Page 1: NIST IT Standards for Local Governments 2010

1

Implementing NIST for Local Governments

Rev 1 (JUN 2010)© 2010 Maze & Associates

Page 2: NIST IT Standards for Local Governments 2010

2

Introductions

NameEmployerSecurity ExperienceNIST Experience

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 3: NIST IT Standards for Local Governments 2010

3

Suggested Materials

Building and Implementing a Security Certification and Accreditation Program, Official (ISC)2 Guide to the CAP CBK, by Patrick D. Howard

NIST SP 800-100 NIST SP 800-37 rev 1

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 4: NIST IT Standards for Local Governments 2010

4

Introduction

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 5: NIST IT Standards for Local Governments 2010

5

Introduction Due Diligence Standards NIST / FISMA Background A Risk Based Approach What is Certification and Accreditation Systems Security Approach Benefits External Drivers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 6: NIST IT Standards for Local Governments 2010

Question

How do you explain to someone who does not understand firewalls that your organization has done everything it should to protect your organization?

How do you demonstrate due diligence in IT?

Page 7: NIST IT Standards for Local Governments 2010

Solution

The only way to show you have done everything you should, to someone who does not understand the technical aspects, is to show you follow an industry standard.

The only way to show due diligence is to use an industry standard.

An industry standard properly vetted by professionals or authorities

Page 8: NIST IT Standards for Local Governments 2010

Following a standard

Actions and needs are explainable and defendable

Help when you need to fight for resources

In accounting you have GAAP

In IT you have NIST

Page 9: NIST IT Standards for Local Governments 2010

NIST There is no compulsory IT standard required

for local governments. The National Institute of Standards and

Technology (NIST) encourages state, local and tribal governments to consider the use of these guidelines, as appropriate.

In adopting NIST standards the local government demonstrates due diligence."State, local, and tribal governments, as well as private sector organizations are encouraged to consider using these guidelines, as appropriate." - NIST SP 800-37 Rev 1 pg 11

Page 10: NIST IT Standards for Local Governments 2010

10

State of California

Rev 4 (Jan 2010)© 2010 Maze & Associates

The State of California is going to adopt NIST standards

Modified version

NIST SP 800-53 NIST SP 800-37

Page 11: NIST IT Standards for Local Governments 2010

Other Standards Yes there are other standards

PCI ISO 27002 (ISO 17799) COBIT Etc..

If ever a local government is required to follow a standard it would be NIST

NIST is recommend by DOJ for local police NIST is a Government friendly standard

Page 12: NIST IT Standards for Local Governments 2010

PCI & NIST PCI has a narrow focus (just card holder data) NIST has a broad focus (all of IT) If you focus on PCI only you may sacrifice in

other areas If you implement a standard like NIST you are

90% there for PCI If a new regulation comes up you are already

prepared

Page 13: NIST IT Standards for Local Governments 2010

13

NIST/FISMA Background E-Government Act (Public Law 107-347)

passed and signed into law in December 2002 Title III of the E-Government Act, Federal

Information Security Management Act (FISMA) Required for all government agencies To develop, document, and implement an

agency-wide information security program To provide information security for the

information and systems that support the operations and assets of the agency

Applies to contractors and other sources

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 14: NIST IT Standards for Local Governments 2010

14

A Risk Based Approach Emphasize a risk-based policy for cost-

effective security FISMA The Paperwork Reduction Act of 1995 The Information Technology Management Reform

Act of 1996 (Clinger-Cohen Act) Supported by Office of Management and

Budget (OMB) through Circular A-130, Appendix III, Security of Federal Automated Information Resources OMB defines as adequate security, or security

commensurate with risk, to include the magnitude of harm resulting from the unauthorized access, use, disclosure, disruption, modification, or destruction of information.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 15: NIST IT Standards for Local Governments 2010

15

Certification and Accreditation

“Certification and accreditation is the methodology used to ensure that security controls are established for an information system, that these controls are functioning appropriately, and that management has authorized the operation of the system in is current security posture.” - Official (ISC)2 Guide to the CAP CBK

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 16: NIST IT Standards for Local Governments 2010

16

Certification Detailed security review of an information

system Comprehensive assessment of

Management security controls Operational security controls Technical security controls

To determine the extent to which the controls are Implemented correctly Operating as intended Producing the desired outcome

Providing the factual basis for an authorizing official to render a security accreditation decision

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 17: NIST IT Standards for Local Governments 2010

17

Accreditation Security accreditation is the official management

decision to operate Given by a senior agency official (management) The official should have the authority to oversee

the budget and business operations of the information system

Explicitly accept the risk to operations assets individuals

Accepts responsibility for the security of the system Fully accountable for the security of the system

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 18: NIST IT Standards for Local Governments 2010

18

System Security Approach Security not at the application, device, data or

user level Security that encompasses a system made up

of applications, devices, data and users. Easier and more cost effect to define

‘systems’ with boundaries and perimeters Implement controls based upon the system

and not the entire enterprise

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 19: NIST IT Standards for Local Governments 2010

19

Benefits Information security visibility Management involvement Management due diligence Integrate security Consistent implementation Common goal Ensure minimum security Ensure proper controls in place Ensure risk-based controls Efficient use of resources and funds

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 20: NIST IT Standards for Local Governments 2010

20

External Drivers Security Incidents Financial scandals Terrorist attacks Natural disasters Sarbanes-Oxley Health Insurance Portability and Accountability

Act Gramm-Leach-Bliley Act Clinger-Cohen FISMA PCI

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 21: NIST IT Standards for Local Governments 2010

21

Building a Successful Enterprise Certification and Accreditation (C & A) Program

Section I

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 22: NIST IT Standards for Local Governments 2010

Key Elements of an Enterprise C & A Program

Chapter 1

Page 23: NIST IT Standards for Local Governments 2010

23

The C & A business case What is the benefit to the organization?

Due diligence Accountability Implementation of risk management Visibility of risk Cost-effectiveness

A strong business case will help enlist support The C & A program will help them meet their

organizational needs, reach their goals and accomplish their mission

C & A is a business enabler

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 24: NIST IT Standards for Local Governments 2010

24

C & A goal setting Typical project management Goals must be:

Realistic Comprehensive Integrated Achievable Effective Supported Enduring

The organizations management, culture, personality and security posture all play a part.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 25: NIST IT Standards for Local Governments 2010

25

Establishing program tasks and milestone Typical project management

Project management is the discipline of planning, organizing and managing resources to bring about the successful completion of specific project goals and objectives.

A Project is made up of multiple stages, tasks and milestones.

A milestone is the end of a stage that marks the completion of a work phase

A task is an activity that needs to be accomplished within a defined period of time

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 26: NIST IT Standards for Local Governments 2010

26

Overseeing program execution Constant measurement,

metrics Ensure program requirements

are being met Tracking process Need to have some way to

enforce project management and include escalation

A security oversight committee can provide oversight to the C&A program

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 27: NIST IT Standards for Local Governments 2010

27

Maintaining program visibility Need consistent management

support Without management support

people will not fulfill their obligations to the project

Without management support you will not have access to needed resources and funding

The Chief Information Security Officer (CISO) can keep the program visible by giving regular updates to c-level management

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 28: NIST IT Standards for Local Governments 2010

28

Resources What types of resources might the project

need? Funds, money, budget People, man-hours Processes Technology Outside expertise Training Automated tools

Use realistic requirements

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 29: NIST IT Standards for Local Governments 2010

29

Developing guidance Document what the program is Document how you plan to

implement Sample Documents

Policies Standards Guidelines Procedures

Should meet organizational business needs

Describe the process Precise, clear and brief

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 30: NIST IT Standards for Local Governments 2010

30

Sample C & A Policy

Reference: http://www.tess-llc.com/Certification%20&%20Accreditation%20PolicyV4.pdf

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 31: NIST IT Standards for Local Governments 2010

31

C & A Guidance Development Life Cycle

• Awareness• Monitoring• Enforcement• Maintenance

• Retirement

• Communication

• Compliance• Exceptions

• Creation• Review• Approval

Development

Implementation

Maintenance

Disposal

Life-cycle for the development of the documentation for the C & A process

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 32: NIST IT Standards for Local Governments 2010

32

Guidance caution Too many rules limit the

latitude and innovation that may be needed at lower levels

Long, cumbersome guidance documents will be ignored

Limits agility Should be easy to access

Intranet site System administrators

need to use regularly

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 33: NIST IT Standards for Local Governments 2010

33

C & A process flow

Conduct Minimum Security Baseline Assessment

•Minimum Security Baseline Report

Assess Risks

•Risk Assessment Report

Perform Vulnerability Scanning

•Vulnerability Scan Results

Develop Security Plan

•Draft System Security Plan

Perform Certification Testing

•Certification Test Plan

Prepare Certification Package

•Certification Test Results

•Updated System Security Plan

•Certification Statement

Submit Certification Package

•Transmittal

Accredit System

•Accreditation Statement

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 34: NIST IT Standards for Local Governments 2010

34

System Owner

Authorizing OfficialCertification Agent

Prepare Documentation

Initiation Phase 1

1. Describe the System2. Categorize its C.I.A.3. Identify Threats to it4. Identify its Vulnerabilities5. Identify In-Place and Planned Security Controls6. Determine its Initial Risks

Initiation

NIST 800-37 Risk Management & Certification and Accreditation Tasks

Notify Officials & IdentifyResourcesPlanning Phase 3

1. Notify Program Officials2. Identify Resources Needed and Plan execution of Activities

Initiation

Report & DocumentStatus

O&M Phase 9

1. Update Security Plan2. Update Plan of Action & Milestones3. Report Status

Monitoring

Monitor SecurityControls

O&M Phase 9

1. Select In-Place Security Controls2. Assess Selected Security Controls

Monitoring

Manage & ControlConfiguration

O&M Phase 9

1. Document System Changes2. Analyze Security Impacts

Monitoring

Analyze, Update& Accept System Security PlanMultiple Phases 4-6

1. Review Security C.I.A. Categorizations2. Analyze Security Plan 3. Update Security Plan 4. Obtain Authorizing Official Acceptance of Security Plan

Initiation

Assess & EvaluateSecurity Controls

Integration & Test Phase 7

1. Prepare Documentation & Supporting Materials2. Review Methods and Test Procedures3. Assess & Evaluate In- Place Security Controls4. Report Security Assessment Results

