DESCRIPTION
I List of ongoing Development projects Table-1
II List of Future projects where financing has been lined upTable-2
III List of Future projects where financing is requiredTable-3
IV Cross Border Inter-connection Projects Table-4
TABLE OF CONTENTS
NTDC ONGOING DEVELOPMENT PROJECT
SR.NO.
NAME OF SUBSTATIONS
TRANSFORMER CAPACITY (MVA)
ASSOCIATED TRANSMISSION LINES
EXPECTED COMMISSIONING
1Ext. at 500 kV Sheikh Muhammadi
1x450 - Feb, 2012
2 Ext. at 220 kV Bannu1x160 -
Feb, 2012
3 Ext. at 220 kV Sarfraznagar 1x160 - Feb, 2012
4 New 220 kV GIS Bandala
2x160 220 kV Gatti - K.S.K D/C In/Out at Bandala. (5+5 km) April, 2012
5 Installation of SVCs at 220 kV N.K.L.P. Lahore.
SVCs Static Var Compensators of appropriate capacity. June, 2012
6 Looping In/Out of 220 kV G/Barotha-S/Bagh T/L at Mardan
-
Looping in & out of one circuit of Ghazi Barotha – Shahi Bagh at Mardan (30 km)
Feb, 2012
3
SR.NO.NAME OF
SUBSTATIONSTRANSFORMER CAPACITY (MVA)
ASSOCIATED TRANSMISSION LINES
EXPECTED COMMISSIONING
7 Extension/Augmentation at existing substations:
- March, 2012
500 kV Dadu 1x450
1x160
220 kV Burhan 1x160
220 kV Mardan 1x250
500 kV Sheikh Muhammadi
1x160
500 kV New Rewat 1x250
220 kV Shikarpur 1x160
8 220 kV Okara3x250
220 kV Yousafwala - Sarfaraz Nagar D/C In/Out at Okara. (5 + 5km)
June, 2012
9 220 kV Toba Tek Singh/Gojra
3x250 220 kV Faisalabad-Multan D/C In&Out at T.T.Singh/Gojra. (1+1 km) June, 2012
NTDC ONGOING DEVELOPMENT PROJECTS
4
SR.NO.
NAME OF NEW SUBSTATIONS
TRANSFORMER CAPACITY
(MVA)
ASSOCIATED TRANSMISSION LINES
EXPECTED COMMISSIONING
10 Installation of SVC at Quetta
SVC Static Var Compensators of appropriate capacity Dec, 2013
11 Ext. at Ghazi Brotha for addition of 600 MVA 500/220 kV T/F.
1x600 -
Dec, 2012
12 220 kV Loralai 2x250 220 kV D.G Khan – Loralai (250 km) Nov, 2012
13 Augmentation of 220 kV Ravi at Lahore.
3x250
Nov, 2011
14 500kV D.G Khan Substation.
2x6002x250
500kV Guddu-Multan 2nd cct In/Out at D.G. Khan substation(20+20) km
Dec, 2013
NTDC ONGOING DEVELOPMENT PROJECTS
5
SR.NO.
NAME OF NEW SUBSTATIONS
TRANSFORMER CAPACITY
(MVA)
ASSOCIATED TRANSMISSION LINES
EXPECTED COMMISSIONING
15 220 kV Rohri New for interconnection of IPPs at Engro Energy PP and Mari (Dharki) CCPP
2x250 220 kV D/C T/L Dharki CCPP– Rohri New (115 km)
June, 2012
132 kV D/C T/L for In/Out of Rohri-Khairpur/Gambat D/C T/L at Rohri New (1+1 km)
220kV D/C Rohri New-Shikarpur T/L (50 km)
220 kV D/C T/L for In/Out of Dharki -Rohri New at Engro CCPP (5+5 km)
132 kV Rohri New-Gambat D/C T/L (53 km)
16 220 kV Gridstation at Khuzdar, 2x160
220kV D/C Dadu – Khuzdar Transmission Line (300 km) Aug, 2012
17 220 kV Grid Station at Ghazi Road, Lahore
3x160 220 kV D/C T/L for In&Out of NKLP – Sarfraz Nagar at Ghazi Road. (30 km)
June, 2012
220 kV D/C T/L for In&Out of Ravi– KSK at Ghazi Rd. (30 km)
NTDC ONGOING DEVELOPMENT PROJECTS
6
SR.NO.
NAME OF NEW SUBSTATIONS
T/F CAPACITY
(MVA)
ASSOCIATED TRANSMISSION LINES
EXPECTED COMMISSIONING
18 220 kV Grid Station at Kassowal along with associated 220kV D/C T/Lines.
