new boyd pit no. 0723 - gov.bc.ca · ministry of transportation and infrastructure geotechnical and...

17
Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C 2T3 Telephone: (250) 371-3789 Fax: (250) 828-4083 New Boyd Pit No. 0723 2018 Technical Information Report Location: The pit is located approximately 1km south of Clinton off Hwy 97 and on Boyd Road. Legal Description: Ministry of Transportation and Infrastructure owned property, legally described as Lot A, Plan 9062, and a part of Lot 1 Plan 19385, District Lot 1060 LDYD. The UTM coordinates for the pit are Grid Zone 10, 598600 Easting, 5659500 Northing.

Upload: ledung

Post on 08-Aug-2019

217 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering

Southern Interior Region 231-447 Columbia Street Kamloops, BC, V2C 2T3 Telephone: (250) 371-3789 Fax: (250) 828-4083

New Boyd Pit No. 0723

2018 Technical Information Report

Location: The pit is located approximately 1km south of Clinton off Hwy 97 and on Boyd Road.

Legal Description: Ministry of Transportation and Infrastructure owned property, legally described as Lot A, Plan 9062, and a part of Lot 1 Plan 19385, District Lot 1060 LDYD. The UTM coordinates for the pit are Grid Zone 10, 598600 Easting, 5659500 Northing.

Page 2: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

2 August 2018

Gradation: The average and range of laboratory samples as well as oversize rock field estimates for material from the 2017 testing program at New Boyd are as follows: Laboratory Samples

Classification Average (%) Range (%) Gravel (4.75-75mm) 43.8 3.2-49.9 Sand (0.075-4.75mm) 86.8 48.6-94.0 Fines (<0.075mm) 5.0 0.4-27.3 Oversize Field Estimates

Classification Average (%) Range (%) Boulders (>375mm) 0 0 Cobbles (150-375mm) 1 0-3 Cobbles (75-150mm) 3 1-8 Maximum rock size observed was 300mm. Wet Sieve Analysis Chart: 2017

PROJECT REPORT OFSIEVE ANALYSIS SUMMARIES PERCENT PASSING

Project: New Boyd Pit Project No.: 0Sample Source: Test Pits Client: 0Material: PIT RUN Date: October 17-18 2017

Sample Information Percent PassingTest Pit Depth Bag # Pit Run Sieve Sizes (mm)

(m) 75 50 37.5 25 19 12.5 9.5 4.75 2.36 1.18 0.6 0.3 0.15 0.07517-01 0-3.5 101 100.0 100.0 98.4 93.1 89.3 81.1 73.4 57.0 40.9 23.9 11.3 4.2 1.5 0.717-02 0-5 102 100.0 96.7 96.1 91.5 87.4 80.6 74.5 60.3 46.2 31.8 16.2 4.3 1.2 0.617-03 0-4 103 100.0 100.0 95.3 91.1 88.0 80.5 76.7 65.9 57.0 49.1 40.0 22.5 5.3 1.817-04 0.2-3.5 104 100.0 100.0 96.4 92.7 88.5 82.0 77.1 62.8 48.9 32.9 16.4 5.3 1.5 0.417-05 1.4-3.7 105 100.0 100.0 99.3 96.2 93.4 88.6 85.3 76.1 65.8 55.5 43.1 26.3 9.5 3.317-06 0.2-4.8 106 100.0 95.8 93.8 89.9 86.3 83.9 79.5 70.1 62.4 54.8 45.6 30.6 13.5 4.417-07 0.3-3 107 100.0 98.9 97.2 92.6 87.0 78.1 72.2 59.2 48.3 38.4 27.9 16.2 6.2 2.417-08 2-3.5 108 100.0 99.0 97.4 93.7 89.5 82.1 76.3 62.2 49.9 39.6 27.2 11.0 2.9 1.017-09 1.3-3.8 109 100.0 100.0 99.6 97.6 95.8 90.9 86.8 77.1 66.9 55.5 42.1 21.2 5.1 1.317-10 1.1-2.8 110 100.0 100.0 96.1 90.9 86.5 79.2 72.7 58.6 46.2 33.5 18.9 6.4 1.7 0.617-11 0-3.6 111 100.0 96.2 94.1 86.4 78.5 70.5 62.6 50.1 38.6 27.2 16.2 7.1 2.8 1.417-12 2-3.8 112 100.0 100.0 96.2 92.9 87.9 80.4 73.6 59.0 45.3 31.6 18.1 7.2 2.3 1.117-13 1-3.4 113 100.0 99.3 99.3 94.8 89.9 78.4 69.8 51.6 34.4 19.0 8.3 3.8 2.4 1.817-14 1.2-3.5 114 100.0 100.0 98.2 96.0 92.5 86.9 81.7 67.5 52.8 37.9 25.3 12.5 3.5 1.217-15 2-3 115 100.0 100.0 99.2 96.5 92.7 88.9 82.9 70.4 59.2 44.7 27.7 13.6 5.9 2.817-16 0.8-3.5 116 100.0 100.0 99.3 98.3 96.4 95.2 91.7 77.5 61.3 43.7 24.9 11.9 7.5 4.817-17 2.5-5.5 117 100.0 100.0 99.2 95.3 88.9 77.3 69.4 56.8 48.4 40.4 31.1 18.9 7.6 3.217-18 1.5-3.5 118 100.0 100.0 100.0 97.5 94.6 87.3 82.2 67.2 51.5 34.1 17.8 7.0 2.5 1.117-19 0-3.3 119 100.0 100.0 100.0 99.5 99.3 99.3 97.4 91.4 86.6 81.5 75.3 63.5 35.4 13.317-20 0-3.8 120 100.0 100.0 100.0 99.5 99.0 98.2 97.8 93.6 87.2 78.8 63.4 30.9 9.1 4.117-21 0-3.5 121 100.0 100.0 98.9 98.4 98.2 97.8 97.4 96.8 95.9 93.6 79.0 35.2 8.8 2.817-22 1.2-3.9 122 100.0 100.0 98.3 95.5 91.3 84.0 77.7 62.4 47.7 32.3 15.0 4.2 1.7 1.117-23 1-3.5 123 100.0 100.0 96.8 92.1 86.0 77.7 70.4 52.8 38.2 25.8 14.7 6.0 3.1 2.317-24 1-3 124 100.0 100.0 99.3 97.1 95.7 91.5 89.3 83.9 79.0 73.0 66.1 55.5 42.4 27.317-25 0-2.5 125 100.0 100.0 100.0 96.6 93.0 87.4 81.2 64.5 47.0 32.2 20.7 13.2 10.7 9.7

