from GOVERNM ENT OF ANDHR PAADESH DEPARTMENT OF MINES AND GEOLOGY To N.Rana Rao, M.Sc. Tech., Sri. Jastl Avape(sh, S/o. J, Vljay Sha.nkr, Dy, D i rector or Mines and Geolog - , Visakhapatnam. PJo, Sal Keerthana, 56, J Sir, Ocean Orlve, Near SagarNa ar, Viiahapatnam. j ,L .. e«erN.,o , ,992MP.·VuZM/�2,o" , 1z., d+•+ted ;·0§,2"0"1LZ!, I Sub:- M i n & Minerals Quarry Leas e h e l d by Sri. Jastf AVneish for Buiklin9 Sne and Gravel over an extent of 10.00 Hecr6S In Sy.No .103/5B of lntafapalem VIilage, Kothavala$a Manda!, Vlzfanagaran Oistrict - M i nln . g Plan-Approva l - Re. Ref: l, Proed1n9s No,28S94/R. QP/2001, dated:2S.09.io1S of the O i rector of Mines aod Glogy, A..P ., Hyderb&d. 2, Proceedings No.5028/-Q3V/20 16, dated: 09 .02.2017 of the Oy, Jrector or Mines & Geotogv, Visakh&patnam. 3. Proc. No.66)9/Q/2015 DL 24.03.2017 or the Asst. Director of Min & Geology, Viziam19aram. 4. Draſt Mining Pion submitted on 22.06.2017 by St1 , Jani Avancjsh. 5. is office Lttt,r No.99 . S/•1P-V$P/20l7, dated: 28.06 .017. 6. Lett dated: 29.06.20'i along with five sets or fair Mining Plan from e Jeee. In exerc i se of the powe conferred as per amended Rule22(4A) of Mineral CnCSlon Rules, 19 60, f app.roval of Min i ng Plans/ Schemes of Mining in add i on to tht dedauon of (31) MaJor Mfnals dcclr�d as Minor Minerals a � from istlng approvals the Govt. vjde Memo No.7674/Mtnes. u (1)/2014, dt: 23.07.201S from lnd & Comm (M.1£) Dept. vement or Andhra Pradosh. I hereby approve the Mining Plan Five Years for Building Stone and Grvel ov an extent of 10.00 Hectres In Sy.No .103/58 of Chintatapalem vmage, Kcthavalasa Mandel, Vitianaram District In favour of Sri. JasAvancish. ts approval Is subject to the following conditions: 1. Th i s M i ning Pion lneludfn9 Prressive Mine CIJure Plan l$ approved wiout prejudice to nny oer laws applf ! e to the Mine area from time to time whether made by e Central Govement, State Govment or any other authority or any, order/ direction rrom any court of mpetcnt Jurllct!on. 2. Th i s approval or the aforaid Mining Pion including Progressfve M i ne Closue Plan dœs not In any wav impJy the appval or the Government I n terms o( on other ptovisions of the Mineral Cosion & Development Rules, 1988, APMMC, . Rules, 1%6 (G.O.M. No. 56, Jnd & mm {M,H) Dept, DL .J0 .04 .2016) and Mineral Concession Rules, 1960 or tl'u! other Rles framed there under and an other laws lnc l udJng the Forest ConservatiAct, 1980, Forest Conservation Rules1. 003 and also Oth relevant atus, orders, guidelines as the C8$e may be' appllcable from me to ume. f 3 . The Mining Plan Is approved subject to strlctiy adherlDQ to th.e Relevant Reul.1Uons or MMR 1961 , prov i sions of the Mines Act, 1952 and other RuJcs and Regulations made ttiere under lcludlng submission of notice or opening, appointment of r�anager and ot,her stabJto otflcla as required under e Mines , Act, 1952 shall be complied with. \ 4, Prior permisson from the Oirector General, Ml.n Safetv whenever and where ev it is r�uited. J

Upload: lamdat

Post on 05-May-2018

218 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

from

GOVERNMENT OF ANDHR.A PAADESH DEPARTMENT OF MINES AND GEOLOGY

To

N.Rang:a Rao, M.Sc. Tech., Sri. Jastl Avape(sh, S/o. J, Vljay Sha.nk.ar, Dy, Director or Mines and Geolog-.,.,

Visakhapatnam. PJo, Sal Keerthana, 56, J

Sir,

Ocean Orlve, Near Sagar Na ar, Viiak:hapatnam.

j ,L .. elltt«e:,:r_,N.,o,.,,::,9::,92SL{i,Me:P::.·Vu.ZMru/�2,,o",1.,z.,, .. d11•11te<Jd .. ;__.$y�'-·"'0"'§'"',2"0"1LZ!.,, I

Sub:- Mines & Minerals .. Quarry Lease held by Sri. Jastf AVilneish for Buiklin9Stone and Gravel over an extent of 10.00 Hectar6S In Sy.No.103/5B of Chlntafapalem VIilage, Kothavala$a Manda!, Vlzfanagaran:, Oistrict -Minln.g Plan-Approval - Re:g.

Ref: l, Proc:2ed1n9s No,28S94/R.QP/2001, dated: 2S.09.io1S of the Oirectorof Mines aod Geology, A..P., Hydera:b&d.

2, Proceedings No.5028/-Q3V/20 16, dated: 09 .02.2017 of the Oy,C>Jrector or Mines & Geotogv, Visakh&patnam.

3. Proc. No.66)9/Q/2015 DL 24.03.2017 or the Asst. Director ofMines & Geology, Viziam19aram.

4. Draft Mining Pion submitted on 22.06.2017 by St1, Jani Avancjsh.

5. ll'lis office Lttt,r No.99.S/•1P-V$P/20l7, dated: 28.06.'2017.6. Letter dated: 29.06.20'.ti along with five sets or fair Mining Plan

from the Jessee .