Certification

Document SecurityAccreditation

Integration & Test Phase 7

1. Transmit Security Accreditation Package2. Update Security Plan

Accreditation

Document SecurityCertification

Integration & Test Phase 7

1. Provide Findings and Recommendations2. Update Security Plan3. Prepare Plan of Action & Milestones4. Assemble Accreditation Package

Certification

Make Security AccreditationDecisionIntegration & Test Phase 7

1. Determine Final Risk Levels2. Accept Residual Risk

Accreditation

System Owner

Phase 1 – Task 1

Phase 3 – Task 6

Phase 1 – Task 2 Phase 1 – Task 3 Phase 2 – Task 4 Phase 2 – Task 5

Phase 3 – Task 7 Phase 4 – Task 8 Phase 4 – Task 9 Phase 4 – Task 10

Primary Responsibility

SDLC

NIST 800-37

Phases

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 35: NIST IT Standards for Local Governments 2010

35

Program integration Security needs to be baked

into the organization C & A program should

integrate with other organizational programs, processes and activities

For example Integrate with human

resources for background checks

Guard service for physical security

Accounting for procurement and budget Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 36: NIST IT Standards for Local Governments 2010

36

Establishing C & A points of contact Chief Information Security Officer (CISO) is directly

responsible. Other key players

System Owners C & A Workgroup Security Steering Committee IT administrators

Key areas of knowledge for Organizations Operations Hierarchy Management Strategies Initiative

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 37: NIST IT Standards for Local Governments 2010

37

Measuring progress Need to have a method for measuring progress and

effectiveness. Dashboard for an over-all status and where

additional resources are needed. Scope

Tasks Systems Risk Need and Sensitivity

Time Effort

Budget Cost

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 38: NIST IT Standards for Local Governments 2010

38

Tracking program activities Keep your eyes on the road Know where you are Determine potential hazards (Problem

forecasting) Determine outside influences (Track external

projects) Keep people informed (Reporting) Know what you have (Resource monitoring)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 39: NIST IT Standards for Local Governments 2010

39

Tracking compliance How do you hit a moving target? Maintenance Phase (keep your guard up)

Updates and maintenance (systems and documentation)

Plan of Actions and Milestones (POA&M) Open items that need to be addressed (mitigation)

Recertification Triggers or Reassessment Risk New Vulnerabilities New Risks Environment changes Control failure Audit findings

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 40: NIST IT Standards for Local Governments 2010

40

Providing advise & assistance Need to strive for a consistent approach within

the program Multiple systems and system owners

(Enterprise wide) Maintain flexibility for individual systems Seek advice of professionals Take suggestions Document understandings

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 41: NIST IT Standards for Local Governments 2010

41

Responding to change Need a process to know when a change has

been made that will effect the C & A of a system

Is the change a material change? Significant changes modify the risk to the system

Recertification Triggers or Reassessment Risk New Vulnerabilities (major possibly, minor are

handled by patch management) New Risks (brought about by changes) Environment changes (Application or OS change) Control failure (Controls not working as intended) Audit findings (Missing controls)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 42: NIST IT Standards for Local Governments 2010

42

Program awareness, training and education In order to maintain the C & A

program Constant reminders – awareness Training – program training –

depending on role Education – security and C & A

related continuing education Possible to integrate with other

training and awareness programs within the organization

Track training

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 43: NIST IT Standards for Local Governments 2010

43

Use of expert systems Automated tools

Tracking systems C & A document management systems Audit log management Dashboards Intrusion Prevention Systems Etc.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 44: NIST IT Standards for Local Governments 2010

44

Waivers and exceptions to policy There needs to be a process to handle

exceptions How will you consider waivers? Who makes the decision? Can the decision be made in a timely fashion? How will the decision be documented? Does the system owner accept the risk?

Don’t let the process control you. C & A is not supposed to be a paper exercise. C & A is based on risk! C & A helps the organization meets its goals. Waivers should be based on business need.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 45: NIST IT Standards for Local Governments 2010

45

Summary Business Case Setting up the program Establishing tasks, milestones and goals Resources Program Integration Program Phases Points of contact Measuring results Tracking progress Education, training and awareness Exceptions and waivers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 46: NIST IT Standards for Local Governments 2010

46

Class Discussion What are some of the tools you use or would

use to help your organization have an effective certification and accreditation program?

Should all agencies use the same processes and tools to implement a certification and accreditation program?

What would you say to a manager who thinks certification and accreditation is a waste of time and money?

You are responsible for the certification and accreditation program for your organization. What things would you do to ensure the program was successful?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 47: NIST IT Standards for Local Governments 2010

C & A Roles and Responsibilities

Chapter 2

Page 48: NIST IT Standards for Local Governments 2010

48

Primary roles and responsibilities The five primary roles

Chief Information Security Officer (CISO) System Owner Information Systems Security Officer (ISSO) Certifying Agent Approving Authority (AA)

Authorizing Official (AO) Designated Approving Authority (DAA)

Different C & A framework use different names NIST, DCID 6/3, DITSCAP, DIACAP, NIACAP, ISO

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 49: NIST IT Standards for Local Governments 2010

49

Approving Authority (AA) Also Known As

Designated Approving Authority (DAA)

Authorizing Official (AO) Senior management Formally accepts responsibility for

operating an information system Accepts residual risk to the

system Must be a Government Employee May have a designated

representative – can do everything but sign or decide Accreditation

“A senior management official or executive with the authority to formally assume responsibility for operating an information system at an acceptable level of risk to agency operations, agency assets, or individuals.” - NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 50: NIST IT Standards for Local Governments 2010

50

Chief Information Security Officer (CISO) AKA: Senior Agency Information Security

Officer (SAISO) Senior manager in charge of Information

Security Accountable for most aspects of security

within an organization Security is primary duty Head of the certification and accreditation

program within the organization Establish the program Enforce the program

Responsible for the success of a C & A program

Professional Qualifications

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 51: NIST IT Standards for Local Governments 2010

51

System Owner Also Known As

Information System Owner Primary responsibility for the system Establishes the systems sensitivity level Full lifecycle of the system Often it is the IT department

“Official responsible for the overall procurement, development, integration, modification, or operation and maintenance of an information system. “ - (NIST SP 800-37)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 52: NIST IT Standards for Local Governments 2010

52

Information Systems Security Officer (ISSO) Principal advisor to the Approving Authority Serves as an agent to the system owner Monitors day to day security on the system Coordinate with physical security, personal,

incident handling and security awareness. Does not touch the system

“The information system security officer often plays an active role in developing and updating the system security plan as well as in managing and controlling changes to the system and assessing the security impact of those changes.“ NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 53: NIST IT Standards for Local Governments 2010

53

Certifying Agent AKA: Assessor or Auditor Independent authority Impartial and unbiased (separation of duties) Measures effectiveness and completeness of

controlsThe certification agent is an individual, group, or organization responsible for conducting a security certification, or comprehensive assessment of the management, operational, and technical security controls in an information system to determine the extent to which the controls are implemented correctly, operating as intended, and producing the desired outcome with respect to meeting the security requirements for the system. - NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 54: NIST IT Standards for Local Governments 2010

54

Other roles and responsibilities Secondary Roles

Chief Information Officer (CIO) IT Security Program Steering Committee Auditor Information Owner/Custodian System Administrator Business Unit Manager Project Manager Facility Manager Executive Management

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 55: NIST IT Standards for Local Governments 2010

55

Chief Information Officer (CIO) Overall responsibility for organization’s

security Delegates authority to CISO Provision resources Provide oversight Maintain visibility

“The Chief Information Officer, with the support of the senior agency information security officer, works closely with authorizing officials and their designated representatives to ensure that an agency-wide security program is effectively implemented, that the certifications and accreditations required across the agency are accomplished in a timely and cost-effective manner, and that there is centralized reporting of all security-related activities. “ NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 56: NIST IT Standards for Local Governments 2010

56

IT Security Program Steering Committee Provides high-level oversight Provides direction Indirect supervision Advisory group to the program Does not exercise authority

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 57: NIST IT Standards for Local Governments 2010

57

Auditor Provides independent (unbiased) assessment

of the C & A program Looks at individual program components Ensures documentation is adequate Weaknesses identified Corrective actions specified Example: Certification Agent or Inspector

General

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 58: NIST IT Standards for Local Governments 2010

58

Information Owner/Custodian Information Owner Also known as

Custodian Data Owner

Information owner typically owns business process

Aware of the required protection for the data Establish impact level on the business process

“The information owner is an agency official with statutory or operational authority for specified information and responsibility for establishing the controls for its generation, collection, processing, dissemination, and disposal.” NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 59: NIST IT Standards for Local Governments 2010

59

System Administrator In charge of the day-to-day operation and

administration Implements technical and operational controls IT administrators Separation of duties from ISSO Implement hardware changes Implement software changes Backups Monitoring Maintenance

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 60: NIST IT Standards for Local Governments 2010

60

Business Unit Manager Often function as system owner Might be manager or director Disseminate security information to

subordinates Report security incidents to higher

management Respond to security incidents Determine resources Set priorities

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 61: NIST IT Standards for Local Governments 2010

61

Project Manager May work for the system owner for complex

system security plans May aid the CIO or CISO in the overall

program implementation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 62: NIST IT Standards for Local Governments 2010

62

Facility Manager Responsible for physical security Responsible for environmental controls

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 63: NIST IT Standards for Local Governments 2010

63

Executive Management Crucial Role Establish Policy Enforce Policy Allocate Resources Maintain visibility of program

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 64: NIST IT Standards for Local Governments 2010

64

User Representative Represents a user group or community Looks out for the interests of users Helps to keep it real!

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 65: NIST IT Standards for Local Governments 2010

65

Role Relationships

IG

CA

CISO

ISSO

CIO

SA

BUM

EU

Independence

SO

D

SO

D

IOSOAA

Program

System

Rev 4 (Jan 2010)© 2010 Maze & Associates

Large local governments may have a similar stratified approach. While smaller local governments will most likely only have a single level of management. Remember separation of duties is still a needed control for smaller organizations.