2x160 220 kV D/C Transmission Line for In&Out of Vehari – Yousafwala at Kassowal. (45+45 km)
Aug, 2012
19 220 kV GIS substation at Gwadar
2x160 220 kV D/C T/L from Pak-Iran border to Gwadar (100 km)
Jun, 2013
20 500 kV R.Y.Khan 2x600500 kV Guddu - Multan 3rd Circuit In/Out at R.Y.K (30+30 km) Dec. 2012
21220 kV GIS Shalamar (Mehmood Buti)
3x250220 kV Ravi-KSK D/C In/Out at Shalamar (9km long overhead T/L) & (3+3km) cable
May.2012
NTDC ONGOING DEVELOPMENT PROJECTS
7
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION
LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in Million
Approval by
ECNECFinancing
Expected commissi-
oning
1220 kV Gujrat
3x250220 kV Mangla-Ghakkar D/C In/Out at Gujrat (2+2 km)
2805 33 22.10.2007 JICA June,2013
2220 kV Chishtian
2x250220 kV Vehari - Chishtian D/C T/Line. ( 65 km)
3740 44 22.10.2007 JICAJune,2013
3 500 kV New Lahore
2x750 Two 500 kV S/C T/Lines for In/out of 500 kV Sahiwal – Lahore S/C at Lahore New (15+15 km)
12665 149 09.12.2010 JICA June,2013
Two 500 kV S/C T/Lines for In/out of 500 kV Lahore – Gujranwala S/C at Lahore New (50+50 km)
220 kV D/C T/Line for In/out of 220 kV NKLP-Ghazi Road at Lahore New. (50 km)
220 kV D/C T/Line for In/out of 220 kV NKLP-Wapda Town at Lahore New. (54km)
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
8
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION
LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
4-500 kV Shikarpur
2x600
Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:1 at Shikarpur (20+20 km)
8160 96 09.12.2010 JICADec,2013
Two 500 kV S/C T/Lines for In/out of 500 kV Dadu-Guddu circuit No:2 at Shikarpur. (22+22 km)
220 kV D/C for In/Out of 500/220 kV Guddu – Sibbi S/C at Shikarpur (50 km)
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
9
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION
LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
5-
2nd source of supply to Islamabad University
-
220 kV D/C T/L for In/out of Manshera-Sangjani T/L (40 km)
1105 13PC-I under preparatio
nADB Tr-IV 2012-13
6-
2nd Source of supply to Hala Road Grid Station
-
220 kV D/C T/L from T.M Khan Road to Hala Road (30 km)
850 10PC-I under preparatio
nADB Tr-IV 2012-13
7-220 kV Chakdara
2X250220 kV Chakdara – Mardan (85 km)
3230 38PC-I under preparatio
nADB Tr-IV 2013-14
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
10
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION
LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
8-220 kV Mirpur
Khas2x160
220 kV D/C T/L from Hala Rd. to .M.Khan . (10 km)In/Out of one circuit of above 220 kV proposed T/L at Mirpur Khas New (70 km).
2975 35PC-I under preparation
ADB Tr-IV 2013-14
9- 220 kV Taxila. 2x250In/Out of 220 kV Burhan - ISPR S/C at Taxila. (6 km)
2295 27PC-I under preparation
ADB Tr-IV 2013-14
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
11
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSI
ON LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
10-220 kV Nowshera
3x250
220 kV D/C T/L for In/Out of G.Brotha Sh/Bagh T/L at Nowshera (5+5 km)
1876 31 06.02.2008ADB Tr-IV 2013-14
11- 220 kV Lalian
3x250
220 kV Gatti - Ludewala D/C In/Out at Chiniot Ind. (4+24km)
1581 18
PC-I approved
on 11.11.201
1
ADB Tr-IV
2013-14
12-
Dispersal of Power from Uch-2
-
220 kV Uch-II – Sibbi D/C (125 km)
2975 35
PC-I approved
on 29.07.201
1
ADB Tr-III Ext
2013-14
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
12
S.#Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSI
ON LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
13-
Augmentation of 500 & 220 kV existing substations
-
3825 45
PC-I Approved
on 29.07.2011
ADB Tr-I (Ext-II) 2013-14
500 kV Rewat 1x750 -
500 kV Sh. Muhammadi
4x250 -
220 kV Mardan 2x250 -
220 kV Burhan 4x250 -
220 kV Bund Rd 4x250 -
220 kV Bahawalpur
2x250 -
220 kV Quetta Industrial
2X250 -
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
13
S.#`Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION
LINES
Estimated Cost (Rs.