•••

In exercise of the powel'$ conferred as per amended Rule 22(4A) of MineralCc>nC1!$Slon Rules, 19 60, for app.roval of Mining Plans/ Schemes of Mining in addition totht dedaniuon of (31) MaJor Mfnerals dccl;ar�d as Minor Minerals a �rt. from ie,cistlng approvals the Govt. vjde Memo No.7674/Mtnes. u (1)/2014, dt: 23.07.201S from lnd & Comm (M.1£) Dept. Government or Andhra Pradosh. I hereby approve the Mining Plan fM Five Years for Building Stone and Gr.avel over an extent of 10.00 Hect.ares In Sy.No.103/58 of Chintatapalem vmage, Kcthavalasa Mandel, Vitiana,garam District In favour of Sri. Jastf Avancish. Thts approval Is subject to the following conditions:

1. This Mining Pion lneludfn9 Progressive Mine CIQ1Jure Plan l$ approved withoutprejudice to nny other laws applfcat>!e to the Mine area from time to time whethermade by the Central Government, State Government or any other authority or any,order/ direction rrom any court of cc>mpetcnt JurlSdlct!on.

�2. This approval or the aforesaid Mining Pion including Progressfve Mine Closu.re Plan

does not In any wav impJy the approval or the Government In terms o( onother ptovisions of the Mineral ColY'..ession & Development Rules, 1988, APMMC,.Rules, 1%6 (G.O.M.S. No.. 56, Jnd & Comm {M,H) Dept, DL .J0.04.2016) andMineral Concession Rules, 1960 or tl'u! other R!Jles framed there under and anr,other laws lncludJng the Forest Conservation Act, 1980, Forest Conservation Rules1.:2003 and also Other relevant s*atus, orders, guidelines as the C8$e may be'appllcable from time to ume.

f 3. The. Mining Plan Is approved subject t o strlctiy adherlDQ to th.e Relevant

Re.gul.1Uons or MMR 1961 , provisions of the Mines Act, 1952 and other RuJcs and

Regulations made ttiere under W'lcludlng submission of notice or opening,appointment of r�anager and ot,her stabJtory otflclals a s required under the Mines,

Act, 1952 shall be complied with.\ 4, Prior permiss.ion from the Oirector General, Ml.nes Safetv whenever and where ever

it is r�uited.

J

Page 2: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

1 I

S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,Andhra Pradesh Pollution control Board as applicable In this case c-hould beobtained and a copy of the same- shootd be submitted to thl$ office,

6, The el<ecution or approved Mining Plan shall be subject to v-acation of prohibitory order I notices if any issued by competent authority,

7. The Mining Plan approval Js for proposals contalned therein and as appllcable fortht mining activities to be carried out with

i

n the Quarry lease hold for Five Yearsor part period of the Five years blodc..

8 . It .:inything found to be tonccaled as required by the Mlnes Act In the contents of approved Mining Plan (lndudlno progresslve MJne dosurc plan) and the proposalfor rectifi�tion has not been made or ff a later stage the Information furnished In the doo.,ment ts found to be incorrect or misrepresentation of r-acts, the approval shall be revoked with lmmedjate effect,

You fil nv, Encl: Approved Mrnlng Plan

.. Oy. DI ctor r Mines & Geology,

Vlsakh.apatnam.

Copy i.ubmitted to the Director of Mines and Geology, A.P., Jb<ahimpatnam along with Approved Mining Plan.

Copv to Sri. v. C. N, Ranga.swamy, AQP, Plot. No. S3,H.No. 5•100•1, PrtJigathl CofOl'ly, I Meyitt

1 S&roornagar, Hyd.erabad-500079 for lnforrnatlon.

Y"PY to the Member Secretary, Andhra Prade$h Pollution Control Board, Hvde:rabad along

, with Approved Hlnl1'19 Pl.an for information.

iCOpy to the Dire ctor of Mines Safety, Hyderabad RegJon-2, Room No-701, 7"' Floor, C.G.O Towers, Kavadiguda, Secunderabad-500080 for information.

Copy to the Asst. Director o f Mines and Geology, Vi.danagaram along with Approved Mining Plan for Information and he is directed to accept Bank 1G·uarantcc as financial assurance from the lease Holder as per 23 (f)2 of MCO�1988 & obtain Environmental Clnranc� as per Notmcatlon s.o.N 141 (E) Dt. 15.01�2016 or the MoEF.

,

I J

Page 3: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

MINING PLAN INCLUDING

PROGRESSIVE MINE CLOSURE PLAN

FOR

BUILDING STONE AND GRAVEL

Over an extent of 10.0 Ha. In Sy. No. 103/SB Chlntalapalem(V), Kothavalasa(M), Vizlanagaram District

Andhra Pradesh State

(FOR THE PLAN PERIOD 2017-18 to 2021-22)

(Under Rule 7(l) of APHHC Rules, 1966 amended and as per the G.D. Hs. No. 56, Industries and Commerce (Mines -11) 311"' Apr/I, 2016)

LESSEE

"' ..

Pe V. C. N. Ranga SwamyRQP/DMG/HYD/99/12

H. No. s-100-1, Plot No. 53,Pragathi Colony, Meerpet,

Saroornagar, Hyderabad - 500079 i:9573257074

Email : [email protected]

Page 4: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

CO,NSENT LmiEA

Sri v .. ,c. N. ,RANGA SWAMY, 1R.Q.JP (RQPf DMG f H'ro / 99 / 12) Is appointed

fur preparation 1of lhe Mlnir1Q Plan [ncludirlg ?rogresswe Mine dosure Plan mn

mspec.t of Road Metal, Suikling Stone & Gravel Quarry over an extEnt of 10.0 Ha.

in Sy. No. 103/58 of Chfntalapa1em Village, Kothavalasa Ma.Mal, Vrtianagaram

Oismct, Andhra Prade$til state.

Pface : Vbiaftaga:ram

Page 5: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

DECLARATION

Certified that the Mining Plan including Progressive Mine Closure Plan for Gravel

and Building Stone over an extent of 10.0 Ha. rn Sy. No. 103/58 of

Chlntalapalem Village, Kothavalasa Mandal, Vlzianagaram District, Alldhra

Pradesh State, prepared in consultation with me and we have under.;tood Its

contents and agree to Implement the same in accordance with raw.