Page 66: NIST IT Standards for Local Governments 2010

66

Delegation of Roles

“At the discretion of senior agency officials, certain security certification and accreditation roles may be delegated and if so, appropriately documented. Agency officials may appoint appropriately qualified individuals, to include contractors, to perform the activities associated with any security certification and accreditation role with the exception of the Chief Information Officer and authorizing official. The Chief Information Officer and authorizing official have inherent United States Government authority, and those roles should be assigned to government personnel only. Individuals serving in delegated roles are able to operate with the authority of agency officials within the limits defined for the specific certification and accreditation activities. Agency officials retain ultimate responsibility, however, for the results of actions performed by individuals serving in delegated roles. “ NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 67: NIST IT Standards for Local Governments 2010

67

Documenting roles and responsibilities Document contact information for each role In other documents, refer to the roles not the

person Letters of appointment May create contact database

Sample System Security Plan from Centers for Disease Control and PreventionRev 4 (Jan 2010)© 2010 Maze & Associates

Page 68: NIST IT Standards for Local Governments 2010

68

Job descriptions Describe responsibilities Don’t forget the C & A responsibilities Outline expectations of performance Used for accountability

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 69: NIST IT Standards for Local Governments 2010

69

Position sensitivity designations Some key roles should be designated highly

sensitive People who know security of the system People who know the controls People with knowledge of the security posture Need trustworthy people Avoid frequent turnover

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 70: NIST IT Standards for Local Governments 2010

70

Personnel transitions Make sure individuals have adequate

replacements before they leave, if possible Overlapping smooth transition Acclimatize the individual with the C & A

process and organizational specifics Make sure they understand their new roles

and responsibilities

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 71: NIST IT Standards for Local Governments 2010

71

Time requirements C & A duties do not require full time, unless

you dedicate the tasks Collateral duties to normal ones Dedicated employee help with consistency Size of the organization Number of systems

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 72: NIST IT Standards for Local Governments 2010

72

Expertise requirements Skills and abilities Project management System development life-cycle Technical controls Operational controls IT terminology Security terminology Clear background Administrative skills – technical writing skills Certifications like CAP, CISSP, CISA, CISM

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 73: NIST IT Standards for Local Governments 2010

73

Using contractors Want to have stability in the following

positions, thus employees are preferred CIO, CISO System Owner Authorizing Authority ISSO

Need for independence, often contractors used for certifying agent

Contractors can make for effective partners Need to have background checks, statements

of work, contracts and timetables

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 74: NIST IT Standards for Local Governments 2010

74

Routine duties Scheduling Reporting Providing advice Meetings Quality control Monitor compliance Intermediary Offer solutions Educate and train Systems development Explain technical issues to non-technical

management

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 75: NIST IT Standards for Local Governments 2010

75

Organizational skills Well organized Proficient in C & A Project management skills

Scheduling Task lists Meeting notes Manage email

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 76: NIST IT Standards for Local Governments 2010

76

Certifications

CISSP

CISM

CISSP ISSMP

CAP CISA

GSNA

SSCP

Security+

CISSP ISSEP/ ISSAP

CSSLP

Management / Risk

AuditSoftware

Dev

Network / Communicati

ons

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 77: NIST IT Standards for Local Governments 2010

77

Organizational placement of C & A function Where it will be able to be the most effective? Reach the highest and lowest parts of the

organizational chart As wide as the enterprise CISO may work for the CIO or COO for whistle

blower

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 78: NIST IT Standards for Local Governments 2010

78

Summary People are the most important part of the

process The right people make the program 5 key roles and supporting roles

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 79: NIST IT Standards for Local Governments 2010

79

Class Discussion: Roles & Responsibility What are some of the biggest challenges within

your current role? How would you respond to a business unit

owner, information owner or approving authority who says C&A is an IT issue and that he/she does not need to be involved?

If staffing is an issue, what roles would you combine? Which roles would you not combine?

In order to have a successful C&A program you have been tasked to make an education system for your organization. What are some key features you would include?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 80: NIST IT Standards for Local Governments 2010

The C & A Life Cycle

Chapter 3

Page 81: NIST IT Standards for Local Governments 2010

81

Certification and Accreditation in the SDLC

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 82: NIST IT Standards for Local Governments 2010

82

Initiation phase Document the sensitivity of the system with

the risk assessment Identify threats and vulnerabilities Control selection With limited resources you will have to

prioritize All information technology (IT) projects have a starting point, what is commonly referred to as the initiation phase. During the initiation phase, the organization establishes the need for a particular system and documents its purpose. The information to be processed, transmitted, or stored is typically evaluated, as well as who is required access to such information and how (in high-level terms). In addition, it is often determined whether the project will be an independent information system or a component of an already-defined system. A preliminary risk assessment is typically conducted in this phase, and security planning documents are initiated (system security plan). NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 83: NIST IT Standards for Local Governments 2010

83

Certification and Accreditation in the SDLC

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 84: NIST IT Standards for Local Governments 2010

84

Acquisition / Development phase Cost-benefit analysis Control selection Develop SSP

During this phase, the system is designed, purchased, programmed, developed, or otherwise constructed. This phase often consists of other defined cycles, such as the system development cycle or the acquisition cycle.

During the first part of the development/acquisition phase, the organization should simultaneously define the system’s security and functional requirements. These requirements can be expressed as technical features (e.g., access control), assurances (e.g., background checks for system developers), or operational practices (e.g., awareness and training). During the last part of this phase, the organization should perform developmental testing of the technical and security features/functions to ensure that they perform as intended prior to launching the implementation and integration phase. NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 85: NIST IT Standards for Local Governments 2010

85

Certification and Accreditation in the SDLC

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 86: NIST IT Standards for Local Governments 2010

86

Implementation phase Ensure controls are in place and functioning

correctly SSP updated as needed Certification test Certification test results reporting Authorization to operate (go live)

In the implementation phase, the organization configures and enables system security features, tests the functionality of these features, installs or implements the system, and finally, obtains a formal authorization to operate the system. Design reviews and system tests should be performed before placing the system into operation to ensure that it meets all required security specifications. NIST SP 800-100 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 87: NIST IT Standards for Local Governments 2010

87

Certification and Accreditation in the SDLC

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 88: NIST IT Standards for Local Governments 2010

88

Operations / Maintenance phase Make sure the system stays secure Continuous monitoring Configuration management Patch management Recertification and reaccreditation

An effective security program demands comprehensive and continuous understanding of program and system weaknesses. In the operation and maintenance phase, systems and products are in place and operating, enhancements and/or modifications to the system are developed and tested, and hardware and/or software is added or replaced. During this phase, the organization should continuously monitor performance of the system to ensure that it is consistent with preestablished user and security requirements, and needed system modifications are incorporated. NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 89: NIST IT Standards for Local Governments 2010

89

Certification and Accreditation in the SDLC

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 90: NIST IT Standards for Local Governments 2010

90

Disposition Phase Disposal of the system System replacement and/or upgrade Secure disposal Archive data Data migration

The disposal phase of the system life cycle refers to the process of preserving (if applicable) and discarding system information, hardware, and software. This step is extremely important because during this phase, information, hardware, and software are moved to another system, archived, discarded, or destroyed. If performed improperly, the disposal phase can result in the unauthorized disclosure of sensitive data. NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 91: NIST IT Standards for Local Governments 2010

91

Additional Study Resource Check out Section 3.6 Security Activities

within the SDLC, NIST SP 800-100, Information Security Handbook: A Guide for Managers (March 2007)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 92: NIST IT Standards for Local Governments 2010

92

Challenges to implementation Failing to follow the System Development Life

Cycle (SDLC) Rapid deployment

Alternative is to have multiple tracks Normal full C & A track Fast track for interim authorization to operate,

followed by full C & A Flexibility, should be risk-based

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 93: NIST IT Standards for Local Governments 2010

93

Comparison C & A Methodology

Methodology

Phase 1 Phase 2 Phase 3 Phase 4

NIST SP 800-37

Initiation Security Certification

Security Accreditatio

n

Continuous Monitoring

(ISC)2 CAP Preparation

Execution Maintenance

NIACAP Definition Verification Validation Postaccreditation

DITSCAP Definition Verification Validation Postaccreditation

DIACAP Definition Verification Validation Postaccreditation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 94: NIST IT Standards for Local Governments 2010

94

SDLC and C & A overlay

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Initiation / Definition

Certification / Verification

Accreditation / Validation

Continuous Monitoring / Post accreditation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 95: NIST IT Standards for Local Governments 2010

95

NIS

T SP

800

-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 96: NIST IT Standards for Local Governments 2010

96

Summary

Reference: NIST SP 800-100, Information Security Handbook: A Guide for Managers

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 97: NIST IT Standards for Local Governments 2010

97

Class Discussion: Life Cycle You are an auditor assessing a system for the

certification phase. You notice the last time the system security plan and risk assessment were modified was prior to the last accreditation. What would this indicate to you as an auditor?

What is the benefit of using a cycle to describe the process of certification and accreditation?

What is the best time to start the C&A process when developing or purchasing a new system? What happens in reality?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 98: NIST IT Standards for Local Governments 2010

Why C & A Programs Fail

Chapter 4

Page 99: NIST IT Standards for Local Governments 2010

99

Program Risks Programs run risks as well Programs don’t always fail Sometimes the program is not as effective as

it could be Sometimes the program is not as efficient as it

could be

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 100: NIST IT Standards for Local Governments 2010

100

Problems in program scope Accurate inventory

Without an accurate inventory you don’t know what is in your system or what data is on the system

Make sure you have 100% accurate inventory

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 101: NIST IT Standards for Local Governments 2010

101

Assessment focus Problems Only focus on control assessment Must remediate failed controls Management failed to allocate adequate

resources Systems change constantly Need to have a system of assessment and

remediation Need to have adequate resources

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 102: NIST IT Standards for Local Governments 2010

102

Short-term thinking Failing to think of the long-term because they

focus on short-term projects neglecting long-term

Dealing with problems in fire-fight mode

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 103: NIST IT Standards for Local Governments 2010

103

Long-term thinking If an organization fails

to think of the short-term because they focus on long-term projects neglecting short-term

Focus so much on strategy they fail to implement

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 104: NIST IT Standards for Local Governments 2010

104

Poor planning Programs don’t implement themselves Failure to set realistic requirements Failure to assign responsibility Failure to integrate C & A (bake it in) Failure to train people Misconceptions about program Failure to recognize limitation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 105: NIST IT Standards for Local Governments 2010

105

Lack of responsibility Responsibility needs to be assigned If no one is made responsible for the C & A

program you will not be able to hold anyone accountable

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 106: NIST IT Standards for Local Governments 2010

106

Too much paperwork C & A program in danger of becoming a paper

exercise If it becomes a paper exercise, it will not be

based on risk

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 107: NIST IT Standards for Local Governments 2010

107

Lack of enforcement Accountability Inconsistency can lead to failure Everyone must be onboard for the program

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 108: NIST IT Standards for Local Governments 2010

108

Lack of foresight Fail to see the benefit of Certification and

Accreditation Perform a cost benefit analysis to see the

benefit

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 109: NIST IT Standards for Local Governments 2010

109

Poor timing If the organization is not ready for

implementation Organization may have more pressing needs

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 110: NIST IT Standards for Local Governments 2010

110

Lack of support Need for resources Need for management support Need to be supported at the highest and

lowest level Management may not understand the value

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 111: NIST IT Standards for Local Governments 2010

111

Summary The C & A Program may miss the target if it is

not properly supported by management If the organization is not ready for the

program If the C & A program is looked at as a paper

exercise If the organization does not assign

responsibility If the organization does not enforce the C & A

program If the organization does not properly plan for

the C & A program If the program does not get the resources

needed

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 112: NIST IT Standards for Local Governments 2010

112

Class Discussion: Why C&A Programs Fail You have been tasked with ensuring the

certification and accreditation program does not fail. What would you do to ensure success?