in Million)
Eqt. US$ in Million
Approval by ECNEC
Financing
Expected Year of
commissi-oning
14-220 kV
Manshera2x160
In/out of 220 kV Alai Khawar-Sangjani T/L at Manshera (0.5+.0.5 km)
1105 13 Approved Tranche-III 2013-14
15-220 kV D.M
Jamali1x1601x100
in/out of 220 kV Uch-Guddu S/C at D.M. Jamali (5 km)
850 10 ApprovedOwn
resource/ PSDP
2013-14
16-
Interconnection of 1200 MW AES Imported coal based Power Plant near Karachi (Part-I)
-
500 kV Jamshoro--R.Y.K (535 km)500 kV Moro-Dadu (55 km)
25694 285
PC-I cleared by CDWP
on 18.03.2010
ADB Tr-III 2015-16
NTDC FUTURE PROJECTS WHERE FINANCING HAS BEEN LINED UP
14
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST* (Rs.in
Million)
Eqt. US$ in Million
EXPECTED YEAR OF
COMMISSIO-NING
1- 220 kV Chakwal2x160
In/out of 220 kV Mangla-Rewat S/C at Chakwal (65 km)
2890 34 2014-15
2- 220 kV GIS Jhang Rd. Faisalabad 2x250
220 kV Samundri Rd. – Jhang Rd. D/C T/L (40 km) 2975 35 2014-15
3- 220 kV D.I Khan 2x250 220 kV D/C T/Line for In/out of 220 kV Chashma Nuclear – Ludewala S/C at D.I Khan (100 km)
3825 45
2012-13
4- 220 kV Gharo2x250
220 kV Gharo – T.M Khan Road ((130)
4590 54 2014-15
5- 220 kV Jhimpir
2x250
In/Out of 220 kV Gharo – T.M Khan Road at Jhimpir (65 km)
3230 38 2014-15
6- 220 kV Mastung2x250
220 KV Mastung Sibbi (120 km)
4080 48 2014-15
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
15
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRD YEAR OF
COMMISSIO-NING
7. 220 kV Shadman
2x250
220 kV D/C cable from Shadman to Bund Road (30 km) 4250 50 2013-14
8. Interconnection of Chashma Nuclear (C-3 & C-4)
220 kV D/C T/L from Chashma Nuclear to Bannu (125km) 3150 35 2013-14
9.-
220 kV Tarbela – Burhan D/C T/L on Rail conductor (35 km) 990 10 2013-14
10.
-
Re-conductoring of 220 kV Tarbela ISPR on Rail conductor (62.5 km) 1260 14 2013-14
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
16
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRD YEAR OF
COMMISSIO-NING
11. 500 kV Islamabad New
2x750
2x250
500 kV D/C T/L for In/Out of 500 kV Tarbela – Rewat S/C at Islamabad New (40 km)500 kV D/C T/L for In/Out of 500 kV G/Barotha–Rewat S/C at Islamabad New (50 km) 220 kV D/C T/L for In/out of Tarbela – ISPR 220 kV S/C at Islamabad New (25 km).Two 220 kV D/C T/Ls for In/out of Mansehra – ISPR at Islamabad New (5+5 km).220 kV D/C T/L from Islamabad New to ISPR (15 km)
10560 120 2014-15
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
17
S.#`Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Expected Year of commissi-
oning
12- 500 kV Faisalabad New
2x750
500 kV D/C T/L for In/Out of 500 kV M/Garh – Gatti S/C at Faisalabad West (2 km)500 kV D/C T/L for In/Out of 500 kV Multan - Gatti S/C at Faisalabad West (20 km)
11250 125 2014-15
2x250
220 kV D/C T/L from Faisalabad West to T.T Singh (70 km).220 kV D/C T/L from Faisalabad West to Lalian / (M3) (100 km).
13- 220 kV M-3 Industrial Estate Faisalabad 2x250
220 kV M3 Industrial Estate – Faisalabad New (70 km)
In/Out of 220 kV Faisalabad New - M3 Industrial Estate at 220 kV Chinot Industrial New (30 km)
3570 422013-14
NTDC FUTURE PROJECTS WHERE FINANCING IS REQUIRED
18
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRD YEAR OF
COMMISSIO-NING
14 220 kV Jamrud`2x250
220 kV Jamrud – Sh. Muhammadi (10 km)
1445 17 2013-14
15 500 kV Peshawar New
2x750
In/out of Tarbela – Sh. Muhammadi at Peshawar New (2+2 km)
In/Out of 220 kV Sh. Muhammadi-Shahibagh at Peshawar New (5 km)
5440 64 2014-15
16 220 kV Kohat
2x250
220 kV Kohat – Peshawar New (50 km)
220 kV Kohat – Bannu (150 km)
5950 70 2014-15
17 220 kV Islamabad I-10
2x250
In/Out of 220 kV Rewat – Islamabad University D/C at Islamabad I-10 (30+30 km)
2635 31 2014-15
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
19
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST
(Rs.in Million)
Eqt. US$ in Million
REQUIRD YEAR OF
COMMISSIO-NING
18- Ext. at 220 kV Gujrat 1x250
-425 5 2014-15
19- Power Dispersal from 747 MW CCPP at Guddu -
500 kV Guddu New PP – M. Garh (256 km)
In/Out of Guddu – Multan at New Guddu (10+10 km)
7735
(PC-I approved
on 29.07.2011)
912013-14
20- Interconnection of 1200 MW AES Imported coal based power near Karachi (Part-II)
500 kV switch
ing station
at Matiari
500 kV S/C T/Line from AES Power Plant to Matiari switching station (200 km)
In/Out of 500 kV Hub-Jamshoro S/C T/Line at AES (45+45 km)
13934(PC-I
cleared by CDWP on
18.3.10
1552015-16
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
20
S.#` Name of Project
Transfor-mer
Capacity(MVA)
ASSOCIATED TRANSMISSION LINES
Estimated Cost
(Rs. in Million)
Eqt. US$ in
Million
Expected Year of
commissi-oning
21-
Dispersal of Power from Neelum Jhelum, Karot & Azad Pattan HPPs
-
500 kV Neelum Jhelum – Gujranwala D/C T/Line (270 km).