Page 3: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

3 August 2018

2010

Aggregate Gradation Charts:

PROJECT REPORT OFSIEVE ANALYSIS SUMMARIES PERCENT PASSING

Project: New Boyd Project No.:Sample Source: Pit Run Client: MoTIMaterial: Pit Run Date: Nov 18 2010

Sample Information Percent Passing Percent PassingTest Pit Depth Bag # Pit Run Sieve Sizes (mm) Pit Run Sieve Sizes (mm)

(m) 75 37.5 19 9.5 4.75 2.36 1.18 0.6 0.3 0.07510-01 621 100.0 92.5 84.2 78.5 71.3 61.0 43.5 18.5 5.2 1.610-02 622 100.0 75.0 64.2 55.2 44.9 34.6 26.5 19.5 10.4 3.210-03 623 100.0 72.3 59.3 49.3 39.3 28.8 18.7 10.7 6.3 2.910-04 624 100.0 75.0 61.1 47.5 36.2 25.3 16.4 10.9 7.3 4.010-06 600 94.4 94.4 64.1 53.2 39.8 26.6 13.6 5.6 2.7 0.910-07 665 100.0 80.5 66.4 51.0 37.4 24.9 15.4 8.9 5.0 2.210-08 697 100.0 76.5 60.4 50.2 41.5 32.1 22.6 13.1 5.8 1.610-09 626 100.0 79.6 61.5 50.7 39.4 28.9 18.1 9.4 5.0 1.910-10 627 100.0 78.4 68.1 59.8 52.4 43.6 31.9 18.9 11.3 5.510-11 630 100.0 92.9 83.1 73.5 64.1 53.6 41.6 27.8 13.4 4.3

Page 4: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

4 August 2018

Page 5: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

5 August 2018

Page 6: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

6 August 2018

Page 7: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

7 August 2018

Page 8: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

8 August 2018

Summary of Test Pit Logs (with results bolded in the chart): 2017

1 OF 1

PROJECT: New Boyd Pit SAMPLED BY: Samantha Kinniburgh PIT #: 0723 METHOD: Excavator

DISTRICT: Cariboo DATE: October 17-18 2017

TP SAMPLESOILS CLASS

SAND TYPE

REMARKS

FROM TO BAG No. G S F MAX SIZE

75mm 150mm

150mm - 375mm >375mm F M C Lab Sieve

17-01 0 3.5 101 GP 63 36 1 150 5 1 0 C Sloughing after 1mSP G43 S56.2 F0.7

17-02 0 5 102 GP 60 39 1 240 3 1 0 C-M Bony below 3m, sloughingSP G39.7 S59.6 F0.6

17-03 0 4 103 GP 55 44 1 210 5 3 0 M Dirtier soilSP G34.1 S64.0 F1.8

17-04 0 0.2 Floor Old asphalt on top 0.2m,

0.2 3.5 104 GP 50 49 1 150 3 1 0 M sloughing @ 1mSP G37.2 S62.3 F0.4

17-05 0 0.1 Floor0.1 1.4 GP1.4 3.7 105 SP 44 55 1 90 2 0 0 M Beach sand below 1.4m

