NEI Groundwater Protection Initiative NEI Technical Report 08-08 DG-1186 & DG-4013 (aka RG 1.21 &
4.1) Decommissioning Planning SECY 08-0197 Radiation Protection
Standards
2
3
NEI Groundwater Protection Initiative
Nuclear Generating Unit Issues 2005-2006– Indian Point, Braidwood…..
NRC Also Formed “The Liquid Radioactive Release Lesson Learned Task Force– Report September 1, 2006
– 26 Recommendations
Not A Health And Safety Issue It Was An Issue About Communications
And Public Perception (Transparency) NEI 07-07 Issued 8-31-2007
4
NEI Groundwater Protection Initiative
What's Happening?– NRC Began Assessment Summer-2008 – GWPI Self Assessments (One Year After
Implementation)– NEI Sponsored Peer Assessments– EPRI/NEI Groundwater Protection Workshop
September 15-16, 2009 – Charleston, SC
NEI Groundwater Protection Initiative
5
NEI Groundwater Protection Initiative
6
NEI Groundwater Protection Initiative
NEI Peer Review Issue Areas– SSC’s Risk Assessments (Objective 1.2)
– Remediation Protocol (Objective 1.4)
–NEI Notification (Objective 2.2.e)
Note: These Are Detailed Assessments
7
NEI Technical Report 08-08(New Plants)
Meeting The Operational Requirements Of 10 CFR 20.1406 & Regulatory Guide 4.21
NEI 08-08 Minimizing Facility Contamination – MINIMIZATION OF LEAKS AND SPILLS
– PROMPT DETECTION OF LEAKAGE
– MINIMIZE THE POTENTIAL OF THE RELEASE OF CONTAMINATION FROM UNDETECTED LEAKS
– REDUCING THE NEED FOR DECONTAMINATION OF EQUIPMENT AND STRUCTURES
– REVIEW OF OPERATIONAL PRACTICES
8
NEI Technical Report 08-08(New Plants)
NEI 08-08 MINIMIZING CONTAMINATION OF THE ENVIRONMENT– SITE CONCEPTUAL MODEL DEVELOPMENT
– EARLY DETECTION OF LEAKAGE AND CONTAMINANT MIGRATION
– FINAL SITE CONFIGURATION
NEI 08-08 FACILITATION OF DECOMMISSIONING – DESIGN AND OPERATIONAL FEATURES
– DECOMMISSIONING RECORDS 9
NEI Technical Report 08-08(New Plants)
NEI 08-08 MINIMIZING THE GENERATION OF WASTE –WASTE MANAGEMENT
–ONSITE STORAGE OF RADIOACTIVE WASTE
Based Largely On NEI 07-07 Objective 1 NEI 08-08 Is Part Of The Licensing Basis As The Licensing Basis It Is Not
Voluntary 10
11
Decommissioning Planning Rules
Federal Register Notice 1-22-2008•Financial And Monitoring Guidance
– Comments Submitted 5-8-2008– NEI Decommissioning Taskforce
12
Decommissioning Planning Rules
The Nuclear Industry Shares The NRC Goal Of Preventing Legacy Sites
We Do Not Believe The Proposed Rules Are Required To Prevent Future Legacy Sites
Any Health And Safety Benefits Do Not Justify The Burden Created By The Rules
We Also Believe The Proposed Rules Are A Backfit
13
Decommissioning Planning Rules
Rules Provide For Adjustment of Financial Assurances Based On Soil Or Groundwater Contamination
Rules Provide For Subsurface Evaluations Based On Decommissioning Criteria
14
Additional Issues of Interest Decommissioning Planning Rules
NRC Is Reviewing Proposed Final Rules
DG-4014 To Be Issued For Public Comment
A NRC Stakeholder Workshop Is Anticipated Later This Year
DG-1186 & DG-4013 IssuesIndustry & Staff Efforts
Industry Contribution From 30+ Individuals
Many Detailed Technical Comments Professional & Productive Relationship
With Staff– January 15, 2009 Workshop Productive
Emergence Of SECY 08-0197– 40 Guidance Documents Impacted An Integrated Approach Is Needed
15
DG-1186 & DG-4013 IssuesNeed For Integrated Approach
DG-1186 & DG-4013 Duplicate & Inconsistent With Other Guidance– Several Guidance Documents Related
To Groundwater
SECY 08-0197 Offers A Real Opportunity– Benefits Of Consolidated Guidance
16
DG-1186 & DG-4013 Opportunities
The Existing Guidance Should Remain Applicable– The Licensing Basis Is Not Impacted
Clarification Of Solid Radioactive Waste Reporting
Elimination of On Site Radiological Monitoring Programs From DG-4014
Additional Flexibility– Calculate C-14 Effluents
17
SECY 08-0197Need For Integrated Approach
Emergence Of SECY 08-0197– NEI/Industry Supports The Approach
Taken By The Commission
– Approximately 40 Guidance Documents Impacted
– An Integrated Approach Is Needed
– Supports Efficient Resource Utilization
– Gather Stakeholder Input
– Several Year Effort18
We Need Your Support!
Completion Of GWPI Peer Reviews Review Of DG-4014
“Decommissioning Planning” Monitoring
SECY 08-0197 “10 CFR 20, 10 CFR 50, …”