In/Out of one circuit of Neelum Jhelum-Gujranwala T/L at Karot (5 km).
In/Out of one circuit of Neelum Jhelum-Gujranwala T/L at Azad Pattan (5 km).
22582
(PC-I submitted to GoP in Dec,2011)
251 2015-16
22-
Interconnection of Thar Coal Based 1200 MW Engro Power Plant wi
-500 kV D/C T/L form Engro power plant to Matiari (250 km
20053
(PC-I submitted to GoP in Aug.2011
233 2014-15
NTDC FUTURE PROJECTS WHERE FINANCING IS REQUIRED
21
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRED YEAR OF
COMMISSIO-NING
23 220 kV Kamalabad 2x250
In/out of Rewat – Islamabad Peshawar Rd. at Kamalabad (5+5 km)
1445 17 2015-16
24 Ext. at 500 kV Gujranwala 1x600
-1700 20 2015-16
25 Ext. at 500 kV Lahore New 1x750
-2040 24 2015-16
26 220 kV Kamra2x250
In/out of 220 kV Tarbela – Taxila at Kamra (5 km)
1275 15 2015-16
27 220 kV Iqbal Town 2x250
In/Out of 220 kV Lahore – Wapda Town D/C at Iqbal Town (20+20 km)
2125 25 2015-16
28 220 kV Gujranwala
New 2x250
In/Out of 220 kV Mangala – K.S.K at Gujranwala New (20 km)
220 kV Nokhar - Gujranwala New (50 kM)
2890 34 2015-16
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
22
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRED YEAR OF
COMMISSIO-NING
29 220 kV Pindi Bhattian
2x250
220 kV Pindi Bhattian Ind. – Gujranwala (50 km)
2380 28 2015-16
30 220 kV Head Faqirian
2x250
220 kV Head Faqirian – Ludewala (60 km)
238028
2015-16
31 220 kV Joharabad
2x250
In/out of 220 kV D/C Ludewala –Chashma at Jauharabad (5+6 km) 1445 17 2015-16
32 220 kV Alizai2x250
220 kV Kohat – Ali zai D/C (110 km) 3825 45 2015-16
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
23
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRED YEAR OF
COMMISSIO-NING
33 2nd Source of supply to 220 kV Bhawalpur
substation-
220 kV R.Y.K – Bahalawlpur D/C T/L (150 km)
3825 45 2015-16
34 220 kV Arif Wala 2x250
In/Out of 220 kV Yousafwala – Kassowal D/C at Arifwala (5+5 km)
1445 17 2015-16
35 Interconnection of 2x1000 MW Nuclear Power Plants at Karachi
-
Three 500 kV Circuits from Nuclear Plants to Matiari (200 km each) 25500 300
2018-19
36 Dispersal of Power from 720 MW Karot HPP -
500 kV Karot – Lahore New (270 km)
In/Out of 500 kV Neelum Jhelum – Gujranwala at Karot (10 km)
13250 156 2018-19
NTDC FUTURE PROJECTS FOR WHICH FINANCING IS REQUIRED
24
SR#.
NAME OF NEW SUBSTATIONS
T/F CAP. (MVA)
ASSOCIATED TRANSMISSION LINES
ESTIMATED COST (Rs.in Million)
Eqt. US$ in Million
REQUIRED YEAR OF
COMMISSIO-NING
1-Import of 1000 MW Power from Iran
-
Two 500 kV HVAC S/C T/Lines from Zahidan to Quetta with series compensation (198 km)
Switching station at Zahidan, Quetta and midpoint between Zahidan & Quetta
40120 472 2015-16
2-
Import of 1000 MW Power from Tajikistan (CASA-1000)
-
500 kV HVDC T/L from Pak-Afghan Border to Peshawar (71 km)
500 kV Converter Station Peshawar
16065 189 2015-16
CROSS BORDER INTER-CONNECTION PROJECTS