P.O. Box 63 Lycoming, New York 13093 0 Constellation Energy- Nine Mile Point Nuclear Station May 25, 2007 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 SUBJECT: Nine Mile Point Nuclear Station Unit No. 1; Docket No. 50-220 2007 Owner's Activity Report for Imservice Examinations Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC (NMPNS) is submitting the 2007 Owner's Activity Report for Inservice Examinations for Nine Mile Point Unit 1 (NMP1). This Report summarizes the results of examinations performed during the First Refueling Outage (RFO-19) of the Third Inspection Period of the Third Ten-Year Inspection Interval (December 26, 1999 through December 25, 2009). This Report meets the requirements of the American Society of Mechanical Engineers (ASME), Code Case N-532-1, approved for use by Regulatory Guide 1.147, "Inservice Inspection Code Case Acceptability, ASME Section XI, Division 1," Revision 13. Should you have any questions regarding the contents of this letter, please contact T. F. Syrell, Acting Licensing Director, at (315) 349-7198. Very t uy u s Ga/JayLaughlin Manager Engineering Services GJL/GB/ Attachment: (1) Nine Mile Point Nuclear Station, Unit 1 2007 Owner's Activity Report for Refuel Outage 19 Inservice Examinations.

Upload: others

Post on 28-May-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

P.O. Box 63Lycoming, New York 13093

0 Constellation Energy-Nine Mile Point Nuclear Station

May 25, 2007

U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001

SUBJECT: Nine Mile Point Nuclear StationUnit No. 1; Docket No. 50-2202007 Owner's Activity Report for Imservice Examinations

Pursuant to 10 CFR 50.55a, Nine Mile Point Nuclear Station, LLC (NMPNS) is submitting the 2007Owner's Activity Report for Inservice Examinations for Nine Mile Point Unit 1 (NMP1). This Reportsummarizes the results of examinations performed during the First Refueling Outage (RFO-19) of theThird Inspection Period of the Third Ten-Year Inspection Interval (December 26, 1999 through December25, 2009).

This Report meets the requirements of the American Society of Mechanical Engineers (ASME), CodeCase N-532-1, approved for use by Regulatory Guide 1.147, "Inservice Inspection Code CaseAcceptability, ASME Section XI, Division 1," Revision 13.

Should you have any questions regarding the contents of this letter, please contact T. F. Syrell, ActingLicensing Director, at (315) 349-7198.

Very t uy

u s

Ga/JayLaughlinManager Engineering Services

GJL/GB/Attachment: (1) Nine Mile Point Nuclear Station, Unit 1 2007 Owner's Activity Report for

Refuel Outage 19 Inservice Examinations.

Page 2: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Document control DeskMay 25, 2007Page 2

cc: S. J. Collins, NRC Regional Administrator, Region IL. M. Cline, NRC Senior Resident InspectorM. J. David, NRR Project Manager

Page 3: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

ATTACHMENT (1)

NINE MILE POINT NUCLEAR STATION, UNIT 1

2007 OWNER'S ACTIVITY REPORT FOR REFUEL OUTAGE 19

INSERVICE EXAMINATIONS

Report No. NMP1-OAR-003-19, Revision 00, Dated April 26,2007

Nine Mile Point Nuclear Station, LLCMay 25, 2007

Page 4: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

0 ConstellationEnergy GroupNine Mile PointNuclear Station

Constellation Energy Group1997 Annapolis Exchange Parkway

Annapolis, Maryland 21401

THIRD INSERVICE INSPECTION INTERVALTHIRD INSERVICE INSPECTION PERIOD

2007 OWNER'S ACTIVITY REPORTFOR

RFO-19 INSERVICE EXAMINATIONS

Prepared For

Nine Mile Point Nuclear StationP.O. Box 63, Lake Road

Lycoming, New York 13093

Commercial Service Date: December 26,1969

NRC Docket Number. 50-220

Document Number: NMP1-OAR-003-019

Revision Number. 00 Date: Apdl26, 2007

Prepared by: 41ýj 7 J e~me -1241 7

Ed*ard L. Anderson L Principal Engineer Analyst Corporate Engineering Programs

Reviewed by: _ ,I 9 R 44,1, )Ro•iHall - PrincipoEngineer Analyst Corporate Engineering Programs

Approved by: 'fl,-~LGlenn R Perkins a-eneral Supervisor Corporate Engineering Programs

