norshor arts center historic renovation - details

7
Attachment A For Local Governments Requesting a 2014 Capital Appropriation I. Project Basics 1) Name: City of Duluth (Duluth Economic Development Authority). 2) Project title: NorShor Arts Center Historic Renovation 3) Project priority number: 1 of 2. 4) Project location : City of Duluth; St. Louis County 5) Ownership and Operation: Who will own the facility: Duluth Economic Development Authority (DEDA). Who will operate the facility: Duluth Playhouse (private, non-profit) Names of any private entities that will occupy/use any portion of the building: The Theatre will be used by a number of private, non-profit arts organizations. 6) Project contact person (name, phone number and email address): Christopher Eng Duluth Economic Development Authority Phone: (218) 730-5322 E-mail: [email protected] II. Project Description 7) Description and Rationale: Provide a brief project description and rationale (one page maximum). This request is for $6,950,000 in state bond funding to complete renovations to the NorShor Arts Center – the historic NorShor Theatre, Annex and Temple Opera Buildings in Downtown Duluth. The funding will be used to design, construct, furnish and equip improvements to the existing buildings located on East Superior Street in Duluth, Minnesota and St. Louis County. The project will provide a first-class, community-based arts center with live theatre performances, classroom, rehearsal, scene-shop, and gallery space which will serve the City of Duluth and surrounding region. The redevelopment will house a 750 seat theatre which will be used by a number of local and regional arts organizations. The state bond proceeds will be used specifically to facilitate skywalk and handicapped accessibility and provide public access to the newly renovated NorShor Arts Center. 8) Square Footage. The project will involve the renovation of approximately 65,000 square feet of space at the NorShor Theatre, Annex and Temple Opera Building. Page 242

Upload: senatedfl

Post on 12-May-2017

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NorShor Arts Center Historic Renovation - Details

Attachment A

For Local Governments Requesting a 2014 Capital Appropriation

I. Project Basics

1) Name: City of Duluth (Duluth Economic Development Authority).

2) Project title: NorShor Arts Center Historic Renovation

3) Project priority number: 1 of 2.

4) Project location : City of Duluth; St. Louis County

5) Ownership and Operation:

Who will own the facility: Duluth Economic Development Authority (DEDA).

Who will operate the facility: Duluth Playhouse (private, non-profit)

Names of any private entities that will occupy/use any portion of the building: The

Theatre will be used by a number of private, non-profit arts organizations.

6) Project contact person (name, phone number and email address):

Christopher Eng Duluth Economic Development Authority Phone: (218) 730-5322 E-mail: [email protected]

II. Project Description

7) Description and Rationale: Provide a brief project description and rationale (one page maximum).

This request is for $6,950,000 in state bond funding to complete renovations to the NorShor Arts Center – the historic NorShor Theatre, Annex and Temple Opera Buildings in Downtown Duluth. The funding will be used to design, construct, furnish and equip improvements to the existing buildings located on East Superior Street in Duluth, Minnesota and St. Louis County. The project will provide a first-class, community-based arts center with live theatre performances, classroom, rehearsal, scene-shop, and gallery space which will serve the City of Duluth and surrounding region. The redevelopment will house a 750 seat theatre which will be used by a number of local and regional arts organizations. The state bond proceeds will be used specifically to facilitate skywalk and handicapped accessibility and provide public access to the newly renovated NorShor Arts Center.

8) Square Footage. The project will involve the renovation of approximately 65,000 square feet

of space at the NorShor Theatre, Annex and Temple Opera Building.

Page 242

Page 2: NorShor Arts Center Historic Renovation - Details

III. Project Financing Do the project cost estimates below include inflation (see question 10 below)? X Yes No

Sources of Funds Dollars in Thousands

Prior Years

For 2014

For 2016

For 2018

Total

State GO Bonds Requested 6,950 6,950 Funds Already Committed State Funds 2,300@ 2,300 City Funds 1,600 County Funds Other Local Government Funds Federal Funds 7,500@@ 7,500 Non-Governmental Funds 4,000 4,000 Pending Contributions City Funds County Funds Other Local Government Funds Federal Funds Non-Governmental Funds l

TOTAL* 22,350 22,350

@ State Historic Preservation Tax Credits and State Legacy Grants @@Federal New Market Tax Credits, Federal Historic Preservation Tax Credits Uses of Funds Dollars in Thousands

Prior Years

For 2014

For 2016

For 2018

Total

Land Acquisition Predesign (required for projects over $1.5 M) 750 750 Design (including construction administration) 800 800 Project Management 1,200 1,200 Construction 17,100 17,100 Furniture/Fixtures/Equipment 2,500 2,500 Relocation (not bond-eligible)

TOTAL* 750 21,600 22,350

* Totals must be the same.

