
• Time: 1PM – 4PM, starting with a presentation by NSSO
• Location: Savannah International Trade and Convention Center, Rooms 105 & 106
• Influence update to PNT planning documents– Federal Radionavigation Plan
– Five-Year National Space-Based PNT Plan
• Architecture Transition Plan – Event-based implementation timeline
– Coordinate through Decision Coordination Group members and co-sponsors as appropriate
18
UNCLASSIFIED
Points of Contact
• National Security Space Office
– CAPT Milton Abner
– Website: http://www.acq.osd.mil/nsso/pnt/pnt.htm
• OASD/NII
– Mr. Ray Swider
• DOT RITA, Volpe Center
– Ms. Karen Van Dyke