new compressor station second stage of nitrogen system (n2 refrigerator, cryogenic tank, pipe lines)...
TRANSCRIPT
New compressor station
Second stage of nitrogen system (N2 refrigerator, cryogenic tank,
pipe lines)
Cryogenic equipment required to run NICA
Third stage of nitrogen system (N2
refrigerator, cryogenic tank, pipe lines)
Helium satellite refrigerators and pipe
lines for Collider
Helium liquefier “OG-1000”
Helium purification units
helium gas bags
Helium screw compressors “Kaskad-
110”Unit is ready for commissioning
Contract is signed, shipping is expectedContract is not signed yet, first calculations are done, potential suppliers are selected
Status and assessment deadlines of NICA cryogenic system development
Work description Status Assessment deadlines
Development of the helium cryogenic plant: 1. liquefier OG-1000, 2. enlargement of the helium purification
system,3. gas bags,4. designing and manufacturing of the new
“wet” turbo-expanders for helium refrigerators KGU-1600.
1. Liquefier OG-1000 is under commissioning now.
2. For helium purification system the main required parameters are calculated and potential suppliers are selected.3. For gas bags the contract is signed and shipping is expected.4. For new “wet” turbo-expanders the first calculations are in progress.
1. Liquefier OG-1000 – June of 2016.2. Helium purification system - June of 2017.3. Gas bags - June of 2016.4. New “wet” turbo-expanders - December of 2016
Development of the new compressor station:1. Building reconstruction for the new
compressor station2. Commissioning of the first stage of LN2
system3. Commissioning of the two “Kaskad-110”
helium compressors.
1. Building reconstruction is at the beginning stage of construction project.
2. The contract for the first stage of LN2 system is signed and shipping is expected.
3. Both “Kaskad-110” are supplied and in a storage now waiting for finish of building reconstruction.
Building reconstruction – December 2016.First stage of LN2 system and “Kaskad-110” commissioning - December 2016.
Water cooling system Work is at the design stage. Potential suppliers are being selected now.
June of 2016.
Second and third stage of LN2 system Designing is done. The contract is being prepared.
Second stage – December 2016,Third stage – January 2018.
Cryogenic pipe lines for the helium system of booster.
Work is at the stage of first calculations, scheme drawing and selecting of potential suppliers.
June of 2017
Helium satellite refrigerators and pipe lines for Collider.
Work is at the stage of first calculations, scheme drawing and selecting of potential suppliers.
December of 2018
Central helium
liquefier
KGU-1600 helium
refrigerators
KGU-1600 helium
refrigeratorsHelium
gas bags
Helium gas
bags
Helium purification units
Helium purification units
Helium purification units
Screw helium
compressor
Nitrogen turbine
compressor
Nitrogen liquefier
Nitrogen gas bags
Nitrogen reservoir with
pumps
Nitrogen receiver
Nitrogen turbine
compressor
Screw helium
compressor
Thank you!
General view
MPD
Satellite refrigerato
r
Control dewar
Cryogenic equipment for MPD
Controldewar
Schematic diagram•Heat capacity: 100W at 4.5K•LN2 reservoir contains a heat exchanger (compressed helium - boiling nitrogen) •Portion of the LHe supply stream is taken to cool the current leads•There are 3 additional lines of the return flow to operate in cooldown mode
HEX
HEX
HEXHEX
Schematic diagram for MPD cooling down
Heat exchanger of the SC coil