Date : 28-06·2017

:J.� Place : Vi�anagaram LESSEE

Page 6: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 7: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 8: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 9: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

E CLOSURE PLAN FOR

BUILDING STONE AND GRAVEL (Undo, Amended' Rul• T( J)' or APHHC:' RUie$ 19615' a Rule ll (B) of HCDR. 1!186)

(FOR THE PLAN PERIOD 2101'7-18 To 2021·22)

Over !lin l::ldent Of 1 o.,o Ha,. Located .1111 Sy. Na� 103,J SB, Ch1Ata1a1palem Vllf11 ge, KiJNl,avaltasa Mand al, Vblama9a ram Dlstdct,

A . PROVED. Amdhra Pradesh St

ate.

& LESSEE:

SRI JAs-TI AVANEl'SH, · =- 5/o J. Vljay Shankar, . , . . . .... .... ft/o Sree Sal Keelhana, SG

f lhls Mir1i�g Plan is Ap�ro•re? · bJect ito

.D1', D RE TOil OF tiHfl:S � GEiOL�an drlve,, Near: Sagar na,ga_.,,e Cor,(Jj�ijons Stipul;;1t1ons. 10d cated c,.it, or Andhra I ndcsk vrsakh,apatnam, A� P. in the Mining Plan Ap?ro11al L ter \r1SA.R.liAL'ATNAM , . , . ��n,_ �• ,..,,_1 �11No .. fl� . . . �."':'lr� .. H:\,ri" .. '' • IHI

INTRODUCTION o91e: •••• . rJ ..... t?.-!!. , •• �t't.� ... �•H

Sri Jastl Av.aneish, ha-s appHtMI 'for a quarry rease for Du111dlng S:tone ancl ,Gr,iveJ ove:r an ElCter,t of Um. 00 Ha. Sy. No. 103/ S:B of Ch�ntalapalem ViHage, Kothavalasa Mandal, Vlzlanagairarn District, Andhra Pradesh State.

The Deputy 0fre<:tor of M�nes & Geoh>QV, Vlsakhapatnam has granted the Quarry Lease for BuUrllng Stone & Roed Metal aver an extent of 10,.0 ha. In Sy. No* lrOJ/S'.B of 0,,lnta�aipa1em VUlage, Kotttavallasa Mandal, Vizla1rniagaram DJstrict,..

A. P. ro.r a l)erilodl of 10 yeaf"s �n fa"-'O urr of Srf 11asu Avane:Jsh vtde Proc. Ne: 5028/Q.JV/2016, rDat,ed 109-02-::w,17.

The lease d1eedl v,1as executed by Assrstaint Director of Mines & Geolo-gy, \! 12.,,·.N 1 i.r1""fn favour· o'f Sri JasU Avaneish, vide. Proc. No. 6519/Q/lOl.5 dlaited 24.03.2017' for a per,lod of 10 years from 24.03.2iCJ17 to 24.0J.2027 (Cop,y endasf!d as Annsvr,e - I).

The Lessee ha,s to submit M�nlng PJan as required under Rul\e 7A (I} of APMMC IRu!e-�, 196:6 a,rong wnh Envlrcnmental Clea,rance as per the [Procedun! mentioned �n U,e N'otNlcation S.O.IN0; 141 (E), Dated 15,.;01-2.016.

The lesseQ has approached Srl V, C. N. Rang a Swamy, Geo logtst (RQP/DMG/H'Y0/99/12) v.ailld upto J0,1.1,2022 (a copy of RQP Certificate is endosed! ars An111,exure --IJ) fo,r preparat�0n of Mining Plan 1n the ,above mentioned illlre-a.

Page 10: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Accordingly this Mining Plan Is prepared as per guidelines Issued In Form - r In G.O.Ms. No. 56, Industries & Commerce (M.11) Department, dated 30.04.2016 under Amended Rule 7 A of APMMC Rules '1966 and Progressive Mine Closure Plan under Rule 23 (B) of MCDR 1988 and submitted to the Deputy Director of Mines & Geology, Visakhapattlam for approval.

1.0 GENERAL

Sri lastl Avaneish,

1.1 Name and Address of S/o J. VIJay Shankar,

the Applicant RJo Sree Sai Keethana, 56, Ocean drive, Near: Sagar nagar,

1.2

Status of tne Applicant (Individual/ Private

Vlsakhaoatnam A. P.

Individual Comoanu Firm) Mineral {s) which are

1.3 included in the Letter of Building Stone and Gravel Intent

V. C. N. Ranga Swamy,

Name and Details of RQP/DMG/HYD/99/12,

1.4 person employed for H. No. 5·100·1, Plot No. 53,Pragathl Colony, Meerpet, preparing Mining Plan Saroornagar, Hyderabad · 500079 l: 9573257074 '

1.5 E-Mail &. Website vcnf'[email protected]

1.6 RQP Registration No. &. RQP/DMG/HY0/99/12 ValldJtv {Valid Upto 30th Nov 20221

2.0 Location and Accessibility

Lease Details:

1 Village Chintalapalem

2 Manda! Kothavalasa

3 District Vizianagaram

4 State Andhra Pradesh

5 Survef No. 103/5B

6 Extent 10.0 Ha.

7 Ownership of Govt. Land Occun:iinrv

The quarry lease area falls in the Toposheet No. 65 0/1 (Scale 1 : so,ooo).

Survey of India,

Geo CO•The Geo Co-ordinates are taken as per Surveyed Plan prepared by ADMG, Vlzlanagaram and boundary pillars/

ordinates markings are shown by the lessee .

