Network Control: EMS and DMS New Developments and Roadmap Jacek Bujak, Network Manager Forum, October 9th, 2013
Agenda
©2013 Ventyx, an ABB company | Confidential & Proprietary | 2
Network Manager SCADA/EMS/GMS/DMS
• Vision and Themes
• New Developments & Roadmaps
• Network Manager in the E.ON Project
The information contained herein:
is for informational purposes only and may not be incorporated into any contract
is intended to outline our general product direction and should not be relied on in making a purchasing decision
is not a commitment, promise, or legal obligation to deliver any material, code or functionality
The development, release, and timing of any features or functionality described for our products remains at our sole discretion.
Safe Harbor
©2013 Ventyx, an ABB company | Confidential & Proprietary | 3
NM SCADA/EMS/GMS – Vision and Themes
Virtualization Hardware;
Support; Hosting
Incremental Upgrades
Patch Management
Release Fixes
Addressing NERC security requirements
Integration with Cyber Security tools & solutions eg Industrial Defender
1 2 3
Reduced Total Cost of
Ownership Cyber Security
New DTS based on NM-R TS
FAST-DTS - New high-fidelity TS for training and analysis
New features & enhancements in the new DTS
Enhanced Operator Training
Implementing in NM major functions used by NM-R customers
Closing other NM to NM-R gaps
NM-R to NM Upgrades
4
©2013 Ventyx, an ABB company | Confidential & Proprietary | 4
NM SCADA/EMS/GMS – Vision and Themes – continued
Conformance with modeling and operational rules and requirements in the ENTSO-E zone
Advanced modeling of renewables
Accounting for intermittency of renewable energy in EMS and GMS apps.
5 6 7
ENTSO-E Compliance
Renewable Energy
Quick assessment of power system state
Visualization of power system conditions and application results
Improved Situational Awareness
Enhancements to address common requirements in the Net Apps
New advanced applications eg Voltage Var Contr. for trans.
Network Apps. Enhancements & New Apps.
8
©2013 Ventyx, an ABB company | Confidential & Proprietary | 5
NM SCADA/EMS/GMS – Vision and Themes – continued
Making EMS/GMS a complete solution
Integration with other packages and products
Processing of phasor data
State Estimation enhanced with PMU data
Advanced WAMS applications
9 10 11
Integrated Solutions with
Ventyx products
Wide-Area Monitoring
State-of-the-art EMS platform and integration capabilities
Independent of underlying SCADA
Advanced EMS Architecture
New GUI with common look-and-feel across NM products
New features to turn data to information for fast decision making
New EMS User Interface
12
©2013 Ventyx, an ABB company | Confidential & Proprietary | 6
6.0, 6.1 (Q1 2013) 6.2, 6.3 (H2 2013) 2014 & Beyond
Roadmap Overview – SCADA/EMS/GMS
Integration with Industrial Defender
Renewable Energy Modeling - SCADA
EMS/GMS GUI using Windows Pres. Foundation
Industrial standards for integration
Patch Management Offering
Situational Awareness and Optimized Workflows
Display building and Data Maintenance
©2013 Ventyx, an ABB company | Confidential & Proprietary | 7
New GUI for Operation and Data Maintenance
6.0, 6.1 (Q1 2013) 6.2, 6.3 (H2 2013) 2014 & Beyond
Roadmap Overview – EMS/GMS
ENTSO-E Compliance
NM-R–to-NM Upgrades
Renewable Energy
Integrated Solutions with Ventyx Products
Enhanced Operator Training
©2013 Ventyx, an ABB company | Confidential & Proprietary | 8
New Network Applications
Wide Area Monitoring
Network Application Enhancements
NM EMS/GMS 6.0
Released Q1 2013
Topology Correction in SE
ENTSO-E Compliance
Net. Apps. Enhancements
Block Control in AGC AGC Enhancements
©2013 Ventyx, an ABB company | Confidential & Proprietary | 9
Color Coding of SA Violations
Switch to Default Network Parameters
Additional Attributes in Equipment Outage Scheduler
