Client Trevi S.p.a. Software 1 x Easy Drill Guide 1 x Easy Design Instruments 1 x Radio Modem 1 x Inclinometer 1 x Computer JLT Rugger GPS System 1 x Rover Receiver GPS GS5M-20 Hz double antenna GNSS 1 x GPS 1200 Reference Base Target Guarantee minimal project tolerance during pillars posi- tioning for ground consolidation. Planning Elements Complete independents from specialized personnel for stakes control Reduction of MAST positioning times during drilling points alignment. Elimination of stakes translation due to terrain upheaval from concrete injections. Memorization of realized job and report creation on workflow and productivity rates. Personnel reduction inside the construction site. Benefits Ground Strengthening to secure excavation procedures Commission Location Scavalco work is placed between the Florence-Castello train station and Firenze-Rifredi station and is done with a box-shaped artifact, partially underground, realized with two -arched gateway where will be placed the new high-speed rails. Inside this important work area is planned a rails ramification to arrive in Santa Maria Novella station with HS (High Speed) and High Capacity trains. TREVI S.p.a. Is responsible to ensure a strengthen ground with adequate geometrical and mechanical characteristics such that excavation can be performed in total security agains induced superficial subsiding and interference between the two digging areas. Turbojet system counts to cut, desegregate and then soil mixing through the combined action of a mechanical and hydraulic energy provided by a geometrical known utensil and high pressured water or cement mixture. Diameter is fixed during project phase through utensil dimensions. The utensil has been arranged for the use of more nozzles, located on the beam’s tip and sideway or on utensil blade. Construction site project data Plot 1 “scavalco”: Operation is done at the outside end of cutter machineries, where covering was only 6 meters from ground level. The difficulty was emphasized by the fact that construction area is nearby the operating train rails and from the necessity to create column with different length, thereby the use of Leica’s GPS solution was fundamental to memorize position with ground movements due to perforations. Column N.: 2700 Diameter: 1m Length : 6m-19m Total Length treatments : 40000 liner-meters Rmin = 5Mpa “SCAVALCO” Lotto 1 Zona Rifredi NODOVIA - PLOT 1 “SCAVALCO” - T.A.V. - Florence. Italy

Upload: emilio-palchetti

Post on 08-Apr-2016

213 views

Category:

Documents


3 download

DESCRIPTION

EASYDRILL SOLUTION HIGH SPEED RAIL

TRANSCRIPT

NODAVIA - LOTTO 1 “SCAVALCO” – T.A.V. -Firenze, Italia

Client

•Trevi S.p.a.

Software• 1 x Easy Drill Guide• 1 x Easy Design

Instruments• 1 x Radio Modem• 1 x Inclinometer• 1 x Computer JLT Rugger

GPS System• 1 x Rover Receiver GPS GS5M-20 Hz double antenna

GNSS• 1 x GPS 1200 Reference Base

Target• Guarantee minimal project tolerance during pillars posi-

tioning for ground consolidation.

Planning Elements

• Complete independents from specialized personnel for stakes control

• Reduction of MAST positioning times during drilling points alignment.

• Elimination of stakes translation due to terrain upheaval from concrete injections.

• Memorization of realized job and report creation on workflow and productivity rates.

• Personnel reduction inside the construction site.

Benefits

Ground Strengthening to secure excavation procedures

Commission

Location

Scavalco work is placed between the Florence-Castello train station and Firenze-Rifredi station and is done with a box-shaped artifact, partially underground, realized with two -arched gateway where will be placed the new high-speed rails. Inside this important work area is planned a rails ramification to arrive in Santa Maria Novella station with HS (High Speed) and High Capacity trains.TREVI S.p.a. Is responsible to ensure a strengthen ground with adequate geometrical and mechanical characteristics such that excavation can be performed in total security agains induced superficial subsiding and interference between the two digging areas.Turbojet system counts to cut, desegregate and then soil mixing through the combined action of a mechanical and hydraulic energy provided by a geometrical known utensil and high pressured water or cement mixture. Diameter is fixed during project phase through utensil dimensions.The utensil has been arranged for the use of more nozzles, located on the beam’s tip and sideway or on utensil blade.

Construction site project data Plot 1 “scavalco”: Operation is done at the outside end of cutter machineries, where covering was only 6 meters from ground level.The difficulty was emphasized by the fact that construction area is nearby the operating train rails and from the necessity to create column with different length, thereby the use of Leica’s GPS solution was fundamental to memorize position with ground movements due to perforations. Column N.: 2700Diameter: 1mLength : 6m-19mTotal Length treatments : 40000 liner-metersRmin = 5Mpa

“SCAVALCO” Lotto 1Zona Rifredi

NODOVIA - PLOT 1 “SCAVALCO” - T.A.V. - Florence. Italy