Reviewed by:Todd Avis - S ogram Implementer

Approved by-. - Gn V "

M el Co wa -Ge e Supervisor Site Engineering Programs

Page 5: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-190Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine Mie Point 2007 OWNERS' ACTIVITY REPORTNudear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page 1-2 of 1-13

TABLE OF CONTENTS

Table of Contents ..................................................................................................................................................... i-2

Record of Revision .................................................................................................................................................... i-3

Abstract .................................................................................................................................................................... i-4

Form OAR-1 Owner's Activity Report for Inservice (ISI) Inspection Plan NMPI-ISI-003 ................................... i-6

Form OAR-1 Owner's Activity Report for Risk-Informed (RI-ISI) Inspection Plan NMP1-RI-ISI-003 ..................... 1-7

Form OAR-1 Owner's Activity Report for Containment (CISI) Inspection Plan NMPI-IWE-003 ........................ i-8

Table I Abstract of Examination and Tests ........................................................................................................ i-9

Table 2 Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service ........................ i-10

Table 3 Abstract of Repairs, Replacements, or Corrective Measures Required for Continued Service ........... i-11

Page 6: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-190 Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNudear Station FOR Date: April26, 2007

INSERVICE EXAMINATIONS Page 1-3 of 1-13

RECORD OF REVISION

REVISION DATE AFFECTED REASON FOR REVISIONNo. PAGES

00 April 26,2007 EntireDocument

Initial issue of Owner's Activity Report for ASMESection XI Inservice Inspection, Risk-InformedInspection and Containment Inservice Examinationsin accordance with the requirements of ASME CodeCase N-532-1.

__________ A_____________ A __________ A

Page 7: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19O Cornst ellationEnergy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine MWe Point 2007 OWNERS' ACTIVITY REPORTNudear Statin FOR Date: April 26,2007

INSERVICE EXAMINATIONS Page 1-4 of 1-13

ABSTRACT

This Owner's Activity Report summarizes the results of the Nine Mile Point Nuclear Station (NMPNS), Unit 1,American Society of Mechanical Engineers (ASME) Section XI Inservice Inspection, Risk-Informed Inspection andContainment Inservice Examinations performed during Refueling Outage Nineteen (RFO-19), from March 17,2007through April 15, 2007, and the First outage of the Third Inservice Inspection Period that started on 26 December2006 and is scheduled to end on 25 December 2009.

As an alternate to the requirements of the ASME, Boiler and Pressure Vessel Code (B&PVC), Section XI, Article IWA-6000, NMPNS is Implementing ASME Code Case N-532-1, "Alternative Requirements to Repair and ReplacementDocumentation Requirements and Inservice Summary Report Preparation and Submission as Required by IWA-4000and IWA-6000, Section XI, Division 1". Regulatory Guide 1.147, Revision 13, approved ASME Code Case N-532-1 foruse. This Report complies with the requirements of Code Case N-532-1 and the conditions identified in RG 1.147.

OWNER'S ACTMTY REPORTS - FORM OAR-1

Owner's Activity Reports Form OAR-I's were prepared and certified upon completion of the Nine Mile Point Unit 1,2007 refueling outage (RFO-19) examination activity in accordance with the following inspection plans and schedules:

* NMPI-ISI-003, Third Inservice Inspection Plan and Schedule* NMPI-RI-ISI-003, Risk-Informed Inspection Plan and Schedule* NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule.

In addition to the Owner's Activity Report, Form OAR-i, the following Tables are also included:

a. Abstract of Examinations and Tests, Table 1, provides such Information as ASME Code ExaminationCategory, Total Examinations Required for the Inspection Interval, Total Examinations Required for thisPeriod, Total Examinations Credited (%) for this Period, Total Examinations Credited (%) to Date for theInterval, and any remarks that may be applicable to each Examination Category.

b. Items with Flaws or Relevant Conditions that Require Evaluation for Continued Service, Table 2.provides a listing of item(s) with flaws or relevant conditions that required evaluation to determineacceptability for continued service, whether or not the flaw or relevant condition was discovered during ascheduled examination or test, and provides such information as Examination Category, Examination ItemNumber, Item Description, Flaw Characterization (as required by IWA-3300).

c. Abstract of Repairs, Replacements or Corrective Measures Required for Continued Service, Table 3,identifies those items containing flaws or relevant conditions that exceeded the ASME Section XI acceptancecriteria (IWX-3000) or In the case of supports IWF-3000 acceptance criteria; even though the discovery ofthe flaw or relevant condition that necessitated the repair, replacement or corrective measure, may not haveresulted from an examination or test required by Section XI, and provides such Information as Code Class,whether the item Is a repair, replacement or corrective action, item description, description of work, If the flawor relevant condition was found during a scheduled Section XI Examination or test, date completed and therepair replacement plan number.