Manual Regulation to Regulating Limits
AGC Enhancements New Types of Regulation
Participation Factorss
Monitoring of Non-tracking Units
Absolute and Relative Set-points
6.0, 6.1 (Q1 2013) 6.2, 6.3 (H2 2013) 2014 & Beyond
Roadmap Overview – EMS/GMS
Enhanced Traning – Port NM-R DTS to Global NM Product
Orthogonal Transformation Algor. in SE
Market Interface to the ERCOT and MISO markets
©2013 Ventyx, an ABB company | Confidential & Proprietary | 10
NM-R-to-NM Upgrades
FAST-DTS – High Fidelity Simulator for Training and Analysis of Trans. Systems
Enhanced Operator Training
Phasor-Enhanced State Estimator
Modeling and Simulation of Hydro Chains
Interface to External Protection Modeling System
6.0, 6.1 (Q1 2013) 6.2, 6.3 (H2 2013) 2014 & Beyond
Roadmap Overview – EMS/GMS
Loosely Coupled Integration with Genops
Loosely Coupled Integration with Asset Health Monitoring
©2013 Ventyx, an ABB company | Confidential & Proprietary | 11
Integrated Solutions
Loosely Coupled Integration with Nostradamus
Improved Load Forecasting
Extension to Solar Plants
Advanced Management of Wind Farms
Extension to VPPs
Renewable Energy
6.0, 6.1 (Q1 2013) 6.2, 6.3 (H2 2013) 2014 & Beyond
Roadmap Overview – EMS/GMS
Phasor-Enhanced State Estimator
WAMS Extensions
©2013 Ventyx, an ABB company | Confidential & Proprietary | 12
Wide Area Monitoring
Modeling and Calculations for HVDC – DC Grid
Net. Apps. Enhancements
Phasor- Data Concentrator Integrated with PCU400
Voltage-Var Control - Manual Execution
New Network Applications
Voltage-Var Control - Automatic Execution
Classical Quasi Steady State DTS
Long-term phenomena Short-term phenomena Electromechanical swings Loss of synchronism Simulation of protective devices
V V V V V
Quasi-static phenomena V Long-term phenomena Short-term phenomena Electromechanical swings Loss of synchronism Simulation of protective devices
V Quasi-static phenomena V
FAST-DTS
Needed for a correct representation of power
system behaviour!
FAST DTS - new Dispatcher Training Simulator
©2013 Ventyx, an ABB company | Confidential & Proprietary | 13
Simple
Freq
uent
Se
ldom
Blackout / Blackstart
New Procedure
Prot. Failure
Daily Switching
Splitting+
Resynch
Complex
Local
Global
Extreme Weather
Multiple Failures
Volt. Collapse
Freq. Collapse Global /
Local
Global /InterTSO
Local/Global/InterTSO
FAST DTS – from simple to complex scenarios
©2013 Ventyx, an ABB company | Confidential & Proprietary | 14
New Dispatcher Training Simulator
Real-time SCADA/EMS Environment Real-time
start solution
UDW recorded data points
OTS Training Environment
Engineering and Maintenance Environment Power
system model
Development Environment
Programs, calculations, scripts…
Conditional Events
Interface to CAPE - Protection. Modeling System
Hydro-Chain Modeling
©2013 Ventyx, an ABB company | Confidential & Proprietary | 15
Transmission Network Applications and VVC
Telemetry Snapshot (SNP) Status and Analog Retrieval (SAR) Network Model Builder (NMB) Bad Topology Detection (BTD) Bus Scheduler (BSK) State Estimator (SE) SE Hourly Save Cases (SES) Optimal Power Flow (OPF) Security Analysis (SA) Security Constrained Dispatch
(SCD) Voltage Stability Analysis(VSA) Network Sensitivities (NS) Network Parameter Update (NPU) Reactive Power Reserve (RPR) Interlock Power Flow and Security
Analysis (ISR, INMB, IDPF, ISA) Pattern
Data
Analog Measurements
Tuning Parameters Status
Measurements
ICCP Data
SAR
SES
OPF
SA
SCD
NS
NPU
RPR
ISR INMB IDPF ISA
Operator Entries
Maintenance Scheduling
Data
SNP
NMB
BTD
BSK
SE
VSA
VVC
VVC (Voltage-Var Control for Transmission) will find optimal Voltage-VAr settings , and schedule power system voltage (reactive) controls to achieve a user-selected optimization objective while ensuring that the system operating constraints are not violated.