Business unit owners, information owners, system owners or approving authorities are not engaged in the C&A process. How would you ensure success of the C&A program?

We have all been a part of a program or initiative that failed. What are some reasons programs or initiatives fail?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 113: NIST IT Standards for Local Governments 2010

113

C & A Process

Section II

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 114: NIST IT Standards for Local Governments 2010

C & A Project Planning

Chapter 5

Page 115: NIST IT Standards for Local Governments 2010

115

Quote

If you fail to plan, you plan

to fail!

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 116: NIST IT Standards for Local Governments 2010

116

Integrating Security into the CPIC Process

NIST SP 800-65, “Integrating IT Security into the Capital Planning and Investment Control Process,” provides a seven-step process, illustrated on the right, for prioritizing security activities and corrective actions: 1. Identify the Baseline2. Identify Prioritization Requirements3. Conduct Enterprise-Level

Prioritization 4. Conduct System-Level

Prioritization5. Develop Supporting Materials6. Implement Investment Review

Board (IRB) and Portfolio Management

7. Submit Exhibit 300s, Exhibit 53, and Conduct Program Management

CPIC = Capital Planning and Investment Control

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 117: NIST IT Standards for Local Governments 2010

117

Planning factors Key Factors

Properly Coordinated Effectively Organized Closely Managed

Project management usually takes 10% of the required effort of the program

Project Managers Skills Knowledgeable – understand the C & A process Personable – a people-person Present – always on the ball Involved – the one person who should know

everyone's status

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 118: NIST IT Standards for Local Governments 2010

118

Dealing with peopleProject manager Need to be a people-

person Manage expectations Manage objectives Need to identify the

individuals in the project Develop a contact list

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 119: NIST IT Standards for Local Governments 2010

119

Team member selection Should be based on

Knowledge Skills Abilities

Such as Critical Impartial, Fair People skills Analytical Familiar with C & A

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 120: NIST IT Standards for Local Governments 2010

120

Scope definition How many systems are in the project? How complex are the systems? Are there any deadlines? Locations of the systems? How many people are involved? What are the available resources? What will happen if the scope creeps? What are the costs?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 121: NIST IT Standards for Local Governments 2010

121

Assumptions You never have all the information need to

make decisions. You have to learn how to make decisions. Learn how to deal with fear, uncertainty and

doubt.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 122: NIST IT Standards for Local Governments 2010

122

Project Risks Identify risks to the project What could prevent this project from being

completed? Lack of cooperation Lack of management support Lack of manpower Lack of funds Lack of time Lack of skills needed Delays Etc.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 123: NIST IT Standards for Local Governments 2010

123

Project agreements Document the project plan This serves to inform people of their roles It also serves to identify what resources will be

needed Sets expectations on timing

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 124: NIST IT Standards for Local Governments 2010

124

Project team guidelines May be necessary to implement procedures

and policy on how to approach the project Such as procedures to follow in the event of a

scope change Also helps to ensure consistency

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 125: NIST IT Standards for Local Governments 2010

125

Administrative requirements Don’t forget to take into consideration the

cost of administrative support File storage Copy paper Binders Media Software tools Hardware tools Reference materials Etc.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 126: NIST IT Standards for Local Governments 2010

126

Reporting Reporting status to

management helps to gain support for the program Status reporting Monitoring progress Inform management

Reports should be succinct, clear and concise

Consider a dashboard approach

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 127: NIST IT Standards for Local Governments 2010

127

Other tasks Don’t forget training Most forgotten aspect is training

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 128: NIST IT Standards for Local Governments 2010

128

Project kickoff Important to have a kick-off meeting This meeting will help get everyone on the team on

the same page Also shows management’s support for the program Should cover

Deliverables Timeline Resources Roles & Responsibilities Procedures Scope Input from past projects

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 129: NIST IT Standards for Local Governments 2010

129

Wrap-up Helpful to have a close out-meeting Cover

Deliverables Success or failure What went wrong What went right Lessons learned Recommendations Any handoffs necessary Quality assurance, what do we do next time

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 130: NIST IT Standards for Local Governments 2010

130

Summary Project management is necessary for a

successful C & A program Planning is necessary for a successful C & A

program

If you fail to plan, you plan

to fail!Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 131: NIST IT Standards for Local Governments 2010

131

Class Discussion: Project Planning You are a project manager for a certification

and accreditation program. You have one team member who continuously misses deadlines causing delays in the program implementation. How would you solve this problem?

You have had projects successfully complete in the past without a project manager. How would you decide when you would need one?

Explain project risk.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 132: NIST IT Standards for Local Governments 2010

System Inventory Process

Chapter 6

Page 133: NIST IT Standards for Local Governments 2010

133

Inventory Project Work Plan

1

•Identify General Support Systems and Applications

•Identify Business Functions

•Identify automated information resources & categorize as GSS or application

2

•Classify GSS and applications

•Determine information sensitivity

•Determine mission criticality

3

•Determine what applications qualify as major applications

•Determine major applications support systems

•Non-major application become GSS

4

•Submit to CIO for review

•Business unit executive review

•Publish inventory

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 134: NIST IT Standards for Local Governments 2010

134

Responsibility Inventory roles should be defined in writing

System Owners are the primary contact of the inventory process

CISO is the owner of the inventory process Need to appoint an ISSO for each system Information technology security manager – actual

count Inventory is a function of the security process It is also an accounting process

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 135: NIST IT Standards for Local Governments 2010

135

System identification System owner is the primary role for the initial

system identification Assisted by others, such as the CIO and CISO

“The term ‘information system’ means a discrete set of information resources organized for the collection, processing, maintenance, transmission and dissemination of information in accordance with defined procedures, whether automated or manual.” OMB Circular A-130

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 136: NIST IT Standards for Local Governments 2010

136

General Support System v. Major Application

General Support System“An interconnected set of information resources under the same direct management control that shares common functionality. It normally includes hardware, software, information, data, applications, communications, and people.” OMB Circular A-130

Major Application“An application that requires special attention to security due to the risk and magnitude of harm resulting from the loss, misuse, or unauthorized access to or modification of the information in the application.” OMB Circular A-130

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 137: NIST IT Standards for Local Governments 2010

137

Small systems Generally are supported by the GSS For example

Database Spreadsheets Etc.

Technical security controls usually not a part of the small system Unlike major applications that have security

control designed in Normally addressed under the GSS system

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 138: NIST IT Standards for Local Governments 2010

138

Large systems Difficult to define because they are large and

complex May contain subsystems May contain multiple processes May have different managers for different

parts For example

ERP system May be best to manage subsystems

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 139: NIST IT Standards for Local Governments 2010

139

System and Subsystem

NIST SP 800-100

System 1Subsyste

m ASubsyste

m BSubsyste

m C

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 140: NIST IT Standards for Local Governments 2010

140

Combining systems A possible way to streamline the C

& A process Group similar systems together You can only group them if they will

have the same owner Also need to be in the same

environment Must be protected within a

common security perimeter Even if all the systems are in the

same datacenter, that does not mean they will be in the same system

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 141: NIST IT Standards for Local Governments 2010

141

Accreditation boundaries Everything (System, application, hardware)

must be in the C & A program The idea of a system boundary is to establish

responsibility Where to draw the line

Business process Security perimeter Ownership

Make the boundaries as small as you can with sensitive systems

Flexibility is required

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 142: NIST IT Standards for Local Governments 2010

142 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 143: NIST IT Standards for Local Governments 2010

143

The process Inventory

GSS Major Applications

Identify business function Identify supporting information technology Categorize into types of systems Classified by need for protection

Disclosure Modification Destruction Denial

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 144: NIST IT Standards for Local Governments 2010

144

Validation Time for a sanity check Does the system

boundary make sense? Is the system properly

classified based on risk not what the system owner wants

Don’t rush the process and miss critical issues

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 145: NIST IT Standards for Local Governments 2010

145

Inventory information Capture only the needed information If you don’t need it for the C & A program,

don’t collect it The additional information may be needed for

a different purpose May already exist, for maintenance purposes You just need to know the name of the

system, what it is doing to what type of data, what applications are involved

Typically 3 or 4 sentences

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 146: NIST IT Standards for Local Governments 2010

146

Inventory tools Inventory Form Inventory Change Form Summary reports Generally this is best done with a database or

website

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 147: NIST IT Standards for Local Governments 2010

147

Using the inventory Funding may be tied to the Inventory Disputes and disagreements will naturally

arise The CISO should handle these disagreements Inventory can be used to solve these issues

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 148: NIST IT Standards for Local Governments 2010

148

Maintenance Need to have a formalized (meaning

documented and supported) Inventory Annual review (required) Timely update as it changes Automated system Can help trigger an evaluation of

recertification Closely tied to risk-management Closely tied to business continuity Typically, obtaining an up-to-date inventory is

a challenge

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 149: NIST IT Standards for Local Governments 2010

149

Summary Need to have a sound process for

Create inventory Classification of systems inventory Update systems inventory Review systems inventory

Goal To provide assurance that systems that need

protection are identified Need to be able to understand where one

systems starts and where it ends

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 150: NIST IT Standards for Local Governments 2010

150

Inventory Is Central

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 151: NIST IT Standards for Local Governments 2010

151

Class Discussion: Inventory Due to timing restraints you have been asked

to complete the certification and accreditation for a system without a complete inventory. What can you do?

