national transmission and despatch company (ntdc) ntdc development program planning power (ntdc)...

25
NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO PLANNING POWER (NTDC) PEPCO January 2012 January 2012

Upload: della-boyd

Post on 27-Dec-2015

258 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC)NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC)

NTDC DEVELOPMENT PROGRAMNTDC DEVELOPMENT PROGRAM

PLANNING POWER (NTDC) PEPCOPLANNING POWER (NTDC) PEPCOJanuary 2012January 2012

Page 2: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR.NO.

DESCRIPTION

I List of ongoing Development projects Table-1

II List of Future projects where financing has been lined upTable-2

III List of Future projects where financing is requiredTable-3

IV Cross Border Inter-connection Projects Table-4

TABLE OF CONTENTS

Page 3: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

NTDC ONGOING DEVELOPMENT PROJECT

SR.NO.

NAME OF SUBSTATIONS

TRANSFORMER CAPACITY (MVA)

ASSOCIATED TRANSMISSION LINES

EXPECTED COMMISSIONING

1Ext. at 500 kV Sheikh Muhammadi

1x450 - Feb, 2012

2 Ext. at 220 kV Bannu1x160 -

Feb, 2012

3 Ext. at 220 kV Sarfraznagar 1x160 - Feb, 2012

4 New 220 kV GIS Bandala

2x160 220 kV Gatti - K.S.K D/C In/Out at Bandala. (5+5 km) April, 2012

5 Installation of SVCs at 220 kV N.K.L.P. Lahore.

SVCs Static Var Compensators of appropriate capacity. June, 2012

6 Looping In/Out of 220 kV G/Barotha-S/Bagh T/L at Mardan

-

Looping in & out of one circuit of Ghazi Barotha – Shahi Bagh at Mardan (30 km)

Feb, 2012

3

Page 4: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR.NO.NAME OF

SUBSTATIONSTRANSFORMER CAPACITY (MVA)

ASSOCIATED TRANSMISSION LINES

EXPECTED COMMISSIONING

7 Extension/Augmentation at existing substations:

- March, 2012

500 kV Dadu 1x450

1x160

220 kV Burhan 1x160

220 kV Mardan 1x250

500 kV Sheikh Muhammadi

1x160

500 kV New Rewat 1x250

220 kV Shikarpur 1x160

8 220 kV Okara3x250

220 kV Yousafwala - Sarfaraz Nagar D/C In/Out at Okara. (5 + 5km)

June, 2012

9 220 kV Toba Tek Singh/Gojra

3x250 220 kV Faisalabad-Multan D/C In&Out at T.T.Singh/Gojra. (1+1 km) June, 2012

NTDC ONGOING DEVELOPMENT PROJECTS

4

Page 5: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR.NO.

NAME OF NEW SUBSTATIONS

TRANSFORMER CAPACITY

(MVA)

ASSOCIATED TRANSMISSION LINES

EXPECTED COMMISSIONING

10 Installation of SVC at Quetta

SVC Static Var Compensators of appropriate capacity Dec, 2013

11 Ext. at Ghazi Brotha for addition of 600 MVA 500/220 kV T/F.

1x600 -

Dec, 2012

12 220 kV Loralai 2x250 220 kV D.G Khan – Loralai (250 km) Nov, 2012

13 Augmentation of 220 kV Ravi at Lahore.

3x250

Nov, 2011

14 500kV D.G Khan Substation.

2x6002x250

500kV Guddu-Multan 2nd cct In/Out at D.G. Khan substation(20+20) km

Dec, 2013

NTDC ONGOING DEVELOPMENT PROJECTS

5

Page 6: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR.NO.

