 Coal-Fired Power Plants in Indonesia - other islands  Barru Location: South Sulawesi Operator: PT PLN Persero Configuration: 2 X 50 MW Fuel: coal Operation: 2011 Boiler supplier: Hangzhou T/G supplier: Nanjing EPC: Hubei Hongyuan Power Engineering Co Ltd, PT Bagus Karya, PT Gemilang Pratama Karya Quick facts: Emerson supplied an Ovation control system for PLTU Labuanm Banten. The first unit was connected in Jul 2009 and officially opened by President Susilo Bambang Yudhoyono on 28 Jan 2010 Photograph by iqbal.bakaru (Panoramio) Posted 18 Aug 2012  Bukit Asam Location: South Sumatra Operator: PT PLN Configuration : 4 X 65 MW Operation: 1989-1995 Fuel: subbituminous coal, oil Boiler supplier: Stein T/G supplier: Rateau, GEC-Alsthom EPC: Sogeah, Japan Jurong Engineering Photograph courtesy of PT Bukit Asam Batubara Posted 2 Nov 2005 Lampung Location: South Sumatra Operator: PT PLN Configuration: 2 X 100 MW Operation: 2012 Fuel: coal Boiler supplier: Jinan T/G supplier: Wuhan Turbine EPC: Jiangxi Electric Power Overseas Engineering, PT Adhi Karya Quick facts: In Mar 2008, PLN broke ground on PLTU Lampung in Kec Katibung, Tarahan Lampung. In Jul 2009, PLN secured financing for the $154.3mn project from Bank Rakyat Indonesia. Photograph by RiZaL MuKhTaR (Panoramio) Posted 30 Sep 2012  Nagan Raya Location: Aceh Operator: PT PLN Configuration: 2 X 110 MW Operation: 2013-2014 Fuel: coal Boiler supplier: Wuxi T/G supplier: Nanjing EPC: Sinohydro, Sinohydro No 8, Northwest Power Construction Group Corp Quick facts: Nagan Raya is atSuak Puntong Village, Kuala District, Nagan Raya Regency. The kickoff meeting was held on on 8 May 2008, the first pile was driven on 25 Nov. It was a $247mn contract for Sinohydro. Photograph courtesy of PT PLN Posted 25 Jan 2014  Ombilin Location: West Sumatra Operator: PT PLN Configuration: 2 X 100 MW Operation: 1996-1997 Fuel: subbituminous coal, oil Boiler supplier: Stein T/G supplier: GEC-Alstho m EPC: GEC-Alstom, Cegelec, Lahmeyer Quick facts: EPC contract awarded in late 1993. The ESPs were built by Walther. Photograph courtesy of PT Bukit Asam Batubara Posted 2 Nov 2005 Palu Location: Central Sulawesi Operator: PT Pusaka Jaya Palu Power Configuration: 2 X 15 MW Operation: 2006 Fuel: coal Boiler supplier: Wuxi T/G supplier: Qingdao, Jinan EPC: SEPCO No 3 Quick facts: This is an IPP project of PT Toba Sejahtera. Coal is supplied by PT PLN via barge from East Kalimantan. Photograph courtesy of SEPCO No 3 Posted 6 Nov 2011 Page 1 of 2 st-coal-indonesia 2/12/2014 http://www.industcards.com/st-coal-indonesia.htm

Upload: luthfi-yulian-fikri

Post on 02-Jun-2018

227 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: New Coal Power Plant

8/10/2019 New Coal Power Plant

http://slidepdf.com/reader/full/new-coal-power-plant 1/2

 

Coal-Fired Power Plants in Indonesia - other islands 

Barru Location: South Sulawesi

Operator: PT PLN PerseroConfiguration: 2 X 50 MW

Fuel: coal

Operation: 2011Boiler supplier: Hangzhou

T/G supplier: NanjingEPC: Hubei Hongyuan Power Engineering Co Ltd,

PT Bagus Karya, PT Gemilang Pratama KaryaQuick facts: Emerson supplied an Ovation controlsystem for PLTU Labuanm Banten. The first unit

was connected in Jul 2009 and officially opened byPresident Susilo Bambang Yudhoyono on 28 Jan

2010

Photograph by iqbal.bakaru (Panoramio)Posted 18 Aug 2012 

Bukit Asam Location: South Sumatra

Operator: PT PLNConfiguration: 4 X 65 MW

Operation: 1989-1995Fuel: subbituminous coal, oil

Boiler supplier: SteinT/G supplier: Rateau, GEC-Alsthom

EPC: Sogeah, Japan Jurong Engineering

Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005 

Lampung Location: South Sumatra

Operator: PT PLNConfiguration: 2 X 100 MW

Operation: 2012Fuel: coal

Boiler supplier: JinanT/G supplier: Wuhan Turbine

EPC: Jiangxi Electric Power Overseas Engineering,PT Adhi Karya

Quick facts: In Mar 2008, PLN broke ground onPLTU Lampung in Kec Katibung, Tarahan

Lampung. In Jul 2009, PLN secured financing forthe $154.3mn project from Bank Rakyat Indonesia.