. � ... "�,� //J

. . .,�

f� '

. ''<•

'� ... l)il. ';I'· .. ·.,

Page 11: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Locatio:n of the9 area and

approach

GCP LATITUDE LONGJTIJDE

1 17°52'51.49"N 83° 12'09.9"E

2 17°52'47.BS"N so012·1s.69"E

3 l 7°53'00.46"N so•12'26. U"E

4 17°53'04,14"N so•12·20.62"E

The accuracy of the GPS varies between + 3 to S m. and are for location ouroose onlv. The quarry lease are:a Is located at a distance of L3 Km due SW of Mangalapalem village. Mandal Head Quarter Kothavalasa is at a distance of 1.5 Km. The location of the area Is Indicated in Kev Cum Location Mao I Plate - Il.

The GPS Coordinates are obtained as per surveyed plan and arc for location

only. The accuracy varies from ±3 to s m. The area is bounded by the following geographical Co-ordinates with WGS·84 as map datum. The demarcated map certified by the Asst. Director of Mines & Geology, VlzJanagaram in favour of Sri lasti Avaneish Is attached as Plate No. II.

2.1 Period of Quarry lease= 10 years (from 24.03.2017 to 24.03.2027)

3.0 Infrastructure and Communication

Avallability of Water

Avallablllty of Electricity

communication Network

Road Network

Nearest Rail Head

Port Faclll

School

Medical Facllll:v

The ground water Is available 45 to SO m BGL The agricultural fields in the surrounds of the quarry lease area

are irrigated by ground water.

Electrlclty i; availabl� in all the villag� an� In the nearty agria.iltural lands for borewetts.

Tele Communications facility is available at the Chintafa alem & Kottavalasa villa es State Transport Bus Setvices ply from Kothavala.sa -

Vlsakhapatnam frequentfy; Private Transport Js also

avallable on this road network.

Kothavalasa Railway Station is 2,2 Km from the area.

Vlsakhapatnam Port Is about 25 Km from the area. Primary School Edu cation is available at Chlntalapalem vlllage. Higher Education Is available at Kothavalasa & Chodavaram. Registered Pvt. Medical Practitioner is available at Chlntalapalem vlllage.

Doctors, Nursing Homes & Hospitals are available at Kothavalasa T

3

Page 12: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Dound·arles NarUI HIHy �ea South Aarloulture Area East O.L, Area'West O.L Area

AgrJculh.lre Is Important iocrupatlon of the locail peo1ple<. Further good potentilal exists for the emr,loyme"t of unskllled laborers aind aillled s.maH scaJe: Industries:, T

r

he .are:ai ,experrence. sem I-and cllmat1c condltton. lhe area e11;per1�ru::a. 1 oo o mm average annual! r,alnfa1II during August - November months. The day temperature va:nl!!!s 26°c fn winter and about SO"'c rn summer season. The general wind �lrectio n rs SW to1 N1E & SE� NW,

De.tat Is ,of Appmvedl Mlln,1ng Plan� 'If anr No Min Ing plan, was approved eartEer, The Present Mining Pf.an Is for ,assessment of the qua ny act.iv lty, Reserve Estlmattti n, Ptoposed Method of Mlnlng, Snvironment IMimagenu�nt Plan Including RedamaUon aind Rehabmtatron measures to be adopted.

-l

Page 13: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

I

eART-A

1.0 General Details of the applied area/ Mining lease:

Topography 1 Topography The quarry lease area Is loC3ted on a part of the hlll raising

upto 252 m from the ground level; The hlll Is elevated In the centre and slopfn9 in all the directions. The maximum elevation in the quarry lease area is 190 m. R.L. at Eastern side of the lease area and 90 m R.L at SW side of the tease area. Surface relief In QL area is 100 m.

Quarry Lease area ts a fresh mine. Assumed Bench Mark (ABM) is fixed at 90 m at NW corner at Boundary point 1. This bench mar1< will not be disturbed and a concrete pillar will be erected. General ground level is at 60 m. R.L. surrounding the QL applied area.

2 Drainage Sub•Oendrltic Pattern in N-S

3 Vegetation Sparse wtth thorny bushes in the quarry lease area. 4 Climate The area experience semi-arid cllmatfc condition. The area

experience 1000 mm average annual rainfall during August - November months. The day temperature varies 28°c inwinter and about 50°c In summer season. The general winddirection Is SW to NE & SE• NW.

� Rilnfall The average annual rainfall of the area is 1,000 mm 6 Soil Type Brown soil (Silty Clay texture) 7 Land use pattem HIiiy area with shrubs & bushes

The baseline is considered from the GPS reading in co-relation with Topo sheet contours, the levels were taken using GPS with ±3 to 5 m accuracy covering the total area.

2.0 GEOLOGY AND EXPLORATION

a) Brief descriptions of Regional Geology with reference to location oflease/applied area.

The Eastern Ghat Mobile Belt is a high grade terrain along the east coast of India

and bounded to the north by the singhbhum craton and to the west by Bastar

craton, the Dharwar craton and Nellore - Khammam schist belt. Nanda and Pati

(1989) and Ram Krishnan et.al. (1988) on the basis of dominant lithological

assemblages of Eastern ghat belt.

zones.

I) Western Charnockite Zone

2) Western KhonOalite Zone

3) Central Mlgmatlte Zone

4) Eastern Khondalite Zone

Longltudinattv divided Into following four (4)

�ff,� .. �, .,;

;1�,� �i �

�· �,; -

. -� t .. . . '-Q"'- i'A

·�5

Page 14: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Recent wor1<s by Chetty et.al 2001, 2003 helped in identifying leptynites and

shear zone In Eastern ghat belt and theire by sub divide the EGB to several

structural domatns viz.

A) Eastern Ghat Boundary Shear ZoneB) Slleru Shear ZoneC) Koraput - Sonpur She11r ZoneDJ Nagavalll - Vamshadhara Shear Zone

The area lies between Sileru shear zone In the west and Nagavalli - Vamshadhar She11r zone Is Identified as Eastem ghat provides with specific lithology, structure

and metamorphic grade. The area from Salur In the North • Rajahmundry In the south Including Araku - Paderu in the west and Vlzlanagaram - Vizianagaram comes In Eastern ghat provides area with principle litho unit like Khondallte, Chamo-d<ltes, teptynite and cafc granulite.