SP G23.9 S72.8 F3.3

17-06 0 0.2 OB Composite sample taken0.2 3 GP 50 49 1 beach sand below 3m3 4.8 106 SP 34 65 1 100 2 0 0 M-F SP G29.9 S65.7 F4.4

17-07 0 0.3 OB Composite sample taken0.3 3 107 GP 50 49 1 120 3 0 0 C-M Fairly consistent3 4 SP SP G40.8 S56.7 F2.4

17-08 0 1.5 GP1.5 2 SP2 3.5 108 GP 55 44 1 200 3 1 0 C-M Sand seam from 1.5-2m

SP G37.8 S61.2 F 1.0

17-09 0 1.3 GP1.3 3.8 109 SP 19 80 1 200 1 1 0 M-F Sandy with gravel cap

SP G22.9 S75.8 F1.3

ESTIMATED GRADUATION

ESTIMATED ROCK 75mm

AGGREGATE LOG

DEPTH

Page 9: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

9 August 2018

PROJECT: New Boyd Pit SAMPLED BY: Samantha Kinniburgh

PIT #: 0723 METHOD: Excavator

DISTRICT: Cariboo DATE: October 17-18 2017

TP SAMPLESOILS CLASS

SAND TYPE

REMARKS

FROM TO BAG No. G S F MAX SIZE75mm 150mm

150mm - 375mm

>375m

mF M C Lab Sieve

17-10 0 1.1 GP1.1 2.8 110 SP 41 58 1 170 4 2 0 C-M Slouging at 0.5m, sandy

SP G41.4 S58.0 F0.6

17-11 0 3.6 111 GP 60 39 1 150 7 2 0 C-M ConsistentGP G49.9 S48.6 F1.4

17-12 0 1.5 GP1.5 2 SP Sloughing througout2 3.8 112 GP 57 42 1 170 3 1 0 C-M Sand seam dipping towards highway

SP G41.0 S57.9 F1.1

17-13 0 1 SP1 3.4 113 GP 63 36 1 150 5 1 0 C-M Clean gravel after 1m, sloughing

SP G48.4 S49.8 F1.8

17-14 0 1.2 SP Caps the gravel1.2 3.5 114 GP 56 43 1 180 3 1 0 C-M Sand seam dipping towards highway

SP G32.5 S66.3 F1.2

17-15 0 1.2 GP1.2 1.5 SP Banded and sandy throughout1.5 2 GP2 3 115 SP 42 57 1 90 1 0 0 M SP G29.6 S67.7 F2.83 4.7 SP

17-16 0 0.5 SP0.5 0.8 SP Sand seam running W-E, dipping @1m0.8 3.5 116 SP 43 56 1 190 3 1 0 C-M and getting wider

SP G22.5 S72.7 F4.8

17-17 0 2.5 PR2.5 5.5 117 GP 52 47 1 300 3 1 0 C-M Pit run and reject for the top 2.5m

SP G43.2 S53.6 F3.2

AGGREGATE LOG

DEPTHESTIMATED GRADUATIO

ESTIMATED ROCK 75mm

Page 10: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

10 August 2018

PROJECT: New Boyd Pit SAMPLED BY: Samantha Kinniburgh

PIT #: 0723 METHOD: Excavator

DISTRICT: Cariboo DATE: October 17-18 2017

TP SAMPLESOILS CLASS

SAND TYPE REMARKS

FROM TO BAG No. G S F MAX SIZE 75mm - 150mm

150mm - 375mm

>375m

mF M C Lab Sieve

17-18 0 0.3 Floor0.3 1 GP1 1.5 SP

1.5 3.5 118 GP 54 45 1 160 4 1 0 C-M Visible sand seamsSP G32.8 S66.1 F1.1

17-19 0 3.3 119 SP 5 85 10 100 1 0 0 M-F Beach sand withsome cementing

SW G8.6 S78.1 F13.3

17-20 0 3.8 120 SP 14 85 1 100 1 0 0 M-F much like 17-19, beach sandSW G6.4 S89.6 F4.1

17-21 0 3.5 121 SP 9 90 1 130 1 0 0 M-F same as 17-19,20some gravel seams, OS

SW G3.2 S94.0 F2.817-22 0 1.2 SP

1.2 3.9 122 GP 52 47 1 150 3 1 0 C-M Dirty materialSP G37.6 S61.4 F1.1

17-23 0 0.7 GP0.7 1 SP Silt seam on highway side1 3.5 123 GP 59 40 1 190 8 3 0 C-M 1m down