©2013 Ventyx, an ABB company | Confidential & Proprietary | 16
Production Scheduling Overview with Genops & Nost
Optimal scheduling of generation resources and interchange transactions to minimize total operating costs
The results of these programs have a significant impact on the cost of electricity production and overall operational efficiency
Network Sensitivities
Economic Dispatch
Automatic Generation
Control
Utility Data Warehouse INTERCHANGE SCHEDULING
Dispatcher Power Flow
SHORT TERM LOAD FORECASTING
UNIT COMMITMENT
Genops
Nostradamus
©2013 Ventyx, an ABB company | Confidential & Proprietary | 17
Management of Hydro Resources • Real-Time Monitoring & Control of hydroelectric power plants and
associated water resources
• Optimal Scheduling of all generation resources, subject to operational and environmental constraints
• Minimization of the overall operational cost
• Capability to model cascaded hydro systems and topology
• Handling of complex hydro characteristics and constraints
Wind (and Solar) Generation • Centralized Management of Wind Farms
• Enhancements in the EMS and GMS Applications to improve the modeling, monitoring and control of wind farms and account for intermittency of wind power
• Simulating wind related outages and power variations of a plant, a region/sub-region and a power grid
• Integration of Wind Power Forecast
• Wind Power Visualization on Operator’s displays
Renewables – with Wind and Solar Energy Mgmt.
©2013 Ventyx, an ABB company | Confidential & Proprietary | 18
NM DMS - Vision and Themes
Efficient operation of network
Automated restoration
Operate closer to limits
Reduce outage time
Increased cyber security
1 2 3
Smart Grid Improve Reliability
Eliminate reliance on paper maps and manual switch procedures
Reduce operational time and errors
Improve Workflows
Provide integrated solutions
More efficient data engineering
Reduced Total Cost of
Ownership
4
©2013 Ventyx, an ABB company | Confidential & Proprietary | 19
7.2 (Q1 2014) 7.3 (H2 2014) 8.0 (H1 2015)
DMS Roadmap Overview
Improve Operator Workflows
Reduce Total Cost of Ownership
Smart Grid
Improve Reliability
©2013 Ventyx, an ABB company | Confidential & Proprietary | 20
NM DMS 7.1
Released H1 2013
Common Alarm and Event Lists
DMS in WPF
Situational Awareness
Optimized Workflows
Coordinated views Advanced Search Tools
©2013 Ventyx, an ABB company | Confidential & Proprietary | 21
Operator Actions from DMS DMS Worldmap in WPF
Background Maps
OMI Integration
Display Converter
Workflow Orientation
PSE is a major R&D effort with a main goal to remake the entire HMI for Network Manager (SCADA/EMS/DMS product lines) Cutting edge user experience and support situational awareness PSE is an integration platform for various functions and products needed in the
control room Everything from operations to maintenance will be handled by one application
NM DMS 7.1 - with Power System Explorer (PSE)
©2013 Ventyx, an ABB company | Confidential & Proprietary | 22
Demand Response Capabilities presented in the DMS network
FocalPoint KPI visualization based on selections in DMS, EMS or SCADA screens
Integration between Ventyx Products
©2013 Ventyx, an ABB company | Confidential & Proprietary | 23
NM DMS 7.2
Targeted Q1 2014
Improve Situational Awareness
Smart Grid
Improve Workflow
Improve Reliability
Retrieve fault measurements via SCADA
AMI Pinging AMI Restoration Verification
©2013 Ventyx, an ABB company | Confidential & Proprietary | 24
Retrieve Dynamic Transformer Limits by SCADA
Load Forecasting Demand Response
Assign Crew to Fault Location
Distributed Energy Resources
Work Tag Notifications
Exchange Outage Data with Field Crews
Switch Order Recording
Smart Grid
SCADA Fault Measurements
Automatically retrieve fault measurements via SCADA Enables FLISR to locate the fault automatically
Benefits
When coupled with FLISR, allows isolation and restoration within momentary outage time
Reduces outage time
Reduces equipment operations by removing the need to manual test to locate the fault
©2013 Ventyx, an ABB company | Confidential & Proprietary | 25
Smart Grid
SCADA Transformer Limits Retrieves dynamic transformer limits from substation Limits reflect local real-time conditions
Benefits
More accurate overload alarming and capacity margin calculation
©2013 Ventyx, an ABB company | Confidential & Proprietary | 26
Smart Grid
Load Forecasting Load forecast at a service transformer level Accounts for AMI and weather input
Benefits
Improved estimation of non telemetered loading when combined with State Estimation