NAME OF NEW SUBSTATIONS

TRANSFORMER CAPACITY

(MVA)

ASSOCIATED TRANSMISSION LINES

EXPECTED COMMISSIONING

15 220 kV Rohri New for interconnection of IPPs at Engro Energy PP and Mari (Dharki) CCPP

2x250 220 kV D/C T/L Dharki CCPP– Rohri New (115 km)

June, 2012

132 kV D/C T/L for In/Out of Rohri-Khairpur/Gambat D/C T/L at Rohri New (1+1 km)

220kV D/C Rohri New-Shikarpur T/L (50 km)

220 kV D/C T/L for In/Out of Dharki -Rohri New at Engro CCPP (5+5 km)

132 kV Rohri New-Gambat D/C T/L (53 km)

16 220 kV Gridstation at Khuzdar, 2x160

220kV D/C Dadu – Khuzdar Transmission Line (300 km) Aug, 2012

17 220 kV Grid Station at Ghazi Road, Lahore

3x160 220 kV D/C T/L for In&Out of NKLP – Sarfraz Nagar at Ghazi Road. (30 km)

June, 2012

220 kV D/C T/L for In&Out of Ravi– KSK at Ghazi Rd. (30 km)

NTDC ONGOING DEVELOPMENT PROJECTS

6

Page 7: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR.NO.

NAME OF NEW SUBSTATIONS

T/F CAPACITY

(MVA)

ASSOCIATED TRANSMISSION LINES

EXPECTED COMMISSIONING

18 220 kV Grid Station at Kassowal along with associated 220kV D/C T/Lines.

2x160 220 kV D/C Transmission Line for In&Out of Vehari – Yousafwala at Kassowal. (45+45 km)

Aug, 2012

19 220 kV GIS substation at Gwadar

2x160 220 kV D/C T/L from Pak-Iran border to Gwadar (100 km)

Jun, 2013

20 500 kV R.Y.Khan 2x600500 kV Guddu - Multan 3rd Circuit In/Out at R.Y.K (30+30 km) Dec. 2012

21220 kV GIS Shalamar (Mehmood Buti)

3x250220 kV Ravi-KSK D/C In/Out at Shalamar (9km long overhead T/L) & (3+3km) cable

May.2012

NTDC ONGOING DEVELOPMENT PROJECTS

7

Page 8: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION

LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in Million

Approval by

ECNECFinancing

Expected commissi-

oning

1220 kV Gujrat

3x250220 kV Mangla-Ghakkar D/C In/Out at Gujrat (2+2 km)

2805 33 22.10.2007 JICA June,2013

2220 kV Chishtian

2x250220 kV Vehari - Chishtian D/C T/Line. ( 65 km)

3740 44 22.10.2007 JICAJune,2013

3 500 kV New Lahore

2x750 Two 500 kV S/C T/Lines for In/out of 500 kV Sahiwal – Lahore S/C at Lahore New (15+15 km)

12665 149 09.12.2010 JICA June,2013

Two 500 kV S/C T/Lines for In/out of 500 kV Lahore – Gujranwala S/C at Lahore New (50+50 km)

220 kV D/C T/Line for In/out of 220 kV NKLP-Ghazi Road at Lahore New. (50 km)

220 kV D/C T/Line for In/out of 220 kV NKLP-Wapda Town at Lahore New. (54km)

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

8

Page 9: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION

LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

4-500 kV Shikarpur

2x600

Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:1 at Shikarpur (20+20 km)

8160 96 09.12.2010 JICADec,2013

Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:2 at Shikarpur. (22+22 km)

220 kV D/C for In/Out of 500/220 kV Guddu – Sibbi S/C at Shikarpur (50 km)

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

9

Page 10: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION

LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

5-

2nd source of supply to Islamabad University

-

220 kV D/C T/L for In/out of Manshera-Sangjani T/L (40 km)

1105 13PC-I under preparatio

nADB Tr-IV 2012-13

6-

2nd Source of supply to Hala Road Grid Station

-

220 kV D/C T/L from T.M Khan Road to Hala Road (30 km)

850 10PC-I under preparatio

nADB Tr-IV 2012-13

7-220 kV Chakdara

2X250220 kV Chakdara – Mardan (85 km)

3230 38PC-I under preparatio

nADB Tr-IV 2013-14

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

10

Page 11: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION

LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

8-220 kV Mirpur

Khas2x160

220 kV D/C T/L from Hala Rd. to .M.Khan . (10 km)In/Out of one circuit of above 220 kV proposed T/L at Mirpur Khas New (70 km).