SP G47.2 S50.5 F2.3

17-24 0 1 SP packed sands and fines 1 3 124 SM-3 2 63 35 100 1 0 0 M-F below 1m

SM2 G16.1 S56.6 F27.3

17-25 0 2.5 125 GP 51 43 6 120 3 0 0 C-M major sloughing @ 1msand seam on W sideconsistent otherwiseSP G35.5 S54.8 F9.7

AGGREGATE LOG

DEPTHESTIMATED

GRADUATIONESTIMATED ROCK 75mm

Page 11: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

11 August 2018

2010

Aggregate Quality: A summary of aggregate quality tests performed on pit run samples from the tested area are as follows:

TP or

Year

Micro-Deval (%)

(C/F)

Degradation (%)

Sand Equivalent

(%)

Bulk Relative Density (C/F)

Absorption (%)

(C/F)

MgSO4 (%)

(C/F)

17-02 10.1/16.1 17-05 2.631/2.609 1.32/1.91 17-07 73 17-12 81

PROJECT: New Boyd Pit SAMPLED BY:PIT #: 0723 METHOD: Backhoe

DISTRICT: Cariboo DATE: Nov 18 2010

TP 10-04 0.0 0.1 TS0.1 2.6 GP 65 33 2 150 2 <12.6 5.0 SP 5 94 1 75

629 GP 60 39 2

TP 10-05 0.0 0.1 TS0.1 2.6 GP 62 37 1 150 2 <1 FM2.6 5.0 SP 7 92 1 75

VISUAL TESTING ONLYTP 10-06 0.0 0.1 TS

0.1 2.2 GP 52 46 2 200 5 <1 FM2.2 3.0 SP 40 59 1 753.0 5.0 SP 10 89 1

628 GP 52 46 2TP 10-07 0.0 0.1 TS

0.1 2.6 GP 52 47 1 200 5 <1 FM2.6 3.9 GP 64 35 1 753.9 5.1 SP 19 80 1

VISUAL TESTING ONLYTP 10-08 0.0 0.1 TS

0.1 2.2 GP 60 38 2 200 5 <1 FM2.2 4.4 SP 38 60 1 75

631 GP 60 38 2TP 10-09 0.0 0.1 TS

0.1 1.2 GP 60 38 2 200 5 <1 FM1.2 3.0 SP 21 78 1 753.0 4.6 SP 42 56 2 75

VISUAL TESTING ONLYTP 10-10 0.0 0.1 TS

0.1 2.9 GP 63 36 1 200 5 <1 FM2.9 4.4 SP 41 58 1 75

632 GP 57 42 1

AGGREGATE LOG

Laboratory Sieve Analysis 0.1-2.4 metres

Laboratory Sieve Analysis 0.1-4.4 metres

Laboratory Sieve Analysis 0.1-3.0 metres

Laboratory Sieve Analysis 0.1-2.2 metres

Page 12: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

12 August 2018

17-22 10.2/16.0 17-23 2.635/2.623 0.92/1.34

Granular Volume: Estimated Volume: 112,000m3

• The proven volume has been determined by multiplying the surface area of the suitability boundary by an average depth of 3.5 metres.

Pit Development and Recommendations:

• The mining area has been previously developed by the Ministry of Transportation and Infrastructure (MoTI). Any additional development will be the responsibility of the contractor and shall be completed as per the pit development plan or as directed by the Ministry Representative.

• The crusher is recommended to be located as identified on the Pit Development Plan, with

mining proceeding in an eastern and/or southern direction as indicated. • Processed aggregate may be stockpiled on the east end of the pit adjacent to the existing

berm, on the south end of the pit and in developed areas of the west end of the pit where space permits. Additionally, if the existing stockpile areas as noted on the Pit Development Plan are no longer in place, those areas can be used as potential stockpile locations in their absence.

• Some minor stripping may be required prior to mining and aggregate stockpiling. If

additional development is required it shall conform to the requirements of the pit development plan or be completed as directed by the Ministry Representative.

• At the completion of mining, active pit faces shall be sloped to a minimum of 1 ½:1 with pit

run granular material.

• All reject materials resulting from aggregate production are to be placed in separate stockpiles free from deleterious material and in an easily accessible location. No stockpiling against the pit face is permitted without the permission from the Aggregate Resource Manager.

Page 13: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

13 August 2018

Site Photographs:

TP17-02, October 2017.

Page 14: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

14 August 2018

TP17-04 Spoil, October 2017.

Page 15: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

15 August 2018

TP17-11 Spoil, October 2017.

Page 16: New Boyd Pit No. 0723 - gov.bc.ca · Ministry of Transportation and Infrastructure Geotechnical and Materials Engineering Southern Interior Region 231-447 Columbia Street Kamloops,

New Boyd Pit No. 0723 2018 Technical Information Report

16 August 2018

TP17-14, October 2017.

Samantha Kinniburgh Senior Aggregate Resource Specialist