Prediction of future overloads allows mitigation plans to avoid outages using VVO, DRMS, and line unloading
©2013 Ventyx, an ABB company | Confidential & Proprietary | 27
Smart Grid
DER Forecasting Forecast of distributed energy resource generation Wind, solar and thermal
Benefits
Accurate estimation of distribution network loading when combined with State Estimation
Prediction of future overloads allows mitigation plans to avoid outages using VVO, DRMS, and line unloading
Prediction of power and voltage problems during loss of generation using contingency analysis [available in NM DMS 8.0]
©2013 Ventyx, an ABB company | Confidential & Proprietary | 28
Smart Grid
Demand Response Reduction of overloads with demand response targeted to customers downstream of overload
Benefits
Mitigate overloads to avoid power outages and equipment damage
Reduce peak demand to offset generation and distribution investment
©2013 Ventyx, an ABB company | Confidential & Proprietary | 29
Improve Operator Workflow
Improved Operator Situational Awareness
Satellite map views, camera view windows, and ability to move windows to different displays
Benefits
Improve operators situational awareness with multiple views showing electrical network, streets maps, and satellite view
Improve operator efficiency with modern graphical controls and improved workflows
Reduce operator training time
©2013 Ventyx, an ABB company | Confidential & Proprietary | 30
Improve Workflow
Assign Crew to Fault Location
Assign crew to fault location or switchable device
Benefits
Assign crew to fault locations to restore outage faster
©2013 Ventyx, an ABB company | Confidential & Proprietary | 31
Improve Workflow
Switch Order Recording Create switch orders by recording switching operations
Benefits
Reduce time to create switch order by allowing operations to be recorded directly in a switch order
©2013 Ventyx, an ABB company | Confidential & Proprietary | 32
Improve Reliability
AMI Pinging Call taker and Operator pinging of AMI meter to determine power on status
Benefits
Reduce callouts for customer level outages
Reduce outage duration by allowing operator to verify the extent of a predicted outage
©2013 Ventyx, an ABB company | Confidential & Proprietary | 33
Improve Reliability
AMI Restoration Verification
Customer power on is automatically verified through AMI immediately following restoration switching
Benefits
Crew can be notified there is additional outage work before leaving the area
Customers are not notified of power restoration when their power is still out
©2013 Ventyx, an ABB company | Confidential & Proprietary | 34
Improve Reliability
Work Tag Notifications Automatically notify field crews when work tags are placed or removed
Benefits
Improve safety and reduce work duration by notifying crews when tags are placed ore removed on equipment in their work vicinity
©2013 Ventyx, an ABB company | Confidential & Proprietary | 35
NM DMS 7.3
In Planning H2 2014
Enhanced Outage Management Workflows
Smart Grid
Improve Workflow
State Estimation Feeder Reconfiguration
©2013 Ventyx, an ABB company | Confidential & Proprietary | 36
Smart Grid
State Estimation Estimate loading on distribution network that matches
SCADA measurements, load and generation profiles and voltage measurements
Benefits
Confidence in operational state of the distribution network
Allows operation closer to capacity margin
©2013 Ventyx, an ABB company | Confidential & Proprietary | 37
Smart Grid
Feeder Reconfiguration Reduce losses and balance parallel transformers by moving normal open feeder tie points
Benefits
Most efficient feeder topology
Utilize more feeder capacity
©2013 Ventyx, an ABB company | Confidential & Proprietary | 38
Improve OMI Workflows
Improve Workflow Streamline work flow e.g. reducing OMI windows and key clicks
Benefits
More efficient processing of outages
©2013 Ventyx, an ABB company | Confidential & Proprietary | 39
NM DMS 8.0
In Planning H1 2015 Smart Grid
Improve Operator Workflow
Contingency Analysis
©2013 Ventyx, an ABB company | Confidential & Proprietary | 40
Earth Fault Localization Enhanced Fault Location
Common DMS/SCADA HMI Common DMS/SCADA Data Engineering
Enhanced Power System Modeling
Dispatcher Training Simulator
Improve Reliability
Smart Grid
Contingency Analysis Evaluate network security for n-1 component failure
Benefits
Increase reliability by identifying component failures that cause unacceptable operating conditions
Plan for mitigation before the event happens
©2013 Ventyx, an ABB company | Confidential & Proprietary | 41
Smart Grid