Page 243

Page 3: NorShor Arts Center Historic Renovation - Details

IV. Other Project Information

10) Project schedule. Anticipated Start Date: October 1, 2014

Anticipated Occupancy date: November 1, 2015

(For facilities projects, this information will also be used to calculate an inflation cost, using the Building Projects Inflation Schedule posted on the Minnesota Management and Budget website.

11) Predesign. For projects with a total construction cost of $1.5 million or more:

Has a project predesign been completed? X Yes No

If so, has the predesign been submitted to the Commissioner of Administration?

Yes X No

12) State operating subsidies. There is no request for state operating dollars. 13) Sustainable building guidelines.

The NorShor project will meet or exceed the State of Minnesota’s Sustainable Building Guidelines as apart of the total restoration of this historic theatre. This project will not be able to meet a LEED Silver status, but will adopt many of the design concepts for the heating, cooling, roof, insulation, and lighting for the entire project.

14) Sustainable building designs.

As part of this historic restoration, our design team has looked at the most efficient systems for both energy consumption and life of the units. New state of the art lighting using the most energy efficient technology has been incorporated into the design. Green materials have been selected for the carpet, paint, and wallpaper. We have specified water saving fixtures for bathrooms and bar areas.

15) Resolution of support and priority designation. Has the governing body of the applicant

passed a resolution of support (which indicates the project’s priority number if the applicant is submitting multiple requests)? Yes X No

The City Administration and City Council will develop and approve a formal Resolution in support of the City’s state legislative priorities in the closing months of each year – in advance of the next State Legislative Session. The Duluth Economic Development Authority will be considering a Resolution of its own regarding support for the NorShor Arts Center renovation project at its October meeting.

Legislation was introduced during the 2013 Session – H.F. 794 (Huntley)/S.F. 1352 (Reinert) – seeking state general obligation bond proceeds for this project. The funding requested in this submission to MMB is consistent with the legislation introduced during this past Legislative Session.

Page 244

Page 4: NorShor Arts Center Historic Renovation - Details

Sherman Associates 233 Park Avenue Soulh

MMeapols.- 55415

NorShor Theatre Renovaton

211 E. Supei1orStreet DuMh, MN 55802

PRELIMINARY 8-2-13

NOT FOR CONSTRUCTION

LOCATION KEY

"" I'"'

"'"' ............ I HEREBY CERTfY THAT nas PlAH. SPECFICiJlOH, OR A£PCRT WAS PAEPARED BY llE OR LtaR llY OtR£Cr SlffJMSIOH A>ll MT I >J.l A OULY UCEHSED NIClflECT UNDO THE IRIS Of 1!£ SllJ[ OF MINNESOTA

ARCHITECT· EXTERIOR &SKYWALK STRUCTURAL ENGMER· SKYWALK

t t East &4>erior street. .... 340 °'*"'1.MN56802 2t8.n4.8578 tkda.com

ARCHITECT· THEATRE MECHANICAL ENGINEER· THEATRE & SKYWAl..K ELECTRICAL ENGINEER· THEATRE & SKYWAl..K AV ANO THEATRICAL DESIGN

1422 Eucld Avenue; SUie 300

]

First Floor Plan (Auditorium) Annex

NorShor

~SquateWestlake <loYetand. Ohio 44115

Reed T2tlS.522.1350

Laskosky F 211.522.1357 \YWW.WRLdesign.com

0 Wesdake Reed Laskosky

STRUCTURAL ENGINEER · THEATI<E

A~ NorthlandT_L --.- u.P. 102Scdt2111Al'LWeM.~MN55801 M211-nN5195.(F)Z11-n1-1T11

OESKMD joo..w 1­FIRST FLOOR PLAN

A101SEP 15119.000

Page 245

Page 5: NorShor Arts Center Historic Renovation - Details

.......

Sherman Associates 233 Park Avenue South

Mlnneapolls, Minnesota 55415

NorShor Theatre Renovaton

211 E. Supei1or Slreet Duluth, MN 55802

PRELIMINARY 8-2-13

NOT FOR CONSTRUCTION

LOCATION KEY

I IER£BY CE!IFr ™'1 11tS PIAN. SPEllACAllOll. Oii REPOl!T WAS PIVNIED 8Y 11£ OR ll«lER Ill' Dll!rr SUP£RVISIOH ANO lHAT I AM A DUl.Y lmlSEl ARClllRT l.taR 1lE lAWS Of 11£ STAIE Of MINNESOTA

............,,..,,.._.. ________ UC."°-' ----"""' --

ARClflECT • EXTERIOR & SKYWAU< SlRUCTlJRAI. ENGllEER • SKYWAU<

11 Easl Superior 5""et, SUie 340 DIMI, MN 55802 218.724.8578 Mo.eom

ARCHITECT· THEATRE MECHANICAL ENGINEER · THEATRE & SKYWAIJ( ELECTRICAi. ENGllEER ·THEATRE &SKYWAU< AV ANO THEATRICAi. DESIGN