2975 35PC-I under preparation

ADB Tr-IV 2013-14

9- 220 kV Taxila. 2x250In/Out of 220 kV Burhan - ISPR S/C at Taxila. (6 km)

2295 27PC-I under preparation

ADB Tr-IV 2013-14

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

11

Page 12: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSI

ON LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

10-220 kV Nowshera

3x250

220 kV D/C T/L for In/Out of G.Brotha Sh/Bagh T/L at Nowshera (5+5 km)

1876 31 06.02.2008ADB Tr-IV 2013-14

11- 220 kV Lalian

3x250

220 kV Gatti - Ludewala D/C In/Out at Chiniot Ind. (4+24km)

1581 18

PC-I approved

on 11.11.201

1

ADB Tr-IV

2013-14

12-

Dispersal of Power from Uch-2

-

220 kV Uch-II – Sibbi D/C (125 km)

2975 35

PC-I approved

on 29.07.201

1

ADB Tr-III Ext

2013-14

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

12

Page 13: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSI

ON LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

13-

Augmentation of 500 & 220 kV existing substations

-

3825 45

PC-I Approved

on 29.07.2011

ADB Tr-I (Ext-II) 2013-14

500 kV Rewat 1x750 -

500 kV Sh. Muhammadi

4x250 -

220 kV Mardan 2x250 -

220 kV Burhan 4x250 -

220 kV Bund Rd 4x250 -

220 kV Bahawalpur

2x250 -

220 kV Quetta Industrial

2X250 -

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

13

Page 14: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#`Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION

LINES

Estimated Cost (Rs.

in Million)

Eqt. US$ in Million

Approval by ECNEC

Financing

Expected Year of

commissi-oning

14-220 kV

Manshera2x160

In/out of 220 kV Alai Khawar-Sangjani T/L at Manshera (0.5+.0.5 km)

1105 13 Approved Tranche-III 2013-14

15-220 kV D.M

Jamali1x1601x100

in/out of 220 kV Uch-Guddu S/C at D.M. Jamali (5 km)

850 10 ApprovedOwn

resource/ PSDP

2013-14

16-

Interconnection of 1200 MW AES Imported coal based Power Plant near Karachi (Part-I)

-

500 kV Jamshoro--R.Y.K (535 km)500 kV Moro-Dadu (55 km)

25694 285

PC-I cleared by CDWP

on 18.03.2010

ADB Tr-III 2015-16

NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP

14

Page 15: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST* (Rs.in

Million)

Eqt. US$ in Million

EXPECTED YEAR OF

COMMISSIO-NING

1- 220 kV Chakwal2x160

In/out of 220 kV Mangla-Rewat S/C at Chakwal (65 km)

2890 34 2014-15

2- 220 kV GIS Jhang Rd. Faisalabad 2x250

220 kV Samundri Rd. – Jhang Rd. D/C T/L (40 km) 2975 35 2014-15

3- 220 kV D.I Khan 2x250 220 kV D/C T/Line for In/out of 220 kV Chashma Nuclear – Ludewala S/C at D.I Khan (100 km)

3825 45

2012-13

4- 220 kV Gharo2x250

220 kV Gharo – T.M Khan Road ((130)

4590 54 2014-15

5- 220 kV Jhimpir

2x250

In/Out of 220 kV Gharo – T.M Khan Road at Jhimpir (65 km)

3230 38 2014-15

6- 220 kV Mastung2x250

220 KV Mastung Sibbi (120 km)

4080 48 2014-15

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

15

Page 16: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRD YEAR OF

COMMISSIO-NING

7. 220 kV Shadman

2x250

220 kV D/C cable from Shadman to Bund Road (30 km) 4250 50 2013-14

8. Interconnection of Chashma Nuclear (C-3 & C-4)

220 kV D/C T/L from Chashma Nuclear to Bannu (125km) 3150 35 2013-14

9.-

220 kV Tarbela – Burhan D/C T/L on Rail conductor (35 km) 990 10 2013-14

10.