Page 8: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003419

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNudear Station FOR Date: April 26,2007

INSERVICE EXAMINATIONS Page 1.5of 1-13

In accordance with ASME Section XA, IWB-2412 (a), IWC-2412, IWD-2412 and IWE-2412(a), and with theexception of the examinations that may be deferred until the end of the inspection interval as specified inTable IWB-2500-1, IWC-2500-1, IWD-2500-1, IWF-2500-1 and IWE-2500-1, including those examinationswhich NMPNS has requested and received approval in the form of relief request, the required examinationsIn each examination category have been completed for the Third In-service Inspection Period In accordancewith Tables IWB-2412-1, IWC-2412-1, IWD-2412-1, and IWE-2412-1.

Page 9: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-190 Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page I-6of 1-13

FORM OAR-1OWNER'S ACTIVITY REPORT

As required by the provisions of the ASME Code Case N-532-1

Report Number NMPI-OAR-003-19

Owner Constellation Nuclear Generation. 1997 Annapolis Exchanaie Parkway, Annapolis, Maryland 21401(Name and Address of Owner)

Plant Nine Mile Point Nuclear Station. P. 0. Box 63. Lake Road. Lycominq. New York 13093(Name and Address of Plant)

Plant Unit I Commercial Service Date December 26. 1969 Refueling Outage Number RFO-19

Current inspection Interval Third Inservice Inspection Interval - December 26. 1999 to December 25, 2009(1st. 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Insoction Period - December 26. 2006 to December 25. 2009

(1 st, 2nd. 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1989 Edition, No Addenda

Date and Revision of Inspection Plan NMP-ISI-003. Revision 04. Dated November 28.2006Edition and Addenda of ASME Section XI appficable to Repairs and Replacements. if different than the Inspection PlanhNfA

CERTIFICATE OF CONFORMANCE

I certify that the statements made in this Owners Activity Report are correct, and that the examinations, tests, repairs, replacements,evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. WA Expiration Date NIA

Sign erd_ 8u _isor- _l0o0te Engineeringrogras Date(General Supervisor -Corprate Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of New York and employed by Hartford Steam Boiler (HSBCT3 of Hartford. Connecticut haveInspected the items described In this Owners Activity Report, during the period 03/19/07 to 04112107 , and state that to thebest of my knowledge and belief, the Owner has performed oft activities represented by this report In accordance with the requirements ofSection XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations,tests, repairs, replacements, evaluations and corrective measures described In this report. Furthermore, neither the Inspector nor hisemployer shall be lable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected withthis Inspection.

Inspector's Signatu.:I National Board. State, Province, and Endorsements

Date

Page 10: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNucear Station FOR Date: April 26,2007

INSERVICE EXAMINATIONS page 1-7 of 1-13

FORM OAR-IOWNER'S ACTIVITY REPORT

As required by the provisions of tho ASME Code Case N-532-1

Report Number NMP1-OAR-003-19

Owner Constellation Nuclear Generation. 1997 Annapoois Exchanae Parkway, Annapolis. Maryland 21401(Name and Address of Owner)

Plant Nine Mile Point Nuclear Station, P. 0. Box 63. Lake Road. Lvcomina. New York 13093(Name and Address of Plant)

Plant Unit I Commercial Service Date December 26. 1969 Refueling Outage Number REO-19

Current Inspection Interval Third Inservice Insoection Interval - December 26, 1999 to December 25. 2009(1st, 2nd, 3rd. 4th, Other)

Current Inspection Period Thrd Inservice Inspection Period - December 26, 2006 to December 25, 2009(1st, 2nd, 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1989 Edition, No Addenda

Date and Revision of Inspection Plan NMPI-RI-ISI-003. Revision 01. Dated December 30, 2003Edition and Addenda of ASME Section Xi applicable to Repairs and Replacements, K different than the Inspection Plan WA