What are the risks of an inaccurate and out-of-date inventory?

It is a challenge to keep an accurate and up-to-date inventory. How would you ensure an accurate and up-to-date inventory?

What other processes suffer from an inaccurate and out-of-date inventory?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 152: NIST IT Standards for Local Governments 2010

Assessing Data Sensitivity and Criticality

Chapter 7

Page 153: NIST IT Standards for Local Governments 2010

153

Defining sensitivity The data is what dictates the sensitivity of the

system Not the value of the hardware Not the value of the software

Based on the following factor Confidentiality Availability Integrity

Not all data needs the same level of protection Different requirements based on factors

National defense – confidentiality Life safety – availability Financial – integrity

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 154: NIST IT Standards for Local Governments 2010

154

Data sensitivity and system sensitivity Sensitivity of the system is dictated by the

data sensitivity Data that is stored Data that is processed Data that is transmitted

Most systems have data at multiple levels Document all data types

The categorization is the worst case scenario (Impact)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 155: NIST IT Standards for Local Governments 2010

155

Sensitivity assessment process Confidentiality

Risk of disclosure Nation defense data Privacy data

Integrity Intentional or unintentional modification or

alteration Financial data

Availability Risk of destruction or denial of use Life safety data

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 156: NIST IT Standards for Local Governments 2010

156

Data classification approaches C & A will develop a formal data classification

schemes FIPS 199 is one example Example

Public – available to the masses Internal Use – available within the organization Restricted – information that needs to be safe-

guarded

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 157: NIST IT Standards for Local Governments 2010

157

Responsibility for data sensitivity assessment System owners often make the decision Must rely on the judgment of the data owner Close coordination between parties Ensure proper safeguards (controls,

countermeasures)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 158: NIST IT Standards for Local Governments 2010

158

Ranking data sensitivity Need to determine levels of sensitivity for each factor

and document it Example

Low Moderate High

Example Green Yellow Red

Example 1 2 3

Some things that may determine level:•Contractual•Regulatory•Legal•Operational

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 159: NIST IT Standards for Local Governments 2010

159

Criticality Criticality is not the same as

sensitivity Used to determine the controls,

like sensitivity Criticality is based on the whole

system Importance of the system to the

organization Often based on the amount of time

an organization can withstand Not solely based on availability

Sensitivity of that data Criticality of the system Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 160: NIST IT Standards for Local Governments 2010

160

Criticality assessment How important is the system to the

organization? How would it affect the ability of the

organization to complete its mission? Mission Critical

National security system Interest of national defense or foreign policy Debilitating impact to the mission of the

organization Non-Mission Critical

Does not meet the above 3 criteria May impact efficiency Can be done manually Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 161: NIST IT Standards for Local Governments 2010

161

Criticality in the view of the system owner System owners may overrate their systems Every system is not high criticality or mission

critical It is a matter of perspective Must be balanced

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 162: NIST IT Standards for Local Governments 2010

162

Ranking criticality What would be the financial impact to the

organization? Generally a dollar amount

What would be the effect on the operational effectiveness of the organization?

Is there a life safety impact of the system? What is the effect based upon the

breadth/scope of the system? Based on the fact that it is used widely in the

organization Rank

High, moderate, low Critical, noncritical Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 163: NIST IT Standards for Local Governments 2010

163

NIST SP 800-60

Data Type

Data Description Data

Sensitivity

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 164: NIST IT Standards for Local Governments 2010

164

Data Explanation (NIST SP 800-60)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 165: NIST IT Standards for Local Governments 2010

165

Document All Data Forms

Data Type Confidentiality

Integrity Availability

Personal Identity and Authentication

Moderate Moderate Moderate

Help Desk Services Low Low Low

Budget & Finance Moderate Moderate Low

Accounting Low Moderate Low

Space Operations Low High High

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 166: NIST IT Standards for Local Governments 2010

166

Changes in criticality and sensitivity Systems are not static Systems are dynamic A change in the system may change criticality A change in the data that is processed, stored

or transmitted on the system Review regularly – at least annually

Review triggered when inventory changes Review triggered by change management

If criticality changes, your controls will need to be reevaluated

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 167: NIST IT Standards for Local Governments 2010

167

Summary Criticality of the system Sensitivity of the data Both based on the importance to the

organization The criticality of the system and sensitivity of

the data helps us determine what controls will be used Defines requirements

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 168: NIST IT Standards for Local Governments 2010

168

Class Discussion: Sensitivity & Criticality After a system has completed accreditation it

is found out that a new data type has been added to the system. The sensitivity of the new data type has now changed the criticality of the system. How would you solve this problem so that it does not happen again?

Why expend different levels of effort in protecting systems? Why not treat all systems the same?

You need to determine the criticality of a new system. Who would you meet with to determine the criticality of the system?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 169: NIST IT Standards for Local Governments 2010

System Security Plan (SSP)

Chapter 8

Page 170: NIST IT Standards for Local Governments 2010

170

Paper Tiger?

GCN, February 2007, Reported a pair of security experts say FISMA is fundamentally flawed.

“FISMA wasn’t written badly, but the measuring system they are using is broken. What we measure now is, ‘Do you have a plan?’ Not whether the plan actually improves security. Too often, the plans do not improve security”

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 171: NIST IT Standards for Local Governments 2010

171

No Paper Tiger Avoid the danger of turning your security plan

into a bureaucratic ‘check the box’ Should be

Single reference for what needs to be secured Documents controls Support oversight, planning and budget Document compliance

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 172: NIST IT Standards for Local Governments 2010

172

Applicability System Security

Plans are required

Helps to implement needed controls

Documents how the controls are in place

NIST SP 800-18 Rev 1

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 173: NIST IT Standards for Local Governments 2010

173

Responsible for the Plan System Owner, is responsible for the plan Can delegate preparation of the plan Cannot delegate responsibility Should be familiar with the system Multiple people will contribute

Procedures should be in place outlining who reviews the plans, keeps the plan current, and follows up on planned security controls.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 174: NIST IT Standards for Local Governments 2010

174

Plan Contents System Description Description of Controls System Security Roles & Responsibilities External Requirements Information Categories Interconnectivity with the system Certification Level Plan Information

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 175: NIST IT Standards for Local Governments 2010

175

What SSP is not The System Security Plan is

not proof of the existence of controls

It is not a security procedures manual Cross reference procedures do

not duplicate them (Hyperlink and name and location of documentation)

Plan should not be lengthy and unusable

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 176: NIST IT Standards for Local Governments 2010

176

Plan initiation Can start at any time Generally started early Needs to be complete before an accreditation

decision is made

Plan Initiation

Plan Development

Plan Implementati

on

Plan Maintenance

Recertification or

Retirement

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 177: NIST IT Standards for Local Governments 2010

177

Information sources Information sources

Generally comes from existing documentation May need to develop from scratch

SSP development tools Automated systems Databases Document repositories Forms (may be web-based)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 178: NIST IT Standards for Local Governments 2010

178

Plan format Should be flexible There are a number of different forms

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 179: NIST IT Standards for Local Governments 2010

179

Plan approval Part of the certification and accreditation

package Signed by the person who prepared plan Approved by the system owner

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 180: NIST IT Standards for Local Governments 2010

180

Plan Maintenance Keep the plan up-to-date Don’t wait until recertification to update the

plan Review of the plan should occur prior to any

major change It has to be a living document May trigger a recertification

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 181: NIST IT Standards for Local Governments 2010

181

Plan specifics Plan Security

Sensitive information Limit to need to know Should be labeled

Plan Metrics Documented Plans Use of Defined Formats Approved Plans Consistent Plans Documented Implementation Planning

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 182: NIST IT Standards for Local Governments 2010

182

System Boundary Flexibility in determination

of the system Generally under the same

management control & usually locally group systems

May contain multiple components

System Security Plan will have diagrams showing the system boundary

Components adds clarity to system security plan

System 1

Component A

Component B

Component C

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 183: NIST IT Standards for Local Governments 2010

183 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 184: NIST IT Standards for Local Governments 2010

184

Baseline Security Controls

Selection of baseline security controls is based on system categorization

For this system you would select Moderate controls from NIST SP 800-53 Rev. 1 (High watermark)

Information Criteria Security Impact

Confidentiality Low / Moderate / High

Integrity Low / Moderate / High

Availability Low / Moderate / High

Based on: NIST SP 800-60 and FIPS Pub 199

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 185: NIST IT Standards for Local Governments 2010

185

Implementation Detail Control selection based on Risk Assessment Fully describe the how the control is

implemented Document differences with ‘components’ or

‘elements’ Compensating Controls Common Controls Hybrid Controls Tailored Controls

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 186: NIST IT Standards for Local Governments 2010

186

Component ExampleImplementation Detail: Component 1 (Network Devices)Control satisfied via the following: A configuration

management system retrieves a baseline configuration from all network devices and reports changes via a version control system. The checklist for installation includes a requirement to register new devices in the version control system. The system compares deltas in configurations and notifies technical staff about changes.

Component 2 (Workstations)Control satisfied via the workstation benchmark documentation

which records what has changed in the baseline. Agency Incident Response team performs vulnerability Scans on a regular basis. Information Technology Department reports changes system admin evaluates materiality.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 187: NIST IT Standards for Local Governments 2010

187

Compensating Controls

“Compensating security controls are the management, operational, or technical controls used by an agency in lieu of prescribed controls in the low, moderate, or high security control baselines, which provide equivalent or comparable protection for an information system.” Source: NIST SP 800-100 § 8.4.4

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 188: NIST IT Standards for Local Governments 2010

188

Compensating Controls

1

•Select controls from 800-53

2

•Complete and convincing rationale

3

•Assess and formally accept risk

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 189: NIST IT Standards for Local Governments 2010

189

Common Controls

1

•Agency has developed on documented common controls

2

•Agency has assigned responsibility of the common control

3

•Systems owners should be made aware

4

•Expert in the common control consulted

5

•Agency or Center Common Control

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 190: NIST IT Standards for Local Governments 2010

190

Common Control Example Implementation Detail: Common Control: Item (i) Control satisfied via

Security of Information Technology Policy, Chapter 19 – Identification and Authentication, and Chapter 20 – Logical Access Controls. Item(ii) defined by Common Access Controls Procedures for IT Systems Policy (when finalized).

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 191: NIST IT Standards for Local Governments 2010

191

Hybrid Controls A portion of the control is outside the control

or scope of the system owner For example physical security may be handled

at the gate and building level by guard service, while access to the computer room is handled by system staff.