Photograph by RiZaL MuKhTaR (Panoramio)Posted 30 Sep 2012 

Nagan Raya Location: Aceh

Operator: PT PLNConfiguration: 2 X 110 MW

Operation: 2013-2014Fuel: coal

Boiler supplier: WuxiT/G supplier: Nanjing

EPC: Sinohydro, Sinohydro No 8, Northwest PowerConstruction Group Corp

Quick facts: Nagan Raya is atSuak Puntong Village,Kuala District, Nagan Raya Regency. The kickoffmeeting was held on on 8 May 2008, the first pile

was driven on 25 Nov. It was a $247mn contract forSinohydro.

Photograph courtesy of PT PLNPosted 25 Jan 2014 

Ombilin Location: West Sumatra

Operator: PT PLNConfiguration: 2 X 100 MW

Operation: 1996-1997Fuel: subbituminous coal, oil

Boiler supplier: SteinT/G supplier: GEC-Alsthom

EPC: GEC-Alstom, Cegelec, LahmeyerQuick facts: EPC contract awarded in late 1993.

The ESPs were built by Walther.

Photograph courtesy of PT Bukit Asam BatubaraPosted 2 Nov 2005 

Palu Location: Central Sulawesi

Operator: PT Pusaka Jaya Palu PowerConfiguration: 2 X 15 MW

Operation: 2006Fuel: coal

Boiler supplier: WuxiT/G supplier: Qingdao, Jinan

EPC: SEPCO No 3Quick facts: This is an IPP project of PT TobaSejahtera. Coal is supplied by PT PLN via barge

from East Kalimantan.

Photograph courtesy of SEPCO No 3Posted 6 Nov 2011 

Page 1 of 2st-coal-indonesia

2/12/2014http://www.industcards.com/st-coal-indonesia.htm

Page 2: New Coal Power Plant

8/10/2019 New Coal Power Plant

http://slidepdf.com/reader/full/new-coal-power-plant 2/2

Abbreviations 

Data: industcards, Platts UDI World Electric Power Plants Data Base 

Updated 25-Jan-2014

Home 

Punagaya Location: South Sulawesi

Operator: PT Bosowa MakassarConfiguration: 2 X 125 MW

Operation: 2012Fuel: coal

Boiler supplier: ??T/G supplier: ??

EPC: Chengda, Southwest Electric Power DesignInstitute, Wika

Quick facts: In Nov 2010, local industrial andinfrastructure conglomerate PT Bosowa Corpbegan construction on this IPP at Pungaya,Bangkala, Kab Jeneponto. The project was

completed by SPV PT Bosowa Makassar at a costof about $250mn with China’s Chengda acting aslead EPC contractor. Bosowa has a 200-MW PPA

with PLN for the Phase-I plant at US 5.5 cents/kWhexcluding fuel costs. The project took only 19mos to

complete according to the owner, a substantialimprovement over the original 30mo schedule.

Photograph courtesy of ekonomi.inilah.comPosted 12 Sep 2012 

Tanjung Tabalong Location: South Kalimantan

Operator: PT Adaro Energy TbkConfiguration: 2 X 30 MW

Operation: 2012Fuel: subbituminous coal

Boiler supplier: BHELT/G supplier: Siemens

EPC: Punj Llyod, International Development andEngineering Associates

Quick facts: This power station is associated withthe largest single-site coal mine in the southern

hemishpere. This is located in Tabalong andBalangan districts. Annual production is on the

order of 40mn typy of ultra low-sulfur, moderate CV

subbituminous coal. The new thermal plant willreplace a 20-MW diesel plant. Electricity will beused to power the converyor system and other

mine and handling infrastructure as well as the localgrid. The development company is Adaro subsidiaryPT Makmur Sejahtera Wisesa (MSW). The projectcost about $160mn. Fuel burn is expected to be

about 300,000 tpy.

Photograph courtesy of PT AdaroPosted 3 Mar 2012 