nlc - the next linear collider project nlc program overview d. l. burke nlc machine advisory...

Download NLC - The Next Linear Collider Project NLC Program Overview D. L. Burke NLC Machine Advisory Committee Fermilab May 2002

If you can't read please download the document

Upload: margaret-cross

Post on 08-Jan-2018

232 views

Category:

Documents


0 download

DESCRIPTION

NLC - The Next Linear Collider Project NLC Overview – May 2002D. L. Burke Project Model There is a Project Model – HEPAP “On Shore”: International Collaboration Integration of Existing HEP Resources – Lab and University Infrastructures and People New Money Examples (in $B): TPCInternationalExistingNew … with a project start “sometime around 2005”.

TRANSCRIPT

NLC - The Next Linear Collider Project NLC Program Overview D. L. Burke NLC Machine Advisory Committee Fermilab May 2002 NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Mission Need The need for a linear collider to study particle physics at the TeV energy scale has been firmly stated ACFA, ECFA, and HEPAP (Snowmass ). There is a clear definition of the mission requirements: Start at 500 GeV, but technology must be able to reach a TeV. Luminosity in excess of cm -2 s -1. Physics studies emphasize accumulation of fb -1. (Note: 10 7 seconds cm -2 s -1 300 fb -1.) Global coordination is being put into place: International Steering Committee initiated by ICFA to coordinate global LC activities. Regional Steering Committees to coordinate regional LC activities. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Project Model There is a Project Model HEPAP On Shore: International Collaboration Integration of Existing HEP Resources Lab and University Infrastructures and People New Money Examples (in $B): TPCInternationalExistingNew with a project start sometime around 2005. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke A TeV Linear Collider Two candidates left for a TeV-scale linear collider --- TESLA and NLC/JLC. Completion of 8-Pack test at NLCTA with high-gradient (1 TeV) structures in 2003 with operations in Completion of the first high-gradient (800 GeV) cryo-module in 2003 with operations at TTF-II in TESLA NLC/JLC LC02 (Feb 2002) NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke The 8-Pack The prototype NLC rf system optimized for 1 TeV cms Phase-I.A Single-Feed in Demonstrate rf power suitable for one girder of structures. Test facility for rf power system to run independently of the high-gradient structure testing. Phase-II.Complete 8-Pack in Demonstrate full power source with DLDS feeding high-gradient structures. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke NLC Single Feed (5.4 m of Accelerator) NLC 1 TeV Main Linac RF System (Snowmass Baseline) NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke NLC Solid-State Induction Modulator Klystron 8-Pack Artists Rendition NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke X-Band Power Sources Water Load 500 kV 4-Dog Solid-State Modulator 75XP3 PPM Klystron Two tubes under test with parts in hand for a third. Task-force approach to delivery for 8-Pack. deLamare and Caryotakis. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke 8-Pack Phase-I 2 Klystrons each with 75 MW for 2.4 secs Dual-Mode SLED-II Single-Feed Test Section 600 MW for 400 nsec Completed at the end of calendar 2002 to demonstrate dual-mode capability and test DLDS components in Cross-Potent (Cold Test Model) Schultz, Tantawi, Atkinson NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke 8-Pack Phase-II Operations in summer Space in the NLCTA for two sets (2 5.4 m) of structures. Solyak The critical test is to launch power into the longer waveguide with no recovery. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke High Gradient - Observations and Attack Observations of Gradient Limitations MV/m Historic single-cell tests MV/mEarly short high-Q test structures (with low-power sources) MV/mLong 1.8 m NLC structures at the NLCTA. Limit realized following extensive 24/7 running of the NLCTA at high gradient. Aggressive R&D Program Focus on completed structures tested at NLCTA with substantial exposures. Broad attack on the problem Theory and Modeling Accelerator Design Manufacture and Q/C Operations NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke High Gradient Test Structures (Partial List for Past 18 Months) Test Structure L (m)V g (% c) Maximum Gradient a Operation b DDS T105VG T53VG T53VG (NLC Spec) T53VG3RA (NLC Spec) (a)Unloaded gradient (MV/m) used during processing. (b)Unloaded gradient (MV/m) at which cells operate satisfactorily. 5000 hours of high-power operation of the NLCTA. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Work Left To Do Performance still dominated by input and output rf couplers Structure T53VG3RA with adaptive input waveguide did not solve this problem, and it processed more slowly than T53VG3 (etch-cleaning and vacuum firing were different). Incorporate proven wake-field control the H series. Iris size Detuning, then damping Distribution of Breakdowns (70 MV/m, 400 ns, 10 hr run) InputOutput58 Cells T53VG3 Wakefield Measurements and Theory RDDS1 NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke RF Input Autopsy of T53VG3 Input Coupler SEM Photographs Looking Upstream Matching Aperture NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Structure R&D Table StructuresFeatures May-AugSept-DecJan-April Status H60VG3NLC Aperturesxxxxxxxx Installation H90VG5 and Detuningxxxxxxxx SW565 (pair)Standing Wavexxxxxxxx Installation T53VG3MCMode-Coupler xxx Fabrication H60VG3ILTIn-Line-Taperxxxxxxxx Fabrication (KEK) H90VG3ILT Couplerxxxxxxxx - ILT in Design FXB-001Fermilab H60VG3xxxxxxxx Fabrication H60DDSaNLC Damped-Detuned Pairxxxxxxxx Design H60DDSb with MC or ILT Couplerxxxxxxxx Design FXB-002/003Fermilab with MC or ILTxxxxxxxx Design NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke We are not home with this problem. We have manufactured test structures with cells that reach the design goal of 70 MV/m for a TeV collider but there are still issues to resolve