Document what is done by whom Coordination between responsible parties

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 192: NIST IT Standards for Local Governments 2010

192

Hybrid Control ExamplePS-3 PERSONNEL SCREENINGControl: The organization screens individuals requiring access to

organizational information and information systems before authorizing access.

Implementation Detail:Center Hybrid Control; see System Owner action(s) needed Control is satisfied via the following: Guard Service Actions:All Center Level access is managed by Guard Service.  Human Resources Actions:Civil Servants and contractors are screened by Human Resources. System Owner Action: Access is not granted to users until screening by Guard Service and Human

Resources. No screening beyond what is provided by Guard Service and Human Resources.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 193: NIST IT Standards for Local Governments 2010

193

Scoping Guidance System security plans should clearly identify

which security controls used scoping guidance and include a description of the type of considerations that were made.

Reasons for tailored controls Assessment of risk Organization-specific security requirements Specific threat information Cost-benefit analyses Availability of compensating controls Special circumstances

Source: NIST SP 800-100 § 8.4.1 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 194: NIST IT Standards for Local Governments 2010

194

Scoping Guidance Example

PE-11 EMERGENCY POWER Control: The organization provides a short-

term uninterruptible power supply to facilitate an orderly shutdown of the information system in the event of a primary power source loss.

System consists of desktop computersCriteria Rating

Confidentiality

Moderate

Availability Low

Integrity Low

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 195: NIST IT Standards for Local Governments 2010

195

Scoping Guidance Example Implementation Detail: Control not implemented, applied scoping

guidance per NIST SP 800-53 rev.1 pages 18-20.

Desktop systems do not need uninterruptible power supply. Removing this control does not affect the security-relevant information within the system. System rated moderate for confidentiality and low for availability, control addresses availability not confidentiality. Systems with low availability do not require uninterruptible power supplies.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 196: NIST IT Standards for Local Governments 2010

196

Summary A single reference for documenting the

controls in place Documents current security posture of the

system Supports oversight and review Documents system boundaries Helps with planning and budget Integrates security into the system Does not mean the controls are in place

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 197: NIST IT Standards for Local Governments 2010

197

Class Discussion: System Security Plans Are your system security plans kept up-to-date?

How often are they updated? How would you ensure the system security plan

was keep up-to-date? How does your organization use common controls,

compensating controls, hybrid controls and tailored controls?

An auditor/assessor has come to you a number of times with questions about your control implementation detail. Is this an indication of something? If so, what?

How would you use components in a system security plan?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 198: NIST IT Standards for Local Governments 2010

Coordinating Security for Interconnected Systems

Chapter 9

Page 199: NIST IT Standards for Local Governments 2010

199

The solution How do you protect your organization’s data

when it is someone else's system? A formal agreement establishing

Required levels of protection Required reporting Time period

Called a memorandum of understanding (MOU) or memorandum of agreement (MOA)

Interconnection security agreement (ISA) supports the MOU/MOA – specifics

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 200: NIST IT Standards for Local Governments 2010

200

Agreements in the C & A process The purpose is to ensure

that all systems supporting an organizations data are accredited at the same levels

That systems outside the control of the system owner provide the same level of protection for the data

Supports the understanding of different system owners

Provides a level of assurance

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 201: NIST IT Standards for Local Governments 2010

201

Systems Interconnection

NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 202: NIST IT Standards for Local Governments 2010

202

Initiation Explicitly address the subject of

interconnecting information systems by Establishing formal agreements Specify the technical and security requirements of

the interconnection Define the responsibilities of the participating

organizations Specify the rules governing these interconnections Obtaining written management authority before

interconnecting information systemsOMB recommends that agencies use NIST SP 800-47 to ensure compliance for connections to non-agency systems.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 203: NIST IT Standards for Local Governments 2010

203

Communication between parties is ImportantNIST SP 800-100 Ensure that the interconnection is properly

maintained and that security controls remain effective;

Facilitate effective change management activities by making it easy for both sides to notify each other about planned system changes that could affect the interconnection; and

Enable prompt notification by both sides of security incidents and system disruptions and facilitate coordinated response, if necessary.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 204: NIST IT Standards for Local Governments 2010

204

Lifecycle management approach

Phase 1

• Planning the interconnection

• Establish joint planning team

• Define business case

• Perform C & A• Determine

interconnection requirements

• Document interconnection agreement (MOU/MOA)

• Approve or reject interconnection

Phase 2

• Establishing the interconnection

• Develop implementation plan

• Execute implementation plan

• Activate interconnection

Phase 3

• Maintaining the interconnection

• Maintain the equipment

• Manage users• Security

reviews• Analyze audit

logs• Report and

respond• Contingency

planning• Change

management• Maintain SSP

Phase 4

• Disconnecting the interconnection

• Phase out• Emergency• Restoration of

interconnection

NIST SP 800-47 details a four-phase “life-cycle management” approach for interconnecting information systems that emphasizes proper attention to information security

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 205: NIST IT Standards for Local Governments 2010

205

Sample MOU/MOA

NIST SP 800-100 Chapter 6 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 206: NIST IT Standards for Local Governments 2010

206

Sample ISA

NIST SP 800-100 Chapter 6 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 207: NIST IT Standards for Local Governments 2010

207

Time Issues Legal document that obligate the

organizations Ensure the agreements are executed before

the connections are made Provisions for prompt and timely notification

of security breach Provisions for actions if agreement has been

breached Provisions for cancellation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 208: NIST IT Standards for Local Governments 2010

208

Exceptions You do not need an agreement between a

Major Application and the GSS system Requirements may be in other documentation

Remote access is covered under rules of behavior Service-level agreement Maintenance agreements

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 209: NIST IT Standards for Local Governments 2010

209

Maintaining agreements Agreement must have

an ending date Must be reviewed during

recertification process Keep in touch with other

parties They may need a

change in the agreement

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 210: NIST IT Standards for Local Governments 2010

210

Summary Essential to provide assurance Formal understanding between system

owners Data moves from system to system and

security needs to be ensured Indirect control not direct control Documented MOU/MOA, ISA

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 211: NIST IT Standards for Local Governments 2010

211

Class Discussion: Interconnection Agreements An interconnection between your system and an

external system predates the accreditation of your system. What are some likely issues you will face in trying to implement an MOU/MOA on an existing connection?

How soon would you require notification from the owner of interconnected system after they have had an incident?

How often should you contact the system owner of an interconnected system?

You contact the system owner of an interconnected system. No one at that organization seems to be aware of the MOU/MOA. What do you do?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 212: NIST IT Standards for Local Governments 2010

Minimum Security Baselines and Best Practices

Chapter 10

Page 213: NIST IT Standards for Local Governments 2010

213

Levels of control

NIST SP 800-100 and NIST SP 800-53 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 214: NIST IT Standards for Local Governments 2010

214

Selecting baseline controls Minimum security baselines Based on business needs Must be realistic Must be based on risk (Don’t implement a

control for the sake of the control) Samples

ISO 17799 (27002) GASSP NIST SP 800-26 NIST SP 800-53

Sometimes called a “control catalog”

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 215: NIST IT Standards for Local Governments 2010

215

Use of the minimum security baseline set The idea is that the entire system will meet

these minimum controls May have more controls as business needs

and risks require If a control is not applicable, it should be

justified and documented (Risk analysis) Also should document if the control cannot be

implemented and risk it to be accepted, management sign-off

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 216: NIST IT Standards for Local Governments 2010

216

NIST 800-60

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 217: NIST IT Standards for Local Governments 2010

217

NIST SP 800-60

Data Type

Data Description Data

Sensitivity

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 218: NIST IT Standards for Local Governments 2010

218

Document All Data Forms

Data Type Confidentiality

Integrity Availability

Personal Identity and Authentication

Moderate Moderate Moderate

Help Desk Services Low Low Low

Budget & Finance Moderate Moderate Low

Accounting Low Moderate Low

Space Operations Low High High

High Watermark Moderate High High

Overall High Watermark High

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 219: NIST IT Standards for Local Governments 2010

219

NIST SP 800-60

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 220: NIST IT Standards for Local Governments 2010

220

Security Control Selection Process

NIST SP 800-53A Rev 2

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 221: NIST IT Standards for Local Governments 2010

221

Summary Have to have a place to

start Categorize the system

based on the data in the system

This helps you select a minimum set of security controls

Document and justify any deviations for the minimum security base line

Update security controls as needed Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 222: NIST IT Standards for Local Governments 2010

222

Class Discussion: Security Baseline A business unit manager does not understand

what a minimum security baseline is and why it is necessary. What do you tell them?

What reasons might you have for tailoring the security baseline?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 223: NIST IT Standards for Local Governments 2010

Assessing Risk

Chapter 11

Page 224: NIST IT Standards for Local Governments 2010

224

Background The principal goal of an organization’s risk-

management process is to protect the organization and its ability to perform its mission, not just its information assets.