Vlzlanagaram district forms a part of EGMB exposing all characteristic lltho units or the Eastem Ghat Super Group such as !Khondalite, Chemoklte and Migmatite. The Khondalite group represented by Khondallte (Quartz - Feldspar - Garnet -Sllimanlte - Graphite gneiss). Gale Granulite and Quartzite which occur as lmpe-risistent bands within the Khondallte. The Charnoklte group consists of acid, intermediate ar.d basic varieties. The M igmatite group consists various rock types Including Leptynite, Prophyroblasttc Granltold Gneiss, Garne,t- Biotite -Hypersthene gneiss, Quartz felspathic mobilisates and other associated hybrid rocks.

b) Detailed de:sc.ription of Geology of the lease area

The lease area falls on the Western slopes of the hlUock trending towards NE-SW direction. Geologically rock formation is Khondalite Group of EGMB, medium to coarse grained In texture, gneissic, hard, compact and having Irregular joints, fractures. Due to this, t:he avallable rock is not useful for cutting and polishing Industry, but U$eful for road meal and crusher met.al etc. The slopes of the hillock Is covered with grovel/ Red s.oll and IS used for filling in civil constructions, laying roads etc.

The Khondalite In the area forms dome shaped, steepy sloping hills. The rock is

medium to coarse grained texture com1>osed of greasy quartz, hypersthene, foliated with or· without garnet &. Silimanite. The rock Is mass1ve, with widely spaced vertical to sub vertical joints tre.ndlng In NE-SW direction. It is observed

thal sheet Joints are absent.

6

Page 15: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

.,

,

J

'

I

t

c) Details of Quarry Lease Holder:

Sri Jasu Avaneish, S/o J. VIJay Shankar, R/o Sree Sai Keethana, 56, Ocean drive, Near: Sagar nagar, Vlsakhapatnam, A. P.

d) Details of Prospecting carried out

No prospecting operations were conducted; tha quarry operations are active in the neighboring areas.

e} Surface plan area on l : 1000 or 1 : 2000 scale

Topographical Survey

The baseline Is considered from the GPS reading in co-relation with Toposheetcontours, the levels were taken us-Ing GPS with ±3 to 5 m accuracy covering the total area.

Assumed Bench Mark (ABM) is foced at 90 m In NW comer at Boundary point 1. The geo co-ordinates were fixed using the 12 channel handled GPS, GARMIN make with

MAP DATUM· WGS - 84 .

Position Format hddd - mm - ss.s

Map Datum WGS-84

Units Metric

North Reference Magnetic

Variance 001•w

Angle Degrees

The features captured are drafted to prepare the surface Plan on 1: 1000 Scale.

f) Geotogleat plan prepared on a scale 1:1000 or 1:2000.

The geological features captured are drafted to prepare the Geological Plan on 1 : 1000 Seale.

g) Geologlcal 1cctlon1 on naturtl s�le @t su!tl!l!le lnten111! 1cross thelease area or applied area

7

Page 16: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

h) Broadly Indicate the future problem of exploratlon with dueJustmcatlon taking Into consideration the future tentative excavationprogram planned In next five years.

Year No. of Grid Total No, of pits, No. of Boreholes Interval meter1ge Dimensions Trenches, (Core/RC and Volume Dimensions

IDTHl and Volume

lR N. A. - - N. A. N.A. 2'" N. A. - - N.A. N. A. 3� N,A. - - N.A. N.A. 4'" N.A. - - N.A. N.A. 5m N. A. - - N.A. N,A,

Not applicable to the Building Stone and Gravel quarries as the lease area Is located on undulating land with surface relief of 100 m.

I) Reserves and Resources as per UNFC. Detalled calculation of reservesshall be stated

Method or Estimation or Reserves

The Building Stone and Gravels found to be normal in that area, the deposit is being worked out to a maximum depth of 100 m only.

Five Cross Sections (A-A' - E-E') are drawn perpendlcular to the slope direction for profile purpose. The reserves were estimated In cross sectional method or estimation a;s given below.

sectional Area,

(Width X Depth) (Sq.m.) X

a) Total Geological Reserves

s.

No, Cate o UNFC 1

2

3 4

s

Total

O • D'

E - E'

(Cu. m.)

Influence Volume

90 385740

6068 100 606800

7824 100 782400

8512 100 851200

6848 90 616320 32 42 460

,

The recovery of the Building Stone and Gravel from the quanry Is 100%.

Mlneable Reserves Mlneable reserves are calculated by deducting the reserves blocked under benches and reserves blocked In 7 .s m buffer zone from the total geological

8

Page 17: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

reserves. Only proved reserves were considered for calculating the mineable reserves. The details of reserves blocked under benches & safety zone are given In table below:

Reserves Blocked under Benches s. Sectional No. Cateaorv Section Area Influence Volume

1 Proved A · A' 855 90 76950

2 Proved B • B' 832 100 83200 3 Proved C·C' 1741 100 174100 4 Proved D • D' 2419 100 241900

5 Proved 0-0' 1492 90 134280

Total 7.10,430

Reserves Blocked under 7 .Sm Buffer Zone s. Sectional No, Cateno-· Section Area Influence

1 Proved A •A' 446 90 2 Proved B - B' 445 100 3 Proved C·C' 674 100 4 Proved D • D' 819 100 5 Proved D -D' 631 90

Total

Summary of Reserves:

A . Total Proved Reserves(m ) 32,42,460

B. Reserves Blocked under Benches (m ) 7,10,430

C. Reserves Blocked under 7.5 m Buffer 2,90,730

zone (m')

o. Mineable Reserves [A·(B+C)J (m ) : 22,41,300

Yearly production

Life of mine

Volume 40140 44500 67400 81900 56790

2 90.730

9.884 Say 30 Years

3,0 MINING

(I) Method or Mining Mechanized/Semi

Mechanized)The Building Stone and Gravel In the Quarry lease area Is exposed on the surface. Hence, It is proposed to mine the Building Stone and Gravel, Buiding stone and Gravel by open cast using semi-mechanized method by developing

9

Page 18: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

benches ,of 6 M height with 2 slices of J m and 3 M bench width with s.hamow drlllrng a11CII bfastlng. Thia developmfmt of' bi::mches will be mainlreined @ 40 - 60°

salfety sfopes. The quarry operations will be taken L:IP as per 106 MMR, 19'61 and necessary dearances wm be obtained from DGMS, Hyderabad.