CERTIFICATE OF CONFORMANCE

I certify that the statements made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements,evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. NWA Expiration Date NA

Signe A 4 4.A~.- 4> (If applicable) DtSigned Sp o A DateE

1L- (Geea Suevio -- Coprtni NPorm

CERTIFICATE OF INSERVICE INSPECTION

I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince of ew Ygorkand employed by Hartford Steam Boiler 0IHSBCT) of Hartford. Connecticut haveInspected the Items described in this Owner'es Activity Report, during the period -=19&07 to 04//07 a and state that to thebest of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements ofSection X1.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations,tests, repairs, replacements, evaluations and corrective measures described In this report. Furthermore, neither the Inspector nor hisemployer shall be Roble in any manner for any personal injury or property damage or a loss of any kind arising from or connected withthispection.,(

Inseo SCommissions; NB9a89 A. S N. I NY 3061Inspector's Signature~ National Board. State, Province, and Endorsements

Date 519 1 (J-

Page 11: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19O ConstellationEnergy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page I-Sof 1-13

FORM OAR-1OWNER'S ACTIVITY REPORT

As required by the provisions of the ASME Code Case N-532-1

Report Number NMPI-OAR-003-19

Owner Constellation Nuclear Generation, 1997 Annapolis Exchanae Parkway. Annapolis, Maryland 21401(Name and Address of Owner)

Plant Nine Mile Point Nuclear Station. P. 0. Box 63, Lake Road, Lycominq. New York 13093

(Name and Address of Plant)

Plant Unit .. 1.__ Commercial Service Date December 26. 1969 Refueling Outage Number RFO-19

Current Inspection Interval First Containment Inspection Interval - December 26, 1999 to December 25. 2009(1 at, 2nd, 3rd, 4th, Other)

Current Inspection Period Third Inservice Inspection Period - December 26, 2006 to December 25, 2009(1st, 2nd. 3rd)

Edition and Addenda of Section XI applicable to the Inspection Plan 1998 Edition, No Addenda

Date and Revision of Inspection Plan NMPI-IWE-003. Revision 05. Dated May 31. 2006Edition and Addenda of ASME Section Xl applicable to Repairs and Replacements, if different than the Inspection Plan NIA

CERTIFICATE OF CONFORMANCE

I certify that the statements made In this Owner's Activity Report are correct, and that the examinations, tests, repairs, replacements,evaluations and corrective measures represented by this report conform to the requirements of Section XI.

Certificate of Authorization No. NIA Expiration Date WA

Signed ./ A (if appicable) . /Date(General Supervisor - Corporate Engineering Programs)

CERTIFICATE OF INSERVICE INSPECTION

I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State orProvince ofNewYork and employed by Hartford Steam Boiler (HSBCTl of Hartford. Connecticuthave Inspected the Riems described In this Owner's Activity Report, during the period 0311g17 to .4ZD7 , and state that tothe best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with therequirements of Section Xi.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied. concerning the examinations,tests, repairs, replacements, evaluations and corrective measures described in this report. Furthermore, neither the Inspector nor hisemployer shall be liable iTr2act manner for any personal injury or property damage or a loss of any kind arising from or connected withthis inspection.

ý V%, `ý Commissions NO9889 A. & K I NY 3061Inspector's Signature "-' National Board, State. Province, and Endorsements

Date S-\Ct\lC

Page 12: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-19O Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNjLear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page 1-9of 1-13

TABLE IABSTRACT OF EXAMINATION AND TESTS

As required by ft provisions of the ASME Code Case N-832-1

TOTALTOTAL *TOTAL TOTAL EXAMINATIONS

CODE EXAMINATIONS EXAMINATIONS EXAMINATIONS CREDITED (%) TOEXAMINATION REQUIRED FOR REQUIRED FOR CREDITED (%) FOR DATE FOR THE

CATEGORY INTERVAL THIS PERIOD THE PERIOD INTERVALREMARKS

B.A 45 33 8-24.2% 20-44.4% Deferral Permissible8-D 80 31 21-67.7% 71 -88.7% Deferral Permissible

8-4-1 404 135 127-94.0% 396-98.0% Deferral PermissibleB-G-2 95 21 8-38.0% 82-86.3%

B-K 12 6 3-50.0% 9-75% CC N-509B-L-2 I 1 0- 0.0% 0- 0.0% Deferral Permissible, When