Earth Fault Localization Graphical tool to help operator isolate ungrounded earth faults
Benefits
Increase safety by allowing operator to isolate earth fault in ungrounded or compensated network where no fault current flows on first fault
Prevent outages where second fault would clear line
©2013 Ventyx, an ABB company | Confidential & Proprietary | 42
Smart Grid
Enhanced Fault Location Locate fault areas based only on SCADA fault indicator status
Benefits
Reduce fault isolation and restoration time
Reduce SAIFI by isolating and restoring customers within the momentary switching time
©2013 Ventyx, an ABB company | Confidential & Proprietary | 43
Improve Operator Workflow
Common DMS/SCADA HMI
Common display for world map views and SCADA picture file views with SCADA and manual operations from either view
Common alarm list and line coloring
Benefits
Increase operators situational awareness with common alarms and seamless display interaction
Reduce training for DMS system with SCADA, DMS, and OMS capability
©2013 Ventyx, an ABB company | Confidential & Proprietary | 44
Improve Operator Workflow
Common DMS/SCADA Data Engineering
One HMI interface to maintain DMS and SCADA data
Benefits
Reduce the number of screens and systems needed to set-up and maintain the DMS system
©2013 Ventyx, an ABB company | Confidential & Proprietary | 45
Improve Reliability
Dispatcher Training Simulator
Training simulator driven by independent field database model to realistically simulator power flows, voltages, and outage calls experienced by the SCADA, DMS, and OMS operators
Benefits
Improve operator response under complex operating scenarios
©2013 Ventyx, an ABB company | Confidential & Proprietary | 46
2015 and Beyond
2015 and Beyond Smart Grid
Improve Operator Workflow
DER Control in VVO
©2013 Ventyx, an ABB company | Confidential & Proprietary | 47
Predictive Load Flow
Predictive Contingency
Pre-switch Load Flow
On-line Protection Coordination
CIM Compliant Interfaces
Reduce TCO
Improve Reliability
Enhanced Tagging Combined Subtransmission and Distribution Processing
Network Manager SCADA/EMS/DMS, E.ON Sweden
Customer need Integration of wind and renewables in sub-transmission and distribution network Predict and prevent instability issues Avoid network congestions
ABB response Network Manager Smart Grid Control Center for the mid- and low voltage network Renewable generation forecast using Nostradamus application Look ahead network optimization considering forecast, schedules and dynamic line rating Demand response functionality integrating consumers with Ventyx DRMS application Situational awareness and presentation using Ventyx BI tool Focal Point
Customer benefits Minimized grid losses in mid- and low voltage network Preventive, instead of reactive, network operation Increased awareness of future contingencies and bottlenecks Reduced operator stress
Customer: E.ON, Sweden System operation in 2014
©2013 Ventyx, an ABB company | Confidential & Proprietary | 48
Solution Overview – Integration Landscape
©2013 Ventyx, an ABB company | Confidential & Proprietary | 49
Scada
Weather
EMS
Nostradamus
DRMS
Focal Point
Scada Measurements
Network Topology
Substation Weights
Load Reduction Requests
Load Reduction Recommendations
Historical Weather Data Weather Forecast
Load and Renewable Generation Forecasts
Predicted Events
Meter Reads
VVC Calculation and Optimization
The VVC execution provides optimal Voltage-VAr settings, using available reactive power controls.
©2013 Ventyx, an ABB company | Confidential & Proprietary | 50
VVC Objectives
The VVC function provides optimal Voltage-VAr settings, using available reactive power controls. VVC acts in real-time and look-ahead modes. VVC will be used in the E.ON project to address several operational scenarios. The main objectives are to:
Optimize the voltage and reactive power in the system and predict the voltage profiles for the next six hours
Predict possible subscriptions violations for the next six hours and present a list of MW recommended actions in order to prevent it
Predict possible line congestions for the next 6 hours and present a list of MW recommended actions in order to prevent it
Provide a complete set of output to allow the operator to evaluate the actual and forecasted state of the network. The output will include a solution summary, pre and post optimization bus voltage, branch flow violation and the bus voltage profile.
©2013 Ventyx, an ABB company | Confidential & Proprietary | 51
E.ON SGCC Architecture
©2013 Ventyx, an ABB company | Confidential & Proprietary | 52
Thank You