1DriHing Drll, hoJes of 1.S - .3.0 m depth wlll be drmed in a stagg,ered p�tt�m at l m.intervaJ:

I) Drill ho le dra meter I : 32. mm up to .1.S - 3.0 m �oogii) Depth and ind i,natmon j ·:

Generally drilled verti-calry In �n a I ig nmeratof drm .hole

Ill) Exp losjvQ type l : De.tonator F1US8/ Anfo with detonators

{il] Production Prap-osed for the nex:t five years (2017-18 to 2021-22)

It is proposed to prcduc-e 187500 cu,. m. of Buikling S. tone1 187500 Cu. m. of Gravel during five yea,rs pran period wilth an average annuill production of 75,000 Cu. m. from .an area of 6.25 Ha. Benches of 6 m height and 3 m wldtll Will be Cllevelo.ped durfng the plan perfod In depth of p:revio,us ye�r workings �ccessively.

The lessee proposes to take up quarrying operations in eritire quarry lease area. Tlhe excavat1on actlvitY wil'I be SUrted In Nortl'lli!m part of the quarry l@<1s@ area aod then i:ontlru..1e to move towards Sauthem 5�de.

Y ifWARWISE PRODUCTION PLAN

Bench Building Stone&. Building

Year Area

Hei'ght Gravel Total Stone Gravel (ml)

(m) Volume (li13) volume Vo,lume, @100¾ (nt�- {m�)

I Yeair (2017-18) 12500.00 6, 750Q9 30000 45000

II Year {2018-19) !.2500.00 6 75000 33750 41250

III Year (2019'-20) 12500.00 6 75000 37500 37500 JV Year (2020·-21} 1250'(t00 6 7SOOO I 41250 33750

12500.00 6 75'000 45000 30000

I

I

I

I V Year (2021-22) Total 62500.00 375000 187500 187500 Year,Jv Average 75000 37500 37500

Page 19: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

J

.,)

·'

J

'

'

'

'

'

'

'

I

The mining advances tow:,rds Southern direction. An on:u, of 12500 m' wlll beexcavated producing 30,000 Cu. m. or Building Stone and 45,000 Cu. m. of Gravel @1000/o recovery,

2•• Year (2018 - 19) In the Second year mining wlll be carried out beside and below the 1 .. yearworkings covering total volume of 75,000 m' and a bench or 6 m height with 3

m bench width will be formed.

The mlnrng advances towards Southern direction. An area of 12.soo mll wlll beexcavated producing 33,750 Cu. m. or Building Stone and 41,250 Cu. m. of

Gravel @100% recovery.

3,. Year (2019 - 20)In the third year the mining wlll continue beside and below 2nd year workingscovering a total volume of 75,000 m' and 2 benches of 6 m height with 3 mbench width will be formed.

The mining advances towards Southern direction. An area of 12500 m2 will be excavated producing 37,500 Cu. m or Building Stone and 37,500 Cu. m. of Gravel @100% recovery.

4,. Year (2020 - 21) In the Fourth year the mining will continue beside & below 3� year worl<lngscovering a total volume of 75,000 m'. 2 benches of 6 m height with 3 m benchwidth will be formed.

The rntning advances towards South. An area of 12500 m3 wlll be excavated producing 41,250 Cu. m or &Jlldlng Stone and 33,750 Cu. m. of Gravel@100% recovery.

s"' Year (2021 - 22)

In the fifth year the mining will continue befow 4th year workings covering a totalvolume or 75,000 m'. 2 bench of 6 m height with 3 m bench width will be formed.

The mining advances towards South. An area of 12500 rn2 wlll be excavated producing 45,000 cu. m of Building Stone and 30,000 Cu. m. of Gravel @100% recovery.

Plate - IV shows the Yearwlse Working Plan & Sections of Quarry lease area.

recovery.

11

·'

Page 20: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

a) Production Schedulo

The produt.·tlon of Building Stone nno Gravel 1s continuous Lhrouyltuut the year

except during monsoon. That Is 10 working months, 25 working days per month are considered. The overage production of 37,500 Cu.m per year of Bulldlng Stone and 37,500 Cu.m per year or Grovel (250 days @125 CU. m. per day of Building Stone and Gravel and 125 cu.m. per day of Gravel) can be easily achieved In a single shift with surrlclent men and machinery.

b) Magazine Typo and Capacity

Lessee will engage a licensed blasting contractor for carrying out the drilling and

blastlng as per exploSive Acts & Rules.

c) Stack Yard

The quarried out material will be temporarily stocked In the quarry and will be loaded Into the truck£ and $Cnt to the t'IC�rby crv�hlng plant as i:er the domand.

d) Handllng of blocks within the quarry

Not applicable

e) Transportation of Blocks from quarry to yard and to Destination

Transportation of the Building Stone and Gravel Is through t,ucks of 10/ 17 tonnes.

4.0 MINE DRAINAGE

The general direction of ground water flow Is towards SE & East of the area. Ground water table Is 45·50 m BGL In the surrounding areas. The mining operations will be carried out upto ground level only. Hence there will not be any lmp:ict on ground water table,

5,0 WASTE MANAGEMENT PLAN (SOLID & LIQUID)

Solld waste for the nve years No solid waste wlll be generated from the Quarry.

Dumping Site Particulars No dumping site Is proposed since no solid waste generated In the Building Stone and Gravel Quarry.

12

Page 21: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Liqurd Waste

a) Mine Dralmag:e:The dra ln:age system of mrn.e ln this area consists o'f surface run offi;aenerate-d from rafn faU ana seepage.