-

Re-conductoring of 220 kV Tarbela ISPR on Rail conductor (62.5 km) 1260 14 2013-14

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

16

Page 17: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRD YEAR OF

COMMISSIO-NING

11. 500 kV Islamabad New

2x750

2x250

500 kV D/C T/L for In/Out of 500 kV Tarbela – Rewat S/C at Islamabad New (40 km)500 kV D/C T/L for In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad New (50 km) 220 kV D/C T/L for In/out of Tarbela – ISPR 220 kV S/C at Islamabad New (25 km).Two 220 kV D/C T/Ls for In/out of Mansehra – ISPR at Islamabad New (5+5 km).220 kV D/C T/L from Islamabad New to ISPR (15 km)

10560 120 2014-15

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

17

Page 18: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#`Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Expected Year of commissi-

oning

12- 500 kV Faisalabad New

2x750

500 kV D/C T/L for In/Out of 500 kV M/Garh – Gatti S/C at Faisalabad West (2 km)500 kV D/C T/L for In/Out of 500 kV Multan - Gatti S/C at Faisalabad West (20 km)

11250 125 2014-15

2x250

220 kV D/C T/L from Faisalabad West to T.T Singh (70 km).220 kV D/C T/L from Faisalabad West to Lalian / (M3) (100 km).

13- 220 kV M-3 Industrial Estate Faisalabad 2x250

220 kV M3 Industrial Estate – Faisalabad New (70 km)

In/Out of 220 kV Faisalabad New - M3 Industrial Estate at 220 kV Chinot Industrial New (30 km)

3570 422013-14

NTDC FUTURE PROJECTS WHERE FINANCING IS REQUIRED

18

Page 19: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRD YEAR OF

COMMISSIO-NING

14 220 kV Jamrud`2x250

220 kV Jamrud – Sh. Muhammadi (10 km)

1445 17 2013-14

15 500 kV Peshawar New

2x750

In/out of Tarbela – Sh. Muhammadi at Peshawar New (2+2 km)

In/Out of 220 kV Sh. Muhammadi-Shahibagh at Peshawar New (5 km)

5440 64 2014-15

16 220 kV Kohat

2x250

220 kV Kohat – Peshawar New (50 km)

220 kV Kohat – Bannu (150 km)

5950 70 2014-15

17 220 kV Islamabad I-10

2x250

In/Out of 220 kV Rewat – Islamabad University D/C at Islamabad I-10 (30+30 km)

2635 31 2014-15

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

19

Page 20: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST

(Rs.in Million)

Eqt. US$ in Million

REQUIRD YEAR OF

COMMISSIO-NING

18- Ext. at 220 kV Gujrat 1x250

-425 5 2014-15

19- Power Dispersal from 747 MW CCPP at Guddu -

500 kV Guddu New PP – M. Garh (256 km)

In/Out of Guddu – Multan at New Guddu (10+10 km)

7735

(PC-I approved

on 29.07.2011)

912013-14

20- Interconnection of 1200 MW AES Imported coal based power near Karachi (Part-II)

500 kV switch

ing station

at Matiari

500 kV S/C T/Line from AES Power Plant to Matiari switching station (200 km)

In/Out of 500 kV Hub-Jamshoro S/C T/Line at AES (45+45 km)

13934(PC-I

cleared by CDWP on

18.3.10

1552015-16

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

20

Page 21: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

S.#` Name of Project

Transfor-mer

Capacity(MVA)

ASSOCIATED TRANSMISSION LINES

Estimated Cost

(Rs. in Million)

Eqt. US$ in

Million

Expected Year of

commissi-oning

21-

Dispersal of Power from Neelum Jhelum, Karot & Azad Pattan HPPs

-

500 kV Neelum Jhelum – Gujranwala D/C T/Line (270 km).