Risk cannot be completely eliminated The purpose of risk-management is to

“balance the operational and economic costs of protective measures and achieve gains in mission capability” NIST SP 800-100

Cost benefit analysis

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 225: NIST IT Standards for Local Governments 2010

225

Risk assessment in C & A Support the proper selection of controls To make sure the controls “fit” (tailoring

controls) Ensure the controls selected are not excessive Based on realistic need for protection Cost-effective implementation Ensures controls are applicable Control Justification

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 226: NIST IT Standards for Local Governments 2010

226

Risk “Risk is a function of the likelihood of a given threat-

sources exercising a particular potential vulnerability, and the resulting impact of that adverse event on the organization.” NIST SP 800-30

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 227: NIST IT Standards for Local Governments 2010

227

Vulnerability

“Vulnerability: A flaw or weakness in system security procedures, design, implementation, or internal controls that could be exercised (accidentally triggered or intentionally exploited) and result in a security breach or a violation of the system’s security policy.” NIST SP 800-30

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 228: NIST IT Standards for Local Governments 2010

228

Threat and Threat-Source

“Threat: The potential for a threat-source to exercise (accidentally trigger or intentionally exploit) a specific vulnerability.” NIST SP 800-30

“Threat-Source: Either (1) intent and method targeted at the intentional exploitation of a vulnerability or (2) a situation and method that may accidentally trigger a vulnerability.” NIST SP 800-30

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 229: NIST IT Standards for Local Governments 2010

229

Risk Assessment

AssetV

uln

erab

ilit

y

Threat

Threat

Asset

Vu

lner

abil

ity

Cou

nte

rmeasu

re

•Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 230: NIST IT Standards for Local Governments 2010

230

Risk assessment process1. System

Characterization2. Threat Identification3. Vulnerability

Identification4. Control Analysis5. Likelihood

Determination6. Impact Analysis7. Risk Determination8. Control

Recommendation9. Results Document

NIST SP 800-30 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 231: NIST IT Standards for Local Governments 2010

231

Asset identification

Input

• Hardware• Software• System

interfaces• Data• People• Mission• Reputation

Output

• System boundary

• System functions

• Criticality• Sensitivity

System Characterization

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 232: NIST IT Standards for Local Governments 2010

232

Threat identification

Input

• History of attacks

• Intelligence• Media• Advisories

Output

• Threat statement

Threat Identification

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 233: NIST IT Standards for Local Governments 2010

233

Example Threats

NIST SP 800-30 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 234: NIST IT Standards for Local Governments 2010

234

Vulnerability assessment

Input

• Prior risk assessments

• Audit comments• Security test

results• Know

vulnerabilities

Output

• List of potential vulnerabilities

• Natural• Environmental• Man-made

Vulnerability Assessment

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 235: NIST IT Standards for Local Governments 2010

235

Control Analysis

Input

•Current controls

•Planned controls

Output

• List of current and planned controls

Control Analysis

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 236: NIST IT Standards for Local Governments 2010

236

Risk calculation

Input

• Threat-source motivation

• Threat capacity

• Nature of vulnerability

• Current controls

Output

• Rating

Likelihood Determination

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 237: NIST IT Standards for Local Governments 2010

237

Impact analysis

Input

• Mission impact analysis

• Asset criticality assessment

• Criticality• Sensitivity

Output

• Impact Rating

Impact Analysis

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 238: NIST IT Standards for Local Governments 2010

238

Risk calculation Low Medium High

Confidentiality Limited Serious Grave or Catastrophic

Integrity Limited Serious Grave or Catastrophic

Availability Limited Serious Grave or Catastrophic

NIST SP 800-30Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 239: NIST IT Standards for Local Governments 2010

239

Risk determination Risk determination combines the probability

(likelihood) of threat exploitation and the magnitude of impact

Determines if the controls are adequate

NIST SP 800-30

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 240: NIST IT Standards for Local Governments 2010

240

Safeguard identification Control Recommendations

What controls are needed to reduce risk to an acceptable level

Need more or fewer controls than the minimum security baseline

Consider the following factors Effectiveness of recommended options (e.g.,

system compatibility) Legislation and regulation Organizational policy Operational impact Safety and reliability

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 241: NIST IT Standards for Local Governments 2010

241

Residual Risk

NIST SP 800-30 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 242: NIST IT Standards for Local Governments 2010

242

Accepted or Unacceptable Risk

NIST SP 800-100 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 243: NIST IT Standards for Local Governments 2010

243

Documented risk assessment results “Once the risk assessment has been

completed (threat-sources and vulnerabilities identified, risks assessed, and recommended controls provided), the results should be documented in an official report or briefing. “ NIST SP 800-30

Helps senior management make an educated decision on risk acceptance

Management may wish to accept residual risk

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 244: NIST IT Standards for Local Governments 2010

244

NIS

T SP

800

-37

Rev

1 D

raft

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 245: NIST IT Standards for Local Governments 2010

245

Summary Risk assessment determines and/or verifies

requirements for a system A process to value assets Determine potential threats to those assets Determine potential weaknesses in system Determine the impact of a threat vulnerability

exploitation Determine what controls will reduce risk to an

acceptable level Acceptance of residual risk Document results

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 246: NIST IT Standards for Local Governments 2010

246

Class Discussion: Assessing Risk What is the objective of a risk assessment? Can we completely remove risk? An authorizing authority is having a difficult

time with the concept of residual risk. How would you explain it to him/her?

What information do we need in order to start the risk assessment?

How do you determine likelihood that threat-agent will exploit a vulnerability?

What is the benefit and the danger of using a risk assessment template?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 247: NIST IT Standards for Local Governments 2010

Security Procedures

Chapter 12

Page 248: NIST IT Standards for Local Governments 2010

248

Security Procedures Purpose

Procedure ensure that there is a uniform application (repeatable)

Provide users with instructions on “how to” Problems

Administrator may not follow because it is routine or take longer to complete a given task

Responsibility System owner should develop Administrators should consider them mandatory Disciplinary action for failure to follow

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 249: NIST IT Standards for Local Governments 2010

249

Procedures Procedure templates

Proactive development – used enterprise wide

Easy deployment Tailored for organizations

environment Procedure development

process What procedures are needed Write procedures Review procedures Implement procedures Review procedures Retire/Update

Needs analysis

Development

Review

Implement

Review

Retire / Update

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 250: NIST IT Standards for Local Governments 2010

250

Procedures Style

Concise – Don’t go overboard Easy to understand Modular fashion – easy navigation and updating Not in the System Security Plan

Formatting Need to be written not ‘ad hoc’ Date and revision Signed Bulleted lists Screen shots

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 251: NIST IT Standards for Local Governments 2010

251

Access Access

Procedures need to be available by those who need them when they need them

Stored in multiple locations and by means Paper and electronic

Maintenance Living documents, will need to change as the

system changes Built into the change management process May trigger an update or change to disaster

recovery processes Keep past versions

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 252: NIST IT Standards for Local Governments 2010

252

Procedures in the C & A process Establish process and requirements Should be documented in the System Security

Plan Failure to follow procedures increases risk Procedures are tested as a part of security

testing Weaknesses in procedure should be

documented and placed in remediation

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 253: NIST IT Standards for Local Governments 2010

253

Summary Procedures Describe the tasks to be done and how to do

them Adds constancy to the process Reference but not in the System Security Plan Easily accessible Clear and concise Updated as needed (Change management)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 254: NIST IT Standards for Local Governments 2010

254

Class Discussion: Procedures System administrators consistently ignore

procedures. What are some potential reasons for them not

following procedures? What would you do to ensure they follow

documented procedures? What type of procedures do you typically have

problems with?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 255: NIST IT Standards for Local Governments 2010

Certification Testing

Chapter 13

Page 256: NIST IT Standards for Local Governments 2010

256

Certification and Accreditation

“The security certification and accreditation process is designed to ensure that an information system will operate with the appropriate management review, that there is ongoing monitoring of security controls, and that reaccreditation occurs periodically.” NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 257: NIST IT Standards for Local Governments 2010

257

Scope Scope of the

certification should include the controls of the entire system being certified

Using the SSP the certification agent will start by reviewing the listed controls

May identify additional areas of weakness

“Security certification is a comprehensive assessment of the management, operational, and technical security controls in an information system, made in support of security accreditation, to determine the extent to which the controls are implemented correctly, operating as intended, and producing the desired outcome with respect to meeting the security requirements for the system. The results of a security certification are used to reassess the risks and update the system security plan, thus providing the factual basis for an authorizing official to render a security accreditation decision.” NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 258: NIST IT Standards for Local Governments 2010

258

Level of Effort Testing levels will be dictated by the

sensitivity of the data and criticality of the system.

Lower systems May allow for a self-assessment Checklist based

Higher systems Will require independent review Testing Sample sizes increase with risk

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 259: NIST IT Standards for Local Governments 2010

259

Independence The level of the system will dictate the level of

independence required Must be independent of the entire process,

especially the system owner Can use internal or external auditors Often use independent contractors There should be a level of review with the

auditors May use automated tools for testing such as

CAATs (Computer Aided Audit Tools)

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 260: NIST IT Standards for Local Governments 2010

260

Certification Process (NIST SP 800-37) Security Control Assessment

Prepare for Assessment Conduct Assessment Document Results

Security Certification Documentation Provide the certification findings &

recommendations Update the system security plan (SSP) Prepare the plan of actions and milestones

(POA&M) Assemble accreditation package

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 261: NIST IT Standards for Local Governments 2010

261

Security Control Assessment TasksTask 1“Assemble any documentation and supporting materials necessary for the assessment of the security controls in the information system; if these documents include previous assessments of security controls, review the findings, results, and evidence.”Task 2 “Select, or develop when needed, appropriate methods and procedures to assess the management, operational, and technical security controls in the information system.” Task 3 “Assess the management, operational, and technical security controls in the information system using methods and procedures selected or developed.” Task 4 “Prepare the final security assessment report.”

NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 262: NIST IT Standards for Local Governments 2010

262

Security Documentation TasksTask 1“Provide the information system owner with the security assessment report.”Task 2 “Update the system security plan (and risk assessment) based on the results of the security assessment and any modifications to the security controls in the information system.”Task 3 “Prepare the plan of action and milestones based on the results of the security assessment.”Task 4 “Assemble the final security accreditation package and submit to authorizing official.”

NIST SP 800-37

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 263: NIST IT Standards for Local Governments 2010

263

Changes with NIST SP 800-37 Rev 1 Draft

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 264: NIST IT Standards for Local Governments 2010

264

Changes with NIST SP 800-37 Rev 1 Draft Task 1: Identify and select the security control assessor(s)

and determine if the selected assessor(s) possess the required degree of independence for the assessment.

Task 2: Develop a plan to assess the security controls. Task 3: Review and approve the plan to assess the security

controls. Task 4: Obtain appropriate documentation, records,

artifacts, test results, and other materials needed to assess the security controls.

Task 5: Assess the security controls in accordance with the assessment procedures defined in the security assessment plan.

Task 6: Prepare the preliminary security assessment report documenting the issues, findings, and recommendations from the security control assessment.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 265: NIST IT Standards for Local Governments 2010

265

Changes with NIST SP 800-37 Rev 1 Draft Task 7: Review the preliminary security assessment report. Task 8: If necessary, conduct remediation actions based on the

preliminary security assessment report. Task 9: Assess the remediated security controls. Task 10: Update the security assessment report and prepare the

executive summary. Task 11: If necessary, prepare an addendum to the security

assessment report that reflects the initial results of the remediation actions taken and provides the information system owner or common control provider perspective on the assessment findings and recommendations.

Task 12: Update the security plan based on the findings and recommendations of the security assessment report and any remediation actions taken.

Task 13: Prepare the plan of action and milestones based on the findings and recommendations of the security assessment report.