Westla ke Reed

Laskosky

1422 Eudid Avenua; Suite 300 Playhc>tlu Square Qoveland, Ohio 44 115

1218.522..1350 F 216.522.1357 www.Vt'Rldesign.com

0 Wesllake Reed Lesl<Dsl<y

SlR\/CTlJRAI. 8'Gllll1ER • THEATRE

I I I I I I I I I I I I I

AUDITORllM BELOW

lf\:i1 lj

D

D

D

Northland • --W'.102 South 21st Ava. Wast, Duluth, MN 55806 M 211-727-4995. (F) 218-727·7n9

- 1-~ 1­THIRD FLOOR PLAN

Third Floor Plan {Skywalk} ~---'I Annex

NorShor

A103SEP 15119.000

Page 246

Page 6: NorShor Arts Center Historic Renovation - Details

8-2-13

GAEYS

Sherman Associates 233 Palk Avenuti South

Minneapolls. Minnesota 55415

NorShor Theatre Renovaton

211 E.SuperiorStreet Cluluth,MN 55802

PRELIMINARY

NOT FOR CONSTRUCTION

OU>H

L LOCATION KEY

I tU£fn' CfRTFl' 1tW' lllS PlHt. ~Oii ll£l'Ol1r WAS PllPAA£D BY ME Oii lMOER llt OIAECT SVPEIMSION AND lHAT I AM A DUl.Y UC£NSED AACHITECT UNDER 11£ IAWS OF lffE STATE OF MINNESOTA

"'"''"'""' =HAMS:~~~~~~~

AACHllECT • EXTBOOR & SKVWAU< STRUCTURAi. ENGINEER· SKVWALK ,., 11 East SUpedor street, Sulle 340

1lo"'111,MN55802 218.724.8578 , ... tkda.com

TKDA

ARCHITECT· THEATRE MEaWICAI.ENGINEER· THEATRE & SKYWAU< El.ECTRICAL ENGINEER· THEATRE & SKYWAU< AV AND THEATRICAL DESIGN

1422 Eudld Avenue: Suite 300 Westl ake Playhouse~

Cloveland, Dhio44115Reed T 215.522.1350 Leskosky F 216.522. 1357 www.WRLdtslgn.com

0 Weslal<o Reed Loskosky

STRUC1lJRAt. ENGINEER· THEATRE

4~ NorthlandT_L -... ..... u.>.

102 Soult! 2tM Ave. Welt. DIAUD\. MN 55806 M?11-721'-6995.(F}21~m-1779

GOIGIS I- ! ­SECOND FLOOR PLAN

A102SEP. 15119.000

-D

D

D

Second Floor Plan (Lounge) ,___~_.I Annex

- NorShor

Page 247

Page 7: NorShor Arts Center Historic Renovation - Details

LOCATION KEY

8-2-13

Sherman Associates 233 Park Avenue South

MlnntlldS, Minnesota 55415

NorShor Theatre Renovaton

21 1 E. Superior Street Duluth, MN 55802

PRELIMINARY

NOT FOR CONSTRUCTION

1 7­

I HEMBY CDmfY THAT MS Pl.Ni. SP£Cl'lCl\1KlH, OR REPORT ft.AS PREPARm BY LIE OR UNDER MY OOECT SlJ>ERVIS»ON A.ND 1™.T I AM A DULY ucam> ARCllll:CT VHOOI THE UWS Of 11£ STATE OF MINNESOTA

""""""" ____ DAJe _ _ """""~--------LC.""'

ARCHITECT - EXTCRIOR &SKYWAU< STRUCTURAL ENGINEER• SKYWALK

11 East Superior Street. Sulll 340 DtJ\J1h, MN 55802 218.724.8578 llld>.C4111

ARCHITECT - THEATRE MECHANICAL ENGINEER· THEATRE & SK'IWALK EtECTRICAL ENGINEER· THEATRE & SK'IWALK AVANO lHEATRICAL DESIGN

1422 Eudld Avenue; Suite 300 Playhouse Square Qeveland, Ohlo 44115

Westlake

..

• n IX I 0

...~~c IT.o""A..:

.-_~l.

• •

Basement Floor Plan =~""""'='! Annex - NorShor

Reed T2t8.&22.1350Laskosky F 218.&22.1357 www.WRLdeslgt.com

O Wesllake Reod Leskosl<y

STRUCTURAL ENGINEER· lHEATRE

~Noctbland ~ Co!so61-W'.

102 ~ 21111 AltL Wat. ~MN55806 M 21• m-5995. <Fl t1• m..rrn1

- I-"" 1­sAsEMENr FLOOR

PLAN

A100SEP 15119.000

Page 248