The water that wlll be ac.cumulatecl rn the mine tn.t-ough pits or fracturt?S ofweather a rock Will be pumped out from the mine ,area. Tl,f! water may tieuset!'.I for :Sprfnl(ling of. rni11e n;:tllds & plantations.

ti) Run off fr--om waste d1umps and measures proposed to ar1rest 1run1 &ff,. Not app,ii:abltf! as no waste ge_ne_ratlon from tt'll0 QL ar�a,.

,c) E"xcavaillon dralnag e dlte'lles a II ar-our1d tt1e quarry to direct $urfac,e dn,lnage

d) UtilizaHon of run off for germra I S\I rface us:e or disd't,arg� In to surfacedra In age networks ornty after meeting w�t:h prescrrbetl discti,erg e: standardsar.id further the agirir:ultural purposes on the surface.

e) Bulrdtng S·tone and Griavel has no polh1J1tants or toxic substances; hence, no con'tamination is expe�ted. except siltation.

f) Treat.1n9 wastewater to obta In th@. das[r,i?dl quan� fer lndustr1a, use as rnay berequrlfied:

No lndus't11es e:idst In the vicinity of the applie.d arl�a .. Himc:e, rm treatment js

req1uired for the run off.

6.0 USE Of MffltiRAL, AND MllHIERAL llEJECT

The BuUdlng, Sto. ne and Gravel is usad for formation of r-oads, leveling areas for civil constn.tct,o,n works. etc. BuifcHng ston@ Is ll.fcSed for dvil ool'l5trnc:tkm works and Gravel is rused ror leveilng and eartli fl:IUng. ND mh,eral rejects are antidpat�d.

7.10 Proces�i119 of ROM {Run of mlne] and Mrnera11 Reject

8.·o Others

(11) Site ServicesTem,POrary office, Rest Rooms, f i ,be p-ri,vlded In tlle qu air,y pni!mrses o

13

Page 22: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 23: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

PART-Q

PROGRSSIVE MINE CLOSURE PLAN

1.0 ENVIRONMENTAL BASE LINE INFORMATION

I) Existing Land Use PatternThe lease area Is located part of a moun:i. lease area is barren with sparsevegetation like shrubs & bushes. At the foot of the mound, agrfcultural lands are available.

The local plantation is limited to domestic trees like Neem and Eucalyptus. Thelease area contains very less quantity of top soil.

II) Water RegimeThe lease area operations extend upto ground level. The water that is due torains sett les below the mine area. In mast of the cases the quarries do not

operate during rainy seasons. This is due to accumulation of water and not goodfor Safety.

Ill) Human Settlements The nearest village Mangalapalem Is situated 1.3 km due SW of the lease area.Living population of this village is around 2690 (as per 2011 Census). Agrfcultureand cattle rearing are important professiO'l!'. nf the people Hvlng in the villagebesides working in quarries.

Iv) Public Bulldlngs, Places & Monuments No public buildings, Important places and monuments are seen In and aroundthe quarry lease area. The lessee will adopt the safety measures while conducting the quarry operations as per the Regulatlons of Metalliferrous MinesRegulation 1961.

v) Sanctuaries and eco .. sensltlve areasNo Sanctuaries and eco-sensltJve areas are seen in and around the tease area.

vi) Flora and FaunaThe whole area Is occupied by scattered sparse vegetation of thorny trees andsmall bushes.

2.0 Environmental Impact Assessment

Page 24: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

(b) Air Quality In Environment

Air quality will not be disturbed in the lease area, as quarrying Is very limited.Highest air polluti01l due lo dust is ccsusi::tJ during drtlllng, excavation, foac11ng

operations and during transportation. The dust is not siliceous, and Is notharmful. The noxious gases will generate due to diesel based vehicles.

However as a precautionary measure the workers of the quarry wear a protective nose mask. The only silver lining in this pollutant's quality Is that this does not contain respirable size of dust as defined under Mines Act-1952. That is

the reason that there are no cases of any lung diseases to the persons working.

AIRQUAUTY

Base Level Allowable Level

SPM = 140µg/m' 360µg/m' RSPM = 601,g/m3 120µg/m' so, = 40µg/m' SOµg/m' N02 = '101'9/ml SOµg/m'

CO= l.Oµg/m' S.Oµg/m3

Air quality at quarries will be filled with du;t, due to drilling, loading, haulage on the road, etc., But It will be within the permissible limits by adopting the following measures:

• The dust rising due to drllllng will be controlled by covering the drill rods withdoth;

, Oust suppression on haul road with sprinkling of water with chemical additives.

• To provide dust masks for the workmen to prevent lnhaflng dust laden air• The speed limits of the trucks will be dictated and overloading of trucks Is

totally avoided which wlll prevent 50% of dust rising on roads.

(c) water Quality

Operations of Building Stone and Gravel quarries In general do not contribute to

the water pollution much. This Is due to the reason one being the material Isgeologically Igneous In origin. This is the reason why the water does not

percolate directly Into the earth. Rather it tries to travel through the cleaveplanes or the joints. The site specific reason for low water pollution is that, thefloor exposed Is Impervious whereas the direction perpendicular to the floor Ispervlous. Thus there will not be any direct contamination.

No water course is passing through the lease area. No adverse efft!ct Is anticipated on the water regime In the area due to quarrying of Building Stone and Gravel. The standards for water q , n below.

�t O 11<,M-

9'.'>

.• ,.,

t �..

Page 25: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

�I

..

.. '

S,No .. Cllaracte:rlstic

1 Color

:z Odor& TastE

3 Turbidity

4 pH Value

5 TDS

6 Tota I Hardness

IS 10500 - 1944

Desrrabte Umlt Ma:,eimum

Permi:&sl!bie Umit

5 25

un Objectiorna bre

5 NlU

6.5 to B.5

S-00 mg/I

300 mg/I

10 NTU

No Relaxation

2000 mg/I

600 mg/I l

( d) Noke levelsNoise wiU be due to transpo�tlon of Building Stone and Gravel. However., tne

probable no;se levet will be within the permissible lfmits anti will not cause harm.

The vehicles will be prnper1y mr!'.lllntained.