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 266: NIST IT Standards for Local Governments 2010

266

Developing the test plan ST&E (Security Testing & Evaluation Procedures)

Aka: Audit approach Detailed description of the testing methodology

that will be used Will include the following

Scope Testing requirements Testing approach Tests to be used Timeline Responsibilities Test team Remediation plan, recommendations

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 267: NIST IT Standards for Local Governments 2010

267

The role of the host In order for the auditor to

finish on time he/she will need to have access to documents, systems and people

Delays in providing the auditor with needed items will slow the process

The host organization should ensure the auditor has what he/she needs in a timely fashion, preferably before they ask for it

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 268: NIST IT Standards for Local Governments 2010

268

Test execution Document the testing procedures Who conducted the test What was the results of the test Signed off by tester Reviewed by supervisor Rank findings by severity (not required but

useful) Provide interim results before final report No need to test controls that are not in place Documented so that another auditor with no

knowledge of the system can follow the findings

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 269: NIST IT Standards for Local Governments 2010

269

Documenting the results Executive report

Summary Geared for managers without the technical

background Detail report

Each control covered with either pass or fail Results of the test Reference Recommendations for remediation

See Appendix P in the text Also know as security assessment report

(SAR) Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 270: NIST IT Standards for Local Governments 2010

270

Summary Certification process needs

To be performed by professionals Level of independence depends on the level of the

system Should be well-planned Should be well-documented Should be a basis of remediation

Certification Provides assurance that the implemented controls

are functioning as expected “…to determine the extent to which the controls

are implemented correctly, operating as intended, and producing the desired outcome…” NIST SP 800-100 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 271: NIST IT Standards for Local Governments 2010

271

Class Discussion: Certification Testing What are some reasons why an auditor might

increase the amount of testing? What can you do to ease the audit /

assessment pains? Is an audit a adversarial process? What are some thing you would consider in

selecting an auditor? Why should auditors document what tests

they conducted and the results?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 272: NIST IT Standards for Local Governments 2010

Remediation Planning

Chapter 14

Page 273: NIST IT Standards for Local Governments 2010

273

Plan of Actions and Milestones (POA&M)

“The POA&M describes the measures that have been implemented or planned to correct any deficiencies noted during the assessment of the security controls and to reduce or eliminate known system vulnerabilities.” NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 274: NIST IT Standards for Local Governments 2010

274

Remediation plan Applicability of the remediation plan

Not needed if the certification process found all controls in place and working as expected

The remediation plan is a list of items that need to be done to correct those deficiencies

Responsibility System owners have ultimate responsibility May assign authority to remediate to others such

as ISSO Cannot transfer responsibility, accountability

remains with the system owner You can transfer authority not responsibility

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 275: NIST IT Standards for Local Governments 2010

275

Risk remediation plan Risk remediation plan scope

Should include all vulnerabilities detected Should also include vulnerabilities that the risk is

likely to be accepted Plan Format

At a minimum it should include A weakness A fix A milestone (date) Responsible person

Optional inclusion Cross-referencing numbering Risk ranking

See Appendix Q in the text for a sample Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 276: NIST IT Standards for Local Governments 2010

276

The plan Using the plan

It is a living document and may need regular updates Measure progress

When to create the plan Don’t wait for the certification As soon as a vulnerability is found, add it Append additional as needed It will be in a continuous state of update Should not be excessively detailed It will be in close relationship with the CPIC (Capital

Planning and Investment Control) Risk mitigation meetings

Ongoing like the plan

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 277: NIST IT Standards for Local Governments 2010

277

Summary The plan lays out what needs to be corrected Ensure that vulnerabilities are not forgotten Used to track corrections Ensures proper documentation of remediation

efforts

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 278: NIST IT Standards for Local Governments 2010

278

Class Discussion: Remediation Plan What is the purpose of the remediation plan? You have a limited budget and cannot afford

to remediate all the missing controls. How do you select which controls to remediate? Do you complete all the inexpensive ‘low hanging

fruit’ or do you tackle fewer, more expensive high impact controls?

Which way is risk-based? Why do auditors want to see you past

remediation plans?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 279: NIST IT Standards for Local Governments 2010

Essential C & A Documentation

Chapter 15

Page 280: NIST IT Standards for Local Governments 2010

280

Authority CISO will determine the minimum

requirements for the C & A package The package is everything that is submitted

for Accreditation System owner compiles the package for

review Authorizing official reviews for accreditation

NIST SP 800-100Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 281: NIST IT Standards for Local Governments 2010

281

Certification package contents At minimum

Approved System Security Plan (SSP) Risk assessment Security assessment report (certification test

results) Plan of Actions and Milestones (POA&M)

remediation plan Take a minimalist point of view

Avoid becoming a paper exercise Exclude unnecessary

NIST SP 800-100Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 282: NIST IT Standards for Local Governments 2010

282

Additional documents The certification statement

Statement, at a high level, the results of the certification test

Prepared by the certifying agent Transmittal Letter

Coversheet for the entire package Concise Who prepared the package Why it was prepared Who it goes to What is to be done Contains

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 283: NIST IT Standards for Local Governments 2010

283

Administration A copy will be submitted to the Accrediting

Authority System owner should maintain a copy Central repository is an excellent idea Label the package with appropriate

categorization level E.g. Unclassified but Sensitive

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 284: NIST IT Standards for Local Governments 2010

284

Summary Documents included depend on the need of

the authorizing official Approving authority can require all controls to

be in place before authorizing operation Documents showing that management has

exercised due diligence The C & A package is designed to provide the

authorizing official with the necessary information to make an informed decision

Should not overwhelm the authorizing official

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 285: NIST IT Standards for Local Governments 2010

285

Class Discussion: Documentation If you were an authorizing authority, what

documentation would you like to see before you made a decision on a system?

An authorizing authority does not have questions about the accreditation package, what might this indicate?

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 286: NIST IT Standards for Local Governments 2010

Documenting the Accreditation Decision

Chapter 16

Page 287: NIST IT Standards for Local Governments 2010

287

The accrediting authority The accreditation letter

fixes responsibility for the operation of the system

It established accountability for system operation

Accrediting Authority owns the business process not the system

No system should go into production that has not been accredited

“By accrediting an information system, an agency official accepts the risks associated with operating the system and the associated implications on agency operations, agency assets, or agency individuals. Completing a security accreditation ensures that an information system will be operated with appropriate management review, that there is ongoing monitoring of security controls, and that reaccreditation occurs periodically in accordance with federal or agency policy and whenever there is a significant change to the system or its operational environment.”NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 288: NIST IT Standards for Local Governments 2010

288

The Accreditation letter Also known as “Authorization

to operate” Should clearly reflect the

stipulations of the authorizing official

Are there any conditions which are excluded

Generally limited to a 3 year life span

Must understand personal consequences

Must understand operational consequences

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 289: NIST IT Standards for Local Governments 2010

289

Conditional and interim accreditation Full accreditation may not be possible Conditional or interim may be used Conditional would state that system could

operate under certain circumstances Only if certain controls are in place Interim is often used when the system needs

to be in place and functional for business reasons and still lacks all the necessary controls

Usually has an expiration date

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 290: NIST IT Standards for Local Governments 2010

290

Designation of approval authorities Organization must

designate who the approval authorities will be

Must be senior officials Must be able to commit

resources to the system (budget authority)

Each organization will have multiple approving authorities, usually by business unit or department

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 291: NIST IT Standards for Local Governments 2010

291

Approving authority qualifications Budget authority Qualities

Integrity Competence Common sense Involvement Initiative

Entrusted position with substantial authority

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 292: NIST IT Standards for Local Governments 2010

292

Accreditation decision process Submission of package

by system owner to the authorizing official

Package should be complete

Timing is important System owner should

follow up until the authorization is finalized

System owner should remediate any open issues promptly

“To ensure that the agency's business and operational needs are fully considered, the authorizing official should meet with the system owner prior to issuing the security accreditation decision. In this meeting, the certification and accreditation authorities should clearly explain the rationale for their risk-based decision and, where appropriate, fully explain the terms and conditions of the authorization.”NIST SP 800-100

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 293: NIST IT Standards for Local Governments 2010

293

Actions following accreditation System owner needs

to track any corrective actions

Update the approving authority as needed

Changes in the environment may impact the security controls

Recertification

The Continuous Monitoring phase is an essential component in any security program. During this phase, the status of the security controls in the information system are checked on an ongoing basis. … At a minimum, an effective monitoring program requires the following: •Configuration management and configuration control processes for the information system; •Security impact analyses on changes to the information system; and •Assessment of selected security controls in the information system and reporting of information system security status to appropriate agency officials. Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 294: NIST IT Standards for Local Governments 2010

294

Summary The final event? Ongoing process! Approval for senior management to operate

the system Fixed responsibility and accountability Authorization official may have had little or no

interaction with the process up until this point Should not delegate this process This process demonstrates due care has been

exercised Establishes accountability

Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 295: NIST IT Standards for Local Governments 2010

295

Class Discussion: Accreditation Decision Can an authorizing official sign an

accreditation letter before the system has been certified?

A signed accreditation letter demonstrates what?

What types of conditions might an AO have with an authorization to operate?

Why have a time period on conditional or interim authorization to operate?Why should the system owner and AO meet before the accreditation letter is signed?

Why is it a good idea to have the business unit manager or information owner as the AO?Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 296: NIST IT Standards for Local Governments 2010

Additional Information

Tips & Tricks

Page 297: NIST IT Standards for Local Governments 2010

297

Each part of the process has a NIST Document

NIST SP 800-100 Chapter 10 Rev 4 (Jan 2010)© 2010 Maze & Associates

Page 298: NIST IT Standards for Local Governments 2010

298

Key NIST DocumentsDocument Remember

NIST SP 800-37 C & A program, overall process, guidelines

FIPS 199 Standard to define criticality / sensitivity

NIST SP 800-60 Guideline to define criticality / sensitivity

FIPS 200 Standard to select controls

NIST SP 800-53 Guidelines to selecting controls, control catalog

NIST SP 800-53A Guidelines for assessing controls, audit

NIST SP 800-30 Risk Assessment guidelines

NIST SP 800-18 Guidelines for System Security Plans

NIST SP 800-64 Guidelines for Security and SDLC

NIST SP 800-70 Security Configuration Checklist Program

NIST SP 800-47 Guideline for System Interconnections (MOU/MOA)

NIST SP 800-34 Contingency Planning Guide

NIST SP 800-61 Computer Security Incident Handling Guide Rev 4 (Jan 2010)© 2010 Maze & Associates