in their manufacture and final design. Structures with NLC apertures and wakefield detuning are being installed. Excessive pulsed-heating has been identified as a potential source of breakdowns and damage in couplers - designs with substantially reduced fields and heating Mode Converter and In-Line Taper. Sources of variation in manufacture that need better control have been identified. An aggressive program of design, fabrication, and testing of structures will continue with the highest priority. High-Gradient R&D Summary Adolphsen NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke High Gradient 8-Pack Structures H Test Series . Produce 5.4 m of H Structures HDDS Test Series Produce 5.4 m of HDDS Structures Calendar Pack Civil and Infrastructure Phase-I Commission 4-Dog Modulator Produce 2 Klystrons . SLED-II and DLDS Component Tests Phase-II Construct 8-Pack Modulator Produce 8 Klystrons .. Produce DLDS Long Arm Full System Tests . Produce DLDS Short-Arm NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke The Past Three Years We laid out a three-year plan in 1999 for DOE review. That plan was strongly endorsed by a Lehman Committee, and we have largely followed that plan on a schedule limited by funding: Focus has been kept on critical issues identified in The 8-Pack is underway, and is aimed at an important milestone (the "Single-Feed Test") in 2003, and full tests in Limits on gradients in accelerator structures were unanticipated in We have resolved many of the critical issues identified in We understand the plans and needs of the 8-Pack. We have demonstrated that TeV NLC-spec gradients can be achieved, but have work left to do to build TeV NLC-spec accelerator structures. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke For the MAC We are reviewing the overall NLC R&D plan in light of the Presidents FY03 budget proposal. From the last MAC Report the NLC Collaboration is in a serious dilemma because of funding (in FY02) the question of how to proceed in R&D is reduced to prioritizing existing programs, a rescoping of these programs, and a redefinition of what is needed The Presidents FY03 budget for NLC R&D is the same as FY02. We are once again rescoping our programs and seek your advice. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke NLC Program Planning Goal:Complete conceptual design in 2004 with R&D that is needed to support a technology choice and start of project engineering. The process of forming an international project is not clear, so we are not including effort needed to write a CDR. But evaluations of cost and schedule are important. Budget Assumptions: FY03 will be the same as FY02. There will be growth in FY04 and beyond. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke First Priorities The 8-Pack is our highest priority. Even without increased resources in FY03, we will carry out aggressive R&D on structure gradients and complete the 8-Pack. The remaining program will be squeezed to fit this goal. The 8-Pack is an R&D project with substantial technical risk. The schedule is success-oriented and the critical path has little or no float. We are working to identify where contingency resources could help assure the timely completion of Phase-I and Phase-II. Assigning contingency dollars to the 8-Pack will require further reduction in other efforts, but it is our first priority for remaining funds. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Priorities for Remaining R&D R&D Aimed at Demonstrating Capability to Produce Luminosity IP Girder Prototype Stabilization of nm beams. Goal is a full-sized, but not full-function, prototype in We can do this, and it is our highest priority after the 8-Pack. Damping Ring R&D ATF and ALS experiments and continued analytical evaluation. Very important and does not use much discretionary cash. Linac Girder Studies Limit to studies of cultural drift and vibration e.g. water flow. Would like to build a full-function prototype, but will delay. Other Topics with Lower Priority (Effort will depend on offsets from elsewhere.) Site Investigations California and Illinois. Ground motion and cost analysis. Opportunistic use of data created elsewhere e.g. NUMI. Sources Electron polarization achieved but continue to study cathodes. Study undulator and laser based e + sources. TESLA collab? X-Band RF at Fermilab Non-NLC uses, structure tests, and prep for ETF. Generic R&D? Raubenheimer and other speakers. NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Halted or Not Started Hardware Development Source Laser, RF Deflectors, and Target Prototypes (Baseline Design) Except Completion of Liquid-Metal Studies at BINP. Damping Ring RF, Vacuum, Magnets, and Kickers Component Supports Stability and Control Except IP Girder and Machine-Environment Studies Beam Instrumentation Except to support NLCTA, 8-Pack, and ATF. Alternate X-Band RF Components and Systems LINX and Beam Collimation Except Keep-Alive for SLC Arcs and Final Focus Engineering and Design Systems and Value Engineering Reliability and Operations Active Site and Environmental Studies NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Increasing Effort MOU with Brookhaven National Laboratory A very welcomed addition. Strengthening Collaboration with KEK RF Technology. ATF. Site Requirements and Options. Cost Information. Cornell Initiative and Outreach to Universities International Focus ILC-TRC Himel Phinney NLC - The Next Linear Collider Project NLC Overview May 2002D. L. Burke Outlook We have pursued a broad range of work over the past three years to bring the design and technologies of the entire machine under control. We are putting together the 8-Pack prototype of the rf system capable of reaching 1 TeV cms energy. Our goal had been operations in FY03. We are severely limited by available resources. Budgets in FY00, FY01, and FY02 fell below our hopes in We could have spent 30 M$ (combined U.S. labs) in FY02. Completion of the 8-Pack will slip into FY04. The 8-Pack is squeezing the remainder of the NLC R&D program only the most essential pieces will move ahead.