neighborhood meetings february 8 & 9, 2011. 2011 recent flood information probabilistic stage...

32
Flood Fight 2011 Neighborhood Meetings February 8 & 9, 2011

Upload: chad-seckler

Post on 11-Dec-2015

217 views

Category:

Documents


1 download

TRANSCRIPT

  • Slide 1

Neighborhood Meetings February 8 & 9, 2011 Slide 2 2011 Recent Flood Information Probabilistic Stage Predictions Next Forecast Expected February 17 th, 2011 Approx. 50% Chance of 37.3 ft 10% Chance of 42.6 ft 20% Chance @ 40.7 rivals the 2009 crest Slide 3 City of Fargo Spring Flood Outlook 2009 Approx. 50% Chance of 39 ft 10% Chance of 41 ft Slide 4 Past Forecast Vs. Actual Crests Slide 5 5 7.3+ Million Sandbags Used Slide 6 Fargo 2010 Flood Mitigation Project Benefits Short Term Flood Protection Projects For 43 feet of protection the Work Completed to Date Eliminates: 2.3 Mi of Primary Earth Levees 0.7 Mi of Secondary Earth Levees 670,000 Sandbags 0.5 Mi of Hesco 0.3 Mi of Portadam Slide 7 Slide 8 8 Slide 9 New storm sewer installed on dry (protected side) of 2 nd St S emergency levee and connected to lift station. 9 Slide 10 Belmont Park Levee Raise from 1518 S River Rd to 245 Lindenwood Drive Complete Purchase offer pending 10 Slide 11 11 Slide 12 12 Slide 13 13 Complete Slide 14 City of Fargo Spring Flood Outlook 2011 Slide 15 13 Reaches have been identified and staff has been assigned. These reaches will report to their assigned Area Engineer There are 5 Area Engineers Slide 16 Critical Protection Needs North OaksCut off Levee Belmont ParkAcquisitions Fargo CC/SouthwoodEarth Levee River DriveAcquisitions/Earth Rose CreekEarth Levee/Sandbag River ViliAcquisitions/Earth Oak Creek/Copperfield CourtEarth/Sandbag TimberlineEarth option Meadow Creek Earth Levee Raise Drain 27Hesco/Earth Drain 53Earth/ Sandbag Slide 17 Teamwork Homeowners Organize your neighbors Provide point of contact Prepare your property Remove fences, gazebos, decks & other obstructions Assist volunteers and City Staff in construction of line of protection Maintain sandbag levee Pump Seepage Be aware of your personal safety Secure your Pets City Create a plan for protection Secure sandbags Coordinate the filling of sandbags Deliver sandbags according to protection plan Coordinate volunteers Provide Engineering Staff for quality control of sandbag levee production Provide staking Patrol Levees after placement Slide 18 Right of Entry City will not provide assistance if right of entry on to private property is not granted Slide 19 Pump Checkout HOMEOWNERS SHOULD HAVE A WORKING PUMP If that pump fails Pumps will be available for checkout at 402 23 rd Street North Bring ID with the address pump will be deployed to. A full fuel can will be provided. Refuel is the responsibility of the individual checking out the pump. Post flood any damages to the pump will be special assessed back to the individual checking out the pump! Slide 20 Cul de Sac Kit 24 Shovels 4-pallets 10,000 Empty bags 5 buckets 20 Twist tie tools 5000 rebar ties 3 Express Baggers Tarp 3 Rolls Poly Sand delivered to kit location Instructions Slide 21 Flood Fatigue Flood Fight is very dependant on volunteers Sustaining a steady stream of volunteers could be problematic with back to back flood fights Call on everyone you know!! Family-Friends-Co workers-groups and clubs! Slide 22 Sandbag Central Will Open on Monday February 14, 2011 Slide 23 Hours from 8am to 8 pm Monday through Saturday Hours of Operation Slide 24 Transportation No parking available at Sandbag Central Please park at a dedicated Pick up site and ride the free shuttle bus. Check in at pickup site Buses every 15 minutes Slide 25 Transportation Slide 26 Slide 27 Slide 28 Spring Flood Outlook 2011 Scheduling Volunteers http://volunteerstatus.cityoffargo.com/ Slide 29 Sandbag Filling Incentive Program Incentives and Eligibility $75.00 to a qualified organization that provides each 100 hours of sandbag-filling effort 500 hours or more under this program will receive a $50.00 bonus. Eligibility-Qualified organizations will include non- profit corporations, 501(c)(3) organizations, civic or community organizations, high school teams, etc. Slide 30 City of Fargo Spring Flood Outlook 2011 Need More Information? Useful information on the website www.cityoffargo.com/flood Link to national weather service Link to FEMAs Floodsmart.gov Preliminary floodplain maps Protection Plan Information (Coming Soon) Sandbagging information Information on how to plug drains Videos on Sandbagging and Safety Slide 31 City of Fargo Spring Flood Outlook 2011 Need More Information? Flood Information Center / Property Information Phone number: 701-476-4199 First Link / Volunteering Phone number : 701-476-4000 Slide 32 Questions / Discussion City of Fargo Spring Flood Outlook 2011