Disassembled

B-M1 1 1 0-0.0% 0- 0.0% Deferral PermissibleB-M-2 24 11 1-0.09% 14-68.3% Deferral Permissible, When

Disassembled

B-N-1 99 47 42-89.3% 94-94.9% Note IB-N-2 28 13 12-92.3% 27-96.4% Deferral PermissibleB-0 a 3 3 - 100% 8-100% Deferral PermissibleC-A 4 2 2-100% 4-100%C-8 4 2 2-100% 4-100%C-C 33 13 11-84.6% 31-93.9% CC N-509C-G 21 10 0-0.0% 11 - 52.3% RR-ISI-7, When DisassembledD-A 25 12 12.100% 25-100% CC-N-509D-B 12 0 0-0% 12-100% CC-N-509

3 0 0-0% 3-100% CC-N-509F-A 201 80 57-71.2% 178-88.5% CC N-491,1

-_ ~ 72 34 19 -65.8% 57-79.1% RI-ISI. Note2

E-A 2417 791 733 - 92.7% 2359-97.6% Note 1

Notes:

1. 100% of accessible surfaces examined each period2. Reference RR-Ri-ISI-22, all Risk-lrformed examinations to be completed in the 2"d and 3 1d periods

Page 13: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPl-OAR-003-19O Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page 1-10 of 1-13

TABLE 2ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATION FOR CONTINUED SERVICE

As required by the provisions of the ASME Code Case N-532-1

FLAW OR RELEVANTFLAW CONDITION

EXAMINATION ITEM ITEM CHARACTERIZATION FOUND DURINGCATEGORY NUMBER DESCRIPTION (IWA-3300) SCHEDULED

SECTION XI EXAMINATIONOR TEST

(YES OR NO)

WA WA Reactor Vessel Flange Mating Surface Relevnt Coitions No

F-A F1.30A ISuut7- -t7 s I~RlJvAtC P%,tdon Yes

R-A R1.20 NoATWEnd Surface Planar Yes

R-A Rl.20 N N s d u Ce S ~Yes

E-C E4.l Drywll Uner -- 225 Releva~u•Cndition Yes'neIationac a 25

E-C E4.11 I Dl on* % 4d Releva~Qnulo1 e,k:-c 'ra-e at 225'

E-C E4.11 %&Z- iatea Relevatodition Yes

l e ndition YesE-C E4.11 %e-Zeva eTeonu

Page 14: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-190Cons

Energy Grotp THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine Mile Point 2007 OWNERS' ACTMTY REPORTNuclear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page I -11 of 1-13

TABLE 3ABSTRACT OF REPAIRS. REPLACEMENTS, OR CORRECTIVE MEASURES REQUIRED FOR CONTINUED SERVICE

As recuired by the provisions of the ASME Code Case N-532-1

FLAW OR RELEVANTREPAIR CONDITION FOUND

REPLACEMENT DURING SCHEDULED REPAIROR DESCRIPTION SECTION Xi REPLACEMENT

CODE CORRECTIVE ITEM OF EXAMINATION OR TEST DATE PLANCLASS MEASURE DESCRIPTION WORK (YES OR NO) COMPLETE NUMBER

1 Repair RPV Flange Weld Repair of two No 04/11/07 07-03643-00Mating Surface steam cuts

2 Corrective 39-H2 Spring Adjusted Clamp Yes 027 07-03619-00Measure Support following re.

installation

Page 15: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003-190 Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00

Nine Mile Point 2007 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: April 26, 2007

INSERVICE EXAMINATIONS Page 1-12 of 1-13

END OF INSERVICE INSPECTION

OWNER'S ACTIVITY REPORT

FOR

REFUELING OUTAGE NINETEEN (RFO-19)

Page 16: Nine Mile Point, Unit 1 - 2007 Owner's Activity Report for ... · * NMPI-IWE-003, First Containment Inservice Inspection Plan and Schedule. In addition to the Owner's Activity Report,

Nine Mile Point Nuclear Station Unit I NMPI-OAR-003.190 Constellation

Energy Group THIRD INSERVICE INSPECTION INTERVAL Rev. 00Nine MiWe Point 2007 OWNERS' ACTIVITY REPORTNuclear Station FOR Date: April26, 2007

INSERVICE EXAMINATIONS Page i-13of 1-13

THIS PAGE LEFT BLANK INTENTIONALY