In/Out of one circuit of Neelum Jhelum-Gujranwala T/L at Karot (5 km).

In/Out of one circuit of Neelum Jhelum-Gujranwala T/L at Azad Pattan (5 km).

22582

(PC-I submitted to GoP in Dec,2011)

251 2015-16

22-

Interconnection of Thar Coal Based 1200 MW Engro Power Plant wi

-500 kV D/C T/L form Engro power plant to Matiari (250 km

20053

(PC-I submitted to GoP in Aug.2011

233 2014-15

NTDC FUTURE PROJECTS WHERE FINANCING IS REQUIRED

21

Page 22: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRED YEAR OF

COMMISSIO-NING

23 220 kV Kamalabad 2x250

In/out of Rewat – Islamabad Peshawar Rd. at Kamalabad (5+5 km)

1445 17 2015-16

24 Ext. at 500 kV Gujranwala 1x600

-1700 20 2015-16

25 Ext. at 500 kV Lahore New 1x750

-2040 24 2015-16

26 220 kV Kamra2x250

In/out of 220 kV Tarbela – Taxila at Kamra (5 km)

1275 15 2015-16

27 220 kV Iqbal Town 2x250

In/Out of 220 kV Lahore – Wapda Town D/C at Iqbal Town (20+20 km)

2125 25 2015-16

28 220 kV Gujranwala

New 2x250

In/Out of 220 kV Mangala – K.S.K at Gujranwala New (20 km)

220 kV Nokhar - Gujranwala New (50 kM)

2890 34 2015-16

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

22

Page 23: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRED YEAR OF

COMMISSIO-NING

29 220 kV Pindi Bhattian

2x250

220 kV Pindi Bhattian Ind. – Gujranwala (50 km)

2380 28 2015-16

30 220 kV Head Faqirian

2x250

220 kV Head Faqirian – Ludewala (60 km)

238028

2015-16

31 220 kV Joharabad

2x250

In/out of 220 kV D/C Ludewala –Chashma at Jauharabad (5+6 km) 1445 17 2015-16

32 220 kV Alizai2x250

220 kV Kohat – Ali zai D/C (110 km) 3825 45 2015-16

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

23

Page 24: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRED YEAR OF

COMMISSIO-NING

33 2nd Source of supply to 220 kV Bhawalpur

substation-

220 kV R.Y.K – Bahalawlpur D/C T/L (150 km)

3825 45 2015-16

34 220 kV Arif Wala 2x250

In/Out of 220 kV Yousafwala – Kassowal D/C at Arifwala (5+5 km)

1445 17 2015-16

35 Interconnection of 2x1000 MW Nuclear Power Plants at Karachi

-

Three 500 kV Circuits from Nuclear Plants to Matiari (200 km each) 25500 300

2018-19

36 Dispersal of Power from 720 MW Karot HPP -

500 kV Karot – Lahore New (270 km)

In/Out of 500 kV Neelum Jhelum – Gujranwala at Karot (10 km)

13250 156 2018-19

NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED

24

Page 25: NATIONAL TRANSMISSION AND DESPATCH COMPANY (NTDC) NTDC DEVELOPMENT PROGRAM PLANNING POWER (NTDC) PEPCO January 2012

SR#.

NAME OF NEW SUBSTATIONS

T/F CAP. (MVA)

ASSOCIATED TRANSMISSION LINES

ESTIMATED COST (Rs.in Million)

Eqt. US$ in Million

REQUIRED YEAR OF

COMMISSIO-NING

1-Import of 1000 MW Power from Iran

-

Two 500 kV HVAC S/C T/Lines from Zahidan to Quetta with series compensation (198 km)

Switching station at Zahidan, Quetta and midpoint between Zahidan & Quetta

40120 472 2015-16

2-

Import of 1000 MW Power from Tajikistan (CASA-1000)

-

500 kV HVDC T/L from Pak-Afghan Border to Peshawar (71 km)

500 kV Converter Station Peshawar

16065 189 2015-16