next generation business architecture at basf · quick wins related to sap simplifications as far...
TRANSCRIPT
Next Generation Business Architecture
at BASF
The Internal Partner Engagement Design Phase
Dr.-Ing. Frank Jenner
17 October 2018
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
IPE in a Nutshell - An overview of Internal Partner Engagement
As an important part of the BASF Senior Project NGBA, IPE activates Internal Partners across all relevant entities and integrates
them in a series of workshops and other activities that help generate future value while safeguarding business continuity.
Tim
elin
eV
alu
e
Pu
rpo
se
Ap
pro
ach
What
✓ Nominate and integrate Internal Partners from OD, FU, Regions, Verbund in NGBA
✓ Engage them to prepare for new Enterprise Architecture
✓ Collect and cluster business needs, requirements and design principles
✓ Extract current needs to keep daily processes alive whilst preparing for conversion
✓ Focus on Must Dos, re-engineering of existing processes and design of new solutions
Why
Need for Next Generation Business Architecture based on current and
future needs of BASF, still supported after 2025. Shift from current platform
(R/3) to SAP S/4HANA technology with minimal risk while gaining benefits
along the journey together with all Internal Business Partners.
Key activities
❖ Engage Internal Partners through workshops series per E2E process & Enabling Topics
Short- and long-term benefits
IPE Design Phase
Collect and cluster
what we do before
and after conversion
Short-term: Must Dos, Clean Ups
Mid-term: Innovation topics, Go for Standard
Wo
rkin
g
Str
uctu
re BPTT
IPE Process Manager,
Process Owner, Enterprise
Architect, SAP Lead Architect,
DevOps, EY SME
IPE Coordinators
Coordination Functions
Coordination Businesses
Focal Points / Experts
Regional / Verbund
Site Coordinators
> Support validation of IPE
workshop results
> Involved in preparing IPE
workshops
❖ Collect and cluster business needs, elaborate use cases for quick wins
❖ Assess and prioritize Must Dos, Clean Ups, Go for Standard for SAP and major BASF satellite systems and Innovations
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
During the IPE Design phase we worked towards a clear alignment on the roadmap for the IT adjustments considering all NGBA phases
2019 20202018 2021-24
Conversion
timeline
► Preparation for major
architectural changes by IPE
(CRM, planning, SCM and 3rd
party integration)
► Preparation for conversion and
demonstration of first new
functionalities by Design Phase
► Sequential realization of Must
Dos, Clean Up, Go for Standard
and Innovation
► Strong interaction between IPE
and IT adjustment team to
elaborate implementation
roadmap
Conclusion
IPE
IT a
dju
stm
en
ts
Overall
value
Must Do Must Dos due to SAP roadmapMust Dos Must Dos in S/4HANA
Clean Up Very limited Business driven Clean Up (e.g. Sales)Data & settings
Go for
StandardQuick wins related to SAP Simplifications As far as possible by SAP innovation
Innovation Quick wins (e.g. FIORI) Business driven innovationQuick wins
Timeline R/3 vs
S/4HANA
system
coding, redesignE.g. no/low used BASF
Satellite Transformation
Post Go-LiveConversionPreparation
Design Phase with elaboration of
IT adjustments, satellite systems and quick wins
BASF live in S/4HANA
Testing ofConversionS/4HANA
BASF live in R/3 and technical adjustments in R/3
1st focus at BASF and SAP 2nd focus at BASF and SAP 3rd focus at BASF and SAP
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
Internal Partner Engagement covers the following 12 End-to-End Processes and 7 Enabling Topics
End-to-End Processes
► Market to Order
► Order to Cash
► Manufacturing
► Engineering & Maintenance
► Site Logistics
► Transport Management
► Planning
► Procure to Pay
► Book to Report
► Hire to Retire
► Non Conformance Management
► Research & Development
Enabling Topics
► Master Data
► Digital Customer Experience
► EH&S
► Reporting & Analytics
► Tax Operations
► Business Process Networks
► Cross Topics
Integrated to MTO
Covered by
several E2E
Processes
IPE Finance 2.0
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
Detailed
design
Our IPE approach clusters different transformation needs and opportunities and applies ‘fit for purpose’ methods to drive solutions
Prepare and Rectify Innovate and Design Implement
Phase 3
Phase 4
Conversion
Process
mining
insights SAP S4
oppor-
tunities
Business
needs
Must
Dos
Adapt code
No change
Obsolete
Innovate
Re-engineer
Design
thinking
Use case
library
Showroom
Use
case library
Solution
sprint
Business
Validation
Sprint cycles/
business validation
Design
sprint
Business
Validation
Brown paper
workshops
High level
process design
Must Dos
RoadmapArchitecture
Clean
Ups
Inno-
vation
Go For
Standard
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
The IPE Design approach brought to life - outtakes from an End-to-End Kick-Off Workshop
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
The number of business needs collected by the end of the IPE Preparation Phase increased by 370%
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
What the next six months at Internal Partner Engagement will look like
Q4 / 2018 Q1 / 2019
October November December January February March
Genera
l IP
E Preparation of Conversion
Process Adaptions
Satellite Conversion
Global Roadshow
Major MilestonesS/4HANA Releases
MTO
OTC
PL
MFG
SL
TM
NCM
E&M
BTR
HTR
PTP
R&D
EH&S
R&A
MDM
CT
Tax
Distribution Price InformationIndividual Dash Boards
Predictive Price
Aspire: Fast Track Topics
Others (Pricing, UI, ATP, R/M, DEL, etc.)Aspire: Other Strategic Requirements
Across ProcessKick.Off.Demand, Supply, Produc. Planning,
S&OP*
Yard ManagementWarehouse Management
Tech. Material Supply
Com. Bus. Spec. Bus.