TI, e !"Oise tevels for va rim�s aetivttles are

1. Ti ppe.r EmptyTlppe r loaded

2. Poclairi

88 to 9'1 dB(A) 95 to103 da{A) 90 to 96 r:IB(A)

PERMISSIBLE NOISE E_XPOSURE FOR DIFFERENJ PERIOD Of TIME tsGIVEN BELOW

Duration Per Day Sound Level dB{,Hrs}

. {A}

Hi 80

B a.s

4 90

2 9S

l 100

½ 105

1.4 110

ua 115

The haulagef machinery and the drllling of drill holes generate noise. However, the probaore noise. level will be w1lthin the permissible �imits and will not cause harm by adopting the folfowlng control measures.

Page 26: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

( e) Vibration LevelsIt Is proposed to use low explosives and less quantity to minimize the effeas sothat the vibration generated will be feeble within 8 Hz.

(f) Water RegimeThe lease area Is on hillock. The Building Stone and Gravel quarry operationsextend upto ground level. The water that Is due to rains settles below thequany. In most of the cases the quarries do not operate during rainy seasons.This is due to accumulation of water. The rain water wlll be pumped out to the�ea,�y seasoMI streaM or will be used for dust suppression In the quarry.

(g) Acid Mine Drainage

Not Applicable

(h) Surface subsidenceNot Applicable

(i} Socio Economic Environment The main occupation of villagers Is agriculture, working in quarries and sheep raring. The commencement of quarrying activity In this area Improved the socio­economic status of the local people by creation of employment and paying taxes to gram panchayat.

U) Occupation Health and SafetyThe lease area does not involve any hazardous methods. The quarrying is simpleand open cast mining method. In this, the possibilities of small Injuries areanticipated. The lessee is providing First Aid facilities at quarry site andtemporary Office room.

The lessee will provide PPE (Personal Protective Equipments) to the workers based on their nature of work. The following PPE Is proposed to be distributed.

• Helmets once in three years as needed under Mines Act• Safety shoe to all the employees .twice a year as per the same statute.• Nose masks once two months (Actually these are the cotton thin towels)• Other step to improve safety conditions is to inculcate the safety culture

among the persons working.

(k) Historical Monuments

No historical monuments are locate·

(I) 1110-Dlversity

Agrlculture The Quarry lease area Is away adverse effect on agriculture.

nds. Therefore, there is no

18

Page 27: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

Forest The lease area is not falling under forest zone. (However, the lessee i-S proposing to undertake afforestation In the area during the next five years till the end of life of quarry).

Vegetation No impact is envisaged to the Mankind, Flora and Fauna by the Quarry

operations, except sound pollution and dust which will be under control and within the penmissible limits.

3.0 Progressive reclamatlon plan

The lease area Is part of a hill. No redamation IS envisaged during the next flve

years. The mined out pit during the life of the mine will be left a.s sloping terrain.

At the beginning At the end of During Type of land use of the plan the plan Conce�tua�

nerlod fHa.l Derlod 'Ha.\ nerlod Ha. Mlnlno . 6.25 8.98

Roads . 0.02 0.02

Green Belt A.rea . . .

Total Land Oearadation . 6.27 9.00

Area which will Remain 10.00

Untouched 3.13 LOO

Total 10.00 10.00 10.00

4.0 Mined Out Land

Land Use Pattern of the lease area during the next five years will be as follows.

AREA Hectares

Broken Nil Active Mine Area

6.25

6.25

7.5 M wide safety zone 1.00

Oumps Existing

Proposed Nil

Infrastructure (Mines Office & Site Services) Outside the ML Area

Roads 0.02

Undisturbed Area 2.73

TOTAL AREA 10.00

19

Page 28: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 29: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,

for pt.a ritatlo:n. Ma in.tenanc::e of 'these plaints that are grown a1roing the approach road wUI be t.ak,�n care by the quarry management. The plants ttiat will l>e grownin the vi.Hage will lbe t.a'ken rara by the management., in c-0orcHnatrton with the p,a nchayat members,

5.0 Top soil Management

Th@ lett5e- area contains BuHd'l'ng stone and Gravel exposed on the surface. lopsoi,l avaflable betwcj!n tfle joints of the ro-ck. Top soll will be stored separatelyand wlll be used for plantation along approach r,oad,

6.0 Tamra g Dam iMa.nagement

Not Appllc:ab!e,

7 .o D[saste.r Management and Risk Assessment

Quarrylng shall be carried ouit: as per MMR 1961 & Rules and regulations appl�cable U1e project in charge is h�vlng a mobile o:immunicatiOl"I for quid<, lntrmatloo of infor-mation if need arjses.

A ve:hide is kept all the time at the quarry srte for conveyance. Weekly Safety drills a,re given better reaults for awareness of the MJne team.

At quarry level, first a,idi willl be provided and person(s) s'hall be shifted t.o nearby hospital at Koth.evala,sa/Vizianag,aram which �s havi"'9 all bas.le ameni�ies i£ h'I! S eno us C.ond itions.

8,0 Care and Maintenanict! during temporary discontinuance

The quarry workers are ta ken on contract Iba.sis on need based orders; the worf<ers always get Employment/ contract In slmilar quarrie5' ,existing around.

a) Time Scheduling for Aba11donment

As the applied a,rea ln tile jease hord Is active JiJropasa,I of abandlonr'rlent Is proposed in next 5 years perjod.

S..N-0

!

2.

l.

4.

Til·e time :lidted'ule Is for abandon1men,t

Re-h�:iind ling ,of waste dumps f<Jr back: fil IEn the lt:s Nil

NII N11

21

Page 30: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 31: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 32: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 33: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 34: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 35: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 36: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 37: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 38: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 39: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 40: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 41: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 42: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 43: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 44: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 45: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 46: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 47: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,
Page 48: New Doc 2017-07-08 - Welcome to Environmentenvironmentclearance.nic.in/writereaddata/FormB/TOR/...1 I S. Clearance / Consent / No objection from Mlnfstry or Environment and Forest,