Kickoff Asia
Requisitioner User Experience OptimizationSSC EnablementE2E Process Harmonization & Simplification (RM)
Enabling Package 1 - Large Capital Projects, Technical Expertise, TSS & TARM Enabling Package 2 – Init. WS Enabling Package 3 – Init. WS
NGBA @ Finance SP1
Data AnalysisData Maint. Workflows
ICTPInd. Tax
EU Sites Regions Regions
Go/NoGo Decision
(Quality Stage Gate)
Board Meeting
Approval Conversion
Detailed IT
Target Picture
Mobile Solutions
FillingInterface R&A Interface
EC
Kickoff S. A.Kickoff N.A Wrap Up Global
Digitalization & Collaboration
Working Sessions: Real-time Reporting / Embedded Analytics, Functional Improvements, Value Flow, etc.
KM2, AC, Plant St, EHS & Trade Control, PBG-RD-ART, Authorisation, QM, Lean SAP – will follow soon
will follow soon
will follow soon
will follow soon
Data & Rep. Governance Forecast, budgeting, simulation, adv. analyticsUnified Reporting Layer
Material Master Date ModelSAP MDG for Business PartnerSAP MDG for Financials
Tax Analytics
Global Tax Reporting Tool
Batch Handling Physical Regional Workshops
9 functional, conversion relevant Must Dos
1 functional, conversion relevant Must Do
1 functional, conversion relevant Must Do
1 functional, conversion relevant Must Do
1 functional, conversion relevant Must Do
2 functional, conversion relevant Must Dos
8 functional, conversion relevant Must Dos
4 functional, conversion relevant Must DosBasic Decisions Basic Decisions
3 functional, conversion relevant Must Dos
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
What we achieved so far covering all 19 global BASF End-to-End Processes and Enabling Topics
Outcomes Value created
We created a high level of Internal Partner Engagement
across functions and business while raising awareness for
NGBA across BASF
We collected and consolidated input from a variety of
business and functional sources to boost depth and breadth
for IPE Design Phase
We structured, clustered and validated topics together with
the business to enable a scoping of tangible work packages
for the IPE Design phase
We initiated and orchestrated cross-process and cross-BPTT
alignment to kick start collaborative efforts unrevealed by
prior BASF projects
We generated business excitement and the explicit desire to continue the in-depth collaboration on re-engineering and innovation topics
From 150 topic
library items to 562
to 2.078
From 229 BPTT
members to 813
From 34 planned
meetings to 109 IPE-related sessions
From 402 involved E2E
Kickoff participants to
1.414 session
participants
From 2 topic library input
sources to 25
► #NP#_J VBt S8MwEP4r I58UV9euS5f0W1+16lhLN/YlELLuqnWalDSgMPbfTSYcx93zdnAX1HUoviDdVycUo8D3bbmGrnNLOYwt cmHgLsAhXZM lDnEQRQ9Ods8WaI5Og/MLK9wI/S40mNn2OFjieMOGTqtJ 9WZWqx/QtRqkcaYqt+TbI d+Rddi+Pu/224Y8UUI3zaElTWQl/WgVWczYfgI9MWazPzUAYzlMZ6NGxt qk5tkHfA+d+J p4pmQPGmQHPE3akld1wUst5Jm/gJSgH8fR/Nr c8f+2ncxt oBlOi6I knh8Q6q1I mnsUu5WukgSXUbAs7DOuf w==_#NP#
► Internal
Contact me to find out more
Dr.-Ing. Frank Jenner
Global Chemical Leader
Willy-Brandt-Platz 5
68161 Mannheim
Tel: +49 621 4208 18000
Mobil: +49 172 9450920
EY | Assurance | Tax | Transactions | Advisory
Ernst & Young LLP
© 2018 Ernst & Young LLP. Published in the UK.
All Rights Reserved.
The UK firm Ernst & Young LLP is a limited liability partnership registered in England and Wales
with registered number OC300001 and is a member firm of Ernst & Young Global Limited.
Ernst & Young LLP, 1 More London Place, London, SE1 2AF.
ey.com